Burlington Area School District Community Survey Results. Winter 2016
|
|
- Robert Terry
- 6 years ago
- Views:
Transcription
1 Burlington Area School District Community Survey Results Winter 2016
2 Survey Summary The community survey was conducted in December of Residents within the District were mailed a paper survey. Each survey included a unique survey access code for those who preferred to take the survey online. Total responses = 1,408 (544 paper) Participation rate = 15%
3 Respondent Information
4 What is your age? 50% 47% 45% 40% 35% 30% 25% 20% 19% 23% 15% 10% 9% 5% 0% 1% and over
5 Do you live in the Burlington Area School District? 8% Yes No 92%
6 In which municipality do you reside? 50% 48% 45% 40% 35% 30% 27% 25% 20% 15% 10% 5% 0% 6% 6% 5% 4% 3% 0.43% 0.07%
7 Are you an employee of the Burlington Area School District? 19% 81% Yes No
8 Do you have child(ren) attending school in the District? 42% 58% Yes No
9 If you have school-aged children, what 44% 45% 40% 35% 30% 25% 20% 15% 10% 5% 0% school(s) do they attend? 25% 20% 20% 12% 11% 8% 4% 2% 2% 1% 0.48% 0.16% 0.16%
10 How would you like to receive school/district School website Text messaging Automated phone notification District mailings School newsletters Skyward Messenger Burlington Standard Press Facebook Meetings at school Parent/teacher organizations Racine Journal Times School Board meetings Cable/local TV Radio Twitter Other information? 1% 4% 3% 11% 22% 29% 32% 29% 20% 9% 17% 6% 11% 3% 10% 28% 6% 9% 5% 7% 4% 4% 2% 1% 1% 1% 1% 36% 35% 34% 45% 49% 49% 80% 0% 25% 50% 75% 100% Non-Parents (Non-Staff) Parents (Non-Staff)
11 Facility Planning Background
12 As the School Board explores the possibility of addressing District facility needs, they have established the following goals: Renovate or replace Karcher Middle School The original portion of Karcher Middle School dates back to 1924 with additions and renovations in 1956, 1959, 1963 and A Facilities Assessment identified the following issues: - Portions of the building s exterior, including windows and doors, are not energy efficient and need replacement - Portions of the roof need replacement; minor repairs are no longer sufficient - The heating and plumbing systems are original and require replacement - Portions of the building do not meet Americans with Disabilities Act (ADA) requirements - Classrooms are undersized and lack the flexibility to support modern learning - Building renovation options are severely limited due to placement of load-bearing walls and columns Update building Infrastructure Some building systems, including heating, cooling, electrical and plumbing, are approaching the end of their service life. These older systems are less efficient and require ongoing repairs. In addition, many of the schools interior finishes, including flooring, ceiling tiles, lighting and cabinetry need to be replaced. Improve school security The safety of our students and staff is our top priority. Our schools lack a secured building entrance. This project would reconfigure and move the school offices to the main entrance to better monitor and control visitor access. Reduce the number of student transitions The School Board is recommending we maintain our neighborhood schools and move 5th and 6th grade students to Karcher Middle School. As a result, students would have one less transition to make during their educational experience. Expand 5th and 6th grade course offerings By moving 5th and 6th grade students to Karcher Middle School, students would have access to advanced classes, clubs and extracurricular activities. Consolidate the Montessori program to one location The District operates a very successful Montessori program that serves 4K through 6th grade students. Currently, the program is housed in two schools. This configuration creates challenges to efficiently share staff and Montessori curriculum resources. The School Board would like to consolidate the Montessori Program to one location adjacent to the middle school, allowing the program to operate in space designed specifically for the Montessori curriculum as well as allowing for the program s older students to have access to middle school clubs, sports and other activities. Improve/expand high school classrooms and support areas The auditorium and gym are too small to meet current needs of both the District and community. Classroom updates are needed to support the Culinary Arts and Family and Consumer Science programs.
13 Would you support the District exploring a referendum that provides funding to address these goals? (Residents Only) 90% 80% 70% 60% 69% 86% 79% 56% 50% 40% 30% 20% 10% 17% 4% 25% 14% 11% 10% 10% 19% 0% Yes No Undecided All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)
14 District-wide Infrastructure and Educational Updates
15 While the Burlington Area schools have been well maintained, many of the schools systems have exceeded their useful life, resulting in inefficiencies and ongoing costly repairs, many of which cannot be covered in the District s annual budget. The District has identified the following infrastructure and educational needs: Cooper Elementary School - Replace the air handling units and electrical panels - Replace windows, doors and pavement - Improve school safety with video monitoring system - Renovate toilet rooms to address ADA accessibility requirements - Renovate existing Montessori program space into flexible learning spaces Lyons Elementary School - Replace electrical panels - Replace lighting in the gymnasium with LED Waller Elementary School - Update/replace flooring, ceilings, casework, fixtures and lighting - Replace windows, doors and pavement - Replace the air handling units and electrical panels - Improve school safety with video monitoring system and improved lighting - Renovate toilet rooms to address ADA accessibility requirements - Renovate space for special education, small group instruction and collaborative learning Winkler Elementary School - Improve school safety with video monitoring system - Update heating controls Dyer Intermediate School - Replace exterior windows and doors to improve energy efficiency - Update flooring, ceilings, casework, paint, fixtures and lighting - Replace air handling units and electrical panelboards/switchboards - Renovate toilet rooms to address ADA accessibly requirements - Repair pavement surrounding the school Karcher Middle School - Replace exterior windows and doors to improve energy efficiency - Update flooring, ceilings, lockers, doors, paint, fixtures, electrical panels and lighting - Renovate locker rooms and toilet rooms to address ADA accessibly requirements - Replace electrical panelboards, boilers, controls and ventilators - Improve school safety with video monitoring system Burlington High School - Update the gym bleachers and auditorium seating - Repaint sections of the school and replace worn carpeting - Replace portions of the cooling units and update lighting controls Estimated Cost: $11 - $15* million *This range is dependent on the decision made regarding Karcher Middle School.
16 Would you support a referendum that provides funding to address District-wide Infrastructure and Educational Updates? (Residents Only) 88% 90% 78% 80% 70% 70% 58% 60% 50% 40% 30% 20% 10% 0% 26% 17% 16% 11% 13% 10% 11% 2% Yes No Undecided All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)
17 Karcher Middle School
18 Due to Karcher Middle School s age, energy inefficiencies, infrastructure needs and inadequate educational spaces, a decision on how best to update or replace Karcher Middle School is needed. The School Board has identified the following three options for community feedback. All three options: - Change the middle school grade configuration, allowing Karcher to serve students in 5th through 8th grade. - Create dedicated space for the Montessori program. - Convert Dyer Intermediate into an elementary school, changing elementary school attendance boundaries. - Keep all schools open to provide needed space at the elementary level for special education programming, small group instruction and collaborative learning.
19
20 Would you support a $48 million referendum for Option 1? Representing an estimated annual tax increase of $55* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. All Residents Definitely yes Probably yes 14% 21% 35% Yes Undecided 17% Probably no Definitely no 20% 28% 48% No 0% 15% 30% 45% 60% 75%
21 Would you support a $48 million referendum for Option 1? Representing an estimated annual tax increase of $55* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Staff Residents Definitely yes Probably yes 19% 24% 43% Yes Undecided 14% Probably no Definitely no 21% 22% 43% No 0% 15% 30% 45% 60% 75%
22 Would you support a $48 million referendum for Option 1? Representing an estimated annual tax increase of $55* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Parent Residents (Non-Staff) Definitely yes 13% 40% Yes Probably yes 27% Undecided 18% Probably no Definitely no 20% 22% 42% No 0% 15% 30% 45% 60% 75%
23 Would you support a $48 million referendum for Option 1? Representing an estimated annual tax increase of $55* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Non-Parent Residents (Non-Staff) Definitely yes Probably yes 12% 17% 29% Yes Undecided 19% Probably no Definitely no 19% 33% 52% No 0% 15% 30% 45% 60% 75%
24
25 Would you support a $58 million referendum for Option 2? Representing an estimated annual tax increase of $88* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. All Residents Definitely yes 14% 38% Yes Probably yes 24% Undecided 22% Probably no Definitely no 16% 24% 40% No 0% 15% 30% 45% 60% 75%
26 Would you support a $58 million referendum for Option 2? Representing an estimated annual tax increase of $88* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Staff Residents Definitely yes Probably yes 25% 31% 56% Yes Undecided 20% Probably no Definitely no 10% 14% 24% No 0% 15% 30% 45% 60% 75%
27 Would you support a $58 million referendum for Option 2? Representing an estimated annual tax increase of $88* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Parent Residents (Non-Staff) Definitely yes 18% 47% Yes Probably yes 29% Undecided 19% Probably no Definitely no 16% 18% 34% No 0% 15% 30% 45% 60% 75%
28 Would you support a $58 million referendum for Option 2? Representing an estimated annual tax increase of $88* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Non-Parent Residents (Non-Staff) Definitely yes 10% 28% Yes Probably yes 18% Undecided 24% Probably no Definitely no 16% 32% 48% No 0% 15% 30% 45% 60% 75%
29
30 Would you support a $68.3 million referendum for Option 3? Representing an estimated annual tax increase of $123* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. All Residents Definitely yes Probably yes 23% 27% 50% Yes Undecided 15% Probably no Definitely no 11% 24% 35% No 0% 15% 30% 45% 60% 75%
31 Would you support a $68.3 million referendum for Option 3? Representing an estimated annual tax increase of $123* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Staff Residents Definitely yes Probably yes 25% 46% 71% Yes Undecided 14% Probably no Definitely no 8% 7% 15% No 0% 15% 30% 45% 60% 75%
32 Would you support a $68.3 million referendum for Option 3? Representing an estimated annual tax increase of $123* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Parent Residents (Non-Staff) Definitely yes Probably yes 26% 32% 58% Yes Undecided 13% Probably no Definitely no 11% 18% 29% No 0% 15% 30% 45% 60% 75%
33 Would you support a $68.3 million referendum for Option 3? Representing an estimated annual tax increase of $123* over the current level for each $100,000 of a home s value for each of the next 20 years. *The reduction in debt payments, that equates to $112 per $100,000 of a home s value, described earlier in this survey, is reflected in the calculations above. Non-Parent Residents (Non-Staff) Definitely yes Probably yes 18% 19% 37% Yes Undecided 18% Probably no Definitely no 12% 33% 45% No 0% 15% 30% 45% 60% 75%
34 Additional Analysis for Support for Option 3 Percent of Resident Population Assumptions: - Non-parent/non-staff = 75% - Parents = 25% - Staff < 1% Of those responding either Definitely yes, or Probably yes:.75(37%) +.25(58%) = 42.25% Assuming carrying 1/3 of undecided.75(43%) +.25(62%) = 47.75%
35 High School Updates
36 Auditorium The high school s auditorium is too small to meet the demands for some school/ community concerts, musicals, plays, extracurricular activities and presentations. A new auditorium could include: - Seating for up to 750 spectators - A full fly loft and dressing rooms - A scene shop and backstage storage Would you support a referendum that provides funding to build a new auditorium? (Residents Only) 70% 60% 50% 40% 30% 20% 10% 0% 69% 55% 50% 45% 38% 30% 30% 20% 15% 17% 16% 15% Yes No Undecided All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)
37 Expanded Gym Space The high school gym space no longer meets the ever-expanding needs of the school and community. As a result of limited gym space, practices are being held early in the morning and late in the evening throughout the school year and community use is limited. An expanded gym could include: - Additional courts for physical education, co-curricular and community use - Space for gymnastics and wrestling - Updates to the fitness center and weight room - Additional lockers and storage Would you support a referendum that provides funding to expand gym space? (Residents Only) 70% 60% 61% 56% 52% 50% 40% 30% 20% 44% 31% 38% 27% 20% 18% 19% 17% 17% 10% 0% Yes No Undecided All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)
38 Renovate Culinary Arts and Family and Consumer Science Areas The high school s culinary arts and Family and Consumer Science spaces are outdated and lack access to current equipment and technology. A renovation of the space would include: - Updated and expanded workstations - Upgraded equipment - Access to improved technology Would you support a referendum that provides funding to renovate the culinary arts and Family and Consumer Science areas? (Residents Only) 70% 60% 50% 40% 30% 20% 10% 0% 69% 59% 50% 38% 42% 30% 21% 20% 20% 20% 20% 11% Yes No Undecided All Residents Staff Parents (Non-Staff) Non-Parents (Non-Staff)
39 Funding Support
40 Would you support a referendum for up to $22-$26 million for the high school updates? Representing an estimated average annual tax increase of $73 - $86** for each $100,000 of a home s value. ** The reduction in debt payments, described earlier in this survey is being applied to the Karcher Middle School Update Options. Therefore, the high school updates would require additional debt and represent a higher tax impact. All Residents Definitely yes Probably yes 21% 26% 47% Yes Undecided 16% Probably no Definitely no 14% 23% 37% No 0% 15% 30% 45% 60% 75%
41 Would you support a referendum for up to $22-$26 million for the high school updates? Representing an estimated average annual tax increase of $73 - $86** for each $100,000 of a home s value. ** The reduction in debt payments, described earlier in this survey is being applied to the Karcher Middle School Update Options. Therefore, the high school updates would require additional debt and represent a higher tax impact. Staff Residents Definitely yes Probably yes 27% 39% 66% Yes Undecided 20% Probably no Definitely no 7% 7% 14% No 0% 15% 30% 45% 60% 75%
42 Would you support a referendum for up to $22-$26 million for the high school updates? Representing an estimated average annual tax increase of $73 - $86** for each $100,000 of a home s value. ** The reduction in debt payments, described earlier in this survey is being applied to the Karcher Middle School Update Options. Therefore, the high school updates would require additional debt and represent a higher tax impact. Parent Residents (Non-Staff) Definitely yes Probably yes 27% 32% 59% Yes Undecided 15% Probably no Definitely no 10% 16% 26% No 0% 15% 30% 45% 60% 75%
43 Would you support a referendum for up to $22-$26 million for the high school updates? Representing an estimated average annual tax increase of $73 - $86** for each $100,000 of a home s value. ** The reduction in debt payments, described earlier in this survey is being applied to the Karcher Middle School Update Options. Therefore, the high school updates would require additional debt and represent a higher tax impact. Non-Parent Residents (Non-Staff) Definitely yes 12% 34% Yes Probably yes 22% Undecided 15% Probably no Definitely no 17% 34% 51% No 0% 15% 30% 45% 60% 75%
44 Additional Analysis for Support for the high school Percent of Resident Population Assumptions: - Non-parent/non-staff = 75% - Parents = 25% - Staff < 1% Of those responding either Definitely yes, or Probably yes:.75(34%) +.25(59%) = 40.25% Assuming carrying 1/3 of undecided.75(39%) +.25(64%) = 45.25%
45 Thank you!
West Bend School District Community Survey Results. Spring 2018
West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a
More informationBeaver Dam Unified School District Community Survey Results. Spring 2016
Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each
More informationFreedom Area School District Community Survey Results. Fall 2018
Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.
More informationMuskego Norway Schools Community Survey Results. Fall 2015
Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included
More informationBarneveld School District Community Survey Results. Spring 2017
Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey
More informationLake Mills Area School District Community Survey Results. Spring 2018
Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.
More informationSchool District of Horicon Community Survey Results. Fall 2017
School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey
More informationOakfield School District Community Survey Results. Fall 2018
Oakfield School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late November/early December of 2018. Residents within the District were mailed a paper survey. Each
More informationSchool District of West De Pere Community Survey Results. Fall 2017
School District of West De Pere Community Survey Results Fall 2017 Survey Summary The survey was conducted in October of 2017. Residents within the District were mailed a paper survey. Each survey included
More informationSchool District of Somerset Community Survey Results. Fall 2015
School District of Somerset Community Survey Results Fall 2015 Survey Summary The community survey was conducted in November/December of 2015 Residents within the District were mailed a paper survey. Each
More information76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school:
Mukwonago Area s c h o o l dis t ric t Your Feedback Counts! Thank you for your participation in the MASD Community Survey! The outstanding response rate of 2,766 completed surveys reflects a strong commitment
More informationHayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future
Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15
More informationMarathon School District Community Survey Results. Spring 2018
Marathon School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a unique
More informationPage Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182
Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School
More informationPROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue
PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,
More informationSheboygan Area School District Community Survey Results. Spring 2016
Sheboygan Area School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in April/early May of 2016 Residents within the District were mailed a paper survey.
More informationPublic Presentation Capital Bond November 27, 2017
Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect
More informationCIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5
CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)
More informationBallot Measures-T Section
T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and
More informationCity School District of Albany Five Year Facilities Plan 3/14/2019
Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255
More informationCH-UH Board of Education Meeting. June 27, 2017
CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle
More informationListing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School
Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
More informationBarnesville Public Schools Proposed Building Program
May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent
More informationSchool District of Manawa Community Survey Results. Winter
School District of Manawa Community Survey Results Winter 2018-2019 1 Survey Summary The survey was conducted in late December/early January of 2018-2019. Residents within the District were mailed a paper
More informationFacilities Update Construction Progress
Major Projects Update October 2018 Prepared by Business and Operations October 19, 2018 Facilities Update Construction Progress Bismarck High School Addition & Renovation Auditorium: Concrete foundation
More information(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I
SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY
More informationProgress Update Identified Needs & Capital Plan
Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary
More informationFY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL
Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000
More informationPage Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175
Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175 Special Education Allocation 176 Operational Services Allocation
More informationCapital Projects Fund. Board Work Session August 9, 2007
Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationBarnesville Public Schools Proposed Building Program
August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent
More informationSanta Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013
Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'
More informationContents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)
More informationWeston Public Schools PROPOSED BUDGET OF EXPENDITURES
Weston Public Schools PROPOSED BUDGET OF EXPENDITURES 2012-2013 School Facilities 2012-2013 Budget Presentation Please refer to pages 111-117 in the Budget Binder Budget Preface The Past: Unreliable boilers
More informationSanta Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015
Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'
More informationTomah Area School District Community Survey Results. Spring 2015
Tomah Area School District Community Survey Results Spring 2015 Survey Summary The community survey was conducted in April and early May of 2015 All residents within the District were mailed a paper survey.
More informationCapital Projects Completed since 1988
Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationAPPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES
APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES Introduction State capital appropriations are funded primarily through the issuance of State bonds. State bonds must be authorized by Ohio voters via
More informationTumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent
Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved
More information2019 Capital Projects Plan
Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects
More informationUnderstanding the Costs: Frequently Asked Questions
Understanding the Costs: Frequently Asked Questions As of 9/6/2016 What is the total proposed project cost? The total project cost is $54.9 M and cannot, by state law, exceed that amount if approved by
More informationI. PROJECT DESCRIPTION
REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms
More informationGillett School District Community Survey Results. Spring 2018
Gillett School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in April of 2018. Residents within the District were mailed a paper survey. Each survey included a unique
More informationCAPITAL FUNDING SUMMARY
CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations
More informationPleasantdale Elementary
DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School
More informationNOTICE TO TAXPAYERS. The Notice to Taxpayers is available online at or by calling (888)
Prescribed by the Department of Local Government Finance Approved by the State Board of Accounts NOTICE TO TAXPAYERS Budget Form No. 3 (Rev. 2018) Print 8/9/2018 12:12:13 PM The Notice to Taxpayers is
More informationContents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR
More informationEducational & Performing Arts Center: Downriver Campus
Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed
More informationJACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)
Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -
More informationCecil County Public Schools Board of Education Proposed Budget
Cecil County Public Schools Board of Education Proposed Budget County Council Presentation April 12, 2016 Fiscal 2017 Operating Fund Capital Fund Debt Service Fund Budget Prioritization Survey Results
More informationSchool Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed
School Referendum Results School Amount Type of Debt Description Arrowhead UHS Arrowhead UHS Baraboo Beaver Dam Belleville Cambridge Campbellsport Chippewa Falls Chippewa Falls $64,700,000.00 Issue Debt
More informationBuilding and Site Sinking Fund Millage. Election Date: November 7th 2017
Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount
More informationAction Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List
Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities
More informationGarden City Public Schools Capital Reserve. Presentation to the Board of Education January 10, 2017
Garden City Public Schools Capital Reserve Presentation to the Board of Education January 10, 2017 Tonight s Agenda District Reserves Planning process General use Current reserves Capital Reserve Voter
More informationSagamore Hills Elementary
DeKalb County School District/Elementary Schools Sagamore Hills Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School
More informationSPACE UTILIZATION STUDY ANALYSIS November 5, 2013
SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions
More informationPublic Schools of the Tarrytowns
Union Free School District of the Tarrytowns Board of Education Fiscal 2018/2019 Budget Development Empower students to make informed choices as they become self-directed, lifelong learners committed to
More informationAttachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017
A. Approval - New (Non-State and Other State Funds) Name (Other State) (Other State) Non-State Funds/ Undetermined 1 N/A B. Approval - Amended (Non-State and Other State Funds) 1 Coastal Carolina Main
More informationDeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016
DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary
More informationSOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S
SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters
More informationSpringfield High School
5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February
More informationAPPENDIX A FULL TEXT OF BOND MEASURE
APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass
More informationFrequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?
Over the last few weeks the Board of Education has received a number of questions regarding the proposed 2018-19 budget. We hope that the Frequently Asked Questions and our Answers below will help to shed
More informationPhysical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15
Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings
More informationStone Mountain Middle
DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More informationLos Angeles Unified School District Page 1 of 3
Los Angeles Unified School District 333 South Beaudry Ave, Los Angeles, CA 90017 Board of Education Report File #: Rep-201-16/17, Version: 1 Amendment to the Facilities Services Division Strategic Execution
More informationPage Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160
- Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 Special Education Allocation 161 Operational Services
More informationMUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA
KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S
More informationDepartment Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach
Department Chair Online Resource Center Facility Maintenance or Facility Improvement? Taking a Responsible Approach Richard Bettega, associate vice president for facilities, Lewis and Clark College. Facility
More informationFacility and Financial Overview. Brandywine Heights Area School District
Facility and Financial Overview Brandywine Heights Area School District BHASD Mission: Our Mission is to enable students to strive for success in an ever-changing global society. Agenda 1. Overview of
More informationWissahickon School District Ambler, PA FINANCE COMMITTEE AGENDA. February 21, :30 pm Administration Building Board Room
Wissahickon School District Ambler, PA 19002 FINANCE COMMITTEE AGENDA February 21, 2017 5:30 pm Administration Building Board Room 1. Discussion of Facilities Master Plan 2. Resolution Parameters for Bond
More informationBallot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools
Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a
More informationThis workbook is designed as a supplement to the 2018 Department memo labeled "Capital Projects Plan Template and Notices for Budget Year 2019.
Capital Projects Plan Template and Notices for Budget Year 2019 Amended August 21, 2018 Pursuant to IC 20-40-18-6 and IC 20-40-18-7 and in conjunction with the implementation of HEA 1009-2017 and HEA 1167-2018,
More informationFY17 FMD Capital Budget
FY17 FMD Capital Budget School Committee Presentation December 2, 2015 Wellesley Facilities Maintenance Department AGENDA Status Update on Capital Projects Role in Capital Planning Capital Planning & Budgeting
More informationLocal ballot measure: B. Redding School District Bond Measure
B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,
More informationBoard of Trustees Proposition Summary Table of Contents
Table of Contents Table of Contents... ii 1 Facilities Condition Assessment... 2 1.1 Priority One... 2 1.2 Priority Two... 5 1.3 Priority Three... 7 1.4 Priority Four... 9 2 Major Projects... 10 2.1 Facility
More informationSubject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)
HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationGEORGE MASON UNIVERSITY BOARD OF VISITORS. BOARD OF VISITORS SPECIAL MEETING April 11, 2018 Merten Hall, Fairfax Campus 1:30 3:00 p.m.
GEORGE MASON UNIVERSITY BOARD OF VISITORS BOARD OF VISITORS SPECIAL MEETING April 11, 2018 Merten Hall, Fairfax Campus 1:30 3:00 p.m. AGENDA I. Call to Order II. III. IV. Audit Committee Topics A. FY 2017
More informationAbilene Independent School District Bond Oversight Committee. Meeting Agenda
Abilene Independent School District Bond Oversight Committee Meeting Agenda May 12, 2014 12:00 noon Type of Meeting: Meeting of 2013 Bond Oversight Committee Meeting Facilitator: Cary Etter Invitees: Oversight
More informationUse of State and District Construction Funds
8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,
More informationBudget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007
In This Issue... Budget Newsletter Rush-Henrietta Rush-Henrietta Central School District May 2007 2007-2008 District Budget Proposal Proposed Budget: $96,289,455 Budget-to-Budget Increase: 3.6% Tax Rate
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationPERMANENT IMPROVEMENT LEVY
SIDNEY CITY SCHOOLS PERMANENT IMPROVEMENT LEVY SUPPORT OUR SCHOOL FACILITIES VOTE YES AUGUST 2 Renewing Our Community s Commitment to School Facilities The mission of Sidney City Schools is to provide
More informationConference Center Reservation Agreement. [Signature Page Follows]
Conference Center Reservation Agreement This Conference Center Reservation Agreement (this Agreement ) is entered into by and between, as Tenant, and Cushman & Wakefield of Texas, Inc., as Manager for
More informationOctober 4, 2007 Page 1 of 8
Children and adults learn and perform best in a safe and comfortable environment. Arlington Public Schools therefore provides safe, comfortable, accessible, efficient and attractive spaces for instructional
More informationBallot Measures-LL Section
LL To repair and modernize aging classrooms/school facilities at local elementary/intermediate schools, repair termite damage, dry rot, deteriorating roofs, plumbing, and electrical, improve student safety/security,
More informationSchool District of Slinger Community Survey Report
School District of Slinger Community Survey Report Prepared by: School Perceptions October 2011 Overview The survey was conducted for the School District of Slinger during the fall of 2011 by School Perceptions.
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationFY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT
DRAFT 1 Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT - HVAC Design - Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT - HVAC Design - replacement
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationBob Mathis Elementary
DeKalb County School District/Elementary Schools Bob Mathis Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More informationFort Wayne Community Schools. Capital Projects Planning March 15, 2011
Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of
More informationDISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)
1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal
More informationConstruction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717
Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400
More informationRenovating and Rebuilding America - One Home at a Time. FHA 203(K) Renovation Lending Product Information
FHA 203(K) Product Information 1 Program Summary The FHA 203(k) The FHA 203(k) loan allows a borrower to purchase or refinance and repair or renovate a property all in one loan. The borrower closes with
More informationGrosse Pointe Public School System Facilities Town Halls. Spring 2018 Defer Elementary
Grosse Pointe Public School System Facilities Town Halls Spring 2018 Defer Elementary 1 1. Relation to GPPSS Strategic Plan 2. Review Blue Ribbon Committee Charge 3. Share Blue Ribbon Facilities Study
More information