1 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities

2 SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility) 1 $15,000 $15,000 $15,000 $15,000 $15,000 Energy Conservation 1 $50,000 $50,000 $50,000 $50,000 $50,000 Engineering 1 $25,000 $25,000 $25,000 $25,000 $25,000 Asbestos Survey and Remediation 1 $25,000 $25,000 $25,000 $25,000 $25,000 Carpet and Flooring Replacement 1 $25,000 $25,000 $25,000 $25,000 $25,000 Electrical Upgrades for New Technology 1 $25,000 $25,000 $25,000 $25,000 $25,000 Door (Interior and Exterior) Hardware and Installation 1 $15,000 $15,000 $15,000 $15,000 $15,000 HVAC/Energy Management Upgrades 1 $50,000 $50,000 $50,000 $50,000 $50,000 Painting and Parking Lot Striping 1 $15,000 $15,000 $15,000 $15,000 $15,000 Plumbing Upgrades 1 $15,000 $15,000 $15,000 $15,000 $15,000 Refinish Gym and Stage Floors 1 $25,000 $25,000 $25,000 $25,000 $25,000 Bathroom Partitions 1 $15,000 $15,000 $15,000 $15,000 $15,000 Smoke Detectors Replacement 1 $15,000 $15,000 $15,000 $15,000 $15,000 School Playgrounds 1 $25,000 $25,000 $25,000 $25,000 $25,000 Security Upgrades 1 $50,000 $50,000 $50,000 $50,000 $50,000 Oil Tank Inspections and Maintenance 1 $20,000 $20,000 $20,000 $20,000 $20,000 Totals $410,000 $410,000 $410,000 $410,000 $410,000 Total after cuts $385,000 Cut from CIP

3 SCH-2 School Projects by Building Priority FY15 FY16 FY17 FY18 FY19 AHS Door Safety Blinds 1 $30,000 AHS Safety Lighting - Art Dept. 2 $5,000 AHS Flooring Replacement 3 $40,000 AHS HVAC Study 4 $30,000 AHS Water Conservation 5 $15,000 AHS Room 116 Sinks 6 $20,000 AHS Foyer Display Cases 7 $25,000 AHS Railing Painting 8 $25,000 DMS Shades 1 $35,000 $35,000 DMS Restroom Partitions 2 $15,000 DMS Lockers 3 $50,000 DMS Repaint all Classrooms 4 $75,000 DMS Exterior Windows 5 $35,000 DMS Carpet Replacement 6 $25,000 Sanborn Elementary Carpeting 1 $20,000 Sanborn Elem. Roof Access 2 $10,000 Shawsheen Hallway Painting 1 $20,000 Shawsheen Windows - Replace 2 $20,000 $20,000 $20,000 $20,000 $20,000 Shawsheen Elementary Carpet 3 $5,000 Shawsheen Exterior Painting 4 $20,000 Shawsheen Elem. School Gate 5 $3,000 South Fire Suppression System 1 $20,000 South Elementary School Air-lock Doors 2 $25,000 South Dome Skylights 3 $5,000 West Elementary Shades 1 $25,000 West Elementary Renovations 2 $35,000 West Elem. Restroom Partitions 3 $15,000 West Elementary Crawlspace 4 $30,000 West Elementary Carpeting 5 $10,000 West Elementary Walkway 6 $15,000 West Middle School Safety Wall Pads in the Gymnasium 1 $9,000 West Middle Auditorium 2 $15,000 West Middle School Lockers 3 $50,000 Wood Hill/High Plain Shades 1 $20,000 Wood Hill/High Plain Ventilation Study 2 $30,000 Wood Hill/High Plain Painting 3 $10,000 Wood Hill/High Plain Windows 4 $10,000 Totals $847,000 $55,000 $20,000 $20,000 $20,000 Total after cuts $119,000 Funded Cut from CIP

4 SCH-3 - Textbooks Priority FY15 FY16 FY17 FY18 FY19 Gr Foreign Language 3 $0 $0 $0 $0 $0 Gr. 1 5 World Language 1 $48,000 $48000 $48000 $48000 $48000 Gr English Language Arts 3 $0 $10,000 $0 $10,000 $0 Gr Math Begin program review cycle (FY 13) Gr Science Begin program review cycle (FY 14) 1 $216,000 $0 $0 $0 $0 2 $20,000 $60,000 $60,000 $25,000 $0 Gr Social Studies 3 $0 $0 $20,000 $20,000 $0 PK-5 English Language Arts 2 $20,000 $20,000 $20,000 $20,000 $0 PK-5 Math Begin program review cycle (FY 13) 1 $180,000 $0 $0 $0 $0 PK-5 Science Begin program review cycle (FY 14) 3 $0 $25,000 $0 $20,000 $ PK-5 Social Studies 3 $0 $0 $0 $15,000 $25,000 PK 12 Fine Arts 3 $0 $0 $0 $0 $0 PK-12 Electronic Textbooks 1 $43,000 $40,000 $40,000 $40,000 $20,000 PK-12 Response to Intervention 1 $30,000 $30,000 $25,000 $30,000 $0 Totals $557,000 $233,000 $213,000 $228,000 $93,000

5 SCH-4 AHS Schematic Design Services $350,000 School Committee Members to speak directly on this article.

6 Priority FY15 FY16 FY17 FY18 FY19 AHS Collins Center Flooring 1 $75,000 AHS Replace Boys and Girls Locker Rooms Lockers 2 $200,000 AHS Copy Ctr./Loading Dock 3 $200,000 $200,000 AHS Communications 4 TBD AHS Collins Center Upgrade 5 $50,000 AHS Exterior Lighting 6 $50,000 AHS Kitchen in Room $75,000 AHS Pressure Wash Masonry 8 $100,000 DMS Restrooom Accessibility 1 $100,000 $100,000 $100,000 High Plain Playground Turf 1 $50,000 $50,000 $50,000 Shawsheen Masonry 1 $150,000 Shawsheen Additional Parking 2 $50,000 Shawsheen Playground 3 $150,000 South Gym Skylights replacement 1 $200,000 South Resurface Playground & Additional Parking 2 $400,000 West Middle Boilers 1 $200,000 West Middle Aud. Seating 2 $50,000 West Middle Café Ceiling 3 $100,000 Wood Hill/High Plain Elementary Ceiling Fans 1 $90,000 Wood Hill/High Plain Elementary Storage Building 2 $100,000 Wood Hill/High Plain Elementary Masonry Sealing 3 $200,000 Totals $2,490,000 $450,000 $150,000 $0 $0 Total after cuts $1,465,000 Funded

7 AHS Collins Center Flooring

8 AHS Lockers

9 AHS Lockers

10 Shawsheen Masonry

11 Shawsheen Masonry

12 South School Gym Skylights

13 South School Gym Skylights

14 South School Gym Skylights

15 South School Playground Resurface and Additional Parking

16 South School Playground Resurface and Additional Parking

17 SCH-6 School Site Improvement Plan Priority FY15 FY16 FY17 FY18 FY19 West Elementary School 1 $319,000 $3,200,000 Andover High School $650,000 South Elementary School $300,000 $3,050,000 Wood Hill/ High Plain Schools Sanborn Elementary School Shawsheen Elementary School Totals $319,000 $3,200,000 $300,000 $3,050,000 $650,000

18 P&F-7 Town/School Energy Initiatives Priority FY15 FY16 FY17 FY18 FY19 Memorial Hall Library Boilers Replacement 1 $150,000 Public Safety Ctr. VFD to Supply Fan 2 $8,000 Town Offices and School Admin. Buildings Controls 3 $150,000 Spring Grove Cemetery Boiler and Furnace 4 $12,000 Memorial Hall Library Convert AHU s from Multi Zone to VAV 5 $37,000 Old Town Hall Boilers Replacement 6 $90,000 Town Offices and School Admin. Boilers Replacement 7 $140,000 Totals $158,000 $199,000 $230,000 $0 $0 AHS Variable Freq. Drives 1 $70,000 $70,000 AHS Intelli-Hood Controls 2 $8,000 DMS Retro-commissioning 3 $26,198 Sanborn Retro-commissioning 4 $23,931 Sanborn Demand Control 5 $87,000 West El. Retro-commissioning 6 $25,833 West El. Demand Control 7 $63,000 South Retro-commissioning 8 $25,616 South Demand Control 9 $122,500 HPE Retro-commissioning 10 $32,433 Totals $78,000 $204,011* $150,000 $122,500 $0 *Expect to apply for Green Community Grant in November of 2014 to help fund retro-commissioning.

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000

More information

Andover Public Schools FY 14 Recommended Budget. School Committee Meeting March 4, 2013

Andover Public Schools FY 14 Recommended Budget. School Committee Meeting March 4, 2013 Andover Public Schools FY 14 Recommended Budget School Committee Meeting March 4, 2013 FY 14 Budget Based Upon APS Vision, Mission, Strategic Plan STRATEGIC PLAN GOALS High Achievement for All Technology

More information

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School

More information

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY

More information

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT DRAFT 1 Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT - HVAC Design - Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT - HVAC Design - replacement

More information

2019 Capital Projects Plan

2019 Capital Projects Plan Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

SECTION 6: CAPITAL IMPROVEMENT DETAIL

SECTION 6: CAPITAL IMPROVEMENT DETAIL SECTION 6: CAPITAL IMPROVEMENT DETAIL Summary... 1 General Government... 2 Public Safety... 6 Public Works... 12 Recreation and Leisure... 18 Education... 24 SUMMARY TOTALS CAPITAL IMPROVEMENT PLAN AND

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

7th Draft Projected Adopted Proposed. Summary

7th Draft Projected Adopted Proposed. Summary Summary Central High School $ 15,700 $ 523,000 $ 363,000 $ 513,000 $ 13,000 $ 13,000 Holgate Middle School $ 44,600 $ 12 $ 10 $ $ $ Simmons Middle School $ 22,600 $ 46 $ 10 $ $ $ C.C. Lee Elementary $

More information

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011 Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

FY17 FMD Capital Budget

FY17 FMD Capital Budget FY17 FMD Capital Budget School Committee Presentation December 2, 2015 Wellesley Facilities Maintenance Department AGENDA Status Update on Capital Projects Role in Capital Planning Capital Planning & Budgeting

More information

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 - Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 Special Education Allocation 161 Operational Services

More information

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure

More information

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) 2006-20 CMP Strategy Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) Architectural Research Consultants, Incorporated October, 2004 Cluster: Albuquerque 244 DOLORES

More information

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175 Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175 Special Education Allocation 176 Operational Services Allocation

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

Public Presentation Capital Bond November 27, 2017

Public Presentation Capital Bond November 27, 2017 Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect

More information

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016 POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

BERKELEY UNIFIED SCHOOL DISTRICT

BERKELEY UNIFIED SCHOOL DISTRICT BERKELEY UNIFIED SCHOOL DISTRICT TO: Javetta Cleveland and Neil Smith, Co-Superintendents FROM: Lew Jones, Director of Facilities DATE: June 26, 2013 SUBJECT: Approval of the 2013/14 Measure H Annual Plan

More information

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017 A. Approval - New (Non-State and Other State Funds) Name (Other State) (Other State) Non-State Funds/ Undetermined 1 N/A B. Approval - Amended (Non-State and Other State Funds) 1 Coastal Carolina Main

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

Cecil County Public Schools Board of Education Proposed Budget

Cecil County Public Schools Board of Education Proposed Budget Cecil County Public Schools Board of Education Proposed Budget County Council Presentation April 12, 2016 Fiscal 2017 Operating Fund Capital Fund Debt Service Fund Budget Prioritization Survey Results

More information

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions

More information

2017 Bond Program Summary

2017 Bond Program Summary 2017 Bond Program Summary Middle School #3 (off Vail Divide) $ 76,225,750 Middle School #3 Off-site Utility and Road Construction $ 2,100,000 Elementary School #7 (in Rough Hollow) $ 33,130,150 Bee Cave

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

Building and Site Sinking Fund Millage. Election Date: November 7th 2017 Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount

More information

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY) Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -

More information

Weston Public Schools PROPOSED BUDGET OF EXPENDITURES

Weston Public Schools PROPOSED BUDGET OF EXPENDITURES Weston Public Schools PROPOSED BUDGET OF EXPENDITURES 2012-2013 School Facilities 2012-2013 Budget Presentation Please refer to pages 111-117 in the Budget Binder Budget Preface The Past: Unreliable boilers

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717 Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400

More information

Washingtonville Central School District Building Condition Survey Five Year Plan

Washingtonville Central School District Building Condition Survey Five Year Plan Building Condition Survey Five Year Plan Project Cost Summary Building 2011 2012 2013 2014 2015 Totals 0001 Washingtonville Jr High School $38,759 $325,990 $1,882,653 $1,417,341 $1,025,559 $4,690,302 0002

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Lake Mills Area School District Community Survey Results. Spring 2018

Lake Mills Area School District Community Survey Results. Spring 2018 Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.

More information

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN 2017/2018 YEAR 1 ESTIMATED FUND BALANCE 7/1/17 $ 1,795,000 $ - $ 209,000 $ 117,861 $ (333,878) $ (240,844) $ 642,513 $ (113,143) EXPECTED REVENUE ACTIVITY $ 1,014,000 $ 33,473 $ 49,500 $ - $ - $ - $ -

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

Board of Trustees Proposition Summary Table of Contents

Board of Trustees Proposition Summary Table of Contents Table of Contents Table of Contents... ii 1 Facilities Condition Assessment... 2 1.1 Priority One... 2 1.2 Priority Two... 5 1.3 Priority Three... 7 1.4 Priority Four... 9 2 Major Projects... 10 2.1 Facility

More information

Lebanon Public Schools Board of Education Budget Presentation

Lebanon Public Schools Board of Education Budget Presentation 2017-2018 Board of Education Budget Presentation Board of Finance March 7, 2017 Board of Education Albert Vertefeuille, C James Mello, VC Sandra Tremblay, S Berthier Bosse Nicole McGillicuddy Stephen Nelson

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Capital Improvement Budgeting

Capital Improvement Budgeting Capital Improvement Budgeting This presentation is to be informative and not to promote specific products, services companies, etc. Illinois ASBO Sponsored Programs are permitted to promote products and

More information

BALTIMORE COUNTY PUBLIC SCHOOLS

BALTIMORE COUNTY PUBLIC SCHOOLS Exhibit B BALTIMORE COUNTY PUBLIC SCHOOLS DATE: TO: FROM: SUBJECT: ORIGINATOR: RESOURCE PERSON(S): BOARD OF EDUCATION Dr. Joe A. Hairston, Superintendent PROPOSED FY 2008 STATE AND COUNTY CAPITAL BUDGET

More information

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT 2018-19 Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT GENERAL FUND FINANCIAL STATEMENT (Current financial position) 2017-18 Budget 2017-18 Projected 2017-18 Variance

More information

Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179

Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179 Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179 Special Education Allocation 180 Operational Services/Central

More information

RSU 40 - Repairs & Maintenance List

RSU 40 - Repairs & Maintenance List FVS 1 Electrical outlets needed to reduce extension cord use $ 3,500 $ - $ 3,500 $ - $ - $ - FVS 1 risk of injury $ 2,500 $ - $ - $ 2,500 $ - $ - FVS Eaves need repair by basketball court near kitchen

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Interest Earned through 6/30/2018 2,013, , ,029, ,454, (3,443,911.91) 29, ,500, ,540,322.

Interest Earned through 6/30/2018 2,013, , ,029, ,454, (3,443,911.91) 29, ,500, ,540,322. STATUS OF DISTRICT RESERVES NORTH SHORE CSD Background Reserve funds are an important planning tool generally used by local governments and school districts to save for future needs and other allowable

More information

NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments

NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments NCAHMA Spring Underwriting Forum April 7-8, 2010 Physical Needs Assessments 1. What is a CNA? Presentation by: Thomas E. Fielder Phone: 859-276-0000 / tfielder@fieldergroup.com a) Comprehensive review

More information

Robert Shaw Theme Elementary

Robert Shaw Theme Elementary DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

Budget Committee Meeting. February 8, 2018

Budget Committee Meeting. February 8, 2018 Budget Committee Meeting February 8, 2018 1 Agenda Norms and Parking Lot 8:30 Capital Outlay FMD Hearings 8:35 Capital Outlay FMD Prioritization 11:00 Lunch 11:45 Capital Outlay FMD Prioritization (continued)

More information

Central Michigan University Capital Budget

Central Michigan University Capital Budget Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital

More information

APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES

APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES Introduction State capital appropriations are funded primarily through the issuance of State bonds. State bonds must be authorized by Ohio voters via

More information

1. Call to Order. 2. Public Input. 3. Rochester School Department. 4. Adjournment

1. Call to Order. 2. Public Input. 3. Rochester School Department. 4. Adjournment CITY COUNCIL BUDGET WORKSHOP April 25, 2016 CITY COUNCIL CHAMBERS 7:00 PM AGENDA 1. Call to Order 2. Public Input 3. Rochester School Department 3.1. FY 2017 CIP Budget 3.1.1. Creteau Technology Center

More information

GRF Mutual Project Log (10/31/17)

GRF Mutual Project Log (10/31/17) 904 Maint Svc 904 Maint Svc 904 Maint Svc 904 Maint Svc GRF Mutual Project Log (10/31/17) Priority # Type Name Description Status 1 CH 5 Commercial Appliances Replace Clubhouse 5 Dishwasher and Booster

More information

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5 DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report

More information

Two Ballot Proposals. August 8, 2017

Two Ballot Proposals. August 8, 2017 Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

Sagamore Hills Elementary

Sagamore Hills Elementary DeKalb County School District/Elementary Schools Sagamore Hills Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School

More information

Muskego Norway Schools Community Survey Results. Fall 2015

Muskego Norway Schools Community Survey Results. Fall 2015 Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included

More information

Massachusetts School Building Authority

Massachusetts School Building Authority Massachusetts School Building Authority School District Billerica District Contact Tim Piwowar TEL: (978) 528-7918 Submission Date 1/10/2012 SOI CERTIFICATION To be eligible to submit a Statement of Interest

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 A Library, Learning Resources and Campus Center 217,200 GSF; State Funding component; begin design est. 2015/16 771120 $ 197,529.21

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'

More information

Guaranteed Energy Savings

Guaranteed Energy Savings Guaranteed Energy Savings Mark J. Gallick Account Manager Shayne Homan, P.E., C.E.M. - Director of Energy Services Brian Moore, LEED GA, CIPE Engineering Operations Manager Michael Grochalski, E.I.T.,

More information

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012 Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:

More information

Draft 8 02/13/2014. Projected Adopted Proposed. Summary

Draft 8 02/13/2014. Projected Adopted Proposed. Summary Summary Central High School $ 230,000 $ 2,447,000 $ 1,547,000 $ 112,000 $ 22,000 $ 22,000 Holgate Middle School $ 16,600 $ 114,700 $ 7,700 $ 7,700 $ 7,700 $ 7,700 Simmons Middle School $ 55,900 $ 7,700

More information

Social Housing Administration Directive No

Social Housing Administration Directive No Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the

More information

Stone Mountain Middle

Stone Mountain Middle DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Reserve Request Instructions: Documentation Requirements

Reserve Request Instructions: Documentation Requirements Reserve Request Instructions: Documentation Requirements These instructions specify documentation that must be submitted with requests for withdrawals from property reserve accounts held by IHDA. All requests

More information

TOWN OF ANDOVER TRI-BOARD

TOWN OF ANDOVER TRI-BOARD TOWN OF ANDOVER TRI-BOARD A n d r e w P. F l a n a g a n, To w n M a n a g e r D e c e m b e r 6, 2 0 1 7 TONIGHT S DISCUSSION REVENUE ASSUMPTIONS APPROPRIATIONS - OBLIGATIONS APPROPRIATIONS CAPITAL AND

More information

THE CORPORATION OF THE TOWNSHIP OF BROCK IN THE REGIONAL MUNICIPALITY OF DURHAM 2019 CAPITAL BUDGET

THE CORPORATION OF THE TOWNSHIP OF BROCK IN THE REGIONAL MUNICIPALITY OF DURHAM 2019 CAPITAL BUDGET THE CORPORATION OF THE TOWNSHIP OF BROCK IN THE REGIONAL MUNICIPALITY OF DURHAM 2019 BUDGET INDEX SHEET PAGE # SUMMARY SCHEDULES 2019 Capital Tax Levy Requirement 1 2019 Estimated Capital Financing 2 Summary

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

FACILITIES PLANNING COMMITTEE

FACILITIES PLANNING COMMITTEE Marble Falls ISD FACILITIES PLANNING COMMITTEE Meeting 2 April 26, 2018 Love and Inspire WELCOME! Agenda Welcome Co-Chairs School Finance 101 MFISD Financial Overview Aging Facilities Small Group and Large

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'

More information

Our Focus: Your Future

Our Focus: Your Future Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS

More information

Director Report. Cultural Affairs Commission August 17, Jennifer Scripps, Director Office of Cultural Affairs City of Dallas

Director Report. Cultural Affairs Commission August 17, Jennifer Scripps, Director Office of Cultural Affairs City of Dallas Director Report Cultural Affairs Commission August 17, 2017 Jennifer Scripps, Director Office of Cultural Affairs City of Dallas Agenda FY 2017-18 Budget Update 2017 Bond Program Update New SDCC Manager

More information

Monthly Report. April 2017

Monthly Report. April 2017 Monthly Report April 2017 El Paso ISD Bond Program Program Manager: Jacobs Table of Contents Report Date: 04/30/2017 Understanding the Monthly Report... 3 Executive Summary. 7 Program Report by Phase...

More information

Central Davie Academy

Central Davie Academy NC School District/300 Davie County/High School Central Davie Academy Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

Budget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007

Budget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007 In This Issue... Budget Newsletter Rush-Henrietta Rush-Henrietta Central School District May 2007 2007-2008 District Budget Proposal Proposed Budget: $96,289,455 Budget-to-Budget Increase: 3.6% Tax Rate

More information

Northern Gateway Regional Division No.10 Listing of Events

Northern Gateway Regional Division No.10 Listing of Events Building Events Maintenance Events D2020.01.03 Piping Specialties (Backflow Preventors)** David Ovans Elementary School B3989A Code Northern Gateway Regional Division No.10 Install vacuum breakers on non

More information

Wissahickon School District Ambler, PA FINANCE COMMITTEE AGENDA. February 21, :30 pm Administration Building Board Room

Wissahickon School District Ambler, PA FINANCE COMMITTEE AGENDA. February 21, :30 pm Administration Building Board Room Wissahickon School District Ambler, PA 19002 FINANCE COMMITTEE AGENDA February 21, 2017 5:30 pm Administration Building Board Room 1. Discussion of Facilities Master Plan 2. Resolution Parameters for Bond

More information

Freedom Area School District Community Survey Results. Fall 2018

Freedom Area School District Community Survey Results. Fall 2018 Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.

More information

Why did we undertake a comprehensive Educational Facility Master Plan?

Why did we undertake a comprehensive Educational Facility Master Plan? NUSD EDUCATIONAL FACILITY MASTER PLAN Why did we undertake a comprehensive Educational Facility Master Plan? Novato Unified School District (NUSD) has thirteen school sites that provide the educational

More information