1 CMP Strategy Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) Architectural Research Consultants, Incorporated October, 2004

2 Cluster: Albuquerque 244 DOLORES GONZALES ES Capital Improvement 2 HB F02. Kindergarten Addition $ 2,208,478 $ 2,208, G0. School Improvement $ 59,400 $ 59, A06. Network Drops and Equipment Upgrades $ 23,5 $ 23,5 $ 2,290,992 $ 2,290, A06. School-Based Technology Allocation $ 4,800 $ 4,800 $ 4,800 $ 4, A03. Electrical System Upgrades $ 256,96 $ 256, D04. Re-roof Original Building $ 334,065 $ 334, A06. 3 Network Drops and Equipment Upgrades $ 42,54 $ 42,54 $ 733,566 $ 733, A06. School-Based Technology Allocation $ 4,800 $ 4,800 $ 4,800 $ 4, C0. 2 Refurbish Classrooms $,02,583 $,02, E0. 2 Site Lighting $ 36,486 $ 36, F02. Issue: Land Acquisition C04. Cafeteria Lighting,000, F02. Classroom Addition $,95,30 $,95,30 Total Estimated Capital Needs: $ 6,028,529 $ 2,974,37 $ 2,974,37 Total : Total : $ 6,028,529

3 Cluster: Albuquerque 252 EAST SAN JOSE ES Capital Improvement 2 HB C0. Renovate Buildings A & B (Old Wings) $,678,682 $,678, G0. School Improvement $ 78,220 $ 78, A06. Network Drops and Equipment Upgrades $ 3,926 $ 3,926 $,770,828 $,770, A06. School-Based Technology Allocation $ 9,600 $ 9,600 $ 9,600 $ 9, D04. Re-Roofing $ 24,835 $ 24, A06. 3 Network Drops and Equipment Upgrades $ 73,360 $ 73,360 $ 298,95 $ 298, A06. School-Based Technology Allocation $ 9,600 $ 9,600 $ 9,600 $ 9, E0. Site Improvements $ 237,244 $ 237, A04. Plumbing Improvements in Original $ 54,790 $ 54,790 Buildings C0. Renovate for Kindergarten Classrooms $ 82,495 $ 82, E05. Drainage Improvements $ 93,778 $ 93, A03. HVAC Improvements $ 274,000 $ 274, E0. 2 Demonstration Garden and Outdoor $ 86,928 $ 86,928 Classroom C06. ADA Upgrade,38, C06. Door and Hardware Replacement $ 28,933 $ 28, E03. 2 Vehicle Access Improvements $ 9,853 $ 9, A02. Cracked Surfaces Renewal $ 8,902 $ 8, E0. Issue: Construct Grassed Field/Track F06. Issue: Land Acquisition B02. Asbestos TSI Abatement $ 5,000 $ 5, E02. Landscape, East Side $ 50,000 $ 50, C04. Lighting Retrofit Upgrade $ 90,000 $ 90, C0. Blinds at Windows $ 35,000 $ 35,000 Total Estimated Capital Needs: $ 3,777,284 $,669,06 $,669,06 Total : Total : $ 3,777,284

4 Cluster: Albuquerque 26 EUGENE FIELD ES 79.0 Capital Improvement 2 HB C0. Media Center / Restroom Improvements $ 347,335 $ 347, D0. Site Improvements $ 73,803 $ 73, G0. School Improvement $ 56,790 $ 56, A06. Network Drops and Equipment Upgrades $ 76,544 $ 76,544 $ 554,472 $ 554, A06. School-Based Technology Allocation $ 4,200 $ 4,200 $ 4,200 $ 4, A03. 3 HVAC Replacement $ 294,000 $ 294, A06. 3 Network Drops and Equipment Upgrades $ 53,934 $ 53,934 $ 347,934 $ 347, A06. School-Based Technology Allocation $ 4,200 $ 4,200 $ 4,200 $ 4, G0. Elevator/ Kindergarten Addition $ 879,085 $ 879, C0. Renovate Old Building Classrooms $ 620,209 $ 620, F02. Construct Computer Lab $ 56,955 $ 56, C0. 2 Refurbish New Wing Classrooms / Gym $ 92,452 $ 92, D04. 2 Re-roofing $ 33,23 $ 33, D04. 3 Replace Tile Roofing $ 430,470 $ 430, C06. Window Blind Replacement Throughout $ 28,000 $ 28, A03. Replace HVAC Units in Media Center $ 30,000 $ 30, B02. Asbestos TSI Abatement $ 8,000 $ 8,000 Total Estimated Capital Needs: $ 3,779,9 $ 2,848,384 $ 2,848,384 Total : Total : $ 3,779,9

5 Cluster: Albuquerque 29 LONGFELLOW ES 8.70 Capital Improvement 2 HB E03. Replacement of Courtyard Concrete $ 32,204 $ 32, E0. Field /Track Area Upgrade $ 85,90 $ 85, G0. School Improvement $ 52,220 $ 52,220 $ 370,334 $ 370, A06. School-Based Technology Allocation $ 3,00 $ 3, A06. Network Drops and Equipment Upgrades $,05 $,05 $ 4,205 $ 4, A03. HVAC Improvements $ 447,000 $ 447,000 $ 447,000 $ 447, A06. School-Based Technology Allocation $ 3,00 $ 3, A06. 2 Network Drops and Equipment Upgrades 4,06 4,06 $ 7,6 $ 7, C0. Upgrade Kindergarten Spaces $ 380,282 $ 380, D02. Brick Surface Improvements $ 33,25 $ 33, C0. Refurbish the Facility $ 503,327 $ 503, C09. Restroom Upgrades and Site Accessibility $ 25,954 $ 25, E03. Walter Street Parking Improvements $ 63,55 $ 63, F07. Storage/Office/Stage Addition $ 457,465 $ 457, E0. 2 Refinishing of Concrete Seating Steps, $ 35,608 $ 35,608 Planter Walls, Etc E02. Streetscape Area Improvements $ 60,978 $ 60, E02. Issue: Edith Grassed Areas E03. Issue: Land Purchase for Parking Total Estimated Capital Needs: $ 2,608,640 $,659,985 $,659,985 Total : Total : $ 2,608,640

6 Cluster: Albuquerque 300 LOWELL ES Capital Improvement 2 HB F07. Cafeteria/Kitchen Expansion $ 780,796 $ 780, C09. Complete Restroom Renovation $ 20,558 $ 20, E03. West Parking/Bus Loop/Landscaping $ 300,806 $ 300, E0. Misc. Health/Safety s $ 7,855 $ 7, G0. School Improvement $ 47,590 $ 47, A06. Network Drops and Equipment Upgrades $ 29,46 $ 29,46 $,440,75 $,440, A06. School-Based Technology Allocation $,900 $,900 $,900 $, A03. Electrical Improvements $ 226,490 $ 226, A06. 3 Network Drops and Equipment Upgrades $ 9,262 $ 9,262 $ 245,753 $ 245, A06. School-Based Technology Allocation $,900 $,900 $,900 $, F02. Kindergarten/ Classroom Addition $ 2,67,657 $ 2,67, C0. Refurbish Buildings A & B $,379,307 $,379, E0. 2 Portable Park/South Property $ 275,006 $ 275, C0. Portable Upgrades 4,277 4, D04. 2 Roofing Improvements $ 7,65 $ 7, F06. 2 Track $ 34,755 $ 34, C07. Blinds At Windows Buildings A/B,000, A03. HVAC - Two Air Washers Need $ 30,000 $ 30,000 Refurbishing, South Building B02. Tunnels - Asbestos Abatement $ 39,000 $ 39,000 Total Estimated Capital Needs: $ 5,92,470 $ 4,2,67 $ 4,2,67 Total : Total : $ 5,92,470

7 Cluster: Albuquerque 32 MONTE VISTA ES 82.2 Capital Improvement 2 HB G0. School Improvement $ 66,570 $ 66, A06. Network Drops and Equipment Upgrades $ 44,903 $ 44,903 $,473 $, A06. School-Based Technology Allocation $ 6,600 $ 6,600 $ 6,600 $ 6, A03. HVAC Improvements $ 397,000 $ 397, A06. 3 Network Drops and Equipment Upgrades $ 42,54 $ 42,54 $ 539,54 $ 539, A06. School-Based Technology Allocation $ 6,600 $ 6,600 $ 6,600 $ 6, F02. Computer Lab/Storage Addition $ 464,484 $ 464, E06. Site Play Area Upgrades $ 288,78 $ 288, F07. Cafeteria Addition/Kitchen Renovation $ 547,578 $ 547, G0. Small s $ 75,557 $ 75, E03. Access Upgrades $ 9,689 $ 9, A03. 3 HVAC-Steam System Replacement $,087,448 $,087, F07. Administration Area Expansion $ 8,887 $ 8, E02. 2 Add Trees $ 6,448 $ 6, C0. Interior Refurbishing $ 559,096 $ 559, C06. Blinds In Windows Throughout Classrooms $ 30,000 $ 30, C09. Bathrooms Refurbish Fixtures $ 60,000 $ 60,000 Total Estimated Capital Needs: $ 4,223,578 $ 3,539,364 $ 3,539,364 Total : Total : $ 4,223,578

8 Cluster: Albuquerque 35 MONTEZUMA ES 78. Capital Improvement 2 HB G0. School Improvement $ 7,040 $ 7,040 $ 7,040 $ 7,040 3 GO Bond F02. TDP Classroom Addition $ 3,026,734 $ 3,026, A06. School-Based Technology Allocation $ 7,800 $ 7,800 $ 3,044,534 $ 3,044, A06. School-Based Technology Allocation $ 7,800 $ 7, A06. 2 Network Drops and Equipment Upgrades $ 92,459 $ 92, A06. Network Drops and Equipment Upgrades,259,259 $ 7,472 $ 7,472 $ 7,472 $ 7, F02. Kindergarten Addition $ 824,836 $ 824, A03. Additional Electrical Upgrades $ 24,574 $ 24, F07. Cafeteria/Kitchen Addition $ 576,527 $ 576, A03. Intercom Console $ 20,853 $ 20, C06. 2 Replace Window Wall $ 883,582 $ 883, E03. Asphalt Area Improvements $ 2,07 $ 2, G0. Small s $ 20,040 $ 20, D04. 2 Re-roof School $ 430,264 $ 430, E02. Irrigation Upgrade Front/Patio $ 75,000 $ 75, C0. 2 Renovate West Wing of School and Media $ 638,56 $ 638,56 Center C0. 3 Renovate North Wing Building $,37,022 $,37, F02. Issue: Alternate Classroom Addition B02. Asbestos Tunnel TSI Abatement $ 30,000 $ 30, A04. Restroom Refurbish Fixtures $ 75,000 $ 75, A03. HVAC Library Replacement $ 40,000 $ 40, A03. Secondary Panel Upgrade $ 80,000 $ 80,000 Total Estimated Capital Needs: $ 8,700,582 $ 5,357,277 $ 5,357,277 Total : Total : $ 8,700,582

9 Cluster: Albuquerque 330 REGINALD CHAVEZ ES Capital Improvement 2 HB E03. Site Parking/Traffic Improvements $ 263,565 $ 263, E02. Courtyard Improvements $ 22,584 $ 22, G0. School Improvement $ 49,790 $ 49, A06. Network Drops and Equipment Upgrades $ 5,544 $ 5,544 $ 45,483 $ 45, A06. School-Based Technology Allocation $ 2,400 $ 2,400 $ 2,400 $ 2, D04. Roofing Improvements $ 76,996 $ 76, A03. Electrical s $ 327,387 $ 327,387 $ 504,382 $ 504, A06. School-Based Technology Allocation $ 2,400 $ 2, A06. 2 Network Drops and Equipment Upgrades $ 27,3 $ 27,3 $ 39,53 $ 39, F02. 2 Classroom Addition $,285,259 $,285, C0. Classroom Wings Renovation Work $,025,739 $,025, C0. 2 Administration Area and Staff Restroom $ 3,274 $ 3,274 Improvements C0. Small Miscellaneous s $ 34,404 $ 34, E02. 2 Landscaping $ 39,503 $ 39, C0. Blinds in Classroom Windows $ 25,000 $ 25,000 Total Estimated Capital Needs: $ 3,648,977 $ 2,54,80 $ 2,54,80 Total : Total : $ 3,648,977

10 Cluster: Albuquerque 373 LEW WALLACE ES Capital Improvement 2 HB C05. Facility Improvements $ 56,66 $ 56, C06. Window Replacement $ 22,496 $ 22, E06. Play Lot Improvements $ 84,468 $ 84, G0. School Improvement $ 37,60 $ 37, A06. Network Drops and Equipment Upgrades $ 32,335 $ 32,335 $ 523,20 $ 523, A06. School-Based Technology Allocation $ 9,300 $ 9,300 $ 9,300 $ 9, A03. HVAC - Steam System Upgrades $ 383,000 $ 383,000 $ 383,000 $ 383, A06. School-Based Technology Allocation $ 9,300 $ 9, A06. 2 Network Drops and Equipment Upgrades $ 23,5 $ 23,5 $ 32,45 $ 32, D04. Re-Roof Main Building $ 322,343 $ 322, A03. HVAC - Evap Coolers Replacement $ 63,787 $ 63, F02. 2 Classroom Addition $ 74,00 $ 74, B03. 2 ADA Upgrades $ 44,336 $ 44, F07. Administration Renovation $ 8,889 $ 8, C03. 2 Gymnasium Acoustics $ 4,038 $ 4, F0. Facility Issue E03. 2 Parking Issue B02. Asbestos Floor Tile Abatement $ 24,000 $ 24, C07. 2 Blinds in Windows $ 25,000 $ 25,000 Total Estimated Capital Needs: $ 2,274,229 $,326,394 $,326,394 Total : Total : $ 2,274,229

11 Cluster: Albuquerque 385 ZIA ES Capital Improvement 2 HB F07. Cafeteria - Kitchen Addition/Renovation $ 892,599 $ 892, E03. Site Improvements $ 46,957 $ 46, G0. School Improvement $ 57,600 $ 57, A06. Network Drops and Equipment Upgrades $ 37,46 $ 37,46 $,234,67 $,234, A06. School-Based Technology Allocation $ 4,400 $ 4,400 $ 4,400 $ 4, A06. School-Based Technology Allocation $ 4,400 $ 4, A06. 2 Network Drops and Equipment Upgrades $ 65,492 $ 65,492 $ 79,892 $ 79, F0. Kindergarten Addition $ 654,062 $ 654, D04. Roof Upgrades $ 306,806 $ 306, C0. School Refurbishing $,874,044 $,874, A03. Electrical Upgrade $ 273,263 $ 273, C0. Portable Refurbishing $ 8,905 $ 8, A03. HVAC Improvements $ 234,000 $ 234, C09. Restroom Renovation $ 308,745 $ 308, D04. 2 Roof Improvements $ 339,363 $ 339, E0. Landscape and Site Security Improvements $ 424,422 $ 424, C0. Blinds in Classroom Windows $ 25,000 $ 25, B02. Asbestos Abatement $ 60,000 $ 60,000 Total Estimated Capital Needs: $ 5,90,57 $ 4,58,609 $ 4,58,609 Total : Total : $ 5,90,57

12 Cluster: Albuquerque 425 JEFFERSON MS 8.30 Capital Improvement 2 HB E0. East Site Area Improvements $ 572,652 $ 572, G0. School Improvement $ 7,640 $ 7,640 $ 690,292 $ 690, A06. School-Based Technology Allocation $ 29,400 $ 29, A06. Network Drops and Equipment Upgrades $ 4,33 $ 4,33 $ 43,533 $ 43, A03. HVAC Improvements $ 304,000 $ 304, A06. 3 Network Drops and Equipment Upgrades $ 46,229 $ 46,229 $ 350,229 $ 350, A06. School-Based Technology Allocation $ 29,400 $ 29,400 $ 29,400 $ 29, F04. Music Building Addition and Renovation $ 937,606 $ 937, F02. Science Addition and Renovation $,95,882 $,95, D04. Roofing Improvements $ 66,295 $ 66, C09. Complete Renovation of Restrooms $ 208,228 $ 208, D04. 3 Roofing Improvements 3 $ 350,402 $ 350, F0. Issue: Changes in Master Plan E0. 2 North and South Site Area Improvements $ 69,58 $ 69, C0. Renovation of Substandard Program Spaces $ 667,064 $ 667, D02. 2 Complete Exterior Surfaces Upgrade $ 6,243 $ 6, C0. 2 Refurbishing of the Main Building / 7th $ 772,840 $ 772,840 Grade Wing C0. Gym Complex Improvements $ 355,06 $ 355, D04. 2 Roofing Improvements 2 $ 59,355 $ 59,355 Total Estimated Capital Needs: $ 6,56,634 $ 4,943,80 $ 4,943,80 Total : Total : $ 6,56,634

13 Cluster: Albuquerque 465 WASHINGTON MS Capital Improvement 2 HB E03. Site Improvements $ 2,879 $ 2, A05. Security Improvements $ 48,304 $ 48, G0. School Improvement $ 74,390 $ 74,390 $ 334,572 $ 334, A06. School-Based Technology Allocation $ 8,600 $ 8, A06. 2 Network Drops and Equipment Upgrades $ 8,600 $ 8,600 $ 42,377 $ 42,377 $ 42,377 $ 42, C0. Science and Classroom Improvements $ 757,879 $ 757, A06. School-Based Technology Allocation $ 8,600 $ 8, A06. Network Drops and Equipment Upgrades $ 776,479 $ 776,479 $ 2,883 $ 2,883 $ 2,883 $ 2, F02. Classroom Addition and Media Center $ 2,49,973 $ 2,49,973 Improvements C09. Plumbing and Student Restroom $ 32,940 $ 32,940 Improvements G0. Administration Addition/Remodel $ 355,268 $ 355, F06. 2 Replacement Gymnasium and Renovations $ 2,847,42 $ 2,847, A03. Electrical Improvements $ 394,52 $ 394, E02. 2 Landscape and Irrigation Upgrade $ 40,000 $ 40, C08. Door Hardware Replacement $ 37,05 $ 37, E03. 2 Paved Area Improvements $ 74,360 $ 74, C0. 2 Renovation of Old Gym Areas $ 436,987 $ 436,987 Total Estimated Capital Needs: $ 8,93,028 $ 6,999,6 $ 6,999,6 Total : Total : $ 8,93,028

14 Cluster: Albuquerque 590 ALBUQUERQUE HS Capital Improvement 2 HB C0. Administration Renovation and Addition $ 989,982 $ 989, G0. School Improvement $ 256,240 $ 256,240 $,246,222 $,246, A06. School-Based Technology Allocation $ 64,00 $ 64, A06. Network Drops and Equipment Upgrades $ 230,295 $ 230,295 $ 294,395 $ 294, A03. HVAC Improvements $ 2,08,000 $ 2,08, D04. Roofing Improvements $ 75,53 $ 75, A06. 3 Network Drops and Equipment Upgrades $ 23,279 $ 23,279 $ 2,946,809 $ 2,946, A06. School-Based Technology Allocation $ 64,00 $ 64,00 $ 64,00 $ 64, C0. Refurbish North Wing $ 3,007,260 $ 3,007, A03. Electrical Upgrade $,3,888 $,3, F06. PE Storage and Training Room Addition $,490,846 $,490, E03. Parking Lot/Access Drive Improvements $ 283,8 $ 283, C0. 2 Renovation of Gym, Music, and Shop Wings $ 3,22,24 $ 3,22, C0. 2 Expand Kitchen, Cafeteria, and Commons $,389,583 $,389, E03. Sidewalk Improvements $,354 $, E03. 3 Portable Area Improvements $ 76,744 $ 76, G0. PAC Improvements $ 670,002 $ 670, C06. 2 Upgrade Main Courtyard Fenestration $ 28,722 $ 28, E0. 3 Option: Redevelopment of Softball/Tennis $,200,844 $,200,844 Site Area C0. 2 Media Center Expansion and Art Relocation $,527,335 $,527, E0. Issue: Additional Land Acquisition E0. Portable Area / Entry Improvements $ 95,654 $ 95, C09. Upgrade Restrooms $ 588,32 $ 588, D04. 2 Roofing Improvements 3 $ 7,26 $ 7, E05. Site Drainage Improvement $ 484,475 $ 484, F02. 2 Classroom Addition $ 3,676,4 $ 3,676, E0. Baseball Field Improvements $ 256,693 $ 256, A03. 2 Remove Emergency Generator $ 50,000 $ 50, E02. 2 Landscape at Main Building $ 50,000 $ 50, D04. 2 Roofing Improvements 2 $ 802,57 $ 802,57

15 $ 20,395,890 $ 20,395,890 Total Estimated Capital Needs: $ 24,947,46 Total : Total : $ 24,947,46 2

16 Cluster: Alternative 9 STRONGHURST COMPLEX Capital Improvement 3 GO Bond A06. Network Drops and Equipment Upgrades Total Estimated Capital Needs:,60,60,60,60,60 Total : Total :,60

17 Cluster: Alternative 60 INDIAN SERVICES 436 Capital Improvement A06. 3 Network Drops and Equipment Upgrades Total Estimated Capital Needs: $ 23,5 $ 23,5 $ 23,5 $ 23,5 $ 23,5 Total : Total : $ 23,5

18 Cluster: Alternative 507 STRONGHURST ALT - (SMALL MS Capital Improvement 2 HB F0. Issue: Relocation of the Program G0. Option: New Modular Type Campus $ 3,043,737 $ 3,043, G0. Site Development Plan $ 8,686 $ 8,686 $ 3,062,423 $ 3,062, C0. Portable Facilities / Improvements $ 37,367 $ 37, G0. Issue: Optional Relocation to Existing Facility Total Estimated Capital Needs: $ 3,379,789 $ 37,367 $ 37,367 Total : Total : $ 3,379,789

19 Cluster: Alternative 5 ALBQ EVENING HS 73.4 Capital Improvement 2 HB G0. School Improvement $ 22,640 $ 22,640 $ 22,640 $ 22, A06. School-Based Technology Allocation $ 5,700 $ 5,700 $ 5,700 $ 5, A06. School-Based Technology Allocation $ 5,700 $ 5,700 $ 5,700 $ 5, F0. Issue: Permanent Facility C0. Interior Improvements $ 284,70 $ 284,70 Total Estimated Capital Needs: $ 38,20 $ 284,70 $ 284,70 Total : Total : $ 38,20

20 Cluster: Alternative 549 NEW FUTURES Capital Improvement 2 HB G0. Small s $ 22,354 $ 22, F02. Media Center Addition $ 583,248 $ 583, G0. School Improvement $ 38,380 $ 38,380 $ 743,982 $ 743, A06. School-Based Technology Allocation $ 9,600 $ 9, A06. Network Drops and Equipment Upgrades $ 22,736 $ 22, A06. 3 Network Drops and Equipment Upgrades $ 32,336 $ 32,336 $ 77,049 $ 77,049 $ 77,049 $ 77, A06. School-Based Technology Allocation $ 9,600 $ 9,600 $ 9,600 $ 9, F02. Science Lab, Art, and Classroom Addition $,269,60 $,269, D04. 2 Roofing Improvements $ 304,76 $ 304, F07. Cafeteria Addition $ 472,466 $ 472, C06. 2 Window Wall Replacement $ 54,947 $ 54, E05. 2 Drainage Control Improvements $ 80,79 $ 80, A03. 2 HVAC Controls $ 24,000 $ 24, C0. 2 Interior Renovation $ 596,003 $ 596, F07. Kitchen/Clinic Addition To Cafeteria Area $ 880,27 $ 880,27 Total Estimated Capital Needs: $ 4,835,85 $ 3,972,849 $ 3,972,849 Total : Total : $ 4,835,85

21 Cluster: Alternative 592 CEC Capital Improvement 2 HB G0. Road Realignment - Site Development Study $ 24,47 $ 24, C09. Bathroom remodel $ 222,920 $ 222, A02. Exterior Wall Improvements $ 96,234 $ 96, C0. 2 Complete Refurbishing of Interiors $ 79,7 $ 79, G0. School Improvement $ 4,570 $ 4,570 $,39,32 $,39, A06. School-Based Technology Allocation $,00 $, A06. Network Drops and Equipment Upgrades $ 20,784 $ 20, A06. 3 Network Drops and Equipment Upgrades $ 2,884 $ 2,884 0,64 0,64 0,64 0, A06. School-Based Technology Allocation $,00 $,00 $,00 $, F0. Classroom Addition / Road Realignement $ 2,750,905 $ 2,750, E03. Parking Lot Improvements $ 28,264 $ 28, A03. Continue Electrical Upgrades $ 275,5 $ 275, F05. 3 Auto Shop/Construction Trades Building $,470,447 $,470, C0. Planitarium upgrade $ 549,69 $ 549,69 Total Estimated Capital Needs: $ 6,626,755 $ 5,264,295 $ 5,264,295 Total : Total : $ 6,626,755

22 Cluster: Alternative 594 SIERRA ALT - (LARGE MS ALTER Capital Improvement 2 HB G0. School Improvement $ 9,560 $ 9,560 $ 9,560 $ 9, A06. School-Based Technology Allocation $ 4,900 $ 4, A06. Network Drops and Equipment Upgrades $ 63,858 $ 63, A06. 2 Network Drops and Equipment Upgrades $ 68,758 $ 68,758 $ 26,967 $ 26,967 $ 26,967 $ 26, A06. School-Based Technology Allocation $ 4,900 $ 4,900 $ 4,900 $ 4, F0. Issue: Sierra Alternative School Location G0. Site Development Plan $ 24,47 $ 24, F07. Cafeteria and Kitchen $ 948,577 $ 948, C0. Media Center Addition $ 75,488 $ 75, F06. Mini-Gymnasium Addition $,600,948 $,600, F02. Child Development Program Addition $ 635,02 $ 635, F07. Administration Addition $ 820,467 $ 820, E0. Site Improvements $ 906,027 $ 906, F02. Vocational Shop Addition $ 827,065 $ 827, F02. Issue: Classroom Addition G0. Portable Classrooms $,6,960 $,6, C0. Aztec Facilities Improvements $ 366,635 $ 366,635 Total Estimated Capital Needs: $ 8,08,78 $ 7,96,597 $ 7,96,597 Total : Total : $ 8,08,78

23 Cluster: Alternative 596 FREEDOM HS Capital Improvement 2 HB C0. Refurbish Classroom Wings $,537,754 $,537, G0. School Improvement $ 26,60 $ 26,60 $,563,94 $,563, A06. School-Based Technology Allocation $ 6,500 $ 6, A06. Network Drops and Equipment Upgrades $ 53,429 $ 53,429 $ 59,929 $ 59, A03. HVAC Improvements $ 324,000 $ 324, A06. 2 Network Drops and Equipment Upgrades $ 46,229 $ 46,229 $ 370,229 $ 370, A06. School-Based Technology Allocation $ 6,500 $ 6,500 $ 6,500 $ 6, E0. Site Improvements $ 256,98 $ 256, C0. Specialty Lab Upgrades $ 239,588 $ 239, E05. Continue Drainage Improvements $ 53,86 $ 53, E0. Issue- San Mateo Place Cul-de-Sac E0. Issue - Freeway Noise C0. Replace Blinds $ 30,000 $ 30, C04. Lighting Upgrade $ 50,000 $ 50, B02. Asbestos Abatement (M & O) $ 50,000 $ 50, A03. Electrical Distribution Upgrade $ 282,880 $ 282,880 Total Estimated Capital Needs: $ 3,063,820 $,063,247 $,063,247 Total : Total : $ 3,063,820

24 Cluster: Alternative 597 SCHOOL ON WHEELS Capital Improvement 2 HB C0. Bathrooms Refurbished $ 98,296 $ 98, C0. Safety s $ 68,088 $ 68, C0. Science Room Renovations $ 30,088 $ 30, B03. ADA Upgrades $ 25,440 $ 25, G0. School Improvement $ 28,840 $ 28,840 $ 250,752 $ 250, A06. School-Based Technology Allocation $ 7,200 $ 7, A06. Network Drops and Equipment Upgrades $ 20,967 $ 20,967 $ 28,67 $ 28, A03. Electrical Upgrades 8,268 8, A06. 3 Network Drops and Equipment Upgrades $ 38,525 $ 38,525 $ 46,793 $ 46, A06. School-Based Technology Allocation $ 7,200 $ 7,200 $ 7,200 $ 7, F06. Multi-Purpose Facility $,846,40 $,846, A03. HVAC Improvements $ 245,000 $ 245, E03. Site Access Improvements $ 365,20 $ 365, F04. 2 Classroom Addition $,06,627 $,06, E0. 2 Commons / Portal Area Improvements 7,237 7, C0. 3 Restoration of Main Building $ 323,79 $ 323, C0. 2 Refurbish Portable at Coronado Complex $ 7,34 $ 7, B02. Asbestos Abatement (M & O) $ 75,000 $ 75,000 Total Estimated Capital Needs: $ 4,509,50 $ 4,076,238 $ 4,076,238 Total : Total : $ 4,509,50

25 Cluster: Alternative 900 FAMILY SCHOOL Number Capital Improvement 2 HB F0. Issue: West Side Campus Option E03. Parking / Site Improvements $ 9,454 $ 9, G0. School Improvement $ 35,440 $ 35,440 $ 226,894 $ 226,894 3 GO Bond F02. Multi-use Space Addition $ 536,576 $ 536, A06. School-Based Technology Allocation $ 8,900 $ 8, A06. 3 Network Drops and Equipment Upgrades $ 545,476 $ 545,476 $ 53,934 $ 53,934 $ 53,934 $ 53, A06. School-Based Technology Allocation $ 8,900 $ 8, A06. Network Drops and Equipment Upgrades $ 8,900 $ 8,900 $ 22,988 $ 22,988 $ 22,988 $ 22,988 Total Estimated Capital Needs: $ 858,92 Total : Total : $ 858,92

26 Cluster: 5 AZTEC COMPLEX Number Capital Improvement 2 HB F0. Issue: Site Use Decision 3 GO Bond A06. Network Drops and Equipment Upgrades $ 43,54 $ 43,54 $ 43,54 $ 43, A03. Electrical Distribution Improvements $ 76,75 $ 76, A06. 3 Network Drops and Equipment Upgrades $ 9,262 $ 9,262 $ 95,977 $ 95, E03. Parking Lot/Bus Dropoff 6,33 6, E03. Site, Site Access and Paving Improvements $ 23,375 $ 23, E0. Site Improvements $ 8,966 $ 8, E05. Site Drainage and Landscaping $ 37,206 $ 37,206 Improvements D04. 2 Reroofing s $ 269,596 $ 269, D0. Refurbish Walkways and Damaged Brick $ 38,754 $ 38, C0. 3 General Interior Renovation $ 2,052,486 $ 2,052, C06. 2 Replace Window Wall $ 243,576 $ 243, C06. Exterior / Interior Door Improvements 8,490 8, A03. HVAC Improvements $ 263,000 $ 263, C07. Blinds at Windows Renovations $ 40,000 $ 40, B02. Asbestos Abatement (Renovations) $ 98,000 $ 98,000 Total Estimated Capital Needs: $ 4,047,27 $ 3,807,780 $ 3,807,780 Total : Total : $ 4,047,27

27 Cluster: 7 CORONADO COMPLEX (SCHOOL) 373 Capital Improvement A06. 2 Network Drops and Equipment Upgrades $ 23,5 $ 23,5 $ 23,5 $ 23, F07. Issue - Department Consolidation / New School B03. Entry / Access Addition $ 789,8 $ 789, G0. Conversion Site Development Plan $ 6,278 $ 6, C09. Restroom Renovation $ 8,565 $ 8, E02. Site Landscaping Improvements $ 72,703 $ 72, F03. Records Storage Improvements $ 30,307 $ 30, A03. HVAC Improvements $ 386,896 $ 386, B03. Site Accessibility Improvements $ 9,44 $ 9, G0. Exterior Refurbishing $ 22,778 $ 22, B03. Drinking Fountain Replacement $ 3,60 $ 3, C0. 2 General Interior Refurbishing and $,07,573 $,07,573 Renovation E03. Parking Lot Improvements $ 2,875 $ 2, D04. 2 Roof Improvements $ 207,999 $ 207, A03. Replace Boiler in Annex Building 0,000 0, B02. Asbestos Abatement $ 50,000 $ 50,000 Total Estimated Capital Needs: $ 3,034,32 $ 3,0,206 $ 3,0,206 Total : Total : $ 3,034,32

28 Cluster: 47 MONTGOMERY COMPLEX 355 Capital Improvement 3 GO Bond A06. Network Drops and Equipment Upgrades A06. 3 Network Drops and Equipment Upgrades $ 30,062 $ 30,062 $ 30,062 $ 30,062 $ 77,049 $ 77,049 $ 77,049 $ 77, E03. Site, Site Access and Paving Improvements $ 309,56 $ 309, B03. Site Accessibility Improvements $ 4,578 $ 4, C09. Upgrade Restrooms $ 238,322 $ 238, E0. Site Drainage and Landscape Improvements $ 33,524 $ 33, C06. Window Wall Replacement $ 493,03 $ 493, A03. Electrical Improvements $ 288,470 $ 288, A04. Sewer Line Improvements $ 49,904 $ 49, C06. Entrance/Exit Improvements $ 65,95 $ 65, C0. 2 General Interior Renovation $,084,066 $,084, A03. 2 HVAC Improvements $ 205,000 $ 205, C0. Drinking Fountain and Sink Replacement $ 40,73 $ 40, F07. Construct Meeting Room Addition $,89,203 $,89, F07. 2 Arts Center Addition $ 87,527 $ 87, F07. 2 Instructional Materials Library Addition $ 736,63 $ 736, E02. Irrigation Upgrade $ 45,000 $ 45, B02. Asbestos Abatement $ 95,000 $ 95, C0. Blinds at Windows $ 40,000 $ 40,000 Total Estimated Capital Needs: $ 6,360,52 $ 6,253,04 $ 6,253,04 Total : Total : $ 6,360,52

29 Cluster: 70 LINCOLN COMPLEX (M & O) Capital Improvement 2 HB F07. Issue: Use of Central Kitchen Space G0. Issue: Main building A06. 3 Network Drops and Equipment Upgrades A06. 2 Network Drops and Equipment Upgrades $ 3,852 $ 3,852 $ 3,852 $ 3,852 $ 88,606 $ 88,606 $ 88,606 $ 88, F07. New Repair Shop Building - Phase b $ 2,276,277 $ 2,276, G0. New M & O Warehouse - Phase 2a $ 7,693,05 $ 7,693, G0. 2 New Special s Shops - Phase 2b $ 2,35,526 $ 2,35, G0. 2 New Staging Shops - Phase 2c $,595,85 $,595, G0. 3 New Staging Shops 2 - Phase 3a $,433,940 $,433, G0. 4 New Consolidation Shops - Phase 3b $ 2,23,083 $ 2,23, G0. 2 Exterior Improvements (Building A) $ 68,57 $ 68, G0. 2 Interior Improvements (Building A) $ 449,590 $ 449, G0. Safety Improvements (Building A) $ 258,432 $ 258, G0. New Construction for (Building A) $ 299,706 $ 299, D02. 2 Life-cycle Improvements (Building A) $ 506,887 $ 506, A02. 2 Structural Improvements (Building A) $ 443,029 $ 443, G0. 2 New Construction (Building B) $ 36,42 $ 36, D02. 3 Exterior Improvements (Building C) $ 93,62 $ 93, G0. 3 Interior Improvements (Building C) $ 73,746 $ 73, A03. 2 Safety Improvements (Building C) $ 27,203 $ 27, D02. 3 Exterior Improvements (Building C2) $ 430,964 $ 430, G0. 3 Interior Improvements (Building C2) $ 68,587 $ 68, G0. 2 Safety Improvements (Building C2) $ 62,257 $ 62, G0. 2 New Construction within (Building C2) $ 267,033 $ 267, A02. 2 Structural Improvements (Building C2) $ 28,6 $ 28, E0. 2 Demolition of Building (D) $ 389,998 $ 389, E0. 3 Demolition of (Building E) $ 49,84 $ 49, G0. 2 Exterior Improvements (Building G) $ 56,333 $ 56, C0. 2 Interior Improvements (Building G) $ 667,782 $ 667, G0. 2 Safety Improvements (Building G) $ 235,526 $ 235, G0. 3 New Construction in (Building G) $ 25,473 $ 25, A0. 2 Life-cycle Improvements (Building G) $ 206,867 $ 206, A0. 2 Systems Improvements (Building G2) 9,465 9, E0. Demolition of (Building G2) $ 70,66 $ 70,66

30 G0. 2 New Construction (Building H) $ 49,370 $ 49, C0. 2 Interior Improvements (Bldg. I) $ 6,035 $ 6, E08. 3 Relocation of (Building I),03, E03. 2 Exterior Improvements (Building J) $,500 $, G0. 2 Safety Improvements (Building J) $ 75,35 $ 75, E0. 2 Exterior Improvements (Building K) 2,790 2, G0. 2 Improvements to (Building K) $,094 $, E0. 2 Exterior Improvements (Area L) $ 82,809 $ 82, E05. 2 Removal of (Quonset Q) $ 68,08 $ 68, A0. 2 Life-cycle Improvements (Building R) $ 93,253 $ 93, E03. 2 Exterior Improvements (Building S) $ 308,099 $ 308, E0. 4 Relocation of (Building S) $ 20,988 $ 20, C0. 2 Life-cycle Improvements (Building S) $ 8,05 $ 8, G0. 4 Exterior Improvements (Bldg. T) $ 48,203 $ 48, G0. 2 Safety Improvements (Building T) $ 76,098 $ 76, G0. 4 Demolition of (Building T) $ 26,537 $ 26, E05. 2 Drainage Upgrades (Parking Areas U) $ 592,466 $ 592, G0. Relocate District Imaging and Archive $ 373,358 $ 373,358 Center G0. Interior Improvements- Building M Food $,36,435 $,36,435 Services G0. 3 Exterior Improvements- Building M $ 70,039 $ 70, G0. Exterior Improvements- Building N $ 6,540 $ 6,540 Total Estimated Capital Needs: $ 27,025,44 $ 26,932,982 $ 26,932,982 Total : Total : $ 27,025,44 2

31 Cluster: 96 KANW RADIO STATION 368 Capital Improvement A06. 3 Network Drops and Equipment Upgrades $ 3,852 $ 3,852 $ 3,852 $ 3, B03. Building Access Improvements $,825 $, B03. Interior Accessibility Improvements $ 3,86 $ 3, E03. Site Access and Paving Improvements $ 34,922 $ 34, F07. Building Addition and Remodeling $ 79,206 $ 79, C0. Interior Renovation $ 7,702 $ 7, F07. Issue: Prior Land Use E0. Dumpster Enclosure $ 3,38 $ 3, E02. 2 Re-Sod Lawn $ 2,237 $ 2, D02. Re-Stucco Walls $ 2,643 $ 2, B03. Site Accessibility Improvements $ 4,64 $ 4, E02. Irrigation Upgrade,000, A03. 2 Back Up Generator $ 75,000 $ 75,000 Total Estimated Capital Needs: $ 952,794 $ 948,942 $ 948,942 Total : Total : $ 952,794

32 Cluster: 50 CENTRAL OFFICE Number Capital Improvement A06. 3 Network Drops and Equipment Upgrades Total Estimated Capital Needs: $ 5,40 $ 5,40 $ 5,40 $ 5,40 $ 5,40 Total : Total : $ 5,40

33 Cluster: 80 CITY CENTRE 43 Capital Improvement A06. 3 Network Drops and Equipment Upgrades Total Estimated Capital Needs: $ 27,3 $ 27,3 $ 27,3 $ 27,3 $ 27,3 Total : Total : $ 27,3

34 Cluster: 5 ALBQ EVENING HS 45 Capital Improvement 3 GO Bond A06. Network Drops and Equipment Upgrades Total Estimated Capital Needs: $,326 $,326 $,326 $,326 $,326 Total : Total : $,326

35 Cluster: 60 DISTRICT Number Capital Improvement D04. District Roofing Emergency Fund $ 20,480 $ 20,480 $ 20,480 $ 20, C0. ISP Relocation Fund $ 500,000 $ 500,000 Total Estimated Capital Needs: $ 520,480 $ 500,000 $ 500,000 Total : Total : $ 520,480

36 Cluster: 70 MILNE STADIUM Number Capital Improvement 2 HB F06. Field House Addition $ 960,096 $ 960,096 $ 960,096 $ 960, E0. Site Improvements $ 868,66 $ 868,66 $ 868,66 $ 868, G0. Stadium Improvements $ 947,63 $ 947, C0. Interior Improvements $ 68,544 $ 68, E0. 2 Site Improvements (Phase II) 2,822 2, C09. New Construction within the Stadium $ 543,538 $ 543, A03. Replace HVAC Units/Fans 5,000 5, D05. 2 Issue: Playing Field and Track Replacement G0. Issue: Replace Scoreboard Total Estimated Capital Needs: $ 3,696,229 $,867,58 $,867,58 Total : Total : $ 3,696,229

37 Cluster: 72 NEW WESTSIDE STADIUM Capital Improvement 2 HB E0. Issue: Location of New Stadium G0. Design Fees for New Stadium $ 60,000 $ 60, G0. 4 Construct New Stadium Facility $ 7,38,247 $ 7,38, E03. 4 Develop New Stadium Site $,794,62 $,794,62 Total Estimated Capital Needs: $ 9,542,860 $ 9,542,860 $ 9,542,860 Total : Total : $ 9,542,860

38 Cluster: 75 WILSON STADIUM Number Capital Improvement 2 HB E0. Drive Pads and Paving - East Lot $ 880,338 $ 880, E0. 2 Site Improvements Phase II $ 75,577 $ 75,577 $ 955,95 $ 955, G0. Stadium and Access Improvements $ 92,64 $ 92, C0. Interior Improvements $ 295,84 $ 295, G0. 2 New Construction $ 66,9 $ 66, D05. Issue: Playing Field and Track Replacement G0. Issue: Replace Scoreboard Total Estimated Capital Needs: $ 2,330,03 $,374,098 $,374,098 Total : Total : $ 2,330,03

39 Cluster: 740 FOOD SERVICES Number Capital Improvement 2 HB G0. Issue: New Food Services Complex G0. Design Fees for Food Services Complex $ 845,000 $ 845, A06. Network Drops and Equipment Upgrades $,326 $, A06. 3 Network Drops and Equipment Upgrades $ 846,326 $ 846,326 $,557 $,557 $,557 $, F07. 3 Phase : Relocation of Central Kitchen $ 6,269,68 $ 6,269, F07. 3 Phase 2: Administration and Warehousing Addition Total Estimated Capital Needs: $ 3,776,843 $ 6,269,68 $ 6,269,68 $ 6,649,279 $ 6,649,279 $ 6,649,279 $ 6,649,279 Total : Total : $ 3,776,843

40 Cluster: Cibola 264 VENTANA RANCH ES Number Capital Improvement 2 HB G0. Phase 2 Classroom Wings $ 6,8,2 $ 2,843,32 $ 3,337, E0. Site Redevelopment $ 479,023 $ 220,35 $ 258, G0. Supplemental Funds - Complete Phase $ 2,76,200 $ 2,76, G0. School Improvement 4,040 4,040 $ 9,480,375 $ 3,063,662 $ 6,46, A06. School-Based Technology Allocation $ 26,000 $ 26,000 $ 26,000 $ 26, A06. School-Based Technology Allocation $ 26,000 $ 26,000 $ 26,000 $ 26, E0. 2 Construct a Grass Field $ 258,675 $ 258,675 Total Estimated Capital Needs: $ 9,79,050 $ 258,675 $ 258,675 Total : $ 3,063,662 Total : $ 6,727,388

41 Cluster: Cibola 265 SEVEN BAR ES 92 Capital Improvement 2 HB G0. School Improvement $,620 $, A06. Network Drops and Equipment Upgrades $ 67,450 $ 67,450 $ 79,070 $ 79, A06. School-Based Technology Allocation $ 27,900 $ 27,900 $ 27,900 $ 27, A06. School-Based Technology Allocation $ 27,900 $ 27, A06. 2 Network Drops and Equipment Upgrades $ 54,098 $ 54,098 $ 8,998 $ 8, E0. Site Improvements $ 396,802 $ 396, C0. Administration Storage Addition $ 4,954 $ 4, E03. 2 Complete Parking Traffic Improvements $ 79,570 $ 79, A03. HVAC: Add Cooling for Computer and $ 4,249 $ 4,249 Lounge Areas C0. Media Center and Nurse's Office $ 20,39 $ 20,39 Modifications C0. Cafeteria Refurbishing $ 30,032 $ 30,032 Total Estimated Capital Needs: $,44,967 $ 755,999 $ 755,999 Total : Total : $,44,967

42 Cluster: Cibola 295 CHAMIZA ES Capital Improvement 2 HB A03. HVAC Study / Upgrades $ 37,09 $ 37, G0. School Improvement $ 99,980 $ 99,980 $ 36,999 $ 36, A06. School-Based Technology Allocation $ 25,000 $ 25, A06. 3 Network Drops and Equipment Upgrades $ 25,000 $ 25,000 $ 26,967 $ 26,967 $ 26,967 $ 26, A06. School-Based Technology Allocation $ 25,000 $ 25, A06. Network Drops and Equipment Upgrades $ 25,000 $ 25,000 $ 42,440 $ 42,440 $ 42,440 $ 42, F06. Site / Field Improvements $ 360,792 $ 360, F02. Kindergarten Addition $ 905,37 $ 905, E02. Landscaping Improvements $ 35,648 $ 35, D02. Masonry Wall Corrections $ 4,648 $ 4, D02. Paint Exterior $ 35,000 $ 35,000 Total Estimated Capital Needs: $,697,866 $,44,460 $,44,460 Total : Total : $,697,866

43 Cluster: Cibola 37 PETROGLYPH ES 9. Capital Improvement 2 HB G0. School Improvement 5,590 5, A06. Network Drops and Equipment Upgrades $ 85,454 $ 85,454 $ 29,044 $ 29, A06. School-Based Technology Allocation $ 26,400 $ 26, A06. 3 Network Drops and Equipment Upgrades $ 26,400 $ 26,400 $ 5,40 $ 5,40 $ 5,40 $ 5, A06. School-Based Technology Allocation $ 26,400 $ 26, A06. 2 Network Drops and Equipment Upgrades $ 30,820 $ 30,820 $ 57,220 $ 57, F02. Kindergarten Addition $,670,372 $,670, E03. 2 Construct Additional Parking 6,404 6, E0. Grassed Field/Track $ 240,433 $ 240, E05. Erosion / Landscaping Improvements $ 50,300 $ 50, E09. 2 Add Outdoor Teaching Area 8,222 8, F02. 2 Construct an 8 Classroom Addition $,883,438 $,883, C0. Moisture Abatement $ 42,499 $ 42, E02. Parking Lot Island Landscape $ 80,000 $ 80,000 Total Estimated Capital Needs: $ 4,67,742 $ 4,28,668 $ 4,28,668 Total : Total : $ 4,67,742

44 Cluster: Cibola 35 CORRALES ES Capital Improvement 2 HB C0. Addition to and Refurbishing of the $ 493,52 $ 493,52 Cafeteria E02. Replacement of Courtyard Dying Trees $ 22,774 $ 22, A03. HVAC Humidity Resolution $ 43,443 $ 43, A02. Study CMU Cracking on Gym and E. End $ 6,202 $ 6,202 Old Wing G0. School Improvement $ 77,230 $ 77, A06. Network Drops and Equipment Upgrades $ 42,34 $ 42,34 $ 695,475 $ 695, A06. School-Based Technology Allocation $ 9,300 $ 9,300 $ 9,300 $ 9, A03. HVAC - Evap Coolers Replacement $ 95,000 $ 95, A03. HVAC - Renovate the Mechanical Rooms of $ 283,000 $ 283,000 the Old Wings A03. Electrical Upgrade for Old WIngs $ 44,963 $ 44, A06. 3 Network Drops and Equipment Upgrades $ 3,852 $ 3,852 $ 526,85 $ 526, A06. School-Based Technology Allocation $ 9,300 $ 9, A06. 2 Network Drops and Equipment Upgrades $ 57,787 $ 57,787 $ 77,087 $ 77, C0. 2 Refurbish Old North and South Wings $ 802,248 $ 802, C0. Renovate 2 Classrooms for Kindergarten $ 40,539 $ 40, C09. Restroom / Storage Addition to Gym $ 373,08 $ 373, E0. South Parking Lot Improvements $ 27,22 $ 27, F02. 3 Kindergarten Addition $ 882,575 $ 882, D02. 3 Stucco Surface Improvements $ 83,822 $ 83, C04. 3 Replace Ceiling Tile in the New Wing $ 68,57 $ 68, E06. 3 Playground and Site Upgrades $ 67,645 $ 67, E0. Renovate the Grass Field $ 66,944 $ 66, A04. Replace Domestic Water Lines $ 45,000 $ 45,000 $ 2,657,070 $ 2,657,070

45 Total Estimated Capital Needs: $ 3,975,747 Total : Total : $ 3,975,747 2

46 Cluster: Cibola 356 SIERRA VISTA ES Capital Improvement 2 HB C0. Complete Refurbishing of Original Building $ 368,09 $ 69,330 $ 98, G0. School Improvement 3,60 3, A06. Network Drops and Equipment Upgrades 4,892 4,892 $ 576,62 $ 69,330 $ 406,83 3 GO Bond F02. Kindergarten / Classroom Addition $,974,422 $ 908,234 $,066, A06. School-Based Technology Allocation $ 25,800 $ 25, A06. 3 Network Drops and Equipment Upgrades $ 2,000,222 $ 908,234 $,09,988 $ 3,852 $ 3,852 $ 3,852 $ 3, A06. School-Based Technology Allocation $ 25,800 $ 25, A06. 2 Network Drops and Equipment Upgrades $ 9,262 $ 9,262 $ 45,062 $ 45, F0. Cafeteria/Kitchen Addition $ 888,846 $ 408,869 $ 479, D04. 2 Re-roof 966 Main Building $ 473,200 $ 473, G0. Portables Upgrades $ 9,66 $ 9, E0. Staff Parking/Loop Road and Playground $ 602,25 $ 602,25 Completion C0. Interior s - Enhancement $ 47,220 $ 47,220 Total Estimated Capital Needs: $ 4,728,350 $ 2,03,05 $ 408,869 $,694,8 Total : $,486,434 Total : $ 3,24,96

47 Cluster: Cibola 365 MARIE M HUGHES ES Capital Improvement 2 HB G0. Kitchen/Cafeteria $ 68,532 $ 68, C09. Upgrade Restrooms $ 82,906 $ 82, G0. Site Development Plan $ 24,47 $ 24, G0. School Improvement 3,230 3, A06. Network Drops and Equipment Upgrades $ 89,806 $ 89,806 $,08,89 $,08, A06. School-Based Technology Allocation $ 25,800 $ 25, A06. 3 Network Drops and Equipment Upgrades $ 25,800 $ 25,800 $ 26,967 $ 26,967 $ 26,967 $ 26, A06. School-Based Technology Allocation $ 25,800 $ 25,800 $ 25,800 $ 25, F02. Classroom Addition with Kindergarten $ 4,45,340 $ 4,45,340 WIng Renovation D04. 2 Roof Improvements $ 59,92 $ 59, E0. Field Irrigation System Upgrade $ 75,000 $ 75, E02. 2 Site Landscaping Improvements 4,264 4, G0. New Loop Road and Administration Area $,06,087 $,06, E0. Refurbish Grass Field $ 50,000 $ 50, E03. Resurface Asphalt Areas $ 8,404 $ 8, E06. Upgrade Playground $ 73,747 $ 73, E03. 2 Construct Additional Parking $ 30,958 $ 30, G0. Small s $ 34,960 $ 34, A03. Electrical Upgrade $ 408,384 $ 408, C09. Add Restrooms to N and Southeast Wings $ 592,685 $ 592, E04. Improve Property Line Fencing $ 53,034 $ 53, C0. 2 Media Center Expansion and Renovation $ 309,80 $ 309, F02. Issue: Classroom Addition Total Estimated Capital Needs: $ 8,522,42 $ 7,36,963 $ 7,36,963 Total : Total : $ 8,522,42

48 Cluster: Cibola 457 TAYLOR MS Capital Improvement 2 HB E03. Front Parking & Drop-Off Improvements $ 62,388 $ 62, G0. School Improvement $ 90,030 $ 90,030 $ 52,48 $ 52, A06. School-Based Technology Allocation $ 22,500 $ 22, A06. Network Drops and Equipment Upgrades $ 90,943 $ 90,943 $ 3,443 $ 3, A06. School-Based Technology Allocation $ 22,500 $ 22,500 $ 22,500 $ 22, B02. 2 Floor Tile Replacement, Cafeteria/Hallway $ 22,496 $ 22, F0. Physical Education Addition $ 666,332 $ 666, C0. Music/Drama/Weight & Art Rm. $ 336,976 $ 336,976 Renovations F04. Chorus Addition $ 730,44 $ 730, C0. Kitchen Upgrades $ 8,593 $ 8, D02. Exterior Building Walls Improvements $ 5,447 $ 5, C0. Gym Area Upgrades $ 222,99 $ 222, E0. Site s $ 3,242 $ 3, E0. Issue: West Field Development F0. 3 Issue: Multi-use Performance Room A03. 2 Secondary Electrical Upgrades $ 32,822 $ 32, C0. Refurbish Classroom Wings $ 968,32 $ 968, E08. Portables Site Improvement $ 20,376 $ 20, D04. 2 Re-roof Multipurpose, Science and Ellison $ 87,503 $ 87,503 Bldgs E0. Auxilliary Field and E. Parking $ 36,080 $ 36,080 Total Estimated Capital Needs: $ 4,346,697 $ 4,058,335 $ 4,058,335 Total : Total : $ 4,346,697

49 Cluster: Cibola 485 L. B. JOHNSON MS Capital Improvement 2 HB A03. HVAC Improvements $ 42,000 $ 42, G0. School Improvement $ 42,80 $ 42,80 $ 84,80 $ 84, A06. School-Based Technology Allocation $ 35,500 $ 35, A06. Network Drops and Equipment Upgrades $ 206,896 $ 206, A06. 3 Network Drops and Equipment Upgrades $ 242,396 $ 242,396 $ 96,3 $ 96,3 $ 96,3 $ 96, A06. School-Based Technology Allocation $ 35,500 $ 35,500 $ 35,500 $ 35, E0. Playfield, Track, and Basketball Courts $ 44,6 $ 44, F06. Complete the New Gym Lobby Area $ 269,556 $ 269, C0. Science Renovation $ 290,820 $ 290, C0. Interior Improvements $ 268,70 $ 268, F0. 2 Issue: Multi Use Family D03. Canopy at Side-By-Side Pick-Up $ 65,789 $ 65, E03. 2 Sidewalks Southside Replacement,000, C02. 2 Floor Tile Replacement Hallways $ 50,000 $ 50, E02. 2 Correct Front Landscape Berm Damage $ 50,000 $ 50, E0. Site Improvements $ 353,03 $ 353,03 Total Estimated Capital Needs: $ 2,457,438 $,899,05 $,899,05 Total : Total : $ 2,457,438

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure

More information

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717 Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400

More information

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY) Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)

More information

Public Presentation Capital Bond November 27, 2017

Public Presentation Capital Bond November 27, 2017 Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect

More information

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR Addendum No. 1 1. A preliminary Project Budget which includes all anticipated work items is included for reference in preparing a response to this

More information

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016 POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,

More information

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

2019 Capital Projects Plan

2019 Capital Projects Plan Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

2017 Bond Program Summary

2017 Bond Program Summary 2017 Bond Program Summary Middle School #3 (off Vail Divide) $ 76,225,750 Middle School #3 Off-site Utility and Road Construction $ 2,100,000 Elementary School #7 (in Rough Hollow) $ 33,130,150 Bee Cave

More information

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN

PROPOSED TEN-YEAR CAPITAL IMPROVEMENT PLAN 2017/2018 YEAR 1 ESTIMATED FUND BALANCE 7/1/17 $ 1,795,000 $ - $ 209,000 $ 117,861 $ (333,878) $ (240,844) $ 642,513 $ (113,143) EXPECTED REVENUE ACTIVITY $ 1,014,000 $ 33,473 $ 49,500 $ - $ - $ - $ -

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Central Michigan University Capital Budget

Central Michigan University Capital Budget Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital

More information

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

Why did we undertake a comprehensive Educational Facility Master Plan?

Why did we undertake a comprehensive Educational Facility Master Plan? NUSD EDUCATIONAL FACILITY MASTER PLAN Why did we undertake a comprehensive Educational Facility Master Plan? Novato Unified School District (NUSD) has thirteen school sites that provide the educational

More information

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School

Listing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00

More information

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,

More information

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000

More information

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest

Measure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 A Library, Learning Resources and Campus Center 217,200 GSF; State Funding component; begin design est. 2015/16 771120 $ 197,529.21

More information

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175

Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175 Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175 Special Education Allocation 176 Operational Services Allocation

More information

BERKELEY UNIFIED SCHOOL DISTRICT

BERKELEY UNIFIED SCHOOL DISTRICT BERKELEY UNIFIED SCHOOL DISTRICT TO: Javetta Cleveland and Neil Smith, Co-Superintendents FROM: Lew Jones, Director of Facilities DATE: June 26, 2013 SUBJECT: Approval of the 2013/14 Measure H Annual Plan

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

GRF Mutual Project Log (10/31/17)

GRF Mutual Project Log (10/31/17) 904 Maint Svc 904 Maint Svc 904 Maint Svc 904 Maint Svc GRF Mutual Project Log (10/31/17) Priority # Type Name Description Status 1 CH 5 Commercial Appliances Replace Clubhouse 5 Dishwasher and Booster

More information

Ballot Measures-LL Section

Ballot Measures-LL Section LL To repair and modernize aging classrooms/school facilities at local elementary/intermediate schools, repair termite damage, dry rot, deteriorating roofs, plumbing, and electrical, improve student safety/security,

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 - Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 Special Education Allocation 161 Operational Services

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Wed, May 6,2009 FILE #:

Wed, May 6,2009 FILE #: ARCHITECTURE URBAN DESIGN INTERIOR DESIGN MEETING MINUTES PROJECT NAME: BVSD Birch Elementary School DATE: 22 April 2009 NOTES BY: Wells Squier PROJECT #: 509023.00 Wed, May 6,2009 MEETING #: 002 NEXT

More information

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

Building and Site Sinking Fund Millage. Election Date: November 7th 2017 Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount

More information

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15

Physical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15 Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT DRAFT 1 Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT - HVAC Design - Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT - HVAC Design - replacement

More information

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS) 1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal

More information

Measure G Quarterly Progress Update

Measure G Quarterly Progress Update Measure G Quarterly Progress Update February 3, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure

More information

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012 Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING MAY 15, 2018

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING MAY 15, 2018 FACILITIES COMMITTEE MEETING MAY 15, 2018 1 PROJECTS Dunlap Hall Renovation - Completed Central Plant & Infrastructure - Completed Johnson Student Center Johnson Demolition Science Center & Building J

More information

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Physical Plant. Detailed Assessment Report

Physical Plant. Detailed Assessment Report Physical Plant Detailed Assessment Report 2011-2012 Mission / Purpose The Physical Plant Department enhances the University of West Alabama's mission to provide opportunities for students to pursue a quality

More information

Muskego Norway Schools Community Survey Results. Fall 2015

Muskego Norway Schools Community Survey Results. Fall 2015 Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

Budget Committee Meeting. February 8, 2018

Budget Committee Meeting. February 8, 2018 Budget Committee Meeting February 8, 2018 1 Agenda Norms and Parking Lot 8:30 Capital Outlay FMD Hearings 8:35 Capital Outlay FMD Prioritization 11:00 Lunch 11:45 Capital Outlay FMD Prioritization (continued)

More information

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180

Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180 Bond Amount: $18,470,000 Proposed I&S Tax Rate : $.3180 How was the EBISD 2017 Bond developed? The bond package was developed from K-12 academic needs identified by our fifty-member community facilities

More information

Measure G Quarterly Progress Update

Measure G Quarterly Progress Update Measure G Quarterly Progress Update May 4, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure G is

More information

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)

Subject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH) HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal

More information

7th Draft Projected Adopted Proposed. Summary

7th Draft Projected Adopted Proposed. Summary Summary Central High School $ 15,700 $ 523,000 $ 363,000 $ 513,000 $ 13,000 $ 13,000 Holgate Middle School $ 44,600 $ 12 $ 10 $ $ $ Simmons Middle School $ 22,600 $ 46 $ 10 $ $ $ C.C. Lee Elementary $

More information

Manteca Unified District School District

Manteca Unified District School District Manteca Unified District School District Overview of G.O. Bond Refunding Opportunities 2014 Capital Facility Master Plan Overview Prepared for: District Board February 18, 2014 Manteca USD District-wide

More information

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET

ALAMEDA ISLES PROPOSED BUDGET FACT SHEET ALAMEDA ISLES PROPOSED BUDGET FACT SHEET These sheets outline the proposed 2016/2017 budget in two parts. The first part is the operating budget which shows our income and anticipated expenses with a comparative

More information

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017 A. Approval - New (Non-State and Other State Funds) Name (Other State) (Other State) Non-State Funds/ Undetermined 1 N/A B. Approval - Amended (Non-State and Other State Funds) 1 Coastal Carolina Main

More information

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011 Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

Investing in Our Schools:

Investing in Our Schools: Investing in Our Schools: History of Measures A & B & Potential New Bond Facilities Workshop Special Board Meeting July 13, 2010 Cindy Cathey, Superintendent Song Chin-Bendib, Assistant Superintendent,

More information

Monthly Report. April 2017

Monthly Report. April 2017 Monthly Report April 2017 El Paso ISD Bond Program Program Manager: Jacobs Table of Contents Report Date: 04/30/2017 Understanding the Monthly Report... 3 Executive Summary. 7 Program Report by Phase...

More information

Lake Mills Area School District Community Survey Results. Spring 2018

Lake Mills Area School District Community Survey Results. Spring 2018 Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.

More information

FY17 FMD Capital Budget

FY17 FMD Capital Budget FY17 FMD Capital Budget School Committee Presentation December 2, 2015 Wellesley Facilities Maintenance Department AGENDA Status Update on Capital Projects Role in Capital Planning Capital Planning & Budgeting

More information

Program and Project Status Update

Program and Project Status Update Program and Project Status Update Citizens Bond Oversight Committee Meeting October 14, 2014 Robert Ball, Bond Program Manager 1 Capital Improvement Program General Updates Close out of completed projects

More information

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT.

MT. SAN ANTONIO COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE R, NOVEMBER 2001) PERFORMANCE AUDIT. (MEASURE R, NOVEMBER 2001) (MEASURE R, NOVEMBER 2001) CONTENTS Page Independent Auditor s Report... 1 Objectives... 2 Scope of the Audit... 2 Background Information... 3 Procedures Performed... 3 Results

More information

Harnett Central High

Harnett Central High NC School District/430 Harnett County/High School Harnett Central High Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 6 Campus

More information

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,

More information

Members Present: Gino Gasparini, Vijay Gupta, Nori Jabba, James Ruigomez, Bill Rundberg and Dennis Zheng

Members Present: Gino Gasparini, Vijay Gupta, Nori Jabba, James Ruigomez, Bill Rundberg and Dennis Zheng SAN MATEO COUNTY COMMUNITY COLLEGE DISTRICT Bond Oversight Committee Minutes of June 1, 2017 Meeting District Office Board Room Members Present: Gino Gasparini, Vijay Gupta, Nori Jabba, James Ruigomez,

More information

Educational & Performing Arts Center: Downriver Campus

Educational & Performing Arts Center: Downriver Campus Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed

More information

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017

NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 NC School District/520 Jones County/Elementary School Trenton Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary 4 Campus

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2015 * * *

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2015 * * * AUDIT REPORT * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180 SAN JOSE, CA 95129 Table of Contents Page No. FINANCIAL SECTION: Independent Auditor s Report... 1-2

More information

Facilities Planning & Construction Report nd Quarter Ending December 31, 2017

Facilities Planning & Construction Report nd Quarter Ending December 31, 2017 Facilities Planning & Construction Report 2017 18 2 nd Quarter Ending December 31, 2017 Overview District SRID Spending (MG100) Summary By College By Site District Measure J Spending (MJ100) Summary By

More information

Garden City Public Schools Capital Reserve. Presentation to the Board of Education January 10, 2017

Garden City Public Schools Capital Reserve. Presentation to the Board of Education January 10, 2017 Garden City Public Schools Capital Reserve Presentation to the Board of Education January 10, 2017 Tonight s Agenda District Reserves Planning process General use Current reserves Capital Reserve Voter

More information

Intermediate & Middle Schools

Intermediate & Middle Schools Intermediate & Middle Schools BUILDING ANALYSIS MATRIX Weighting Sakai Woodward Program Assessment Core Instruction 24 20 16 Special Education 5 5 5 Functional Skills 5 5 5 Science 3 3 3 Arts/Performance

More information

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5

DEPRECIATION REPORT Strata VR 1591 The Leicester West 13th Avenue Vancouver BC V6J 2G5 DEPRECIATION REPORT 2015 Strata VR 1591 The Leicester 1545 West 13th Avenue Vancouver BC V6J 2G5 Created by Strata Council Members Merry Meredith Tom Heise Antoine Issa The authors have compiled this report

More information

Board of Trustees Proposition Summary Table of Contents

Board of Trustees Proposition Summary Table of Contents Table of Contents Table of Contents... ii 1 Facilities Condition Assessment... 2 1.1 Priority One... 2 1.2 Priority Two... 5 1.3 Priority Three... 7 1.4 Priority Four... 9 2 Major Projects... 10 2.1 Facility

More information

Reserve Study Transmittal Letter

Reserve Study Transmittal Letter Reserve Study Transmittal Letter Date: January 18, 2012 To: Michael Lee, Collins Management Co. From: Richard Avelar & Associates (RA&A) Re: Bridgewater Condominium Association Attached, please find the

More information

Laurel Hill Elementary

Laurel Hill Elementary NC School District/830 Scotland County/Elementary School Laurel Hill Elementary Final Campus Assessment Report March 11, 2017 PARSONS Campus Assessment Report Table of Contents Campus Executive Summary

More information

CAPITAL FUNDING SUMMARY

CAPITAL FUNDING SUMMARY CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations

More information

TAX INCREMENT FINANCING (T.I.F.)

TAX INCREMENT FINANCING (T.I.F.) TAX INCREMENT FINANCING (T.I.F.) Tax Increment Financing (T.I.F.) is a financing technique that can be used to pay for costs associated with the renovation of conservation areas. Funding is done by designating

More information

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee

BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee AGENDA November 17, 2011 6:00 7:30 PM 1720 Oregon Street Berkeley, CA 94703 (510) 644-6066 1. Call to Order 2. Approval of Meeting

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

1. CALL TO ORDER AND RECOGNITION OF A QUORUM

1. CALL TO ORDER AND RECOGNITION OF A QUORUM Mesa Union School District Agenda for the Special Board Meeting of the Board of Trustees to be held on Thursday, May 3, 2018, at 6:00 p.m. in the School Multi-Purpose Room located at 3901 North Mesa School

More information

CITY OF FORT PIERCE BUILDING DEPARTMENT

CITY OF FORT PIERCE BUILDING DEPARTMENT CITY OF FORT PIERCE BUILDING DEPARTMENT APPLICATION FOR DETERMINATION OF SUBSTANTIAL IMPROVEMENT This is a request for determination by the City s Floodplain Administrator as to whether or not the project

More information

Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179

Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179 Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179 Special Education Allocation 180 Operational Services/Central

More information