Ad Hoc Working Group on the Paris Agreement
|
|
- Amy Matthews
- 5 years ago
- Views:
Transcription
1 14 Nvember 2016 Ad Hc Wrking Grup n the Paris Agreement Secnd part f the first sessin, Marrakech, 7-14 Nvember 2016 Agenda item 6: Matters relating t the glbal stcktake referred t in Article 14 f the Paris Agreement: a) Identificatin f the surces f input fr the glbal stcktake b) Develpment f the mdalities f the glbal stcktake Infrmal nte by the c-facilitatrs Nte: This nte is ur attempt t infrmally summarise the views expressed by Parties n this agenda item in their submissins fr this sessin and discussins during the first six meetings f the infrmal cnsultatins. The nte has been prepared under ur wn respnsibility and thus has n frmal status. It is nt intended t prejudge further wrk that Parties may want t undertake nr des it in any way prevent Parties frm expressing ther views they may have in future. Overview f the infrmal cnsultatins By 14 Nvember 2016 at 11 am, Parties have had six infrmal cnsultatins n this item in Marrakech. During these meetings, Parties prvided general views n this agenda item, as well as specific views n identificatin f surces f input fr and develpment f mdalities n the glbal stcktake. At these meetings, the c-facilitatrs, n their respnsibility prepared and presented tw dcuments which have been further revised based n cmments frm Parties and are bth annexed t this nte. The infrmal cnsultatins devted time t discuss pssible further wrk n this item, with Parties prviding a range f views including n technical wrk (in-sessin technical wrkshp and/r technical paper by the secretariat) and a pssible call fr fcused submissins based n guiding questins. The c-facilitatrs have prepared guiding questins, which will be presented t Parties at the last meeting n this item scheduled fr 12 13pm tday (14 Nvember 2016). An initial versin f this infrmal nte was made available, infrmed by interventins made and submissins frm Parties. Parties had the time t discuss its cntent during infrmal cnsultatins meetings, and based n thse cnversatins this revised nte has been made available t them. Reflectins f the C-Facilitatrs n the discussins in the infrmal cnsultatins: Appraches t cnduct the wrk: during the infrmal cnsultatins, Parties identified several starting pints and appraches that culd be used fr cnducting the wrk under this agenda item, including: Start by identifying pssible additinal surces f input t thse already identified in the Paris Outcme (e.g., decisin 1/CP.21, paragraph 99). Cntinue with the develpment f the mdalities f GST, bearing in mind the elements f the mdalities mentined in the relevant prvisins f Paris Outcmes. Finally, identify the utputs f the GST that will lead t the utcme f the GST stated in the Paris Agreement; Start frm clarifying the utcme f the GST, which will shed light n the mdalities f the GST and the surces f input needed in rder t fulfil that utcme, s that GST is fit-fr-purpse; Discuss and clarify cnceptual issues befre fcusing n identificatin f surces f input and develpment f mdalities. Examples f such issues include: a cmmn understanding f cllective prgress and its cntext, ways t enhance cllective prgress by enhancing internatinal cperatin as well as by prmting best practises, and the ptential infrmatin that the GST might deliver. T facilitate these discussins, we prepared the flw diagram cntained in annex I t this nte, which includes sme guiding questins n pssible issues fr further cnsideratin relating t surces f inputs, mdalities and utcme f the GST. In a first versin f the diagram a distinctin was made between surces f input and the infrmatin that needs t be extracted frm thse surces as well as between 1
2 14 Nvember 2016 the utputs f the GST 1 and its utcme stated in Article 14.3 f the Paris Agreement (bx 1). The the diagram was revised, based n the views prvided by Parties, and uses at his stage nly the elements mentined in the Paris Outcmes. The guiding questins were als reviewed t reflect the discussins during the infrmal cnsultatins. Bx 1: Article 14 f the Paris Agreement 1. The Cnference f the Parties serving as the meeting f the Parties t the Paris Agreement shall peridically take stck f the implementatin f the Paris Agreement t assess the cllective prgress twards achieving the purpse f the Agreement and its lng term gals (referred t as the glbal stcktake ). It shall d s in a cmprehensive and facilitative manner, cnsidering mitigatin, adaptatin and the means f implementatin and supprt, and in the light f equity and the best available science. 2. The Cnference f the Parties serving as the meeting f the Parties t the Paris Agreement shall undertake its first glbal stcktake in 2023 and every five years thereafter unless therwise decided by the Cnference f the Parties serving as the meeting f the Parties t the Paris Agreement. 3. The utcme f the glbal stcktake shall infrm Parties in updating and enhancing, in a natinally determined manner, their actins and supprt in accrdance with the relevant prvisins f the Paris Agreement, as well as in enhancing internatinal cperatin fr climate actin. Sme Parties were f the view that the views presented culd be gruped under the fllwing categries: linkages and cntext, surces f input, mdalities and utcme. Others have seen all views gruped under surces f inputs and mdalities, in line with the mandate frm the COP fr this agenda item. In this nte fur categries are used withut prejudging hw Parties will like t structure their future wrk under this agenda item. Linkages: the discussins at the infrmal cnsultatins stressed the crss-cutting nature f the GST. While the main prvisins f the Paris Agreement n the glbal stcktake (GST) are cntained in Article 14 (bx 1 belw), there are many ther articles f the Agreement and paragraphs f decisin 1/CP.21 that referred directly t the GST r are indirectly linked t it. T facilitate the discussin n the direct and indirect linkages, which may be relevant fr the identificatin f inputs and develpment f the mdalities f the GST, we develped the diagram cntained in annex II t this nte. Sme Parties were f the view that indirect links t the GST shuld nt be included in the diagram. Therefre, the diagram was revised and such links are written in italics fnts. Nte that sme Parties prvided views in their submissins n these interlinkages. Anther categry f linkages discussed relates t the hw nging wrk under the APA and SBs culd affect the surces f input and the mdalities f GST. Fr example, sme Parties have seen interlinkages with the wrk f APA under agenda items 3 (NDCs), item 4 (Adaptatin cmmunicatins) and item 5 (Transparency) and item 7 (Cmpliance) and with the FD As regards the cntext fr the GST, sme Parties were f the view that Article 14 prvides all the cntext needed fr cnducting the GST (i.e., cmprehensive and facilitative manner, cnsidering mitigatin, adaptatin and the means f implementatin and supprt, and in the light f equity and the best available science). Others were f the view that the linkages with ther articles prvide additinal cntext (e.g., Article 2). Yet, anther grup f Parties suggested it is imprtant t understand that this cntext includes ther aspects such as the principles f the Cnventin. 1 The submissins made by Parties fr this sessin cntain many suggestins n pssible utputs f the GST. See FCCC/APA/2016/INF.4, Add.1, Add.2 and the submissins by Indnesia and Demcratic Republic f Cng n behalf f the LDCs and Mali n behalf f the AGN n this matter available n the submissin prtal at < 2 Details n this matter are presented in table 1, under Mdalities. 2
3 14 Nvember 2016 Althugh Parties identified sme pssible surces f input beynd thse already identified in decisin 1/CP.21, paragraph 99, they did nt discuss them in details. Many Parties were f the view that an initial nn-exhaustive list f surces f input shuld be cnsidered, with the understanding that this list culd be cmpleted prir t each GST, bearing in mind the need t maintain a manageable prcess. Many Parties emphasized the need t maintain a balance between IPCC and nn-ipcc inputs. Sme Parties prvided suggestins fr generic as well as specific surces f input (mitigatin, adaptatin and means f implementatin and supprt) and the need t identify surces f input that wuld allw fr the assessment f prgress in the light f equity. As regards the mdalities f the GST, discussins fcused n main elements such as the nature f the GST (a prcess with phases and wrkstreams), its duratin and timelines, ptential institutinal arrangements fr assisting the CMA with cnducting the GST, linkages with ther prcesses and nging wrk and the aim, frmat and characteristics f utputs. Several Parties were f the view that it is t early t discuss such details. The utcme f the GST, were discussed at sme level f detail. Mst f the views expressed referred t clarifying expectatins fr the utcme f GST. Table 1 belw grups and summarizes the main views presented by Parties under the fllwing categries: linkages and cntext, surces f input, mdalities and utcme. Under each categry, the presentatin f these views is nt in any rder f imprtance nr des nt imply any cnsensus amngst Parties n the them. 3 Nte that in the table we have nt attempted t distinguish between elements already agreed in Paris and thse prpsed by Parties. Table 1: Summary f views expressed by Parties (submissins and views at infrmal cnsultatins) Linkages and cntext (sme Parties have seen this as separate categry while ther cnsider this as part f mdalities): On the principles that shuld guide the GST, Parties restated sme f thse agreed in Paris and prpsed additinal nes: Party-driven, natinally determined, cmprehensive, facilitative; build trust, be transparent; in light f best available science and equity and CBDR-RC; histrical respnsibility and carbn budget sharing; timely; balanced, tailred and hlistic manner; cmmunicate clear and accurate picture f cllective prgress; actin-riented; wnership; sustainable develpment; eradicate pverty; climate justice; GST as part f the ambitin mechanism; PA Articles 2 and 3; psitive infrmatin, mtivatin, mutual encuragement, learning by ding, principles f the Cnventin, general understanding f cllective prgress and its cntext. On interlinkages, tw aspects were discussed: Clarify any interlinkages between surces f input, mdalities and utcmes als t (e.g., APA agenda items 3 (NDCs), item 4 (Adaptatin cmmunicatins) and item 5 (Transparency) and item 7 (Cmpliance) and the FD2018) Links t ther Paris Agreement articles/prvisins including Article 2. Surces f inputs Decisin 1/CP Requests the Ad Hc Wrking Grup n the Paris Agreement t identify the surces f input fr the glbal stcktake referred t in Article 14 f the Paris Agreement and t reprt t the Cnference f the Parties, with a view t the Cnference f the Parties making a recmmendatin t the Cnference f the Parties serving as the meeting f the Parties t the Paris Agreement fr cnsideratin and adptin f at its first sessin, including, but nt limited t: (a) Infrmatin n: 3 Given that this table cntains a summary f the main views expressed is nt a cmplete reflectin f all Parties' view n GST. Further details are available in the submissins made fr this sessin. 3
4 14 Nvember 2016 (i) The verall effect f the natinally determined cntributins cmmunicated by Parties; (ii) The state f adaptatin effrts, supprt, experiences and pririties frm the cmmunicatins referred t in Article 7, paragraphs 10 and 11, f the Paris Agreement, and reprts referred t in Article 13, paragraph 8, f the Paris Agreement; (iii) The mbilizatin and prvisin f supprt; (b)the latest reprts f the Intergvernmental Panel n Climate Change (c) Reprts f the subsidiary bdies; The apprach fr identifying surces f inputs: Build an initial nn-exhaustive list t be cmpleted prir t each GST by: Parties/c-facilitatrs f technical expert grups/secretariat, bearing in mind the need t maintain a manageable prcess; Be cmprehensive and balance inputs between mitigatin, adaptatin and means f implementatin and supprt Selectin f surces f inputs shuld be demands/questin riented (what then where is needed) Priritize fficial inputs frm Parties and allw fr input frm nn-state actrs (NSA) Balance between IPCC and nn-ipcc Need t identify surces f input that wuld allw fr the assessment f prgress in the light f equity (e.g. equity framewrk with indicatrs and indexes previusly submitted, thers); Pssible generic/verarching surces f input Infrmatin frm enhanced transparency framewrk Infrmatin frm NatCms, BURs/BRs; NIRs; ICA reprts; IAR reprts) Synthesis reprt n infrmatin frm the transparency framewrk, the technical expert review and the cmpliance cmmittee Submissins frm Parties and nn-party stakehlders prir t each GST Secretariat SYR n verall effect f NDCs: backwards and/r frward lking Latest reprts (ARs and SRs) f the IPCC Submissins frm Parties and nn-party stakehlders Reprt f the next peridic review Relevant reprts frm ther UN agencies, multilateral dev. rgs and reginal agencies Infrmatin n ptential slutins (reprts f TEMs) Reprts f the subsidiary bdies NDCs Surce f input that identify barriers t implementatin, Surces f input that identify pre-2020 gaps, Surces f input that capture impact f actin, Surces f input that capture gaps between actin & supprt Infrmatin n impacts f actins Pssible specific surces f inputs fr: Adaptatin Infrmatin n verall effect f NDCs (relevant part f the synthesis reprt n NDCs) Infrmatin n state f adaptatin needs and plans, effrts, supprt, experiences and pririties frm Adaptatin Cmmunicatins and transparency framewrk reprts n impacts and adaptatin Relevant sectins f the synthesis reprt n infrmatin frm enhanced transparency framewrk Synthesis reprt n adaptatin cmmunicatins Output f the wrk f Parties using the mdalities f the recgnizing adaptatin effrts (develped by AC and LEG) Reprt f the AC, LEG, NWP, LDCF, WIM Barriers t implementatin & supprt Mitigatin Relevant natinal infrmatin frm the enhanced transparency framewrk and a synthesis reprt by the secretariat n the reprting under the enhanced transparency framewrk, including 4
5 14 Nvember 2016 technical review and multilateral cnsideratin and summaries f GHG emissins and emissin trends, (aggregate impact and state f implementatin f NDCs) Infrmatin t shwcase f mitigatin actins and prgrammes Infrmatin n challenges and barriers Infrmatin n recurses requirements Infrmatin n gaps in terms f finance, technlgy and capacity fr supprting mitigatin actin Synthesis reprt by the secretariat t estimate the aggregate effect/adequacy f NDCs (anticipated effect f NDCs that have been cmmunicated fr subsequent perids) Infrmatin in the cntext f lng-term lw greenhuse gas emissins develpment strategies Inputs fr identifying ptential and cncrete ptins fr increased climate actin fr achieving the level f cllective mitigatin effrt required Mdalities: Means f implementatin and supprt Infrmatin n mbilizatin and prvisin f supprt Relevant sectins f the synthesis reprt n infrmatin frm enhanced transparency framewrk Infrmatin n needs f supprt and gaps Reprts f perating entities f the FM, SCF, AF, AC, WIM ExCm, TEC/CTCN, PCCB, as well as biennial cmmunicatins by develped cuntries n indicative quantitative and qualitative financial infrmatin and cmmunicatins, reprts, NDCs by develping cuntries n financial, technlgy and capacity building needs Infrmatin n cllective pace f transfrmatin in technlgy, investment in lw carbn develpment, cnsumptin behaviur, institutin and plicy; Infrmatin n best practices, experiences and lessns learned; Infrmatin n ptential barriers t implementatin and the way t vercme them; Infrmatin n pprtunities n internatinal cperatin, in particular climate finance and technlgy innvatin Reprt f the GCF n financial prvisins Available infrmatin n effrts related t financial supprt prvided by develped t develping cuntries Infrmatin frm internatinal financial institutins n climate prfing and climate resilience measures Surces f input that capture linkages and gaps between actin & supprt Decisin 1/CP Further requests the Ad Hc Wrking Grup n the Paris Agreement t develp mdalities fr the glbal stcktake referred t in Article 14 f the Agreement and t reprt t the Cnference f the Parties, with a view t the Cnference f the Parties making a recmmendatin t the Cnference f the Parties serving as the meeting f the Parties t the Paris Agreement fr cnsideratin and adptin at its first sessin; The apprach fr develping mdalities: Mdality shuld nt nly cllect facts (as a fact-based exercise) but shuld als be psitive, build trust and psitive mtivatin. It shuld als identify pprtunity fr enhanced internatinal cperatin and fr Parties t encurage ne anther Pssible elements f mdalities: A prcess: Simple and practical, Infrmed by existing experiences under the Cnventin and frm the technical prcess fr raising mitigatin ambitin befre 2020 and lessns learned frm the review Ensures balance between adaptatin, mitigatin and means f implementatin and supprt (cnsidered in cntext and in parallel) and linkages between actin and supprt Capable f learning frm previus GSTs and building trust Cnsiders different rles and differentiated respnsibilities between develped and develping cuntries Parties Organizatin f the prcess 5
6 14 Nvember 2016 Cnducted by the CMA but wh else (e.g. fr technical tasks SBs/independent bdy/thematic institutins under the UNFCCC) Ensures full participatin f Parties, especially f develping cuntries Ensures invlvement f ther stakehlders (at what stage and in what capacity) Number f wrkstreams and linkages between thematic areas Link between surces f input and utputs Duratin f the prcess All inputs t be in by June/mid-year sessin f the year f the GST Prcess lasting fr at least ne year and culminating at the relevant CMA Shuld depend n the timeframe f infrmatin gathering and implementatin prcess Timelines and sequencing, Aligning IPCC and GST cycles (link t availability f IPCC ARs (maximum 2.5 years)) On the structure f the prcess several Parties specifically mentined that it was t early t discuss this issue as these culd be defined after clarifying utcmes, discussing principles and cntext which will clarify the inputs needed and mdalities fr the GST. Other Parties see mre than ne phase: Preparatry phase: generate ahead the necessary inputs Technical phase Aim: Identify, analyze and summarize, allw fr exchange f best practices and experiences and understand the gaps, cllecting f technical infrmatin, mtivatin and shwcasing, trust building, identificatin f pprtunities fr enhanced internatinal cperatin, encuraging each ther; Inputs: See sectin I abve Timing: sufficient fr preparatin and cnsideratin f technical infrmatin/ depend n the timeframe f infrmatin gathering and implementatin prcess Frmat: Dialgue (structured/expert); wrkshps; Frum; Special events/taskfrce/panel (e.g. panel under CMA); Ad-Hc Wrking Grup; Jint SB cntact grup; technical cmmittee f chairs/c-chairs f the SBs and CBs Output/utcme: SYRs by vice chairs/c-facilitatrs, summary f inputs and technical discussins, cnclusins by the SBs; Q and A; Cmpilatin f technical infrmatin Cmpilatin f meeting reprt; ref t Art. 2 Characteristics f utputs/utcme: Cntain evidence and pprtunities fr further actin; Factual, nn-prescriptive, Include best practices, case studies and shwcase f experiences Distil inf but nt filter ut, Prvide infrmatin n barriers, Gaps between needs and supprt prvided and n pprtunities (technlgies, CB, Finance); suggestins n hw t imprve perfrmance f institutins and mechanisms related t supprt Plitical/leadership phase Inputs: utput f technical prcess; presentatins by technical phase facilitatrs Aim: generate plitical mmentum; Frmat: high-level event: HS/G, Ministers, Ambassadrs, cntact grup under CMA, Characteristics f utput/utcme: Be presented in a manner accessible t all/publically shared Shuld recgnize prgress and strengthen cnfidence (psitive signals) Summarizes best practices/lessns learned and experiences frm implementatin as well as identify the ptential and barriers, benefits and csts n climate actins Prvide infrmatin n pprtunities n internatinal cperatin, in particular climate finance and technlgy innvatin t facilitate enhancement f dmestic climate actin and internatinal cperatin in a natinally determined manner Assist develping cuntries identify their needs and prvide suggestins n hw t imprve perfrmance f institutins and mechanisms related t supprt Be recgnized and agreed by all Parties Be useful internatinally and dmestically 6
7 Pst GST plitical level engagement (part f the ambitin cycle): UNSG Summit Outcme (seen by many Parties under mdalities) 14 Nvember 2016 The apprach fr clarifying the utcme: 4 What is the ptential infrmatin GST might deliver? Hw t maximize the cllective prgress by enhanced internatinal cperatin and prmtin f best practices? Hw it will infrm the NDCs? What infrmatin shuld be delivered by GST? Hw t ensure that that utcme f GST is balanced amng Parties & elements? What shuld be its frmat? Hw will the utput address gaps btw actin & supprt as well as impact f thse actins? Hw will the utcme address pre-2020 gaps? Hw will the GST driver further ambitin/ enhanced actin? Hw will GST recgnise adaptatin effrts f develping Parties? 4 Als see annex I. 7
8 Annex I: Pssible issues fr further cnsideratin n the glbal stcktake 14 Nvember
9 14 Nvember 2016 Annex II - Illustratin f mandates and prvisins related t the glbal stcktakes 9
Input from South Africa Preliminary material in preparation for the first iteration of the informal note on this agenda item
Input frm Suth Africa Preliminary material in preparatin fr the first iteratin f the infrmal nte n this agenda item APA agenda item 6: Matters relating t the glbal stcktake referred t in Article 14 f the
More informationInformal note by the co-facilitators final version
14 Nvember 2017 @ 15:30 Draft elements fr APA agenda item 6 Matters relating t the glbal stcktake referred t in Article 14 f the Paris Agreement: a) Identificatin f the surces f input fr the glbal stcktake
More informationInformal note by the co-facilitators final iteration
Draft elements fr APA agenda item 6 Matters relating t the glbal stcktake referred t in Article 14 f the Paris Agreement: a) Identificatin f the surces f input fr the glbal stcktake b) Develpment f the
More informationPreliminary material in preparation for the first iteration of the informal note on this agenda item
Input frm China Preliminary material in preparatin fr the first iteratin f the infrmal nte n this agenda item APA agenda item 6: Matters relating t the glbal stcktake referred t in Article 4 f the Paris
More informationI. Completion of the work programme under the Paris Agreement
United Natins FCCC/CP/2017/L.13 Distr.: Limited 18 Nvember 2017 Original: English Cnference f the Parties Twenty-third sessin Bnn, 6 17 Nvember 2017 Agenda item 4 Preparatins fr the implementatin f the
More informationDraft Decision 1/CP.23 Non-paper Proposal by the President of COP23. Version 2 of 18 November at 00:30
Draft Decisin 1/CP.23 Nn-paper Prpsal by the President f COP23 Versin 2 f 18 Nvember at 00:30 The Cnference f the Parties, Fiji Mmentum fr Implementatin Recalling the Paris Agreement, adpted under the
More informationInformal note. Framing elements Reference to relevant decisions; Other references as needed.
AD HOC WORKING GROUP ON LONG-TERM COOPERATIVE ACTION UNDER THE CONVENTION Infrmal additinal sessin Bangkk, 30 August 5 September 2012 Plicy appraches and psitive incentives n issues relating t reducing
More informationPROJECT SUPPORT FUND OVERVIEW
PROJECT SUPPORT FUND OVERVIEW What is the missin f the Prject Supprt Fund? The Prject Supprt Fund aims t advance the Calitin member sites ability t serve as Sites f Cnscience. It seeks t create a space
More informationINFORMATION NOTE FOR PARTICIPANTS AT THE ROUND-TABLE DISCUSSIONS AMONG PARTIES FOR ARTICLE 6 OF THE PARIS AGREEMENT SBSTA ITEMS 11 A TO C
INFORMATION NOTE FOR PARTICIPANTS AT THE ROUND-TABLE DISCUSSIONS AMONG PARTIES FOR ARTICLE 6 OF THE PARIS AGREEMENT SBSTA ITEMS 11 A TO C Date f publicatin: 20 Octber 2017 Mandate: Pursuant t paragraphs
More informationAPA agenda item 3 Further guidance in relation to the mitigation section of decision 1/CP.21, on: Informal note by the co-facilitators final version
13 Nvember 2017 APA agenda item 3 Further guidance in relatin t the mitigatin sectin f decisin 1/CP.21, n: features f natinally determined cntributins, as specified in paragraph 26 infrmatin t facilitate
More informationNational Planning Guide Summary A Practical Approach to Health Security Capacity Building Draft 21 July 2017
Natinal Planning Guide Summary A Practical Apprach t Health Security Capacity Building Draft 21 July 2017 "Image designed by macrvectr / Freepik" P Purpse f this guide. The purpse f this guide is t prvide
More informationPreliminary material in preparation for the first iteration of the informal note
Preliminary material in preparatin fr the first iteratin f the infrmal nte APA agenda item 7: Mdalities and prcedures fr the effective peratin f the cmmittee t facilitate implementatin and prmte cmpliance
More informationA Civil Society Agenda for the OECD
A Civil Sciety Agenda fr the OECD Fr the CFA-DAC and Glbal Frum n Develpment meetings, January 2010 A Civil Sciety Agenda fr the OECD Page 2 Backgrund In 2010, the wrld s gvernments will review prgress
More informationNavigation tool by the co-facilitators
APA 1-5 30 April 10 May 2018 Bnn, Germany APA agenda item 3 Further guidance in relatin t the mitigatin sectin f decisin 1/CP.21, n: features f natinally determined cntributins, as specified in paragraph
More informationSteering Committee of the Global Nuclear Safety and Security Network (GNSSN)
Steering Cmmittee f the Glbal Nuclear Safety and Security Netwrk (GNSSN) Attachment 1 Terms f Reference April 2012 Intrductin The glbal nuclear safety and security framewrk is the glbal framewrk fr achieving
More informationWorking document. [Section A - Preamble] Version of 1 September 2015 at 23:55
AD HOC WORKING GROUP ON THE DURBAN PLATFORM FOR ENHANCED ACTION Secnd sessin, part ten 31 August 4 September 2015 Bnn, Germany Wrking dcument Versin f 1 September 2015 at 23:55 [Sectin A - Preamble] Parties
More information*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter
*** A DRAFT starting pint *** Suth Central Fresn Cmmunity Steering Cmmittee Charter 1. Cmmittee Objectives The Suth Central Fresn Cmmunity Steering Cmmittee is a special cmmittee that will be respnsible
More informationGreen Climate Fund (GCF) Readiness Programme in Ghana. Terms of Reference: Development of Climate Change Budget and Finance Tracking Tools
Green Climate Fund (GCF) Readiness Prgramme in Ghana Terms f Reference: Develpment f Climate Change Budget and Finance Tracking Tls I. Backgrund The Green Climate Fund (GCF) was established in 20 as an
More informationInformal note by the co-facilitators final version. II. Cross-cutting and overarching considerations / relevant context / general elements
13 Nvember 2017 Draft elements fr APA agenda item 7 Mdalities and prcedures fr the effective peratin f the cmmittee t facilitate implementatin and prmte cmpliance referred t in Article 15.2 f the Paris
More informationUNCRC REPORTING AND NGO PARTICIPATION BY: SAMNANG MEAS ADVISOR AND FORMER SECRETARY GENERAL OF NOVEMBER 2016
UNCRC REPORTING AND NGO PARTICIPATION BY: SAMNANG MEAS ADVISOR AND FORMER SECRETARY GENERAL OF THE NGO COALITION ON THE RIGHTS OF THE CHILD-CAMBODIA NOVEMBER 2016 1 THE UN CONVENTION ON THE RIGHTS OF THE
More informationObjectives of the review. Context. February 2015
Review f the peratin f the Financial Advisers Act 2008 and Financial Service Prviders (Registratin and Dispute Reslutin) Act 2008 Terms f Reference February 2015 Objectives f the review The bjectives f
More informationTechnical workshop. On the margins of the forty-seventh session of the Subsidiary Body for Implementation 7 November 2017
Technical wrkshp On the margins f the frty-seventh sessin f the Subsidiary Bdy fr Implementatin 7 Nvember 2017 Jan Sawe, Frank Rauch, Juleka Rajah, Daniele Viletti, Laura Lpez UNFCCC secretariat Increasing
More informationElements for a draft decision on workstream 2 of the ADP
AD HOC WORKING GROUP ON THE DURBAN PLATFORM FOR ENHANCED ACTION ADP.2015.5.InfrmalNte Elements fr a draft decisin n wrkstream 2 f the ADP 24 July 2015 Recalling decisins 1/CP.17, 2/CP.18, 1/CP.19 and 1/CP.20,
More informationRevised additional tool under item 3 of the agenda
Ad Hc Wrking Grup n the Paris Agreement Sixth part f the first sessin Bangkk, 4 9 September 2018 9 September 2018 Revised additinal tl under item 3 f the agenda Further guidance in relatin t the mitigatin
More informationCONCORD recommendations to put People and Planet first in the future EU-ACP agreement
CONCORD recmmendatins t put Peple and Planet first in the future EU-ACP agreement 1. The framewrk February 2018 The general framewrk with a cmmn binding fundatin and three cmprehensive and adaptable reginal
More informationTerms of reference for the expert groups, subcommittees, panels, thematic advisory groups or task focused ad hoc working groups of the Executive
Terms f reference fr the expert grups, subcmmittees, panels, thematic advisry grups r task fcused ad hc wrking grups f the Executive Cmmittee f the Warsaw Internatinal Mechanism fr Lss and Damage assciated
More informationLinkages between systematic observation and the work of the Executive Committee on Loss and Damage
Linkages between systematic bservatin and the wrk f the Executive Cmmittee n Lss and Damage Enhancing bservatins t supprt preparedness and adaptatin in a changing climate Learning frm IPCC 5 th Assessment
More informationTERMS OF REFERENCE (TOR) Mainstreaming gender inclusive features in a climate resilient energy policies and practices in ECOWAS countries
United Natins Industrial Develpment Organizatin TERMS OF REFERENCE (TOR) Mainstreaming gender inclusive features in a climate resilient energy plicies and practices in ECOWAS cuntries CTCN request reference
More informationWorking document. [Section A - Preamble] Version of 4 September 2015 at 01:45 1
AD HOC WORKING GROUP ON THE DURBAN PLATFORM FOR ENHANCED ACTION Secnd sessin, part ten 31 August 4 September 2015 Bnn, Germany Wrking dcument Versin f 4 September 2015 at 01:45 1 [Sectin A - Preamble]
More informationTeaching performance assessment (Program Standard 1.2)
Teaching perfrmance assessment (Prgram Standard 1.2) Rbust assessment f pre-service teachers is vital in giving students, families and schls cnfidence that graduates frm Australian initial teacher educatin
More informationInitial strategic plan for the GCF
This dcument captures the strategic plan as adpted by the Bard in decisin B.12/20. The strategic plan was sent t the Bard fr cnsideratin at B.12 in dcument GCF/B.12/06 titled Reprt n the develpment f the
More information[AGENCY NAME] Mandate and Roles Document. (Pure Advisory Committees)
[This sample dcument has been develped by the Agency Gvernance Secretariat. It is intended t be used fr infrmatinal purpses nly. Agencies are encuraged t adapt the dcument t meet their specific needs.
More informationNARACOORTE LUCINDALE COUNCIL COUNCIL POLICY 94 PUBLIC CONSULTATION AND COMMUNITY ENGAGEMENT
RESPONSIBLE OFFICER: RELEVANT DELEGATIONS: Chief Executive Officer Manager Gvernance and Cmmunity Develpment LEGISLATION AND REFERENCES: Lcal Gvernment Act 1999 sectins 12, 50, 92, 122,123, 151, 156, 193,
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directorate B - Natural Capital ENV.B.2 - Biodiversity ENV.B.3 - Nature CGBN.
EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directrate B - Natural Capital ENV.B.2 - Bidiversity ENV.B.3 - Nature CGBN C-rdinatin Grup fr Bidiversity and Nature 22 nd meeting 15/03/2017 Agenda
More informationKnowledge Sharing Session: Present UNDP Work Related to NDC Implementation. Partnership for Market Readiness 15 th Meeting of the Partnership Assembly
Knwledge Sharing Sessin: Present UNDP Wrk Related t NDC Implementatin Partnership fr Market Readiness 15 th Meeting f the Partnership Assembly 20 June 2016 - Hani, Vietnam James M. Vener, P.E. UNDP Climate
More informationAPPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND
APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND This template is the riginal assistance request frm which when sent shuld cver all the questins asked. It can be adjusted t accmmdate
More informationProgramme Development Funding Phase
Prgramme Develpment Funding Phase Backgrund The Tees Valley Eurpean Structural & Investment Funds Strategy (ESIFS) 2014 2020 was submitted t Gvernment in January 2014 (available n the TVU website). It
More informationReflections on progress made at the fourth part of the second session of the Ad Hoc Working Group on the Durban Platform for Enhanced Action
Reflectins n prgress made at the furth part f the secnd sessin f the Ad Hc Wrking Grup n the Durban Platfrm fr Enhanced Actin Nte by the C-Chairs 17 April 2014 I. Intrductin 1. At the furth part f the
More informationActive Sussex. Trustee Recruitment Pack
Active Sussex Trustee Recruitment Pack Our main aim is t imprve lcal peple s health and wellbeing thrugh the prmtin f sprt and physical activity fr all members f the cmmunity, n matter their level f activity.
More informationEngineering IT Application Development Governance Workflow
Apprved April 6, 2018 Engineering IT Applicatin Develpment Gvernance Wrkflw This dcument is intended t define the gvernance structure and prcesses t be used in guiding the activities f the Engineering
More informationEITI International Secretariat 3 July Concept note: Pilot on mainstreaming EITI disclosures
EITI Internatinal Secretariat 3 July 2015 Cncept nte: Pilt n mainstreaming EITI disclsures 2 CONCEPT NOTE: PILOT ON MAINSTREAMING EITI DISCLOSURE Cntents 1 2 3 4 5 Intrductin... 2 Backgrund... 2 Objectives...
More informationABORIGINAL ECONOMIC PARTNERSHIPS Program Grant Application Guidelines
ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Grant Applicatin Guidelines Abriginal Ecnmic Partnerships Prgram (AEPP) grant funding supprts Indigenus cmmunities, cmmunity-wned businesses and nt-fr-prfit nn-gvernmental
More informationNon-Teacher Appraisal Goal-Setting Conference Guide
2014-2015 Nn-Teacher Appraisal Gal-Setting Cnference Guide TABLE OF CONTENTS Page Cntents 3 Intrductin 4 Nn-Teacher Gal-Setting Cnference Objectives 4-5 Preparing fr the Nn-Teacher Gal-Setting Cnference
More informationAUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER
AUDIT, RISK MANAGEMENT AND COMPLIANCE COMMITTEE CHARTER August 2012 OPUS Grup Limited Audit, Risk Management and Cmpliance Cmmittee 1. GENERAL PURPOSE The primary bjective f the Audit, Risk Management
More informationChapter 3 Requirements Analysis
Chapter 3 Requirements Analysis Intr SDLC is prcess by which rg. mves frm as-is (current) system t t-be (new) system Outputs frm planning phase: system request, feasibility study, prject plan Analysis
More informationCHAIR AND MEMBERS COMMUNITY AND PROTECTIVE SERVICES NOVEMBER 15, 2016 ART ZUIDEMA CITY MANAGER COMMUNITY DIVERSITY AND INCLUSION STRATEGY UPDATE
TO: FROM: CHAIR AND MEMBERS COMMUNITY AND PROTECTIVE SERVICES NOVEMBER 15, 2016 ART ZUIDEMA CITY MANAGER SUBJECT: COMMUNITY DIVERSITY AND INCLUSION STRATEGY UPDATE RECOMMENDATION That, n the recmmendatin
More informationScope of Services and Timeline. PHASE 1: Project Organization & Best Practices Research Week Completed
Organizatin Scpe f Services and Timeline Versin f December 9, 2011 PHASE 1: Prject Organizatin & Best Practices Research Cmpleted CONSULTANT Aug 8 12 Aug 15 19 Aug 22 26 Aug 29 Oct 28 CONSULTANT Nv 13
More informationTERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE
W&RSETA Standard Bidding Dcuments Terms f Reference TERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE 1 W&RSETA Standard Bidding Dcuments Terms f Reference 1. BACKGROUND TO W&RSETA
More informationAdaptation under UNFCCC the road from Bonn to Poznan 2008
Executive summary 1 Adaptatin under UNFCCC the rad frm Bnn t Pznan 2008 A Jint WWF Germanwatch paper, August 2008 KEY MESSAGES 1. The Accra sessin and the fllwing mnths have t be used by all Parties t
More informationSound Management of Electronic Wastes in North America Operating Year(s):
2011 2012 Operatinal Plan Prject Descriptin Sund Management f Electrnic Wastes in Nrth America Operating Year(s): 2011 2012 Planned Budget: C$400,000.00 2011: C$165,000.00 2012: C$235,000.00 Strategic
More informationTASSAL GROUP LIMITED ABN
Plicy fr the Selectin and Appintment f Directrs TASSAL GROUP LIMITED ABN 15 106 067 270 Plicy fr the Selectin and Appintment f Directrs (Reviewed by the Bard 25 June 2013) 1 Reviewed by the Bard - 25 June
More information1 This paper seeks agreement to the final Terms of Reference (the Terms) for the Welfare Expert Advisory Group (WEAG). The final Terms are attached.
Office f the Minister fr Scial Develpment Chair Cabinet Scial Wellbeing Cmmittee WELFARE EXPERT ADVISORY GROUP TERMS OF REFERENCE Prpsal 1 This paper seeks agreement t the final Terms f Reference (the
More informationCall for nomination for members of the CSEM (civil society engagement mechanism) Advisory group in UHC2030
Call fr nminatin fr members f the CSEM (civil sciety engagement mechanism) Advisry grup in UHC2030 The Civil Sciety Engagement Mechanisms (CSEM) fr UHC2030 is lking fr vlunteers t becme members f the Advisry
More informationPolicy Planning and Analysis Team (PAT) Charter
Plicy Planning and Analysis Team (PAT) Charter Purpse f this Charter Dcument This charter defines the missin, guiding principles, scpe, rles, membership, and peratins fr the Plicy Planning and Analysis
More informationWorking document. Version of 8 September 2015 at 18:00 1. [Section A Preamble]
AD HOC WORKING GROUP ON THE DURBAN PLATFORM FOR ENHANCED ACTION Secnd sessin, part ten 31 August 4 September 2015 Bnn, Germany Wrking dcument Versin f 8 September 2015 at 18:00 1 [Sectin A Preamble] Main
More informationGuideline. TAF TSI Regional Workshop. Date 30/09/2015 Enter a date. Enter a date.
Guideline Name Psitin Elabrated by Validated by Apprved by Rdrig Gutierrez Dminguez Prject Officer Date 30/09/2015 Enter a date. Enter a date. Signature Dcument Histry Versin Date Cmments 0.1 24/07/2015
More informationTERMS OF REFERENCE EXTERNAL EVALUATION AT END OF PROJECT PHASE IN NAIROBI
TERMS OF REFERENCE EXTERNAL EVALUATION AT END OF PROJECT PHASE IN NAIROBI Evaluatin Perid: September t Nvember 2018 Expressin f Interest Deadline: 17:00 EAT n 2 nd September 2018 An expressin f interest
More informationENVIRONMENTAL STEWARDSHIP AND CLIMATE CHANGE GROUP PROGRAM
ENVIRONMENTAL STEWARDSHIP AND CLIMATE CHANGE GROUP PROGRAM APPLICATION PROPOSAL GUIDE Prject selectin criteria The fllwing utlines a list f brad criteria that will be taken int cnsideratin during the selectin
More informationABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines
ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Applicatin Guidelines The Abriginal Ecnmic Partnerships Prgram (AEPP) supprts Abriginal cmmunities, businesses and rganizatins t increase participatin in ecnmic
More informationSection 4: Nominating Committee. Approved: 07/24/17. Policy
Sectin 4: Nminating Cmmittee Apprved: 07/24/17 Plicy The Nminating Cmmittee will nminate in accrdance with Bylaws Sectin IX a slate f fficers fr the Executive Cuncil, specifically fr the psitins f President,
More informationAdvocacy Prioritization Survey Results Executive Summary
Survey Results Executive Summary January, 2015 Advcacy Priritizatin Survey Results Executive Summary Intrductin T meet the demands that ur current gvernment relatins success brings t the assciatin, and
More informationTERMS OF REFERENCE. Audit and Risk Committee (the "Committee") of Wilmcote Holdings Plc (the "Company")
References t the "Bard" shall mean the full Bard f Directrs. MEMBERSHIP - The Bard has reslved t establish a cmmittee f the Bard t be knwn as the Audit and Risk Cmmittee. - The Cmmittee shall cmprise at
More informationCorporate Governance Principles
Crprate Gvernance Principles Revised 05-03-2018 Amphenl s Crprate Gvernance Principles have been apprved by the Bard f Directrs and, tgether with the Cmpany s Certificate f Incrpratin, as amended and/r
More information2018 ADASS Tutorial Selection Process, Criteria and Requirements
2018 ADASS Tutrial Selectin Prcess, Criteria and Requirements Cntributrs: Kathleen Labrie Last mdified: April 23, 2018 1 Purpse This dcument attempts t define the basic requirements and the selectin prcess
More informationUCEA/ECU Age Discrimination Working Group Guidance. Age Discrimination Legislation Guidance Note 1: Pay and Benefits A UCEA Publication
UCEA/ECU Age Discriminatin Wrking Grup Guidance Age Discriminatin Legislatin 2006 Guidance Nte 1: Pay and Benefits A UCEA Publicatin Scpe f guidance This guidance nte addresses the implicatins f the Emplyment
More informationResponsible Investment Policy
Respnsible Investment Plicy 1. Backgrund and purpse Respnsible Investment (RI) is a crnerstne in ur ambitin t be recgnised as the mst trusted financial partner. We are cmmitted t respnsible investment
More informationCall for Proposals from the Royal Academy of Engineering Research projects in engineering education
Call fr Prpsals frm the Ryal Academy f Engineering Research prjects in engineering educatin 1. Intrductin 1.1. Overview This is a call fr prpsals by the Ryal Academy f Engineering fr research prjects that
More informationAcademic and Administrative and Other Related Staff Annual Review
Academic and Administrative and Other Related Staff Annual Review Intrductin Heads f Cllege/Budget Centre (r nminated representative) have the pprtunity t cnsider and t make the fllwing recmmendatins fr
More informationTerms of Reference. 1. Background/Context. 1.1 Purpose
Sub-regin Steering Cmmittee Terms f Reference 1. Backgrund/Cntext 1.1 Purpse The Patients First Act, 2016 requires Lcal Health Integratin Netwrks (LHINs) t establish gegraphic sub-regins fr the purpses
More informationPSNC Briefing on the NHS Complaints procedure (from 1 April 2009)
PSNC Briefing n the NHS Cmplaints prcedure (frm 1 April 2009) Under the prvisins f the Natinal Health Service (Pharmaceutical Services) Regulatins 2005 1 pharmacy cntractrs are required t make arrangements
More informationCONCORD recommendations for a more effective and meaningful participation of Civil Society in the future EU- ACP relations
CONCORD recmmendatins fr a mre effective and meaningful participatin f Civil Sciety in the future EU- ACP relatins In the current cntext f grwing criticism and restrictin f civil sciety actin in all parts
More informationANNEX 1 Natural Capital Asset Check Proposed Approach October 2013
ANNEX 1 Natural Capital Asset Check Prpsed Apprach Octber 2013 Intrductin This is the first elabrated versin f the asset check apprach being develped thrugh a scping study fr Defra and the UKNEA fllw-n
More informationThe Sustainable Development Goals and linkage with Strategic Frame Country: Albania From planning to implementation/indicators
The Sustainable Develpment Gals and linkage with Strategic Frame Cuntry: Albania Frm planning t implementatin/indicatrs.. Geneva, 2 4 Nvember 2016 Current situatin Strategic frame and SDGs Natinal Strategy
More informationFramework for interim reporting
Framewrk fr interim reprting Prpsal by GAML Secretariat Glbal Alliance fr Mnitring Learning Furth meeting 28-29 Nvember 2017 Madrid, Spain GAML4/18 Headline 1 Overview 2 GAML4/18 Framewrk fr interim reprting
More informationENNHRI Operational Plan 2018
ENNHRI Operatinal Plan 2018 Cre Objective 1: Mre Eurpean NHRIs in cmpliance with the Paris Principles 1.1. Supprt the establishment f NHRIs acrss Eurpe 1.1. An increased number f NHRIs are established
More informationCALL FOR INTELLECTUAL SERVICE PROVIDERS ( EXTERNAL CONSULTANTS ) OECD Guidelines for Multinational Enterprises National Contact Point Peer Reviews
CALL FOR INTELLECTUAL SERVICE PROVIDERS ( EXTERNAL CONSULTANTS ) OECD Guidelines fr Multinatinal Enterprises Natinal Cntact Pint Peer Reviews The OECD is seeking submissins frm cnsultants t supprt the
More informationNew Zealand Submission to the Ad Hoc Working Group on the Durban Platform for Enhanced Action: Work-stream 1
Cntext New Zealand Submissin t the Ad Hc Wrking Grup n the Durban Platfrm fr Enhanced Actin: Wrk-stream 1 Implementatin f all the elements f decisin 1/CP.17, (a) Matters related t paragraphs 2 t 6 March
More informationTERMS OF REFERENCE FOR CONSULTANTS
A. Backgrund: Develping an Infrmatin System fr Develpment Plicy and Planning (KSTA) MON 51136-001 TERMS OF REFERENCE FOR CONSULTANTS The Asian Develpment Bank (ADB) will engage 82 persn-mnths f cnsulting
More informationUNODC. \ Chief. Dear Mr. Hanif,
UNODC United Natins Office n Drugs and Crime 25 September 2012 Dear Mr. Hanif, I wish t thank yu fr yur letter dated 3 August 2012, in which yu invited the functinal cmmissins f the Ecnmic and Scial Cuncil
More informationStrategic Plan Request for Proposals. March 2018
Strategic Plan 2018-2022 Request fr Prpsals March 2018 Cntact: Denyse Newtn, Executive Directr Alzheimer Sciety Durham Regin 202 1600 Champlain Avenue Whitby, Ontari L1N 9B2 (905) 576-2567 ext 5223 dnewtn@alzheimerdurham.cm
More informationREA Space Unit guidelines for Individual Evaluation Report Coordination & support actions. DT-SPACE-07-BIZ-2018: Space hubs for Copernicus
REA Space Unit guidelines fr Individual Evaluatin Reprt Crdinatin & supprt actins DT-SPACE-07-BIZ-2018: Space hubs fr Cpernicus These guidelines are intended t help and guide evaluatin experts n what shuld
More informationCountry brief. Rwanda. Ronald Nkusi MINECOFIN. September Contacts: / Country Case - Rwanda
Cuntry brief Rwanda Rnald Nkusi MINECOFIN September 2015 Cntacts: rnald.nkusi@minecfin.gv.rw / danila.bneva@undp.rg 1 Cuntry Case - Rwanda The present cuntry brief was prepared by the External Finance
More informationEXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017
EXECUTIVE SUMMARY INTERNAL AUDIT REPORT IOM Kingstn JM201701 17-21 JULY 2017 Issued by the Office f the Inspectr General Page 1 f 9 Reprt n the Audit f IOM Kingstn Executive Summary Audit File N. JM201701
More informationCONCEPT NOTE. 7, Avenue Bourguiba, BP 48- cp Dakar SENEGAL Tel Fax
Preparatin f the Secnd Five Year Operatinal Plan 2014 2018 CONCEPT NOTE PREPARATION OF CORAF/WECARD S SECOND OPERATIONAL PLAN 2014-2018 SECRETARIAT AND STC SELF-ASSESSMENT RETREAT JANUARY 2014 7, Avenue
More informationWho can participate 1.2. Project participants
1.2 Wh can participate The Alpine Space prgramme welcmes the participatin f rganisatins frm the public and private sectr that bring added value t the preparatin and implementatin f an Alpine Space prject.
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE. Description of the assignment: National Consultant- GEF Project Design Expert
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE Descriptin f the assignment: Natinal Cnsultant- GEF Prject Design Expert Prject title: Strengthening Institutinal Capacity fr Effective Implementatin
More informationPERFORMANCE DEVELOPMENT SYSTEM. Supervisory and Management Staff Appraisal. Department: Reviewer s Name: Review Period:
PERFORMANCE DEVELOPMENT SYSTEM Supervisry and Management Staff Appraisal Emplyee Name: Title: Department: Reviewer s Name: Title: Review Perid: t Date f Entry t Psitin: Date f Last Review: Type f Review:
More informationUSDA Forest Service Project-level Objections Process
USDA Frest Service Prject-level Objectins Prcess 36 CFR Part 218, Prject-Level Pre-decisinal Administrative Review Prcess September, 2013 What is the bjectin prcess and what happened t the appeals prcess?
More informationLBIS FFT: Current Reforestation and Timber Supply Mitigation 5 Year and Annual Operating Plan
LBIS FFT: Current Refrestatin and Timber Supply Mitigatin 5 Year and Annual Operating Plan Purpse The Land Based Investment Strategy (LBIS) was develped in 2010 t ensure that the gvernment gals and pririties
More informationCommunity Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013
Cmmunity Planning Assciatin f Suthwest Idah FY2015-2017 Strategic Plan Reprt N. 01-2014 Apprved by the COMPASS Bard, December 16, 2013 FINAL COMPASS FY2015 FY2017 Strategic Plan Page 1 Cmmunity Planning
More informationDesign Council CONSULTANT GUIDELINES
Design Cuncil CONSULTANT GUIDELINES Intrductin: The Design Cuncil s missin is t advise and make recmmendatins t the City Manager and City staff n matters f aesthetic quality related t the built envirnment.
More informationCALL FOR PROJECT ADVISOR
CALL FOR PROJECT ADVISOR Vacancy #: 2018-07-03 UNLIREC Cnventinal Arms Cntrl Prgramme Prject Advisr - Capacity Building Prject t Enhance the Capacity f Caribbean States t Cmbat Illicit Small Arms and Ammunitin
More informationThis is a living document that can be adjusted by a majority of the NDS Steering Committee, in consultation with the NDSC general membership.
NATIONAL DATA SERVICE (NDS) AND NATIONAL DATA SERVICES CONSORTIUM (NDSC) ELEMENTS OF AN INTERIM CHARTER Preamble This interim charter is designed t prvide guidance fr the peratins f the Natinal Data Service
More informationAllan MacDonald: Director General, Implementation Branch, AANDC
Allan MacDnald: Directr General, Implementatin Branch, AANDC Cntext Treaties are nt the end f smething; we spend many years negtiating them, but many, many mre years implementing them. On average, it takes
More informationArtists working with communities; communities working with artists providing arts access to all.
grant applicatin Prince f Wales Armuries, 2nd Flr, 10440 108 Avenue, Edmntn, AB T5H 3Z9 p. 780.424.2787 f. 780.425.7620 e. grants@edmntnarts.ca Cmmunity Arts Prgram Grant Guidelines Deadline: May 1 Annually
More informationComment Letter on Exposure Draft Reporting on Audited Financial Statements: Proposed New and Revised International Standards on Auditing (ISAs)
Verband der Industrie- und Dienstleistungsknzerne in der Schweiz Fédératin des grupes industriels et de services en Suisse Federatin f Industrial and Service Grups in Switzerland 22 Nvember 2013 Internatinal
More informationMANAGING NATIONAL ASSESSMENT REPORT. Southland Boys High School
MANAGING NATIONAL ASSESSMENT REPORT Suthland Bys High Schl September 2016 Managing Natinal Assessment Review The purpse f reviewing the management f natinal assessment is: t help schls achieve valid, fair,
More informationThirteenth meeting of the Codex Trust Fund Steering Committee. Teleconference 12 January h00-12h00. Summary of decisions and action points
Thirteenth meeting f the Cdex Trust Fund Steering Cmmittee Telecnference 12 January 2017 11h00-12h00 Item 1 Adptin f agenda Summary f decisins and actin pints The agenda fr the meeting was adpted and is
More informationWho can participate 1.2. Project participants
1.2 Wh can participate The Alpine Space prgramme welcmes the participatin f rganisatins frm the public and private sectr that bring added value t the preparatin and implementatin f an Alpine Space prject.
More informationSummary and Future Work
OECD Wrkshp n Gd Practices in Investment Prmtin & Facilitatin Hw t imprve Investment Prmtin Agencies impact and relevance Summary and Future Wrk SUMMARY OF THE WORKSHOP Backgrund On 18 Octber 2016, the
More information