1 RESERVE STUDY Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Browning Reserve Group / Emmett, ID Office (208) Tony@BrowningRG.com / Browning Reserve Group /10/ fs :nad.u Version 2/10/ :03:57 AM

2 Hyde Park Place Owners' Association, Inc. Table of Contents Section Report Page Section I: of Condominium Reserves 1 Section II: 30 Year Expense Forecast Detailed 5 Section III: 30 Year Reserve Funding Plan Cash Flow Method {c} 11 Section III-a: 30 Year Reserve Funding Plan Cash Flow Method - Ending Balances Chart 13 Section IV: 30 Year Reserve Funding Plan Fully Funded Balance and % Funded 14 Section V: Reserve Fund Balance Forecast Component Method 15 Section VI: Component Listing Included Components 20 Section VII: Tabular Component Listing Included Components 45 Section VII-a: Expenditures by Year - Next 3 Years 48 Section IX: Directory of Reserve Study Contractors Section X: Auditor Notes 52 Section X-a: Supplementary Information for Auditor Component Method Section XI: Glossary Reserve Study Terms 57 Addendum: Homeowner Distribution Materials See Page ii for Details /10/ fs :nad.u Version 2/10/ :03:57 AM Browning Reserve Group 2016 TOC - i

3 Hyde Park Place Owners' Association, Inc. Homeowner Distribution Materials The following Reserve Study sections should be provided to each Homeowner. Section Report Idaho: Member Section III: 30 Year Reserve Funding Plan Cash Flow Method {c} /10/ fs :nad.u Version 2/10/ :03:57 AM Browning Reserve Group 2016 TOC - ii

4 Section I Full Study Hyde Park Place Owners' Association, Inc. Published - February 10, 2016 Reserve Study A Reserve Study was conducted of Hyde Park Place Owners' Association, Inc. (the "Condominium"). A Full Study includes an on-site review upon where the following tasks are performed: development of a reserve component inventory; condition assessment based upon on-site visual observation; life and valuation estimates; fund status; and a funding plan. Hyde Park Place Owners' Association, Inc. is a Condominium with a total of 39 Units. Physical Inspection Browning Reserve Group ("BRG") conducted a physical inspection of the Condominium. The inspection encompassed those major components that the Condominium is required to maintain. For this study components are determined to be major components if: 1. As of the date of the study, they have a remaining useful life of less than 30 years, and a value greater than $ Such additional components, if any, determined by the Board of Directors. During the inspection, BRG utilized the services of our own construction cost estimator. In addition, independent contractors were retained to render opinions on selected components as indicated in Section VI, Included Component Listing. Supplemental information to the physical inspection may have been obtained from the following sources: 1. Project plans where available. 2. Maintenance records of the reserve components where available. 3. Condominium board members, management and staff. of Reserves For the first year of the Reserve Study, the reserve contribution is based upon the existing budget unless otherwise noted in Section III, Reserve Funding Plan. In addition BRG relied on the Condominium to provide an accurate Beginning Reserve Balance /10/ fs :nad.u Version 2/10/ :03:57 AM Browning Reserve Group 2016 / Emmett, ID Office (208) Tony@BrowningRG.com /

5 Reserve Study - Full Study Hyde Park Place Owners' Association, Inc. 2 The status of the Condominium's reserves, as reflected in the following Reserve Study, is as follows: 1. The Expenditure Forecast of the following Reserve Study identifies the major components which the Condominium is obligated to repair, replace, restore or maintain, as determined in accordance with the criteria specified above, and specifies for each such component: a. Its current estimated replacement cost; b. Its estimated useful life; and c. Its estimated remaining useful life. 2. It is estimated that the total cash reserves necessary to repair, replace, restore or maintain such major components (in the aggregate) during and at the end of their first remaining useful life is $146,305. [For purposes of this calculation, necessary is defined as the Fully Funded Balance (FFB) (Component Current Cost X Effective Age / Useful Life, including a provision for interest and inflation in future years.)] 3. The current amount of accumulated cash reserves actually set aside to repair, replace, restore, or maintain such major components as of the fiscal year ending December 31, 2016 is estimated to be $54,998, constituting 37.6% of the total expenditures anticipated for all such major components through their first end of useful life replacement. 4. Based upon the schedule of annual reserve contributions necessary to defray the cost of repairing, replacing, restoring or maintaining such major components in the years such expenditures are estimated to be required, it is estimated that annual reserve contributions in the initial amount of $12,500 [$ per Unit per year (average)] for the fiscal year ending December 31, 2016 (the first full fiscal year following first distribution of this report) will be necessary in order to meet all such reserve expenditures when they are projected to come due. Funding Assessment Based on the 30 year cash flow projection, the Condominium's reserves are inadequately funded as the reserve fund ending balances may fail to remain positive throughout the replacement of all major components during the next 30 years. Additional reserve funding including some combination of increased contributions, special assessments and loans may be necessary to meet all reserve obligations. Idaho statute imposes no reserve funding level requirements nor does it address funding level adequacy. Percent Funded Status Based on paragraphs 1-3 above, the Condominium is 37.6% funded. The following scale can be used as a measure to determine the Condominium s financial picture whereas the lower the percentage, the higher the likelihood of the Condominium requiring a special assessment, or other large increases to the reserve contribution in the future. Percent Funded Poor % Fair % Strong %

6 Reserve Study - Full Study Hyde Park Place Owners' Association, Inc. 3 Methodology The above recommended reserve contribution for the next fiscal year (and future fiscal years as outlined in Section III, Reserve Fund Balance Forecast) was developed using the cash flow method. This is a method of developing a reserve funding plan where the contributions to the reserve fund are designed to offset the variable annual expenditures from the reserve fund. Different reserve funding plans are tested against the anticipated schedule of reserve expenses until the desired funding goal is achieved. Funding Goals The funding goal employed for Hyde Park Place Owners' Association, Inc. is Threshold Funding: Establishing a Reserve funding goal of keeping the Reserve balance above a specified dollar or Percent Funded amount. Depending on the threshold, this may be more or less conservative than Fully Funding. Limitations The intention of the Reserve Study is to forecast the Condominium's ability to repair or replace major components as they wear out in future years. The Reserve Study is not an engineering report, and no destructive testing was performed. The costs outlined in the study are for budgetary and planning purposes only, and actual bid costs would depend upon the defined scope of work at the time repairs are made. Also, any latent defects are excluded from this report. Statutory Disclosures Compliance The Reserve Study complies with or exceeds all applicable statutes, if any. General: Supplemental Disclosures BRG has no other involvement(s) with the Condominium which could result in actual or perceived conflicts of interest. Personnel Credentials: N. Anthony Dann graduated from Cal State Northridge with Bachelors & Master of Science degrees in Business Administration, Management and Finance. Diane M. Dann has a Certified Property Manager designation from the Institute of Real Estate Management. Completeness: BRG has found no material issues which, if not disclosed, would cause a distortion of the Condominium's situation. Reliance on Client Data: Information provided by the official representative of the Condominium regarding financial, physical, quantity, or historical issues will be deemed reliable by BRG.

7 Reserve Study - Full Study Hyde Park Place Owners' Association, Inc. 4 Scope: This Reserve Study is a reflection of information provided to BRG and assembled for the Condominium's use, not for the purpose of performing an audit, quality/forensic analysis, health and safety inspection, or background checks of historical records. Reserve Balance: The actual beginning reserve fund balance in this Reserve Study is based upon information provided and was not audited. Reserve Projects: Information provided about reserve projects will be considered reliable. Any on-site inspection should not be considered a project audit, quality inspection, or health and safety review. Browning Reserve Group

8 Section II Hyde Park Place Owners' Association, Inc. 30 Year Expense Forecast - Detailed Current Replacement Life Useful / Reserve Component Cost Remaining Paving Asphalt Repairs & Sealing Parking Area Concrete Total Paving 1, Miscellaneous Miscellaneous Concrete Locations Total Concrete 1, Painting: Exterior Surface Restoration Building Exterior - Front Side Surface Restoration Building Exterior - Rear Side Surface Restoration Building Exterior - East Side Surface Restoration Building Exterior - West Side Metal Fencing Exterior Fencing & Railings Light Poles 8 Street Lamp Posts Total Painting: Exterior 56, Painting: Interior Building Interior Hallways Garage 8 Garage Common Doors Total Painting: Interior 11,800 1, ,025 1,131 1,249 1,379 1,025 1,131 1,249 1,379 1, ,615 1,828 2,068 1,615 1,828 2,068 12, ,692 17,527 12, ,034 17,965 3, ,596 3, ,686 23, ,513 1, ,325 1,696 13,692 15,359 3,596 3,686 28,513 17,527 19,661 10, ,480 14,695 1, ,584 11,480 1,584 14, Structural Repairs Trim Building Exterior Masonry Repairs Brick Façade Stucco Repairs Building Exterior[nr:6] Ceilings 14,457 Sq. Ft. Garage Ceiling (10%) Steel Doors 2 Common Area Metal Doors Doors Common Area Doors Windows Main Entrance , ,371 1, ,025 1,051 1,077 1,104 1,131 1,160 1, ,045 3, , ,104 1,249 1, Version 2/10/ :03:57 AM Browning Reserve Group to

9 Current Replacement Life Useful / Hyde Park Place Owners' Association, Inc. 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Mailboxes 3 Community Mailboxes Total Structural Repairs 12, Decking/Balconies Railings 1,350 Lin. Ft. Metal Railings (3%) Total Decking/Balconies 1, Roofing Low Slope: TPO 40 Squares- Flat Roof Pitched: Dimensional Composition 200 Squares- Shingle Roof Gutters / Downspouts 1,186 Lin. Ft. Gutters & Downspouts Roofing: Inspections & Repairs Flat & Shingle Roof Systems[nr:9] Miscellaneous Roof Hatch Rehab General Interior Common Area Total Roofing 59, Gate Equipment Elite Slide Gate Operators Garage Vehicle Gate Total Rehab 3, Miscellaneous On-going Repairs Garage Vehicle Gate Total Gate Equipment 4, Lighting Exterior Lights 39 Deck Carraige Lights Street Lights 8 Street Lamp Posts (13%) Interior Interior Lighting Garage Lights 30 Garage Lights Signage Total Lighting 17, Monument 2 Association Identity Monuments Total Signage 1,200 1, , ,538 1,051 1,077 2,208 3,176 1,160 5, ,261 18, ,163 34, ,834 5, , , ,389 7, ,834 3, ,035 1, ,500 1,576 1,656 1,740 1,828 1,920 2,017 2,119 4, , , , ,500 1,576 1,656 1,740 1,828 1,920 6,052 2,119 1, ,499 1, Mechanical Equipment HVAC 2 Interior Hallways Wall Heater 5 Common Area 8, ,509 1, ,697 Version 2/10/ :03:57 AM Browning Reserve Group to

10 Current Replacement Life Useful / Hyde Park Place Owners' Association, Inc. 30 Year Expense Forecast - Detailed Reserve Component Cost Remaining Sump Pump Septic System Fire Control System Fire Control System Fire Control Misc. Garage Sprinkler Heads Total Mechanical Equipment Elevator On-Going Repairs & Maint. Automatic Door Protection[nr:1] Cab Renovation Elevator Modernization Submersible Power Unit[nr:1] Modernization Hydraulic Controller[nr:1] Miscellaneous 5 Year Load Test Flooring Carpeting 436 Sq. Yds. Common Area 2, ,560 2, ,829 3,200 14, ,921 28,000 Total Elevator 107,436 Total Flooring 13, Water System Backflow Valve Domestic Water System Total Water System 1, Miscellaneous Telephone Entry System Building Entry System Fire Alarm System Fire Alarm System Fire Alarm System Fire Alarm System Security System Video Security System Utilities In-Wall Utilities Misc. Internet System Total Miscellaneous 17, Reserve Study Year Update with Site Visit Reserve Study Total Reserve Study 2,800 2, ,623 2, ,526 9,509 23,682 35, ,071 65, , ,760 3,122 3,532 2,623 2,760 3,122 47,071 3,532 13, ,937 1, ,697 3, ,311 3, , , ,657 1, , , ,643 10, , ,800 3,168 3,584 15,937 2,800 3,168 3,584 Total Expenditures 2.50% 4,300 3,075 3,152 19,546 37,325 50,790 14,042 38,617 20,201 12,114 73,404 1,050 53,527 21,387 42,692 Total Current Replacement Cost 341,614 Version 2/10/ :03:57 AM Browning Reserve Group to

11 30 Year Expense Forecast - Detailed Reserve Component Paving Asphalt Repairs & Sealing Parking Area Total Paving 1,522 1,680 1,854 2,046 1,522 1,680 1,854 2, Concrete Miscellaneous Miscellaneous Concrete Locations Total Concrete Painting: Exterior Surface Restoration Building Exterior - Front Side Surface Restoration Building Exterior - Rear Side Surface Restoration Building Exterior - East Side Surface Restoration Building Exterior - West Side Metal Fencing Exterior Fencing & Railings Light Poles 8 Street Lamp Posts Total Painting: Exterior Painting: Interior Building Interior Hallways Garage 8 Garage Common Doors Total Painting: Interior Structural Repairs Trim Building Exterior Masonry Repairs Brick Façade Stucco Repairs Building Exterior[nr:6] Ceilings 14,457 Sq. Ft. Garage Ceiling (10%) Steel Doors 2 Common Area Metal Doors Doors Common Area Doors Windows Main Entrance Mailboxes 3 Community Mailboxes Total Structural Repairs Decking/Balconies Railings 1,350 Lin. Ft. Metal Railings (3%) Total Decking/Balconies 2,339 2,647 2,995 2,339 2,647 2,995 22,436 22,997 4,604 5,893 4,719 6,040 36,499 46,722 2,170 4,604 4,719 36,499 22,436 25,167 5,893 6,040 46,722 18,811 2,028 2,596 2,028 18,811 2, ,595 7,162 2,617 3,350 4,454 5,039 5,701 1,599 1,809 2,046 2,713 2,617 4,454 7,194 5,879 4,522 3,350 5,701 9,209 1,760 1,895 2,041 2,198 2,367 1,760 1,895 2,041 2,198 2,367 Version 2/10/ :03:57 AM Browning Reserve Group to

12 30 Year Expense Forecast - Detailed Reserve Component Roofing Low Slope: TPO 40 Squares- Flat Roof Pitched: Dimensional Composition 200 Squares- Shingle Roof Gutters / Downspouts 1,186 Lin. Ft. Gutters & Downspouts Roofing: Inspections & Repairs Flat & Shingle Roof Systems[nr:9] Miscellaneous Roof Hatch Total Roofing ,678 11, ,678 11, Rehab General Interior Common Area Total Rehab Gate Equipment Elite Slide Gate Operators Garage Vehicle Gate Miscellaneous On-going Repairs Garage Vehicle Gate Total Gate Equipment Lighting Exterior Lights 39 Deck Carraige Lights Street Lights 8 Street Lamp Posts (13%) Interior Interior Lighting Garage Lights 30 Garage Lights Total Lighting 4,454 4,454 2,227 2,339 2,458 2,582 2,713 2,850 2,995 2,227 2,339 2,458 2,582 2,713 2,850 2,995 7,418 3,605 4,079 9,052 7,194 9,052 7,418 7,194 3,605 4, Signage Monument 2 Association Identity Monuments Total Signage 2,456 2, Mechanical Equipment HVAC 2 Interior Hallways Wall Heater 5 Common Area Sump Pump Septic System Fire Control System Fire Control System Fire Control Misc. Garage Sprinkler Heads Total Mechanical Equipment Elevator 14,832 2,458 3,621 4,097 4,635 22,941 3,621 29,495 19,466 Version 2/10/ :03:57 AM Browning Reserve Group to

13 30 Year Expense Forecast - Detailed Reserve Component On-Going Repairs & Maint. Automatic Door Protection[nr:1] Cab Renovation Elevator Modernization Submersible Power Unit[nr:1] Modernization Hydraulic Controller[nr:1] Miscellaneous 5 Year Load Test Total Elevator 94,139 3,711 3,997 4,522 5,116 94,139 3,711 3,997 4,522 5, Flooring Carpeting 436 Sq. Yds. Common Area Total Flooring 26,114 26, Water System Backflow Valve Domestic Water System Total Water System Miscellaneous Telephone Entry System Building Entry System Fire Alarm System Fire Alarm System Fire Alarm System Fire Alarm System Security System Video Security System Utilities In-Wall Utilities Misc. Internet System Total Miscellaneous Reserve Study Year Update with Site Visit Reserve Study Total Reserve Study Total Expenditures 2.50% 2,458 2,458 4,796 5, ,193 2,172 2,458 2,781 6,554 7, ,276 17, , ,055 4,588 5,191 4,055 4,588 5, ,275 20,009 45,895 7,042 23,660 60,301 10,103 3,099 25,612 58,475 80,444 26,430 49,673 32,703 19,441 Version 2/10/ :03:57 AM Browning Reserve Group to

14 Section III Hyde Park Place Owners' Association, Inc. 30 Year Reserve Funding Plan Cash Flow Method *See Important footnotes at end of this Section III. Beginning Balance Inflated 2.5% Reserve Contribution 39 Percentage Increase Special Assessments / Other Interest Pre 0.00% Ending Balance 1) , ,573 54,998 67,471 67,456 54,545 34,274 52,275 47,305 62,431 4,300 3,075 3,152 19,546 37,325 50,790 14,042 38,617 20,201 12,114 10, ,500 15,625 19,531 24,414 30,518 32,044 33,646 35,328 37, % 25.0% 25.0% 25.0% 25.0% 5.0% 5.0% 5.0% 5.0% ,573 54,998 67,471 67,456 54,545 34,274 52,275 47,305 62,431 87,411 Beginning Balance provided by DS Property Management. Beginning Balance Inflated 2.5% Reserve Contribution 39 Percentage Increase Special Assessments / Other Interest Pre 0.00% Ending Balance ,411 52,957 92,803 82, , ,568 30,002 59,702 63,516 88,785 73,404 1,050 53,527 21,387 42, ,275 20,009 45,895 7,042 23,660 38,949 40,896 42,941 45,088 47,342 49,709 49,709 49,709 32,311 32, , , , , , , , % 5.0% 5.0% 5.0% 5.0% 5.0% 0.0% 0.0% -35.0% 0.0% ,957 92,803 82, , ,568 30,002 59,702 63,516 88,785 97,436 Beginning Balance Inflated 2.5% Reserve Contribution 39 Percentage Increase Special Assessments / Other Interest Pre 0.00% Ending Balance ,436 69,446 91, , , ,401 53,268 59,149 41,787 41,395 60,301 10,103 3,099 25,612 58,475 80,444 26,430 49,673 32,703 19,441 32,311 32,311 32,311 32,311 32,311 32,311 32,311 32,311 32,311 32, % 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% ,446 91, , , ,401 53,268 59,149 41,787 41,395 54,265 Version 2/10/ :03:57 AM Browning Reserve Group

15 30 Year Reserve Funding PlanCash Flow Method 2) Period / Year 00 / 2015 Reserve Funding Plan - Footnotes Reserve Contribution provided by DS Proprety Management. Version 2/10/ :03:57 AM Browning Reserve Group

16 Fund Balance Section III-a Hyde Park Place Owners' Association, Inc. 30 Year Reserve Funding Plan Cash Flow Method - Ending Balances $140,000 $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 $ Version 2/10/ :03:57 AM Browning Reserve Group Years

17 Section IV Hyde Park Place Owners' Association, Inc. 30 Year Reserve Funding Plan Including Fully Funded Balance and % Funded Year Beginning Balance Fully Funded Balance Percent Funded Inflated 2.50% Reserve Contribution Special Assessments & Other Contributions , , % 4,300 10, , , , % 3,075 12, , , , % 3,152 15, , , , % 19,546 19, , , , % 37,325 24, , , , % 50,790 30, , , , % 14,042 32, , , , % 38,617 33, , , , % 20,201 35, , , , % 12,114 37, , , , % 73,404 38, , , , % 1,050 40, , , , % 53,527 42, , , , % 21,387 45, , , , % 42,692 47, , , , % 130,275 49, , , , % 20,009 49, , , , % 45,895 49, , , , % 7,042 32, , , , % 23,660 32, , , , % 60,301 32, , , , % 10,103 32, , , , % 3,099 32, , , , % 25,612 32, , , , % 58,475 32, , , , % 80,444 32, , , , % 26,430 32, , , , % 49,673 32, , , , % 32,703 32, , , , % 19,441 32, ,265 Interest Ending Balance Version 2/10/ :03:57 AM Browning Reserve Group

18 Section V Hyde Park Place Owners' Association, Inc. Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 2015 Fully Funded Balance 2016 Fully Funded Balance % Per Year Straight Line 2016 Line Item Contribution based on Cash Flow Method Paving Asphalt Repairs & Sealing Parking Area Concrete Miscellaneous Miscellaneous Concrete Locations Painting: Exterior Surface Restoration Building Exterior - Front Side Surface Restoration Building Exterior - Rear Side Surface Restoration Building Exterior - East Side Surface Restoration Building Exterior - West Side Metal Fencing Exterior Fencing & Railings Light Poles 8 Street Lamp Posts 1, , , % 100 1, , % , ,692 1,369 8,900 10, % , ,034 1,403 7,629 9, % 546 3, , ,589 1, % 140 3, , ,271 1, % , ,513 2,851 7,196 9, % 1,110 1, , % 52 Sub-total [ Painting: Exterior] 56,973 64,846 6,485 27,306 33, % 2, Painting: Interior Building Interior Hallways Garage 8 Garage Common Doors 10, ,480 1,148 6,240 7, % 447 1, , % 62 Sub-total [ Painting: Interior] 11,800 13,064 1,306 6,940 8, % 508 Version 2/10/ :03:57 AM Browning Reserve Group

19 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 2015 Fully Funded Balance 2016 Fully Funded Balance % Per Year Straight Line 2016 Line Item Contribution based on Cash Flow Method Structural Repairs Trim Building Exterior Masonry Repairs Brick Façade Stucco Repairs Building Exterior[nr:6] Ceilings 14,457 Sq. Ft. Garage Ceiling (10%) Steel Doors 2 Common Area Metal Doors Doors Common Area Doors Windows Main Entrance Mailboxes 3 Community Mailboxes % 20 3, , % 170 1, , , % 199 1, , , % 80 3, , % 102 1, , % % 13 1, , % 35 Sub-total [ Structural Repairs] 12,907 17,071 1,812 3,144 4, % Decking/Balconies Railings 1,350 Lin. Ft. Metal Railings (3%) Roofing Low Slope: TPO 40 Squares- Flat Roof Pitched: Dimensional Composition 200 Squares- Shingle Roof Gutters / Downspouts 1,186 Lin. Ft. Gutters & Downspouts Roofing: Inspections & Repairs Flat & Shingle Roof Systems[nr:9] Miscellaneous Roof Hatch 1, , % 43 18, ,163 1,058 14,029 15, % , ,834 1,461 22,829 24, % 569 5, , ,151 4, % % % 11 Sub-total [ Roofing] 59,578 72,803 2,995 41,308 44, % 1, Rehab General Interior Common Area 3, , ,080 1, % 69 Version 2/10/ :03:57 AM Browning Reserve Group

20 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 2015 Fully Funded Balance 2016 Fully Funded Balance % Per Year Straight Line 2016 Line Item Contribution based on Cash Flow Method Gate Equipment Elite Slide Gate Operators Garage Vehicle Gate Miscellaneous On-going Repairs Garage Vehicle Gate 3, , ,560 1, % 63 1, , , % 292 Sub-total [ Gate Equipment] 4,500 5, ,060 2, % Lighting Exterior Lights 39 Deck Carraige Lights Street Lights 8 Street Lamp Posts (13%) Interior Interior Lighting Garage Lights 30 Garage Lights 4, , ,915 2, % 103 2, , % 67 6, , ,500 2, % 141 4, , ,650 1, % 93 Sub-total [ Lighting] 17,825 27,269 1,038 6,170 6, % Signage Monument 2 Association Identity Monuments Mechanical Equipment HVAC 2 Interior Hallways Wall Heater 5 Common Area Sump Pump Septic System Fire Control System Fire Control System Fire Control Misc. Garage Sprinkler Heads 1, , % 29 8, , ,889 5, % 206 1, , ,000 1, % 44 2, , ,000 1, % 50 2, , % , ,921 1,629 1,273 1, % 634 Sub-total [ Mechanical Equipment] 28,000 34,516 2,870 8,578 9, % 1,117 Version 2/10/ :03:57 AM Browning Reserve Group

21 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 2015 Fully Funded Balance 2016 Fully Funded Balance % Per Year Straight Line 2016 Line Item Contribution based on Cash Flow Method Elevator On-Going Repairs & Maint. Automatic Door Protection[nr:1] Cab Renovation Elevator Modernization Submersible Power Unit[nr:1] Modernization Hydraulic Controller[nr:1] Miscellaneous 5 Year Load Test 2, , % 255 2, , % 72 35, ,071 3,621 2,692 2, % 1,409 65, ,139 5,884 4,063 4, % 2,290 2, , , % 215 Sub-total [ Elevator] 107, ,305 10,898 8,364 9, % 4, Flooring Carpeting 436 Sq. Yds. Common Area Water System Backflow Valve Domestic Water System Miscellaneous Telephone Entry System Building Entry System Fire Alarm System Fire Alarm System Fire Alarm System Fire Alarm System Security System Video Security System Utilities In-Wall Utilities Misc. Internet System 13, , ,848 8, % 310 1, , ,000 1, % 44 3, , ,200 2, % 86 3, , ,400 1, % % 60 5, , ,333 3, % 147 1, , % 53 4, , ,667 3, % 117 Sub-total [ Miscellaneous] 17,300 21,043 1,392 9,844 11, % Reserve Study Year Update with Site Visit Reserve Study 2, , , % 218 Version 2/10/ :03:57 AM Browning Reserve Group

22 Reserve Fund Balance Forecast Component Method Reserve Component Current Repl. Cost Useful Life Remaining Life Estimated Future Replacement Costs Per Year 2015 Fully Funded Balance 2016 Fully Funded Balance % Per Year Straight Line 2016 Line Item Contribution based on Cash Flow Method [A] [B] Totals 341, ,238 32, , , % 12,500 [EndBal] [EndBal] [A] [B] Percent Funded 35.18% 37.59% Version 2/10/ :03:57 AM Browning Reserve Group

23 Section VI Hyde Park Place Owners' Association, Inc. Component Listing Included Components Paving Asphalt Repairs & Sealing Useful Life 4 Parking Area Quantity 1 Unit of Measure Lump Sum Cost /LS $1, % Total Cost/Study $1,000 Replacement Year 2016 Future Cost $1,025 This is to apply a single coat asphalt emulsion product. Also includes crackfill as needed and striping of the parking area as well as the garage. Cost estimate and useful life provided by Lach McIntosh. 1 Costing provided by PC Maintenance Concrete Miscellaneous Useful Life 5 Miscellaneous Concrete Locations Quantity 1 Unit of Measure Lump Sum Cost /LS $1, % Total Cost/Study $1,500 Replacement Year 2018 Future Cost $1,615 This is for miscellaneous concrete repair as needed. Includes curbs, walkways, ramp, etc. 3 Version 2/10/ :03:57 AM Browning Reserve Group

24 Component Listing Included Components Painting: Exterior Surface Restoration Useful Life 10 Building Exterior - Front Side Quantity 1 Unit of Measure Lump Sum Cost /LS $12, % Total Cost/Study $12,714 Replacement Year 2018 Future Cost $13,692 This is to paint the front side only of the building exterior stucco including all exterior doors on that side. Includes preparation, power washing, sanding, scraping and caulking as needed. Cost estimate provided by Chris Berry. 3 Costing provided by B & K Painting Inc Surface Restoration Useful Life 10 Building Exterior - Rear Side Quantity 1 Unit of Measure Lump Sum Cost /LS $12, % Total Cost/Study $12,714 Replacement Year 2019 Future Cost $14,034 This is to paint the rear side only of the building exterior stucco including all exterior doors on that side. Includes preparation, power washing, sanding, scraping and caulking as needed. Cost estimate provided by Chris Berry. 4 Costing provided by B & K Painting Inc. Version 2/10/ :03:57 AM Browning Reserve Group

25 Component Listing Included Components Painting: Exterior Surface Restoration Useful Life 10 Building Exterior - East Side Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,179 Replacement Year 2020 Future Cost $3,596 This is to paint the east side only of the building exterior stucco including all exterior doors on that side. Includes preparation, power washing, sanding, scraping and caulking as needed. Cost estimate provided by Chris Berry. 5 Costing provided by B & K Painting Inc Surface Restoration Useful Life 10 Building Exterior - West Side Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,179 Replacement Year 2021 Future Cost $3,686 This is to paint the west side only of the building exterior stucco including all exterior doors on that side. Includes preparation, power washing, sanding, scraping and caulking as needed. Cost estimate provided by Chris Berry. 6 Costing provided by B & K Painting Inc. Version 2/10/ :03:57 AM Browning Reserve Group

26 Component Listing Included Components Painting: Exterior Metal Fencing Useful Life 10 Exterior Fencing & Railings Quantity 1 Unit of Measure Lump Sum Cost /LS $23, % Total Cost/Study $23,987 Replacement Year 2022 Future Cost $28,513 This is to prep and paint all the wrought iron and steel work on and around the exterior of the building. Cost estimate provided by Chris Berry. 7 Costing provided by B & K Painting Inc Light Poles Useful Life 10 8 Street Lamp Posts Quantity 8 Unit of Measure Items Cost /Itm $150 This is to prep and paint the street lamp posts as needed % Total Cost/Study $1,200 Replacement Year 2019 Future Cost $1,325 4 Version 2/10/ :03:57 AM Browning Reserve Group

27 Component Listing Included Components Building Painting: Interior Useful Life 10 Interior Hallways Quantity 1 Unit of Measure Lump Sum Cost /LS $10, % Total Cost/Study $10,400 Replacement Year 2019 Future Cost $11,480 This is to paint all building interior hallways including walls, ceilings, trim and doors. Cost estimate provided by Chris Berry. Chris has also offered an option to paint just the walls for $4, Costing provided by B & K Painting Inc Garage Useful Life 10 8 Garage Common Doors Quantity 8 Unit of Measure Items Cost /Itm $ % Total Cost/Study $1,400 Replacement Year 2020 Future Cost $1,584 This is to paint the metal common doors and door jambs in the garage. Cost estimate provided by Chris Berry. 5 Costing provided by B & K Painting Inc. Version 2/10/ :03:57 AM Browning Reserve Group

28 Component Listing Included Components Trim Structural Repairs Useful Life 10 Building Exterior Quantity 1 Unit of Measure Lump Sum Cost /LS $ % Total Cost/Study $500 Replacement Year 2016 Future Cost $512 This is to replace portions of trim as needed during the full body painting cycles Masonry Repairs Useful Life 10 Brick Façade Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,500 Replacement Year 2024 Future Cost $4,371 This is to power wash, minor repointing if needed, and seal the brick façade. 9 Version 2/10/ :03:57 AM Browning Reserve Group

29 Component Listing Included Components Structural Repairs Stucco Repairs Useful Life 1 Building Exterior Quantity 1 Unit of Measure Lump Sum Cost /LS $1, % 1 Treatment [nr:6] Total Cost/Study $1,000 Replacement Year 2016 Future Cost $1,025 This is to have funds available to repair the damaged stucco related to leaks created by inferior flashing at certain locations on the building exterior. History will dictate if this projection will need to be increased or deleted at some point in time. Cost estimate provided by Bob Nichols. Costing provided by Bob Nichols Plastering Ceilings Useful Life 10 14,457 Sq. Ft. Garage Ceiling (10%) Quantity 14,457 Unit of Measure Square Feet Cost /SqFt $1.25 Qty * $/SqFt $18, % Total Cost/Study $1,807 Replacement Year 2020 Future Cost $2,045 This is to have funds available to clean and make necessary repairs to the existing ceiling grid and replace the 4x4 ceiling tiles as needed. The projected cost per square footage at 100% would be for a total replacement of the grid and tiles, this projection is for repairs only and for approximately 10% as needed. Square footage is approximate by BRG. 5 Version 2/10/ :03:57 AM Browning Reserve Group

30 Component Listing Included Components Steel Doors Structural Repairs Useful Life 5 2 Common Area Metal Doors Quantity 2 Unit of Measure Items Cost /Itm $1, % Total Cost/Study $3,000 Replacement Year 2031 Future Cost $4,454 This is to have funds available for replacing 2 of the 10 metal doors as needed. Door count is approximate by BRG Doors Useful Life 5 Common Area Doors Quantity 1 Unit of Measure Items Cost /Itm $1, % Total Cost/Study $1,000 Replacement Year 2019 Future Cost $1,104 This is to have funds available to replace 1 out of the 5 common area wood doors and the front entry glass door, as needed. This projection can be used for minor repairs in lieu of replacement. Door count is approximate by BRG. 4 Version 2/10/ :03:57 AM Browning Reserve Group

31 Component Listing Included Components Windows Structural Repairs Useful Life 25 Main Entrance Quantity 1 Unit of Measure Lump Sum Cost /LS $ % Total Cost/Study $600 Replacement Year 2029 Future Cost $848 This is to have funds available to replace individual glass panels as needed, not full replacement at one time Mailboxes Useful Life 30 3 Community Mailboxes Quantity 3 Unit of Measure Items This is to replace the mailbox covers. Cost /Itm $ % Total Cost/Study $1,500 Replacement Year 2039 Future Cost $2,713 Version 2/10/ :03:57 AM Browning Reserve Group

32 Component Listing Included Components Railings Decking/Balconies Useful Life 3 1,350 Lin. Ft. Metal Railings (3%) Quantity 1,350 Unit of Measure Linear Feet Cost /l.f. $30.00 Qty * $/l.f. $40, % Total Cost/Study $1,215 Replacement Year 2030 Future Cost $1,760 This is to have funds available periodically to replace the metal railings as needed. This projection is for approximately 40 linear feet (3% of total) to be replaced at every three year cycle. History will dictate if this projection will need to be adjusted. With aggressive paint maintenance, this component's life may be extended. Painting is provided for within another component. Linear footage is approximate by BRG Roofing Low Slope: TPO Useful Life Squares- Flat Roof Quantity 40 Unit of Measure Squares Cost /Sqrs $ % Total Cost/Study $18,705 Replacement Year 2020 Future Cost $21,163 This is to replace the existing flat roof with a 60 mil GAF TPO mechanically attached membrane roofing system. Includes TPO pipe flashings, roof drain inserts and slip sheets at condenser units. Square count, cost estimate, useful and remaining life provided by Mike Forbes. 5 Costing provided by ADA County Roofing Inc. Version 2/10/ :03:57 AM Browning Reserve Group

33 Component Listing Included Components Roofing Pitched: Dimensional Composition Useful Life Squares- Shingle Roof Quantity 200 Unit of Measure Squares Cost /Sqrs $ % Total Cost/Study $34,243 Replacement Year 2025 Future Cost $43,834 This is to recover the existing three tab roofing system with a 30 year architectural shingle. Includes 80 one way metal exhaust vents and 80 pipe flashings. Square count, cost estimate, useful and remaining life provided by Mike Forbes. Costing provided by ADA County Roofing Inc Gutters / Downspouts Useful Life 20 1,186 Lin. Ft. Gutters & Downspouts Quantity 1,186 Unit of Measure Linear Feet Cost /l.f. $ % Total Cost/Study $5,930 Replacement Year 2021 Future Cost $6,877 This is to replace the gutters and downspouts with a similar style material. Linear footage is approximate by BRG. 6 Version 2/10/ :03:57 AM Browning Reserve Group

34 Component Listing Included Components Roofing Roofing: Inspections & Repairs Useful Life 1 Flat & Shingle Roof Systems Quantity 1 Unit of Measure Lump Sum Cost /LS $ % 1 Treatment [nr:9] Total Cost/Study $200 Replacement Year 2016 Future Cost $205 This is to inspect and perform rudimentary maintenance as needed to the roofing. Cost estimate and useful life provided by Mike Forbes. Costing provided by ADA County Roofing Inc Miscellaneous Useful Life 25 Roof Hatch Quantity 1 Unit of Measure Items Cost /Itm $ % Total Cost/Study $500 Replacement Year 2030 Future Cost $724 This is to replace the roof hatch. Cost estimate, useful and remaining life provided by Mike Forbes. Costing provided by ADA County Roofing Inc. Version 2/10/ :03:57 AM Browning Reserve Group

35 Component Listing Included Components Rehab General Useful Life 25 Interior Common Area Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,000 Replacement Year 2031 Future Cost $4,454 This is for a general rehab of the common area interior. Includes lobby furniture, 8 pieces of art work, 10 track lights and miscellaneous decorative items Gate Equipment Elite Slide Gate Operators Useful Life 25 Garage Vehicle Gate Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,000 Replacement Year 2027 Future Cost $4,035 This is to replace the Elite slide gate operator. Cost estimate, useful and remaining life provided by Sean Robinson. Costing provided by Overhead Door Co. SW Idaho Version 2/10/ :03:57 AM Browning Reserve Group

36 Component Listing Included Components Gate Equipment Miscellaneous On-going Repairs Useful Life 2 Garage Vehicle Gate Quantity 1 Unit of Measure Lump Sum Cost /LS $1, % Total Cost/Study $1,500 Replacement Year 2015 Future Cost $1,500 This is for on-going miscellaneous vehicle gate equipment repairs. Includes replacement of gate rollers, track and any components of the gate operator (master control, bearings, etc.) as needed. Cost estimate and useful life provided by Sean Robinson. 0 Costing provided by Overhead Door Co. SW Idaho Lighting Exterior Lights Useful Life Deck Carraige Lights Quantity 39 Unit of Measure Items Cost /Itm $125 This is to replace the exterior carriage style light fixtures. Light count is approximate by BRG % Total Cost/Study $4,875 Replacement Year 2032 Future Cost $7,418 Version 2/10/ :03:57 AM Browning Reserve Group

37 Component Listing Included Components Lighting Street Lights Useful Life 5 8 Street Lamp Posts (13%) Quantity 8 Unit of Measure Items Cost /Itm $2,200 Qty * $/Itm $17, % Total Cost/Study $2,200 Replacement Year 2035 Future Cost $3,605 This is to replace a percentage of the association street lights. Since the core light standard and fixture useful life exceeds the scope of this study, this component is for partial replacement only Interior Useful Life 25 Interior Lighting Quantity 1 Unit of Measure Lump Sum Cost /LS $6,250 This is to replace interior lighting. Includes the following: 1 Chandelier; 35 Wall sconces; Light fixture count is approximate by BRG % Total Cost/Study $6,250 Replacement Year 2030 Future Cost $9,052 Version 2/10/ :03:57 AM Browning Reserve Group

38 Component Listing Included Components Lighting Garage Lights Useful Life Garage Lights Quantity 30 Unit of Measure Items This is to replace the garage lights. Light count is approximate by BRG. Cost /Itm $ % Total Cost/Study $4,500 Replacement Year 2034 Future Cost $7, Signage Monument Useful Life 20 2 Association Identity Monuments Quantity 2 Unit of Measure Items Cost /Itm $ % Total Cost/Study $1,200 Replacement Year 2024 Future Cost $1,499 This is to have funds to repair/repaint the community identity custom monument signs. 9 Version 2/10/ :03:57 AM Browning Reserve Group

39 Component Listing Included Components HVAC Mechanical Equipment Useful Life 18 2 Interior Hallways Quantity 2 Unit of Measure Items Cost /Itm $4, % Total Cost/Study $8,000 Replacement Year 2022 Future Cost $9,509 This is to replace the two split system HVAC units including condensers, evaporative coils and air handlers. The useful life is contingent upon regular maintenance. Cost estimate, useful and remaining life provided by Brian Schneider. 7 Costing provided by ACCO Engineered Systems Wall Heater Useful Life 15 5 Common Area Quantity 5 Unit of Measure Items Cost /Itm $ % Total Cost/Study $1,500 Replacement Year 2020 Future Cost $1,697 This is to replace the wall heaters located in the common areas. Cost estimate and useful life provided by Brian Schneider. 5 Costing provided by ACCO Engineered Systems Version 2/10/ :03:57 AM Browning Reserve Group

40 Component Listing Included Components Sump Pump Mechanical Equipment Useful Life 20 Septic System Quantity 1 Unit of Measure Lump Sum Cost /LS $2, % Total Cost/Study $2,000 Replacement Year 2025 Future Cost $2,560 This is to replace the submersible sump pump and other components of the septic system as needed Fire Control System Useful Life 5 Fire Control System Quantity 1 Unit of Measure Lump Sum Cost /LS $2, % Total Cost/Study $2,500 Replacement Year 2020 Future Cost $2,829 This is to have funds available periodically to repair/replace the mechanical and structural components of the wet system. Includes double check valve, Victaulic valves, Potter flow and tamper switches, gauges, lateral piping, etc. Unless a leak develops as the system ages, funds required should be nominal. An annual inspection is recommended as an operating expense. Cost estimate and useful life provided by Sam Ball. 5 Costing provided by Absolute Fire Protection Version 2/10/ :03:57 AM Browning Reserve Group

41 Component Listing Included Components Mechanical Equipment Fire Control Misc. Useful Life 10 Garage Sprinkler Heads Quantity 1 Unit of Measure Lump Sum Cost /LS $14, % Total Cost/Study $14,000 Replacement Year 2025 Future Cost $17,921 This is to have funds available to replace the sprinkler heads should there be a failure in the test conducted every 10 years. The sprinkler heads passed the test in BRG consulted with Brian Schneider in making this projection. Costing provided by ACCO Engineered Systems Elevator On-Going Repairs & Maint. Useful Life 1 Automatic Door Protection Quantity 1 Unit of Measure Lump Sum Cost /LS $2, % 3 Treatment [nr:1] Total Cost/Study $2,436 Replacement Year 2018 Future Cost $2,623 This is to install new automatic door protection to meet code compliance and safety standards. Cost estimate and remaining life provided by Justin Lee. Costing provided by Schindler Elevator Corporation Version 2/10/ :03:57 AM Browning Reserve Group

42 Component Listing Included Components Elevator Cab Renovation Useful Life 20 Elevator Quantity 1 Unit of Measure Lump Sum This is to renovate the interior of the cab. Cost /LS $2, % Total Cost/Study $2,500 Replacement Year 2031 Future Cost $3, Modernization Useful Life 1 Submersible Power Unit Quantity 1 Unit of Measure Items Cost /Itm $35, % 12 Treatment [nr:1] Total Cost/Study $35,000 Replacement Year 2027 Future Cost $47,071 This is to modernize the elevator by installing a state-of-the-art submersible power unit to improve the reliability of the hydraulic system. Cost estimate and remaining life provided by Justin Lee. Costing provided by Schindler Elevator Corporation Version 2/10/ :03:57 AM Browning Reserve Group

43 Component Listing Included Components Elevator Modernization Useful Life 1 Hydraulic Controller Quantity 1 Unit of Measure Items Cost /Itm $65, % 15 Treatment [nr:1] Total Cost/Study $65,000 Replacement Year 2030 Future Cost $94,139 This is to modernize the elevator hydraulic controller to improve reliability, leveling accuracy and floor-to-floor times with the new state-of-the-art system. Cost estimate and remaining life provided by Justin Lee. Costing provided by Schindler Elevator Corporation Miscellaneous Useful Life 5 5 Year Load Test Quantity 1 Unit of Measure Lump Sum Cost /LS $2,500 This is for the 5 year state required load test for the elevator. Costing provided by Schindler Elevator Corporation % Total Cost/Study $2,500 Replacement Year 2019 Future Cost $2,760 4 Version 2/10/ :03:57 AM Browning Reserve Group

44 Component Listing Included Components Flooring Carpeting Useful Life Sq. Yds. Common Area Quantity 436 Unit of Measure Square Yard This is to replace the carpeting. Square yards are approximate by BRG. Cost /SqYd $ % Total Cost/Study $13,080 Replacement Year 2023 Future Cost $15,937 8 Costing provided by A to Z Sprinklers & Landscape Water System Backflow Valve Useful Life 15 Domestic Water System Quantity 1 Unit of Measure Items Cost /Itm $1,500 This is to replace the backflow preventer valve as needed % Total Cost/Study $1,500 Replacement Year 2020 Future Cost $1,697 5 Version 2/10/ :03:57 AM Browning Reserve Group

45 Component Listing Included Components Miscellaneous Telephone Entry System Useful Life 15 Building Entry System Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,000 Replacement Year 2019 Future Cost $3,311 This is to replace the Keri Entregard digital telephone entry system. Cost estimate, useful and remaining life provided by Neal Timmerman. 4 Costing provided by M2 Automation and Control Services, Inc Fire Alarm System Useful Life 25 Fire Alarm System Quantity 1 Unit of Measure Lump Sum Cost /LS $3, % Total Cost/Study $3,500 Replacement Year 2030 Future Cost $5,069 This is to replace the Silent Knight fire alarm communicator control panel. Cost estimate, useful and remaining life provided by Neal Timmerman. Costing provided by M2 Automation and Control Services, Inc. Version 2/10/ :03:57 AM Browning Reserve Group

46 Component Listing Included Components Miscellaneous Fire Alarm System Useful Life 1 Fire Alarm System Quantity 1 Unit of Measure Lump Sum Cost /LS $ % Total Cost/Study $300 Replacement Year 2016 Future Cost $308 This is to have funds available periodically to replace the components of the fire alarm system. Includes horns, strobes, smoke detectors, etc. Cost estimate, useful and remaining life provided by Neal Timmerman. 1 Costing provided by M2 Automation and Control Services, Inc Security System Useful Life 15 Video Security System Quantity 1 Unit of Measure Lump Sum Cost /LS $5, % Total Cost/Study $5,000 Replacement Year 2020 Future Cost $5,657 This is to have funds available to upgrade the video security system as needed. Includes cameras, web based server, etc. The time frame to utilize these funds is not specifically known at the time of the study. BRG consulted with Neal Timmerman in making this projection. 5 Costing provided by M2 Automation and Control Services, Inc. Version 2/10/ :03:57 AM Browning Reserve Group

47 Component Listing Included Components Utilities Miscellaneous Useful Life 5 In-Wall Utilities Quantity 1 Unit of Measure Lump Sum Cost /LS $1, % Total Cost/Study $1,500 Replacement Year 2030 Future Cost $2,172 This is to have funds available periodically for minor repairs of the in-wall utilities Misc. Useful Life 15 Internet System Quantity 1 Unit of Measure Lump Sum Cost /LS $4, % Total Cost/Study $4,000 Replacement Year 2020 Future Cost $4,526 This is to have funds available to upgrade the data infrastructure of the high speed internet system. The time frame to utilize these funds is not specifically known at the time of the study. BRG consulted with Neal Timmerman in making this projection. 5 Costing provided by M2 Automation and Control Services, Inc Reserve Study Year Update with Site Visit Useful Life 5 Reserve Study Quantity 1 Unit of Measure Lump Sum Cost /LS $2, % Total Cost/Study $2,800 Replacement Year 2015 Future Cost $2,800 This is for the 5 year complete reserve study which includes a visual observation of the accessible reserve components the association is obligated to maintain. Costing provided by BRG Northwest, LLC 0 Version 2/10/ :03:57 AM Browning Reserve Group

Ashleigh Commons Condominiums Association, Inc.

Ashleigh Commons Condominiums Association, Inc. RESERVE STUDY Full Study Ashleigh Commons Condominiums Association, Inc. Published - January 14, 2016 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com

More information

Brookwood Homeowners Association, Inc.

Brookwood Homeowners Association, Inc. RESERVE STUDY Full Study Brookwood Homeowners Association, Inc. Published - February 05, 2013 Browning Reserve Group / Emmett, ID 83617 Office (208) 365-0977 Tony@BrowningRG.com / www.browningrg.com Browning

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: October 09, 2016 To: Joleen Cline, Cline & Associates From: Browning Reserve Group (BRG) Re: Whitehawk Townhomes Association; Update w/ Site Visit Review Attached,

More information

R E S E R V E S T U D Y

R E S E R V E S T U D Y SAGUARO CANYON SUBDIVISION HOMEOWNERS ASSOCIATION R E S E R V E S T U D Y Full Study Published - May 27, 2010 B R O W N I N G R E S E R V E G R O U P ~ Emmett, ID 83617 ~ Office (208) 365-0977 Fax (208)

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: August 15, 215 To: Lorrie Olson, Caughlin Creek HOA From: Browning Reserve Group (BRG) Re: Caughlin Creek HOA; Full Study Attached, please find the reserve study

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: February 1, 215 To: Sonja Bachus, Management Alternative, The From: Browning Reserve Group (BRG) Re: ; Update w/o Site Visit Review Attached, please find the reserve

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: November 13, 2013 To: Rob Ross, Gateview From: Richard Avelar & Associates (RA&A) Re: Gateview; Update w/ Site Visit Review Attached, please find the reserve study

More information

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION

THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION THE VINEYARDS AT DUBLIN GREENE OWNERS ASSOCIATION Full Reserve Study With On-site Visual Inspection October 3, 2018 Reserve Study for Fiscal Year: 01/01/2019 through 12/31/2019 2059 Camden Ave. Suite 151

More information

Update With Site Visit

Update With Site Visit Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT

More information

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08

Central Pointe HOA. Level I Reserve Study. Report Period 1/01/08 12/31/08 Central Pointe HOA Level I Reserve Study Report Period 1/01/08 12/31/08 Client Reference Number.... 10870 Property Type...... Mid-Rise Number of Units............ 83 Fiscal Year End....... December 31

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Seavue Condominiums 130-5 th Avenue South, Edmonds, WA 98020 For: Seavue Homeowners Association c/o Jay Grant Board President (202) 351-9399 Prepared By: Jeff Samdal, PE, RS,

More information

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012

Parkwood HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2012. Date of Property Inspection. Report prepared on Saturday, August 11, 2012 Parkwood HOA Level 1 Reserve Study Report Period 1/1/2012 12/31/2012 Client Reference Number Property Type Number of Units Fiscal Year End 12784 Townhouse 8 12/31 Date of Property Inspection Prepared By

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY CAPITAL RESERVE STUDY FOR THE HIALEAH CONDOMINIUM WILDWOOD CREST, NEW JERSEY Project Number: 12-1066 W:\2012\12-1066\CORR\12-1066v1.doc Date: March 29, 2013 Table of Contents Section Page Executive Summary...

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895

More information

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State

CAPITAL RESERVE STUDY. Meadow Wood Commons. City, State CAPITAL RESERVE STUDY FOR THE Meadow Wood Commons City, State Management Company: Any Management Company Contact Name: Mr. Bob Smith Date: July 28, 2014 Table of Contents Section Name Section # Executive

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample Condominium Association Laguna Hills, California Version 1 March 31, 2004 23201 Mill Creek Drive, Suite 100 Laguna Hills, California 92653 Phone (949) 474-9800 Facsimile

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Soda Creek Condominiums Dillon, Colorado Version 2 Monday, August 19, 2013 6860 S. Yosemite Court, Suite 2000 Centennial, CO 80112 Phone (303) 953-2078 Facsimile (303) 953-2157

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

Urban Heights Condominium

Urban Heights Condominium Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION

More information

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2019 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

Cottonwoods at Vine. Reserve Study. October 2012

Cottonwoods at Vine. Reserve Study. October 2012 Reserve Study October 2012 Tab Table of Contents Reserve Study Analysis Executive Summary... Remaining Useful Life Analysis... Reserve Study Schedule... Annual Expenditures... Funding Plan Summary... Percentage

More information

Agenda Item # 5b Page 1 of 43

Agenda Item # 5b Page 1 of 43 Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43

More information

- RS. D e sig n atio n

- RS. D e sig n atio n ALEXANDER LIU CAI - RS Reserve D e sig n atio n Specialist Sample Table Of HOA Contents Project Table of Contents Page Preface i Executive Summary 1 Membership Disclosure Summary 2 Disclosure Statement

More information

Update With Site-Visit Reserve Study

Update With Site-Visit Reserve Study Update With Site-Visit Reserve Study Park Place HOA Surprise, Arizona Report #: 12568-2 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: October 4, 2016 Hello, and welcome

More information

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums.

Regarding: Level I Capital Replacement Reserve Study. We are pleased to submit this Level I Reserve Study for Summit Park Condominiums. 1825 W. Ray Road, #1135, Chandler, AZ 85244 support@azreservestudy.com Tel: (480) 620-4757 Fax: (888) 842-9319 April 4, 2013 Summit Park Condominiums HOA Regarding: 2012 - Level I Capital Replacement Reserve

More information

Calusa Point Association, Inc. Miami, Florida File #

Calusa Point Association, Inc. Miami, Florida File # A FULL RESERVE STUDY FOR Miami, Florida File # 22920-06289 FOR PERIOD: January 1, 2014 December 31, 2014 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM LINDSEY 3300 W. LAKE MARY BLVD. SUITE 350 LAKE

More information

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2

2014 Reserve Study. The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee Report No: 2921 Version 2 2014 Reserve Study The Bear Creek Crossing Owner's Association, Inc. Bear Haven Way Sevierville, Tennessee 37862 Report No: 2921 Version 2 For the Period From: January 1, 2014 To: December 31, 2014 TABLE

More information

OAK CREEK CONDOMINIUMS

OAK CREEK CONDOMINIUMS 1515 Heritage Dr., Suite 204 McKinney, Texas75069 (972) 562-1011 TEL (972) 540-1031 FAX Firm Reg. No F-4577 www.criteriumdotson.com RESERVE FUND STUDY OAK CREEK CONDOMINIUMS 1700 BAIRD FARM CIRCLE ARLINGTON,

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Park Avenue 244 Quari St Denver, CO Level II Study with Site Inspection Fiscal Year End Date: 12/31/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

Reserve Analysis Report

Reserve Analysis Report Reserve Analysis Report Sample HOA 2663 S Oakland St Los Angeles, CA Level I Study with Site Inspection Fiscal Year End: 11/30/2016 Phone: 858-764-1895 Fax: 800-436-3816 brian@mccafferyreserveconsulting.com

More information

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015

SMA RESERVES. Miramar Plaza Homeowners' Association. Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES Miramar Plaza Homeowners' Association Reserve Study Update w/o Visual Inspection July 15, 2014 Reserve Study For Fiscal Year: 10/01/2014 through 09/30/2015 SMA RESERVES 2059 Camden Ave. Suite

More information

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by:

REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION. N & H Enterprises MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT FY 2010 WOODWIND ASSOCIATION WOODWIND ASSOCIATION REPLACEMENT RESERVE REPORT FY 2010 Community Management by: N & H Enterprises PO Box 5539 Greenville, SC 29607 864-467-1600

More information

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon

REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE. Prepared for: Ms. Rebecca Beamon SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 SANCTUARY AT FALSE CAPE REPLACEMENT RESERVE REPORT FY 2018 Prepared for: SANCTUARY AT FALSE CAPE Ms. Rebecca Beamon 3700 Sandpiper Road Virginia

More information

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:

RESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for: RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,

More information

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File #

Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # A FULL RESERVE STUDY FOR Harbour Isle at Hutchinson Island West Condominium Association, Inc. Ft. Pierce, Florida File # 22920-04030 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS,

More information

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019.

Fieldstone RESERVE STUDY UPDATE. John D. Beatty & Company OWNERS ASSOCIATION. for. Date Prepared: 12/4/2018 for fiscal year 2019. RESERVE STUDY UPDATE for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925) 831-1803

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Jason Kozleski Board President 10790-221 st Lane NE Redmond,

More information

Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File #

Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File # A FULL RESERVE STUDY FOR Seaspray Condominium Association, Inc. Fort Walton Beach, Florida File # 22920-02604 FOR PERIOD: January 1, 2017 December 31, 2017 PREPARED BY GAB ROBINS, A DIVISION OF CUNNINGHAM

More information

UPDATE - With Site Visit

UPDATE - With Site Visit SAMPLE Reserve Study UPDATE - With Site Visit Serving the Nation www.reservestudy.com Welcome to your Reserve Study! A Reserve Study is a valuable tool to help you budget responsibly for your property.

More information

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number:

DRAFT CAPITAL RESERVE STUDY. The Piano Works Condominium Association. Deep River, Connecticut FOR THE. Project Number: CAPITAL RESERVE STUDY DRAFT FOR THE Management Company: Sound Real Estate Services, Contact Name: Josh Parsons Date: August 22, 2016 Table of Contents Section Name Section # Executive Summary... 1 Reserve

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cascara at Redmond Ridge NE 112 th Place & Eastridge Drive NE, Redmond, WA 98052 For: Cascara at Redmond Ridge Homeowners Association c/o Luiza Limona Morris Management 325-118

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Cambridge Court 9512-1 st Avenue Northeast, Seattle, WA 98115 For: Cambridge Court Homeowners Association c/o Tim Kammer, Property Manager Condo Managements, Inc. 1661 Harbor

More information

RESERVE STUDY SPECIALISTS

RESERVE STUDY SPECIALISTS RESERVE STUDY SPECIALISTS P.O. BOX 9178, CALABASAS, CA 91372 TEL: 818-992-1312 FAX: 818-992-1338 VILLAGE GREEN EAST HOMEOWNERS ASSOCIATION FULL RESERVE STUDY September 06, 2017 for Fiscal Year 2018 RESERVE

More information

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU

Reference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.

More information

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by:

Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA. Prepared by: RESERVE FUND STUDY THE VILLAGE AT HIGHLANDS CROZET, VA 22932 Prepared for: VILLAGE AT HIGHLANDS OWNERS ASSOCIATION CROZET, VA C/O ASSOCIA COMMUNITY GROUP 1828 PAVILION CIRCLE CHARLOTTESVILLE, VA 22911

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112 th Ave NE

More information

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii

Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii Daniel J. Sullivan CPA, MBA 5389 Kahalakua Street Honolulu, Hawaii 96821 res1cfdl@hawaiiantel.net INDEPENDENT AUDITOR'S REPORT Board of Directors of The Association of Apartment Owners of Report on the

More information

Arizona Nevada Texas Utah New Mexico

Arizona Nevada Texas Utah New Mexico Arizona Nevada Texas Utah New Mexico 9/12/2016 Summit Park HOA Regarding: Fiscal Year beginning 1/1/2017 Level II Capital Replacement Reserve Study We are pleased to submit this Level II Reserve Study

More information

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by:

NEWTON PARISH REPLACEMENT RESERVE REPORT 2008 REPLACEMENT RESERVE REPORT FY CAS, Inc MILLER ~ DODSON ASSOCIATES. Community Management by: REPLACEMENT RESERVE REPORT 2008 NEWTON PARISH NEWTON PARISH REPLACEMENT RESERVE REPORT FY 2008 Community Management by: CAS, Inc Mr. Dan Quartermane 1930 N. Salem Street, Suite 101 Apex, NC 27523 919-367-7711

More information

MILL CREEK CONDOMINIUMS RESERVE STUDY

MILL CREEK CONDOMINIUMS RESERVE STUDY MILL CREEK CONDOMINIUMS RESERVE STUDY Fiscal Year 2016 Prepared by: Eric Harker, Assoc. AIA Alliance Project Engineers and Construction Consultants November 6, 2015 Project Number: OR14-017 MILL CREEK

More information

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014

Park Rise Homeowners Association, Inc. Financial Statements and Supplementary Information. For the Year Ended December 31, 2014 Financial Statements and Supplementary Information For the Year Ended December 31, 2014 Table of Contents Independent Auditor s Report..... 1 Financial Statements Balance Sheet.. 3 Statement of Revenues,

More information

Pemberley at Robinsons Grove

Pemberley at Robinsons Grove Pemberley at Robinsons Grove Level I Reserve Study Report Period 1/01/06 12/31/06 Client Reference Number.... 10429 Property Type...... Apartment Style Number of Units............. 160 Fiscal Year End.......

More information

RESERVE STUDY Component Analysis and Reserve Fund Plan Annual Review Study 2016/17 For Middlefield Meadows HOA Mountain View, CA Prepared By RESERVE ANALYSIS CONSULTING, LLC 1750 Bridgeway, Suite B106

More information

BUDGET APPROVED. GENERAL EXPENSES (158 Units)

BUDGET APPROVED. GENERAL EXPENSES (158 Units) TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1457 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2017 Budget type: M BUDGET APPROVED ACCT.

More information

TANGLEWOOD HILLS CONDOMINIUM

TANGLEWOOD HILLS CONDOMINIUM TANGLEWOOD HILLS CONDOMINIUM Association name: Tanglewood Hills Condom Association number: 1547 General - Total # of Units 158 Fiscal year end: 12/31 Budget year: 2018 Budget type: M BUDGET APPROVED ACCT.

More information

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003

Sample Reserve Study Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Your City, Your State Account Sample Reserve Study -- Version 7.0 (2003) February 01, 2003 Reserve Analyst P.O. Box 797 Vernon, AZ 85940 Phone: 800-561-0173 Fax: 928-537-3377 Prepared By Quality Check

More information

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By

Clearbrook HOA. Level 1 Reserve Study. Report Period 1/1/ /31/2010. Client Reference Number /23/2010 Prepared By Clearbrook HOA Level 1 Reserve Study Report Period 1/1/2010 12/31/2010 Client Reference Number 11775 Property Type Apartment Style Number of Units 21 Fiscal Year End 12/31 Date of Property Inspection 3/23/2010

More information

SAMPLE CONDO RESERVE STUDY for fiscal year 2012

SAMPLE CONDO RESERVE STUDY for fiscal year 2012 SAMPLE CONDO RESERVE STUDY for fiscal year 2012 RDA REPORT - UPDATED RESERVE ANALYSIS FOR FISCAL YEAR 2012 RESERVE DATA ANALYSIS, INC MPLS (612) 616-4817 TOLL FREE (866) 780-7943 WWW.RDAMIDWEST.COM UPDATE

More information

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014

Shadow Ridge. Level 2 Reserve Study. Report Period 01/01/ /31/2015. Date of Property Inspection 8/21/2014 Shadow Ridge Level 2 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 10160 Property Type Condominium Number of Units 168 Fiscal Year End 12/31 Date of Property Inspection 8/21/2014

More information

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE

ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE 0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986

More information

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY:

2015 Reserve Study Report LOCATED AT: FOR: AS OF: BY: 2015 Reserve Study Report LOCATED AT: 101 Oasis Drive Pompano Beach, FL 33069 FOR: Oasis at Palm Aire Association, Inc. 101 Oasis Dr., # Office Pompano Beach, FL 33069 AS OF: January 1st, 2015 - December

More information

CONTENTS 1.0 INTRODUCTION... 1

CONTENTS 1.0 INTRODUCTION... 1 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

HARBOR POINTE CONDOMINIUM ASSOCIATION INC CONDOMINIUM APPROVED BUDGET YEAR ENDING DECEMBER 31, 2017

HARBOR POINTE CONDOMINIUM ASSOCIATION INC CONDOMINIUM APPROVED BUDGET YEAR ENDING DECEMBER 31, 2017 210 Monthly Condominium Assessment $ 477.00 Condominium Income Assessment Income Condominium 1,202,040.00 Assessment Income: $ 1,202,040.00 Condominium Expenses General / Administrative Management Fee

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Sammamish Landing Condominiums 4214 West Lake Sammamish Parkway NE, Redmond, WA 98052 For: Sammamish Landing Homeowners Association c/o Scott McCue, Property Manager McCue &

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 VILLAS AT PARKWOOD ESTATES VILLAS AT PARKWOOD ESTATES REPLACEMENT RESERVE REPORT FY 2016 Community Management by: Community Management Professionals, LLC Beth Maurer

More information

Pacific Tower Condominium Association

Pacific Tower Condominium Association www.hoacpa.com Pacific Tower Condominium Association Audit Report Financial Statements & Supplementary Information December 31, 2016 Cagianut & Company CERTIFIED PUBLIC ACCOUNTANT www.hoacpa.com Members

More information

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc.

RESERVE STUDY LEVEL I - Full Reserve Study. ABC Condominium Association, Inc. Insurance Appraisals Reserve Studies Wind Mitigation RESERVE STUDY LEVEL I - Full Reserve Study Prepared for: ABC Condominium Association, Inc. For the period of January 1, 214 - December 31, 214 71 Enterprise

More information

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2

CONTENTS 1.0 INTRODUCTION EXECUTIVE SUMMARY... 2 CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Sun Peak Master Association

Sun Peak Master Association Sun Peak Master Association Level 1 Reserve Study Report Period 01/01/2014 12/31/2014 Client Reference Number Property Type Fiscal Year End 17547 Master 12/31 Date of Property Inspection Prepared By Analysis

More information

RESERVE STUDY UPDATE SUMMARY

RESERVE STUDY UPDATE SUMMARY RESERVE STUDY UPDATE SUMMARY for Fieldstone OWNERS ASSOCIATION Date Prepared: 12/4/2018 for fiscal year 2019 Prepared By: John D. Beatty & Company 8425 Brentwood Blvd., Suite A7 Brentwood, CA 94513 (925)

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association

21289 E. Lords Way Queen Creek, AZ Tel: (480) Fax: (888) October 27, Sample Association 21289 E. Lords Way Queen Creek, AZ 85142 support@azreservestudy.com Tel: (480) 840-7130 Fax: (888) 842-9319 October 27, 2012 Sample Association Regarding: 2013 - Level I Capital Replacement Reserve Study

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012

GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 GARDEN HOMES AT CHARBONNEAU GREEN TOWNHOME ASSOCIATION MAINTENANCE PLAN LEVEL I: FULL RESERVE STUDY FUNDING ANALYSIS 2012 www.schwindtco.com (503)227-1165 Page 1 of 49 GARDEN HOMES AT CHARBONNEAU GREEN

More information

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th

Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Th Year Per Manor Per Month Assessment Total Contribution United Laguna Woods Mutual 2019 RESERVES PLAN Reserve 30-Year Funding Plan Interest Earnings Threshold (Min Balance): $ 10,400,000 Indexed for projected

More information

CAPITAL RESERVE STUDY

CAPITAL RESERVE STUDY Arizona Texas Nevada Utah New Mexico CAPITAL RESERVE STUDY Prepared for: Quail Creek HOA Date of Report: 6/7/2018 Capital Reserve Analysts Bringing the future into the present Capital Reserve Analysts,

More information

Treetop Condos West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014

Treetop Condos West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014 West Linn, Oregon Account 2015 On Site Update -- Version 1 October 07, 2014 The Management Trust - Northwest P.O. Box 23099 Tigard, OR 97281 Phone: 503-670-8111 Toll Free: 877-852-8100 Fax: 503-670-0775

More information

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO

RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO RESERVE FUND STUDY VILLAS OF HUDSON HOMEOWNERS ASSOCIATION HUDSON, OHIO Criterium Liszkay Engineers 110 N. High St. Gahanna, OH 43230 614-418-7200 www.clengineers.com AUGUST, 2009 1.0 INTRODUCTION... 1

More information

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann

REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES ROCKTOWN REALTY. Community Management by: Bernard Hamann REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES REPLACEMENT RESERVE REPORT FY 2017 CAMDEN TOWNES Community Management by: ROCKTOWN REALTY Bernard Hamann 218 Market Street Harrisonburg, VA 22801 40-70-7080

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017

Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY December 31, 2017 Boca Rio Condominium Homeowners Association LEVEL III: UPDATE RESERVE STUDY Section Page RESERVE STUDY EXECUTIVE SUMMARY 1-2 ASSESSMENT AND RESERVE FUNDING 3 DISCLOSURE SUMMARY (These 3 pages should be

More information

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston

REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM CHESAPEAKE BAY MANAGEMENT. Community Management by: Ms. Kimberly Marston REPLACEMENT RESERVE REPORT FY 2015 WOODBRIDGE CONDOMINIUM WOODBRIDGE CONDOMINIUM REPLACEMENT RESERVE REPORT FY 2015 Community Management by: CHESAPEAKE BAY MANAGEMENT Ms. Kimberly Marston 100 Volvo Parkway,

More information

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5 DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report

More information

Level 3 Reserve Study without a Site a Site Visit Visit

Level 3 Reserve Study without a Site a Site Visit Visit Level 3 Reserve Study without a Site a Site Visit Visit We offer two types of reports for a Level 3 Reserve Study with a Site Visit, RS-3 - Standard Reserve Study without a site visit SMRS-3 - Statutory

More information

Sample Community Association

Sample Community Association Level 1 Reserve Study Report Period - 1/1/2018 to 12/31/2018 Client Reference Number 10014 Property Type Condominium Number of Units 150 Fiscal Year End 12/31 Type of Study Full Study Date of Site Visit

More information

Bridgewood Manor HOA

Bridgewood Manor HOA Bridgewood Manor HOA Level 1 Reserve Study Report Period 01/01/2015 12/31/2015 Client Reference Number 18076 Property Type Condominium Number of Units 40 Fiscal Year End 12/31 Date of Property Inspection

More information

WASHINGTON BROWN DEPRECIATION PTY LTD

WASHINGTON BROWN DEPRECIATION PTY LTD Wednesday, 4 July 2007 The Owners - Strata Plan Number C/- Strata Management Company Address PROPERTY ADDRESS SINKING FUND FORECAST REPORT For the attention of: Strata Manager Dear Strata Manager, In accordance

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY LEVEL 3 UPDATE Tamarack Village 10701 to 10798-221 st Lane NE, Redmond, WA 98053 For: Tamrack Village Homeowners Association c/o Tim Ambre, Property Manager econdoservices 1500-112

More information

Do-It-Yourself Reserve Study

Do-It-Yourself Reserve Study Washington Office Corporate Office 505 South 336 th St., Ste 620 Calabasas, CA Federal Way, WA 98003 Regional Offices TEL 253/661-5437 Phoenix, AZ FAX 253/661-5430 San Francisco, CA arwa@reservestudy.com

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS

More information

PROFESSIONAL RESERVE STUDY

PROFESSIONAL RESERVE STUDY PROFESSIONAL RESERVE STUDY Villa Marina 17104 NE 45 th Street, Redmond, WA 98053 For: Villa Marina Association of Apartment Owners c/o Sacha Copeland The Copeland Group, LLC 221 First Ave W, Suite 105

More information

Reserve Studies Turnover Reports Insurance Appraisals

Reserve Studies Turnover Reports Insurance Appraisals Reserve Studies Turnover Reports Insurance Appraisals Dear Board Members, Managers and Unit Owners, For twenty years we having been serving community associations throughout Florida and the Southeast United

More information

Estates at River Ranch HOA

Estates at River Ranch HOA Full Reserve Study Estates at River Ranch HOA Tucson, Arizona Report #: 29634-0 For Period Beginning: January 1, 2017 Expires: December 31, 2017 Date Prepared: June 15, 2016 Hello, and welcome to your

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information