1 Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: Fax:

2 Le Chateau Client Info: REPORT #: 1002 STUDY TYPE: Update With Site Visit INSPECTION DATE: 9/10/2011 REPORT PERIOD: 1/1/ /31/2012 NUMBER OF UNITS: 105 Parameters: ANNUAL INFLATION RATE: 3% ANNUAL CONTRIBUTION INCREASE: 3% NET ANNUAL INVESTMENT RATE: 0.04% Results: PROJECTED STARTING RESERVE BALANCE: $543,573 THEORETICALLY IDEAL RESERVE BALANCE: $718,194 PERCENT FUNDED: 76% MOST RECENT MONTHLY RESERVE CONTRIBUTION: $6,667 RECOMMENDED 2012 MONTHLY CONTRIBUTION: $8,890 RECOMMENDED SPECIAL ASSESSMENT: $0 This document is an Update With Site Visit Reserve Study that meets all requirements of chapter RCW Article 3, Section 2. Information was gathered for this Reserve Study during our site inspection on 9/10/2011. A Reserve Study Professional performed this Reserve Study. The Association currently contributes $6,667 per month to the reserve account. Based on the findings of our report, we suggest increasing the monthly reserve contribution to $8,890 in fiscal year Please refer to the Photo Component Section for detailed component information regarding our funding decisions.

3 Funded Component Chart Remaining Useful Useful Replacement Cost Component Quantity Life Life Low High Elevated Decks - Seal/Repair Approx 11,280 square feet 5 0 $67,680 $90,240 Elevated Decks - Repair/Replace Approx 11,280 square feet $282,000 $394,800 Asphalt - Seal/Repair Approx 26,040 square feet 5 4 $18,800 $20,800 Asphalt - Overlay Approx 26,040 square feet $49,480 $54,680 HVAC - Replace (Building A) (3) Carrier 20 7 $33,000 $42,000 HVAC - Replace (Building B) (3) Carrier $33,000 $42,000 Exterior Lights - Replace (171) assorted $8,550 $11,970 Trash Compactor - Replace (1) unit 20 7 $15,000 $20,000 Wood Fence - Replace Approx 310 linear feet 20 8 $6,200 $7,750 Carpet - Replace Approx 1,300 square yards 15 7 $39,000 $65,000 Gate Operators - Replace (4) Elite 15 3 $12,000 $20,000 Entry System - Replace (2) units $8,000 $12,000 Building Exterior - Seal/Paint Approx 41,110 GSF 8 7 $30,000 $34,000 Vinyl Siding - Replace Approx 41,110 GSF $205,550 $287,770 Windows/Glass Doors - Replace (484) assorted $216,000 $270,000 Pool Deck - Resurface Approx 2,840 square feet $34,080 $45,440 Pool/Spa - Resurface Approx 1,260 square feet $12,000 $14,000 Composition Shingle Roof - Replace Approx 73,185 square feet 30 7 $256,150 $292,740 Elevators - Modernize (2) Dover $100,000 $140,000

4 Site Inspection: Our site inspection was conducted on 9/10/2011. We compiled a photographic record and visually inspected all of the common and limited common elements. We noted current condition, materials, and exposure to weather elements. The Association contact informed us of any items that are being handled from the Operational budget, not Reserves. Reserve Funds Analysis: The Reserve Fund balance is projected to be $543,573 as-of the start of your fiscal year on 1/1/2012. This is based on your actual balance provided to us by the Association contact. As of 1/1/2012, your Ideal Reserve Balance is figured to be $718,194 making your reserves 76% funded. Recommendations: The Association currently contributes $6,667 per month to the reserve account. Based on the findings of our report, we suggest increasing the monthly reserve contribution to $8,890 in fiscal year 2012.

5 PHOTO COMPONENT SECTION Component: Concrete Repair/Replace Comments: Fair condition with no damage or unexpected deterioration observed. We suggest regularly inspections of concrete, with repair as needed to prevent water penetration and damage. Periodically pressure wash for appearance and repair any trip hazards immediately to ensure safety. We do not expect large-scale or total replacement within the scope of this study. No reserve funding suggested. Quantity: Extensive Square Feet

6 Component: Elevated Decks Seal/Repair Comments: Generally fair condition of decks sampled during our limited scope inspection. The last reported surface coating occurred in This surface type should be cleaned and sealed every 4-6 years for waterproof integrity and appearance. We suggest annual professional inspections, repairing as needed from the general maintenance funds. We recommend reserve funding for regular intervals of sealing of elevated decks. The association reportedly is planning on sealing the elevated decks in Quantity: Approximately 11,280 Square Feet 5 Years $6/Sq Ft 0 Years $8/Sq Ft $67,680 $90,240

7 Component: Elevated Decks Repair/Replace Comments: Fair condition of decks sampled during our limited scope visual inspection. It is our understanding that all decks had significant reflashing work and repair of any necessary decking completed in approximately 2007 as part of a construction defect settlement. We recommend periodic professional evaluations of all elevated decks to assess overall condition. Forensic building evaluation is beyond the scope of a reserve study. Due to the exposure to the elements, best to set aside funds for periodic large-scale repair/replacement. Note: project costs can vary significantly; professional specifications, soliciting several estimates, and professional project oversight are recommended. Quantity: Approximately 11,280 Square Feet 30 Years $25/Sq Ft 25 Years $35/Sq Ft $282,000 $394,800

8 Component: Powder Coated Rail Repair/Replace Comments: Fair condition of powder coated aluminum rail observed during our inspection with no damage or instability apparent. Inspect regularly to ensure safety. Repair as needed from operating budget. We do not expect large-scale or total replacement within the scope of this study. No reserve funding suggested. Quantity: Approximately 540 Linear Feet

9 Component: Asphalt Seal/Repair Comments: Good surface condition observed, reportedly last sealed in 2011 at a cost of $19,800. Seal coating protects the asphalt from the weather elements and provides a uniform appearance. Incorporate any striping and curb repair into this project. Plan for regular seal coat cycles at the interval below. Quantity: Approximately 26,040 Square Feet 5 Years 4 Years $18,800 $20,800 $18,800 $20,800

10 Component: Asphalt Resurface Comments: Fair condition with no cracking or settling observed. We suggest a seal coat every five years to obtain maximum life of asphalt surface. Repair cracks, clean oil stains promptly and ensure that drains are clear. Best to plan to overlay asphalt at roughly the time frame below. Quantity: Approximately 26,040 Square Feet 30 Years $1.90/Sq Ft 19 Years $2.10/Sq Ft $49,480 $54,680

11 Component: Retaining Walls Replace Comments: Retaining walls appear to be in stable condition with no significant erosion noted. We assume that they were properly installed with adequate base and surrounding drainage. If areas of deterioration emerge, consult with civil or geotechnical engineer for repair scope. No basis for reserve funding at this time. Quantity: Extensive Linear Feet

12 Component: HVAC Units Replace (Building A) Comments: The HVAC units are reported to be functional and operating as designed. The (3) Carrier units in Building A are reportedly original to construction. Regular professional inspections and maintenance will help to extend the life of the units. Plan for replacement at the typical life expectancy indicated below. Quantity: (3) Carrier 20 Years $11,000/each 7 Years $14,000/each $33,000 $42,000

13 Component: HVAC Units Replace (Building B) Comments: The (3) Carrier units in Building B were reportedly replaced in Regular professional inspections and maintenance will help to extend the life of the units. Plan for replacement at the typical life expectancy indicated below. Quantity: (3) Carrier 20 Years $11,000/each 16 Years $14,000/each $33,000 $42,000

14 Component: Exhaust Fans Replace Comments: Fair, operational condition observed during our site inspection. No predictable large-scale expenses suitable for reserve designation. Treat as maintenance/operating issue. Quantity: (8) Fans

15 Component: Exterior Lights Replace Comments: Fair condition of assorted exterior lights. They are assumed to be in functional operating condition. Regularly inspect and change bulbs as needed. Best to plan for large-scale replacement at the interval below. Time replacement to coincide with exterior paint cycles for cost efficiency and a consistent appearance. Quantity: Approximately (171) Assorted Fixtures 20 Years $50/each 15 Years $70/each $8,550 $11,970

16 Component: Pole Lights Replace Comments: Fair condition with no damage or unexpected deterioration evident. They are assumed to be in functional operating condition. Regularly inspect and change bulbs as needed, apply touch up paint to posts. We do not expect large-scale or total replacement within the scope of this study. No reserve funding suggested. Quantity: (5) Metal Pole Lights

17 Component: Interior Lights Replace Comments: Fair condition with no damage or unexpected deterioration observed. Regularly inspect and change bulbs as needed. We do not expect large-scale or total replacement at these protected interior locations. Evaluate periodically and replace individual fixtures, as needed using general maintenance funds. Quantity: Approximately (540) Assorted Fixtures

18 Component: Mailboxes Replace Comments: Fair condition apparent; no damage or unusual wear. Inspect regularly, clean and repair as needed from operating budget. No anticipation of total replacement within the scope of the report. No reserve funding suggested. Quantity: Approximately (107) Metal

19 Component: Trash Compactor Replace Comments: No reported problems at this time. Assumed to be functional and in good operating order. These units typically last approximately 20 years. Plan to replace at roughly the time frame below. Quantity: (1) Unit 20 Years 7 Years $15,000/unit $20,000/unit $15,000 $20,000

20 Component: Wood Fence Replace Comments: Fair condition with no significant instability or damage noted. Inspect regularly for any damage or deterioration and repair as needed. Try to avoid contact with the ground and surrounding vegetation. We suggest planning to replace the wood fence at roughly the time frame below. Quantity: Approximately 310 linear feet 20 Years $20/Linear Foot 8 Years $25/Linear Foot $6,200 $7,750

21 Component: Patio Furniture Replace Comments: Varying condition of assorted patio furniture; appear to be stable and functional. Clean periodically and store indoors during off-season. Replace on an asneeded basis from operating budget, not as cyclical reserve project. No reserve funding suggested. Quantity: Extensive Amount of Assorted Pieces

22 Component: Carpet Replace Comments: Fair condition of carpet observed during our inspection with no staining or tearing evident. Vacuum regularly and professionally clean as needed. We recommend regular intervals of replacement to maintain a quality appearance. Quantity: Approximately 1,300 Square Yards 15 Years $30/Sq Yd 7 Years $50/Sq Yd $39,000 $65,000

23 Component: Entry/ Utility Doors Replace Comments: Fair condition of assorted doors observed during our inspection. Repair as needed from general maintenance budget. Clean and paint along with other building surfaces. No reserve funding required. Quantity: Extensive Amount of Assorted Doors

24 Component: Metal Gates Replace Comments: Gates appear to be in good working order and operating as designed. Inspect regularly and repair as needed. The failure rate of this component is typically difficult to predict. Best suited to be handled thru the operating budget. No basis for reserve funding at this time. Quantity: (4) Metal

25 Component: Gate Operators Replace Comments: No operational problems observed at this time. Inspect operator regularly and perform any repairs from the operating budget. Best to plan for replacement at the interval below. Quantity: (4) Elite 15 Years $3,000/each 3 Years $5,000/each $12,000 $20,000

26 Component: Entry System Replace Comments: Fair appearance with no significant damage observed and no reported problems at this time. Professional inspections and maintenance are recommended. Plan for replacement at roughly the interval below, due to constant usage and exposure to weather elements. Quantity: (2) Units 15 Years $4,000/each 12 Years $6,000/each $8,000 $12,000

27 Component: Exercise Equipment Replace Comments: Fair condition of assorted equipment, all assumed to be functioning and in operating order. Maintain and repair promptly as needed from operating budget to ensure safety. The failure rate of this component is typically difficult to predict. Best suited to be handled thru the operating budget. No basis for reserve funding at this time. Quantity: Assorted Pieces

28 Component: Furniture Replace Comments: Fair condition of assorted lobby furniture observed during our inspection. No expectation for regular or large-scale replacement, so we recommend that any replacement when needed be factored into operating/maintenance budget, not reserves. Quantity: Assorted Pieces

29 Component: Kitchen Refurbish Comments: Fair condition with no reported problems. Simple, durable materials typically have an extended useful life, many communities choose to refurbish the kitchen periodically for functionality and aesthetic updating; these may include kitchen cabinets (reface), sinks, counter tops, appliances, etc. No expectation for large-scale replacement within the scope of this report. We recommend that eventual replacement be factored into the general maintenance budget, not reserves. Quantity: Assorted Pieces

30 Component: Bathrooms Refurbish Comments: Fair condition with no reported problems at this time. Inspect regularly, perform any needed repairs promptly utilizing operating budget. No expectation for regular or large-scale replacement, so we recommend that any replacement when needed be factored into general maintenance budget, not reserves. Quantity: (2) Bathrooms

31 Component: Irrigation System Refurbish Comments: No reported problems at this time. Regularly test system and repair as needed from maintenance budget. Follow proper winterization and spring start up procedures. If the system was properly installed the elements within this component are generally low cost and have a failure rate that is difficult to predict. Best suited to be handled thru the operating budget. No basis for reserve funding at this time. Quantity: Extensive System

32 Component: Interior Surfaces Repaint Comments: Fair condition observed during our site inspection with no deterioration or fading evident. Regular cycles of paint are recommended to maintain appearance. We were informed that in-house staff handles painting projects. No reserve funding under this pattern of care. Quantity: Approximately 17,200 Square Feet

33 Component: Building Exterior Seal/Paint Comments: Fair condition of painted surfaces observed at this time. The buildings were reportedly cleaned and some touch up painting done in 2011 at a total cost of $32,000. Exterior surfaces consist primarily of vinyl siding with a moderate amount of wood surfaces. Touch up and repair locally as needed using general maintenance funds. Best to plan for regular cycles of seal/paint at the level below. Note: project costs can vary significantly; professional specifications, soliciting several estimates, and professional project oversight are recommended. Quantity: Approximately 41,110 GSF 8 Years 7 Years $30,000 $34,000 $30,000 $34,000

34 Component: Vinyl Siding - Replace Comments: Fair condition of vinyl siding observed during our limited scope visual inspection. No significant cracking, damage or instability apparent. No reported water intrusion at this time. We assume the siding was installed properly with adequate moisture barrier and waterproofing details. We recommend periodic evaluations of all siding with prompt repair as needed to ensure building waterproofing. Vinyl is a low maintenance product, but eventual replacement will be needed as vinyl will typically become brittle and worn over time. Best to plan for replacement at the interval indicated below. Note: project costs can vary significantly; professional specifications, soliciting several estimates, and professional project oversight are recommended. Quantity: Approximately 41,110 GSF 35 Years $5/Square Foot 22 Years $7/Square Foot $205,550 $287,770

35 Component: Windows/Glass Doors Replace Comments: No problems noted or reported during our visual scope inspection. We assume the windows to have been installed properly with adequate waterproofing details. We recommend periodic evaluations with prompt repair as needed to ensure building waterproofing and help prevent structural damage. Plan to replace windows and glass doors at roughly the time frame indicated below. Note: project costs can vary significantly; professional specifications, soliciting several estimates, and professional project oversight are recommended. Quantity: Approximately (484) Assorted Sizes 35 Years $2,000/unit (x108) 22 Years $2,500/unit (x108) $216,000 $270,000

36 Component: Pool Deck Resurface Comments: Fair condition with no significant cracking evident at this time. Pressure wash regularly for appearance and fill any cracks that may develop to minimize further damage. Best to plan for total resurfacing at interval indicated below. Quantity: Approximately 2,840 Square Feet 30 Years $12/Sq Ft 17 Years $16/Sq Ft $34,080 $45,440

37 Component: Pool/Spa Resurface Comments: Fair condition of surface noted. Professional cleaning and maintenance are recommended to maximize life of this component. Best to plan for regular intervals of pool/spa resurfacing to maintain functionality and a quality appearance. Quantity: Approximately 1,260 Square Feet 15 Years $12,000 allowance 13 Years $14,000 allowance $12,000 $14,000

38 Component: Pool/Spa Filters Replace Comments: Fair and functional condition of filters. Clean regularly and maintain as needed. Replacement cycles of filters are difficult to predict and they are at a relatively low cost. Replacement is best suited as general maintenance expense, not as reserve component. No reserve funding suggested. Quantity: (2) Assorted

39 Component: Pool/Spa Heater Replace Comments: No reported or observed problems at this time. We recommend regular professional maintenance and repair to help maximize life cycles. Replacement is best suited as general maintenance expense, not as reserve component. No reserve funding suggested. Quantity: (2) Heaters

40 Component: Pool/Spa Pumps Replace Comments: Assumed to be in functional condition and operating as designed. Replacement cycles of pumps are difficult to predict and they are at a relatively low cost. Replacement is best suited as general maintenance expense, not as reserve component. No reserve funding suggested. Quantity: (2) Pumps

41 Component: Pool Fence Replace Comments: Fair condition observed during our inspection with no significant deterioration or instability apparent. This metal rail can last for an extended period of time if not damaged or abused. Inspect regularly to ensure safety. Repair and paint as needed from operating budget. We do not expect large-scale or total replacement within the scope of this study. No reserve funding suggested. Quantity: Approximately 245 Linear Feet

42 Component: Composition Shingle Roofs Replace Comments: Generally fair condition with no significant damage, unevenness or missing shingles observed during our limited scope visual inspection. No reported problems at this time. We assume the roof to have been correctly installed per the manufacturers specifications. We suggest regular professional inspections and prompt repairs as needed to ensure waterproof integrity. Keep gutters and downspouts clear and free of debris. Plan for replacement at roughly the time frame below. Quantity: Approximately 73,185 Square Feet 30 Years $3.50/Sq Ft 7 Years $4.00/Sq Ft $256,150 $292,740

43 Component: Gutters/Downspouts Repair/Replace Comments: Fair condition with no damage observed. Inspect regularly and keep gutters and downspouts free of debris. Repair as needed from general maintenance funds. No anticipation of total replacement within the scope of this report. Repair/replace isolated areas as needed from general maintenance funds. Quantity: Approximately 3,650 Linear Feet

44 Component: Entry Monument Replace Comments: Fair condition with no significant fading or deterioration apparent. Clean and apply touch up paint for appearance as needed. Make minor repairs from operating budget. No anticipation of total replacement within the scope of this report. No reserve funding suggested. Quantity: (1) Monument

45 Component: Elevators Modernize Comments: Fair operational condition of elevators observed during our inspection. We suggest the Association provide for regular professional inspections and maintenance. Best to plan for eventual large-scale modernization, which may include electrical updates, controllers, mechanical door components, pump replacement, etc at the interval below. Quantity: (2) Dover 30 Years $50,000/each 17 Years $70,000/each $100,000 $140,000

46 Component: Elevator Cabs Remodel Comments: Fair condition with no damage or unexpected deterioration observed. Periodically wipe down interior surfaces with an appropriate cleaner, being careful to avoid control buttons. Many communities choose to remodel the elevator cab periodically for functionality and aesthetic updating. We recommend that eventual remodeling projects be factored into the general maintenance budget, not reserves. Quantity: (2) Elevator Interior Cabs

47 Component: Fire Panels Replace Comments: These fire panels appear to be in good working order and operating as designed. We suggest regular professional inspections of the fire panels. The failure rate of these types of communicators is typically difficult to predict. Best suited to be handled thru the operating budget. No basis for reserve funding at this time. Quantity: (2) Panels

48 Component: Drainage System Repair/Refurbish Comments: Fair condition with no reported problems at this time. We assumed the community was properly designed with adequate provisions for drainage. As routine maintenance, inspect regularly and keep drains and grates free of debris to ensure water is evacuating as designed. Pump out sediments if needed utilizing mobile evacuator service fund from the maintenance budget. We do not expect any large-scale expenses within the scope of this study. No reserve funding suggested. Quantity: Extensive System

49 Component: Electrical System Repair/Replace Comments: Analysis of electrical system is beyond the scope of a reserve study. There is no predictable time frame for large-scale repair/replacement expenses within the scope of our report. Treat minor repairs as ongoing maintenance expense. No basis for reserve funding at this time. Quantity: Extensive System

50 Component: Plumbing Repair/Replace Comments: No reported problems at this time. Analysis of plumbing system is beyond the scope of a reserve study. There is no predictable time frame for large-scale repair/replacement expenses within the scope of our report. If leaks, poor flow/water quality, etc become evident, have qualified plumber or engineer inspect closely and develop scope of repair/replacement. Treat minor repairs as an ongoing maintenance expense. No basis for reserve funding at this time. Quantity: Extensive Throughout

51 Component: Landscaping Refurbish Comments: This component may be utilized for setting aside funds for larger expenses that do not occur on an annual basis, such as: large-scale plantings, bark mulch or landscape improvement projects. No reserve funding suggested at this time. Quantity: Extensive Square Feet

52 Component: Reserve Study With Site Visit Comments: Per Washington law, chapter RCW Article 3, Section 1 reserve study updates with site inspections are to occur every three years to assess changes in condition and the resulting effect on the community's long-term reserve plan. This expense should be factored within the operating budget, not reserves. Quantity: Every Three Years

53 Year-By-Year Summary Chart Starting Ideal Annual Projected Reserve Reserve Percent Reserve Special Interest Reserve Year Balance Balance Funded Rating Contributions Assessments Income Expenses 2012 $543,573 $718, % Strong $106,680 $0 $223 $78, $571,516 $737, % Strong $109,880 $0 $251 $ $681,647 $841, % Strong $113,177 $0 $295 $ $795,119 $950, % Strong $116,572 $0 $338 $17, $894,546 $1,047, % Strong $120,069 $0 $377 $22, $992,707 $1,144, % Strong $123,671 $0 $404 $91, $1,025,246 $1,176, % Strong $127,381 $0 $436 $ $1,153,063 $1,306, % Strong $131,203 $0 $386 $508, $776,167 $918, % Strong $135,139 $0 $336 $8, $902,806 $1,037, % Strong $139,193 $0 $384 $25, $1,016,548 $1,145, % Strong $143,369 $0 $414 $106, $1,054,216 $1,176, % Strong $147,670 $0 $451 $ $1,202,337 $1,321, % Strong $152,100 $0 $509 $14, $1,340,688 $1,458, % Strong $156,663 $0 $564 $19, $1,478,824 $1,599, % Strong $161,363 $0 $618 $29, $1,610,856 $1,735, % Strong $166,204 $0 $640 $188, $1,588,843 $1,716, % Strong $171,190 $0 $658 $60, $1,700,515 $1,833, % Strong $176,326 $0 $663 $264, $1,613,444 $1,746, % Strong $181,616 $0 $676 $27, $1,768,497 $1,905, % Strong $187,064 $0 $720 $126, $1,830,239 $1,971, % Strong $192,676 $0 $742 $142, $1,881,047 $2,027, % Strong $198,456 $0 $792 $ $2,080,295 $2,235, % Strong $204,410 $0 $666 $1,037, $1,247,494 $1,384, % Strong $210,542 $0 $529 $63, $1,395,410 $1,517, % Strong $216,858 $0 $594 $40, $1,572,613 $1,682, % Strong $223,364 $0 $499 $873, $922,617 $998, % Strong $230,065 $0 $415 $ $1,153,097 $1,198, % Strong $236,967 $0 $480 $144, $1,246,160 $1,261, % Strong $244,076 $0 $538 $45, $1,445,073 $1,433, % Strong $251,398 $0 $619 $46,660

54 Disclosures Washington State disclosure, per Senate Bill 6215: This reserve study should be reviewed carefully. It may not include all common and limited common element components that will require major maintenance, repair or replacement in future years, and may not include regular contributions to a reserve account for the cost of such maintenance, repair, or replacement. The failure to include a component in a reserve study, or to provide contributions to a reserve account for a component, may, under some circumstances, require you to pay on demand as a special assessment your share of common expenses for the cost of major maintenance, repair or replacement of a reserve component. This Reserve Study is based on observations and data obtained from the on-site visit, field measurements, general age of the property and its components, information provided by the association on recent repairs, replacements and maintenance of the common and limited common areas of the site. Reserve Solutions relied upon the Association contact to provide the current reserve balance and the rate of interest earnings. In addition, we have considered the Association and the Association vendor s representation of current and historical reserve projects reliable. No destructive or intrusive inspections of any of the common or limited common area elements were performed. The estimated replacement and maintenance values in the reserve study are derived from appropriate local industry sources (such as contractors, service providers, etc.), the association historic records, and/or professional experience. The anticipated useful life of each component is based on industry standards, manufacturer warranties or recommended maintenance and/or replacement. Phone: Fax: jeremy@reservesolutions.net

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012

Full Reserve Study. The Ridge at Rock Creek Marysville, WA 11/13/2012 Full Reserve Study The Ridge at Rock Creek Marysville, WA 11/13/2012 Report # 1100 Phone: 253-241-8151 E-mail: jeremy@reservesolutions.net www.reservesolutions.net The Ridge at Rock Creek Client Info:

More information

Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, Bellevue Way NE, #483 Bellevue, WA

Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, Bellevue Way NE, #483 Bellevue, WA Sea le, WA Account SAMPLE CONDO Version SAMPLE January 01, 2017 227 Bellevue Way NE, #483 Bellevue, WA 98004 866 574 5115 www.rdanorthwest.com Prepared By Quality Check By Page 1 Disclosures Reserve Study

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Full Reserve Study. Sample Condominium. Anywhere, USA. Report #: For Period Beginning: January 1, 2016 Expires: December 31, 2016

Full Reserve Study. Sample Condominium. Anywhere, USA. Report #: For Period Beginning: January 1, 2016 Expires: December 31, 2016 Full Reserve Study Sample Condominium Anywhere, USA Report #: 25161-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: June 19, 2015 Hello, and welcome to your Reserve Study!

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Depreciation Report Level I

Depreciation Report Level I Depreciation Report Level I Prepared for Strata VIS 2720 s 2013 Fiscal Year Prepared by RBC STRATA CONSULTING LTD. Version 3.1 2014 RBC STRATA CONSULTING LTD. Have questions about this Depreciation Report.

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Update "With-Site-Visit" Reserve Study

Update With-Site-Visit Reserve Study Update "With-Site-Visit" Reserve Study Sample Townhouse HOA Ventura, CA Report #: For Period Beginning: Expires: Date Prepared: 99999999-0 January 1, 2019 December 31, 2019 June 27, 2018 T W Hello, and

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Update With Site-Visit Reserve Study Park Place HOA Surprise, Arizona Report #: 12568-2 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: October 4, 2016 Hello, and welcome

More information

Calusa Point Association

Calusa Point Association Full Reserve Study Calusa Point Association Miami, FL REVISION Report #: 29086-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: November 11, 2015 Hello, and welcome to

More information

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation.

RESERVE STUDY OTHER PROPERTY TYPES. Serving the Nation. RESERVE STUDY OTHER PROPERTY TYPES Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property. This report

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

Reserve Study Canyon Park Townhomes

Reserve Study Canyon Park Townhomes Reserve Study Canyon Park Townhomes Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Country Club - Sample Reserve Study, Account Country Club -- Version Sample January 01, Reserve Data Analyst

Country Club - Sample Reserve Study, Account Country Club -- Version Sample January 01, Reserve Data Analyst , Account Country Club -- Version Sample January 01, 2020 Reserve Data Analyst www.rdanorthwest.com 866-574-5115 Prepared By Quality Check By Table of Contents Country Club - Sample Reserve Study Introduc

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

FIR RIDGE II CONDOMINIUM

FIR RIDGE II CONDOMINIUM FIR RIDGE II CONDOMINIUM BELLINGHAM, WASHINGTON UPDATE WITHOUT SITE VISIT FEBRUARY 2014 FOR USE WITH THE FEBRUARY 2012 RESERVE STUDY PREPARED BY: DENISE DANA, RESERVE SPECIALIST M. ARCH, REGISTERED ARCHITECT

More information

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010

Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Reserve Analysis Sample HOA 1234 Colorado Blvd. Your City, CO 80010 Level 1 Reserve Analysis Report Period 01/01/13 12/31/13 Client Reference Number - 1001 Property Type Townhouse Style Number of Units

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224

Quail Ridge THCA W. 17 th Ave Lakewood, CO 80224 Quail Ridge THCA 11131-11167 W. 17 th Ave Lakewood, CO 80224 Level 1, Limited Reserve Analysis Report Period 5/01/16-4/30/17 Client Reference Number - 8173 Property Type Townhomes Number of Units 112 Fiscal

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: November 13, 2013 To: Rob Ross, Gateview From: Richard Avelar & Associates (RA&A) Re: Gateview; Update w/ Site Visit Review Attached, please find the reserve study

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

Aspens Townhomes Arizona & Sable Blvd. Aurora, CO

Aspens Townhomes Arizona & Sable Blvd. Aurora, CO Aspens Townhomes Arizona & Sable Blvd. Aurora, CO. 80012 Level 1, Platinum Reserve Analysis Report Period 01/01/19-12/31/19 Client Reference Number - 3047 Property Type Townhomes FINAL Version Fiscal Year

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

BUDGET APPROVED. GENERAL EXPENSES (158 Units) TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1457 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2017 Budget type: M BUDGET APPROVED ACCT.

More information

TANGLEWOOD HILLS CONDOMINIUM

TANGLEWOOD HILLS CONDOMINIUM TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1547 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2018 Budget type: M BUDGET APPROVED ACCT.

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

Bridgewood Manor HOA

Bridgewood Manor HOA Bridgewood Manor HOA Level 1 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 18076 Property Type Condominium Number of Units 40 Fiscal Year End 12/31 Date of Property Inspection

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

SAMPLE Reserve Study FULL. Serving the Nation.

SAMPLE Reserve Study FULL. Serving the Nation. SAMPLE Reserve Study FULL Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property. This report contains

More information

Driftwood Point Association

Driftwood Point Association Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

CONTENTS. Twisted Creek Townhomes Holly Springs, NC

CONTENTS. Twisted Creek Townhomes Holly Springs, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Reserve Analyst P.O. Box 797 Vernon, AZ 85940 Phone: 800-561-0173 Fax: 928-537-3377 Prepared By Quality Check

More information

Country Club Townhomes

Country Club Townhomes Full Reserve Study Country Club Townhomes Dewey, Arizona Report #: 9621-0 For Period Beginning: January 1, 2016 Expires: December 31, 2016 Date Prepared: March 4, 2016 Hello, and welcome to your Reserve

More information

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012

FINANCIAL STATEMENTS and Supplementary Information. For the Years Ended DECEMBER 31, 2013 AND 2012 THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION FINANCIAL STATEMENTS and Supplementary Information For the Years Ended FINANCIAL STATEMENTS CONTENTS Page Independent accountants review report 1 Financial

More information

Full Reserve Study. Sample Hawaii AOAO. Kauai, HI. Report #: HI For Period Beginning: January 1, 2007 Ending: December 31, 2007

Full Reserve Study. Sample Hawaii AOAO. Kauai, HI. Report #: HI For Period Beginning: January 1, 2007 Ending: December 31, 2007 Corporate Office P.O. Box 8637 Calabasas, CA 91372 TEL 800/733-1365 FAX 800/733-1581 www.reservestudy.com Local Offices Phoenix, AZ Huntington Beach, CA San Francisco, CA Denver, CO Honolulu, HI Las Vegas,

More information

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026

Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Indian Peaks Townhomes 95 th Street Lafayette, CO 80026 Level 2, Premium Reserve Analysis Report Period 01/01/16 12/31/16 Client Reference Number - 4080 Property Type Townhome Development Number of Units

More information

Pacific Tower Condominium Association

Pacific Tower Condominium Association www.hoacpa.com Pacific Tower Condominium Association Audit Report Financial Statements & Supplementary Information December 31, 2016 Cagianut & Company CERTIFIED PUBLIC ACCOUNTANT www.hoacpa.com Members

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Reserve Study. Epworth United Methodist Church

Reserve Study. Epworth United Methodist Church Reserve Study For Epworth United Methodist Church July 21, 2015 Reserve Study Prepared By The Whayland Group,LLC 30613 Sussex Highway Laurel, Delaware 19956 TABLE OF CONTENTS Epworth United Methodist Church

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

"Full" Reserve Study. Makaha Surfside AOAO Waianae, HI

Full Reserve Study. Makaha Surfside AOAO Waianae, HI "Full" Reserve Study Makaha Surfside AOAO Waianae, HI Report #: For Period Beginning: Expires: Date Prepared: 32902-0 January 1, 2018 December 31, 2018 May 9, 2018 T W Hello, and welcome to your Reserve

More information

"Full" Reserve Study. Wolf Creek Owners Association Longmont, CO

Full Reserve Study. Wolf Creek Owners Association Longmont, CO "Full" Reserve Study Wolf Creek Owners Association Longmont, CO Report #: For Period Beginning: Expires: Date Prepared: 34785-0 January 1, 2018 December 31, 2018 July 12, 2018 T W Hello, and welcome to

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Paradise Island Condominium Association Final Report of the Reserve Study Review Committee

Paradise Island Condominium Association Final Report of the Reserve Study Review Committee Paradise Island Condominium Association Final Report of the Reserve Study Review Committee March 11, 2014 Chairperson Mary Linak Members Jeff Duppler Chuck Lanius Bill Murphy Paul Pudlas Advisor Mike Ashworth,

More information

RESERVE STUDY ANNUAL REPORT

RESERVE STUDY ANNUAL REPORT RESERVE STUDY ANNUAL REPORT PINELOCH SUN BEACH CLUB LEVEL III RESERVE STUDY UPDATE WITHOUT SITE VISIT Ronald, WA 98940 Report #50510500R FINANCIAL YEAR 01.2016 12.2016 701 Fifth Ave, Suite 4200, Seattle

More information

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08

The Ranches HOA. Level II Reserve Study. Report Period 1/01/08 12/31/08 The Ranches HOA Level II Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10329 Property Type..... Single Family Homes Number of Units.......... 1,750 Fiscal Year End......... December

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

"Full" Reserve Study. Sample Reserve Study HOA/POA Anywhere, FL

Full Reserve Study. Sample Reserve Study HOA/POA Anywhere, FL "Full" Reserve Study Sample Reserve Study HOA/POA Anywhere, FL Report #: For Period Beginning: Expires: Date Prepared: 99995-0 January 1, 2019 December 31, 2019 March 5, 2018 T W Hello, and welcome to

More information

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017

Full Reserve Study. Nelson Farms HOA. Fort Collins, CO. Report #: For Period Beginning: May 1, 2016 Expires: April 30, 2017 Full Reserve Study Nelson Farms HOA Fort Collins, CO Report #: 19185-0 For Period Beginning: May 1, 2016 Expires: April 30, 2017 Date Revised: January 13, 2016 Hello, and welcome to your Reserve Study!

More information

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION REVIEWED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION YEARS ENDED DECEMBER 31, 2014 AND 2013 REVIEWED FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File #

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # A FULL RESERVE STUDY FOR Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # 22920-04030 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS,

More information

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA

505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA Regional Offices. Full Reserve Study. Grand Firs HOA. Graham, WA Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft.

August 19, Raintree HOA Attn: Emily Bresina HOA Simple PO Box Denver, CO Regarding: Reserve Study Draft. August 19, 2015 Raintree HOA Attn: Emily Bresina HOA Simple PO Box 13823 Denver, CO 80201 Regarding: Reserve Study Draft Dear Emily: Please find enclosed a Draft version of the Reserve Study for Summerhill

More information

Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File #

Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File # A FULL RESERVE STUDY FOR Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File # 22920-02604 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Do-It-Yourself Reserve Study. Green Valley Resort Homes

Do-It-Yourself Reserve Study. Green Valley Resort Homes Do-It-Yourself Reserve Study Green Valley Resort Homes Green Valley, AZ Report #: 15034-2 For Period Beginning: January 1, 2018 Expires: December 31, 2018 Date Prepared: September 21, 2017 Hello, and welcome

More information

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016

THE BOULDERS AT LA RESERVE CONDOMINIUM ASSOCIATION INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 INDEX TO REVIEWED FINANCIAL STATEMENTS December 31, 2017 and 2016 Independent accountant s review report 1 REVIEWED FINANCIAL STATEMENTS Balance sheets 2 Statements of revenues, expenses, and changes in

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2017 December 31, 2017 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: April 6, 2017 Copyright

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: January 1, 2014 Copyright

More information

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014 Financial Statements and Supplementary Information For the Year Ended December 31, 2014 Table of Contents Independent Auditor s Report..... 1 Financial Statements Balance Sheet.. 3 Statement of Revenues,

More information