1 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.461 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 16,618,500 CLASSROOMS / LIBRARY BUILDING GROSS SQUARE FEET 189,730 NUMBER OF BUILDING STORIES 3 BUILDING SURVEY DATE CCJM: Josh Polasky (M), Stanley Panek (E) ORIGINAL YEAR OF CONSTRUCTION /4/2013 B U I L D I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y TRADE E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR ($) GOOD ($) (5-10 YEARS) (10-20 YEARS) POOR ($) (1-5 YEARS) EXCELLENT ($) (20+ YEARS) TOTAL ($) $/GSF PERCENT OF BUILDING TOTAL (%) MECHANICAL 5,065,600 2,571,900 1,038,100 8,675, PLUMBING 1,393,500 1,050,600 22,200 2,466, FIRE PROTECTION 929, , ELECTRICAL 279,200 1,348, ,600 1,127,200 3,677, COMMUNICATIONS 68, , , TOTAL % OF TOTAL 7,667,500 5,039,300 2,762,300 1,149,400 16,618, CRITICAL ITEM REMEDIATION COST: $4,395,400 REFER TO CRITICAL ITEM SUMMARY ON FOLLOWING PAGE. NOTE: Cost Estimates are Construction Costs are in 2013 dollars to Replace in Kind unless otherwise noted PAGE 1

2 L A W B U I L D I N G C R I T I C A L I S S U E S S U M M A R Y CODE RELATED ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE PLUMBING Domestic Hot Water System Staff reports this system does not deliver hot water to bathroom sinks. Leading theory is that circulation pumps are insufficient and/or broken; however, both pumps are new in , , Exceeded Replace ELECTRICAL Emergency lighting System Major portions of the building (especially heavily student-used areas in the basement) do not have any emergency lighting fixtures. When power outages have occurred in the past, life safety concerns were raised because students were effectively trapped in the basement and unable to safely find their way to exits. This condition has not been addressed. 21,800 43, Years Replace CODE RELATED ITEMS COST 153, , SYSTEM/COMPONENT FAILURE ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE MECHANICAL Air Handling System Staff reports approximately 90% of building return air was cut off during 1990 s renovations major design flaw. Air circulation is extremely poor which accentuates cold/hot spots. Staff reports that parts of original building are not served at all. 3,288,400 0 #Div/0! Exceeded Replace HVAC Controls Thermostats throughout building are inconsistent due to poor system design. Numerous cold/hot spots exist as a result. Overcooling in the summer is an especially acute problem. Pneumatic lines have moisture issues and malfunction often. 954, , Exceeded Replace SYSTEM/COMPONENT FAILURE ITEMS COST 4,242, , NOTE: Cost Estimates are Construction Costs are in 2013 dollars to remediate noted issue. CRITICAL ISSUES COST 4,395,500 1,268, PAGE 2

3 Text106 M E C H A N I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y CHILLED WATER SYSTEM PROCESS COOLING SYSTEM STEAM AND CONDENSTATE SYSTEM HEATING HOT WATER SYSTEM SUPPLY AIR SYSTEM HVAC CONTROLS SYSTEM SYSTEM/COMPONENT Cooling System Process Cooling System Steam and Condensate System Heating Hot Water System Air Handling System Air Handling System 1950s AHUs Air Handling System 1990s AHUs HVAC Controls MECHANICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 130, , , , , ,700 1,038,100 1,038,100 3,288,400 3,288,400 2,457,500 2,457, , ,100 5,065,600 2,571,900 1,038,100 8,675, PAGE 3

4 Text6 C O O L I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed Equipment Tag - Manufacturer Model Number - HP/kW - Material - Recommendation Item ID Comments Critical Issues All cooling comes from 4 chillers and 2 cooling towers installed at different times throughout the 90s. The oldest of these are now at the end of their useful life and the newest have 5-10 years useful life remaining. 2 cooling towers on the roof serve all 4 chillers in the basement mechanical room. Chillers serve all AHUs in building. Glycol water system. Pipes from tower to chillers run down open shaft in center of building (see pictures 12 and 13). Chillers, cooling tower, and pumps are fully functional with no reported problems. See also pictures: 2 10, 12 27, Poor Remaining Useful Life 0-10 Years Nominal Useful Life: 30 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $130,400 Chillers = Continental, Carrier, Bohn, and Trane. Cooling tower = Baltimore Aircoil Company. Staff suggested this building be put on chilled water loop. Recommend chilled water loop hook-up and removal of all existing cooling equipment. There are frequent complaints of overcooling in the summer due to faulty thermostats. Faulty controls detailed in HVAC controls section PAGE 4

5 Text6 C O O L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Cooling towers (Baltimore Air Coil Company) Chiller #4 Chiller #3 (Carrier) Chiller #2 (Bohn) PAGE 5

6 Text6 P R O C E S S C O O L I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description 3 individual cooling units (2 Liebert and 1 Bard) cool specific rooms within the building. Units are 2-3 tons each. See also pictures 224, 225, 235, 276, 277. Overall Condition Fair Date Installed 1/1/1995 Remaining Useful Life 7 Years Nominal Useful Life: 30 Years Equipment Tag - Manufacturer Liebert (2) and Bard Manufacturing Company (1) Model Number - Serial Number - Size/Capacity Each unit is 2-3 tons. HP/kW - Voltage - Material - Replacement Cost $114,400 Comments There are frequent complaints of overcooling in the summer due to faulty thermostats. Critical Issues Faulty controls detailed in HVAC controls section PAGE 6

7 Text6 P R O C E S S C O O L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Liebert Unit (roof) Bard unit (roof) Bard unit tag Liebert unit (Southeast side of building) PAGE 7

8 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 1955 and 1995 Equipment Tag - Manufacturer - Model Number - HP/kW - Material - Recommendation Item ID Comments All heat in the building comes from campus steam, either directly or through a hot water system. Straight steam serves radiators and AHUs in the 1955 portion of the building; perimeter radiators, pipes, and condensate system are all from portion of building has a hot water (glycol) system serving AHUs and a perimeter fin tube radiation system. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $692,700 Replace all 1950s vintage equipment. Strongly recommend retro-commissioning report for this building. 1950s equipment has exceeded its useful life; pipes are in poor condition with significant corrosion. 1990s equipment has 15 years useful life remaining. Compared to the dysfunctional air handling and HVAC control systems, staff reports no problems with these steam systems. See also pictures: 34-51, 88, 116, , 209, 272, PAGE 8

9 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M S U R V E Y P H O T O G R A P H S Hot water pumps Campus steam entering building 1950s steam piping in poor condition 1990s vintage heat exchanger (with minor leak) PAGE 9

10 Text6 H E A T I N G H O T W A T E R S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Item ID Date Installed Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Recommendation - Campus steam serves 4 heat exchangers (glycol closed-loop system) which in turn serve heat coils, re-heat coils, and perimeter fin-tube radiators in the 90s additions of the building (approx. 90,000 sq/ft of building). 2 heat exchangers are located in basement mechanical room #006 and 2 are located in mechanical room #299 along with accompanying pumps. Good 1990s Remaining Useful Life 20 Years Nominal Useful Life: 30 Years Voltage - Replacement Cost $1,038, PAGE 10

11 Text6 H E A T I N G H O T W A T E R S Y S T E M S U R V E Y P H O T O G R A P H S Heat exchangers in room #006 Hot water pumps in room #006 Heat exchanger in room #299 Hot water pumps in room # PAGE 11

12 Text6 A I R H A N D L I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1955 Comments Critical Issues Critical Repair Estimate $3,288, AHUs serve building and are divided into old building 1950s vintage and renovation 1990s vintage. Original 1950s equipment was poorly integrated with equipment from 1990s renovations. This system has major design flaws. Equipment Tag 18 total AHUs. 05.AHU1, 54.AHU1 9, 79.AHU10, 92 AHU4 and 5, 92.AHU1 5. Manufacturer Model Number - HP/kW - Material - Recommendation Item ID Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number - Size/Capacity Voltage - Carrier and American Blower Varied Strong recommendation for retro commissioning on this building. Redesign entire air-handling system. Replace all 1950s vintage equipment (1990s is still useful). Replace HVAC control system. Built in 1956, the Law Building had major (wraparound and other) additions in 1993 and The original mechanical systems are poorly integrated with those from the additions creating many inconsistencies and problems. Staff reports approximately 90% of building return air was cut off during 1990 s renovations major design flaw. Air circulation is extremely poor which accentuates cold/hot spots. Staff reports that parts of original building are not served at all PAGE 12

13 Text6 A I R H A N D L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Typical 1950s AHU Cut off and capped return air ductwork in basement Typical 1990s AHU Cut off and capped return air ductwork in basement PAGE 13

14 Text6 A I R H A N D L I N G S Y S T E M S A H U S A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1955 Equipment Tag Manufacturer Model Number - HP/kW - Material - Recommendation Item ID Critical Issues Original 1950s equipment (9 AHUs) was poorly integrated with equipment from 1990s renovations. This system has major design flaws. Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Serial Number - Size/Capacity Voltage - 54.AHU1 54.AHU9 Replacement Cost $3,288,400 Carrier and Barry Blower Approximately 157,000 cfm total Replace all 1950s vintage equipment (1990s is still useful). Redesign entire air-handling system. Replace HVAC control system. Staff reports approximately 90% of building return air was cut off during 1990 s renovations major design flaw. Air circulation is extremely poor which accentuates cold/hot spots. Staff reports that parts of original building are not served at all PAGE 14

15 Text6 A I R H A N D L I N G S Y S T E M S A H U S S U R V E Y P H O T O G R A P H S Typical 1950s AHU Cut off and capped return air ductwork in basement Typical 1950s AHU Cut off and capped return air ductwork in basement PAGE 15

16 Text6 A I R H A N D L I N G S Y S T E M S A H U S A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1993 Equipment Tag Manufacturer Model Number - HP/kW - Material - Recommendation Item ID Critical Issues Original 1950s equipment (9 AHUs) was poorly integrated with equipment from 1990s renovations (7 AHUs). This system has major design flaws. Fair Remaining Useful Life 10 Years Nominal Useful Life: 30 Years Serial Number - Size/Capacity - Voltage - 92 AHU4, 92 AHU5, 92.AHU1 92.AHU5 Carrier Replacement Cost $2,457,500 Replace all 1950s vintage equipment (1990s is still useful). Redesign entire air-handling system. Replace HVAC control system. Staff reports approximately 90% of building return air was cut off during 1990 s renovations major design flaw. Air circulation is extremely poor which accentuates cold/hot spots. Staff reports that parts of original building are not served at all PAGE 16

17 Text6 A I R H A N D L I N G S Y S T E M S A H U S S U R V E Y P H O T O G R A P H S Typical 1990s AHU Cut off and capped return air ductwork in basement Typical 1990s AHU Cut off and capped return air ductwork in basement PAGE 17

18 Text6 H V A C C O N T R O L S A S S E S S M E N T D A T A Description Overall Condition Date Installed 1955 and 1999 Equipment Tag - Manufacturer - Model Number - HP/kW - Material - Recommendation Item ID Comments Critical Issues Critical Repair Estimate $954,100 Pneumatic controls for entire HVAC system. Staff describes controls as poor, inconsistent, and basically bad. Lines have recurrent moisture issue. Poor Remaining Useful Life Exceeded Nominal Useful Life: 18 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $954,100 Replace all HVAC controls. Built in 1956, the Law Building had major additions in 1993 and The original mechanical systems are poorly integrated with those from the additions creating many inconsistencies and problems. This is especially true for the HVAC control systems which are responsible for the majority of maintenance calls to the building. Thermostats throughout building are inconsistent due to poor system design. Numerous cold/hot spots exist as a result. Overcooling in the summer is an especially acute problem. Pneumatic lines have moisture issues and malfunction often PAGE 18

19 Text6 H V A C C O N T R O L S S U R V E Y P H O T O G R A P H S Pneumatic controls on AHU Johnson Controls Pureflow Compressor Typical thermostat Compressor and air dryer PAGE 19

20 Text106 P L U M B I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DOMESTIC COLD WATER SYSTEM PUMPS DOMESTIC HOT WATER SYSTEM PLUMBING FIXTURES SYSTEM STORM DRAINAGE SYSTEM SUB-SOIL DRAINAGE SYSTEM SYSTEM/COMPONENT Domestic Cold Water Piping Sewage Ejector Pumps Domestic Hot Water System Plumbing Fixtures Plumbing Fixtures - Kitchen Storm Drainage System Sub-Soil Drainage PLUMBING TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 238, ,700 1,050,600 1,050, , , , ,800 22,200 22, , ,900 28,500 28,500 1,393,500 1,050,600 22,200 2,466, PAGE 20

21 Text6 D O M E S T I C C O L D W A T E R P I P I N G A S S E S S M E N T D A T A Description Overall Condition Date Installed 1955 and 1995 Equipment Tag - Manufacturer - Model Number - HP/kW - Material Recommendation Item ID Comments Domestic water comes in through standard 6 campus water pipe. The piping is divided between that from the original 1955 building and the 1990s additions. Both vintages are in expected condition for their age. Original piping has exceeded its useful life, 1990s piping has years useful life left. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $238,700 Galvanized steel pipe Replace 1950s piping, keep 1990s piping. Despite critical rating, the domestic cold water system is fully functional and generates few maintenance calls PAGE 21

22 PAGE 22

23 Text6 S E W A G E E J E C T O R P U M P S S U R V E Y P H O T O G R A P H S Sewage pump system Pump switches Close up on pumps Second set of pump switches PAGE 23

24 Text6 D O M E S T I C H O T W A T E R S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1955 Equipment Tag - Manufacturer - Model Number - HP/kW - Material - Recommendation Item ID Critical Issues Critical Repair Estimate $131,200 Campus steam serves heat exchanger, storage tank, and two 1/6th HP circulation pumps. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $270,600 Repair or replace domestic hot water system. Staff reports this system does not deliver hot water to bathroom sinks. Leading theory is that circulation pumps are insufficient and/or broken; however, both pumps are new in PAGE 24

25 Text6 D O M E S T I C H O T W A T E R S Y S T E M S U R V E Y P H O T O G R A P H S Domestic hot water system Domestic hot water system different angle Circulation pump PAGE 25

26 Text6 P L U M B I N G F I X T U R E S A S S E S S M E N T D A T A Item ID Overall Condition Poor Date Installed 1950s and 1990s Remaining Useful Life 0-10 Years Nominal Useful Life: 50 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation - Replacement Cost $381,800 Comments Fixtures were installed at various times between 1955 and Poor rating is due to age, all fixtures are functional PAGE 26

27 Text6 P L U M B I N G F I X T U R E S S U R V E Y P H O T O G R A P H S Typical toilet Typical sinks Typical urinal Typical fountain PAGE 27

28 Text6 P L U M B I N G F I X T U R E S - K I T C H E N A S S E S S M E N T D A T A Item ID Overall Condition Excellent Date Installed 1/1/2000 Remaining Useful Life 37 Years Nominal Useful Life: 50 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation - Replacement Cost $22, PAGE 28

29 Text6 P L U M B I N G F I X T U R E S - K I T C H E N S U R V E Y P H O T O G R A P H S Kitchen sink Hobart dish washing system Garbage disposal and grease trap PAGE 29

30 Text6 S T O R M D R A I N A G E S Y S T E M A S S E S S M E N T D A T A Item ID Description The system consists of a rubberized roof with internal drains, 3 duplex sump pumps, and one single sump pump. Overall Condition Poor Date Installed 1/1/1955 Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation - Replacement Cost $473,900 Comments Poor rating is due to age only, everything is fully functional PAGE 30

31 Text6 S T O R M D R A I N A G E S Y S T E M S U R V E Y P H O T O G R A P H S Sump pump Second sump pump Third sump pump Fourth sump pump (90s vintage) PAGE 31

32 Text6 S U B - S O I L D R A I N A G E A S S E S S M E N T D A T A Description Overall Condition Item ID Date Installed 1/1/1955 Equipment Tag - Manufacturer - Model Number - HP/kW - Material - Recommendation - Comments Drainage for this building is reported as good. There is no other information. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $28,500 There used to be a cooling tower in the basement which was vented outside through an open shaft (room #6). Water from the tower saturated the brick in the area and staff reports lingering mold problems PAGE 32

33 Text6 S U B - S O I L D R A I N A G E S U R V E Y P H O T O G R A P H S Old cooling tower shaft PAGE 33

34 Text106 F I R E P R O T E C T I O N D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y FIRE ALARM SYSTEM SYSTEM/COMPONENT Fire Alarm System Fire Suppression System FIRE PROTECTION TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 370, , , , , , PAGE 34

35 Text6 F I R E A L A R M S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1994 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID Critical Issues Addressable Fire Alarm System. - System includes Horns, Heat detectors,pull Stations,Smoke Detectors, Beam Detectors,Duct mounted Smoke Detectors and Strobes Panel location Upper Lobby Poor Remaining Useful Life 5 Years Nominal Useful Life: 20 Years Serial Number Size/Capacity Voltage Nor applicable Pyrotronics/Siemens MXL Not Applicable Not Applicable Not Applicable 12 V Not Applicable Replacement Cost $370,900 Migration to XLS or latest system Replacement or refurbishing Smoke detectors PAGE 35

36 Text6 F I R E A L A R M S Y S T E M S U R V E Y P H O T O G R A P H S Fire Alarm Panel Horn /Strobe Horn/strobe in Mechanical room Duct Smoke detector PAGE 36

37 Text6 F I R E S U P P R E S S I O N S Y S T E M A S S E S S M E N T D A T A Description Standpipes are from 1955 and 1990s, depending on section of building, and cover entire building. Sprinkler system installed in 1963 covers Room 215 (about 1200 sq feet). Entire new section of building is sprinkled, with fire pump and backflow preventer (about 90,000 sq/ft). Overall Condition Date Installed 1/1/1955 Equipment Tag - Manufacturer - Model Number - HP/kW - Material - Recommendation Item ID Poor Remaining Useful Life Exceeded Nominal Useful Life: 20 Years Serial Number - Size/Capacity - Voltage - Replacement Cost $558,200 Recommend replacing standpipes and sprinklers with one system that covers entire 189,000 sq/ft building. Comments Standpipes have exceeded their useful life; the sprinkler system is just at the end of its useful life. Also see pictures 136, 137, 139, 140, 162, PAGE 37

38 Text6 F I R E S U P P R E S S I O N S Y S T E M S U R V E Y P H O T O G R A P H S Sprinkler piping and backflow preventer Sprinklers Standpipe Sprinkler head PAGE 38

39 Text106 E L E C T R I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y MEDIUM VOLTAGE SYSTEM SUBSTATION SWITCHGEAR LOW VOLTAGE SYSTEM EMERGENCY POWER SYSTEM INTERIOR LIGHTING EMERGENCY LIGHTING SYSTEM EXIT LIGHTING SYSTEM EXTERIOR LIGHTING SYSTEM SYSTEM/COMPONENT Medium Voltage System Substation Substation#2 Load Center Lightning Protection Low Voltage Distribution Emergency Power System Interior lighting System Emergency lighting System Exit lighting EXTERIOR LIGHTING ELECTRICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 569, , , , , ,000 44,700 44,700 99,500 99,500 1,085,000 1,085, , ,400 1,127,200 1,127,200 43,600 43,600 15,700 15,700 22,300 22, ,200 1,348, ,600 1,127,200 3,677, PAGE 39

40 Text6 M E D I U M V O L T A G E S Y S T E M A S S E S S M E N T D A T A Item ID Description 4160 V - 3 Phase Load Center located in Rm#308 provides power and protection for Substation #1 and Substation #2 Overall Condition Good Date Installed 1/1/1994 Remaining Useful Life 20 Years Nominal Useful Life: 40 Years Equipment Tag Not Applicable Manufacturer S&C Model Number Not Applicable Serial Number Not Available Size/Capacity 600 Amp HP/kW Not Applicable Voltage 4160 V Material Not Applicable Recommendation - Replacement Cost $569, PAGE 40

41 Text6 M E D I U M V O L T A G E S Y S T E M S U R V E Y P H O T O G R A P H S Load center In Vault located South of the Building Substation #1-120/208 V Substation #2-277/480 V PAGE 41

42 Text6 S U B S T A T I O N A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1968 Equipment Tag Manufacturer Model Number HP/kW Material Recommendation Item ID /128/208 V Substation wit 750 KVA transformer, Main Breaker for Lighting,Main Breaker for Power and (15) individual Breakers, Metering Section and KWH Meter. Poor Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Serial Number Size/Capacity Voltage No tag GE AK-4-75 Not Applicable Copper bus Replacement Cost $256,900 CW19620 job number 3000 A main bus 4160/120/208V Replacement due to due to age PAGE 42

43 Text6 S U B S T A T I O N S U R V E Y P H O T O G R A P H S Substation #1 -pic 1 Substation transformer-750va Substation #1 -pic 2 Substation #1 -pic PAGE 43

44 Text6 S U B S T A T I O N # 2 A S S E S S M E N T D A T A Item ID Description 4160/277/480 V Substation750 KVA transformer,(5) Fuse/Switch section, Metering Section KWH Meter # , 100,0000RMS Short Circuit Current Overall Condition Good Date Installed 1/1/1992 Remaining Useful Life 20 Years Nominal Useful Life: 40 Years Equipment Tag No tag Manufacturer Siemens Model Number Series 6 Serial Number Size/Capacity 1200 A Bus HP/kW Not Applicable Voltage 4160/480/277 V Material Copper bus Recommendation Maintenance of Breakers per manufacturer recommendation Replacement Cost $293, PAGE 44

45 Text6 S U B S T A T I O N # 2 S U R V E Y P H O T O G R A P H S Substation #2 Substation transformer Substation Tag Metering Section PAGE 45

46 Text6 L O A D C E N T E R A S S E S S M E N T D A T A Item ID Description 4160 V # phase Load Center (Switchgear) a Short circuiting rating Overall Condition Good Date Installed 1/1/1992 Remaining Useful Life 20 Years Nominal Useful Life: 40 Years Equipment Tag Feed from LC #37-3 Manufacturer S&C Model Number CDA Serial Number Not Available Size/Capacity A S/F HP/kW Not Applicable Voltage 4160 V Material Copper bus Recommendation - Replacement Cost $44, PAGE 46

47 Text6 L O A D C E N T E R S U R V E Y P H O T O G R A P H S Load Center Load Center Data PAGE 47

48 Text6 L I G H T N I N G P R O T E C T I O N A S S E S S M E N T D A T A Item ID Description Lighting Protection for entire structure repair in one section is required. Overall Condition Fair Date Installed 1/1/1980 Remaining Useful Life 7 Years Nominal Useful Life: 40 Years Manufacturer Not Applicable Model Number Lightning Protection Serial Number Not Applicable Size/Capacity Not Applicable HP/kW Not Applicable Voltage Not Applicable Material copper Recommendation - Replacement Cost $99,500 Critical Issues Repairs to Lighting Protection Cable and supports are necessary PAGE 48

49 Text6 L I G H T N I N G P R O T E C T I O N S U R V E Y P H O T O G R A P H S Lighting Protection -pic #1 Lighting Protection -pic #2 Lighting Protection -pic # PAGE 49

50 Text6 L O W V O L T A G E D I S T R I B U T I O N A S S E S S M E N T D A T A Description During 1992 remodeling 18 panelboards were added and majority of existing panelboards were replaced. Original panelboards located mainly in Basement area are subject to upgrade. Overall Condition Date Installed Equipment Tag Manufacturer Model Number Item ID HP/kW Material Fair 1954 and 1992 and Remaining Useful Life Nominal Useful Life: 40 Years Serial Number Size/Capacity Voltage Recommendation - Not Applicable Siemens Not Applicable Not Applicable Not Applicable Not Applicable Cooper Bus Replacement Cost $1,085, /208 V and 277/480 volt PAGE 50

51 Text6 L O W V O L T A G E D I S T R I B U T I O N S U R V E Y P H O T O G R A P H S Distribution Panelboard-1992 Original vintage panelboard Lighting and receptacle panelboard Typical Panelboard PAGE 51

52 Text6 E M E R G E N C Y P O W E R S Y S T E M A S S E S S M E N T D A T A Item ID Description Battery bank and inverter provides power to Lighting and Exit Signs. Inverter was replaced in Overall Condition Fair Date Installed 1/1/1994 Remaining Useful Life 5 Years Nominal Useful Life: 25 Years Equipment Tag Not Applicable Manufacturer Not Applicable Model Number Not Applicable Serial Number Not Applicable Size/Capacity 30 Amp HP/kW Not Applicable Voltage 277 V and 120V Material not applicable Recommendation Replacement Batteries at the end of useful life Replacement Cost $120, PAGE 52

53 Text6 E M E R G E N C Y P O W E R S Y S T E M S U R V E Y P H O T O G R A P H S Emergency Battery banks Emergency inverter Emergency Panel A-277 V-1992 Emergency Lighting pane 120 V PAGE 53

54 Text6 I N T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Majority of fixtures were replaced in Auditorium lighting was upgraded in Lamp /ballast replacement was completed in Overall Condition Excellent Date Installed 1/19/2009 Remaining Useful Life 21 Years Nominal Useful Life: 25 Years Equipment Tag Not Applicable Manufacturer Not Applicable Model Number No applicable Serial Number Not Applicable Size/Capacity Not Applicable HP/kW Not Applicable Voltage 277 V Material Not Applicable Recommendation - Replacement Cost $1,127,200 Comments Tunnel lighting requires improvements PAGE 54

55 Text6 I N T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Typical office Lighting Corridor Lighting Auditorium lighting Lobby Lighting PAGE 55

56 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 01/01/1994 Equipment Tag Manufacturer Model Number Item ID HP/kW Material Critical Issues Critical Repair Estimate $21,800 Selected light fixtures in public area are connected to emergency system. Auditoriums have an additional Battery operated self contained units. Central Battery Bank provides power to Emergency Panelboards serving emergency lights during loss of normal power. Fair Remaining Useful Life 10 Years Nominal Useful Life: 25 Years Serial Number Size/Capacity Voltage Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable 277V and 120 V Not Applicable Replacement Cost $43,600 Major portions of the building (especially heavily student-used areas in the basement) do not have any emergency lighting fixtures. When power outages have occurred in the past, life safety concerns were raised because students were effectively trapped in the basement and unable to safely find their way to exits. This condition has not been addressed PAGE 56

57 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Battery Banks -Back-up for Emergency Lighting Dual Head Battery Lights in Auditorium PAGE 57

58 Text6 E X I T L I G H T I N G A S S E S S M E N T D A T A Item ID Description Exit Sign Overall Condition Good Date Installed 1/1/1994 Remaining Useful Life 10 Years Nominal Useful Life: 25 Years Equipment Tag Not Applicable Manufacturer Not Available Model Number Not Available Serial Number Not Applicable Size/Capacity Standard HP/kW Not Applicable Voltage 277 V Material Brush Aluminum Recommendation - Replacement Cost $15, PAGE 58

59 Text6 E X I T L I G H T I N G S U R V E Y P H O T O G R A P H S Typical Exit Sign Sign at the auditorium doors Recessed exit Sign PAGE 59

60 Text6 E X T E R I O R L I G H T I N G A S S E S S M E N T D A T A Item ID Description Exterior lighting consist of ceiling mounted mercury vapor lights with prismatic lens and wall mounted fixtures. Overall Condition Poor Date Installed 1/1/1994 Remaining Useful Life 5 Years Nominal Useful Life: 25 Years Equipment Tag Not Applicable Manufacturer Not Applicable Model Number Not Applicable Serial Number Not Applicable Size/Capacity Not Applicable HP/kW Not Applicable Material Not Applicable Recommendation Replacement of mercury vapor fixtures with more efficient lighting. Replacement Cost $22,300 Critical Issues Provide more lights at Loading dock area PAGE 60

61 Text6 E X T E R I O R L I G H T I N G S U R V E Y P H O T O G R A P H S South elevation Overhang Lighting Loading Dock Lighting PAGE 61

62 Text106 C O M M U N I C A T I O N S D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DATA SYSTEM CABLE TV SYSTEM SECURITY ACCESS CONTROL SYSTEM SYSTEM/COMPONENT Communication Infrastructure System Cable TV Access Control COMMUNICATIONS TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 690, ,900 68,400 68, , ,700 68, , , PAGE 62

63 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M A S S E S S M E N T D A T A Item ID Description The building is fed with 12 strands of single mode fiber, multi-mode fiber and 550 copper pairs with each pair grounded and individually protected by a fuse/surge arrestor. Fiber and copper originate from Node #2. The building IDF is located in room 49 on the basement level. Fiber distributes radially from the building IDF to hub rooms (telecommunication rooms) to within 100 meters of end-use equipment and lands at rack mounted fiber switches within the hub rooms. Overall Condition There are three hub rooms located within the building - hub A in room 50 on the basement level feeds the lower portion of the building; hub B in room 162A on the first floor feeds the east portion of the building; and hub C in room 242K on the second floor feeds the west portion of the building. Hub room B was not surveyed due to class activities. Each hub room is equipped with free standing rack (four in hub A, two in hub B and three in hub C) and wire management. Hub rooms A and C have technology ground bars tied into the building grounding system (Hub B not surveyed). Hub rooms A and C have dedicated electrical panels. Hub rooms A and C have smoke or sprinkler protection. Hub rooms A and C have dedicated a/c fan-coil units fed from the campus chilled water loop (Liebert). Outlet standards typically have 1"C stubbed to cable management. Standard outlet consists of two network cables and two data jacks. Station cable consists of Cat 5, Cat 5e, Cat 6 and Cat 6e (Mohawk). The building is typically equipped with WIFI throughout (coverage not noted). Good Date Installed UIUC network upgrade complete (date range 2006 to 2012) Remaining Useful Life 20 Years Nominal Useful Life: 20 Years Replacement Cost $690, PAGE 63

64 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M S U R V E Y P H O T O G R A P H S Building 156 Hub Room A Building 156 Hub Room C Building 156 Hub Room Electrical Panel Building 156 IDF PAGE 64

65 Text6 C A B L E T V A S S E S S M E N T D A T A Item ID Description COMCAST Cable TV Overall Condition Fair Date Installed 1/1/2001 Remaining Useful Life 8 Years Nominal Useful Life: 20 Years Equipment Tag Not Applicable Manufacturer Not Applicable Model Number Not Applicable Serial Number Not Applicable Size/Capacity Not Applicable HP/kW Not Applicable Voltage Not Applicable Material Not Applicable Recommendation - Replacement Cost $68, PAGE 65

66 PAGE 66

67 Text6 A C C E S S C O N T R O L A S S E S S M E N T D A T A Item ID Description Card Access system Overall Condition Good Date Installed 1/1/2006 Remaining Useful Life 10 Years Nominal Useful Life: 20 Years Equipment Tag Not applicable Manufacturer Not Applicable Model Number Not Applicable Serial Number Not Applicable Size/Capacity Not Applicable HP/kW Not Applicable Voltage Not Applicable Material Not Applicable Recommendation - Replacement Cost $110, PAGE 67

68 Text6 A C C E S S C O N T R O L S U R V E Y P H O T O G R A P H S Card reader at main entry Card reader at classroom entry PAGE 68

69 Text6 L E G A C Y A S S E T D E S C R I P T I O N : L A W B U I L D I N G The Law Building consists of classrooms, classroom computer laboratories, mechanical and electrical rooms, information technology rooms, conference rooms, offices, library stacks, library reading rooms, a kitchen, and a bookstore. This building is classified by the Life Safety Code as Mixed Occupancy; part Assembly, part Business. Assembly occupancies are located in Room 040, 042, 142A, 142U, 142V, 154, 155, 158, 162, 166, 169, 171, 172, 179B, 181, 208, and 242. The remaining portion of the building is business occupancy. The Law Building is a partially sprinklered building containing a manual fire alarm system at every exit. A partial automatic fire alarm system is located in the following areas: smoke detectors are located in Room 154, 158, 162, 144, corridor 146, corridor 145, corridor 117, corridor 2011, corridor 200, corridor 311, and Stair 2. Occupant notification is by audible and visual alarms and is located: at every exit and throughout the majority of the occupied areas in the building. The portions of the basement that are non-sprinklered include: Basement - the library stacks, mechanical rooms, and locker area 056; First Floor - Room 154, 158, 162, 166, 171, the library stacks, Room 174, 174A, and 174B; Second Floor - the library stacks, Room 241, 241A, 241B, 241C, and 241G. A standpipe system with 2-1/2" hose connections is throughout the building. The kitchen is equipped with an chemical automatic suppression system in the hood exhaust. Partial emergency lighting is in the following areas: Room 042, 154, 158, 162, corridor 1009 and 1007, Room , The fire alarm control panel, located on the first floor in vestibule 148, is a Cerebus Pyrotronics Model XL3. OCCUPANT LOAD/EXITING Basement: 437 occupants; two exits required (6 total exits provided including 4 open stairs that does not meet the requirements as an exit); the exit width required, including stairs/doors, provides capacity for 803 occupants and 460 without the open stairs. The stair width for Stair 1, 2, 3, and 5 is insufficient for occupants served. First: 1821 occupants; 4 exits required (10 exits provided); 364-inch exit door width required (558-inch provided). Door widths are sufficient for occupants serving first floor only and for occupant discharge from both the basement and second floor (385-inch required, 558-inch provided). Second: 634 occupants; three exits required (7 exits provided including 4 open stairs that do not meet the requirements as an exit); the exit width required, including stairs/doors, provides capacity for 1,033 occupants and 564 without the open stairs. Door widths are sufficient for occupants served. Stair width for Stairs 4, 5, and the unnumbered stairway in the library reading room are insufficient for occupants served. Third: 80 occupants; two exits required (3 exits provided including 1 open stairs that does not meet the requirements as an exit); the exit width required, including stairs/doors, provides capacity for 457 occupants and 300 without the open stairs. Door and stair widths are sufficient for occupants served PAGE 69

70 L A W B U I L D I N G L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS ITEMS REQ /8/2002 Stairs: Replace Non-Compliant Stairs at 175, , ,400 Library REQ /8/2002 ADA: Misc. Items are Not ADAAG Compliant 51, ,600 51, REQ /8/2002 Flooring: Replace Carpet (Near Term) 101, , , REQ /8/2002 Rail: Paint Ramp Rails and Bike Rack 2, ,400 2, REQ /8/2002 Wall Surfaces: Refinish Replace at Lecture 71, ,400 71,400 Areas REQ /8/2002 Stairs: Refinish Wood Handrail at Library 2, ,900 2,900 Stair Rails and Guards REQ /8/2002 Wall Surfaces: Refinish/ Replace at Academic Areas 27, ,600 27, REQ /8/2002 Flooring: Replace VAT 389, , , REQ /8/2002 Flooring: Replace Carpet (Mid Term) 108, , , REQ /8/2002 Atrium Space: Non-Compliant at Library 65, ,200 65, REQ /8/2002 Mezzanine Area/Egress: Non-Compliant at 236, , ,800 Library REQ /8/2002 Safety: Correct Non-Compliant Newspaper Storage 97, ,800 97, REQ /8/2002 Ceilings: Modify Non-Compliant Heights 43, ,300 43, REQ /8/2002 Partitions: Replace Non-Compliant Glazed Partitions at Library 7, ,100 7, REQ /8/2002 Exits: Additional Exits at Classrooms ABC and Courtroom REQ /8/2002 Pest Infestation: Eliminate 3, ,300 3, REQ /8/2002 SIte Drainage: Improve 11, ,500 11, REQ /8/2002 Site Amenities: Repair Planters, Sidewalks, 5, ,800 5,800 etc REQ /8/2002 Ceiling: Replace ACT (Near Term) 117, , , REQ /8/2002 Ceiling: Replace ACT (Mid Term) 58, ,700 58, PAGE 70

71 L A W B U I L D I N G L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER REQ REQ REQ REQ REQ REQ INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE 10/8/2002 Structure: Investigate Leaks at Foundation 36, ,900 36,900 Wall 11/29/2004 Vertical Openings: Library 471, , ,100 11/12/2004 Means of Egress: Stair Enclosure 21, ,300 21,300 11/29/2004 Fire Barrier Penetrations Building Wide 33, ,900 33,900 11/24/2004 Means of Egress: Protected Enclosure 18, ,500 18,500 Openings 11/29/2004 Means of Egress: Obstructed Exits POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS TOTALS 2,160, ,423,000 11, ,800 2,160,400 MEP LEGACY ITEMS ITEMS REQ /8/2002 Assisted Listening System: Add 63, ,600 63,600 Poor = VFA Priorities 1,2, and 3; Fair VFA Priority 4; and Code VFA Priority 5 MEP LEGACY ITEMS TOTALS 63, ,600 63,600 TOTALS 2,223, ,423,000 11, ,400 2,223,900 % OF LEGACY VALUE PAGE 71

72 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition There are three stairways, which connect the library levels. Two of these connect the library from the basement level to the 2nd floor level. The third connects the 1st and 2nd floor levels. These stairs lack compliant widths, rail heights and riser and tread dimensions. The two stairs, which connect to the basement level, are enclosed and are required to be enclosed and rated. The rails around the 2nd floor floor opening in the library and the stair near the classrooms are 36" ADAAG and BOCA require that a guard rail be 42" high. Accessibility Stairs: Replace Non-Compliant Stairs at Library (Legacy) Critical Percent Complete 0.0 Recommendation Replace existing stairs with compliant stairs. Replace doors and frame at basement level. Replace guardrail at second floor library. Replace guardrail at stair near classrooms. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 175, Estimated Remaining Cost: 175, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description All interior/exterior spaces, namely the four lecture halls, with fixed seating of 50 or more, must have a Assistive listening system per UBC , and ADAAG 4.1.3(19)(b). Requirement Category Requirement Name Condition Accessibility Assisted Listening System: Add (Legacy) Critical Percent Complete 0.0 Recommendation All interior/exterior spaces with 50 or more fixed seats must have an Assistive listening system with special communication ports in place as per UBC to comply with CABO/ANSI A Install in each of the floor auditoriums. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 63, Estimated Remaining Cost: 63, PAGE 72

73 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The following items were noted: The counter at the cafeteria and the snak area exceed the 34" permitted by ADAAG Section 4. The sink and faucets at the sink snack area are also not compliant. The door to Stair (adjacent to hall 252) lacks compliant hardware and latch clearance. The drinking fountain near the cafeteria protrudes more than 4" from wall. Accessibility ADA: Misc. Items are Not ADAAG Compliant (Legacy) Critical Percent Complete 0.0 Recommendation Modify counter and cabinets for compliance to wheelchair accessibility. Correction also assumes and upper cabinet is lowered to within height range and sink is replaced. Relocate door and replace hardware. Provide recess for drinking fountain. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 51, Estimated Remaining Cost: 51, PAGE 73

74 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description The carpeting in the Classroom D (Rm # 166), the Auditorium, and the Courtroom are currently worn and ready for replacement or will likely be in the next 2 years. It is also recommended that the carpet in the reading/stack areas of the library be replaced in this time frame concurrently with removal of VAT (refer to separate deficiency for VAT removals). Note: All or some of this work may be included under a FY 2000 project Remodel Academic and Student Areas, scheduled to be completed in 8/01. Carpeting in classrooms A, B, and C were reported to have been replaced in Requirement Category Requirement Name Condition Appearance Flooring: Replace Carpet (Near Term) (Legacy) Poor Percent Complete 0.0 Recommendation Replace carpeting in Classroom D (Rm # 166), the Auditorium, and the Courtroom. Also replace carpet in the reading/stack areas of the library. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 101, Estimated Remaining Cost: 101, Action Date 10/8/ PAGE 74

75 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The paint finish is deteriorated at the ramp rails near the loading dock (southeast corner). Appearance Rail: Paint Ramp Rails and Bike Rack (Legacy) Poor Percent Complete 0.0 Recommendation Repaint rails A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 2, Estimated Remaining Cost: 2, Action Date 10/8/ PAGE 75

76 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Refinish wood paneling and replace VWC and acoustic wall materials in Classroom A, B and C. Note: All or some of this work may be included under a FY 2000 project Remodel Academic and Student Areas, scheduled to be completed in 8/01. The wood paneling in A, B, and C have been refinished and the vinyl wall covring the instructor area have been replaced in however the Acoustic wall materials in the room are now in a significantly deteriorated state as well as the items in classroom D and the auditorium. Requirement Category Requirement Name Condition Appearance Wall Surfaces: Refinish Replace at Lecture Areas (Legacy) Poor Percent Complete 0.0 Recommendation Replace acoustic materials. Carpenter labor is for preparing wood surfaces. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 71, Estimated Remaining Cost: 71, Action Date 10/8/ PAGE 76

77 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The finish at the wood handrail portion of the stiar and well opening rails in the Library and the rails at the stairs near the classrooms is wearing. Also refer to separate deficiency for replacement of rails and guards due to lack of code conformance. Appearance Stairs: Refinish Wood Handrail at Library Stair Rails and Guards (Legacy) Poor Percent Complete 0.0 Recommendation Refinish wood handrails. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 2, Estimated Remaining Cost: 2, Action Date 10/8/2007 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Refinish wood paneling and replace VWC and acoustic wall materials in Classroom D, Auditorium, the corridor sides of classrooms and Courtroom concurrent with replacement of other finshes. Appearance Wall Surfaces: Refinish/ Replace at Academic Areas (Legacy) Poor Percent Complete 0.0 Recommendation Refinish wood paneling, replace VWC and acoustic materials. Carpenter labor is for preparing wood surfaces. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 27, Estimated Remaining Cost: 27, Action Date 10/8/ PAGE 77

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE 0222 54 EAST GREGORY DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.722 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,473,300 DISTRIBUTION BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/5/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/5/2013 BUILDING SURVEY DATE 0062 1105 WEST NEVADA STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.850 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,286,000 LABORATORY BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/19/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/19/2013 BUILDING SURVEY DATE 0154 52 EAST GREGORY DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.646 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,203,500 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/4/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/4/2013 BUILDING SURVEY DATE 0218 504 EAST ARMORY AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.764 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,714,300 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE 0134 614 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.528 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 495,100 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/13/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/13/2013 BUILDING SURVEY DATE 0197 1102 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.644 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 11,554,400 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE 0171 1503 SOUTH MARYLAND DRIVE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.770 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,686,100 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE 0004 1103 SOUTH SIXTH STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.810 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,831,000 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/17/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/17/2013 BUILDING SURVEY DATE 0039 1114 WEST NEVADA STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.766 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 9,578,600 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE 0358 1004 SOUTH FOURTH STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.508 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,281,700 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE 0040 1402 WEST PENNSYLVANIA AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.685 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,364,800 LECTURE HALL BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE 0002 1301 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.862 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 746,400 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE 0238 URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.183 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,237,600 OFFICE BUILDING GROSS SQUARE FEET 18,054 NUMBER OF BUILDING

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE 0110 23 EAST STADIUM DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.838 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,161,900 LABORATORY BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/3/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/3/2013 BUILDING SURVEY DATE 0006 505 EAST AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.492 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 10,114,300 BUILDING GROSS SQUARE FEET 260,748 NUMBER

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE 0220 500 EAST PEABODY DRIVE CHAMPIAGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.364 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,262,400 MUSEUM BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/6/2013 BUILDING SURVEY DATE 0133 608 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.516 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 646,900 PARKING STRUCTURE BUILDING GROSS

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information

Washingtonville Central School District Building Condition Survey Five Year Plan

Washingtonville Central School District Building Condition Survey Five Year Plan Building Condition Survey Five Year Plan Project Cost Summary Building 2011 2012 2013 2014 2015 Totals 0001 Washingtonville Jr High School $38,759 $325,990 $1,882,653 $1,417,341 $1,025,559 $4,690,302 0002

More information

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus Dashboard

More information

Harnett Central Middle

Harnett Central Middle NC School District/430 Harnett County/Middle School Harnett Central Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Anderson Creek Primary

Anderson Creek Primary NC School District/430 Harnett County/Elementary School Anderson Creek Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

BUILDING SUBCODE FEES:

BUILDING SUBCODE FEES: Building Sub-code PERMIT FEES TOWNSHIP OF PENNSVILLE 2011 (A 4-2011) 1. Plan review shall be 20% of the amount to be charged for a construction permit. a. The fee for plan review for elevator devices in

More information

Sagamore Hills Elementary

Sagamore Hills Elementary DeKalb County School District/Elementary Schools Sagamore Hills Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Mountain Heritage High

Mountain Heritage High NC School District/995 Yancey County/High School Mountain Heritage High Final Campus Assessment Report March 12, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 7 Campus

More information

Davie County Early College High

Davie County Early College High NC School District/300 Davie County/High School Davie County Early College High Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Bob Mathis Elementary

Bob Mathis Elementary DeKalb County School District/Elementary Schools Bob Mathis Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

BUILDING PERMIT FEES

BUILDING PERMIT FEES BUILDING PERMIT FEES 1. Building Permit Fee Based on the Construction Valuation of the project excluding site work. Refer to Fee Charts below. Electrical, Mechanical and Plumbing permits are not included

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Lilesville Elementary

Lilesville Elementary NC School District/040 Anson County/Elementary School Lilesville Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

1. The fee for plan review shall be due upon completion of subcode review.

1. The fee for plan review shall be due upon completion of subcode review. New Jersey State permit surcharge fees: Amount: This fee shall be in the amount of $0.00334 per cubic foot volume of new buildings and additions. Volume shall be computed in accordance with N.J.A.C. 5:232.28.

More information

Harnett Central High

Harnett Central High NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

Lafayette Elementary

Lafayette Elementary NC School District/430 Harnett County/Elementary School Lafayette Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5

More information

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary

More information

Pinebrook Elementary

Pinebrook Elementary NC School District/300 Davie County/Elementary School Pinebrook Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

Central Davie Academy

Central Davie Academy NC School District/300 Davie County/High School Central Davie Academy Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

What did they tell me?

What did they tell me? LBS Insurance Commission Oct 25, 2018 What did they tell me? Handouts from the October 25, 2018 Insurance Town Hall C R. Reynolds 1 High Level Recap of Changes for 2018-19 Deductible $5,000 -> $25,000

More information

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS

TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER 190-2 OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS WHEREAS, it is the desire of the Township Committee of the Township of Franklin,

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

Building Permit Fees

Building Permit Fees Permit Center 210 Lottie Street, Bellingham, WA 98225 Phone: (360) 778-8300 Fax: (360) 778-8301 TTY: (360) 778-8382 Email: permits@cob.org Web: www.cob.org/permits Building Permit Fees This handout includes

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

Building Division Fees 2018

Building Division Fees 2018 Building Division Fees 2018 Permit Administration A permit administration fee of $45.00 shall be assessed for each permit. Staff Consultation Fee $75.00 Administration Determination $90.00 / hour; $23.00

More information

William Bradley Bryant Center

William Bradley Bryant Center DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED

CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING PERMIT FEES SERVICE PROPOSED FEE RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation $18.00 Building Permit $501-$2,000 Valuation $18 + $2.40 for

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Our Focus: Your Future

Our Focus: Your Future Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS

More information

Facility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA

Facility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA AGENDA benefits & limitations Rod Moore, RA, LEED AP, PMP Georgia Tech Benjamin Dutton, FFB, MCIOB, MRICS Faithful+Gould GT Facilities GT Program What is GT FCA Deliverables How GT uses FCA Information

More information

Marion County Marion Public County Works Public Building Works Inspection Division

Marion County Marion Public County Works Public Building Works Inspection Division FEE SCHEDULE The final determination of valuation, occupancy, and/or construction type under any of the provisions of this order shall be made by the Building Official. A. Structural Permits: The valuation

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

CITY OF TAMARAC BUILDING DEPARTMENT Schedule of Permit Fees

CITY OF TAMARAC BUILDING DEPARTMENT Schedule of Permit Fees CITY OF TAMARAC BUILDING DEPARTMENT Schedule of Permit Fees SECTION I: As set forth in Section 105 of the Broward County Amendments to the 5th Edition (2014) Florida Building Code, it is unlawful for any

More information

Stone Mountain Middle

Stone Mountain Middle DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

REPLACEMENT RESERVE GUIDE

REPLACEMENT RESERVE GUIDE CANADA MORTGAGE AND HOUSING CORPORATION REPLACEMENT RESERVE GUIDE What is the Replacement Reserve? The replacement reserve is a fund kept by each housing sponsor under the terms of its operating agreement

More information

William Ellis Middle

William Ellis Middle NC School District/300 Davie County/Middle School William Ellis Middle Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta Entuitive Corporation Calgary + Toronto Howsyth Court Condominium Corporation No. CCN9011190 305 25 Avenue SW Calgary, Alberta Submitted By: Entuitive Corporation 209 8 th Avenue SW, Suite 300 Calgary,

More information

Questions by Vendors: District Answers are in Red. Vendor Questions are in Black.

Questions by Vendors: District Answers are in Red. Vendor Questions are in Black. Questions by Vendors: District Answers are in Red. Vendor Questions are in Black. 1. Can we receive a final Excel Sheet of all Facilities that includes physical addresses, square foot info and original

More information

CAPITAL RESERVE FUNDING ANALYSIS

CAPITAL RESERVE FUNDING ANALYSIS CAPITAL RESERVE FUNDING ANALYSIS FOR BROADWAY HOUSING, LLC 625 SW Jackson Portland, OR Prepared by: Capital Reserve Consultants, LLC Carson M. Horton, RS April 2014 Copyright 2014 USA / Canada 503 336

More information

NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Protecting your older home

Protecting your older home Protecting your older home HOMEOWNERS INSURANCE Helping you protect your biggest investment: your home At Travelers, we care about our homeowners. We want you to get the most out of the older home you

More information

Equipment Breakdown from Prepared Insurance Homeowners

Equipment Breakdown from Prepared Insurance Homeowners Equipment Breakdown from Prepared Insurance Homeowners Exposures Clothes Washers and Dryers Prepared Insurance is pleased to offer an alternative to home warranty plans. Equipment Breakdown coverage is

More information

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5 DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM 104 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF EXTERNAL FINANCING

More information

All electrical, gas and plumbing applications, together with the fee amount, must be mailed or delivered to:

All electrical, gas and plumbing applications, together with the fee amount, must be mailed or delivered to: Application for Permit to Perform Electrical Work Massachusetts Uniform Application for a Permit to do Gas Fitting Massachusetts Uniform Application for a Permit to Perform Plumbing Work Applications and

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Yakima County Code ~ Building and Construction ~ Title FEES

Yakima County Code ~ Building and Construction ~ Title FEES 13.24.010 AMENDED FEE TABLES AND FEE SCHEDULES The fee tables and fee schedules contained in the various codes and regulations adopted in this title shall be amended as established herein. *PLAN REVIEW

More information

Mocksville Elementary

Mocksville Elementary NC School District/300 Davie County/Elementary School Mocksville Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Warranty Information

Warranty Information Warranty Information Home warranty extension Page 2 SMART Home Protection Plan Page 2 90 Day Warranty Page 3 SewerGard Warranty Page 5 MoldSafe Warranty Page 7 Radon Warranty Page 9 5 Year Platinum Roof

More information

DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016

DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016 DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition

More information

ADDENDUM #1 RFQ M1201M. 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications.

ADDENDUM #1 RFQ M1201M. 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications. ADDENDUM #1 RFQ M1201M 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications. Please replace M1201M Pricing Proposal with the attached M1201M Pricing

More information

Martin Luther King Jr. High

Martin Luther King Jr. High DeKalb County School District/High Schools Martin Luther King Jr. High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

Property Assessment Form Property Data. Servicer and Loan Data

Property Assessment Form Property Data. Servicer and Loan Data Property Data Property Name: Holmead Apartments Property Address: 3435 Holmead Place NW Change from previously reported City: Washington State: DC Zip: 20010 # Units: 101 # Buildings: 1 Year Built: 1951

More information

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER I, of UNIT # request approval by the Architectural Review Committee for the

More information

TABLE OF CONTENTS - ADDENDUM NO. 3

TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS Addendum No. 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS SIB-1 SIB-2 SIB-3 Article I-2.4 - Contract Completion Time Article I-14.4 - Participation by SBE

More information

NOTICE OF ANNUAL BUILDING DIVISION FEE INCREASES. EFFECTIVE: July 1, 2017

NOTICE OF ANNUAL BUILDING DIVISION FEE INCREASES. EFFECTIVE: July 1, 2017 NOTICE OF ANNUAL BUILDING DIVISION FEE INCREASES EFFECTIVE: July 1, 2017 In accordance with the City Council Resolution No. 91-129 establishing fees for the Building Division, increases have been made

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

NUNAVUT HOUSING CORPORATION. Home Renovation Program (HRP)

NUNAVUT HOUSING CORPORATION. Home Renovation Program (HRP) NUNAVUT HOUSING CORPORATION Home Renovation (HRP) October 2014 Date October 201 TABLE OF CONTENTS OBJECTIVE... 1 SUMMARY... 1 ENABLING LEGISLATION... 1 ELIGIBLE CLIENTS... 1 PRIORITY OF APPLICANTS...

More information

TITLE 110 LEGISLATIVE RULE STATE TAX DEPARTMENT

TITLE 110 LEGISLATIVE RULE STATE TAX DEPARTMENT TITLE 110 LEGISLATIVE RULE STATE TAX DEPARTMENT SERIES 15I CONSUMER SALES AND SERVICE TAX AND USE TAX EXECUTIVE ORDERS DECLARING EMERGENCY AND EXEMPTING FROM TAX MOBILE HOMES AND SIMILAR UNITS AND BUILDING

More information

CLASSES OF PERMITS AND FEES PAYABLE. Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C

CLASSES OF PERMITS AND FEES PAYABLE. Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C CLASSES OF PERMITS AND FEES PAYABLE Item Class of Permit Reference Fee Payable 1. Building Permit 6(3) See Part C 2. Demolition Permit 6(4) All Occupancies - $0.11 for each square metres of floor area

More information

Home Buyer Pre Lending Package

Home Buyer Pre Lending Package Home Buyer Pre Lending Package Congratulations on the decision to buy a new home! The most important step in the home buying process is first obtaining a Mortgage Pre-Approval, and to understand the home

More information

Northern Gateway Regional Division No.10 Listing of Events

Northern Gateway Regional Division No.10 Listing of Events Building Events Maintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)** David Ovans Elementary School B3989A Code Northern Gateway Regional Division No.10 Install vacuum breakers on non

More information

FOR SALE: 4,940 Sq. Ft. 5-Apartment Property 11 Paradise Avenue in Historic Catonsville, Baltimore County, Maryland 21228

FOR SALE: 4,940 Sq. Ft. 5-Apartment Property 11 Paradise Avenue in Historic Catonsville, Baltimore County, Maryland 21228 FOR SALE: 4,940 Sq. Ft. 5-Apartment Property 11 Paradise Avenue in Historic Catonsville, Baltimore County, Maryland 21228» Property BUILT 1924 ZONING DR-3.5 Residential Zoning allowing 3 ½ units per acre.

More information

Board of Trustees Proposition Summary Table of Contents

Board of Trustees Proposition Summary Table of Contents Table of Contents Table of Contents... ii 1 Facilities Condition Assessment... 2 1.1 Priority One... 2 1.2 Priority Two... 5 1.3 Priority Three... 7 1.4 Priority Four... 9 2 Major Projects... 10 2.1 Facility

More information

One and two family residences... $ Mobile Homes... $73.73 Commercial Building... $ All other miscellaneous applications... $44.

One and two family residences... $ Mobile Homes... $73.73 Commercial Building... $ All other miscellaneous applications... $44. EXHIBIT "A" BUILDING PERMITS, HOUSING CODE AND MOBILE HOME PERMIT FEES Page 1 of 9 I. APPLICATION FEES (Non-refundable) One and two family residences... $147.59 Mobile Homes... $73.73 Commercial Building...

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February