1 EAST GREGORY DRIVE CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.722 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,473,300 DISTRIBUTION BUILDING GROSS SQUARE FEET 59,376 NUMBER OF BUILDING STORIES 2 BUILDING SURVEY DATE CCJM: Josh Polasky (M), Stanley Panek (E) ORIGINAL YEAR OF CONSTRUCTION /6/2013 B U I L D I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y TRADE E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR ($) GOOD ($) (5-10 YEARS) (10-20 YEARS) POOR ($) (1-5 YEARS) EXCELLENT ($) (20+ YEARS) TOTAL ($) $/GSF PERCENT OF BUILDING TOTAL (%) MECHANICAL 1,641,000 1,641, PLUMBING 280, , FIRE PROTECTION 388, , ELECTRICAL 196, , , COMMUNICATIONS 215, , TOTAL % OF TOTAL 2,506, ,100 3,473, CRITICAL ITEM REMEDIATION COST: $11,400 REFER TO CRITICAL ITEM SUMMARY ON FOLLOWING PAGE. NOTE: Cost Estimates are Construction Costs are in 2013 dollars to Replace in Kind unless otherwise noted PAGE 1

2 P R I N T I N G & P H O T O G R A P H I C S E R V B L D G C R I T I C A L I S S U E S S U M M A R Y CODE RELATED ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE ELECTRICAL Exit Sign System North building signage 11,400 19, Years Replace CODE RELATED ITEMS COST 11,400 19, CRITICAL ISSUES COST 11,400 19, NOTE: Cost Estimates are Construction Costs are in 2013 dollars to remediate noted issue. Text106 M E C H A N I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y CHILLED WATER SYSTEM STEAM AND CONDENSTATE SYSTEM SUPPLY AIR SYSTEM HVAC CONTROLS SYSTEM SYSTEM/COMPONENT Cooling System Steam and Condensate System Air Handling System HVAC Controls MECHANICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 596, , , , , ,800 32,400 32,400 1,641,000 1,641, PAGE 2

3 Text6 C O O L I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description The North building is cooled by a helical rotary liquid chiller and cooling tower system located in the penthouse. Chiller is Trane Series R unit from 99. Fair/Poor Condition. Model: RTHC Model #: RTHC1C1F0F0E1L3F1LFVQU00 Serial #: U00C05778 Overall Condition Date Installed Recommendation Comments Cooling Tower is Baltimore Aircoil Company unit from 90s. Fair/Poor Condition. Model #: VT0145M Serial #: U Chiller and Cooling Tower are served by two pumps, each 15 hp. Fair Condition. The South building is cooled by an air-cooled liquid chiller located outside on the West side of the building. Trane unit from Fair Condition. Model #: CGAEC25GABA1WYCDHR Serial #: J95L82478 Poor 1990s Remaining Useful Life 0-10 Years Nominal Useful Life: 30 Years Replacement Cost $596,500 Repair cooling tower leaks. Install sound dampening and vibration control on Penthouse chiller. Trane Series R unit in the Penthouse is leaky and extremely loud (vibrations can be felt throughout building). Cooling Tower in the Penthouse also has leak problems and is loud (ceiling tiles below need frequent replacement) PAGE 3

4 Text6 C O O L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Trane Chiller (South Building) Trane Tag (South Building) Chiller (North Building) Cooling Tower (North Building) PAGE 4

5 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M A S S E S S M E N T D A T A Item ID Description 6 campus steam piping serves both buildings and is original to 59 and 63. AHUs, perimeter fin-tube radiation, and domestic hot water are served. Overall Condition Date Installed 59 and 63 Recommendation North building has 2 duplex vacuum condensate pumps (21 and 35 gpm, newer than 63, look to be in fair condition). North building also has 1 additional condensate pump (1.5 HP, poor condition). South building has 1 small condensate pump (2hp, fair/poor condition). Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Replacement Cost $252,300 Install thermostats on electric heaters in South building. Comments Staff notes there are supplemental electric strip heaters in South building that are on 24/7/ PAGE 5

6 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M S U R V E Y P H O T O G R A P H S Radiator in Entryway Steam Pipes in South Building Mechanical Room Duplex Condensate Pumps in North Building Condensate Pump in South Building PAGE 6

7 Text6 A I R H A N D L I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description North Building (60s vintage, all in poor condition): AHU1 = 13,500 cfm, 10 HP, 11,220 sq/ft AHU2 = 12,400 cfm, 10 HP, 1732 sq/ft AHU3 = 11,800 cfm, 10 HP, 11,400 sq/ft AHU4 = 18,000 cfm, 10,581 sq/ft 2 small fans exhaust restrooms and 1 exhausts working areas (2000, 3600, and 1600 cfm poor condition). South Building (90s vintage, all in fair condition): AHU1 = 5,400 cfm, 5 HP, 2900 sq/ft AHU2 = 4,700 cfm, 5 HP, 2522 sq/ft Overall Condition Date Installed 59 and 63 Recommendation Comments Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Replacement Cost $759,800 Adjust cooling load in North building 2nd floor (redirect to 1st floor and/or decrease volume and cooling). North Building 2nd floor used to be printing facility with significant heat load from equipment. It is now abandoned but cooled as if it were full of equipment (i.e. significantly overcooled). At the same time, occupants of 1st floor frequently complain about undercooling PAGE 7

8 Text6 A I R H A N D L I N G S Y S T E M S U R V E Y P H O T O G R A P H S AHU2 in South Building AHU1 in South Building AHU3 in North Building AHU2 in North Building PAGE 8

9 Text6 H V A C C O N T R O L S A S S E S S M E N T D A T A Item ID Description Controls are of various vintages and conditions. Some DDCs and newer VFDs. 10 HP pneumatic compressor. Overall Condition Poor Date Installed 1990s Remaining Useful Life 0-10 Years Nominal Useful Life: 18 Years Replacement Cost $32,400 Comments This HVAC controls report is likely obsolete as staff notes building is being retro-commissioned during spring/summer of PAGE 9

10 Text6 H V A C C O N T R O L S S U R V E Y P H O T O G R A P H S Stat in South Building Siemens Controls in South Building (good condition) VFDs for Cooling Tower (good condition) Pneumatic Compressor (poor condition) PAGE 10

11 Text106 P L U M B I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DOMESTIC HOT WATER SYSTEM PLUMBING FIXTURES SYSTEM SUB-SOIL DRAINAGE SYSTEM SYSTEM/COMPONENT Domestic Hot and Cold Water Plumbing Fixtures Storm and Subsoil Drainage PLUMBING TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 196, ,500 48,300 48,300 35,600 35, , , PAGE 11

12 Text6 D O M E S T I C H O T A N D C O L D W A T E R A S S E S S M E N T D A T A Description Domestic water piping in main building (North) is from 63 and office addition (South) was replaced in 95. Overall Condition Item ID Date Installed 1963 and 1995 South building has residential style hot water heater served by campus steam (50 gal, 5 year useful life left, fair condition). North building has original (1959) heat exchange system with storage tank served by campus steam (exceeded useful life, poor condition). Circulation pump is newer (1/2 or 1/3 HP, fair condition). Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Replacement Cost $196,500 Text6 D O M E S T I C H O T A N D C O L D W A T E R S U R V E Y P H O T O G R A P H S Domestic Hot Water Heater in South building Domestic Hot Water Heater in North Building North Building Circulation Pump PAGE 12

13 Text6 P L U M B I N G F I X T U R E S A S S E S S M E N T D A T A Item ID Description Plumbing fixtures in main building (North) are mostly from 63 (poor condition) and those in office addition (South) were replaced in 95 (good condition). Overall Condition Date Installed 1959 and sink, 1 toilet, and 1 drinking fountain = good condition. 5 sinks, 6 toilets, 4 urinals, 1 drinking fountain = poor condition. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Replacement Cost $48,300 Text6 P L U M B I N G F I X T U R E S S U R V E Y P H O T O G R A P H S Typical fixtures in South Building Typical fixtures in North Building Toilet in North Building PAGE 13

14 Text6 S T O R M A N D S U B S O I L D R A I N A G E A S S E S S M E N T D A T A Description Overall Condition Date Installed 1959 and 1963 Recommendation Item ID Comments Main building (North) is from 63 and office addition (South) is from 59. Gutters, drains, and downspouts are original to each building (with minor replacements). Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Replacement Cost $35,600 Re-route downspout away from loading dock and/or install drain in loading dock. Assess roof of South building. The South building roof has ponding issues and inadequate roof drainage. Gutter and downspout exit into loading dock, where there s no drain. Flooding occurs during heavy rain. Text6 S T O R M A N D S U B S O I L D R A I N A G E S U R V E Y P H O T O G R A P H S Loading Dock PAGE 14

15 Text106 F I R E P R O T E C T I O N D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y FIRE ALARM SYSTEM SPRINKLER SYSTEM SYSTEM/COMPONENT Fire Alarm System Standpipe and Sprinkler System FIRE PROTECTION TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 115, , , , , , PAGE 15

16 Text6 F I R E A L A R M S Y S T E M A S S E S S M E N T D A T A Item ID Description Addressable fire arm system with pull stations, horns/strobes and smoke detection. Overall Condition Poor Date Installed 1/1/1996 Remaining Useful Life 4 Years Nominal Useful Life: 20 Years Manufacturer Cerberus/Siemens Model Number MXL Recommendation Conversion to XLS system Replacement Cost $115,900 Critical Issues Provide coverage for North building Text6 F I R E A L A R M S Y S T E M S U R V E Y P H O T O G R A P H S Fire Alarm Panel Horn/Strobe Pull station PAGE 16

17 Text6 S T A N D P I P E A N D S P R I N K L E R S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 1963 and 1995 Recommendation Item ID South building is has sprinkler system (1995, good condition). North building doesn t appear to have any fire suppression other than extinguishers. Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Replacement Cost $272,700 Install sprinkler system in paper storage areas of North building (at minimum). Text6 S T A N D P I P E A N D S P R I N K L E R S Y S T E M S U R V E Y P H O T O G R A P H S Sprinkler in South Building Sprinkler Piping in South Building PAGE 17

18 Text106 E L E C T R I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y SUBSTATION LOW VOLTAGE SYSTEM EMERGENCY POWER SYSTEM INTERIOR LIGHTING EMERGENCY LIGHTING SYSTEM EXIT LIGHTING SYSTEM EXTERIOR LIGHTING SYSTEM SYSTEM/COMPONENT Substation Low Voltage Distribution System Emergency Power Interior lighting System Emergency Lighting System Exit Sign System Exterior Lighting System ELECTRICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 144, , , ,100 52,000 52, , ,300 26,000 26,000 19,100 19,100 14,600 14, , , , PAGE 18

19 Text6 S U B S T A T I O N A S S E S S M E N T D A T A Item ID Description Substation with 500 KVA transformer and (12) breakers Overall Condition Poor Date Installed 1/1/1959 Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Manufacturer G E Size/Capacity 1600 A Voltage 4160 /120/208 V Recommendation Testing and replacement or refurbishing. Replacement Cost $144, PAGE 19

20 Text6 S U B S T A T I O N S U R V E Y P H O T O G R A P H S Substation Transformer nameplate Metering station Substation nameplate PAGE 20

21 Text6 L O W V O L T A G E D I S T R I B U T I O N S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Item ID Date Installed 1959/1996 Equipment Tag - Model Number - Serial Number - Size/Capacity HP/kW - Material - Critical Issues - Substation provides service to distribution panelboards and equipment. (10) panelboards were installed in 1996and (4)in South building chiller has separate service. Fair Remaining Useful Life 10 Years Nominal Useful Life: 40 Years Voltage 1600A 120/208 A Replacement Cost $339, PAGE 21

22 Text6 L O W V O L T A G E D I S T R I B U T I O N S Y S T E M S U R V E Y P H O T O G R A P H S Distribution Panelboard Lighting panelboard Panelboard serving mechanical load Transformer serving pad mounted chiller PAGE 22

23 Text6 E M E R G E N C Y P O W E R A S S E S S M E N T D A T A Description Overall Condition Item ID Date Installed 1/1/1959 Equipment Tag - Manufacturer Model Number - HP/kW - Material - Comments Emergency panelboard connected ahead of main service switch at substation provides emergency service for lighting and exit signs in North building. Bank of batteries with charger and inventor provides poser to South building. Poor Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Serial Number - Size/Capacity Voltage Chloride System 50 A 120/208 A Replacement Cost $52,000 Provide emergency power utilizing battery or generator back- up system for entire building PAGE 23

24 Text6 E M E R G E N C Y P O W E R S U R V E Y P H O T O G R A P H S Emergency lighting switch( not utilized) Emergency panelboard PAGE 24

25 Text6 I N T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Item ID Date Installed 1959/1995 Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Material - Recommendation - Comments - Critical Issues - Majority of space illuminated by fluorescent recessed fixtures. Ballasts and lamps were replaced has been in progress. Fixtures in South building have electronic ballast and T-8 lamps installed in North building first floor is illuminated with industrial type open lamp fluorescent fixtures. Second floor has vapor proof fixtures with clear glass diffuser. Second floor was converted from printing area to storage. Fair Remaining Useful Life 10 Years Nominal Useful Life: 25 Years Voltage 120 V Replacement Cost $352, PAGE 25

26 Text6 I N T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Work room lighting Office lighting Work area lighting 2nd floor lightinh PAGE 26

27 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Emergency lighting includes selected fixtures in stairways, corridors and public areas connected to emergency circuits. Overall Condition Fair Date Installed 1959/1995 Remaining Useful Life 10 Years Nominal Useful Life: 25 Years Voltage 120/208 V Recommendation Provide fixtures with battery back-up in North building. Replacement Cost $26,000 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Corridor lighting includes emergency lighting PAGE 27

28 Text6 E X I T S I G N S Y S T E M A S S E S S M E N T D A T A Item ID Description Exit signs with (2) fluorescent lamps. Overall Condition Fair Date Installed 1959/1996 Remaining Useful Life 10 Years Nominal Useful Life: 25 Years Equipment Tag - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage 120 V Material - Recommendation Replace with LED type signage in South building and LED type with battery back up in North building Replacement Cost $19,100 Critical Issues North building signage Critical Repair Estimate $11, PAGE 28

29 Text6 E X I T S I G N S Y S T E M S U R V E Y P H O T O G R A P H S Exit sign#1 Work room (requires exit signage) PAGE 29

30 Text6 E X T E R I O R L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Metal halide wall mounted lighting fixtures and campus walkway lights provide illumination at the building exterior. Overall Condition Fair Date Installed 1/1/1995 Remaining Useful Life 5 Years Nominal Useful Life: 25 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage 208 V Material - Recommendation An additional lighting at east side of the building Replacement Cost $14,600 Comments - Critical Issues PAGE 30

31 Text6 E X T E R I O R L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Front entry East side West side Loading dock PAGE 31

32 Text106 C O M M U N I C A T I O N S D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DATA SYSTEM SYSTEM/COMPONENT Communication Infrastructure System Voice/Data System COMMUNICATIONS TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 215, , , , PAGE 32

33 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M A S S E S S M E N T D A T A Item ID Description The building is fed with 12 strands of single mode fiber and 200 copper pairs with each pair grounded and individually protected by a fuse/surge arrestor. Fiber and copper originate from Node #2. The building IDF is located in room B on the first level. Fiber distributes radially from the building IDF to the hub room (telecommunication room) to within 100 meters of end-use equipment and lands at rack mounted fiber switch(es) within the hub room. Overall Condition There is one hub room located in room B on the lower level which serves the entire building. The hub room is equipped with two free standing rack, wire management, overhead basket cable tray. The hub room has no dedicated cooling. Outlet standards typically have 1"C stubbed to cable management. Standard outlet consists of two network cables and two data jacks. Station cable consists of Cat 6e (Mohawk Advancenet). The building is typically equipped with WIFI throughout (coverage not noted) Good Date Installed UIUC network upgrade complete (date range 2006 to 2012) Remaining Useful Life 20 Years Nominal Useful Life: 20 Years Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M S U R V E Y P H O T O G R A P H S IDF Termination Data Rack Overhead Cable Management PAGE 33

34 Text6 V O I C E / D A T A S Y S T E M A S S E S S M E N T D A T A Item ID Description Voice/Outlets are installed in all offices. Cable tray was provided for future outlets in north building. Telephone lines have been utilized for fax. Services. Overall Condition Fair Date Installed 1/1/2000 Remaining Useful Life 5 Years Nominal Useful Life: 20 Years Replacement Cost $215,900 Text6 V O I C E / D A T A S Y S T E M S U R V E Y P H O T O G R A P H S Cable tray with Voice/data wiring Voice/Data equipment Fiber service PAGE 34

35 Text6 L E G A C Y A S S E T D E S C R I P T I O N : P R I N T I N G & P H O T O G R A P H I C S E R V B L D G The Printing and Photographic Services Building contains two floors and a penthouse. The building consists of mechanical and electrical rooms, building service storage, administrative offices, central service areas, and conference rooms. The Life Safety Code classifies the building as Business Occupancy. The Printing and Photographic Services Building has a manual and automatic fire alarm system. Manual pull stations are located at all exits on the second and first floor. Automatic fire detection is located in the penthouse, second floor (Room 244 and 246), and throughout the first floor office area. Occupant notification is by visual/audible and audible alarms. Visual/audible devices are located in the first floor (Room 129). Audible devices are located throughout the first floor office area. The fire alarm control panel for the building, located on the first floor Vestibule 101, is Cerebus Pyrotronics model MXL. The Printing and Photographic Services Building has no observable emergency lighting. Five batteries in Room 122 comprise the emergency power system. The Printing and Photographic Services Building is a partially sprinklered building with no standpipe system. The fire department connection is located on the southwest side of the building from Room 122. OCCUPANT LOAD/EXITING Penthouse Floor: 21 occupants; one exit required (1 exits provided); the exit width including stairs/doors provides capacity for 135 occupants. Door and stair widths are sufficient for occupants served. Second Floor: 97 occupants; two exits required (2 exits provided); the exit width including stairs/doors provides capacity for 287 occupants. Door and stair widths are sufficient for occupants served. First Floor (LED): 151 occupants; 2 exits required (3 exits provided); 31" exit door width required (132" provided); door and corridor widths are sufficient for occupants served PAGE 35

36 P R I N T I N G & P H O T O G R A P H I C S E R V B L D G L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS ITEMS REQ /8/2002 ADA Signage: Existing Signs are Not Braille 14, ,100 14,100 Type REQ /8/2002 ADA: Elevator Non-Compliant Controls 42, ,400 42, REQ /8/2002 ADA: Lacking Detectable Warning Strips 4, ,100 4, REQ /8/2002 ADA: Non-Compliant Signage 11, ,500 11, REQ /8/2002 ADA: Install Auto Opener on Front Door 8, ,700 8, REQ /8/2002 Doors: Replace Non ADA Compliant Hardware 79, ,100 79, REQ /8/2002 Glazing: Inadequate Safety Glazing at Doors 18, ,300 18, REQ /8/2002 Exterior Doors: Aged 14, ,000 14, REQ /11/2005 Fire Barrier: Unprotected Penetrations 29, ,100 29, REQ /11/2005 Means of Egress: Discontinuous Protected Path of Travel 3, ,900 3,900 GENERAL LEGACY ITEMS TOTALS 225, ,000 8, , ,200 MEP LEGACY ITEMS ITEMS REQ REQ REQ /8/2002 ADA: Non-Compliant Payphones 14, ,200 14,200 3/11/2005 Means of Egress: Travel Distance (2nd Floor) 129, , ,900 10/8/2002 Data: Upgrade Network Infrastructure 152, , ,900 MEP LEGACY ITEMS TOTALS 296, , ,900 14, ,900 TOTALS 522, , , , ,100 % OF LEGACY VALUE Poor = VFA Priorities 1,2, and 3; Fair VFA Priority 4; and Code VFA Priority PAGE 36

37 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The signs, which designate permanent rooms and spaces, do not comply with requirements for raised or brailled characters, mounting locations or heights. See BOCA section under room identification and ADAAG section (7). Accessibility ADA Signage: Existing Signs are Not Braille Type (Legacy) Critical Percent Complete 0.0 Recommendation Add or replace room signs to comply with BOCA and ADAAG regulations. Each sign is approximately $75.00 x the number of rooms. Note: Type of sign selected for budgetary purposes only. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 14, Estimated Remaining Cost: 14, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description The existing elevator controls do not meet the height, location, or tactile feel requirements for the ADA Requirement Category Requirement Name Condition Accessibility ADA: Elevator Non-Compliant Controls (Legacy) Critical Percent Complete 0.0 Recommendation Remove the existing elevator controls and replace with ones that comply with the ADA regulations for location and tactile feel. A difficulty factor of 40% has been applied to this deficiency to account for known historical data on campus mechanical installations and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 42, Estimated Remaining Cost: 42, PAGE 37

38 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Stairs and hazardous vehicular areas are required to have a detectable warning surface per ADAAG and Requirement Category Requirement Name Condition Accessibility ADA: Lacking Detectable Warning Strips (Legacy) Critical Percent Complete 0.0 Recommendation ADAAG & 5 require a detectable warning strip at stairs and vehicular entrance areas. At stair landings install adhesive detectable strips. At sidewalks, saw cut reliefs per ADAAG A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 4, Estimated Remaining Cost: 4, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description There are a number of payphones in the building. None of the installations are ADA compliant and there are no TTY units as required per ADAAG Requirement Category Requirement Name Condition Accessibility ADA: Non-Compliant Payphones (Legacy) Critical Percent Complete 0.0 Recommendation Install ADA compliant payphones. One each in central location in general circulation area per floor (2) with signage indicating location of ADA payphones A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 14, Estimated Remaining Cost: 14, PAGE 38

39 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description The building lacks compliant room signage which conforms with the Uniform Federal Accessibility Standard (15) and 4.30 Requirement Category Requirement Name Condition Accessibility ADA: Non-Compliant Signage (Legacy) Critical Percent Complete 0.0 Recommendation Provide UFAS compliant and permanent room signage throughout building spaces. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 11, Estimated Remaining Cost: 11, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The front doors are heavy doors that are difficult to open for wheelchair or handicapped individuals. The door needs an ADA auto opener and door hardware in accordance with UIUC guidelines (Accessibility / Universal Design Section B) Accessibility ADA: Install Auto Opener on Front Door (Legacy) Fair Percent Complete 0.0 Recommendation Install auto door opener on front door. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 8, Estimated Remaining Cost: 8, PAGE 39

40 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Interior doors generally have knob style hardware which should be replaced with lever type hardware in accordance with ADA Section Requirement Category Requirement Name Condition Accessibility Doors: Replace Non ADA Compliant Hardware (Legacy) Critical Percent Complete 0.0 Recommendation Replace hardware on Accessible Doors in compliance with ADAAG Section Door Hardware. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 79, Estimated Remaining Cost: 79, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Regardless of the occupancy, glass doors must conform to the BOCA that requires glass doors to have a manufacturer designation of safety glass. None of the exterior doors had this designation. Glazing in ingress and means of egress doors shall comply with and pass the requirements of CPSC 16 CFR; 1201, Safety Standard for Architectural Glazing. Fire-rated safety glazing will be required at these installations. (See deficiency for non-compliant fire rated doors). Building Code Glazing: Inadequate Safety Glazing at Doors (Legacy) Critical Percent Complete 0.0 Recommendation Install safety glazing as required at all interior doors. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 18, Estimated Remaining Cost: 18, PAGE 40

41 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The exterior door shows signs of extreme wear and tear. An excessive amount of maintenance has been required to keep the doors in operation. These units have exceeded their design life expectancy and should be replaced. All are missing emergency egress hardware and ADA compliance. See correction for locations. Integrity Exterior Doors: Aged (Legacy) Poor Percent Complete 0.0 Recommendation Replace exterior doors at the conncector, room 144 electric vault, and loading dock. Replace all doors, hardware, and weather-stripping with insulated hollow metal doors and new metal frames. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 14, Estimated Remaining Cost: 14, Action Date 10/8/2003 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 3/11/2005 Description Requirement Category Requirement Name Condition There exists ductwork, conduit, pipes, and similar building service equipment, without fire protection, penetrating a fire barrier. This occurs in the following areas: First Floor - Room 139, 117, 122, 141, 140, and 145. This is not compliant with NFPA 101 Section Life Safety Fire Barrier: Unprotected Penetrations (Legacy) Poor Percent Complete 0.0 Recommendation Seal openings with approved through-penetration firestopping system. Adjustment factor of 1.2 used to account for additional costs typically associated with retrofit work, and/or working with existing construction. Estimated Cost 29, Estimated Remaining Cost: 29, Action Date 3/11/ PAGE 41

42 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 3/11/2005 Description The travel distance exceeds 200 feet (NFPA 101 Section 7.6) from Room 243 to Stair 1. Requirement Category Requirement Name Condition Life Safety Means of Egress: Travel Distance (2nd Floor) (Legacy) Poor Percent Complete 0.0 Recommendation The travel distance noted is in excess for floors that are provided without sprinkler protection. As a minimum sprinkler protection should be provided for the entire floor noted. It is recommended that the building be fully protected based on other requirements noted for the building and the added life safety afforded by a fully protected building. Cost for installing water service, fire pump, etc. is excluded. Adjustment factor of 1.6 used to account for additional costs typically associated with retrofit work, working with existing construction, and to ensure cost is near expected cost of approximately $4 to $6 per sqft. Estimated Cost 129, Estimated Remaining Cost: 129, Action Date 3/11/2006 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 3/11/2005 Description Requirement Category Requirement Name Condition There exists a stair, Stair 3 connecting the penthouse and second floor, that discharges onto the second floor. This is not compliant with NFPA 101 Section Life Safety Means of Egress: Discontinuous Protected Path of Travel (Legacy) Poor Percent Complete 0.0 Recommendation Install new 1-hour fire rated corridor. Demolish door assembly to Room 236 and install a new 1-hour fire rated door assemblies. Adjustment factor of 2.0 used to account for additional costs typically associated with retrofit work, working with existing construction, limited-access conditions, and/or smaller size jobs (less than $5,000). Estimated Cost 3, Estimated Remaining Cost: 3, Action Date 3/11/ PAGE 42

43 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition Upgrade existing voice/data system to Cat 5 or Cat 6 to meet occupant requirements. Voice/Data System Data: Upgrade Network Infrastructure (Legacy) Fair Percent Complete 0.0 Recommendation (Cont. from Deficiency) The dollar estimates are based on a combination of average costs drawn from completed building upgrade projects, the existence of partial network upgrades, and physical challenges a building may pose. The estimates DO NOT include costs for constructing Communication Equipment Rooms, additional power, or additional cooling needed for network equipment. CITES has typically never borne these costs and has no tracking history for them. There may be a several week delay between the completion of a project and the updating of CITES wiring/jack database; thus, the number of jacks most recently added may not be reflected in this list. Only campus buildings for which CITES has a record of data jacks are included on this list. Housing buildings and campus-leased buildings are not included on this list. Estimated Cost 152, Estimated Remaining Cost: 152, PAGE 43

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/4/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/4/2013 BUILDING SURVEY DATE 0218 504 EAST ARMORY AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.764 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,714,300 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/19/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/19/2013 BUILDING SURVEY DATE 0154 52 EAST GREGORY DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.646 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,203,500 OFFICE BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/5/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/5/2013 BUILDING SURVEY DATE 0062 1105 WEST NEVADA STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.850 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,286,000 LABORATORY BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE 0134 614 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.528 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 495,100 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE 0040 1402 WEST PENNSYLVANIA AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.685 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,364,800 LECTURE HALL BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE 0358 1004 SOUTH FOURTH STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.508 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,281,700 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE 0002 1301 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.862 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 746,400 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE 0004 1103 SOUTH SIXTH STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.810 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,831,000 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/3/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/3/2013 BUILDING SURVEY DATE 0006 505 EAST AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.492 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 10,114,300 BUILDING GROSS SQUARE FEET 260,748 NUMBER

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/13/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/13/2013 BUILDING SURVEY DATE 0197 1102 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.644 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 11,554,400 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/17/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/17/2013 BUILDING SURVEY DATE 0039 1114 WEST NEVADA STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.766 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 9,578,600 CLASSROOMS / LIBRARY BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/6/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/6/2013 BUILDING SURVEY DATE 0133 608 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.516 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 646,900 PARKING STRUCTURE BUILDING GROSS

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/4/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/4/2013 BUILDING SURVEY DATE 0156 504 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.461 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 16,618,500 CLASSROOMS / LIBRARY BUILDING

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE 0110 23 EAST STADIUM DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.838 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,161,900 LABORATORY BUILDING GROSS SQUARE FEET

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE 0238 URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.183 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,237,600 OFFICE BUILDING GROSS SQUARE FEET 18,054 NUMBER OF BUILDING

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE 0171 1503 SOUTH MARYLAND DRIVE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.770 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,686,100 LABORATORY BUILDING GROSS SQUARE

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE 0220 500 EAST PEABODY DRIVE CHAMPIAGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.364 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,262,400 MUSEUM BUILDING GROSS SQUARE FEET

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Davie County Early College High

Davie County Early College High NC School District/300 Davie County/High School Davie County Early College High Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Facility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA

Facility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA AGENDA benefits & limitations Rod Moore, RA, LEED AP, PMP Georgia Tech Benjamin Dutton, FFB, MCIOB, MRICS Faithful+Gould GT Facilities GT Program What is GT FCA Deliverables How GT uses FCA Information

More information

1. The fee for plan review shall be due upon completion of subcode review.

1. The fee for plan review shall be due upon completion of subcode review. New Jersey State permit surcharge fees: Amount: This fee shall be in the amount of $0.00334 per cubic foot volume of new buildings and additions. Volume shall be computed in accordance with N.J.A.C. 5:232.28.

More information

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus Dashboard

More information

Pinebrook Elementary

Pinebrook Elementary NC School District/300 Davie County/Elementary School Pinebrook Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

TABLE OF CONTENTS - ADDENDUM NO. 3

TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS Addendum No. 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS SIB-1 SIB-2 SIB-3 Article I-2.4 - Contract Completion Time Article I-14.4 - Participation by SBE

More information

Westmount Place Renovations Policy

Westmount Place Renovations Policy Conditions Precedent to the Implementation of Renovations 1. Condominium Bylaws and Regulations No renovations or modifications shall be implemented without authorization of the Board of Directors. All

More information

Our Focus: Your Future

Our Focus: Your Future Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS

More information

Mountain Heritage High

Mountain Heritage High NC School District/995 Yancey County/High School Mountain Heritage High Final Campus Assessment Report March 12, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 7 Campus

More information

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

BUILDING PERMIT FEES

BUILDING PERMIT FEES BUILDING PERMIT FEES 1. Building Permit Fee Based on the Construction Valuation of the project excluding site work. Refer to Fee Charts below. Electrical, Mechanical and Plumbing permits are not included

More information

Building Division Fees 2018

Building Division Fees 2018 Building Division Fees 2018 Permit Administration A permit administration fee of $45.00 shall be assessed for each permit. Staff Consultation Fee $75.00 Administration Determination $90.00 / hour; $23.00

More information

BUILDING SUBCODE FEES:

BUILDING SUBCODE FEES: Building Sub-code PERMIT FEES TOWNSHIP OF PENNSVILLE 2011 (A 4-2011) 1. Plan review shall be 20% of the amount to be charged for a construction permit. a. The fee for plan review for elevator devices in

More information

FOR APARTMENTS SEGMENT

FOR APARTMENTS SEGMENT UNDERWRITING GUIDELINES FOR APARTMENTS SEGMENT Local exceptions to these underwriting guidelines may apply. Please consult with your underwriter or sales executive for details and to discuss risks which

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED

CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING PERMIT FEES SERVICE PROPOSED FEE RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation $18.00 Building Permit $501-$2,000 Valuation $18 + $2.40 for

More information

Sagamore Hills Elementary

Sagamore Hills Elementary DeKalb County School District/Elementary Schools Sagamore Hills Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

Anderson Creek Primary

Anderson Creek Primary NC School District/430 Harnett County/Elementary School Anderson Creek Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Bob Mathis Elementary

Bob Mathis Elementary DeKalb County School District/Elementary Schools Bob Mathis Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Questions by Vendors: District Answers are in Red. Vendor Questions are in Black.

Questions by Vendors: District Answers are in Red. Vendor Questions are in Black. Questions by Vendors: District Answers are in Red. Vendor Questions are in Black. 1. Can we receive a final Excel Sheet of all Facilities that includes physical addresses, square foot info and original

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

What did they tell me?

What did they tell me? LBS Insurance Commission Oct 25, 2018 What did they tell me? Handouts from the October 25, 2018 Insurance Town Hall C R. Reynolds 1 High Level Recap of Changes for 2018-19 Deductible $5,000 -> $25,000

More information

Harnett Central Middle

Harnett Central Middle NC School District/430 Harnett County/Middle School Harnett Central Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Lilesville Elementary

Lilesville Elementary NC School District/040 Anson County/Elementary School Lilesville Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Yakima County Code ~ Building and Construction ~ Title FEES

Yakima County Code ~ Building and Construction ~ Title FEES 13.24.010 AMENDED FEE TABLES AND FEE SCHEDULES The fee tables and fee schedules contained in the various codes and regulations adopted in this title shall be amended as established herein. *PLAN REVIEW

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS

TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER 190-2 OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS WHEREAS, it is the desire of the Township Committee of the Township of Franklin,

More information

Harnett Central High

Harnett Central High NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

All electrical, gas and plumbing applications, together with the fee amount, must be mailed or delivered to:

All electrical, gas and plumbing applications, together with the fee amount, must be mailed or delivered to: Application for Permit to Perform Electrical Work Massachusetts Uniform Application for a Permit to do Gas Fitting Massachusetts Uniform Application for a Permit to Perform Plumbing Work Applications and

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

Central Davie Academy

Central Davie Academy NC School District/300 Davie County/High School Central Davie Academy Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Property Inspection Guidelines

Property Inspection Guidelines Property Inspection Guidelines www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Provide a tool

More information

William Bradley Bryant Center

William Bradley Bryant Center DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Stone Mountain Middle

Stone Mountain Middle DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

Lafayette Elementary

Lafayette Elementary NC School District/430 Harnett County/Elementary School Lafayette Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5

More information

REPLACEMENT RESERVE GUIDE

REPLACEMENT RESERVE GUIDE CANADA MORTGAGE AND HOUSING CORPORATION REPLACEMENT RESERVE GUIDE What is the Replacement Reserve? The replacement reserve is a fund kept by each housing sponsor under the terms of its operating agreement

More information

Building Permit Fees

Building Permit Fees Permit Center 210 Lottie Street, Bellingham, WA 98225 Phone: (360) 778-8300 Fax: (360) 778-8301 TTY: (360) 778-8382 Email: permits@cob.org Web: www.cob.org/permits Building Permit Fees This handout includes

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta Entuitive Corporation Calgary + Toronto Howsyth Court Condominium Corporation No. CCN9011190 305 25 Avenue SW Calgary, Alberta Submitted By: Entuitive Corporation 209 8 th Avenue SW, Suite 300 Calgary,

More information

CAPITAL RESERVE FUNDING ANALYSIS

CAPITAL RESERVE FUNDING ANALYSIS CAPITAL RESERVE FUNDING ANALYSIS FOR BROADWAY HOUSING, LLC 625 SW Jackson Portland, OR Prepared by: Capital Reserve Consultants, LLC Carson M. Horton, RS April 2014 Copyright 2014 USA / Canada 503 336

More information

Best Practices Dealing With Vacant, Idle, Or Shut-Down Facilities

Best Practices Dealing With Vacant, Idle, Or Shut-Down Facilities Global Asset Protection Services Best Practices Dealing With Vacant, Idle, Or Shut-Down Facilities By: Sobhy Girgis XL GAPS June 2011 Background Anticipating the Vacancies 85% to 90% of the time advance

More information

Developer Project Guidelines

Developer Project Guidelines Developer Project Guidelines The Texas A&M University System Office of Facilities Planning and Construction November 04, 2015 Introduction The purpose of these guidelines is to explain the Office of Facilities

More information

NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Condominium. Travelers Condominium Pac SM and Condominium Pac Plus SM are designed for owners of buildings used exclusively as condominiums.

Condominium. Travelers Condominium Pac SM and Condominium Pac Plus SM are designed for owners of buildings used exclusively as condominiums. 25 Condominium Travelers Condominium Pac SM and Condominium Pac Plus SM are designed for owners of buildings used exclusively as condominiums. Eligibility Up to $10 million Total Insured Values per building,

More information

Home Buyer Pre Lending Package

Home Buyer Pre Lending Package Home Buyer Pre Lending Package Congratulations on the decision to buy a new home! The most important step in the home buying process is first obtaining a Mortgage Pre-Approval, and to understand the home

More information

Washingtonville Central School District Building Condition Survey Five Year Plan

Washingtonville Central School District Building Condition Survey Five Year Plan Building Condition Survey Five Year Plan Project Cost Summary Building 2011 2012 2013 2014 2015 Totals 0001 Washingtonville Jr High School $38,759 $325,990 $1,882,653 $1,417,341 $1,025,559 $4,690,302 0002

More information

William Ellis Middle

William Ellis Middle NC School District/300 Davie County/Middle School William Ellis Middle Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

June 15, City Of Rochelle 420 N 6th St Rochelle, IL Att: Ms. Sue Messer. UPDATED: Old Building / HVAC Controls and Energy Improvements

June 15, City Of Rochelle 420 N 6th St Rochelle, IL Att: Ms. Sue Messer. UPDATED: Old Building / HVAC Controls and Energy Improvements City Of Rochelle 420 N 6th St Rochelle, IL 61068 Att: Ms. Sue Messer June 15, 2018 Helm Group Mechanical Inc Advanced Automation Solutions Group 2279 Route 20 East Freeport, Illinois 61032 UPDATED: Old

More information

Mocksville Elementary

Mocksville Elementary NC School District/300 Davie County/Elementary School Mocksville Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

NJR Home Services General Terms and Conditions Residential Interior Electrical Service Contract

NJR Home Services General Terms and Conditions Residential Interior Electrical Service Contract NJR Home Services General Terms and Conditions Residential Interior Electrical Service Contract This is your official agreement with NJR Home Services (NJRHS) and provides a detailed description of the

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

Facilities and Equipment Checklist

Facilities and Equipment Checklist Facilities and Equipment Checklist The stairs and corridors leading to the gym are well lit. The stairs and corridors are free of obstruction. The stairs and corridors are in good repair. Exits are well

More information

Martin Luther King Jr. High

Martin Luther King Jr. High DeKalb County School District/High Schools Martin Luther King Jr. High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Builder s Risk Renovation Application

Builder s Risk Renovation Application Builder s Risk Renovation Application General Information - Project Start Date: - Project Completion Date: - Named Insured: - Mailing Address: - Project Location Address: - Protection Class: ; or - Distance

More information

Protecting your older home

Protecting your older home Protecting your older home HOMEOWNERS INSURANCE Helping you protect your biggest investment: your home At Travelers, we care about our homeowners. We want you to get the most out of the older home you

More information

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER

THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER I, of UNIT # request approval by the Architectural Review Committee for the

More information

Code Reference: Section , F.S. Chapter ; FS Section ; Responsible Dept.: Community Development/Building Division

Code Reference: Section , F.S. Chapter ; FS Section ; Responsible Dept.: Community Development/Building Division Building Construction Permit Fees 322100 Building Division 341910 Planning Division 341940 Harbor/Code Division 322200/322300 Surcharge Building Permit Fees The governing bodies of local governments may

More information

CONVENIENCE STORE QUICK APPLICATION WITH AND WITHOUT GAS PUMPS

CONVENIENCE STORE QUICK APPLICATION WITH AND WITHOUT GAS PUMPS CONVENIENCE STORE QUICK APPLICATION WITH AND WITHOUT GAS PUMPS Binding subject to any additional information when required by IIC. Agency Agency Contact Email: Effective Date Expiration Date: Years in

More information

The Final Tangible Property Regulations West Virginia Tax Institute

The Final Tangible Property Regulations West Virginia Tax Institute The Final Tangible Property Regulations West Virginia Tax Institute October 20, 2014 Notice ANY TAX ADVICE IN THIS COMMUNICATION IS NOT INTENDED OR WRITTEN BY KPMG or Teresa Castanias, CPA TO BE USED,

More information

Building Codes. BOCA / Simon Tenant Construction Manual. Plumbing: National Standard Plumbing Code as modified /Simon Tenant Construction Manual

Building Codes. BOCA / Simon Tenant Construction Manual. Plumbing: National Standard Plumbing Code as modified /Simon Tenant Construction Manual Building Codes General Contractor shall be responsible for obtaining all necessary approvals and permits, and for compliance with all Federal State and Local codes and ordinances for each occupancy type.

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

Oak Island 1999 Hurricane Floyd

Oak Island 1999 Hurricane Floyd Oak Island 1999 Hurricane Floyd Topics to be Discussed What is a flood zone Flood zones in Oak Island Special Flood Hazard Areas (SFHA) Flood insurance Base Flood Elevations (BFEs) Building in flood zones

More information

WINTER WEATHER PRECAUTIONS. Risk Directory (December 2016)

WINTER WEATHER PRECAUTIONS. Risk Directory (December 2016) Risk Directory (December 2016) Introduction Winter weather experienced across the United Kingdom shows the devastating impact snow, ice and low temperatures can have on businesses. Losses involve not only

More information

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary

More information

One and two family residences... $ Mobile Homes... $73.73 Commercial Building... $ All other miscellaneous applications... $44.

One and two family residences... $ Mobile Homes... $73.73 Commercial Building... $ All other miscellaneous applications... $44. EXHIBIT "A" BUILDING PERMITS, HOUSING CODE AND MOBILE HOME PERMIT FEES Page 1 of 9 I. APPLICATION FEES (Non-refundable) One and two family residences... $147.59 Mobile Homes... $73.73 Commercial Building...

More information

DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016

DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016 DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition

More information

National Institute of Building Sciences

National Institute of Building Sciences National Institute of Building Sciences Provider Number: G168 Improving the Flood Resistance of Buildings and Mitigation Techniques WE3B Peter Spanos, P.E., CFM, LEED AP (Gale Associates, Inc.) Stuart

More information