DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016

Size: px
Start display at page:

Download "DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016"

Transcription

1 DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016 PARSONS

2 School Assessment Report Table of Contents School Executive Summary 3 School Condition Summary Building 6 Executive Summary 6 Condition Summary 7 Photo Album 8 Condition Detail 9 System Listing 10 Renewal Schedule 12 Forecasted Sustainment Requirement 15 Deficiency Summary By System 16 Deficiency Summary By Priority 17 Deficiency By Priority Investment 18 Deficiency Summary By Category 19 Deficiency Details By Priority 20 Site 29 Executive Summary 29 Condition Summary 30 Photo Album 31 Condition Detail 32 System Listing 33 Renewal Schedule 34 Forecasted Sustainment Requirement 36 Deficiency Summary By System 37 Deficiency Summary By Priority 38 Deficiency By Priority Investment 39 Deficiency Summary By Category 40 Deficiency Details By Priority 41 Glossary 42 Page 2 of 46

3 School Assessment Report - Chapel Hill Middle School Executive Summary Building condition is evaluated based on the functional systems and elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these systems and elements and applying a current replacement value to them develops a representative building cost model. Cost Models are developed for similar building types and functions. Systems and their elements are evaluated based on their current replacement values, life cycles, installation dates and next renewal dates. Systems and their elements that are within their useful lives are further evaluated to identify current deficient conditions that may have a significant impact on a system's or element's remaining service life, and to determine if they are beyond their predicted expected life. The system's or element's current replacement value is based on RS Means Commercial Cost Data. Following are the cost model's system details for this facility. The Replacement Value is the amount needed to replace the property of the same present scope. The Repair Cost (the sum of the cost to repair/replace the Deficiencies) represents the budgeted contractor-installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the corrective actions due to packaging of the work. Facility Condition Index ( FCI) is an industry-standard measurement of facility condition calculated as the ratio of the costs to correct a facility's deficiencies (Condition Needs) to the facility's Current Replacement Value. It ranges from 0% (new) to 100% (very poor - beyond service life). The Remaining Service Life Index (RSLI) is calculated as the sum of a renewable system's Remaining Service Life (RSL) divided by the sum of a system's Replacement Value (both values exclude soft-cost to simplify calculation updates) expressed as a percentage ranging from 100% (new) to 0% (expired). The relationship between the key metrics FCI and RSLI is an important indicator, at either the facility, building, system, or component levels, of the condition trend and the imminent need for capital renewal. These indices exist in an inverse relationship wherein the FCI increases when systems reach their expected life-cycle age, whereas the RSLI decreases annually indicating the relative time remaining before reaching the life-cycle expiration age. For example, a facility or a system with a high RSLI and a low FCI indicates it is in the early portion of its useful life. However, a low RSLI indicates that expiration dates are approaching at which point the FCI would increase. The term FCA Score is the inverse of Total FCI and calculated as 100-Total FCI (without the %) where 100 is best and 0 is worst condition. Gross Area (SF): Year Built: 154, Last Renovation: Replacement Value: Repair Cost: Total FCI: Total RSLI: $36,124,120 $13,936, % % FCA Score: Description: The Chapel Hill Middle School campus consists of one main building located at 3535 Dogwood Farm Road in Decatur, Georgia. The original campus was constructed in 1991 and there have been no additions to the main school building. In addition to the main school building, the campus contains a covered walkway, softball field, football field, tennis courts, and track. This report contains condition and adequacy data collected during the 2015 Facility Condition Assessment (FCA). Detailed condition and deficiency statements are contained in this report for each building and site improvement on the campus. Attributes: General Attributes: Assigned Region: Region 4 Board District: District 5 DOE Facility: 193 Geographic Region: Region 4 HS Attendance Area: Southwest DeKalb HS Jurisdictional City: DeKalb County (Unincorporated) Site Acreage: 25.8 Page 3 of 46

4 School Assessment Report - Chapel Hill Middle School Condition Summary The Table below shows the RSLI and FCI for each major system shown at the UNIFORMAT classification Level II. Note that Systems with lower FCIs require less investment than systems with higher FCIs. Current Investment Requirement and Condition by Uniformat Classification UNIFORMAT Classification RSLI% FCI % Current Repair A10 - Foundations % 0.00 % $0.00 A20 - Basement Construction 0.00 % 0.00 % $0.00 B10 - Superstructure % 0.00 % $0.00 B20 - Exterior Enclosure % 0.00 % $0.00 B30 - Roofing 0.13 % % $3,528, C10 - Interior Construction % % $352, C20 - Stairs 0.00 % 0.00 % $0.00 C30 - Interior Finishes % % $1,177, D10 - Conveying 0.00 % 0.00 % $0.00 D20 - Plumbing % % $1,385, D30 - HVAC 3.62 % % $4,702, D40 - Fire Protection % 0.00 % $0.00 D50 - Electrical % % $563, E10 - Equipment 0.00 % % $746, E20 - Furnishings 0.00 % % $1,119, F10 - Special Construction % 0.00 % $0.00 G20 - Site Improvements % 6.11 % $247, G30 - Site Mechanical Utilities % 0.00 % $0.00 G40 - Site Electrical Utilities % % $114, Totals: % % $13,936, Condition Deficiency Priority Gross Facility Name Area (S.F.) FCI % 1 Priority 2 Priority 3 Priority 4 Priority 5 Priority 1991 Building 154, $0.00 $1,204, $12,370, $0.00 $0.00 Site 154, $0.00 $0.00 $361, $0.00 $0.00 Deficiencies By Priority Total: $0.00 $1,204, $12,731, $0.00 $0.00 Page 4 of 46

5 School Assessment Report - Chapel Hill Middle 1 Priority 2 Priority - $1,204, Priority - $12,731, Priority 5 Priority Budget Estimate Total: $13,936, Page 5 of 46

6 School Assessment Report Building Executive Summary Building condition is evaluated based on the functional systems and elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these systems and elements and applying a current replacement value to them develops a representative building cost model. Cost Models are developed for similar building types and functions. Systems and their elements are evaluated based on their current replacement values, life cycles, installation dates and next renewal dates. Systems and their elements that are within their useful lives are further evaluated to identify current deficient conditions that may have a significant impact on a system's or element's remaining service life, and to determine if they are beyond their predicted expected life. The system's or element's current replacement value is based on RS Means Commercial Cost Data. Following are the cost model's system details for this facility. The Replacement Value is the amount needed to replace the property of the same present scope. The Repair Cost (the sum of the cost to repair/replace the Deficiencies) represents the budgeted contractor-installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the corrective actions due to packaging of the work. Facility Condition Index ( FCI) is an industry-standard measurement of facility condition calculated as the ratio of the costs to correct a facility's deficiencies (Condition Needs) to the facility's Current Replacement Value. It ranges from 0% (new) to 100% (very poor - beyond service life). The Remaining Service Life Index (RSLI) is calculated as the sum of a renewable system's Remaining Service Life (RSL) divided by the sum of a system's Replacement Value (both values exclude soft-cost to simplify calculation updates) expressed as a percentage ranging from 100% (new) to 0% (expired). The relationship between the key metrics FCI and RSLI is an important indicator, at either the facility, building, system, or component levels, of the condition trend and the imminent need for capital renewal. These indices exist in an inverse relationship wherein the FCI increases when systems reach their expected life-cycle age, whereas the RSLI decreases annually indicating the relative time remaining before reaching the life-cycle expiration age. For example, a facility or a system with a high RSLI and a low FCI indicates it is in the early portion of its useful life. However, a low RSLI indicates that expiration dates are approaching at which point the FCI would increase. The term FCA Score is the inverse of Total FCI and calculated as 100-Total FCI (without the %) where 100 is best and 0 is worst condition. Function: Gross Area (SF): Year Built: Middle School 154, Last Renovation: Replacement Value: Repair Cost: Total FCI: Total RSLI: $30,377,395 $13,574, % % FCA Score: Description: Chapel Hill Middle School is a one-story building located at 3535 Dogwood Farm Road in Decatur, Georgia. Originally built in 1991, there have been no additions or major renovations. This report contains condition and adequacy data collected during the 2015 Facility Condition Assessment (FCA). Detailed condition and deficiency statements are contained in this report. Attributes: General Attributes: Building Codes: 4010 Fire Sprinkler System: Yes Page 6 of 46

7 School Assessment Report Building Condition Summary The Table below shows the RSLI and FCI for each major building system shown at the UNIFORMAT classification Level II. Note that Systems with lower FCIs require less investment than systems with higher FCIs. UNIFORMAT Classification RSLI % FCI % Current Repair Cost A10 - Foundations % 0.00 % $0.00 A20 - Basement Construction 0.00 % 0.00 % $0.00 B10 - Superstructure % 0.00 % $0.00 B20 - Exterior Enclosure % 0.00 % $0.00 B30 - Roofing 0.13 % % $3,528, C10 - Interior Construction % % $352, C20 - Stairs 0.00 % 0.00 % $0.00 C30 - Interior Finishes % % $1,177, D10 - Conveying 0.00 % 0.00 % $0.00 D20 - Plumbing % % $1,385, D30 - HVAC 3.62 % % $4,702, D40 - Fire Protection % 0.00 % $0.00 D50 - Electrical % % $563, E10 - Equipment 0.00 % % $746, E20 - Furnishings 0.00 % % $1,119, F10 - Special Construction % 0.00 % $0.00 Totals: % % $13,574, Page 7 of 46

8 School Assessment Report Building Photo Album The photo album consists of the various cardinal directions of the building. 1). East Elevation - Jun 19, ). South Elevation - Jun 19, ). West Elevation - Jun 19, ). North Elevation - Jun 19, 2015 Page 8 of 46

9 School Assessment Report Building Condition Detail This section of the report contains results of the Facility Condition Assessment. The building is separated into system components based on UNIFORMAT II. The columns in the System Listing table represent the following: 1. System Code: A code that identifies the system. 2. System Description: A brief description of a system present in the building. 3. Unit Price $: The unit price of the system. 4. UoM: The unit of measure of the system. 5. Qty: The quantity for the system. 6. Life: Building Owners and Managers Association (BOMA) recommended system design life. 7. Year Installed: The date of system installation. 8. Calc Next Renewal Year: The date of system expiration based on the life, NR stands for non renewable. 9. Next Renewal Year: The suggested system expiration date by the assessor based on visual inspection. 10. RSLI: The Remaining Service Life Index of the system. 11. FCI: The Facility Condition Index of the system. 12. RSL: Remaining Service Life in years. 13. ecr: ecomet Condition Rating (not used in this assessment). 14. Deficiency $: The financial investment to repair/replace system to address deficiency. 15. Replacement Value $: The replacement cost of the system. Page 9 of 46

10 School Assessment Report Building System Listing The System Listing table below lists each of the systems organized by their UNIFORMAT II classification. The assessment team was tasked with recording the most recent replacement year of each system, determining the remaining service life based on the theoretical life, and evaluating the condition to confirm the forecast next replacement year. The system listing is the basis for all data contained in the Building Assessment Report. System Code System Description Unit Price $ UoM Qty Life Year Installed Calc Next Renewal Year Next Renewal Year RSLI% FCI% RSL ecr Deficiency $ Replacement Value $ A1010 Standard Foundations $1.63 S.F. 154, % 0.00 % 76 $252,456 A1020 Special Foundations $4.46 S.F % 0.00 % $0 A1030 Slab on Grade $3.56 S.F. 154, % 0.00 % 76 $551,376 A2010 Basement Excavation $1.31 S.F % 0.00 % $0 A2020 Basement Walls $1.66 S.F % 0.00 % $0 B1010 Floor Construction $17.86 S.F % 0.00 % 76 $0 B1020 Roof Construction $7.88 S.F. 154, % 0.00 % 76 $1,220,462 B2010 Exterior Walls $15.93 S.F. 154, % 0.00 % 76 $2,467,254 B2020 Exterior Windows $8.60 S.F. 154, % 0.00 % 6 $1,331,977 B2030 Exterior Doors $0.84 S.F. 154, % 0.00 % 6 $130,100 B3010 Roof Coverings - Asphalt Shingles $4.32 S.F % 0.00 % $0 B3010 Roof Coverings - BUR $20.70 S.F. 154, % % -4 $3,526, $3,206,037 B3010 Roof Coverings - EPDM $3.33 S.F % 0.00 % $0 B3010 Roof Coverings - Preformed Metal $5.01 S.F % 0.00 % $0 B3010 Roof Coverings Standing Seam Metal $27.45 S.F % 0.00 % $0 B3020 Roof Openings $0.14 S.F. 154, % 8.89 % 6 $1, $21,683 C1010 Partitions $7.91 S.F. 154, % 0.00 % 76 $1,225,109 C1020 Interior Doors $2.26 S.F. 154, % 0.00 % 6 $350,031 C1030 Fittings $2.07 S.F. 154, % % -4 $352, $320,604 C2010 Stair Construction $1.06 S.F % 0.00 % 76 $0 C3010 Wall Finishes - Ceramic & Glazed $10.27 S.F. 45, % 0.00 % 6 $468,189 C3010 Wall Finishes - Paint $1.93 S.F. 108, % 0.00 % 4 $209,245 C3010 Wall Finishes - Wood Paneling $9.73 S.F % 0.00 % 6 $8,523 C3020 Floor Finishes - Carpet $8.50 S.F. 15, % % -7 $144, $131,648 C3020 Floor Finishes - Ceramic & Quarry Tile $14.49 S.F. 30, % 0.00 % 26 $448,900 C3020 Floor Finishes - Terrazzo $53.01 S.F. 30, % 0.00 % 26 $1,642,250 C3020 Floor Finishes - VCT $9.54 S.F. 66, % 0.00 % 4 $632,569 C3020 Floor Finishes - Wood $9.73 S.F. 11, % 0.00 % 44 $108,256 C3030 Ceiling Finishes $6.06 S.F. 154, % % -4 $1,032, $938,579 D1010 Elevators and Lifts $1.02 S.F % 0.00 % $0 D2010 Plumbing Fixtures $8.13 S.F. 154, % % 0 $1,385, $1,259,183 D2020 Domestic Water Distribution $3.84 S.F. 154, % 0.00 % 6 $594,743 D2030 Sanitary Waste $4.33 S.F. 154, % 0.00 % 6 $670,635 D2040 Rain Water Drainage $0.92 S.F. 154, % 0.00 % 6 $142,491 Page 10 of 46

11 School Assessment Report Building System Code System Description Unit Price $ UoM Qty Life Year Installed Calc Next Renewal Year Next Renewal Year RSLI% FCI% RSL ecr Deficiency $ Replacement Value $ D2090 Other Plumbing Systems - Natural Gas $0.77 S.F. 154, % 0.00 % 16 $119,258 D3020 Heat Generating Systems $4.55 S.F. 154, % 0.00 % 6 $704,709 D3030 Cooling Generating Systems $4.73 S.F. 154, % 0.00 % 1 $732,587 D3040 Distribution Systems & Exhaust Systems $5.51 S.F. 154, % % 0 $938, $853,394 D3050 Terminal & Package Units $18.52 S.F. 154, % % -9 $3,155, $2,868,396 D3060 Controls & Instrumentation $3.57 S.F. 154, % % -4 $608, $552,925 D3070 Systems Testing & Balance $0.37 S.F. 154, % 0.00 % 6 $57,306 D3090 Other HVAC Systems/Equip - Kitchen Hood $1.06 S.F. 154, % 0.00 % 6 $164,174 D4010 Sprinklers $4.13 S.F. 154, % 0.00 % 6 $639,659 D4020 Standpipes $0.58 S.F. 154, % 0.00 % 6 $89,831 D5010 Electrical Service/Distribution $1.73 S.F. 154, % 0.00 % 16 $267,944 D5020 Branch Wiring $5.53 S.F. 154, % 0.00 % 6 $856,492 D5020 Lighting $8.36 S.F. 154, % 7.53 % 6 $97, $1,294,805 D5030 Communications and Security - Fire Alarm $1.44 S.F. 154, % % 0 $259, $223,029 D5030 Communications and Security - PA & Clock Systems $3.33 S.F. 154, % 0.00 % 9 $515,754 D5030 Communications and Security - Security & CCTV $1.21 S.F. 154, % % -9 $206, $187,406 D5090 Other Electrical Systems - Emergency Generator $0.84 S.F. 154, % 0.00 % 5 $130,100 E1010 Commercial Equipment $8.10 S.F % 0.00 % 19 $0 E1020 Institutional Equipment $2.82 S.F. 154, % % -4 $480, $436,764 E1090 Other Equipment (Sports Equipment) $1.56 S.F. 154, % % -9 $265, $241,614 E2010 Fixed Furnishings $6.57 S.F. 154, % % -4 $1,119, $1,017,568 F1010 Special Structures - Canopies $0.59 S.F. 154, % 0.00 % 76 $91,380 Total % % $13,574, $30,377,395 Page 11 of 46

12 School Assessment Report Building Renewal Schedule ecomet forecasts future Capital Renewal projects for expiring systems based on the Calculated Next Renewal year found in the system listing. There is a 3% yearly inflation factor applied to the system costs expiring in the future. The table below reflects Capital Renewal projects over the next 10 years. Note: Blank cells (or $0) indicate no systems are scheduled for renewal in that year. Inflation Rate: 3% System Current Deficiencies Total Total: $13,574,835 $830,021 $0 $0 $1,042,216 $165,904 $9,758,837 $0 $183,445 $740,236 $0 $26,295,493 * A - Substructure $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A10 - Foundations $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A Standard Foundations $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A Special Foundations $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A Slab on Grade $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A20 - Basement Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A Basement Excavation $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * A Basement Walls $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B - Shell $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B10 - Superstructure $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * B Floor Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * B Roof Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B20 - Exterior Enclosure $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * B Exterior Walls $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B Exterior Windows $0 $0 $0 $0 $0 $0 $1,749,494 $0 $0 $0 $0 $1,749,494 B Exterior Doors $0 $0 $0 $0 $0 $0 $170,881 $0 $0 $0 $0 $170,881 B30 - Roofing $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B Roof Coverings - Asphalt Shingles $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B Roof Coverings - BUR $3,526,640 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,526,640 B Roof Coverings - EPDM $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B Roof Coverings - Preformed Metal B Roof Coverings Standing Seam Metal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 B Roof Openings $1,927 $0 $0 $0 $0 $0 $28,481 $0 $0 $0 $0 $30,408 C - Interiors $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C10 - Interior Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Page 12 of 46

13 School Assessment Report Building C Partitions $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C Interior Doors $0 $0 $0 $0 $0 $0 $334,364 $0 $0 $0 $0 $334,364 C Fittings $352,664 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $352,664 C20 - Stairs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * C Stair Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C30 - Interior Finishes $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C Wall Finishes - Ceramic & Glazed $0 $0 $0 $0 $0 $0 $614,946 $0 $0 $0 $0 $614,946 C Wall Finishes - Paint $0 $0 $0 $0 $259,057 $0 $0 $0 $0 $0 $0 $259,057 C Wall Finishes - Wood Paneling $0 $0 $0 $0 $0 $0 $11,195 $0 $0 $0 $0 $11,195 C Floor Finishes - Carpet $144,813 $0 $0 $0 $0 $0 $0 $0 $183,445 $0 $0 $328,258 C Floor Finishes - Ceramic & Quarry Tile $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C Floor Finishes - Terrazzo $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C Floor Finishes - VCT $0 $0 $0 $0 $783,158 $0 $0 $0 $0 $0 $0 $783,158 C Floor Finishes - Wood $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 C Ceiling Finishes $1,032,437 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,032,437 D - Services $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D10 - Conveying $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D Elevators and Lifts $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D20 - Plumbing $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D Plumbing Fixtures $1,385,101 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,385,101 D Domestic Water Distribution $0 $0 $0 $0 $0 $0 $781,169 $0 $0 $0 $0 $781,169 D Sanitary Waste $0 $0 $0 $0 $0 $0 $880,850 $0 $0 $0 $0 $880,850 D Rain Water Drainage $0 $0 $0 $0 $0 $0 $187,156 $0 $0 $0 $0 $187,156 D Other Plumbing Systems - Natural Gas $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D30 - HVAC $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D Heat Generating Systems $0 $0 $0 $0 $0 $0 $925,604 $0 $0 $0 $0 $925,604 D Cooling Generating Systems $0 $830,021 $0 $0 $0 $0 $0 $0 $0 $0 $0 $830,021 D Distribution Systems & Exhaust Systems $938,734 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $938,734 D Terminal & Package Units $3,155,236 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $3,155,236 D Controls & Instrumentation $608,218 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $608,218 D Systems Testing & Balance $0 $0 $0 $0 $0 $0 $75,269 $0 $0 $0 $0 $75,269 D Other HVAC Systems/Equip - Kitchen Hood $0 $0 $0 $0 $0 $0 $215,635 $0 $0 $0 $0 $215,635 Page 13 of 46

14 School Assessment Report Building D40 - Fire Protection $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D Sprinklers $0 $0 $0 $0 $0 $0 $840,164 $0 $0 $0 $0 $840,164 D Standpipes $0 $0 $0 $0 $0 $0 $117,989 $0 $0 $0 $0 $117,989 D50 - Electrical $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D Electrical Service/Distribution $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 D Branch Wiring $0 $0 $0 $0 $0 $0 $1,124,966 $0 $0 $0 $0 $1,124,966 D Lighting $97,492 $0 $0 $0 $0 $0 $1,700,672 $0 $0 $0 $0 $1,798,164 D Communications and Security - Fire Alarm D Communications and Security - PA & Clock Systems D Communications and Security - Security & CCTV D Other Electrical Systems - Emergency Generator $259,884 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $259,884 $0 $0 $0 $0 $0 $0 $0 $0 $0 $740,236 $0 $740,236 $206,147 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $206,147 $0 $0 $0 $0 $0 $165,904 $0 $0 $0 $0 $0 $165,904 E - Equipment & Furnishings $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 E10 - Equipment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 E Commercial Equipment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 E Institutional Equipment $480,441 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $480,441 E Other Equipment (Sports Equipment) $265,776 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $265,776 E20 - Furnishings $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 E Fixed Furnishings $1,119,325 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $1,119,325 F - Special Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 F10 - Special Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 F Special Structures - Canopies $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 * Indicates non-renewable system Page 14 of 46

15 School Assessment Report Building Forecasted Capital Renewal Requirement The following chart shows the current building deficiencies and the forecasted capital renewal (system replacement) requirements over the next ten years. $15,000,000 $13,574,835 $10,000,000 $9,758,837 $5,000,000 $0 $830,021 $1,042,216 $165,904 $740,236 $183,445 Current Deficiencies Page 15 of 46

16 School Assessment Report Building Deficiency Summary by System Current deficiencies include assemblies that have reached or exceed their design life or components of the assemblies that are in need of repair. Assemblies that have reached their design life are identified as current deficiencies and assigned the distress 'Beyond Service Life'. The following chart lists all current deficiencies associated with this facility broken down by UNIFORMAT system. B3010 Roof Coverings - BUR $3,526, C1030 Fittings $352, C3030 Ceiling Finishes $1,032, D2010 Plumbing Fixtures $1,385, D3040 Distribution Systems & Exhaust Systems $938, D3050 Terminal & Package Units $3,155, D3060 Controls & Instrumentation $608, E1020 Institutional Equipment $480, E1090 Other Equipment (Sports Equipment) $265, E2010 Fixed Furnishings $1,119, Other $710, Budget Estimate Total: $13,574, Page 16 of 46

17 School Assessment Report Building Deficiency Summary by Priority The following chart shows the total repair costs broken down by priority. Assessors assigned deficiencies within ecomet to one of the following priority categories: 1 Priority 2 Priority - $1,204, Priority - $12,370, Priority 5 Priority Budget Estimate Total: $13,574, Page 17 of 46

18 School Assessment Report Building Deficiency By Priority Investment Table The table below shows the current investment cost grouped by deficiency priority and building system. Assessors assigned deficiencies within ecomet to one of the following priority categories: Priority 1 deficiencies require immediate review to correct a poten al life/safety hazard, stop accelerated deteriora on, or return a facility to opera on. Priority 2 deficiencies could become a Priority 1 deficiency, if not corrected within the next 2-3 years. These include intermi ent opera ons, rapid deteriora on, or poten al life/safety hazards.. Priority 3 deficiencies require appropriate a en on to preclude predictable deteriora on or poten al down me and the associated damage or higher costs if deferred further and not completed within the next 3-5 years. Priority 4 deficiencies represent a sensible improvement to exis ng condi ons. The recommended improvements are not required for the basic func onality of the facility; however addressing these deficiencies will improve overall usability and/or reduce long term maintenance costs. Repairs for these deficiencies may be budgeted and scheduled for comple on within the next 5-7 years. Priority 5 deficiencies will include condi ons that have no impact on the func on or usability of the facility, such as appearance. No ac on is required for these deficiencies, but they are tracked since they may require future inspec on or be completed as part of related repairs in con guous areas of the facility. System Code System Description Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total B3010 Roof Coverings - BUR $0.00 $0.00 $3,526, $0.00 $0.00 $3,526, B3020 Roof Openings $0.00 $0.00 $1, $0.00 $0.00 $1, C1030 Fittings $0.00 $0.00 $352, $0.00 $0.00 $352, C3020 Floor Finishes - Carpet $0.00 $0.00 $144, $0.00 $0.00 $144, C3030 Ceiling Finishes $0.00 $0.00 $1,032, $0.00 $0.00 $1,032, D2010 Plumbing Fixtures $0.00 $0.00 $1,385, $0.00 $0.00 $1,385, D3040 Distribution Systems & Exhaust Systems $0.00 $938, $0.00 $0.00 $0.00 $938, D3050 Terminal & Package Units $0.00 $0.00 $3,155, $0.00 $0.00 $3,155, D3060 Controls & Instrumentation $0.00 $0.00 $608, $0.00 $0.00 $608, D5020 Lighting $0.00 $0.00 $97, $0.00 $0.00 $97, D5030 Communications and Security - Fire Alarm $0.00 $0.00 $259, $0.00 $0.00 $259, D5030 Communications and Security - Security & CCTV $0.00 $0.00 $206, $0.00 $0.00 $206, E1020 Institutional Equipment $0.00 $0.00 $480, $0.00 $0.00 $480, E1090 Other Equipment (Sports Equipment) $0.00 $265, $0.00 $0.00 $0.00 $265, E2010 Fixed Furnishings $0.00 $0.00 $1,119, $0.00 $0.00 $1,119, Total: $0.00 $1,204, $12,370, $0.00 $0.00 $13,574, Page 18 of 46

19 School Assessment Report Building Deficiency Summary by Category The following chart shows the total repair costs broken down by deficiency categories. Assessors assigned deficiencies to one of the following categories: Building Code Compliance - $1,203, Deferred Maintenance - $3,430, Deferred Maintenance / Accessibility Code Compliance - $1,385, Deferred Maintenance / Energy - $7,290, Deferred Maintenance / Safety - $265, Budget Estimate Total: $13,574, Page 19 of 46

20 School Assessment Report Building Deficiency Details by Priority The deficiency detail notes listed below provide additional information on identified deficiencies found within the facility. Priority 2 Priority: System: D Distribution Systems & Exhaust Systems Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Inadequate Building Code Compliance 2 Priority Renew System 154, S.F. $938, Ben Nixon 06/19/2015 Notes: The exhaust system is inadequate and in poor condition, and does not meet current building code. The system should be scheduled for replacement. System: E Other Equipment (Sports Equipment) Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Gym Beyond Service Life Deferred Maintenance / Safety 2 Priority Renew System 154, S.F. $265, Sam Mandola 04/11/2015 Notes: Sports equipment, such as the basketball backboards, are beyond their expected service life, and should be scheduled for replacement to avoid safety risk. Page 20 of 46

21 School Assessment Report Building Priority 3 Priority: System: B Roof Coverings - BUR Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Roof Beyond Service Life Deferred Maintenance / Energy 3 Priority Renew System 154, S.F. $3,526, Ben Nixon 04/11/2015 Notes: The built-up roof covering is aged, showing signs of failure, and should be replaced. System: B Roof Openings Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Roof Inadequate Building Code Compliance 3 Priority Replace roof hatch and structure single unit 1.00 Ea. $1, Ben Nixon 09/19/2015 Notes: Roof hatch does not comply with OSHA standards; roof opening protection and proper extension of fixed ladder to platform is not provided. Page 21 of 46

22 School Assessment Report Building System: C Fittings Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $352, Sam Mandola 04/11/2015 Notes: Fittings, such as toilet partitions, hand rails and signage, are aged, in fair condition, and should be scheduled for replacement. SPLOST project to renovate unisex adult restroom and hall restrooms for ADA compliance. System: C Floor Finishes - Carpet Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Offices and Media Center Beyond Service Life Deferred Maintenance 3 Priority Renew System 15, S.F. $144, Ben Nixon 04/11/2015 Notes: The carpet is beyond its expected service life and stained, and should be replaced. Page 22 of 46

23 School Assessment Report Building System: C Ceiling Finishes Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $1,032, Ben Nixon 04/11/2015 Notes: The acoustical ceiling tile and grid system is beyond its expected service life, damaged in some areas due to roof leaks and the environment, and should be replaced. System: D Plumbing Fixtures Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Inadequate Deferred Maintenance / Accessibility Code Compliance 3 Priority Renew System 154, S.F. $1,385, Sam Mandola 09/14/2015 Notes: Plumbing fixtures in restrooms and water fountains in hallways do not function adequately, are not ADA compliant and difficult to maintain, and should be scheduled for replacement. Also, there are an inadequate number of restrooms for school staff members. SPLOST project to renovate unisex adult restroom and hall restrooms for ADA compliance, and replace drinking fountains. Page 23 of 46

24 School Assessment Report Building System: D Terminal & Package Units Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Ceiling and Rooftop Mounted Beyond Service Life Deferred Maintenance / Energy 3 Priority Renew System 154, S.F. $3,155, Ben Nixon 04/11/2015 Notes: The terminal and package units are beyond their expected service life and should be scheduled for replacement. Seven units were replaced in 2015 due to vandalism. System: D Controls & Instrumentation Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Beyond Service Life Deferred Maintenance / Energy 3 Priority Renew System 154, S.F. $608, Ben Nixon 04/11/2015 Notes: Building controls and instrumentation are beyond their expected service life, in poor condition, and should be scheduled for replacement. Page 24 of 46

25 School Assessment Report Building System: D Lighting Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Gym Inadequate Deferred Maintenance 3 Priority Remove and replace existing lighting in Gymnasium 10, S.F. $94, Sam Mandola 09/19/2015 Notes: The lighting in the gym is very dim and inadequate and should be replaced with appropriate lighting. SPLOST project to replace the light fixtures in the gym. System: D Lighting Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Wet Areas Needs Remediation Building Code Compliance 3 Priority Add GFCI receptacle in wet location Ea. $3, Ben Nixon 09/19/2015 Notes: Remove and replace receptacles with GFCI receptacles in wet areas. Page 25 of 46

26 School Assessment Report Building System: D Communications and Security - Fire Alarm Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Restrooms Missing Building Code Compliance 3 Priority Renew System 154, S.F. $245, Ben Nixon 06/19/2015 Notes: The facility fire alarm system is inadequate. There are no audible or visual alarms in the restrooms. System: D Communications and Security - Fire Alarm Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Restrooms and Locker Rooms Missing Building Code Compliance 3 Priority Add horn/strobe Ea. $14, Ben Nixon 09/19/2015 Notes: Add missing visual/audio fire alarms in different locations. Page 26 of 46

27 School Assessment Report Building System: D Communications and Security - Security & CCTV Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $206, Ben Nixon 04/11/2015 Notes: The security and CCTV systems are beyond their expected service life and should be scheduled for replacement. System: E Institutional Equipment Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $480, Ben Nixon 04/11/2015 Notes: Institutional equipment, such as theater and stage equipment and audio-visual equipment, is beyond its expected service life and should be scheduled for replacement. Staff reports that stage curtains need to be replaced (fire retardant). Page 27 of 46

28 School Assessment Report Building System: E Fixed Furnishings Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Throughout Building Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $1,119, Ben Nixon 04/11/2015 Notes: Fixed furnishings, such as cabinets, window treatment and fixed seating, are beyond their expected service life and should be scheduled for replacement. Fixed multiple seating in the gym bleachers is failing. Page 28 of 46

29 School Assessment Report - Site Executive Summary Building condition is evaluated based on the functional systems and elements of a building and organized according to the UNIFORMAT II Elemental Classification. The grouping of these systems and elements and applying a current replacement value to them develops a representative building cost model. Cost Models are developed for similar building types and functions. Systems and their elements are evaluated based on their current replacement values, life cycles, installation dates and next renewal dates. Systems and their elements that are within their useful lives are further evaluated to identify current deficient conditions that may have a significant impact on a system's or element's remaining service life, and to determine if they are beyond their predicted expected life. The system's or element's current replacement value is based on RS Means Commercial Cost Data. Following are the cost model's system details for this facility. The Replacement Value is the amount needed to replace the property of the same present scope. The Repair Cost (the sum of the cost to repair/replace the Deficiencies) represents the budgeted contractor-installed costs plus owner's soft costs for the repair, replacement or renewal for a component or system level deficiency. It excludes contributing costs for other components or systems that might also be associated with the corrective actions due to packaging of the work. Facility Condition Index ( FCI) is an industry-standard measurement of facility condition calculated as the ratio of the costs to correct a facility's deficiencies (Condition Needs) to the facility's Current Replacement Value. It ranges from 0% (new) to 100% (very poor - beyond service life). The Remaining Service Life Index (RSLI) is calculated as the sum of a renewable system's Remaining Service Life (RSL) divided by the sum of a system's Replacement Value (both values exclude soft-cost to simplify calculation updates) expressed as a percentage ranging from 100% (new) to 0% (expired). The relationship between the key metrics FCI and RSLI is an important indicator, at either the facility, building, system, or component levels, of the condition trend and the imminent need for capital renewal. These indices exist in an inverse relationship wherein the FCI increases when systems reach their expected life-cycle age, whereas the RSLI decreases annually indicating the relative time remaining before reaching the life-cycle expiration age. For example, a facility or a system with a high RSLI and a low FCI indicates it is in the early portion of its useful life. However, a low RSLI indicates that expiration dates are approaching at which point the FCI would increase. The term FCA Score is the inverse of Total FCI and calculated as 100-Total FCI (without the %) where 100 is best and 0 is worst condition. Function: Gross Area (SF): Year Built: Middle School 154, Last Renovation: Replacement Value: Repair Cost: Total FCI: Total RSLI: $5,746,725 $361, % % FCA Score: Description: The Chapel Hill Middle School site was originally constructed in 1991, has a total area of 25.8 acres, and is occupied by approximately 154,881 square feet of permanent building space. Campus site features include paved driveways and parking lots, pedestrian pavement, covered walkways, flag pole, landscaping, football field, softball field, track, tennis courts, playing fields, and fencing. This report contains condition and adequacy data collected during the 2015 Facility Condition Assessment (FCA). Detailed condition and deficiency statements are contained in this report for the site features. Attributes: General Attributes: Site Code: 1800 Page 29 of 46

30 School Assessment Report - Site Condition Summary The Table below shows the RSLI and FCI for each major building system shown at the UNIFORMAT classification Level II. Note that Systems with lower FCIs require less investment than systems with higher FCIs. UNIFORMAT Classification RSLI % FCI % Current Repair Cost G20 - Site Improvements % 6.11 % $247, G30 - Site Mechanical Utilities % 0.00 % $0.00 G40 - Site Electrical Utilities % % $114, Totals: % 6.29 % $361, Page 30 of 46

31 School Assessment Report - Site Photo Album The photo album consists of the various cardinal directions of the building. 1). Aerial Image of Chapel Hill Middle School - Sep 18, 2015 Page 31 of 46

32 School Assessment Report - Site Condition Detail This section of the report contains results of the Facility Condition Assessment. The building is separated into system components based on UNIFORMAT II. The columns in the System Listing table represent the following: 1. System Code: A code that identifies the system. 2. System Description: A brief description of a system present in the building. 3. Unit Price $: The unit price of the system. 4. UoM: The unit of measure of the system. 5. Qty: The quantity for the system. 6. Life: Building Owners and Managers Association (BOMA) recommended system design life. 7. Year Installed: The date of system installation. 8. Calc Next Renewal Year: The date of system expiration based on the life, NR stands for non renewable. 9. Next Renewal Year: The suggested system expiration date by the assessor based on visual inspection. 10. RSLI: The Remaining Service Life Index of the system. 11. FCI: The Facility Condition Index of the system. 12. RSL: Remaining Service Life in years. 13. ecr: ecomet Condition Rating (not used in this assessment). 14. Deficiency $: The financial investment to repair/replace system to address deficiency. 15. Replacement Value $: The replacement cost of the system. Page 32 of 46

33 School Assessment Report - Site System Listing The System Listing table below lists each of the systems organized by their UNIFORMAT II classification. The assessment team was tasked with recording the most recent replacement year of each system, determining the remaining service life based on the theoretical life, and evaluating the condition to confirm the forecast next replacement year. The system listing is the basis for all data contained in the Building Assessment Report. System Code System Description Unit Price $ UoM Qty Life Year Installed Calc Next Renewal Year Next Renewal Year RSLI% FCI% RSL ecr Deficiency $ Replacement Value $ G2010 Roadways $5.17 S.F. 74, % 0.00 % 1 $386,333 G2020 Parking Lots $4.56 S.F. 31, % 0.00 % 1 $143,535 G2030 Pedestrian Paving $1.50 S.F. 154, % 0.00 % 6 $232,322 G2040 Baseball Field $8.35 S.F % 0.00 % -4 $0 G2040 Canopies $0.29 S.F % 0.00 % 1 $0 G2040 Covered Walkways $48.72 S.F. 7, % 0.00 % 1 $366,667 G2040 Fencing & Guardrails $0.91 S.F. 154, % 0.00 % 6 $140,942 G2040 Football Field $5.85 S.F. 103, % 0.00 % 5 $606,440 G2040 Hard Surface Play Area $6.26 S.F % 0.00 % $0 G2040 Playing Field $3.92 S.F. 130, % 0.00 % 5 $511,317 G2040 Soccer/Lacross Field $5.00 S.F % 0.00 % $0 G2040 Softball Field $8.86 S.F. 108, % 0.00 % 5 $963,826 G2040 Tennis Courts $18.47 S.F. 12, % 0.00 % 5 $235,234 G2040 Track $7.04 S.F. 33, % 0.00 % 5 $233,390 G2050 Landscaping $1.45 S.F. 154, % % -9 $247, $224,577 G3010 Water Supply $1.83 S.F. 154, % 0.00 % 26 $283,432 G3020 Sanitary Sewer $1.15 S.F. 154, % 0.00 % 26 $178,113 G3030 Storm Sewer $3.55 S.F. 154, % 0.00 % 26 $549,828 G3060 Fuel Distribution $0.78 S.F. 154, % 0.00 % 16 $120,807 G4010 Electrical Distribution $1.86 S.F. 154, % 0.00 % 26 $288,079 G4020 Site Lighting $1.15 S.F. 154, % 0.00 % 28 $178,113 G4030 Site Communications & Security $0.67 S.F. 154, % % -14 $114, $103,770 Total % 6.29 % $361, $5,746,725 Page 33 of 46

34 School Assessment Report - Site Renewal Schedule ecomet forecasts future Capital Renewal projects for expiring systems based on the Calculated Next Renewal year found in the system listing. There is a 3% yearly inflation factor applied to the system costs expiring in the future. The table below reflects Capital Renewal projects over the next 10 years. Note: Blank cells (or $0) indicate no systems are scheduled for renewal in that year. Page 34 of 46

35 School Assessment Report - Site Inflation Rate: 3% System Current Deficiencies Total Total: $361,183 $1,015,775 $0 $0 $0 $3,252,028 $490,266 $0 $0 $0 $153,404 $5,272,655 G - Building Sitework $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G20 - Site Improvements $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Roadways $0 $437,716 $0 $0 $0 $0 $0 $0 $0 $0 $0 $437,716 G Parking Lots $0 $162,626 $0 $0 $0 $0 $0 $0 $0 $0 $0 $162,626 G Pedestrian Paving $0 $0 $0 $0 $0 $0 $305,145 $0 $0 $0 $0 $305,145 G Baseball Field $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Canopies $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Covered Walkways $0 $415,433 $0 $0 $0 $0 $0 $0 $0 $0 $0 $415,433 G Fencing & Guardrails $0 $0 $0 $0 $0 $0 $185,121 $0 $0 $0 $0 $185,121 G Football Field $0 $0 $0 $0 $0 $773,333 $0 $0 $0 $0 $0 $773,333 G Hard Surface Play Area $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Playing Field $0 $0 $0 $0 $0 $652,033 $0 $0 $0 $0 $0 $652,033 G Soccer/Lacross Field $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Softball Field $0 $0 $0 $0 $0 $1,229,073 $0 $0 $0 $0 $0 $1,229,073 G Tennis Courts $0 $0 $0 $0 $0 $299,970 $0 $0 $0 $0 $0 $299,970 G Track $0 $0 $0 $0 $0 $297,619 $0 $0 $0 $0 $0 $297,619 G Landscaping $247,035 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $247,035 G30 - Site Mechanical Utilities $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Water Supply $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Sanitary Sewer $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Storm Sewer $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Fuel Distribution $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G40 - Site Electrical Utilities $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Electrical Distribution $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Site Lighting $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 G Site Communications & Security $114,147 $0 $0 $0 $0 $0 $0 $0 $0 $0 $153,404 $267,551 * Indicates non-renewable system Page 35 of 46

36 School Assessment Report - Site Forecasted Capital Renewal Requirement The following chart shows the current building deficiencies and the forecasted capital renewal (system replacement) requirements over the next ten years. $4,000,000 $3,252,028 $3,000,000 $2,000,000 $1,000,000 $1,015,775 $361,183 $490,266 $153,404 $0 Current Deficiencies Page 36 of 46

37 School Assessment Report - Site Deficiency Summary by System Current deficiencies include assemblies that have reached or exceed their design life or components of the assemblies that are in need of repair. Assemblies that have reached their design life are identified as current deficiencies and assigned the distress 'Beyond Service Life'. The following chart lists all current deficiencies associated with this facility broken down by UNIFORMAT system. G2050 Landscaping $247, G4030 Site Communications & Security $114, Budget Estimate Total: $361, Page 37 of 46

38 School Assessment Report - Site Deficiency Summary by Priority The following chart shows the total repair costs broken down by priority. Assessors assigned deficiencies within ecomet to one of the following priority categories: 1 Priority 2 Priority 3 Priority - $361, Priority 5 Priority Budget Estimate Total: $361, Page 38 of 46

39 School Assessment Report - Site Deficiency By Priority Investment Table The table below shows the current investment cost grouped by deficiency priority and building system. Assessors assigned deficiencies within ecomet to one of the following priority categories: Priority 1 deficiencies require immediate review to correct a poten al life/safety hazard, stop accelerated deteriora on, or return a facility to opera on. Priority 2 deficiencies could become a Priority 1 deficiency, if not corrected within the next 2-3 years. These include intermi ent opera ons, rapid deteriora on, or poten al life/safety hazards.. Priority 3 deficiencies require appropriate a en on to preclude predictable deteriora on or poten al down me and the associated damage or higher costs if deferred further and not completed within the next 3-5 years. Priority 4 deficiencies represent a sensible improvement to exis ng condi ons. The recommended improvements are not required for the basic func onality of the facility; however addressing these deficiencies will improve overall usability and/or reduce long term maintenance costs. Repairs for these deficiencies may be budgeted and scheduled for comple on within the next 5-7 years. Priority 5 deficiencies will include condi ons that have no impact on the func on or usability of the facility, such as appearance. No ac on is required for these deficiencies, but they are tracked since they may require future inspec on or be completed as part of related repairs in con guous areas of the facility. System Code System Description Priority 1 Priority 2 Priority 3 Priority 4 Priority 5 Total G2050 Landscaping $0.00 $0.00 $247, $0.00 $0.00 $247, G4030 Site Communications & Security $0.00 $0.00 $114, $0.00 $0.00 $114, Total: $0.00 $0.00 $361, $0.00 $0.00 $361, Page 39 of 46

40 School Assessment Report - Site Deficiency Summary by Category The following chart shows the total repair costs broken down by deficiency categories. Assessors assigned deficiencies to one of the following categories: Deferred Maintenance - $361, Budget Estimate Total: $361, Page 40 of 46

41 School Assessment Report - Site Deficiency Details by Priority The deficiency detail notes listed below provide additional information on identified deficiencies found within the facility. Priority 3 Priority: System: G Landscaping Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Site Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $247, Eduardo Lopez 06/19/2015 Notes: Landscaping is missing and bare in areas and should be provided to prevent erosion. System: G Site Communications & Security Location: Distress: Category: Priority: Correction: Qty: Unit of Measure: Estimate: Assessor Name: Date Created: Site Beyond Service Life Deferred Maintenance 3 Priority Renew System 154, S.F. $114, Eduardo Lopez 06/19/2015 Notes: The site communications and security systems are beyond their expected service life and should be scheduled for replacement. Page 41 of 46

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

William Bradley Bryant Center

William Bradley Bryant Center DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary

More information

Stone Mountain Middle

Stone Mountain Middle DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Sagamore Hills Elementary

Sagamore Hills Elementary DeKalb County School District/Elementary Schools Sagamore Hills Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Bob Mathis Elementary

Bob Mathis Elementary DeKalb County School District/Elementary Schools Bob Mathis Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

DeKalb County School District/Middle Schools Peachtree Middle Final School Assessment Report May 20, 2016

DeKalb County School District/Middle Schools Peachtree Middle Final School Assessment Report May 20, 2016 DeKalb County School District/Middle Schools Peachtree Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition

More information

Martin Luther King Jr. High

Martin Luther King Jr. High DeKalb County School District/High Schools Martin Luther King Jr. High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Harnett Central High

Harnett Central High NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus Dashboard

More information

Anderson Creek Primary

Anderson Creek Primary NC School District/430 Harnett County/Elementary School Anderson Creek Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

Pinebrook Elementary

Pinebrook Elementary NC School District/300 Davie County/Elementary School Pinebrook Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

Davie County Early College High

Davie County Early College High NC School District/300 Davie County/High School Davie County Early College High Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Harnett Central Middle

Harnett Central Middle NC School District/430 Harnett County/Middle School Harnett Central Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Central Davie Academy

Central Davie Academy NC School District/300 Davie County/High School Central Davie Academy Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Mountain Heritage High

Mountain Heritage High NC School District/995 Yancey County/High School Mountain Heritage High Final Campus Assessment Report March 12, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 7 Campus

More information

William Ellis Middle

William Ellis Middle NC School District/300 Davie County/Middle School William Ellis Middle Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Lafayette Elementary

Lafayette Elementary NC School District/430 Harnett County/Elementary School Lafayette Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5

More information

Mocksville Elementary

Mocksville Elementary NC School District/300 Davie County/Elementary School Mocksville Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017

NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017 NC School District/430 Harnett County/Elementary School Coats Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus

More information

Lilesville Elementary

Lilesville Elementary NC School District/040 Anson County/Elementary School Lilesville Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

BUILDING CONDITION ASSESSMENT. A Comprehensive Approach in Energy and Facility Management

BUILDING CONDITION ASSESSMENT. A Comprehensive Approach in Energy and Facility Management BUILDING CONDITION ASSESSMENT A Comprehensive Approach in Energy and Facility Management Presentation Outline Page Nadine International Company Profile.. 3 FCI -Industry Preferred Formula.... 4 FCI -Other

More information

Integrating Green Building Measures into Capital Planning for HUD Assisted and Public Housing Programs

Integrating Green Building Measures into Capital Planning for HUD Assisted and Public Housing Programs Building Bridges to Net Zero Integrating Green Building Measures into Capital Planning for HUD Assisted and Public Housing Programs Evolution of HUD's Green Capital Needs Assessment, and the new CNA etool

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

1. CALL TO ORDER AND RECOGNITION OF A QUORUM

1. CALL TO ORDER AND RECOGNITION OF A QUORUM Mesa Union School District Agenda for the Special Board Meeting of the Board of Trustees to be held on Thursday, May 3, 2018, at 6:00 p.m. in the School Multi-Purpose Room located at 3901 North Mesa School

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

CAPITAL FUNDING SUMMARY

CAPITAL FUNDING SUMMARY CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations

More information

Washingtonville Central School District Building Condition Survey Five Year Plan

Washingtonville Central School District Building Condition Survey Five Year Plan Building Condition Survey Five Year Plan Project Cost Summary Building 2011 2012 2013 2014 2015 Totals 0001 Washingtonville Jr High School $38,759 $325,990 $1,882,653 $1,417,341 $1,025,559 $4,690,302 0002

More information

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016 POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

Release Date: January 3, 2019 Due Date: January 17, 2019

Release Date: January 3, 2019 Due Date: January 17, 2019 SAN JUAN SCHOOL DISTRICT REQUEST FOR BID CONSTRUCTION OF NEW BLUFF ELEMENTARY SCHOOL AND NEW MONTEZUMA CREEK ELEMENTARY GYM Release Date: January 3, 2019 Due Date: January 17, 2019 I. GENERAL A. Intent

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717 Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400

More information

BERKELEY UNIFIED SCHOOL DISTRICT

BERKELEY UNIFIED SCHOOL DISTRICT BERKELEY UNIFIED SCHOOL DISTRICT TO: Javetta Cleveland and Neil Smith, Co-Superintendents FROM: Lew Jones, Director of Facilities DATE: June 26, 2013 SUBJECT: Approval of the 2013/14 Measure H Annual Plan

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta

Howsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta Entuitive Corporation Calgary + Toronto Howsyth Court Condominium Corporation No. CCN9011190 305 25 Avenue SW Calgary, Alberta Submitted By: Entuitive Corporation 209 8 th Avenue SW, Suite 300 Calgary,

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

NOTICE TO TAXPAYERS. The Notice to Taxpayers is available online at or by calling (888)

NOTICE TO TAXPAYERS. The Notice to Taxpayers is available online at   or by calling (888) Prescribed by the Department of Local Government Finance Approved by the State Board of Accounts NOTICE TO TAXPAYERS Budget Form No. 3 (Rev. 2018) Print 8/9/2018 12:12:13 PM The Notice to Taxpayers is

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

Desktop Facilities Assessment

Desktop Facilities Assessment Desktop Facilities Assessment Town of Gravenhurst 3-5 Pineridge Gate Gravenhurst, Ontario PP Z3 R.J. Burnside & Associates Limited 28 Wellington Street West Suite 30 Barrie ON L4N 8J6 CANADA January 20,

More information

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: January 1, 2014 Copyright

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2017 December 31, 2017 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: April 6, 2017 Copyright

More information

REPLACEMENT RESERVE GUIDE

REPLACEMENT RESERVE GUIDE CANADA MORTGAGE AND HOUSING CORPORATION REPLACEMENT RESERVE GUIDE What is the Replacement Reserve? The replacement reserve is a fund kept by each housing sponsor under the terms of its operating agreement

More information

Our Focus: Your Future

Our Focus: Your Future Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 A Library, Learning Resources and Campus Center 217,200 GSF; State Funding component; begin design est. 2015/16 771120 $ 197,529.21

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments

NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments 1. What is a CNA? Presentation by: Thomas E. Fielder Phone: 859-276-0000 / tfielder@fieldergroup.com a) Comprehensive review

More information

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY) Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -

More information

Hyde Park Place Owners' Association, Inc.

Hyde Park Place Owners' Association, Inc. RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET ALAMEDA ISLES PROPOSED BUDGET FACT SHEET These sheets outline the proposed 2016/2017 budget in two parts. The first part is the operating budget which shows our income and anticipated expenses with a comparative

More information

Facility Condition Assessment Report 2010 Limited Scope Update

Facility Condition Assessment Report 2010 Limited Scope Update PARSONS Ferris State University Facility Condition Assessment Report 2010 Limited Scope Update April 25, 2011 Table of Contents Objectives and Approach... 1 Objectives... 3 Approach... 3 Summary of Findings...

More information

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5 DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

CITY OF FORT PIERCE BUILDING DEPARTMENT

CITY OF FORT PIERCE BUILDING DEPARTMENT CITY OF FORT PIERCE BUILDING DEPARTMENT APPLICATION FOR DETERMINATION OF SUBSTANTIAL IMPROVEMENT This is a request for determination by the City s Floodplain Administrator as to whether or not the project

More information

Body Corporate ten year maintenance plan example for South Africa

Body Corporate ten year maintenance plan example for South Africa Body Corporate ten year maintenance plan example for South Africa Prepared by: Date: This plan covers the period of ten years from.. Building details & report inputs Supplied information Building name

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

State Historic Homes Rehabilitation Tax Credit CGS

State Historic Homes Rehabilitation Tax Credit CGS State Historic Homes Rehabilitation Tax Credit CGS 10-416 Historic Homes Rehabilitation Tax Credit Basic Eligibility Requirements Listed on the State or National Register Located in a Program Targeted

More information

Facility Condition Assessment Report. Coast Community College District

Facility Condition Assessment Report. Coast Community College District Facility Condition Assessment Report Coast Community College District February 28, 2003 Introduction To help document the need for funding the necessary replacement and upgrading of facilities within California

More information

VENDOR PREQUALIFICATION FORM

VENDOR PREQUALIFICATION FORM VENDOR PREQUALIFICATION FORM Date: Please complete this form and return to Rockford Construction via e mail (prequal@rockfordconstruction.com) or fax (1 616 285 8423 must include the 1 616). Name of Company

More information

WASHINGTON BROWN DEPRECIATION PTY LTD

WASHINGTON BROWN DEPRECIATION PTY LTD Wednesday, 4 July 2007 The Owners - Strata Plan Number C/- Strata Management Company Address PROPERTY ADDRESS SINKING FUND FORECAST REPORT For the attention of: Strata Manager Dear Strata Manager, In accordance

More information

Budget Committee Meeting. February 8, 2018

Budget Committee Meeting. February 8, 2018 Budget Committee Meeting February 8, 2018 1 Agenda Norms and Parking Lot 8:30 Capital Outlay FMD Hearings 8:35 Capital Outlay FMD Prioritization 11:00 Lunch 11:45 Capital Outlay FMD Prioritization (continued)

More information

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Prepared for FY 2016 Report Date: November 27, 2015 Southeast Region 10459 Hunters Creek Court Jacksonville, FL 32256 (904)

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information