DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

Size: px
Start display at page:

Download "DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:"

Transcription

1 CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016

2 Table of Contents Section Name Section # Executive Summary... 1 Reserve Study Disclosures... 2 Introduction... 3 Capital Reserve Methodology... 4 Capital Reserve Calculation...5 Capital Reserve Recommendations... 6 Component Narrative... 7 Reserve Summary... 8 Component Schedule... 9 Component Detail Disbursement Schedule Reserve Fund Scenarios Disbursements by Year...13 Reserve Fund Closing Balance Reserve Fund Contributions Definitions... DRAFT 16

3 Executive Summary The Piano Works is a 70 unit condominium associated in 3 high rise buildings that were previously used for industrial use. The Piano Works is located off of Main Street in, which is easily accessible from Route 9. Recreational amenities include a community room and an exercise room. Brick masonry siding is utilized on the exterior exposures of the buildings and a combination of composite asphalt shingles and EPDM are utilized on the various roofs. On the ground level a ballast EPDM roofing system is utilized above a portion of the building. Asphalt parking is provided on the exterior ground level with asphalt curbing. Cast-in-place concrete sidewalks are located around the back entrance to the building accompanied by concrete curbing. Level of Service Level I: New Study Fiscal Year of Study 2016 Current Status of Reserve Fund (Component Method) Current Balance $71,466 Fully Funded Balance $971,270 Percent Funded 7.36% Reserve Budget Recommendations Prior Budget Component Year Contribution Method * Contribution/Year $31,771 $261,208 Contribution/Unit $454 $3,732 Contribution/Unit/Month $38 $311 5% Threshold * $121,483 $1,735 $145 10% Threshold * $127,569 $1,822 $152 * Please note that this is the contribution for the period of July 2016 through June

4 Reserve Study Disclosures General - Becht Engineering BT is not aware of any involvement with this Association, which would lead to an actual or perceived conflict of interest. Physical Analysis - The inspections performed to determine the current physical condition of the common elements were visual in nature; no destructive testing or invasive inspections were performed. Quantities were taken from a combination of field counts/measurements and plan take-offs. Personnel Credentials - Preparation of this Reserve Study was performed by a CAI designated Reserve Specialist and licensed Building Inspector. Completeness - This Reserve Study assumes that proper preventative and corrective maintenance has been and will continue to be performed on the common elements. Failure to properly maintain the common elements may lead to premature failure. It should be noted that higher rates of inflation, lower earned interest rates or prematurely failing components can result in a negative closing cash balance. In addition, it is important to note that the capital fund contributions each year are assumed to rise at the assumed rate of inflation. Failure to raise the annual contributions with inflation will reduce the closing balance and may lead to a future shortfall. Reliance on Client Data - This Reserve Study was prepared based on certain information provided by an official representative of the Association. This information includes the current asset balance of the Reserve Fund and the ages of the common elements and dates of most recent replacements. Scope - This Reserve Study is a reflection of the information provided to us and assembled for the Association's use for budgeting purposes, not for the purpose of performing an audit, quality/forensic analysis or background checks of historical records. Interpretation of contradictions that may exist within the governing document's definition of common elements is not within the scope of this Study. Reserve Balance - The actual and projected Reserve Fund Balance is based upon information provided by the Association and was not audited. Component Quantities - Where this Reserve Study is an update of a previously prepared Study, the Association is considered to have deemed previously developed component listings and quantities as accurate and reliable. Estimated Replacement Costs - Replacement costs are to be considered estimated projections of the cost to replace common elements in kind. These cost estimates are to be considered preliminary until such time as a project specific design or scope of work is developed. These costs can be affected by many variables including inflation, project scope and hidden damage conditions. Reserve Projects - While the information provided in this Study is to be considered reliable, on-site inspections are not to be considered a project audit or quality inspection. 2

5 Introduction The purpose of a Capital Reserve Study is to estimate the amount of money that must be funded annually to replace those common element components that will require replacement before the end of the effective life of the project. Mortgage lenders recognize the conditions of inadequate reserves. Reserves are important in preserving the qualities of a particular complex or building and therefore can affect property values. Consequently, capital reserves are directly related to the security and risk of a lender's investment and the marketability of the property. The Capital Reserve Study develops a recommended basic annual contribution based upon current replacement costs. Inflation may increase future costs unpredictably, and the accumulation of interest on the reserve fund deposits increases available funds. Accurate projection of these factors is not possible. However, the effects of inflation and interest are shown via cash flow projections using assumed inflation and interest rates. Accurate reserve funding requires regular updates. The Community Associations Institute recommends yearly reviews and a formal study every three years. 3

6 Capital Reserve Methodology In preparing this study, when provided, we reviewed the master deed and offering statement to identify the common element components. The Association owns these building and site components. Only components with estimated remaining lives of 30 years or less have been included in the capital reserve fund. Components with estimated remaining lives that are greater than 30 years, such as building structures, piping and electrical wiring are usually replaced during a major renovation and financed at that time. Including these components in the reserve fund would result in an unrealistically high-recommended annual contribution to the capital reserve. Quantities of the components to be included in the reserve fund were then determined by field measurements, as well as a review of building and site plans, if available. Estimates of the costs to replace each component were derived from published industry standards, such as the R.S. Means Company cost-estimating guides and from our own experience in designing and supervising construction of similar projects. These cost estimates are to be considered preliminary until such time as a project specific design or scope of work is developed. Finally, estimated remaining lives were determined for each of the included components based on the reported or evident present age, available industry data related to typical useful lives and the condition of the component, as determined by our physical inspection. The capital reserve fund is not intended to cover annual maintenance. If maintenance items are included in the Capital Reserve Study, the tax status of the reserve fund can be jeopardized. However, expected lives are based on the assumption that proper annual maintenance is being performed. Therefore, this annual maintenance should be included in the Association's budget and maintenance fee. Without proper maintenance, accelerated deterioration can be expected, with shortened lives. Please note, it is only possible to reserve for future expenditures and that a current need must be financed separately by borrowing or assessments. This Capital Reserve Study is developed as an aid in the proper financial planning of the Association. As such, the common element components included are evaluated for their physical condition and only for the purpose of estimating their remaining lives. Identification of possible deficient conditions is beyond the intent and scope of the Capital Reserve Study. 4

7 Capital Reserve Calculation We have provided two Capital Reserve calculation methods as described below. Component Method The first method provided in this reserve study is what is known as the Component Method. This is the most conservative approach to calculating the reserve requirement. The Component Method analyzes each component individually and assumes that the money collected for each item will only be used to replace that item. Our program uses assumed rates of interest and inflation in the calculation of the annual contribution and fully funded balance. We compare the actual balance in the Association's Reserve Fund with the calculated fully funded balance and determine if a surplus or deficit condition exists. If a deficit condition exists, an additional contribution is calculated for each component to offset the deficit. Threshold Funding Method The second calculation method is known as the Threshold Funding Method. This method pools all the components and assumes that the money contributed to the fund is available for replacement of any item. Looking out over the next 30 years, the annual contribution is determined by lowering the contribution until the closing balance for any given year reaches a predetermined threshold. We typically provide two Threshold Method scenarios. These thresholds are based on a percentage of the current replacement cost of all the components in the Reserve Study. Basing the threshold on a percentage of the replacement cost of all components keeps the minimum proportional to the needs of a specific community. This minimizes the annual contribution while maintaining a minimum closing balance. Determining the optimum minimum closing balance is a subjective task. Certainly, the lower the minimum acceptable balance is the greater the risk that the fund will experience a deficit. It should be noted that this method only considers Reserve Account balances over the next 30 years. Large capital expenditures just beyond the 30- year window will not be considered using this method until in the future they fall within the 30-year window. 5

8 Capital Reserve Recommendations has a total of 19 components in the reserve fund with a current Replacement Cost of $1,398,205. presently has a total of $71,466 in the reserve fund. Using the Component Method, we have determined that the Basic Annual Contribution to the reserve fund should be $90,311. The fully funded balance required is $971,270. This leaves deficit of $899,804 in the reserve fund. The deficit will be offset on an annual basis, for each reserve component, based on the estimated remaining lives. The total of the next budget year contribution to the Contribution Adjustment is $170,898. This results in a Total Contribution to the reserve fund for the next budget year of $261,208. Based on your evaluation of the preferred calculation method, we suggest that you plan your annual contributions over the next few years according to the appropriate cash flow schedule. Each year for the next three years, you may choose to review these assumptions. At no later than three years, we suggest that you contact us for an update based on a proper engineering review of the facility and replacement costs. It should be noted that higher rates of inflation, lower earned interest rates or prematurely failing components can result in a negative closing cash balance. In addition, it is important to note that the capital fund contributions each year are assumed to rise at the assumed rate of inflation. Failure to raise the annual contributions with inflation will reduce the closing balance. We recommend that the Association review this Capital Reserve Study with their Certified Public Accountant to be utilized in the preparation of their annual budget. 6

9 Component Narrative Architectural Present Age: 36 Bridge, Wood Quantity: 550 SF Cost Per Unit: $30.00 Replacement Cost: $16,500 Present Age: 36 Carpeting Typical Life: 20 Typical Life: 10 Est Rem Life: 5 Quantity: 9,600 SF Cost Per Unit: $9.00 Replacement Cost: $86,400 Present Age: 23 Roof, Shingles-1993 Replacement Typical Life: 25 Est Rem Life: 5 Quantity: 1 LS Cost Per Unit: $18, Replacement Cost: $18,000 Comment: This price reflects the replacement of the roof and the gutter system. Present Age: 36 Roof, Shingles-Original Typical Life: 25 Est Rem Life: 2 Quantity: 1 LS Cost Per Unit: $19, Replacement Cost: $19,500 Comment: This price reflects the replacement of the roof and the gutter system. Present Age: 36 Roof, Single-Ply Bal-Ground Level Typical Life: 15 Est Rem Life: 5 Quantity: 1 LS Cost Per Unit: $150, Replacement Cost: $150,000 Comment: This price reflects the roofing system as a whole including the walkway above. Est Rem Life: 5 7-1

10 Component Narrative Architectural Present Age: 23 Roof, Single-Ply-1993 Replacement Quantity: 1 LS Cost Per Unit: $70, Replacement Cost: $70,575 Typical Life: 15 Comment: This price reflects the replacement of the roof and the gutter system. Present Age: 6 Roof, Single-Ply-2010 Replacement Typical Life: 15 Est Rem Life: 5 Quantity: 1 LS Cost Per Unit: $146, Replacement Cost: $146,938 Comment: This price reflects the replacement of the roof and the gutter system. Present Age: 2 Roof, Single-Ply-2014 Replacement Typical Life: 15 Est Rem Life: 9 Quantity: 1 LS Cost Per Unit: $47, Replacement Cost: $47,670 Comment: This price reflects the replacement of the roof and the gutter system. Present Age: 36 Roof, Single-Ply-Original Typical Life: 15 Est Rem Life: 13 Quantity: 1 LS Cost Per Unit: $27, Replacement Cost: $27,120 Comment: This price reflects the replacement of the roof and the gutter system. Present Age: 23 Windows, Double Hung Typical Life: 30 Est Rem Life: 5 Quantity: 442 EA Cost Per Unit: $ Replacement Cost: $309,400 Est Rem Life: 7 7-2

11 Component Narrative Electrical Present Age: 1 Lower Level Parking Lights Quantity: 1 LS Cost Per Unit: $16, Replacement Cost: $16,000 Typical Life: 25 Est Rem Life:

12 Component Narrative Mechanical Present Age: 5 Buffalo Fire Pump Quantity: 1 EA Cost Per Unit: $25, Replacement Cost: $25,000 Present Age: 36 Elevator System Typical Life: 25 Typical Life: 20 Est Rem Life: 20 Quantity: 1 LS Cost Per Unit: $200, Replacement Cost: $200,000 Comment: This price reflects the system as a whole, including the generators, motors, belts and cars. Est Rem Life:

13 Component Narrative Site Present Age: 26 Asphalt Paving Quantity: 5,150 SY Cost Per Unit: $20.00 Replacement Cost: $103,000 Typical Life: 20 Comment: Asphalt paving requires regular maintenance, including crack filling and pot hole repair to prevent accelerated damage. Present Age: 36 Concrete Sidewalks Typical Life: 30 Est Rem Life: 5 Quantity: 3,900 SF Cost Per Unit: $7.00 Replacement Cost: $27,300 Present Age: 36 Fence, Aluminum Typical Life: 25 Est Rem Life: 10 Quantity: 800 LF Cost Per Unit: $33.50 Replacement Cost: $26,800 Present Age: 5 Fire Escapes Typical Life: 50 Est Rem Life: 5 Quantity: 1 LS Cost Per Unit: $1.00 Replacement Cost: $1 Comment: This line item is currently a placeholder. Present Age: 36 Retaining Wall, Segmental-Basketball Court Typical Life: 40 Est Rem Life: 45 Quantity: 2,400 SF Cost Per Unit: $45.00 Replacement Cost: $108,000 Present Age: 36 Retaining Wall, Segmental-Parking Lot Typical Life: 40 Est Rem Life: 4 Quantity: 1 LS Cost Per Unit: $1.00 Replacement Cost: $1 Comment: This line item is currently a placeholder. Est Rem Life: 4 7-5

14 Capital Reserve Calculations

15 Reserve Summary Architectural Replacement Cost Present Fund RESERVES Required Fund CONTRIBUTION Surplus (Deficit) Basic Annual Adjustment* Total Architectural $892,103 $45,263 $615,152 ($569,889) $62,705 $108,146 $170,851 Electrical $16,000 $61 $829 ($768) $833 $41 $875 Mechanical $225,000 $9,010 $122,449 ($113,439) $13,961 $12,863 $26,824 Site $265,102 $17,132 $232,840 ($215,708) $12,811 $49,848 $62,659 TOTALS $1,398,205 $71,466 $971,270 ($899,804) $90,311 $170,898 $261,208 8

16 Component Schedule Description Replacement Cost Present Age Est. Rem. Life Typical Life Basic Annual Contrib. Percent Total Present Fund Required Fund Surplus (Deficit) Contrib. Adjustment Architectural Bridge, Wood $16, $1, % $991 $13,475 ($12,483) $2,718 Carpeting $86, $10, % $3,461 $47,039 ($43,578) $9,490 Roof, Shingles-1993 Replacement $18, $ % $1,264 $17,184 ($15,920) $8,260 Roof, Shingles-Original $19, $1, % $1,250 $16,986 ($15,736) $3,427 Roof, Single-Ply Bal- Ground Level Roof, Single-Ply-1993 Replacement Roof, Single-Ply-2010 Replacement Roof, Single-Ply-2014 Replacement Roof, Single-Ply- Original $150, $12, % $8,012 $108,886 ($100,874) $21,967 $70, $5, % $3,770 $51,231 ($47,461) $10,336 $146, $11, % $4,964 $67,469 ($62,505) $7,972 $47, $3, % $560 $7,613 ($7,053) $650 $27, $2, % $1,449 $19,687 ($18,238) $3,972 Windows, Double Hung $309, $13, % $19,542 $265,583 ($246,041) $39,353 Electrical Lower Level Parking Lights $16, $ % $61 $829 ($768) $41 Mechanical Buffalo Fire Pump $25, $1, % $466 $6,329 ($5,864) $371 Elevator System $200, $12, % $8,544 $116,119 ($107,575) $12,492 Site Asphalt Paving $103, $6, % $6,189 $84,114 ($77,925) $16,970 Concrete Sidewalks $27, $1, % $1,555 $21,134 ($19,579) $2,273 Fence, Aluminum $26, $1, % $1,718 $23,345 ($21,627) $4,710 Fire Escapes $ $0 0.00% $0 $0 ($0) $0 Retaining Wall, Segmental-Basketball Court Retaining Wall, Segmental-Parking Lot $108, $3, % $7,670 $104,246 ($96,576) $25,894 $ $0 0.00% $0 $1 ($1) $0 9-1

17 Component Schedule Description Replacement Cost Present Age Est. Rem. Life Typical Life Basic Annual Contrib. Percent Total Present Fund Required Fund Surplus (Deficit) Contrib. Adjustment Totals $1,398,205 $90, % $71,466 $971,270 ($899,804) $170,898 The Piano Works is a 70 unit condominium associated in 3 high rise buildings that were previously used for industrial use. The Piano Works is located off of Main Street in, which is easily accessible from Route 9. Recreational amenities include a community room and an exercise room. Brick masonry siding is utilized on the exterior exposures of the buildings and a combination of composite asphalt shingles and EPDM are utilized on the various roofs. On the ground level a ballast EPDM roofing system is utilized above a portion of the building. Asphalt parking is provided on the exterior ground level with asphalt curbing. Cast-in-place concrete sidewalks are located around the back entrance to the building accompanied by concrete curbing. 9-2

18 Component Detail Architectural Quantity Replacement Cost Present Fund RESERVES Required Fund CONTRIBUTION Surplus (Deficit) Basic Annual Adjustment* Total Bridge, Wood 550 SF $16,500 $991 $13,475 ($12,483) $1,044 $2,718 $3,763 Carpeting 9,600 SF $86,400 $3,461 $47,039 ($43,578) $10,033 $9,490 $19,523 Roof, Shingles-1993 Replacement Roof, Shingles- Original Roof, Single-Ply Bal- Ground Level Roof, Single-Ply-1993 Replacement Roof, Single-Ply-2010 Replacement Roof, Single-Ply-2014 Replacement Roof, Single-Ply- Original Windows, Double Hung 1 LS $18,000 $1,264 $17,184 ($15,920) $938 $8,260 $9,198 1 LS $19,500 $1,250 $16,986 ($15,736) $1,016 $3,427 $4,443 1 LS $150,000 $8,012 $108,886 ($100,874) $12,195 $21,967 $34,162 1 LS $70,575 $3,770 $51,231 ($47,461) $5,738 $10,336 $16,073 1 LS $146,938 $4,964 $67,469 ($62,505) $11,946 $7,972 $19,918 1 LS $47,670 $560 $7,613 ($7,053) $3,876 $650 $4,525 1 LS $27,120 $1,449 $19,687 ($18,238) $2,205 $3,972 $6, EA $309,400 $19,542 $265,583 ($246,041) $13,716 $39,353 $53,070 TOTALS $892,103 $45,263 $615,152 ($569,889) $62,705 $108,146 $170,

19 Component Detail Electrical Quantity Replacement Cost Present Fund RESERVES Required Fund CONTRIBUTION Surplus (Deficit) Basic Annual Adjustment* Total Lower Level Parking Lights 1 LS $16,000 $61 $829 ($768) $833 $41 $875 TOTALS $16,000 $61 $829 ($768) $833 $41 $

20 Component Detail Mechanical Quantity Replacement Cost Present Fund RESERVES Required Fund CONTRIBUTION Surplus (Deficit) Basic Annual Adjustment* Total Buffalo Fire Pump 1 EA $25,000 $466 $6,329 ($5,864) $1,302 $371 $1,673 Elevator System 1 LS $200,000 $8,544 $116,119 ($107,575) $12,659 $12,492 $25,150 TOTALS $225,000 $9,010 $122,449 ($113,439) $13,961 $12,863 $26,

21 Component Detail Site Quantity Replacement Cost Present Fund RESERVES Required Fund CONTRIBUTION Surplus (Deficit) Basic Annual Adjustment* Total Asphalt Paving 5,150 SY $103,000 $6,189 $84,114 ($77,925) $6,519 $16,970 $23,489 Concrete Sidewalks 3,900 SF $27,300 $1,555 $21,134 ($19,579) $1,210 $2,273 $3,484 Fence, Aluminum 800 LF $26,800 $1,718 $23,345 ($21,627) $1,396 $4,710 $6,106 Fire Escapes 1 LS $1 $0 $0 ($0) $0 $0 $0 Retaining Wall, Segmental-Basketball Court Retaining Wall, Segmental-Parking Lot 2,400 SF $108,000 $7,670 $104,246 ($96,576) $3,686 $25,894 $29,580 1 LS $1 $0 $1 ($1) $0 $0 $0 TOTALS $265,102 $17,132 $232,840 ($215,708) $12,811 $49,848 $62,

22 Disbursement Schedule Year Description Base Cost Future Replacement Cost 2018 Roof, Shingles-1993 Replacement $18,000 $19,096 $18,000 $19, Retaining Wall, Segmental-Basketball Court $108,000 $121,555 Retaining Wall, Segmental-Parking Lot $1 $1 $108,001 $121, Asphalt Paving $103,000 $119,405 Bridge, Wood $16,500 $19,128 Carpeting $86,400 $100,161 Fence, Aluminum $26,800 $31,069 Roof, Shingles-Original $19,500 $22,606 Roof, Single-Ply Bal-Ground Level $150,000 $173,891 Roof, Single-Ply-1993 Replacement $70,575 $81,816 Roof, Single-Ply-Original $27,120 $31,440 $499,895 $579, Windows, Double Hung $309,400 $380,523 $309,400 $380, Roof, Single-Ply-2010 Replacement $146,938 $191,721 $146,938 $191, Concrete Sidewalks $27,300 $36,689 Elevator System $200,000 $268,783 $227,300 $305,

23 Disbursement Schedule Year Description Base Cost Future Replacement Cost 2029 Roof, Single-Ply-2014 Replacement $47,670 $70,005 $47,670 $70, Carpeting $86,400 $134,608 $86,400 $134, Buffalo Fire Pump $25,000 $45,153 Roof, Single-Ply Bal-Ground Level $150,000 $270,917 Roof, Single-Ply-1993 Replacement $70,575 $127,466 Roof, Single-Ply-Original $27,120 $48,982 $272,695 $492, Lower Level Parking Lights $16,000 $32,525 Roof, Single-Ply-2010 Replacement $146,938 $298,695 $162,938 $331, Asphalt Paving $103,000 $215,659 Bridge, Wood $16,500 $34,547 Carpeting $86,400 $180,902 $205,900 $431, Roof, Shingles-1993 Replacement $18,000 $39,983 $18,000 $39, Roof, Single-Ply-2014 Replacement $47,670 $109,066 $47,670 $109,

24 Disbursement Schedule Year Description Base Cost Future Replacement Cost 2046 Elevator System $200,000 $485,452 Fence, Aluminum $26,800 $65,051 Roof, Shingles-Original $19,500 $47,332 $246,300 $597,

25 Year DRAFT Reserve Fund Scenario Opening Balance Annual Contribution Contribution Adjustment Disbursements Calculation Method: Component Earned Interest Closing Balance $71,466 $90,311 $170,898 $0 $2,130 $334,804 $334,804 $93,020 $176,025 $0 $4,805 $608,654 $608,654 $95,811 $172,542 $19,096 $7,540 $865,450 $865,450 $98,685 $177,718 $0 $10,152 $1,152,005 $1,152,005 $101,645 $153,905 $121,556 $12,904 $1,298,904 $1,298,904 $104,695 $73,212 $579,515 $13,953 $911,249 $911,249 $107,836 $75,408 $0 $10,105 $1,104,598 $1,104,598 $111,071 $29,271 $380,523 $11,806 $876,222 $876,222 $114,403 $30,149 $0 $9,545 $1,030,319 $1,030,319 $117,835 $20,651 $191,721 $11,053 $988,138 $988,138 $121,370 $1,428 $305,472 $10,547 $816,010 $816,010 $125,011 $1,471 $0 $8,845 $951,337 $951,337 $128,761 $1,515 $0 $10,219 $1,091,832 $1,091,832 $132,624 $606 $70,005 $11,640 $1,166,697 $1,166,697 $136,603 $624 $0 $12,410 $1,316,334 $1,316,334 $140,701 $643 $134,608 $13,929 $1,336,999 $1,336,999 $144,922 $662 $0 $14,159 $1,496,742 $1,496,742 $149,270 $682 $0 $15,780 $1,662,473 $1,662,473 $153,748 $702 $0 $17,461 $1,834,385 $1,834,385 $158,360 $724 $0 $19,206 $2,012,674 $2,012,674 $163,111 $75 $492,518 $21,011 $1,704,353 $1,704,353 $168,004 $77 $0 $17,954 $1,890,389 $1,890,389 $173,045 $79 $0 $19,842 $2,083,354 $2,083,354 $178,236 $82 $0 $21,799 $2,283,472 $2,283,472 $183,583 $0 $331,219 $23,829 $2,159,664 $2,159,664 $189,090 $0 $431,109 $22,621 $1,940,267 $1,940,267 $194,763 $0 $0 $20,458 $2,155,488 $2,155,488 $200,606 $0 $39,983 $22,641 $2,338,752 $2,338,752 $206,624 $0 $109,066 $24,507 $2,460,818 $2,460,818 $212,823 $0 $0 $25,761 $2,699,402 $2,699,402 $219,208 $0 $597,835 $28,181 $2,348,

26 Year DRAFT Reserve Fund Scenario Opening Balance Annual Contribution Contribution Adjustment Disbursements Calculation Method: 5% of Rep. Cost Minimum Balance: $69,910 Earned Interest Closing Balance 2016 $71,466 $121,483 $0 $0 $1,373 $194, $194,322 $125,127 $0 $0 $2,621 $322, $322,070 $128,881 $0 $19,096 $3,919 $435, $435,774 $132,747 $0 $0 $5,077 $573, $573,598 $136,729 $0 $121,556 $6,477 $595, $595,248 $140,831 $0 $579,515 $6,715 $163, $163,279 $145,056 $0 $0 $2,419 $310, $310,754 $149,408 $0 $380,523 $3,917 $83, $83,556 $153,890 $0 $0 $1,669 $239, $239,115 $158,507 $0 $191,721 $3,250 $209, $209,151 $163,262 $0 $305,472 $2,976 $69, $69,917 $168,160 $0 $0 $1,610 $239, $239,687 $173,205 $0 $0 $3,335 $416, $416,227 $178,401 $0 $70,005 $5,129 $529, $529,752 $183,753 $0 $0 $6,293 $719, $719,798 $189,266 $0 $134,608 $8,223 $782, $782,679 $194,944 $0 $0 $8,883 $986, $986,506 $200,792 $0 $0 $10,953 $1,198, $1,198,251 $206,816 $0 $0 $13,103 $1,418, $1,418,170 $213,020 $0 $0 $15,336 $1,646, $1,646,526 $219,411 $0 $492,518 $17,654 $1,391, $1,391,073 $225,993 $0 $0 $15,135 $1,632, $1,632,201 $232,773 $0 $0 $17,583 $1,882, $1,882,557 $239,756 $0 $0 $20,124 $2,142, $2,142,437 $246,949 $0 $331,219 $22,762 $2,080, $2,080,929 $254,357 $0 $431,109 $22,187 $1,926, $1,926,364 $261,988 $0 $0 $20,683 $2,209, $2,209,035 $269,848 $0 $39,983 $23,552 $2,462, $2,462,452 $277,943 $0 $109,066 $26,130 $2,657, $2,657,459 $286,281 $0 $0 $28,125 $2,971, $2,971,865 $294,869 $0 $597,835 $31,316 $2,700,

27 Year DRAFT Reserve Fund Scenario Opening Balance Annual Contribution Contribution Adjustment Disbursements Calculation Method: 10% of Rep. Cost Minimum Balance: $139,821 Earned Interest Closing Balance 2016 $71,466 $127,569 $0 $0 $1,406 $200, $200,441 $131,396 $0 $0 $2,716 $334, $334,553 $135,338 $0 $19,096 $4,079 $454, $454,874 $139,398 $0 $0 $5,304 $599, $599,576 $143,580 $0 $121,556 $6,773 $628, $628,373 $147,887 $0 $579,515 $7,085 $203, $203,830 $152,324 $0 $0 $2,863 $359, $359,017 $156,894 $0 $380,523 $4,440 $139, $139,828 $161,601 $0 $0 $2,274 $303, $303,703 $166,449 $0 $191,721 $3,939 $282, $282,370 $171,442 $0 $305,472 $3,752 $152, $152,092 $176,585 $0 $0 $2,477 $331, $331,154 $181,883 $0 $0 $4,297 $517, $517,334 $187,339 $0 $70,005 $6,188 $640, $640,856 $192,959 $0 $0 $7,454 $841, $841,269 $198,748 $0 $134,608 $9,489 $914, $914,898 $204,710 $0 $0 $10,258 $1,129, $1,129,866 $210,851 $0 $0 $12,441 $1,353, $1,353,158 $217,177 $0 $0 $14,708 $1,585, $1,585,043 $223,692 $0 $0 $17,062 $1,825, $1,825,797 $230,403 $0 $492,518 $19,506 $1,583, $1,583,188 $237,315 $0 $0 $17,117 $1,837, $1,837,620 $244,434 $0 $0 $19,700 $2,101, $2,101,754 $251,767 $0 $0 $22,381 $2,375, $2,375,902 $259,320 $0 $331,219 $25,164 $2,329, $2,329,167 $267,100 $0 $431,109 $24,738 $2,189, $2,189,896 $275,113 $0 $0 $23,389 $2,488, $2,488,398 $283,366 $0 $39,983 $26,419 $2,758, $2,758,200 $291,867 $0 $109,066 $29,163 $2,970, $2,970,164 $300,623 $0 $0 $31,330 $3,302, $3,302,117 $309,642 $0 $597,835 $34,698 $3,048,

28 DRAFT Disbursements by Year 13

29 DRAFT Reserve Fund Closing Balance 14

30 DRAFT Reserve Fund Contributions 15

31 DRAFT Cumulative Contributions and Disbursements 16

32 Definitions 16-1

33 Definitions Base Cost - See definition "Current Replacement Cost Allowance." This calculation, based on current costs, is increased according to the assumed rates of inflation in the "Disbursement Schedule." Basic Annual Contribution - This is the amount that should have been contributed each year, while considering assumed rates of interest and inflation, to accumulate a reserve equal to the Current Replacement Cost at the anticipated replacement time (end-of-life). This is roughly calculated. Contribution Adjustment - If the capital reserve fund for a component is not fully funded, this is the increase in annual contributions that would be required to fully fund the reserve before the estimated end-oflife. If the capital reserve fund for a component is over-funded, this is the decrease in annual contributions that would offset the over-funded condition. Contribution, Total - This is the recommended Basic Annual Contribution plus the "Contribution Adjustment" (see definition) required to make up for past underfunding before replacement of the component is estimated to be required. The amount can decrease in future years because the required Contribution Adjustment decreases each year in which a reserve fund for a capital component is fully funded. Current Replacement Cost - The estimated cost to replace a component in kind at the time of the Study. Estimated Remaining Life - The anticipated number of years before replacement of this component can be expected to be necessary. This is based on the normal life, the current age, and an engineering assessment that considers site-specific condition. Deficit - This shows the amount that the Present Fund is undercapitalized. It is the present fund minus the Required Fund, A positive number (surplus) means excess cash reserves have been set aside to date. A negative number indicates a deficit in the Present Fund; this underfunding can be made up in one of two ways: 1) an increase in the annual fees to catch up or, 2) a special assessment between now and when the component requires replacement. This Study assumes the second method is used and recommends annual makeup on that basis. Interest - Interest accumulated on the capital reserve fund deposit based on the assumed interest rate listed at the top of the "Projected Cash Flow" pages. Inflation - The increased cost of future replacement expenditures are based on an assumed rate of inflation. Opening Balance - On the "Projected Cash Flow" pages, this is the reported total reserve fund on deposit 16-2

34 for the condominium Association. Percent Funded - Represents the ratio of the Reserve Fund balance to the Required Fund or Fully Funded Balance. This is a measure of the financial health of the Reserve Fund and an indicator of the risk of the future necessity of special assessments. Percentage Of Total - Percent of total recommended Basic Annual Contribution. This shows the significance of specific components relative to required contributions to the capital reserve fund. Present Age - Age of the component at the time of this Study. Present Fund - Present funds set aside for capital component replacement at this time. If present funds are not reserved for specific components but are an unallocated pool, the total present funds allocated between the components according to the Percentage Of Total column. Required Fund - This amount should have been set aside for each component in the fund to be considered fully funded. Surplus - This shows the amount that the Present Fund is overcapitalized. It is the present fund minus the Required Fund. A positive number (surplus) means excess cash reserves have been set aside to date. Typical Life - The anticipated number of years that a component may be expected to provide adequate service. Please note that this is based on industry standards. A component may outlive, or require replacement prior to, its typical life. 16-3

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland

CAPITAL RESERVE STUDY. Ellicott Meadows Condominium Association I. Ellicott City, Maryland CAPITAL RESERVE STUDY FOR THE Ellicott Meadows Condominium Association I Ellicott City, Maryland Contact Name: Victor Brzozowski Date: October 3, 2017 Table of Contents Section Name Section # Executive

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp.

CAPITAL RESERVE STUDY. Providence Corner. Upper Providence Twp. CAPITAL RESERVE STUDY FOR THE Providence Corner Upper Providence Twp. Management Company: The Galman Group Contact Name: Ms. Debra Lynch Date: September 28, 2016 Table of Contents Section Name Section

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Heritage Park 3208-52 nd Place NE, Tacoma, WA 98422 For: Heritage Park Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions 5500 Olympic Drive,

More information

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO

NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO RESERVE FUND STUDY NEW ALBANY COUNTRY CLUB MASTER ASSOCIATION, INC NEW ALBANY, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com NOVEMBER 2013 1.0 INTRODUCTION...1

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?

WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the

More information

TIMBERLAKE COMMUNITY ASSOCIATION

TIMBERLAKE COMMUNITY ASSOCIATION TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 TIMBERLAKE COMMUNITY ASSOCIATION REPLACEMENT RESERVE REPORT FY 2014 Community Management by: Mr. Phil Massa, AMS, PCAM 933 Windsor Oaks

More information

FIR RIDGE II CONDOMINIUM

FIR RIDGE II CONDOMINIUM FIR RIDGE II CONDOMINIUM BELLINGHAM, WASHINGTON UPDATE WITHOUT SITE VISIT FEBRUARY 2014 FOR USE WITH THE FEBRUARY 2012 RESERVE STUDY PREPARED BY: DENISE DANA, RESERVE SPECIALIST M. ARCH, REGISTERED ARCHITECT

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Licorice Fern II Homeowners Association 16880 SE Licorice Way, Renton, WA 98059 For: Licorice Fern II Homeowners Association c/o Ann Hart, Property Manager Pinnacle 2801 Alaskan

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

CAPE GEORGE COLONY CLUB MARINA RESERVES

CAPE GEORGE COLONY CLUB MARINA RESERVES CAPE GEORGE COLONY CLUB MARINA RESERVES Port Townsend, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Reserve Fund Study My Condominium Plan

Reserve Fund Study My Condominium Plan Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO

HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY HUDSON PARK ESTATES HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST 2016 CONTENTS 1.0 INTRODUCTION...

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX

.USI.COMMERCIAL. (888) Funding Reserve Analysis. for. The Retreat at Gleannloch Farms Homeowners Association Spring, TX .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Retreat at Gleannloch Farms Homeowners Association Spring, TX October 14, 2014 Page 1 of 31 Pages Funding Reserve Analysis

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

Commercial Assessments

Commercial Assessments Commercial Assessments (888) 225-3755 www.commercialassessments.com Funding Reserve Analysis for Timberlake Crossing Condominium Unit Owners Association Hardy, VA January 15, 2013 Page 1 of 24 Pages Funding

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY

The Ford Plantation - POA Revised August 17, THE FORD10 EXECUTIVE SUMMARY Replacement Reserve Analysis - Page A1 EXECUTIVE SUMMARY The Ford Plantation - POA Replacement Reserve Inventory identifies 77 Projected Replacements for funding from Replacement Reserves, with an estimated

More information

National Reserve Study Standards

National Reserve Study Standards RS National Reserve Study Standards General Information about Reserve Studies One of the primary responsibilities of the board of directors of a community association is to protect, maintain, and enhance

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

Reserve Specialist (RS ) Designation

Reserve Specialist (RS ) Designation Reserve Specialist (RS ) Designation NATIONAL RESERVE STUDY STANDARDS General Information About Reserve Studies One of the primary responsibilities of the board of directors of a community association

More information

LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION

LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION LEVEL 2 RESERVE STUDY UPDATE POINTE WOODWORTH HOMEOWNERS ASSOCIATION Tacoma, WA January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: July 20, 2013 Copyright

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina

Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Full Reserve Study For Glenmoor Homeowners Association Conway, South Carolina Prepared for FY 2016 Report Date: November 27, 2015 Southeast Region 10459 Hunters Creek Court Jacksonville, FL 32256 (904)

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Raft Island Homeowners Association 200 Raft Island Drive Northwest, Gig Harbor, WA 98335 For: Raft Island Homeowners Association c/o Juanita Carbaugh, Property Manager P.O. Box

More information

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC.

DRAFT WILLOUGHBY PARK GREENVILLE, NC. Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION & HOA MANAGEMENT COMPANY, LLC. DRAFT FULL RESERVE STUDY WILLOUGHBY PARK GREENVILLE, NC Prepared for: WILLOUGHBY PARK CONDOMINIUM ASSOCIATION GREENVILLE, NC & HOA MANAGEMENT COMPANY, LLC Prepared by: CRITERIUM GILES ENGINEERS, INC. 1150

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of:

2019 Reserve Study. Pebble Shores Condominium Association, Inc. Pebble Shores Drive Naples, FL A Service of: Pebble Shores Drive Naples, FL 34410 A Service of: 5036 Dr. Phillips Blvd, Suite 207, Orlando FL 32819 www.lcamresources.com October 31, 2018 Pebble Shores Condominium Pebble Shores Drive Naples, FL 34410

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions

Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions Initial Capital Reserve Funding Information provided by the Association and agreed Forecasting Assumptions 1 Organization: Highlands Condominium Association 2 Address: Spokane, WA 3 Number of Units 46

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Bridgewood Estates 2500 Jahn Avenue Northwest, Gig Harbor, WA 98335 For: Bridgewood Estates Homeowners Association c/o Juanita Carbaugh, Property Manager HOA Community Solutions

More information

Belle Monet. Full Reserve Study Report by HOMECERTS.COM

Belle Monet. Full Reserve Study Report by HOMECERTS.COM Belle Monet Full Reserve Study Report by HOMECERTS.COM 800.683.5528 SUPPORT@HOMECERTS.COM Belle Monet Reserve Study Report as of June 5, 2015 538 South 2200 West Pleasant Grove, UT 84062 168 Units Completed

More information

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844)

GLOBAL Solution Partners, LLC - Toll free phone and fax: (844) GLOBAL Solution Partners, LLC info@globalreservestudies.com - Toll free phone and fax: (844) 477-7883 - www.globalsolutionpartners.com Funding Reserve Analysis for Oak Crest Farms November 2, 2016 Page

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111

Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Sanctuary on the Park HOA Jordan & Caley Centennial, CO 80111 Level 3 Reserve Analysis Reserve Study without Property Inspection Report Period 01/01/11 12/31/011 Date of Property Inspection Inspector Report

More information

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For IRONWOOD AT TUKWILA HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2016 December 31, 2016 Project No: OR 11101 0006 U17 Prepared By: Carson M. Horton, RS Quality

More information

DeKalb Elementary School of the Arts at Terry Mills

DeKalb Elementary School of the Arts at Terry Mills DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School

More information

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S.

WYLIE, TX. Date of Investigation: February 6, 2018 Investigator: Phillip Nieman, P.E. Reviewed By: David H. Dotson, P.E., R.S. 3218 Fannin Road Melissa, TX 75454 (972) 562-1011 TEL Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY RIVERCHASE AT WYLIE WYLIE, TX Prepared for: RIVERCHASE AT WYLIE HOMEOWNERS ASSOCIATION

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by:

FOR BOARD REVIEW CARRBORO, NC. Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. Prepared by: FOR BOARD REVIEW RESERVE FUND STUDY FENWAY PARK CARRBORO, NC Prepared for: FENWAY PARK HOMEOWNERS ASSOCIATION, INC. CARRBORO, NC Prepared by: CRITERIUM GILES ENGINEERS 1150 SE MAYNARD ROAD, SUITE 220 CARY,

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

Anson County Early College High

Anson County Early College High NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

Common Component Inventory and Capital Expenditure Planning

Common Component Inventory and Capital Expenditure Planning Common Component Inventory and Capital Expenditure Planning Expected Percent Useful Life Funded Remaining Full Capital Item Quantity CapEx Beginning (or Frequency) Amount Useful Life Reserve Funding Required

More information

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC.

LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. LEVEL 3 RESERVE STUDY UPDATE For ORCHARD GREENS HOMEOWNERS ASSOCIATION, INC. Woodburn, OR January 1, 2015 December 31, 2015 Project No: OR 11101 0006 5 Prepared By: Carson M. Horton, RS Quality Check By:

More information

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO

Full Reserve Study. Twenty Four Neighborhood TOA. Carbondale, CO Full Reserve Study Twenty Four Neighborhood TOA Carbondale, CO Report #: 21306-0 For Period Beginning: January 1, 2011 Ending: December 31, 2011 Revision Date (2): February, 9, 2011 Date Prepared: September

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado

Reserve Study Project No Prepared for Nelson Farm Homeowner Association 1771 Norwood Lane Fort Collins, Colorado Reserve Study Project No. 09069 Prepared for 1771 Norwood Lane Fort Collins, Colorado Prepared by Bornengineering 1130 West 124 th Avenue, Suite 100 Westminster, Colorado 80234 January 28, 2010 1130 WEST

More information

FY15 Level 1 Reserve Study Tahoma Terra Yelm, WA 98597

FY15 Level 1 Reserve Study Tahoma Terra Yelm, WA 98597 FY15 Level 1 Reserve Study Yelm, WA 98597 17404 Meridian E, Suite F - PMB 208 Puyallup, WA 98375 September, 7 2015 Yelm, WA Board of Directors, Thank you for choosing as your trusted source for homeowners

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

SOMERSET VILLAGE DRAFT HOA RESERVE STUDY. Beginning Period: January 1, 2011 Ending: December 31, Prepared By:

SOMERSET VILLAGE DRAFT HOA RESERVE STUDY. Beginning Period: January 1, 2011 Ending: December 31, Prepared By: SOMERSET VILLAGE HOA RESERVE STUDY Beginning Period: January 1, 2011 Ending: December 31, 2011 Prepared By: Report Number: 10-003 Site Inspection Date: September 14, 2010 Report Submittal Date: October

More information

RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box Portland, Oregon Phone: Fax:

RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box Portland, Oregon Phone: Fax: Chelan Drive & Chaparrel Loop West Linn, Oregon 97068 Account 98 - Version L Fiscal Year: October 1, 017 to September 30, 018 RESERVE STUDY & MAINTENANCE PLAN ReserveStudyUpdate.com, LLC P.O. Box 66778

More information

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014

.USI.COMMERCIAL. The Summerlyn Association of Owners Inc. Lewes, Delaware. Funding Reserve Analysis. for. September 3, 2014 .USI.COMMERCIAL (888)225-3755 www.usicommercial.com Funding Reserve Analysis for The Summerlyn Association of Owners Inc. Lewes, Delaware September 3, 2014 Page 1 of 25 Pages Funding Reserve Analysis for

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111

RESERVE STUDY. Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION. Prepared by: 22 MONUMENT SQUARE PORTLAND, MAINE (800) , EXT 111 RESERVE STUDY THE VILLAGE AT HIGHLANDS CHARLOTTESVILLE, VA Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION C/O ASSOCIA COMMUNITY GROUP 1413 SACHEM PLACE, SUITE 2 CHARLOTTESVILLE, VA 22901 Prepared

More information

FULL RESERVE STUDY Stillwood Cluster Lot Owners' Association, Inc. Stow, Ohio August 15, 2017

FULL RESERVE STUDY Stillwood Cluster Lot Owners' Association, Inc. Stow, Ohio August 15, 2017 FULL RESERVE STUDY Stillwood Cluster Lot Owners' Association, Inc. Stow, Ohio August 15, 2017 This Report contains intellectual property developed by Reserve Advisors, Inc. and cannot be reproduced or

More information

PM+Reserves Veteran Owned Business SPECIALIZING IN RESERVE STUDIES SINCE 1990 A PROFESSIONAL CORPORATION APRA Association of Professional Reserve Analysts April 10, 2016 Stonewall Acres Professional Center

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Revised FULL RESERVE STUDY. Falcon Ridge at Highland Creek Homeowners Association, Inc.

Revised FULL RESERVE STUDY. Falcon Ridge at Highland Creek Homeowners Association, Inc. Revised FULL RESERVE STUDY Falcon Ridge at Highland Creek Homeowners Association, Inc. Charlotte, North Carolina Inspected - February 20, 2018 Revised - August 6, 2018 This Report contains intellectual

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Villa Marina 17104 NE 45 th Street, Redmond, WA 98053 For: Villa Marina Association of Apartment Owners c/o Sacha Copeland The Copeland Group, LLC 221 First Ave W, Suite 105

More information

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM

LEVEL 3 RESERVE STUDY UPDATE WOOLSEY CORNER CONDOMINIUM LEVEL 3 RESERVE STUDY UPDATE FOR WOOLSEY CORNER CONDOMINIUM Portland, OR January 1, 2014 December 31, 2014 Prepared By: Carson M. Horton, RS Quality Check By: L. Law Broili Date: January 1, 2014 Copyright

More information