ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/11/2013 BUILDING SURVEY DATE
|
|
- Thomasina Flynn
- 5 years ago
- Views:
Transcription
1 WEST PENNSYLVANIA AVENUE URBANA, ILLINOIS SYSTEM CONDITION INDEX.685 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,364,800 LECTURE HALL BUILDING GROSS SQUARE FEET 43,547 NUMBER OF BUILDING STORIES 1 BUILDING SURVEY DATE CCJM: Josh Polasky (M), Stanley Panek (E) ORIGINAL YEAR OF CONSTRUCTION /11/2013 B U I L D I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y TRADE E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR ($) GOOD ($) (5-10 YEARS) (10-20 YEARS) POOR ($) (1-5 YEARS) EXCELLENT ($) (20+ YEARS) TOTAL ($) $/GSF PERCENT OF BUILDING TOTAL (%) MECHANICAL 230,700 37, , PLUMBING 153, , FIRE PROTECTION 85,000 85, ELECTRICAL 466,000 52,000 23, , COMMUNICATIONS 158, , , TOTAL % OF TOTAL CRITICAL ITEM REMEDIATION COST: $106, , , ,900 1,364, REFER TO CRITICAL ITEM SUMMARY ON FOLLOWING PAGE. NOTE: Cost Estimates are Construction Costs are in 2013 dollars to Replace in Kind unless otherwise noted PAGE 1
2 S T O C K P A V I L I O N C R I T I C A L I S S U E S S U M M A R Y CODE RELATED ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE ELECTRICAL Emergency Lighting System Lack of emergency lighting 21,400 21, Exceeded Replace CODE RELATED ITEMS COST 21,400 21, SYSTEM/COMPONENT FAILURE ITEMS REPAIR COST REPLACEMENT COST REPAIR/ REPLACEMENT % REMAINING LIFE REPAIR OR REPLACE FIRE PROTECTION Fire Alarm System System is obsolete. 85,000 85, Exceeded Replace SYSTEM/COMPONENT FAILURE ITEMS COST 85,000 85, NOTE: Cost Estimates are Construction Costs are in 2013 dollars to remediate noted issue. CRITICAL ISSUES COST 106, , Text106 M E C H A N I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y STEAM AND CONDENSTATE SYSTEM SUPPLY AIR SYSTEM AIR HANDLER HVAC CONTROLS SYSTEM SYSTEM/COMPONENT Steam and Condensate System Air Handling System Unit Heaters HVAC Controls MECHANICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR (5-10 YEARS) GOOD (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 173, ,100 37,200 37,200 25,200 25,200 32,400 32, ,700 37, , PAGE 2
3 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Item ID Date Installed 1914 and 1963 Comments Campus steam serves radiators throughout the building, including un-insulated steam pipes running along ceiling in arena. Many radiator traps appear new. Steam also serves 4-6 fan-powered unit heaters throughout building. There is one condensate pump with 4, 2-HP motors (Dunham Bush 10,000 EDR). Poor Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Replacement Cost $173,100 System is functional PAGE 3
4 Text6 S T E A M A N D C O N D E N S A T E S Y S T E M S U R V E Y P H O T O G R A P H S Radiator Condensate pump Steam pipes near roof Perimeter radiators visible PAGE 4
5 Text6 A I R H A N D L I N G S Y S T E M A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1988 Recommendation Item ID This building s only ventilation comes from 4 large exhaust fans mounted near the roof of the main Pavilion area, 2 on each end. They are controlled by a manual switches. Further details are unavailable but the fans are large and create significant negative pressure in the building. There is no makeup air system, although the building has large barn-type doors that are frequently open during use. Fair Remaining Useful Life 5 Years Nominal Useful Life: 30 Years Size/Capacity HP/kW 7.5 or 10 Replacement Cost $37,200 Approximately 10,000 CFM each Install new ventilation/make-up air system for Pavilion. Integrate with heating system. Text6 A I R H A N D L I N G S Y S T E M S U R V E Y P H O T O G R A P H S Exhaust fan Second exhaust fan Fans mounted through windows near roof at far end of arena PAGE 5
6 Text6 U N I T H E A T E R S A S S E S S M E N T D A T A Item ID Description 4-6 unit heaters (with fans) served by campus steam provide supplemental heat to the building. Overall Condition Poor Date Installed 1/1/1963 Remaining Useful Life Exceeded Nominal Useful Life: 30 Years Manufacturer Equipment mounted too high to see tags Size/Capacity Approximately 60,000 BTU each Recommendation Replace unit heaters and/or redesign building heating system. Replacement Cost $25,200 Comments Poor rating is due to age. Units are functional. Text6 U N I T H E A T E R S S U R V E Y P H O T O G R A P H S Typical unit heater Another unit heater Another unit heater PAGE 6
7 Text6 H V A C C O N T R O L S A S S E S S M E N T D A T A Description Overall Condition Date Installed Recommendation Item ID Pneumatic thermostats control steam perimeter radiation in Pavilion. Quincy/Pneumatech compressor system is in good condition. Controls for pavilion are basic and work poorly. Staff reports building will get very cold before steam comes on and then it will get very hot. Poor Early 90s Remaining Useful Life Exceeded Nominal Useful Life: 18 Years Replacement Cost $32,400 Recalibrate/redesign controls. Incorporate exhaust fans PAGE 7
8 Text6 H V A C C O N T R O L S S U R V E Y P H O T O G R A P H S Quincy compressor Pneumatic piping Compressor tag Thermostat PAGE 8
9 Text106 P L U M B I N G D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DOMESTIC HOT WATER SYSTEM PLUMBING FIXTURES SYSTEM SUB-SOIL DRAINAGE SYSTEM SYSTEM/COMPONENT Domestic Hot and Cold Water Plumbing Fixtures Storm and Subsoil Drainage PLUMBING TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 90,300 90,300 22,600 22,600 40,700 40, , , PAGE 9
10 Text6 D O M E S T I C H O T A N D C O L D W A T E R A S S E S S M E N T D A T A Description Overall Condition Date Installed 1/1/1914 Recommendation Item ID Piping appears original to building and is in very poor condition. Domestic hot water comes from 2 heat exchangers served by campus steam along with a small circulation pump (all installed around 1992, good condition). Poor Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Replacement Cost $90,300 Replace all domestic water piping. Text6 D O M E S T I C H O T A N D C O L D W A T E R S U R V E Y P H O T O G R A P H S Domestic hot water heating system Circulation pump PAGE 10
11 Text6 P L U M B I N G F I X T U R E S A S S E S S M E N T D A T A Item ID Description Most plumbing fixtures are old and in poor condition. Overall Condition Poor Date Installed 1/1/1963 Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Recommendation Renovate/expand bathrooms and replace plumbing fixtures. Replacement Cost $22,600 Comments Staff reports that bathroom facilities are insufficient PAGE 11
12 Text6 P L U M B I N G F I X T U R E S S U R V E Y P H O T O G R A P H S Broken toilet Janitor sink Urinals Sinks PAGE 12
13 Text6 S T O R M A N D S U B S O I L D R A I N A G E A S S E S S M E N T D A T A Item ID Description Building has no basement and no pumps. No other information available. No problems reported Overall Condition Poor Date Installed 1/1/1963 Remaining Useful Life Exceeded Nominal Useful Life: 50 Years Replacement Cost $40, PAGE 13
14 Text106 F I R E P R O T E C T I O N D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y FIRE ALARM SYSTEM SYSTEM/COMPONENT Fire Alarm System FIRE PROTECTION TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 85,000 85,000 85,000 85, PAGE 14
15 Text6 F I R E A L A R M S Y S T E M A S S E S S M E N T D A T A Item ID Description Fire alarm consist of pull stations connected to campus security office Overall Condition Poor Date Installed 1/1/1951 Remaining Useful Life Exceeded Nominal Useful Life: 20 Years Equipment Tag - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation Installation of new campus standard system. Replacement Cost $85,000 Critical Issues System is obsolete. Critical Repair Estimate $85, PAGE 15
16 Text6 F I R E A L A R M S Y S T E M S U R V E Y P H O T O G R A P H S Fire alarm pull station-north entry Fire Alarm pull station -south entry PAGE 16
17 Text106 E L E C T R I C A L D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y SUBSTATION LOW VOLTAGE SYSTEM INTERIOR LIGHTING EMERGENCY LIGHTING SYSTEM EXIT LIGHTING SYSTEM EXTERIOR LIGHTING SYSTEM SYSTEM/COMPONENT Transformer #1 Transformer #2 Low Voltage Distribution #1 Low Voltage Distribution #2 Interior Lighting Emergency Lighting System Exit Lighting System Exterior Lighting ELECTRICAL TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 16,100 16,100 23,500 23,500 46,600 46,600 52,000 52, , ,400 21,400 21,400 17,200 17,200 11,400 11, ,000 52,000 23, , PAGE 17
18 Text6 T R A N S F O R M E R # 1 A S S E S S M E N T D A T A Item ID Description Oil cooled transformer serving lighting loads Overall Condition Poor Date Installed 1/1/1951 Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Equipment Tag - Manufacturer Moloney Model Number - Serial Number - Size/Capacity 50KVA HP/kW - Voltage 4160/120/208 V Material - Recommendation Replace transformer. Size to meet new loads. Replacement Cost $16, PAGE 18
19 Text6 T R A N S F O R M E R # 1 S U R V E Y P H O T O G R A P H S Transformer # PAGE 19
20 Text6 T R A N S F O R M E R # 2 A S S E S S M E N T D A T A Item ID Description Oil cooled transformer for mechanical equipment load (exhaust fans and nonfunctional refrigeration equipment). Overall Condition Good Date Installed 1/1/1984 Remaining Useful Life 11 Years Nominal Useful Life: 40 Years Equipment Tag - Manufacturer Sorgel Model Number Serial Number - Size/Capacity 225KVA HP/kW - Voltage 4160/120/208 V Recommendation Replace entire distribution and equipment due to age Replacement Cost $23, PAGE 20
21 Text6 T R A N S F O R M E R # 2 S U R V E Y P H O T O G R A P H S Transformer data 225KVA transformer PAGE 21
22 Text6 L O W V O L T A G E D I S T R I B U T I O N # 1 A S S E S S M E N T D A T A Item ID Description Service originated from 50 KVA transformer includes 200 A main panelboard and (5) branch panelboards serving lighting. Overall Condition Poor Date Installed 1/1/1951 Remaining Useful Life Exceeded Nominal Useful Life: 40 Years Equipment Tag - Manufacturer The Trumbull Electric Model Number - Serial Number - Size/Capacity - HP/kW - Voltage 120/208 V Material - Recommendation Replace entire distribution #1 and combine with distribution #2 Replacement Cost $46, PAGE 22
23 Text6 L O W V O L T A G E D I S T R I B U T I O N # 1 S U R V E Y P H O T O G R A P H S Main panelboard Branch panelboard Panelboard tag Wiring in pump room PAGE 23
24 Text6 L O W V O L T A G E D I S T R I B U T I O N # 2 A S S E S S M E N T D A T A Item ID Description Service originated from 225 KVA transformer includes 600A main panelboard and (7) branch breakers serving mechanical equipment and lighting. Overall Condition Fair Date Installed 1/1/1984 Remaining Useful Life 10 Years Nominal Useful Life: 40 Years Equipment Tag - Manufacturer Square D Model Number - Serial Number - Size/Capacity - HP/kW - Voltage 120/208 V Material - Recommendation Replacement of entire distribution #1 and modify distribution #2 Replacement Cost $52, PAGE 24
25 Text6 L O W V O L T A G E D I S T R I B U T I O N # 2 S U R V E Y P H O T O G R A P H S Distribution Main panelboard Panelboard tag Disconnect switches for equipment PAGE 25
26 Text6 I N T E R I O R L I G H T I N G A S S E S S M E N T D A T A Item ID Description Illumination at arena includes (80) pendant incandescent fixtures with metal shade. Office and storages are illuminated with fluorescent fixtures with T-12 lamps. Overall Condition Poor Date Installed 1/1/1951 Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage 120 V Material - Recommendation Replace light fixtures with new more efficient fixtures. Replacement Cost $353, PAGE 26
27 Text6 I N T E R I O R L I G H T I N G S U R V E Y P H O T O G R A P H S Arena lighting Classroom lighting Arena fixture Washroom lighting PAGE 27
28 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Emergency lights were not visible during survey. Overall Condition Poor Date Installed - Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation Installation of new emergency lighting system and emergency distribution system Replacement Cost $21,400 Critical Issues Lack of emergency lighting Critical Repair Estimate $21, PAGE 28
29 Text6 E M E R G E N C Y L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Arena without emergency lighting PAGE 29
30 Text6 E X I T L I G H T I N G S Y S T E M A S S E S S M E N T D A T A Item ID Description Hand painted exit signs Overall Condition Poor Date Installed 1/1/1965 Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation Replacement with LED type signs with battery back-up Replacement Cost $17,200 Critical Issues Lack of illuminated exit signage PAGE 30
31 Text6 E X I T L I G H T I N G S Y S T E M S U R V E Y P H O T O G R A P H S Typical exit sign-pic 1 Typical exit sign-pic2 Typical exit sign pic PAGE 31
32 Text6 E X T E R I O R L I G H T I N G A S S E S S M E N T D A T A Item ID Description Ornamental incandescent sconce fixtures and bracket type incandescent light fixtures provide exterior illumination. Overall Condition Poor Date Installed 1/1/1983 Remaining Useful Life Exceeded Nominal Useful Life: 25 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage 120V Material - Recommendation Refurbish existing ornamental fixtures and replace all others fixtures. Replacement Cost $11, PAGE 32
33 Text6 E X T E R I O R L I G H T I N G S U R V E Y P H O T O G R A P H S Ornamental fixtures at North side Lighting above main entrance Site entry Site entry close up PAGE 33
34 Text106 C O M M U N I C A T I O N S D I S C I P L I N E R E P L A C E M E N T C O S T S U M M A R Y DATA SYSTEM SYSTEM/COMPONENT Communication Infrastructure System Voice/Data System COMMUNICATIONS TOTAL % OF TOTAL POOR (1-5 YEARS) E X P E C T E D R E M A I N I N G S E R V I C E L I F E FAIR GOOD (5-10 YEARS) (10-20 YEARS) EXCELLENT (20+ YEARS) TOTAL 158, , , , , , , PAGE 34
35 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M A S S E S S M E N T D A T A Item ID Description The building is fed with 12 strands of single mode fiber and 50 copper pairs with each pair grounded and individually protected by a fuse/surge arrestor. Fiber and copper originate from Node #5. The building panel mounted IDF is located in room 111 on the first level. Fiber distributes radially from the building IDF to hub room (telecommunication rooms) to within 100 meters of end-use equipment and lands at rack mounted fiber switch(es) within the hub room. There are one hub rooms located within the building in room at the time of survey, this room could not be accessed. Overall Condition Good Date Installed UIUC network upgrade complete (date range 2006 to 2012) Remaining Useful Life 20 Years Nominal Useful Life: 20 Years Replacement Cost $158,400 Text6 C O M M U N I C A T I O N I N F R A S T R U C T U R E S Y S T E M S U R V E Y P H O T O G R A P H S Building 40 IDF panel PAGE 35
36 Text6 V O I C E / D A T A S Y S T E M A S S E S S M E N T D A T A Item ID Description Voice/data outlets are installed at offices and at arena. Several Wi Fi antennas allows wireless connections Overall Condition Fair Date Installed 1/1/2000 Remaining Useful Life 10 Years Nominal Useful Life: 20 Years Equipment Tag - Manufacturer - Model Number - Serial Number - Size/Capacity - HP/kW - Voltage - Material - Recommendation - Replacement Cost $158,400 Comments MDF room was not accessible PAGE 36
37 Text6 V O I C E / D A T A S Y S T E M S U R V E Y P H O T O G R A P H S Voice /data -typical Cable tray with cat 6 cabling Voice/data outlet in office area Wi Fi antenna PAGE 37
38 Text6 L E G A C Y A S S E T D E S C R I P T I O N : S T O C K P A V I L I O N Stock Pavilion contains a balcony and ground floor. There is no separation between the balcony and ground floor. The building consists of mechanical and electrical rooms, building service storage, administrative offices, a research laboratory, an exhibition area, and a conference room. The Life Safety Code classifies the building as Mixed Occupancy (part Assembly and part Business). Stock Pavilion has a manual and automatic fire alarm system. Manual pull stations are located at most exits. There exists no automatic fire detection and no occupant notification. There exists no fire alarm control panel for the building. Stock Pavilion has no observable emergency lighting or emergency power systems. Stock Pavilion is a non-sprinklered building with no standpipe system. There exists no fire department connection. OCCUPANT LOAD/EXITING Ground Floor (LED): 2245 occupants; 4 exits required (7 exits provided); 449" exit door width required (585" provided); door and corridor widths are sufficient for occupants served PAGE 38
39 S T O C K P A V I L I O N L E G A C Y A S S E S S M E N T S U M M A R Y Item ID REQUIREMENT NUMBER INSPECTION DATE IDENTIFIED ISSUE LEGACY VALUE PERCENT COMPLETE GENERAL LEGACY ITEMS ITEMS REQ /8/2002 ADA: Lacking Detectable Warning Strips 21, ,700 21, REQ /8/2002 ADA Signage: Existing Signs are Not Braille 11, ,700 11,700 Type REQ /8/2002 Doors: Replace Non ADA Compliant Hardware 36, ,100 36, REQ /27/2006 Interior Walls: Paint 43, ,900 43, REQ /27/2006 Ceilings: Deteriorated Paint 39, ,600 39, REQ /27/2006 Skylights - Replace 94, ,600 94, REQ /27/2006 Flooring: Replace Worn VAT 34, ,000 34, REQ /8/2002 Sound System: Beyond Useful Life 12, ,100 12, REQ /27/2006 Efflorescence: Water Damage 38, ,600 38, REQ /27/2006 Roof: Copestone Repair 23, ,700 23, REQ /27/2002 Ceiling: Replace ACT 15, ,600 15, REQ /27/2006 Roof: Replacement 93, ,500 93, REQ /27/2005 Arrangement of Means of Egress: Aisle Handrails 72, ,700 72, REQ /27/2006 Equipment: Abandoned in Place 19, ,200 19,200 POOR FAIR CODE TOTAL GENERAL LEGACY ITEMS TOTALS 556, ,300 88, ,900 MEP LEGACY ITEMS ITEMS REQ /27/2006 Communications: Loose Wiring 4, ,700 4,700 Poor = VFA Priorities 1,2, and 3; Fair VFA Priority 4; and Code VFA Priority 5 MEP LEGACY ITEMS TOTALS 4, ,700 4,700 TOTALS 561, ,300 88,600 4, ,600 % OF LEGACY VALUE PAGE 39
40 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Stairs and hazardous vehicular areas are required to have a detectable warning surface per ADAAG and Requirement Category Requirement Name Condition Accessibility ADA: Lacking Detectable Warning Strips (Legacy) Fair Percent Complete 0.0 Recommendation ADAAG & 5 require a detectable warning strip at stairs and vehicular entrance areas. At stair landings install adhesive detectable strips. At sidewalks, saw cut reliefs per ADAAG At the top of each section of seating and at the bottom step. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 21, Estimated Remaining Cost: 21, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The signs, which designate permanent rooms and spaces, do not comply with requirements for raised or brailled characters, mounting locations or heights. See BOCA section under room identification and ADAAG section (7). Accessibility ADA Signage: Existing Signs are Not Braille Type (Legacy) Fair Percent Complete 0.0 Recommendation Add or replace room signs to comply with BOCA and ADAAG regulations. Each sign is approximately $75.00 x the number of rooms. Note: Type of sign selected for budgetary purposes only. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 11, Estimated Remaining Cost: 11, PAGE 40
41 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Interior doors generally have knob style hardware which should be replaced with lever type hardware in accordance with ADA Section Requirement Category Requirement Name Condition Accessibility Doors: Replace Non ADA Compliant Hardware (Legacy) Fair Percent Complete 0.0 Recommendation Replace hardware on Accessible Doors in compliance with ADAAG Section Door Hardware. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 36, Estimated Remaining Cost: 36, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition Most of the interior walls and doors need painting. Appearance Interior Walls: Paint (Legacy) Poor Percent Complete 0.0 Recommendation Scrape, prep and repaint surfaces, doors and trim. Estimated Cost 43, Estimated Remaining Cost: 43, Action Date 11/27/ PAGE 41
42 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition The painted surfaces appear old, are cracked or peeling paint. Appearance Ceilings: Deteriorated Paint (Legacy) Poor Percent Complete 0.0 Recommendation Remove existing paint by standard means as needed for proper adhearence of new paint being applied. Includes 2 finish coats by roller/spray application. Includes hand cut in of intersecting surfaces and/or trim. Estimated Cost 39, Estimated Remaining Cost: 39, Action Date 11/27/2009 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition Skylights appear to be original to structure which are beyond its rated life. Replacement is warranted. Beyond Useful Life Skylights - Replace (Legacy) Poor Percent Complete 0.0 Recommendation The skylihgts in the center of the arena are worn and appear to be original to the buildin. Repalcement is warranted. Estimated Cost 94, Estimated Remaining Cost: 94, Action Date 11/27/ PAGE 42
43 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition Telecommunication cables/wiring are loosely strung and supported by means not compliant with NEC Section It is also attached to electrical conduit in violation of the NFPA-70 NEC article b. Building Code Communications: Loose Wiring (Legacy) Critical Percent Complete 0.0 Recommendation Remove and reinstall loosely run and unsupported wire and cable. Estimated quantities are for budgetary purposes only. Estimated Cost 4, Estimated Remaining Cost: 4, Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition During our investigation we encountered a number of areas throughout the building that may contain asbestos floor tile. The flooring in many areas has exceeded its expected useful life and should be replaced. This flooring should be removed and replaced with UIUC approved floor covering (VCT). Many areas have broken and loose tile and should be abated immediately. Functionality Flooring: Replace Worn VAT (Legacy) Poor Percent Complete 0.0 Recommendation Replace flooring as indicated. Approximately $2 / square foot as provided by Operations and Maintenance. Areas include all of the office and bathroon sections on the north and south side of the arena. Estimated Cost 34, Estimated Remaining Cost: 34, Action Date 11/27/ PAGE 43
44 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 10/8/2002 Description Requirement Category Requirement Name Condition The existing sound system for public address during events is beyond the end of its life expectancy. A complete change out is recommended. Integrity Sound System: Beyond Useful Life (Legacy) Poor Percent Complete 0.0 Recommendation Replace existing sound system. Estimated quantities are for budgetary purposes only. A difficulty factor of 20% has been applied to represent typical costs associated with working in older buildings or confined areas, such as higher staging costs, additional demolition, addition physical and equipment resources and may not account for project specific items such as timing requirements, hidden conditions, and the organizing of multiple deficiencies corrections where issues other than costs are the prime considerations. Estimated Cost 12, Estimated Remaining Cost: 12, Action Date 10/8/2007 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition The walls in the upper balcony area on the south side are experiencing some efflorescence or water damage and should be repaired. The damage could be due to concealed deficiency conditions of either the roof or wall leak. See correction for locations. Integrity Efflorescence: Water Damage (Legacy) Poor Percent Complete 0.0 Recommendation Subsequent to, or in conjunction with, repair of source of damage, patch and seal the walls in in the upper balcont area. The walls may need to be coated with an epoxy product to seal out the water. Estimated Cost 38, Estimated Remaining Cost: 38, Action Date 11/27/ PAGE 44
45 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition The limestone copestone around the perimeter of the building roofline is in need of sealant at the joints. Coordinate this repair with possible repairs or cleaning of the copestone. Integrity Roof: Copestone Repair (Legacy) Poor Percent Complete 0.0 Recommendation Remove the existing sealant by scrapping and replace with new butyl type sealant. (include locations) Estimated Cost 23, Estimated Remaining Cost: 23, Action Date 11/27/2009 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2002 Description Requirement Category Requirement Name Condition The acoustical tile ceilings in the second floor administrative area are in poor condition. The condition has deteriorated to the point where replacement of tiles and existing grid is recommended. Integrity Ceiling: Replace ACT (Legacy) Poor Percent Complete 0.0 Recommendation Replace acoustical tile ceilings in their entirety. Estimated Cost 15, Estimated Remaining Cost: 15, Action Date 11/27/ PAGE 45
46 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition The rolled asphalt roof is aged and needing replacement. Integrity Roof: Replacement (Legacy) Poor Percent Complete 0.0 Recommendation Remove BUR to subroof support and replace with mopped BUR. Estimated Cost 93, Estimated Remaining Cost: 93, Action Date 11/27/2009 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2005 Description There exist aisle stairs with risers exceeding 7 inches that lack handrails. This is not compliant with NFPA 101 Section Requirement Category Requirement Name Condition Life Safety Arrangement of Means of Egress: Aisle Handrails (Legacy) Poor Percent Complete 0.0 Recommendation Install new handrails for each existing aisle stair: one along the centerline. Adjustment factor of 1.2 used to account for additional costs typically associated with retrofit work, and/or working with existing construction. Estimated Cost 72, Estimated Remaining Cost: 72, Action Date 11/27/ PAGE 46
47 Text6 L E G A C Y A S S E S S M E N T D A T A : R E Q Date Inspected 11/27/2006 Description Requirement Category Requirement Name Condition During the building survey there several pieces of equipment were observed abandoned in place. Equipment that is no longer operational and should be removed to make space for new systems and operations. Plant Adaptation Equipment: Abandoned in Place (Legacy) Fair Percent Complete 0.0 Recommendation Disconnect and remove equipment and materials abandoned in place in the building. This includes the cold box on the west end and the vacuum oven in room 108. Estimated Cost 19, Estimated Remaining Cost: 19, PAGE 47
ORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE
0002 1301 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.862 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 746,400 CLASSROOMS / LIBRARY BUILDING GROSS
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/15/2013 BUILDING SURVEY DATE
0807 3502 SOUTH FIRST STREET CHAMPAIGN, ILLINOIS SYSTEM CONDITION INDEX.771 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 347,400 LABORATORY BUILDING GROSS SQUARE FEET 16,986
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE
0134 614 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.528 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 495,100 LABORATORY BUILDING GROSS SQUARE
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/4/2013 BUILDING SURVEY DATE
0218 504 EAST ARMORY AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.764 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,714,300 OFFICE BUILDING GROSS SQUARE FEET
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/5/2013 BUILDING SURVEY DATE
0062 1105 WEST NEVADA STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.850 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,286,000 LABORATORY BUILDING GROSS SQUARE FEET
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/19/2013 BUILDING SURVEY DATE
0154 52 EAST GREGORY DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.646 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,203,500 OFFICE BUILDING GROSS SQUARE FEET
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE
0222 54 EAST GREGORY DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.722 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,473,300 DISTRIBUTION BUILDING GROSS SQUARE
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE
0358 1004 SOUTH FOURTH STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.508 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,281,700 CLASSROOMS / LIBRARY BUILDING GROSS
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/13/2013 BUILDING SURVEY DATE
0197 1102 SOUTH GOODWIN AVENUE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.644 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 11,554,400 LABORATORY BUILDING GROSS SQUARE
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/6/2013 BUILDING SURVEY DATE
0133 608 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.516 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 646,900 PARKING STRUCTURE BUILDING GROSS
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/6/2013 BUILDING SURVEY DATE
0004 1103 SOUTH SIXTH STREET CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.810 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,831,000 CLASSROOMS / LIBRARY BUILDING GROSS
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/18/2013 BUILDING SURVEY DATE
0238 URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.183 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 1,237,600 OFFICE BUILDING GROSS SQUARE FEET 18,054 NUMBER OF BUILDING
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 02/08/2013 BUILDING SURVEY DATE
0171 1503 SOUTH MARYLAND DRIVE URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.770 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 2,686,100 LABORATORY BUILDING GROSS SQUARE
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 6/3/2013 BUILDING SURVEY DATE
0006 505 EAST AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.492 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 10,114,300 BUILDING GROSS SQUARE FEET 260,748 NUMBER
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/17/2013 BUILDING SURVEY DATE
0039 1114 WEST NEVADA STREET URBANA, ILLINOIS 61801 SYSTEM CONDITION INDEX.766 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 9,578,600 CLASSROOMS / LIBRARY BUILDING GROSS
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/10/2013 BUILDING SURVEY DATE
0110 23 EAST STADIUM DRIVE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.838 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 3,161,900 LABORATORY BUILDING GROSS SQUARE FEET
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 4/19/2013 BUILDING SURVEY DATE
0220 500 EAST PEABODY DRIVE CHAMPIAGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.364 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 4,262,400 MUSEUM BUILDING GROSS SQUARE FEET
More informationORIGINAL YEAR OF CONSTRUCTION NUMBER OF BUILDING STORIES 2/4/2013 BUILDING SURVEY DATE
0156 504 EAST PENNSYLVANIA AVENUE CHAMPAIGN, ILLINOIS 61820 SYSTEM CONDITION INDEX.461 PRIMARY BUILDING USE BUILDING SURVEY TEAM BUILDING SYSTEM REPLACEMENT COST $ 16,618,500 CLASSROOMS / LIBRARY BUILDING
More informationListing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School
Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
More informationSubject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)
HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal
More informationBob Mathis Elementary
DeKalb County School District/Elementary Schools Bob Mathis Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More informationPleasantdale Elementary
DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School
More informationSagamore Hills Elementary
DeKalb County School District/Elementary Schools Sagamore Hills Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School
More informationNC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017
NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus
More informationAnson County Early College High
NC School District/040 Anson County/High School Anson County Early College High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary
More informationWashingtonville Central School District Building Condition Survey Five Year Plan
Building Condition Survey Five Year Plan Project Cost Summary Building 2011 2012 2013 2014 2015 Totals 0001 Washingtonville Jr High School $38,759 $325,990 $1,882,653 $1,417,341 $1,025,559 $4,690,302 0002
More informationDavie County Early College High
NC School District/300 Davie County/High School Davie County Early College High Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary
More informationTABLE OF CONTENTS - ADDENDUM NO. 3
TABLE OF CONTENTS - ADDENDUM NO. 3 TABLE OF CONTENTS Addendum No. 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS SIB-1 SIB-2 SIB-3 Article I-2.4 - Contract Completion Time Article I-14.4 - Participation by SBE
More informationEducational & Performing Arts Center: Downriver Campus
Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed
More informationNC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017
NC School District/430 Harnett County/Elementary School Gentry Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus
More informationAnderson Creek Primary
NC School District/430 Harnett County/Elementary School Anderson Creek Primary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary
More informationNC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017
NC School District/430 Harnett County/Middle School Highland Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus Dashboard
More informationMountain Heritage High
NC School District/995 Yancey County/High School Mountain Heritage High Final Campus Assessment Report March 12, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 7 Campus
More informationReference: The Bel-Harbour Condominium Association Reserve Study Update Kipcon Great Lakes Project No CRU
August 18, 2016 Mr. Nicholas Burbulis 420 W. Belmont Ave. Chicago, IL 60657 Reference: The Kipcon Great Lakes Dear Mr. Burbulis: Attached, please find Kipcon Great Lakes, which has been prepared for the.
More informationOur Focus: Your Future
Town of Fort Erie Infrastructure Services Our Focus: Your Future Prepared for Council-in-Committee Report No. IS-53-07 Agenda Date November 19, 2007 File No. 220102 Subject 5 YEAR FACILITY CONDITION STATUS
More informationBacklog Reduction Plan
2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future
More informationDeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016
DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary
More informationHayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future
Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15
More informationWilliam Bradley Bryant Center
DeKalb County School District/Education Other William Bradley Bryant Center Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School
More informationWhat did they tell me?
LBS Insurance Commission Oct 25, 2018 What did they tell me? Handouts from the October 25, 2018 Insurance Town Hall C R. Reynolds 1 High Level Recap of Changes for 2018-19 Deductible $5,000 -> $25,000
More informationBuilding Division Fees 2018
Building Division Fees 2018 Permit Administration A permit administration fee of $45.00 shall be assessed for each permit. Staff Consultation Fee $75.00 Administration Determination $90.00 / hour; $23.00
More informationUrban Heights Condominium
Condominium Capital 2011 2010, AssociationAnalysis, LLC Condominium Prepared For: Table of Contents Condominium Association, Inc. 1642 Maxwell Road Atlanta, GA 30012 October 19, 2010 INTRODUCTION INTRODUCTION
More informationHarnett Central High
NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus
More informationCity School District of Albany Five Year Facilities Plan 3/14/2019
Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255
More informationRobert Shaw Theme Elementary
DeKalb County School District/Elementary Schools Robert Shaw Theme Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School
More informationYakima County Code ~ Building and Construction ~ Title FEES
13.24.010 AMENDED FEE TABLES AND FEE SCHEDULES The fee tables and fee schedules contained in the various codes and regulations adopted in this title shall be amended as established herein. *PLAN REVIEW
More informationPinebrook Elementary
NC School District/300 Davie County/Elementary School Pinebrook Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus
More informationDeKalb Elementary School of the Arts at Terry Mills
DeKalb County School District/Elementary Schools DeKalb Elementary School of the Arts at Terry Mills Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School
More informationHowsyth Court Condominium Corporation No. CCN Avenue SW Calgary, Alberta
Entuitive Corporation Calgary + Toronto Howsyth Court Condominium Corporation No. CCN9011190 305 25 Avenue SW Calgary, Alberta Submitted By: Entuitive Corporation 209 8 th Avenue SW, Suite 300 Calgary,
More informationMartin Luther King Jr. High
DeKalb County School District/High Schools Martin Luther King Jr. High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More informationStone Mountain Middle
DeKalb County School District/Middle Schools Stone Mountain Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More informationDeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016
DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More information1. The fee for plan review shall be due upon completion of subcode review.
New Jersey State permit surcharge fees: Amount: This fee shall be in the amount of $0.00334 per cubic foot volume of new buildings and additions. Volume shall be computed in accordance with N.J.A.C. 5:232.28.
More informationCentral Davie Academy
NC School District/300 Davie County/High School Central Davie Academy Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus
More informationLilesville Elementary
NC School District/040 Anson County/Elementary School Lilesville Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus
More informationREPLACEMENT RESERVE GUIDE
CANADA MORTGAGE AND HOUSING CORPORATION REPLACEMENT RESERVE GUIDE What is the Replacement Reserve? The replacement reserve is a fund kept by each housing sponsor under the terms of its operating agreement
More informationHome Buyer Pre Lending Package
Home Buyer Pre Lending Package Congratulations on the decision to buy a new home! The most important step in the home buying process is first obtaining a Mortgage Pre-Approval, and to understand the home
More informationCITY OF EL SEGUNDO SCHEDULE B-1 BUILDING & SAFETY FEE SCHEDULE BUILDING PERMIT FEES PROPOSED
CITY OF EL SEGUNDO SCHEDULE B-1 BUILDING PERMIT FEES SERVICE PROPOSED FEE RESIDENTIAL BUILDING PERMITS Building Permit Under $500 Valuation $18.00 Building Permit $501-$2,000 Valuation $18 + $2.40 for
More informationTOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS
TOWNSHIP OF FRANKLIN O-6-18 ORDINANCE AMENDING CHAPTER 190-2 OF THE CODE OF THE TOWNSHIP OF FRANKLIN- CONSTRUCTION PERMITS WHEREAS, it is the desire of the Township Committee of the Township of Franklin,
More informationSocial Housing Administration Directive No
Regional Municipality of Halton Social Housing Administration Directive No. 06-05 Date: August 30, 06 To: Federally-Funded Social Housing Providers subject to Operating Agreements under Section 95 of the
More informationLafayette Elementary
NC School District/430 Harnett County/Elementary School Lafayette Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5
More informationWilliam Ellis Middle
NC School District/300 Davie County/Middle School William Ellis Middle Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus
More informationBurlington Area School District Community Survey Results. Winter 2016
Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each
More informationLaurel Hill Elementary
NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary
More informationBUILDING PERMIT FEES
BUILDING PERMIT FEES 1. Building Permit Fee Based on the Construction Valuation of the project excluding site work. Refer to Fee Charts below. Electrical, Mechanical and Plumbing permits are not included
More informationQuestions by Vendors: District Answers are in Red. Vendor Questions are in Black.
Questions by Vendors: District Answers are in Red. Vendor Questions are in Black. 1. Can we receive a final Excel Sheet of all Facilities that includes physical addresses, square foot info and original
More informationHarnett Central Middle
NC School District/430 Harnett County/Middle School Harnett Central Middle Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus
More informationReserve Analysis Report
Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895
More informationRonald E. McNair Discovery Learning Academy
DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive
More informationWestmount Place Renovations Policy
Conditions Precedent to the Implementation of Renovations 1. Condominium Bylaws and Regulations No renovations or modifications shall be implemented without authorization of the Board of Directors. All
More informationProperty Assessed Clean Energy Programs and How PACE Can Benefit Your Community
Property Assessed Clean Energy Programs and How PACE Can Benefit Your Community WHAT IS PACE? Property Assessed Clean Energy (PACE) is a financing mechanism that enables low-cost, long-term funding for
More informationFacility Condition Assessment. Facility Condition Assessment 8/13/2013 AGENDA
AGENDA benefits & limitations Rod Moore, RA, LEED AP, PMP Georgia Tech Benjamin Dutton, FFB, MCIOB, MRICS Faithful+Gould GT Facilities GT Program What is GT FCA Deliverables How GT uses FCA Information
More informationProperty Assessment Form Property Data. Servicer and Loan Data
Property Data Property Name: Holmead Apartments Property Address: 3435 Holmead Place NW Change from previously reported City: Washington State: DC Zip: 20010 # Units: 101 # Buildings: 1 Year Built: 1951
More informationAPPRAISAL_PLUS_CRAW_ PDF. Date 2/21/2017 INSURED
1 APPRAISAL_PLUS_CRAW_022117092958.PDF Appraisal Plus Report PACIFIC SPECIALTY menlo park, CA 94025 ATTN: Brenda Riley Date 2/21/2017 FILE I.D. Client File 3110027 Loss 2/7/2017 Our File 6557-2979109 Assigned
More informationWASHINGTON BROWN DEPRECIATION PTY LTD
Wednesday, 4 July 2007 The Owners - Strata Plan Number C/- Strata Management Company Address PROPERTY ADDRESS SINKING FUND FORECAST REPORT For the attention of: Strata Manager Dear Strata Manager, In accordance
More informationBody Corporate ten year maintenance plan example for South Africa
Body Corporate ten year maintenance plan example for South Africa Prepared by: Date: This plan covers the period of ten years from.. Building details & report inputs Supplied information Building name
More informationProtecting your older home
Protecting your older home HOMEOWNERS INSURANCE Helping you protect your biggest investment: your home At Travelers, we care about our homeowners. We want you to get the most out of the older home you
More informationUpdate With Site Visit
Update With Site Visit Le Chateau Bellevue, WA 10/28/2011 Report #1002 Phone: 253-241-8151 Fax: 360-872-8073 E-mail: jeremy@reservesolutions.net www.reservesolutions.net Le Chateau Client Info: REPORT
More informationBUILDING SUBCODE FEES:
Building Sub-code PERMIT FEES TOWNSHIP OF PENNSVILLE 2011 (A 4-2011) 1. Plan review shall be 20% of the amount to be charged for a construction permit. a. The fee for plan review for elevator devices in
More informationCH-UH Board of Education Meeting. June 27, 2017
CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle
More informationReserve Fund Study My Condominium Plan
Reserve Fund Study My Condominium Plan 12 3456 Number of Units 36 Number of Buildings 1 Building Construction 21 Contact Ima Happy Position(s) President Contact Phone 43.555.4321 Report Date August 8,
More informationWarranty Information
Warranty Information Home warranty extension Page 2 SMART Home Protection Plan Page 2 90 Day Warranty Page 3 SewerGard Warranty Page 5 MoldSafe Warranty Page 7 Radon Warranty Page 9 5 Year Platinum Roof
More informationBuilding Permit Fees
Permit Center 210 Lottie Street, Bellingham, WA 98225 Phone: (360) 778-8300 Fax: (360) 778-8301 TTY: (360) 778-8382 Email: permits@cob.org Web: www.cob.org/permits Building Permit Fees This handout includes
More informationProperty Inspection Guidelines
Property Inspection Guidelines www.tridentinsurance.net Lines of Business: Property, General Liability, Worker s Compensation, Public Official Liability Risk Control Strategy/Key Issues: Provide a tool
More informationDEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5
DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report
More informationHome Buyer Pre Lending Package
Click to view homes! Carrie Woodruff Keller Williams 734.255.3188 carielw@sbcglobal.net Home Buyer Pre Lending Package Congratulations on the decision to buy a new home! The most important step in the
More informationAll electrical, gas and plumbing applications, together with the fee amount, must be mailed or delivered to:
Application for Permit to Perform Electrical Work Massachusetts Uniform Application for a Permit to do Gas Fitting Massachusetts Uniform Application for a Permit to Perform Plumbing Work Applications and
More informationBoard of Trustees Proposition Summary Table of Contents
Table of Contents Table of Contents... ii 1 Facilities Condition Assessment... 2 1.1 Priority One... 2 1.2 Priority Two... 5 1.3 Priority Three... 7 1.4 Priority Four... 9 2 Major Projects... 10 2.1 Facility
More informationFee Schedule for 2017
EXHIBIT A Fee Schedule for GENERAL CITY ADMINISTRATIVE FEES Business Licenses Neighborhood Business License Neighborhood Business License - Initial Application Neighborhood Business License - Annual Renewal
More informationTO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM
104 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM AND APPROVAL OF EXTERNAL FINANCING
More informationATTIC FAN - DECEMBER 1995
400 Ashley Court Glen Mills, PA 19342 Phone: 610-459-0510 Fax: 610-459-5317 ATTIC FAN - DECEMBER 1995 WHEREAS, the Declaration of Condominium for Darlington Woods Condominium restricts alterations of any
More informationMocksville Elementary
NC School District/300 Davie County/Elementary School Mocksville Elementary Final Campus Assessment Report March 10, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 5 Campus
More informationADDENDUM #1 RFQ M1201M. 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications.
ADDENDUM #1 RFQ M1201M 06/07/13 Please replace Chiller Maintenance Specifications with the attached Chiller Maintenance Specifications. Please replace M1201M Pricing Proposal with the attached M1201M Pricing
More informationFinal Report. Capital Plan Building Condition and Energy Assessments Khyber Building 1588 Barrington Street Halifax, Nova Scotia
Capital Management Engineering Limited EMPOWERING OUR CLIENTS WITH KNOWLEDGE 5531 Cornwallis Street, Halifax, NS, Canada B3K 1B3 Phone: 902 429 4412 Fax: 902 423 4945 Final Report Capital Plan Building
More informationST. LOUIS COUNTY REVISED ORDINANCES (SLCRO) TITLE XI PUBLIC WORKS AND BUILDING REGULATIONS CHAPTER 1100 CODE ENFORCEMENT FEE SCHEDULES
PERMIT AND INSPECTION FEES NOTICE This is an unofficial user friendly copy of Chapter 1100, Title XI SLCRO 1974, as amended Code Enforcement Fee Schedules, as adopted and amended by St. Louis County Ordinances
More informationTHE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER
THE CLARIDGE OF POMPANO CONDOMINIUM, INC. ARCHITECTURAL REVIEW COMMITTEE REQUEST FOR MODIFICATION PART A - COMPLETED BY OWNER I, of UNIT # request approval by the Architectural Review Committee for the
More informationDeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016
DeKalb County School District/Middle Schools Chapel Hill Middle Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 3 School Condition
More informationRESERVESTUDYUPDATE. The Villas at Blackberry Run Dallas, GA. Prepared for:
RESERVESTUDYUPDATE Dallas, GA Prepared for: THE VILLAS AT BLACKBERRY RUN HOME OWNERS ASSOCIATION, INC. Carl Swanson-President Prepared by: CRITERIUM-CARUSO ENGINEERS 1065 POWERS PLACE, SUITE B ALPHARETTA,
More informationComprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149
Comprehensive Reserve Fund Study and Building Condition Assessment for Wellington Standard Condominium Corporation No. 149 820 Gartshore Street Fergus, Ontario Report Prepared for the Board of Directors
More informationNJR Home Services General Terms and Conditions Residential Interior Electrical Service Contract
NJR Home Services General Terms and Conditions Residential Interior Electrical Service Contract This is your official agreement with NJR Home Services (NJRHS) and provides a detailed description of the
More information