Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Size: px
Start display at page:

Download "Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU"

Transcription

1 August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the. 8901N. Western Ave. Suite 411 Des Plaines, IL telephone: (847) toll free: (800) facsimile: (866) info: internet: This has been prepared in conformance with the National Reserve Study Standards of the Community Associations Institute (CAI), which is a national educational organization for the community association industry. It is recommended that prior to implementing this, it be reviewed by the Association s accountant, paying particular attention to the beginning balance and the funding plan. As always, if you have any questions or comments, please do not hesitate to contact me at your convenience. Thank you again for selecting Kipcon to provide these services. Very truly yours, KIPCON GREAT LAKES, LLC Ron Katz Principal RK/sz

2 Prepared for: The Chicago, Illinois Revised 8/17/16 Prepared by Kipcon Great Lakes, LLC Ronald W Katz, JD R.S. Reserve Specialist Number 017

3 Table of Contents The Page Description 2 Executive Summary 5 Physical Analysis 17 Financial Analysis 22 Expenditures/Charts 28 Disclosures 29 Glossary of Abbreviations 30 Bibliography Page 1

4 The Executive Summary The following report is a prepared by Kipcon, Great Lakes LLC for the Bel-Harbour Building Condominium Association located in Chicago, Illinois. The is a community association comprised of one 30-story residential building consisting of 207 condominium units on the upper floors. Residential units occupy floors 2-30; Commercial space currently housing a restaurant, a lobby and an office occupy the ground floor. Mechanical equipment is installed n the first floor boiler room, as well as other areas including the 2 nd floor, garage roof, the 30 th floor and the roof top. There is a pool located on the 30 th floor with locker areas and outdoor sun deck, along with a party room. There is also an elevator penthouse area above the main roof. The report is based on visual observations made during site visits conducted on June 6, 2016, prior visits to the property, the prior reserve studies and information provided by Mr. Nicholas Burbulis, the Community Manager. The purpose of a is to make updated recommendations to the Association regarding the amount to be contributed to the reserve fund on an annual basis to fund future replacements of the reserve components as those replacements become necessary. The basis for this study is an analysis of the condition, as well as the replacement costs, of the community s common area reserve components. As required by the National Reserve Study Standards of the Community Associations Institute, a Reserve Study Update is comprised of two parts, a Physical Analysis and a Financial Analysis. The Physical Analysis involves field observations of the common element components that are included within the. Unless indicated otherwise in this report, the conditions of the components were observed by Kipcon Great Lakes to be representative of their ages. A prepared by Reserve Advisors, Inc. in 2004, the Reserve Update prepared in 2011 by Kipcon; as well as site observations and information provided by the Community Manager and the building engineer were used as sources for the component listing and quantities in this. Remaining useful lives were determined based on field observations. The replacement costs were estimated using standard cost estimating guides published by R.S. Means Company, Inc. (2014 Editions) and Kipcon Great Lakes industry experience. This indicates the Association s reserves are currently underfunded. The Association has not followed the prior recommendations of the previous reserve study provided. However, it has on its own been able to maintain adequate reserves without special assessments. It is noted that the Association has made numerous improvements over the past several years including a new A/C unit, Tuck Pointing, Lobby Renovation, Pool Window replacement and various life safety upgrades. However, in reviewing the past two studies and the need for amongst other things an overhaul to the elevators, several items that were not part of the prior reports have been added. These items will be noted in the notes section of the report. Page 2

5 The Executive Summary Carefully review the individual components on the Component Inventory to determine if several smaller, individual components can be consolidated into one-line item that can be continuously funded. For example: If there are five or six components with a total replacement cost of $1,000 each, the Association may want to consider funding all six components under one-line item for a total of $1,000 rather than reserving the full $5,000 or $6,000 dollars for all of these items. Should one of these six items ever have to be replaced, that $1,000-line item would have to be brought current within a year or so after its expenditure. By doing this, rather than funding the full $6,000, only a portion of the total would be funded. This approach would allow the Association to reduce their Annual Contribution to the reserve fund. Based upon field observations by Kipcon Great Lakes and the available reviewed data, the existing conditions at The are accurately represented within this report. It should be recognized that costs and useful lives fluctuate as a result of variables which include overall economic conditions, conditions within the construction industry, unanticipated severe weather, and the amount of ongoing maintenance performed. To ensure that proper funding levels are maintained, this report should be updated in two (2) years to provide the Association with a more current assessment of the status of its reserve fund. This report is prepared for budgetary purposes only. In most cases, bids solicited for replacement of any of the components will not match the costs shown in the Component Inventory. The costs contained within this report are obtained from the sources previously listed and are based on the replacement of the existing components with components of similar quality. It is recommended that in the next update the Association have a complete review of its common elements to ensure that all items are appropriately accounted within its reserve study. Including but not limited to adding various elements to the report as well as deleting various elements that the cost of replacing may not be the responsibility of the Association. Specific notes in this regard may be contained within this report. In conclusion, the recommendations made in this report are provided to assist The Bel-Harbour Condominium Association in selecting the best way to optimize their assets in the future. If the Association would like to develop a strategy for replacing equipment and incorporating savings into next year s budget, Kipcon Great Lakes LLC can provide assistance. Page 3

6 Executive Summary: Key Figures Level of Service Provided Physical Description Number and Type of Building: Number and Type of Units: Recreational Facilities: Full Component Inventory Condition Assessment (based upon on-site visual observations) Life and Valuation Estimates Fund Status Funding Plan One 30-Story Building 207 Condominium Units and Commercial Unit Pool, Sundeck and Party Room Age of Community: Built in 1967 Converted in 1979 Financial Description Date of Most Recent Reserve Studies: September 7, 2004; December 21, 2011 Preparer of Most Recent Reserve Study: Beginning Reserve Balance: Source of Beginning Reserve Balance and Annual Contribution: Funding Goal: Reserve Advisors, Inc.; Kipcon Great Lakes $434,115- (As per the Budget provided via as to the beginning balance as of 01/01/2016) Budget Prepared by: Mr. Nicholas Burbulis, Community Manager Full Funding/ Threshold Funding/Alternative Funding Reserve Fund Status Current Percent Funded (Beginning Reserve Balance/Full Funding Balance): 13% (as per summary chart on p.5) Current Annual Contribution: $164,498 Recommended Annual Contribution: Averaging Interval $243,999 Full Funding $219,599 Threshold Funding Alternative Funding: 10% Increases for 4 years; Level out at $225,000 (Includes 1x loan or special assessment) 30 years Page 4

7 Physical Analysis The following data represent the Physical Analysis portion of the. This analysis is based on the Component Inventory which incorporates a Condition Assessment of each specific component. The Condition Assessment is presented as the Estimated Remaining Life of each Component with the accompanying Notes. Also included is a valuation of the replacement cost for each Component. These costs are derived as outlined within this study. Construction costs and useful life estimates in this report represent the Engineer's best judgment as a professional familiar with the construction industry. It is recognized, however, that neither the Engineer nor the Association has control over the cost of labor, energy, materials, or equipment; over the contractors' methods of determining bid prices; or over competitive bidding, marketing, or negotiating conditions. Further, the Engineer cannot accurately determine the ongoing rate of deterioration, or the amount of preventive maintenance employed on an ongoing basis for determination of estimated useful lives. In all cases, unless stated otherwise, the useful life estimates are based upon visual inspections with no destructive testing employed. Accordingly, the Engineer cannot and does not warrant or represent those bids or negotiated prices and useful lives will not vary from that presented within the evaluation prepared or agreed to by the Engineer. CATEGORY RESERVE REQUIREMENT PRESENT DOLLARS BEGINNING BALANCE BALANCE REQUIRING ANNUAL RESERVE REQUIRED FULL BALANCE PERCENT FUNDED Sitework Totals $62,623 $2,856 $59,767 $3,217 $21,222 Waterproofing Totals $284,579 $24,147 $260,432 $47,320 $179,431 Interior Finishes Totals $339,932 $25,330 $314,602 $61,936 $188,225 Exterior Finishes Totals $806,722 $78,647 $728,075 $265,841 $584,412 Electrical Totals $197,728 $6,551 $191,177 $13,901 $48,676 Special Construction $84,460 $8,757 $75,703 $30,433 $65,074 The Percent Funded and Funding Goal are based on fully funding each component within the schedule. Please review the report for various funding strategies. Mechanical Totals $2,701,993 $287,827 $2,414,166 $589,642 $2,138,780 Grand Totals $4,478,036 $434,115 $4,043,921 $1,012,290 $3,225,820 13% Page 5

8 Sitework Component Inventory Category: Sitework COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT DOLLARS BEGINNING BALANCE ANNUAL ESTIMATED ESTIMATED RESERVE USEFUL LIFE REMAINING USEFUL LIFE REQUIRED FULL BALANCE NOTES Site Concrete 5,630 SF $11.02 $62,043 $2, $2, $20,681 1 Planter 1 LS $ $580 $ $ $541 2 Notes: 1) Site Concrete: The Association maintains a drive for ingress and egress to the building and entry and exit from the garage. There is also a drive for refuse pick-up. The front of the building also includes concrete walk including handicap access to the building. The concrete was observed to be in overall fair condition. There were cracks noted that should be repaired. The area also includes catch basins and the alley. The quantity was taken from the prior reports. 2) Planter: There are planters contained within a brick wall. The brick was observed to have damaged areas as well as cracked mortar that should be repaired. This item was noted in the prior report but was separated to its own line item. Page 6

9 Waterproofing Component Inventory Category: WaterProofing COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT BEGINNING DOLLARS BALANCE ESTIMATED ESTIMATED USEFUL REMAINING LIFE USEFUL LIFE ANNUAL RESERVE REQUIRED FULL BALANCE NOTES Roof Main 58 SQ $ $49,199 $5, $8, $42,171 3 Garage Roof Membrane 14,000 SF $8.35 $116,928 $10, $21, $77,952 4 Garage 2nd Floor Membrane 13,000 SF $8.35 $108,576 $6, $12, $50,669 5 Penthouse Roofs 1 LS $5, $5,800 $ $1, $4,971 6 Roof Repairs 1 LS $4, $4,076 $ $3, $3,668 7 Totals $284,579 $24,147 $47,320 $179,431 Notes: 3) The main roof consists of a modified BTU membrane. The roof was in adequate condition for its age. Some pooling was noted just to the West of the main internal drain. The Association has entered into a roof maintenance agreement which will act to extend the roof to its maximum useful life. The roofs actual age is beyond the useful life of most comparable membranes and should be monitored carefully. The area of the roof was obtained from the prior reports. 4) The property includes a 3-level garage with parking on the roof level. The roof area was observed to be in good condition, with attention needed at the entry points and the drain areas. 5) The 2 nd floor membrane of the garage was replaced in 2009 and was observed to be in good condition. Maintaining the area and minimizing the effects of winter ice and salt will act to extend the membranes estimated remaining useful life. 6) Penthouse Roofs: The elevator penthouse roof has been added to the report, and on the same track as the main roof. 7) Roof Repairs: $4,075 is set to be spent on roof repairs in 2016, in order to extend the useful life of the roofs. Page 7

10 Interior Finishes Component Inventory Category: Interior COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT BEGINNING DOLLARS BALANCE ANNUAL ESTIMATED ESTIMATED RESERVE USEFUL LIFE REMAINING USEFUL LIFE REQUIRED FULL BALANCE NOTES Carpet 750 SY $46.42 $34,817 $3, $10, $24,372 8 Lobby Renovation 1 LS $81, $81,200 $2, $4, $16,240 9 Mailboxes 208 EA $98.60 $20,509 $ $ $1, Hall Decoration 1 LS $70, $70,760 $6, $21, $49, Party Room and Sun Deck Furnishings 1 LS $10, $10,440 $ $1, $4, Party Room Renovation 1 SF $5, $5,800 $ $2, $4, Rest Room Locker Room Renovation 1 LS $13, $13,920 $1, $3, $12, Sauna 2 EA $10, $20,880 $1, $1, $8, Garage Floor Repairs 1 LS $5, $5,046 $ $1, $3, Trash Chute and Door Repairs 1 LS $5, $5,800 $ $2, $4, Elevator Cabs 3 EA $5, $15,660 $1, $2, $12, Stairwells 1 LS $11, $11,600 $1, $1, $8, Other Interior Doors 75 EA $ $34,800 $4, $6, $30, Fire Extinguishers and Hoses 1 LS $8, $8,700 $ $1, $7, Totals $339,932 $25,330 $61,936 $188,225 Notes: 8) Carpet: The hall areas are carpeted and is approximately 15 years old. It was noted that the carpet is worn particularly at the high traffic areas at the elevators. Replacement to be advanced as per the budget allows. 9) Lobby: The lobby was renovated in ) Mail Boxes: There are mail box stacks located in a mail room adjacent to the lobby. The boxes were noted to be in good condition having been installed in 1999 and should be able to last a significant time. 11) Hall Decoration: The residential halls are primarily finished with paint. The Association plans on maintaining the corridors on the same schedule as the carpet. 12) Party Room/Sundeck Furniture: Party Room and sundeck furnishings/furniture were purchased in 2010 and 2016 and are in good condition. 13) Party Room Renovation: The party room although renovated in and updated and was observed to be in poor condition and in need of a face-lift sooner than anticipated. Page 8

11 14) Rest Room/Locker Rooms: There are two Locker rooms/restrooms serving the pool area. The floors are need of repairs especially around the drains and the plumbing fixtures were observed to be in fair condition. The fixtures can be expected to last an extended period. 15) Saunas: The restroom/pool locker areas also contain two saunas. The inserts were observed to have been updated and were in good condition 16) Garage Floor: The garage ground floor is concrete and was last extensively repaired in Due to the weather conditions and salt used during the winters in Chicago we have conservatively estimated that repairs are needed and will be done on a regular basis. Coating the entire surface is put on hold so long as regular repairs are performed. This can be reviewed again at the next update. 17) Trash Chute and Doors: There is one trash chute serving the building with access on each of the 29 floors. It appears the chute is original equipment as are the doors to the trash chute closets. However, trash chute repairs are needed if replacement is delayed. Funding for the replacement is put on hold, so long as repairs are sufficient to maintain the items. This can be reviewed again at the next update. 18) Elevator Cabs: Replacement of the elevator cab furnishings has been added to the study, and could be done in conjunction with other anticipated elevator work. 19) Stairwells: The maintenance of the stairwell walls, stairs and railings has been added to the report. 20) Interior Doors: There are various other doors located throughout the building, including stairwells, various rooms and access to the garage. Replacement of the doors should become part of the reserve budget. The actual replacement would be on as needed basis. The inventory count was done in prior reports. 21) Fire Extinguishers and Hoses: The building is also equipped with various fire extinguishers and fire hoses. These elements were included in the prior report, however up to date fire prevention equipment and systems are essential in the City of Chicago and part of the current life safety ordinance, and we have therefore added an amount to the reserve requirements for the replacement of these items. The Association has been upgrading life safety features and these are noted below. Page 9

12 Exterior Finishes Component Inventory Category: Exterior COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT DOLLARS BEGINNING BALANCE ESTIMATED ESTIMATED USEFUL REMAINING LIFE USEFUL LIFE ANNUAL RESERVE REQUIRED FULL BALANCE NOTES Balcony Capital Repairs 54 EA $4, $225,504 $21, $17, $157, Balcony Railings 54 EA $1, $56,376 $5, $4, $39, Wall City Critical Examination(s) 1 LS $4, $4,640 $ $1, $1, Wall Concrete Capital Repairs 10,000 LF $7.08 $70,760 $7, $21, $56, Tuck Pointing South 1 LS $75, $75,400 $ $3, $6, Window and Balcony Door Sealants 14,000 LF $4.93 $69,020 $7, $30, $55, Tuck Pointing North and Parapet walls 1 LS $200, $200,100 $25, $174, $192, Tuck Pointing East and West 1 LS $75, $75,400 $7, $9, $54, Smoke Stack 1 LS $17, $17,400 $1, $2, $12, Exterior Doors 8 EA $ $6,032 $ $1, $5, Garage Doors 3 EA $2, $6,090 $ $ $4, Totals $806,722 $78,647 $265,841 $584,412 Notes: 22) Balcony Repairs: There are 54 balconies constructed of reinforced concrete located on the front (South) elevation of the building. A review of the Condominium Declaration confirmed that these are common elements and the responsibility of the Association. They were last renovated in 1993 and based on our observations work should be budgeted for as necessary to maintain the integrity of the balcony surfaces. Only useful life was updated. 23) Balcony Railings: The balcony railings are constructed of steel and were replaced in They should be periodically maintained, however, due to their exposure and the weather conditions new railings should be anticipated again by 2028 based on prior useful life of the last replacement and the prior reserve studies. This can be reviewed again in the next update. 24) Critical Exam: The City of Chicago requires inspection of the building facade of this type of structure each 4 years. The Association may budget this expense through reserves or the operating budget. If the operating budget is used, then this report should be adjusted accordingly. 25) Wall/Concrete Repairs: During these inspections it is anticipated that various deficiencies may be noted and that wall and concrete repairs can be anticipated from time to time. This is in addition to the scheduled tuck pointing. 26) Tuck Pointing (South Wall) The façade is primarily brick with decorative concrete details. Extensive tuck pointing was on the South wall in Tuck pointing is anticipated to last years if done properly. If the upcoming critical exams change the useful life estimates they can be revised accordingly. 27) Window and Door Sealants: A review of the Declaration of Condominium indicated that the individual unit windows and balcony doors are limited common elements. Therefore, the replacement costs of the windows and doors have been removed as limited common elements are the financial responsibility of the Page 10

13 individual unit owners. There remain various common area windows and therefore the cost to maintain the windows and doors as well as caulking the limited elements have been included in the reserve budget. 28) Tuck Pointing North and Garage Parapet Walls: Tuck pointing projects have been broken down in this report. The North wall work is scheduled for The parapet walls of the garage roof should also be included. 29) Tuck Pointing East and West Walls: The East and West walls have less square footage to cover and are scheduled together in 5-7 years. 30) Smoke Stack: The smoke stack painting and repairs have been added to be done with the West wall. 31) Exterior Doors: The building maintains several common exterior doors including automated handicapped accessible entry doors, garage entry and trash entry doors. An estimated amount was therefore included to this report and added to the update as an additional element. 32) Garage Doors: There are three overhead garage doors. However, the one by the trash area is not in use and not considered in the replacement costs. This item is add-on to the study. Page 11

14 Electrical Component Inventory Category: Electrical COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT BEGINNING DOLLARS BALANCE ANNUAL ESTIMATED ESTIMATED RESERVE USEFUL LIFE REMAINING USEFUL LIFE REQUIRED FULL BALANCE NOTES Interior Fixtures 108 EA $ $20,045 $1, $2, $13, Emergency and Exit Fixtures 99 EA $ $37,323 $1, $2, $13, Intercom 1 LS $30, $30,160 $1, $1, $9, Garage Openers 2 EA $2, $4,640 $ $ $ Elevators Controls Upgrades 3 EA $0.00 $0 $ $0.00 $0 37 Security System Equipment 1 LS $7, $7,540 $ $ $ Life Safety Upgrades 1 LS $81, $81,200 $ $5, $5, Gararge Lighting 1 LS $8, $8,700 $ $ $2, Exterior Lighting 1 LS $8, $8,120 $ $ $3, Totals $197,728 $6,551 $13,901 $48,676 Notes: 33) Interior Fixtures: There are wall mounted light fixtures located throughout the interior common area hallways and other common areas primarily updated in Updating these with energy efficient lights whenever possible is highly recommended. (Useful Life Change Only) 34) Emergency and Exit Fixtures: Emergency and Exit lighting in the stairwells, hallways and garage areas is sufficient for this structure. These were installed in 2002 and in (Useful Life was adjusted to average in the newer fixtures) 35) Intercom: The Association installed a new wireless intercom system in 2008 and was observed to be in working condition. (Useful Life Change Only) 36) Garage Door Openers: The garage has two operating overhead doors one at ground level and one at roof level. There is in addition one smaller overhead door that is no longer used. The openers were recently installed and in good condition and operating at the time of inspection. 37) Elevator Control Upgrades: The building is equipped with three traction Otis elevators. The drives are located in the elevator penthouse (see elevators below). One generator has been repaired since the time of the last update. Elevator controls and specifications as required by City Ordinance is constantly in flux and should be closely monitored. Updates to the controls and also to the cabs should be anticipated going forward. An elevator renovation project is in the planning and controls maybe a part. If that is done this section should be updated accordingly. The cost of new controls will be factored in to the elevator modernization plan in the mechanical section below on p ) Security System and Equipment: A new key FOB system was installed in 2015 and additional cameras to upgrade overall security. This item was added to the study. Page 12

15 39) Life Safety Upgrades: The building completed some life safety upgrades in 2015 the rest in 2016 as per the City Hi-Rise Ordinance. A line item has been established for this as well. 40) Garage Lighting: The garage new lighting installed in ) Exterior Lights: The building has various exterior lighting fixtures, including garage roof pole mounted and wall mounted fixtures, front entry overhead lights, emergency lights, as well as four light standards. Some outside lights were removed and the amount being collected has been slightly reduced from the prior report. Page 13

16 Special Construction Component Inventory Category: Special Construction COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT BEGINNING DOLLARS BALANCE ANNUAL ESTIMATED ESTIMATED RESERVE USEFUL LIFE REMAINING USEFUL LIFE REQUIRED FULL BALANCE NOTES Pool Filter 1 EA $3, $3,260 $ $ $2, Pool Heater 1 EA $6, $6,380 $ $2, $5, Pool Liner 1 EA $37, $37,120 $4, $16, $32, Pool Piping 1 LS $5, $5,800 $ $ $1, Pool Walls 1 LS $23, $23,200 $2, $10, $21, Pool Deck 1 LS $8, $8,700 $ $ $2, Totals $84,460 $8,757 $30,433 $65,074 Notes: 42) Pool Filter: There is an indoor pool located on the 30 th floor. The pool is equipped with a sand type filter installed in As long as it is maintained and the other mechanical parts including chlorinators, pumps, controls, pipes, fittings and valves are replaced and maintained the filter should meet or exceed its estimated remaining useful life. (Useful life changes only) 43) Pool Heater: The pool is equipped with a gas fired heater, installed in 1984 and rebuilt in Due to the ability of the maintenance staff to maintain and repair the system the need for replacement may not be necessary but it is scheduled for replacement in ) Pool Liner: Fiberglass pool liners have a10-12year useful life. The pool usage however is light to moderate and the pool area is frequently serviced, therefore the liner generally lasts up to 15 years. However, the liner has had to have several repairs and should be scheduled for replacement. 45) Pool Piping: The piping should be monitored closely for leaks and maintained. A replacement pipe was installed in ) Pool Walls: The pool walls are in need of tuck pointing and painting and has been added to the budget. 47) Pool Deck: The pool deck was replaced with a safety deck surface in 2010 and was noted to be in good condition. Note: The windows around the pool were replaced in Their useful life and remaining useful should exceed the 30-year time frame of this report and thus have not been included. Page 14

17 Mechanical Component Inventory Category: Mechanical COMPONENT QUANTITY UNIT COST RESERVE REQUIREMENT PRESENT DOLLARS BEGINNING BALANCE ESTIMATED ESTIMATED USEFUL REMAINING LIFE USEFUL LIFE ANNUAL RESERVE REQUIRED FULL BALANCE NOTES Air Conditioning Compressors 1 EA $75, $75,400 $9, $65, $73, Boilers 7 EA $29, $203,000 $11, $9, $87, Cooling Tower 1 EA $20, $20,880 $1, $1, $10, MAU Unit 1 EA $13, $13,920 $ $ $1, Air Handlers 2 EA $11, $22,040 $2, $2, $16, Trash Compactor 1 EA $16, $16,240 $ $ $1, Domestic Hot Water Heaters 2 EA $8, $17,400 $1, $1, $7, Plumbing Repairs 1 LS $12, $12,499 $1, $11, $9, Heat Pumps 3 EA $17, $52,200 $3, $3, $26, Circulating Pumps 5 EA $6, $34,800 $2, $3, $20, Exhaust Fan Phase 1 (3) 3 EA $2, $8,700 $ $ $ Exhaust Fans Phase 2 (4) 4 EA $3, $12,064 $1, $3, $10, Elevator Penthouse HVAC 1 LS $0.00 $0 $ $0.00 $0 60 Hot Water Risers I 1 LS $522, $522,000 $58, $46, $435, Hot Water Risers II 1 LS $522, $522,000 $56, $38, $417, Cold Water Risers 1 LS $464, $464,000 $47, $29, $355, Storage Tanks 3 EA $2, $8,700 $ $ $2, Elevator Modernization 3 EA $77, $232,050 $30, $201, $226, Elevator Modernization 3 EA $77, $232,050 $29, $101, $220, Elevator Modernization 3 EA $77, $232,050 $28, $67, $214, Totals $2,701,993 $287,827 $589,642 $2,138,780 Notes: 48) Air Conditioning: The common areas are cooled by an air conditioning unit with one compressor installed on the 2 nd floor. Compressors have been replaced and the unit was replaced in While the unit is new and installed in the 2 nd floor ceiling, the ventilation system must be repaired as the dampers were not working thus limiting the efficiency of the unit. 49) Boilers: The Association has 6 Lochinvar Boilers and one Dura-Max installed in 2005 to provide heat to the residential units and common areas. This was a significant upgrade to the prior system however the efficiency and structure should be reviewed to ensure the application is the best that could be utilized. (Useful life change only) 50) Cooling Tower: The building is equipped with a BAC cooling tower to assist the compressor system to cool the common areas. The current unit was installed in 2002 and was observed in good operating condition. (Useful life change only) Page 15

18 51) Make Up Air Unit: The Yasakawa MAU unit was installed in This unit heats the outside air for the building. 52) Air Handlers: There are 2 other Air Handlers on located on the garage roof parking area servicing floors 1-15 and one located on the 30 th floor for floors ) Trash Compactor: Anew compactor was installed in 2014 and in good operating condition. 54) Domestic Hot Water Heaters: 2 A.O. Smith Hot Water Heaters were installed in 2005 and in good operating condition. 55) Plumbing Repairs: Plumbing repairs are needed for 2016 and due to the age of the building it is reasonable to foresee repairs will be needed on a regular basis. 56) Heat Pumps: Heat pumps are installed to work with the boilers for the building heat delivery. The staff keeps them in good working condition. 57) Circulating Pumps: There are circulating pumps for water delivery assistance working with the Hot Water Boilers and the storage tanks. 58) Exhaust Fans I: Three of the 7 exhaust fans located on the main and garage roof have been replaced. 59) Exhaust Fans II: There are plans to replace the other 4 fans. 60) Elevator Penthouse HVAC: It is highly recommended particularly in light of the projected elevator overhaul that the elevator penthouse be equipped with its own HVAC combo-pack unit. His has been added to the schedule, the cost being initially included in the elevator modernization budget. 61) Hot Water Risers I: Plumbing infrastructure circa 1967 is due for replacement to begin and should be planned for on or before the next 10 years. The valves for the baseboard heating units are also original and their replacement should be handled along with the piping. 62) Hot Water Risers II: The project has been split due to the nature of its size and budgetary purposes. 63) Cold Water Risers: The cold water risers generally last slightly longer than hot water. All risers replacements were added to this report. 64) Storage Tanks: The Hot Water system includes storage tanks that are in good condition and well maintained. 65) Elevator Modernization: The three traction machines have original geared drives and other equipment that has never been replaced since the machines were put into use some 50 years ago. A complete overhaul is anticipated and in the planning stages. The work will be phased in beginning in 2016 and take 3 years to complete. Page 16

19 Financial Analysis The Cash Flow Chart and Cash Flow Graph (pages 19, 20 and 21) contain a Projected Thirty (30) Year Cash Flow of the reserve requirements for The. This analysis contains four (4) funding scenarios. The first, entitled Full Funding is based on the assumption that all of the items which make up the schedule will be fully funded. In other words, Full Funding means that each component will accumulate its full replacement cost over the span of its Estimated Useful Life. When a component reaches the end of its useful life (which varies for each reserve component), the component would be replaced and the funding cycle would immediately begin again for that particular component. Because expenditures vary from year to year, the Annual Contribution to the reserve changes over the projection period. Since it is impractical for the Association to adjust the amount of its contribution to the reserve fund on a yearly basis, a cash flow analysis based on an average contribution amount (designated Average Annual Contribution) is shown under Full Funding Analysis on page 19. The average annual contribution is based on an average of Full Funding contributions over all 30 years. The second funding scenario, entitled Current Funding, represents a projection of the Association s current contribution amount for the next 30 years. It is based on the Beginning Balance provided by Mr. Nicholas Burbulis and the calculated expenditures. We find that Current Funding is insufficient and will require increases and a special assessment to manage all the upcoming projects that are needed for this property. A negative balance would begin in 2018 due to the anticipated elevator project and other high end work. (We however, anticipate a loan or special assessment for this project (see alternative funding scenario) so that the plans would need to be adjusted once the elevator budget and financing options are decided upon by the Association.) The third funding scenario, entitled Baseline or Threshold Funding represents a projection of reserve contributions and expenditures which would allow for the Association to plan contributions less than the amount recommended for Full Funding. This funding plan is often utilized by Associations that have been historically underfunded and are unable to contribute the amounts needed for full funding but still then able to contribute a sufficient amount to meets its responsibilities. Should The Association decide to adopt Baseline or Threshold Funding this report should be updated a minimum of every two (2) years to avoid negative reserve balances. It is noted that the amount recommended is less than the full funding amount but more than the Association currently contributes. Despite that due to the projects projected for the near term this plan alone is insufficient without a special assessment or bank loan to supplement that funding. The fourth funding scenario is an Alternative Funding Plan and is on page 20. This plan would increase the assessments by 10% for the next 4 years and then level off at $225,000 for the remainder of the plan. A $600,000 special assessment would be needed for the elevator project, otherwise all other projects in the time frame would be able to be met and a health reserve balance should be accumulated by 2045 increasing the over value of the property and the units. The following data was calculated for The : 1. The Full Funding Annual Contribution for the year beginning 2016 would be $1,012,290. This amount is taken directly from the Summary of Replacement Reserve Needs on page 5 and is the amount used in the cash flow projection. 2. Projections of the Full Funding Annual Contribution amount for Years 2017 through 2045 vary from year to year but, generally decrease over time to an amount of $151,107 in the final year of the projection. 3. The Average Annual Contribution is $243,999. The average annual contribution is based on an average of Full Funding contributions over all 30 years. However, without a loan or special assessment this contribution amount would also be insufficient to keep the reserve balance positive in the years 2018,2027,2029 and Page 17

20 4. The average annual contribution for Baseline/Threshold Funding is $219,599. This is 10% less than the full funding plan, however has multiple years where there would be negative balances to the fund. Either loans or special assessments would be needed in these years for specific projects. This plan on its face costs $730,000 less than the full funding plan, but does not account for the loans or special assessments that would be required. 5. The alternative funding plan begins with the current annual budgeted contribution. In the years a 10% increase to the reserve contribution is planned. In 2022 through the remainder of the plan the annual contribution would level off at $225, The plan contemplates that in order to meet the funds required by the anticipated upcoming projects a $600,000 special assessment or loan would be needed in 2017 for the elevator project, which is beginning in This is only a sample projection and if adopted a clear understanding of the timing and cost of the elevator program should be included in the finalized plan adopted by the Association. This would be the only year a special assessment or bank loan is projected to be needed. The loan point of the plan would be a balance of around $8,000 in This plan would be $75,000 less than the full funding costs. However, noting the reserve balances there should be funds available in the reserves to handle the interest costs due to any loans. On the Projected Thirty (30) Year Cash Flow Chart on page 19, the column entitled Reserve Fund Balance shows the projected reserve fund amounts over the thirty (30) year period. This cash balance is also represented by the upper line on the Cash Flow Graph (see page 21) which is designated as the Reserve Fund Balance Full Funding. (The other funding plans are also represented in the chart and graph.) This is calculated by taking the amount that is currently contained in the reserve fund, adding to it the Average Annual Contribution, and subtracting the Annual Expenditure, if any. The Alternative cash flow is found on the chart on page 20. Page 18

21 Financial Analysis Year Beginning Annual Contribution Average Annual Contribution Effective Date: January 1, 2016 Annual Expenditure Reserve Fund Balance Annual Contribution Reserve Fund Balance Annual Contribution Reserve Fund Balance Pooling Factor 90.00% 2015 Beginning Balance $434,115 $164,498 $434,115 $434, $1,012,290 $243,999 $524,125 $153, $684,315 $243,999 $379,950 $18, $520,264 $243,999 $430,137 -$168, $314,857 $243,999 $13,920 $61, $338,023 $243,999 $237,119 $68, $265,037 $243,999 $24,099 $288, $269,265 $243,999 $100,700 $432, $259,358 $243,999 $191,551 $484, $232,314 $243,999 $10,440 $718, $244,414 $243,999 $522,000 $440, $198,814 $243,999 $21,215 $662, $207,343 $243,999 $913,500 -$6, $168,018 $243,999 $110,623 $126, $168,090 $243,999 $575,940 -$205, $155,582 $243,999 $77,720 -$38, $154,925 $243,999 $131,022 $74, $153,616 $243,999 $73,660 $244, $153,176 $243,999 $70,760 $417, $152,877 $243,999 $20,880 $640, $153,338 $243,999 $381,971 $502, $151,764 $243,999 $25,275 $721, $151,846 $243,999 $80,620 $884, $151,890 $243,999 $315,479 $813, $151,269 $243,999 $10,440 $1,046, $151,289 $243,999 $0 $1,290, $151,395 $243,999 $226,519 $1,308, $151,163 $243,999 $27,840 $1,524, $151,170 $243,999 $64,009 $1,704, $151,151 $243,999 $91,640 $1,856, $151,107 $243,999 $15,660 $2,085,263 TOTAL $7,319,961 $7,319,961 Reserve Study Funding Plan Projected Thirty Year Cash Flow FULL ANALYSIS CURRENT ANALYSIS $164,498 $74,488 $219,599 $129,589 $164,498 -$140,964 $219,599 -$30,762 $164,498 -$406,603 $219,599 -$241,301 $164,498 -$256,025 $219,599 -$35,622 $164,498 -$328,646 $219,599 -$53,142 $164,498 -$188,247 $219,599 $142,358 $164,498 -$124,449 $219,599 $261,257 $164,498 -$151,502 $219,599 $289,305 $164,498 $2,556 $219,599 $498,464 $164,498 -$354,946 $219,599 $196,062 $164,498 -$211,663 $219,599 $394,447 $164,498 -$960,665 $219,599 -$299,455 $164,498 -$906,790 $219,599 -$190,479 $164,498 -$1,318,232 $219,599 -$546,820 $164,498 -$1,231,454 $219,599 -$404,941 $164,498 -$1,197,978 $219,599 -$316,365 $164,498 -$1,107,140 $219,599 -$170,426 $164,498 -$1,013,402 $219,599 -$21,587 $164,498 -$869,784 $219,599 $177,132 $164,498 -$1,087,257 $219,599 $14,760 $164,498 -$948,033 $219,599 $209,084 $164,498 -$864,155 $219,599 $348,063 $164,498 -$1,015,137 $219,599 $252,183 $164,498 -$861,079 $219,599 $461,342 $164,498 -$696,581 $219,599 $680,940 $164,498 -$758,602 $219,599 $674,020 $164,498 -$621,944 $219,599 $865,779 $164,498 -$521,455 $219,599 $1,021,369 $164,498 -$448,597 $219,599 $1,149,328 $164,498 -$299,759 $219,599 $1,353,267 $4,934,940 $6,587,965 Baseline/Threshold Funding Analysis Page 19

22 ALTERNATIVE Year Beginning Annual Contribution Reserve Fund Balance TOTAL Pooling Factor 0.00% $434,115 $164,498 $74,488 $780,947 $475,485 $199,042 $244,390 $218,945 $449,415 $240,839 $453,135 $225,000 $654,036 $225,000 $778,336 $225,000 $811,785 $225,000 $1,026,345 $225,000 $729,345 $225,000 $933,130 $225,000 $244,630 $225,000 $359,007 $225,000 $7,977 $225,000 $155,347 $225,000 $249,325 $225,000 $396,605 $225,000 $530,845 $225,000 $714,965 $225,000 $559,898 $225,000 $739,623 $225,000 $884,363 $225,000 $793,884 $225,000 $1,008,444 $225,000 $1,253,444 $225,000 $1,231,925 $225,000 $1,429,085 $225,000 $1,610,585 $225,000 $1,743,945 $225,000 $1,953,285 $7,229,271 Page 20

23 Page 21

24 Financial Analysis Expenditure List (Projected) CHARTS Category Expenditures by Year (Present Dollars) Sitework Totals $0 $580 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Waterproofing Totals $4,076 $0 $0 $0 $171,927 $0 $0 $108,576 $0 $0 $4,076 $0 $0 $0 $0 Interior Finishes Totals $0 $11,600 $110,623 $13,920 $59,160 $11,600 $0 $0 $10,440 $0 $0 $11,600 $110,623 $0 $20,880 Exterior Finishes Totals $200,100 $69,020 $75,400 $0 $6,032 $0 $97,440 $6,090 $0 $0 $4,640 $350,900 $0 $0 $4,640 Electrical Totals $0 $0 $0 $0 $0 $0 $0 $20,045 $0 $0 $0 $8,120 $0 $94,540 $0 Special Construction Totals $0 $66,700 $0 $0 $0 $0 $3,260 $0 $0 $0 $0 $0 $0 $0 $0 Mechanical Totals $319,949 $232,050 $244,114 $0 $0 $12,499 $0 $56,840 $0 $522,000 $12,499 $542,880 $0 $481,400 $52,200 Grand Totals $524,125 $379,950 $430,137 $13,920 $237,119 $24,099 $100,700 $191,551 $10,440 $522,000 $21,215 $913,500 $110,623 $575,940 $77,720 Page 22

25 INDIVIDUAL CATEGORIES LISTED BELOW Category: Sitework Component Expenditures by Year (Present Dollars) Site Concrete Planter $0 $580 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Totals $0 $580 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Category: Waterproofing Component Expenditures by Year (Present Dollars) Roof Main $0 $0 $0 $0 $49,199 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Garage Roof Membrane $0 $0 $0 $0 $116,928 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Garage 2nd Floor Membrane $0 $0 $0 $0 $0 $0 $0 $108,576 $0 $0 $0 $0 $0 $0 $0 Penthouse Roofs $0 $0 $0 $0 $5,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Roof Repairs $4,076 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,076 $0 $0 $0 $0 Totals $4,076 $0 $0 $0 $171,927 $0 $0 $108,576 $0 $0 $4,076 $0 $0 $0 $0 Page 23

26 Category: Interior Finishes Component Expenditures by Year (Present Dollars) Carpet $0 $0 $34,817 $0 $0 $0 $0 $0 $0 $0 $0 $0 $34,817 $0 $0 Lobby Renovation Mailboxes Hall Decoration $0 $0 $70,760 $0 $0 $0 $0 $0 $0 $0 $0 $0 $70,760 $0 $0 Party Room and Sun Deck Furnishings $0 $0 $0 $0 $0 $0 $0 $0 $10,440 $0 $0 $0 $0 $0 $0 Party Room Renovation $0 $5,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,800 $0 $0 $0 Rest Room Locker Room Renovation $0 $0 $0 $13,920 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Sauna $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,880 Garage Floor Repairs $0 $0 $5,046 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,046 $0 $0 Trash Chute and Door Repairs $0 $5,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $5,800 $0 $0 $0 Elevator Cabs $0 $0 $0 $0 $15,660 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Stairwells $0 $0 $0 $0 $0 $11,600 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Interior Doors $0 $0 $0 $0 $34,800 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fire Extinguishers and Hoses $0 $0 $0 $0 $8,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Totals $0 $11,600 $110,623 $13,920 $59,160 $11,600 $0 $0 $10,440 $0 $0 $11,600 $110,623 $0 $20,880 Category: Exterior Finishes Component Expenditures by Year (Present Dollars) Balcony Capital Repairs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $225,504 $0 $0 $0 Balcony Railings $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $56,376 $0 $0 $0 Wall City Critical Examination(s) $0 $0 $4,640 $0 $0 $0 $4,640 $0 $0 $0 $4,640 $0 $0 $0 $4,640 Wall Concrete Capital Repairs $0 $0 $70,760 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Tuck Pointing South Window and Balcony Door Sealants $0 $69,020 $0 $0 $0 $0 $0 $0 $0 $0 $0 $69,020 $0 $0 $0 Tuck Pointing North and Parapet walls $200,100 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Tuck Pointing East and West $0 $0 $0 $0 $0 $0 $75,400 $0 $0 $0 $0 $0 $0 $0 $0 Smoke Stack $0 $0 $0 $0 $0 $0 $17,400 $0 $0 $0 $0 $0 $0 $0 $0 Exterior Doors $0 $0 $0 $0 $6,032 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Garage Doors $0 $0 $0 $0 $0 $0 $0 $6,090 $0 $0 $0 $0 $0 $0 $0 Totals $200,100 $69,020 $75,400 $0 $6,032 $0 $97,440 $6,090 $0 $0 $4,640 $350,900 $0 $0 $4,640 Category: Electrical Component Expenditures by Year (Present Dollars) Interior Fixtures $0 $0 $0 $0 $0 $0 $0 $20,045 $0 $0 $0 $0 $0 $0 $0 Emergency and Exit Fixtures Intercom Garage Openers $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,640 $0 Elevators Controls Upgrades Security System Equipment Life Safety Upgrades $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $81,200 $0 Gararge Lighting $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,700 $0 Exterior Lighting $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,120 $0 $0 $0 Totals $0 $0 $0 $0 $0 $0 $0 $20,045 $0 $0 $0 $8,120 $0 $94,540 $0 Page 24

27 Category: Special Construction Component Expenditures by Year (Present Dollars) Pool Filter $0 $0 $0 $0 $0 $0 $3,260 $0 $0 $0 $0 $0 $0 $0 $0 Pool Heater $0 $6,380 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Pool Liner $0 $37,120 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Pool Piping Pool Walls $0 $23,200 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Pool Deck Totals $0 $66,700 $0 $0 $0 $0 $3,260 $0 $0 $0 $0 $0 $0 $0 $0 Category: Mechanical Component Expenditures by Year (Present Dollars) Air Conditioning Compressors $75,400 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Boilers Cooling Tower $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $20,880 $0 $0 $0 MAU Unit Air Handlers $0 $0 $0 $0 $0 $0 $0 $22,040 $0 $0 $0 $0 $0 $0 $0 Trash Compactor Domestic Hot Water Heaters $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $17,400 $0 Plumbing Repairs $12,499 $0 $0 $0 $0 $12,499 $0 $0 $0 $0 $12,499 $0 $0 $0 $0 Heat Pumps $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $52,200 Circulating Pumps $0 $0 $0 $0 $0 $0 $0 $34,800 $0 $0 $0 $0 $0 $0 $0 Exhaust Fan Phase 1 (3) Exhaust Fans Phase 2 (4) $0 $0 $12,064 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Elevator Penthouse HVAC Hot Water Risers I $0 $0 $0 $0 $0 $0 $0 $0 $0 $522,000 $0 $0 $0 $0 $0 Hot Water Risers II $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $522,000 $0 $0 $0 Cold Water Risers $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $464,000 $0 Storage Tanks Elevator Modernization $232,050 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Elevator Modernization $0 $232,050 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Elevator Modernization $0 $0 $232,050 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Totals $319,949 $232,050 $244,114 $0 $0 $12,499 $0 $56,840 $0 $522,000 $12,499 $542,880 $0 $481,400 $52, PROJECTED EXPENDITURES Category Expenditures by Year (Present Dollars) Sitework Totals $0 $0 $0 $0 $62,043 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Waterproofing Totals $0 $0 $0 $0 $116,928 $4,076 $0 $108,576 $0 $0 $0 $0 $0 $0 $0 Interior Finishes Totals $81,200 $0 $0 $0 $0 $0 $11,600 $110,623 $10,440 $0 $0 $0 $20,509 $0 $15,660 Exterior Finishes Totals $0 $0 $70,760 $4,640 $0 $0 $69,020 $80,040 $0 $0 $200,100 $4,640 $0 $0 $0 Electrical Totals $37,323 $30,160 $0 $7,540 $0 $0 $0 $0 $0 $0 $0 $0 $0 $85,840 $0 Special Construction Totals $0 $43,500 $0 $8,700 $0 $0 $0 $0 $0 $0 $0 $23,200 $0 $5,800 $0 Mechanical Totals $12,499 $0 $0 $0 $203,000 $21,199 $0 $16,240 $0 $0 $26,419 $0 $43,500 $0 $0 Totals $62,623 $518,234 $610,479 $1,243,462 $283,568 $151,160 $2,799,138 Grand Totals $131,022 $73,660 $70,760 $20,880 $381,971 $25,275 $80,620 $315,479 $10,440 $0 $226,519 $27,840 $64,009 $91,640 $15,660 $5,668,664 Page 25

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii 96821 res1cfdl@hawaiiantel.net INDEPENDENT AUDITOR'S REPORT Board of Directors of The Association of Apartment Owners of Report on the

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

SAMPLE CONDO RESERVE STUDY for fiscal year 2012

SAMPLE CONDO RESERVE STUDY for fiscal year 2012 SAMPLE CONDO RESERVE STUDY for fiscal year 2012 RDA REPORT - UPDATED RESERVE ANALYSIS FOR FISCAL YEAR 2012 RESERVE DATA ANALYSIS, INC MPLS (612) 616-4817 TOLL FREE (866) 780-7943 WWW.RDAMIDWEST.COM UPDATE

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Our Focus: Your Future

Our Focus: Your Future Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: November 13, 2013 To: Rob Ross, Gateview From: Richard Avelar & Associates (RA&A) Re: Gateview; Update w/ Site Visit Review Attached, please find the reserve study

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

"Full" Reserve Study. Makaha Surfside AOAO Waianae, HI

Full Reserve Study. Makaha Surfside AOAO Waianae, HI "Full" Reserve Study Makaha Surfside AOAO Waianae, HI Report #: For Period Beginning: Expires: Date Prepared: 32902-0 January 1, 2018 December 31, 2018 May 9, 2018 T W Hello, and welcome to your Reserve

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Watermark Tower - Residential Association 1107-1 st Avenue, Seattle, WA 98101 For: Watermark Tower Residential Association c/o Alicia Graham, Property Manager CWD Group, Inc.

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Sample Only. Maintenance Budget Plan Report - V2. 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS

Sample Only. Maintenance Budget Plan Report - V2. 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS Maintenance Budget Plan Report - V2 1 Sample Street, Melbourne VIC 3022 OC4, OC5, OC6, OC7 & OC8 Plan of Subdivision: PS 123456 30+ Years Experience In Reporting Services Our Quality Reports Make Roscon

More information

LEVEL II RESERVE STUDY HARRISON WEST CONDOMINIUM OWNERS ASSOCIATION

LEVEL II RESERVE STUDY HARRISON WEST CONDOMINIUM OWNERS ASSOCIATION LEVEL II RESERVE STUDY HARRISON WEST CONDOMINIUM OWNERS ASSOCIATION Portland, OR January 1, 2017 December 31, 2017 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: November 11, 2016

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

REPLACEMENT RESERVE GUIDE

REPLACEMENT RESERVE GUIDE CANADA MORTGAGE AND HOUSING CORPORATION REPLACEMENT RESERVE GUIDE What is the Replacement Reserve? The replacement reserve is a fund kept by each housing sponsor under the terms of its operating agreement

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5 DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report

More information

Reserve Study: Alpenrose Condominium Association

Reserve Study: Alpenrose Condominium Association Reserve Study: Alpenrose Condominium Association The Alpenrose Condominiums 74 Erste Strausse Snoqualmie Pass, Washington 98068 Originally Prepared October 5 th 2009 Updated with inspection November 15

More information

THE PARKSHORE CONDOMINIUM ASSOCIATION. Financial Statements December 31, 2017 and 2016

THE PARKSHORE CONDOMINIUM ASSOCIATION. Financial Statements December 31, 2017 and 2016 THE PARKSHORE CONDOMINIUM ASSOCIATION Financial Statements December 31, 2017 and 2016 THE PARKSHORE CONDOMINIUM ASSOCIATION - 2 - FINANCIAL STATEMENTS DECEMBER 31, 2017 AND 2016 TABLE OF CONTENTS PAGE(S)

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

Harnett Central High

Harnett Central High NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

Reserve Studies Turnover Reports Insurance Appraisals

Reserve Studies Turnover Reports Insurance Appraisals Reserve Studies Turnover Reports Insurance Appraisals Dear Board Members, Managers and Unit Owners, For twenty years we having been serving community associations throughout Florida and the Southeast United

More information

Condominium Reserve Fund Planners Inc.

Condominium Reserve Fund Planners Inc. Condominium Reserve Fund Planners Inc. Reserve Fund Study York County Condominium Corporation No. 10 185 Reynolds Street Fredericton, NB E3A 0K7 Prepared for Board of Directors May 29, 2014 Table of Contents

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

Reserve Request Instructions: Documentation Requirements

Reserve Request Instructions: Documentation Requirements Reserve Request Instructions: Documentation Requirements These instructions specify documentation that must be submitted with requests for withdrawals from property reserve accounts held by IHDA. All requests

More information

What did they tell me?

What did they tell me? LBS Insurance Commission Oct 25, 2018 What did they tell me? Handouts from the October 25, 2018 Insurance Town Hall C R. Reynolds 1 High Level Recap of Changes for 2018-19 Deductible $5,000 -> $25,000

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Smoky Ridge 19902 E Red Fox Ln Centennial, CO Level I Study with Site Inspection Fiscal Year End Date: 12/31/2017 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information

Anderson Creek Primary

Anderson Creek Primary NC School District/430 Harnett County/Elementary School Anderson Creek Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

Mrs. Casey Davis Houston Community Management Services El Comino Real Houston, Texas 77058

Mrs. Casey Davis Houston Community Management Services El Comino Real Houston, Texas 77058 Mrs. Casey Davis Houston Community Management Services 7049 El Comino Real Houston, Texas 77058 Reference: Detailed Reserve Study Kipcon Dear Mrs. Davis: Attached please find Kipcon s Detailed Reserve

More information

FHA Renovation Loan Program, or 203K

FHA Renovation Loan Program, or 203K FHA Renovation Loan Program, or 203K The Federal Housing Administration (FHA), which is part of the Department of Housing and Urban Development (HUD), administers various single family mortgage insurance

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Westmount Place Renovations Policy

Westmount Place Renovations Policy Conditions Precedent to the Implementation of Renovations 1. Condominium Bylaws and Regulations No renovations or modifications shall be implemented without authorization of the Board of Directors. All

More information

William Bradley Bryant Center

William Bradley Bryant Center DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Depreciation Report Level I

Depreciation Report Level I Depreciation Report Level I Prepared for Strata VIS 2720 s 2013 Fiscal Year Prepared by RBC STRATA CONSULTING LTD. Version 3.1 2014 RBC STRATA CONSULTING LTD. Have questions about this Depreciation Report.

More information

Summary of Depreciation Report. 888 Beach Avenue Strata Plan LMS 712 Halsall Project 213vA040A Vancouver, BC

Summary of Depreciation Report. 888 Beach Avenue Strata Plan LMS 712 Halsall Project 213vA040A Vancouver, BC G Summary of Depreciation Report 888 Beach Avenue Strata Plan LMS 712 Halsall Project 213vA040A Vancouver, BC Presented by Kevin Grasty, P.Eng., LEED AP Ed Watson, B.Sc.(Eng.) Halsall Associates November

More information

Stone Mountain Middle

Stone Mountain Middle DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

SINKING FUND PLAN UPDATE

SINKING FUND PLAN UPDATE SINKING FUND PLAN UPDATE RIVERVIEW APARTMENTS 10 Broughton Street Canterbury NSW 2193 Strata Plan 50834 Report details Inspection date: 19/10/2016 Inspector: Marco Camps NEW SOUTH WALES QUEENSLAND VICTORIA

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

CLASSICO STRATA PLAN BCS 460

CLASSICO STRATA PLAN BCS 460 CLASSICO STRATA PLAN BCS 460 STRATA COUNCIL MEETING MINUTES TUESDAY, FEBRUARY 27, 2018, 5:30 PM COUNCIL PRESENT: Roman Piechocki President/Treasurer Peter van Diepen Vice-President Irfaan Hafeez Ken Sopko

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

CAPITAL RESERVE FUNDING ANALYSIS

CAPITAL RESERVE FUNDING ANALYSIS CAPITAL RESERVE FUNDING ANALYSIS FOR BROADWAY HOUSING, LLC 625 SW Jackson Portland, OR Prepared by: Capital Reserve Consultants, LLC Carson M. Horton, RS April 2014 Copyright 2014 USA / Canada 503 336

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: January 1, 2014 Copyright

More information

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta Entuitive Corporation Calgary + Toronto Howsyth Court Condominium Corporation No. CCN9011190 305 25 Avenue SW Calgary, Alberta Submitted By: Entuitive Corporation 209 8 th Avenue SW, Suite 300 Calgary,

More information

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus Dashboard

More information

Mountain Heritage High

Mountain Heritage High NC School District/995 Yancey County/High School Mountain Heritage High Final Campus Assessment Report March 12, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 7 Campus

More information

FOR APARTMENTS SEGMENT

FOR APARTMENTS SEGMENT UNDERWRITING GUIDELINES FOR APARTMENTS SEGMENT Local exceptions to these underwriting guidelines may apply. Please consult with your underwriter or sales executive for details and to discuss risks which

More information

Harnett Central Middle

Harnett Central Middle NC School District/430 Harnett County/Middle School Harnett Central Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149

Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Update With Site-Visit Reserve Study Park Place HOA Surprise, Arizona Report #: 12568-2 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: October 4, 2016 Hello, and welcome

More information

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary

More information

Underwriting guidelines

Underwriting guidelines Underwriting guidelines CONDOMINIUM Local exceptions to these underwriting guidelines may apply. Please consult with your underwriter or sales executive for details and to discuss risks that exceed the

More information

Condominium. Travelers Condominium Pac SM and Condominium Pac Plus SM are designed for owners of buildings used exclusively as condominiums.

Condominium. Travelers Condominium Pac SM and Condominium Pac Plus SM are designed for owners of buildings used exclusively as condominiums. 25 Condominium Travelers Condominium Pac SM and Condominium Pac Plus SM are designed for owners of buildings used exclusively as condominiums. Eligibility Up to $10 million Total Insured Values per building,

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2017 December 31, 2017 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: April 6, 2017 Copyright

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

PROPOSED FIRST YEAR BUDGET

PROPOSED FIRST YEAR BUDGET PROPOSED FIRST YEAR BUDGET for JASPER CONDOS A STANDARD CONDOMINIUM PLAN located at 716 Main Street East Milton, Ontario by MILTON CENTRE CO-OPERATIVE DEVELOPMENT CORPORATION A Condominium Project Pursuant

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

METROPOLITAN TORONTO CONDOMINIUM CORPORATION NO. 878 FINANCIAL STATEMENTS WITH INDEPENDENT AUDITOR'S REPORT JUNE 30, 2015

METROPOLITAN TORONTO CONDOMINIUM CORPORATION NO. 878 FINANCIAL STATEMENTS WITH INDEPENDENT AUDITOR'S REPORT JUNE 30, 2015 METROPOLITAN TORONTO CONDOMINIUM CORPORATION NO. 878 FINANCIAL STATEMENTS WITH INDEPENDENT AUDITOR'S REPORT JUNE 30, 2015 June 30, 2015 Contents Page Independent Auditor's Report 1 Financial Statements

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

BUILDING PERMIT FEES

BUILDING PERMIT FEES BUILDING PERMIT FEES 1. Building Permit Fee Based on the Construction Valuation of the project excluding site work. Refer to Fee Charts below. Electrical, Mechanical and Plumbing permits are not included

More information