Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175
|
|
- Gladys Mitchell
- 5 years ago
- Views:
Transcription
1 Page Item 165 Overview 167 Revenue 168 Expenditures 169 Elementary School Allocation 171 Middle School Allocation 173 High School Allocation 175 Special Education Allocation 176 Operational Services Allocation 178 Central Services Allocation 179 Debt Services 180 Five-Year Capital Outlay Fund Plan
2 0BCAPITAL OUTLAY FUND SDCL states, in part, the capital outlay fund of the school district is a fund provided by law to meet expenditures which result in the acquisition or lease of or additions to real property, plant or equipment. Such expenditure shall be for land, existing facilities, additions to facilities, remodeling of facilities, or for the purchase or lease of equipment. It may also be used for installment or lease-purchase payments for the purchase of real property, plant or equipment which have a contracted terminal date not exceeding twenty years from the date of the installment contract or lease-purchase and for the payment of the principal of and interest on capital outlay certificates issued pursuant to SDCL The Sioux Falls School District s FY14 Capital Outlay Fund includes expenditures for renovations and maintenance, site improvements, equipment, technology, and debt serv ice. According to SDCL , a school district which contracts its student transportation may expend from the capital outlay fund an amount not to exceed fifteen percent of the contract amount. The Sioux Falls School District contracts with School Bus, Inc. to provide transportation to the students of Sioux Falls and fifteen percent of that contract is charged to the Capital Outlay Fund. SDCL also allows a school district to use capital outlay funds to pay for general liability insurance. Since FY10, the School District had moved $600,000 from its General Fund to the Capital Outlay fund to pay for liability insurance, but for the FY13 budget general liability insurance was moved back to the General Fund of the District. The Director of Operational Services and build ing principals cond uct build ing w alkthroughs annually to assess individual building needs for renovations, maintenance, and site improvements. The improvements are evaluated and prioritized using the following criteria: Safety and Security Structural Integrity Mechanical and Electrical Systems Site Maintenance Legal Requirements includes Americans with Disabilities Act items Instructional Program Renovations and New Construction Building Interior may consist of replacing/ repairing floorcoverings, paint, plaster, doors, window treatments, ceilings, chalkboards, tackboards, lockers, light fixtures, restrooms and auditorium seating The Sioux Falls School District is committed to providing a safe and secure environment for all students and staff members. To assist with the District s commitment to safety, the Safe and Secure Schools Council was formed in November The Council membership was comprised
3 01B REVENUES of School Board members, administration, staff, parents, fire fighters, law enforcement, a representative of the Sioux Falls Risk Management Department, a representative of Social Services and of court services. During the 2008/ 09 school year, the Council members toured each of the District s buildings and have made recommendations for improvements to ensure th e safety of the District s students and staff at them. The Council s recommendations are part of the FY13 Capital Outlay Fund Budget and will be ongoing expenditures over the next several years to fully implement the Safe and Secure School Council s recom mendations. There is an increase in the amount of property tax revenues for the FY14 budget year of $111,786. Levies are projected to remain at $2.09 for Calendar Year Revenue for Other Local Sources has increased slightly more than $122,000. Federal sources are derived from a share of the interest payment on Build America Bonds issued in the summer of The District expects to transfer $1,341,946 from the Capital Outlay Fund into the Capital Improvements Projects Fund. Source FY13 FY14 from Prior Year Property Taxes $18,800,579 $18,912,365 $111,786 Other Local Sources 109, , ,406 State Sources - - Federal Sources 338, ,575 - Total $19,248,458 $19,482,650 $234,192 Cash from Fund Balance 2,003,698 - (2,003,698) Total Revenues & Transfers $21,252,156 $19, $(3,111,452)
4 21B Property 31B State 41B Other CAPITAL OUTLAY FUND 1BRevenues Taxes Source FY13 FY14 from Prior Year Property Taxes $ 18,800,579 $ 18,912,365 $ 111,786 Total $ 18,800,579 $ 18,912,365 $ 111,786 The mil levy for property taxes in 2014 will be $2.09 per $1,000 of valuation. Local Tax revenue is budgeted to increase by $111,786 Sources Source FY13 FY14 from Prior Year Other State Revenue $ - $ - $ - Total $ - $ - $ - For the third year, the District does not project any state revenue in the Capital Outlay Fund. Local Sources Source FY13 FY14 from Prior Year Interest Income $ 72,951 $ 74,710 $ 1,759 Mobile Home Tax 12,000 12,000 - Penalties and Interest 3,000 3,000 - Miscellaneous Other Revenue 21, , ,647 Rental Income Total $ 109,304 $ 231,710 $ 122,406 Cash from Fund Balance 2,003,698 - (2,003,698) Total $ 2,113,002 $ 231,710 $ (1,881,292) In teres t In com e is ba sed u pon expected ea rn in gs on fu n ds kept on h a n d for FY
5 51B Federal 1B EXPENDITURES Sources Source FY13 FY14 from Prior Year Federal Sources $ 338,575 $ 338,575 $ - Total $ 338,575 $ 338,575 $ - There is no increase anticipated for federal revenue. The expenditures of the Capital Outlay Fund are, as follows: Use FY13 FY14 from Prior Year Building & Land Acquisitions $ 100,000 $ 100,000 $ - Renovations and Maintenance 3,580,185 4,052, ,696 Site Improvements 946, ,010 33,720 Professional Services 176, , ,500 Purchased Services* (Transportation) 398, ,052 - Equipment 768, ,943 22,137 Library Books 675,000 - (675,000) Technology 2,517,933 2,468,087 (49,846) Building Allocations** 691, ,852 (47,525) Vehicles 158, ,000 (18,000) Principal 6,820,000 3,645,000 (3,175,000) Interest 3,877,310 4,046, ,456 Dues and Fees 543, ,613 26,410 Total $ 21,252,156 $ 18,140,704 $ (3,111,452) CIP Projects Fund Transfers - 1,341,946 1,341,946 Total Expenditures and Transfers $ 21,252,156 $ 19,482,650 $ (1,769,506) * 15% of the Bus Contract ** To be allocated to appropriate budget lines in final budget
6 61B Elementary B81U CAPITAL OUTLAY FUND 2BElementary School Allocation The Capital Outlay Fund budget increases and decreases reflect year-to-year differences in building repair, remodeling and new construction needs. Annual building walk-throughs identify significant annual repair and remodeling needs. Projected student enrollment growth provides a basis for determining future needs for additional facilities. Education Allocation Budget Data FY13 FY14 from Prior Year Renovations & Maintenance $ 1,058,797 $ 922,102 $ (136,695) Site Improvements 714, ,600 (380,490) Professional Services 111,000 92,500 (18,500) Furniture Library Books 260,000 - (260,000) Equipment 130, ,324 (10,136) Building Allocation* 217, ,966 7,554 Technology 845, ,580 (39,874) Total $ 3,337,213 $ 2,499,072 $ (838,141) *To be allocated to appropriate budget lines in final line item budget Significant elementary school projects planned for FY14 include the following: B71UB71UPurchased Services Engineering services for reconstruction of playground/ berms at Hayward Elementary $15,000 Design waterproofing/ roof decking project at Hawthorne Elementary $20,000 Renovations and Maintenance Replace light fixtures at L.B. Anderson, Cleveland, Eugene Field, and Hawthorne Elementary $67,500 Provide air conditioning in the gym at L.B. Anderson Elementary $30,000 Add windows to the multipurpose room at Cleveland Elementary $25,000 Replace boilers at Garfield Elementary $190,000 Tuckpoint and caulk exterior of Garfield Elementary $72,000 Add insulation and metal wall panels at Hayward Elementary School $33,500 Install air conditioning in the gym at Renberg Elementary $25,000 Replace roofs at Jane Addams Elementary $184,000 Replace glassblock at Hawthorne Elementary $60,000 Update fire panel at J.F. Kennedy Elementary $56,
7 Site Improvements Reroute sewer system, in conjunction with the City of Sioux Falls, at Eugene Field Elementary $60,000 Reconstruct playground and berms around playground at Hayward Elementary $160,000 Install new garbage dumpster enclosu re at J.F. Kennedy Elementary $35,000 Remove berm around gymnasium at J.F. Kennedy Elementary $30,000 B91UFurniture, Library Books, Equipment and Technology Replacement and new musical instruments $55,724 Tractor replacement at Cleveland and Terry Redlin Elementary - $28,000 Building allocations $224,966 Elementary schools tablets, computers for desktops and classrooms $734,
8 02B Middle CAPITAL OUTLAY FUND 3BMiddle School Allocation The Capital Outlay Fund budget increases and decreases reflect year-to-year differences in building repair, remodeling and new construction needs. Annual building walk-throughs identify significant annual repair and remodeling needs. Projected student enrollment growth provides a basis for determining future needs for additional facilities. School Allocation Budget Data FY13 FY14 from Prior Year Renovations & Maintenance $ 195,178 $ 1,547,675 $ 1,352,498 Site Improvements 14, , ,700 Professional Services 35, , ,000 Equipment 182, ,467 (63,167) Library Books 215,000 - (215,000) Furniture Building Allocation* 121, ,163 4,999 Technology 642, ,560 (245,120) Total $ 1,406,456 $ 2,600,365 $ 1,193,909 *To be allocated to appropriate budget lines in final line item budget Significant middle school projects planned for FY14 include the following: UB12UB12Purchased Services Engineering services to rebuild chiller at Memorial Middle School $81,000 Engineering services to rebuild boiler system at Edison Middle School $15,000 Engineering services to rebuild boiler system and replace steam system at Whittier Middle School $50,000 Engineering services to rebuild dock area at Whittier Middle School $15,000 Renovations and Maintenance Tuckpoint and caulk exterior at Memorial Middle School $35,000 Add security cameras at Axtell Park Middle School $20,000 Replace security hardware at Axtell Park Middle School $33,950 Replace lockers at Edison Middle School $66,022 Rebuild boiler system at Edison Middle School $100,000 Tuckpoint and caulk exterior walls at Patrick Henry Middle School $90,000 Renovate band storage area at Patrick Henry Middle School $35,000 Replace boilers and steam system throughout Whittier Middle School $850,000 Replace light fixtures at Whittier Middle School $82,500 Renovate stage into health classroom/ meeting room at Whittier Middle School $140,
9 B2USite Improvements Resurface Track at Patrick Henry Middle School $50,000 Recrown football field at Patrick Henry Middle School $40,000 Furniture, Library Books, Equipment and Technology Replacement and new musical instruments $95,567 Building allocations $126,163 Computers and tablets for middle schools $375,
10 32B High B62U CAPITAL OUTLAY FUND 4BHigh School Allocation The Capital Outlay Fund budget increases and decreases reflect year-to-year differences in building repair, remodeling and new construction needs. Annual building walk-throughs identify significant annual repair and remodeling needs. Projected student enrollment growth provides a basis for determining future needs for additional facilities. School Allocation Budget Data FY13 FY14 from Prior Year Renovations & Maintenance $ 1,389,171 $ 851,704 $ (537,467) Site Improvements 17, , ,200 Professional Services 30,000 29,000 (1,000) Furniture - - Library Books 200,000 - (200,000) Equipment 299, ,704 90,806 Building Allocation* 158, ,842 (37,956) Technology 364, , ,258 Total $ 2,458,902 $ 2,283,261 $ (218,160) *To be allocated to appropriate budget lines in final line item budget Significant high school projects planned for FY14 include the following: B42UB42UPurchased Services Design replacement boiler project at Lincoln High School $15,000 Evaluate and design track surface replacement at Roosevelt High School $20,000 Renovations and Maintenance Replace moveable walls at Washington High School $25,150 Repair roof flashing at Washington High School $15,030 Update energy management controllers Washington High School $105,000 Replace epoxy science table tops at Washington High School $40,000 Replace seating in Little Theatre at Roosevelt High School $28,600 Replace lighting at Roosevelt High School $364,000 Site Improvements Replace track surface at Roosevelt High School $170,
11 Furniture, Library Books, Equipment and Technology Replacement and new musical instruments $60,702 Athletic uniform rotation $41,450 Replacement band uniforms for Lincoln High School $140,000 Building allocations $162,842 Tablets and computers for high schools $632,734 CTE Academy equipment $55,
12 72B Special CAPITAL OUTLAY FUND 5BSpecial Education Allocation The Sioux Falls Special Education Program utilizes capital outlay funds in a variety of ways to provide support and assistance to the regular and special education programs. This support is reflected in the purchase of equipment and furniture that provide the necessary accommodations required for students with unique learning needs. Education Allocation Budget Data FY13 FY14 from Prior Year Equipment $ 1,534 $ - $ ( 1,534) Total $ 1,534 $ - $ ( 1,534)
13 82B Operational B24U CAPITAL OUTLAY FUND 6BOperational Services Allocation The Capital Outlay Fund budget increases and decreases reflect year-to year differences in building repair, remodeling and new construction needs. The Operational Services Department budgets for District-wide needs. Projected student enrollment growth provides a basis for determining future needs for additional facilities and remodeling projects. Services Allocation Budget Data FY13 FY14 from Prior Year Renovations & Maintenance $ 922,040 $ 725,000 $ (197,040) Site Improvements 200, ,000 25,000 Professional Services Equipment 131, ,300 16,600 Building Allocation (District) 183, ,513 (61,207) Technology 1,500 - (1,500) Vehicles 158, ,000 (18,000) Total $ 1,596,960 $ 1,360,813 $ (236,147) Significant purchases planned for FY14 school year include: B93URenovations and Maintenance District-wide General building repair $250,000 District-wide Floorcovering $250,000 District-wide Painting $150,000 District-wide Roof repairs $20,000 District-wide Update light fixtures $40,000 District-wide Update energy management software $15,000 B04USite Improvements District-wide Landscaping projects $25,000 District-wide Asphalt repair/ replacement $100,000 District-wide Concrete repair/ replacement $100,000 B14UEquipment, Furniture and Technology Various maintenance/ cleaning equipment replacement to be used throughout the District $148,300 floor scrubbers carpet fans various shop tools vacuum cleaners walk off mats lawn tractors lawn mowers sewer auger snowblowers
14 Vehicles Replace shop truck including plows and utility box $85,000 Replace Warehouse delivery truck $55,
15 92B Central CAPITAL OUTLAY FUND 7BCentral Services Allocation The expenditures for this allocation are coordinated by staff of the Finance Office, Operational Services, and the Purchasing Department. Services Allocation Budget Data FY13 FY14 from Prior Year Land & Building Acquisitions $ 100,000 $ 100,000 $ - Renovations & Maintenance 15,000 6,400 (8,600) Site Improvements - 12,310 12,310 Purchased Services 398, ,052 - Furniture - - Equipment 22,580 12,148 (10,432) Building Allocation 10,800 7,368 (3,431.51) Vehicles Technology 664, ,536 (64,610) Total $ 1,210,578 $ 1,135,814 $ (74,764) Significant purchases planned for FY14 school year include: B34UPurchased Services Bus contract charged to Capital Outlay Fund (15% of total contract) $398,052 Furniture, Equipment and Technology Infinite Campus $40,000 Disaster Recovery System $330,900 Microsoft Office Licenses $72,530 Smart Boards $33,000 Video Projectors $36,580 Computer Replacement $15,
16 03B Debt CAPITAL OUTLAY FUND 8BDebt Services Principal and interest payments charged to the Capital Outlay Fund result from issuing capital outlay certificates. Approximately $0.84 of an expected $2.09 capital outlay levy is currently needed to pay debt services expense. The Capital Outlay Fund levy devoted to longterm debt is expected to be $1.22 by the end of the five-year plan (FY18.) Services Budget Budget Data FY13 FY14 from Prior Year Principal $ 6,820,000 $ 3,645,000 $ (3,175,000) Interest 3,877,310 4,046, ,456 Dues and Fees 543, ,613 26,410 Total $ 11,240,513 $ 8,261,379 $ (2,979,134) Includes debt service for all outstanding Capital Outlay Certificates. Dues and Fees include the fees on the Capital Outlay Certificates ($15,000) and the Harrisburg Payment, which will be made in accordance to the Harrisburg Tax Revenue Sharing Agreement ($554,613)
17 13B FIVE-YEAR CAPITAL OUTLAY FUND 9BFive-Year Capital Outlay Fund Plan South Dakota State Law states, Five year plan required when fund used to construct new facilities or additions. Any school district using the capital outlay fund for payment of construction of new facilities or construction of additions to facilities must develop and maintain a five year plan on the annual projected revenues and th e annual projected expenditures for the capital outlay fund and such projected expenditures shall itemize the projected costs for new or additional facilities. The following is the Five-Year Capital Outlay Fund Plan of the Sioux Falls School District for the years FY14 FY18. CAPITAL OUTLAY FUND PLAN Revenues FY14 FY15 FY16 FY17 FY18 Total Revenue Available $ 19,482,650 $ 202,815,889 $ 21,893,765 $ 23,748,686 $ 26,776,176 Use FY14 FY15 FY16 FY17 FY18 Long Term Debt 2006 Issue 1,523,087 1,522,731 1,522,325 1,521, Issue 1,833,122 1,827,585 1,823,022 1,806,298 1,790, Issue 1,252,225 1,248,510 1,248,795 1,247,345 1,251, Issue 1,359,207 1,359,208 1,359,207 1,359,208 3,005, Issue 1,155,700 1,170,475 1,160,175 1,169,650 2,687,750 Capital Outlay Certificates Subtotal $ 7,123,341 $ 7,128,509 $ 7,113,524 $ 7,104,152 $ 8,735,593 Debt Administration Dues and Fees 15,000 15,000 15,000 15,000 15,000 Proposed 2013 Issue -- $30 Million 568,425 2,430,194 2,430,194 2,430,194 2,430,194 Proposed 2015 Issue -- $38 Million - - 2,977,246 2,977,246 2,977,246 Total Long Term Debt $ 7,706,766 $ 9,573,703 $ 12,535,964 $ 12,526,592 $ 14,158,033 Land and Building Acquisitions 100, , , , ,000 Playground Equipment 45,000 45,000 45,000 45,000 45,000 Construction Additions, Renovations, Maintenance and Site Improvements 5,294,262 5,495,564 6,059,890 6,614,561 7,263,399 Harrisburg Payment 554, , , , ,136 CTE Academy Equipment 55,697 57,368 59,089 60,862 62,688 Equipment/Vehicles 739, , , , ,705 Technology 2,468,087 2,080,450 2,184,473 2,293,696 2,408,381 Curriculum Study 135, , , ,172 Library Books CIP Projects Fund 1,341, ,395 (1,669,189) (247,858) 86,700 Building Allocations 643, , , , ,511 Professional Services (Liability/Casualty Ins.) Bus Expense from General Fund 398, , , , ,451 Total Capital Expenditures $ 19,482,650 $ 20,281,589 $ 21,893,765 $ 23,748,686 $ 26,776,
18 The tables below reflect the five-year plan for the Capital Improvement Plan for the District. CIP Revenue FY14 FY15 FY16 FY17 FY18 CIP Projects 1,341, ,395 (1,669,189) (247,858) 86,700 CO Certificate Proceeds 30,000,000 38,000, Total CIP Revenues $ 31,341,946 $ 38,411,395 $ (1,669,189) $ (247,858) $ 86,700 CIP Cash Flow FY14 FY15 FY16 FY17 FY18 Prior Year CIP Fund Balance $ 1,393,738 $ 854,048 $ 11,418,441 $ (8,275,648) $ (9,653,927) IDEA for 1 to 1 Initiative 502, , Revenues 31,341,946 38,411,395 (1,669,189) (247,858) 86,700 CIP Projected Expenditures (28,017,909) (25,460,890) (18,024,900) (1,130,421) - 1 to 1 Initiative (4,366,408) (2,908,780) FY Actual to Date vs Estimates +/(-) Net CIP III Fund Balance $ 854,048 $ 11,418,441 $ (8,275,648) $ (9,653,927) $ (9,567,227) Unobligated CO Fund Balance 11,962,356 11,962,356 11,962,356 11,962,356 11,962,356 Net Fund Balance (CIP and Capital Outlay) $ 12,816,404 $ 23,380,797 $ 3,686,708 $ 2,308,429 $ 2,395,129 The Administration plans for future land purchases for necessary parking/ playground expansion at approximately five locations throughout the District. Land Bank FY14 FY15 FY16 FY17 FY18 Beginning Year Balance $ 965,309 $ 1,065,309 $ 1,165,309 $ 1,265,309 $ 1,365,309 Additional Budgeted Reserve 100, , , , ,000 Total Land Bank $ 1,065,309 $ 1,165,309 $ 1,265,309 $ 1,365,309 $ 1,465,309 The Administration plans to keep the Career and Technical Education Academy equipped with the most current technology and equipment needed for the programs at the Academy. CTE Equipment Fund FY14 FY15 FY16 FY17 FY18 Beginning Year Balance $ 106,575 $ 162,272 $ 219,640 $ 278,729 $ 339,591 Additional Budgeted Reserve 55,697 57,368 59,089 60,862 62,688 Less Expenditures Total CTE Equipment Fund Reserve $ 162,272 $ 219,640 $ 278,729 $ 339,591 $ 402,279 A detailed version of the Capital Improvement Projects for the next seven years is, as follows:
19
Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182
Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School
More informationPage Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179
Page Item 172 Overview 173 Revenue 175 Expenditures 176 Elementary School Allocation 177 Middle School Allocation 178 High School Allocation 179 Special Education Allocation 180 Operational Services/Central
More informationPage Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160
- Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 Special Education Allocation 161 Operational Services
More informationPROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue
PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,
More informationTumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent
Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved
More information7th Draft Projected Adopted Proposed. Summary
Summary Central High School $ 15,700 $ 523,000 $ 363,000 $ 513,000 $ 13,000 $ 13,000 Holgate Middle School $ 44,600 $ 12 $ 10 $ $ $ Simmons Middle School $ 22,600 $ 46 $ 10 $ $ $ C.C. Lee Elementary $
More informationCIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5
CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)
More informationCapital Improvement Plan USD#497 Lawrence Public Schools January 14, 2019
Capital Improvement Plan USD#497 Lawrence Public Schools January 14, 2019 Capital Improvement Plan Introduction A Capital Improvement Plan (CIP) provides an overview of school facility maintenance and
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationBurlington Area School District Community Survey Results. Winter 2016
Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information2019 Capital Projects Plan
Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects
More informationCapital Component. Fiscal Planning & Budget Proposal
Fiscal Planning & Budget Proposal Capital Component 2016 2017 Richard Outtrim, Director of Facilities III Robyn Bhend, Interim School Business Official Tammy J. Sutherland, Superintendent Greenville Central
More informationChamber of Commerce Issues Management Council July 12, A community discussion on increasing enrollment in the Sioux Falls School District
Chamber of Commerce Issues Management Council July 12, 2018 A community discussion on increasing enrollment in the Sioux Falls School District Current Reality: The Why Since 1990, District enrollment has
More informationAPPENDIX A FULL TEXT OF BOND MEASURE
APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass
More informationBallot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools
Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,
More informationEducational & Performing Arts Center: Downriver Campus
Educational & Performing Arts Center: Total Estimated Project Construction Cost: $ 18.04 million Groundbreaking: September 2006 Percentage Completed: 100 percent Anticipated Completion Date: Completed
More informationLake Mills Area School District Community Survey Results. Spring 2018
Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.
More informationProgress Update Identified Needs & Capital Plan
Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary
More informationContents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR
More informationBallot Measures-T Section
T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and
More informationHayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future
Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15
More informationCapital Projects Fund. Board Work Session August 9, 2007
Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting
More informationBERKELEY UNIFIED SCHOOL DISTRICT
BERKELEY UNIFIED SCHOOL DISTRICT TO: Javetta Cleveland and Neil Smith, Co-Superintendents FROM: Lew Jones, Director of Facilities DATE: June 26, 2013 SUBJECT: Approval of the 2013/14 Measure H Annual Plan
More informationJACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)
Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -
More informationSOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S
SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters
More informationLEE COUNTY SCHOOL DISTRICT S CAPITAL PLANNING PROCESS
LEE COUNTY SCHOOL DISTRICT S CAPITAL PLANNING PROCESS A Capital Projects Management Team has been established consisting of the Superintendent, the Chief Administrative Officer, the Chief Academic Officer,
More informationSchool District of Horicon Community Survey Results. Fall 2017
School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey
More informationPerformance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012
Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:
More informationPhysical Plant. Five-Year Capital Budget Plan. State College Area School District November Page 1 of 15
Physical Plant Five-Year Capital Budget Plan State College Area School District November 2011 Page 1 of 15 Table of Contents Background and 2013 Projects Pages 3-5 Funding Level Pages 6-7 Existing Buildings
More informationFacilities Update Construction Progress
Major Projects Update October 2018 Prepared by Business and Operations October 19, 2018 Facilities Update Construction Progress Bismarck High School Addition & Renovation Auditorium: Concrete foundation
More information(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I
SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY
More informationAnnual Report on Parish Facilities. Patrick Jendraszak
Annual Report on Parish Facilities Patrick Jendraszak May 15, 2018 Buildings & Grounds Committee Andy Bauer (School Liaison) Sue MacGill (School Liaison) Progress on Last Year s Plans Renovate Grades 3/4
More informationWest Bend School District Community Survey Results. Spring 2018
West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a
More information$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationSubject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)
HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal
More informationMUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA
KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S
More informationBuilding and Site Sinking Fund Millage. Election Date: November 7th 2017
Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount
More informationThis workbook is designed as a supplement to the 2018 Department memo labeled "Capital Projects Plan Template and Notices for Budget Year 2019.
Capital Projects Plan Template and Notices for Budget Year 2019 Amended August 21, 2018 Pursuant to IC 20-40-18-6 and IC 20-40-18-7 and in conjunction with the implementation of HEA 1009-2017 and HEA 1167-2018,
More informationContents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFORECASTING/BUDGETING SDASBO April 26, 2017
FORECASTING/BUDGETING SDASBO April 26, 2017 BUDGET TIMELINES Fall Five Year Capital Outlay Plan Review equipment and facilities to determine needs that will be paid from the Capital Outlay Fund 1. Facilities
More informationFY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL
Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000
More informationCity School District of Albany Five Year Facilities Plan 3/14/2019
Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255
More informationDISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)
1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal
More informationDraft 8 02/13/2014. Projected Adopted Proposed. Summary
Summary Central High School $ 230,000 $ 2,447,000 $ 1,547,000 $ 112,000 $ 22,000 $ 22,000 Holgate Middle School $ 16,600 $ 114,700 $ 7,700 $ 7,700 $ 7,700 $ 7,700 Simmons Middle School $ 55,900 $ 7,700
More informationCentral Michigan University Capital Budget
Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital
More informationCMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)
2006-20 CMP Strategy Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) Architectural Research Consultants, Incorporated October, 2004 Cluster: Albuquerque 244 DOLORES
More informationPOJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016
POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,
More information2019 Capital Projects Plan
General Information: 2019 Capital Projects Plan The form below may be used as part of your 2019 capital project plan. Total Land Area: 212 Acres Location: Marshall County, Plymouth, IN Composition of Governing
More informationOVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE
MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure
More informationPublic Schools of Petoskey ANNUAL BUDGET Fiscal Year Final
Public Schools of Petoskey ANNUAL BUDGET Fiscal Year 2007-2008 Final 6-19-2008 "A Special Place for Everyone" 1130 Howard Street Petoskey, Michigan 49770 Phone: 231-348-2100 Fax: 231-348-2342 PETOSKEY,
More informationCecil County Public Schools Board of Education Proposed Budget
Cecil County Public Schools Board of Education Proposed Budget County Council Presentation April 12, 2016 Fiscal 2017 Operating Fund Capital Fund Debt Service Fund Budget Prioritization Survey Results
More informationSPACE UTILIZATION STUDY ANALYSIS November 5, 2013
SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions
More informationPublic Schools of the Tarrytowns
Union Free School District of the Tarrytowns Board of Education Fiscal 2018/2019 Budget Development Empower students to make informed choices as they become self-directed, lifelong learners committed to
More informationConstruction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717
Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400
More informationWeston Public Schools PROPOSED BUDGET OF EXPENDITURES
Weston Public Schools PROPOSED BUDGET OF EXPENDITURES 2012-2013 School Facilities 2012-2013 Budget Presentation Please refer to pages 111-117 in the Budget Binder Budget Preface The Past: Unreliable boilers
More informationCAPITAL FUNDING SUMMARY
CAPITAL SUMMARY SCC (School Consolidation Capital ) CAPITAL : B19 -December 1, Specifically to address a school board s excess capacity : B11 -May 26, Opportunity to identify most urgent & pressing accommodations
More informationTotal Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationSECTION 6: CAPITAL IMPROVEMENT DETAIL
SECTION 6: CAPITAL IMPROVEMENT DETAIL Summary... 1 General Government... 2 Public Safety... 6 Public Works... 12 Recreation and Leisure... 18 Education... 24 SUMMARY TOTALS CAPITAL IMPROVEMENT PLAN AND
More informationCapital Improvement Budgeting
Capital Improvement Budgeting This presentation is to be informative and not to promote specific products, services companies, etc. Illinois ASBO Sponsored Programs are permitted to promote products and
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationAdopted Tentative Budget. Final Public Hearing
2013-14 Adopted Tentative Budget Final Public Hearing September 5, 2013 Presentation Outline Proposed Millage Budget Information Enrollment Projections vs. State Recalibration Proposed Employee Positions
More informationBallot Measures-LL Section
LL To repair and modernize aging classrooms/school facilities at local elementary/intermediate schools, repair termite damage, dry rot, deteriorating roofs, plumbing, and electrical, improve student safety/security,
More informationCITY OF FORT PIERCE BUILDING DEPARTMENT
CITY OF FORT PIERCE BUILDING DEPARTMENT APPLICATION FOR DETERMINATION OF SUBSTANTIAL IMPROVEMENT This is a request for determination by the City s Floodplain Administrator as to whether or not the project
More informationCapital Projects Completed since 1988
Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990
More informationReserve Analysis Report
Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895
More informationAPPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES
APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES Please Submit Application To: COMMUNITY USE OF SCHOOLS OFFICE 3301 Stafford Drive Charlotte, NC 28208 980-343-5290 SCHOOL REQUESTED: (List In Order Of
More informationOverview of Public Schools CIP
Overview of Public Schools CIP The Public Schools Community Investment Plan (CIP) includes school construction, additions and modernizations, as well as other school related projects. For more than a decade
More informationInterest Earned through 6/30/2018 2,013, , ,029, ,454, (3,443,911.91) 29, ,500, ,540,322.
STATUS OF DISTRICT RESERVES NORTH SHORE CSD Background Reserve funds are an important planning tool generally used by local governments and school districts to save for future needs and other allowable
More informationPUBLIC SCHOOLS OF PETOSKEY
"A Special Place for Everyone" ANNUAL BUDGET Fiscal Year 20062007 1130 Howard Street Petoskey, Michigan 49770 Phone: 2313482100 Fax: 2313482342 NOTICE OF A PUBLIC HEARING ON PROPOSED 20062007 BUDGET PLEASE
More informationListing of Events Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School
Fort McMurray Roman Catholic Seperate School District Fr. M. Beauregard School Building Events 2004 2005 2006 2007 2008 Total Code Repair Add ventilation to storage room $ 1,000.00 $ - $ - $ - $ - $ 1,000.00
More informationUse of State and District Construction Funds
8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,
More informationTOPEKA PUBLIC SCHOOLS UNIFIED SCHOOL DISTRICT NO. 501 TOPEKA, KANSAS
TOPEKA PUBLIC SCHOOLS BASIC FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION YEAR ENDED JUNE 30, 2017 TOPEKA PUBLIC SCHOOLS BASIC FINANCIAL STATEMENTS WITH SUPPLEMENTARY INFORMATION Year Ended June
More informationMeasure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest
6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 A Library, Learning Resources and Campus Center 217,200 GSF; State Funding component; begin design est. 2015/16 771120 $ 197,529.21
More informationUpper St. Clair School District
Proposed Final 2016-17 General Fund Budget May 16, 2016 1 2 2016-17 Budget Revenues $76,203,330 As of April 12 Comments Primarily related to lower PSERS and FICA $76,183,919 As of April 25 Comments As
More informationButler School District 53. Budget Hearing Presentation Board of Education Meeting September 17, 2018
Butler School District 53 Budget Hearing Presentation Board of Education Meeting September 17, 2018 Presentation Overview 2 I. Legal Requirements for Budget Adoption & Budget Development Process II. Overview
More informationPublic Presentation Capital Bond November 27, 2017
Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect
More informationFort Wayne Community Schools. Capital Projects Planning March 15, 2011
Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationPERMANENT IMPROVEMENT LEVY
SIDNEY CITY SCHOOLS PERMANENT IMPROVEMENT LEVY SUPPORT OUR SCHOOL FACILITIES VOTE YES AUGUST 2 Renewing Our Community s Commitment to School Facilities The mission of Sidney City Schools is to provide
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationUpdated Long Range Capital Outlay Operation/Maintenance Plan Report EXECUTIVE SUMMARY
Updated Long Range Capital Outlay Operation/Maintenance Plan Report EXECUTIVE SUMMARY Purpose of Report: To inform the School Board of the updated Long Range Capital Outlay Operation/Maintenance Plan based
More informationNOTICE TO TAXPAYERS. The Notice to Taxpayers is available online at or by calling (888)
Prescribed by the Department of Local Government Finance Approved by the State Board of Accounts NOTICE TO TAXPAYERS Budget Form No. 3 (Rev. 2018) Print 8/9/2018 12:12:13 PM The Notice to Taxpayers is
More informationFiscal Year GUIDE TO UNDERSTANDING THE BUDGET CHERRY CREEK SCHOOL DISTRICT #5 ARAPAHOE COUNTY, COLORADO
Fiscal Year 2015-16 GUIDE TO UNDERSTANDING THE BUDGET CHERRY CREEK SCHOOL DISTRICT #5 ARAPAHOE COUNTY, COLORADO ACKNOWLEDGMENTS Thank you to the members of the Budget Department for their dedicated efforts
More informationAction Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List
Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities
More informationLebanon Public Schools Board of Education Budget Presentation
2017-2018 Board of Education Budget Presentation Board of Finance March 7, 2017 Board of Education Albert Vertefeuille, C James Mello, VC Sandra Tremblay, S Berthier Bosse Nicole McGillicuddy Stephen Nelson
More informationRichland School District
Richland School District April 5, 2016 Referendum Ballot and Cost Impact Presentation Presented by: Carol Wirth, President 1020 N. Broadway, Suite G-9 Milwaukee, WI 53202 Phone 414/434-9644 Question 1
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationConducting a Facilities Condition Assessment as Part of Your Capital Planning. FEFPA July 5, 2011
Conducting a Facilities Condition Assessment as Part of Your Capital Planning FEFPA July 5, 2011 Agenda Introduction History and Goals Process Physical Condition Analysis and Ranking Educational Adequacy
More informationBoard of Trustees Proposition Summary Table of Contents
Table of Contents Table of Contents... ii 1 Facilities Condition Assessment... 2 1.1 Priority One... 2 1.2 Priority Two... 5 1.3 Priority Three... 7 1.4 Priority Four... 9 2 Major Projects... 10 2.1 Facility
More informationCORPORATION OF HAMILTON 2016 BUDGET FINAL
CORPORATION OF HAMILTON 2016 BUDGET FINAL TABLE OF CONTENTS Contents Vision and Mission 1 Budget Summary and Assumptions 2-3 Proposed Rate Changes 4-6 Employee numbers by Department 7 2016 Operating Budget
More informationCH-UH Board of Education Meeting. June 27, 2017
CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle
More informationFY Capital Improvement Program City of New Bedford, Massachusetts
City of New Bedford, Massachusetts Background The Massachusetts Department of Revenue, credit agencies and the Government Accounting Standards Board recommend that localities develop a capital improvement
More informationBarneveld School District Community Survey Results. Spring 2017
Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey
More information