Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180
|
|
- Joy Waters
- 5 years ago
- Views:
Transcription
1 Bond Amount: $18,470,000 Proposed I&S Tax Rate : $.3180 How was the EBISD 2017 Bond developed? The bond package was developed from K-12 academic needs identified by our fifty-member community facilities committee, input from community members who attended the district walk through, input from all EBISD staff members, feedback from community members regarding previous bonds, architect forensic analysis of facilities, and maintenance and facility records. The fifty-member facilities committee ranged in age, race, profession, number of years in EB, ages of children, stages of life, and opinions regarding previous bond issues. Two staff per campus were also on the committee. The committee divided into three sub-committees one per campus. The sub-committees conducted their own walk through and met back together to prioritize needs at their campus as well as the district as a whole. The committee held seven meetings from March 2017 to July 2017 discussing facility conditions, true necessities and priorities, demographic data, community trends, financial impact, and overall bond pricing. The research and information guiding all of these factors ultimately drove the Bond 2017plan that was presented for consideration to the EBISD Board of Trustees on August 7, The Board unanimously approved the committee s recommendation on August 14, 2017 and called for a November bond election. What needs were identified, and how does the 2017 Bond plan address these needs? Forensic facility data along with the committee s input identified the following in need of remodel, repair, upgrade, increase, or replace: HVAC, plumbing, electrical, lighting, technology infrastructure, classroom and instructional space, secure entry points, covered drop off, cafeteria dining space, ADA compliance, and parking. Three additional factors of importance to the committee were: 1) Remain a geographically unified K-12 District in the current city location (not moving outside of town) 2) Focus strictly on needs for daily academic performance for all students K-12 3) Bring a new and equitable plan to the table 4)
2 NEEDS ASSESSED: Plumbing: leaking, corroded pipes; additional faculty restrooms; upgrades to existing for sanitation and ADA compliance HVAC: pneumatic leaks and chiller malfunctions; staff complaints of noise and size impeding instruction; thermostats regulated on outside temperature create discrepancies on when heat or A/C should be in use, lacks consistent humidity control; classroom learning temperatures inconsistent Electrical: out of current code; lack of wiring infrastructure; insufficient outlets; breakers at max capacity or in need of replacement. Lighting: low illumination; faulty wiring in fixtures; energy inefficient Technology infrastructure: current infrastructure does not support demand needed for 21st century instruction; lacks necessary support for additional connectivity & accessibility in learning environment Classroom space: size below current TAC standards; additional space needed for special programs; lack of space for technology labs, small group instruction, core subjects Secure entry points: multiple, unsecured access points to buildings; lacks ability to quickly and safely lock down facilities in emergencies Covered drop-off: no covered drop-off available for K-8 students in inclement weather Cafeteria dining: early serving of lunch to elementary; lack of seating for students as well as visitors eating with a student; need for additional serving space ADA compliance: lacking in facilities, restrooms, classrooms, and nurses office Parking & Student Pick Up/Drop Off: Current drop off/pick up locations are utilized by more than one campus creating congestion; lack of parking for visitors, lack of staff parking away from congested areas; congestion on Fitzgerald St. due to logistics associated with drop off/pick up (parked cars, thru traffic, pickup/drop off points) How are the $18,470,000 funds estimated to be distributed across the district? Elementary: New construction & remodel 3rd/4th wing for special programs $ 6,029,754 Junior High: New construction & remodel of existing JH $ 4,622,056 High School: New construction, remodel of Naiser & Science Bldg $ 6,439,649 Convert library to additional dining, new maintenance Bldg, relocate bus canopy & fuel station, demo existing elem, Geotech/Civil/Survey, Contingency $ 1,373,650 GRAND TOTAL: $18,465,109* *NOTE: BOND AMOUNT IS $18,470,000 DUE TO BONDS SOLD IN $5,000 INCREMENTS.
3 What will this bond referendum cost me? $50,000 value $79.50 per year $6.63 per month 22 per day $100,000 value $ per year $19.88 per month 65 per day $150,000 value $ per year $33.13 per month $1.09 per day $200,000 value $ per year $46.38 per month $1.52 per day Average home value in EBISD is $123,160 $250,000 value $ per year $59.63 per month $1.96 per day $350,000 value $1, per year $86.13 per month $2.83 per day Taxpayers 65 yrs of age & over: Once you receive an over-65 homestead exemption, you receive a school tax ceiling for your home. The tax ceiling is the amount you pay in the year that you qualify for the exemption and cannot increase as long as you live in that home and make no additions to your home. With the exemption, you will see no increase in your taxes as a result of the bond. Exemptions are filed with the Wharton County Appraisal District. EFFECT ON AG VALUE PROPERTY Taxable Value of Annual Monthly Taxable Value of Annual Monthly Land Type 100 acres 200 acres Aquaculture $ 55,000 $ $ $ 110,000 $ $ Dryland $ 51,200 $ $ $ 102,400 $ $ Irrigated $ 51,100 $ $ $ 102,200 $ $ Native Brush $ 10,500 $ $ 2.78 $ 21,000 $ $ 5.57 Orchard $ 65,000 $ $ $ 130,000 $ $ Range Land $ 16,000 $ $ 4.24 $ 32,000 $ $ 8.48 Turf Grass $ 65,000 $ $ $ 130,000 $ $ If the bond is approved, when will I see an increase in my tax rate? It is not likely that all of the bonds will be sold at one time. Therefore, the tax rate will increase over time to the maximum increase of $.318 once all of the bonds have been issued. The first increase you will see will be on taxes due in February with the second increase in February of Remember, those 65 and older will not see an increase of your residential homestead tax if you file for the 65+ or disabled exemption with the Wharton County CAD.
4 What is the estimated construction timeline and will construction require relocation of students? The estimated timeline is below. Staggering the projects will potentially avoid student and staff displacement and the expense associated with portable buildings. The existing 1939 High School building will not be used for everyday instruction, BUT, will be used for transient programs, small group STAAR/EOC testing, meetings, etc. during the year and certainly for campus storage. The existing High School Gymnasium will continue to be used as it is used now but no renovations are planned for the Gym. The existing outdoor wing classrooms will not be used for everyday instruction, BUT, will be used by maintenance or storage for a variety of departments and organizations. FALL FALL BUS BARN Relocation MAINTENANCE BLDG New Elem Demo Existing Elem Renovation of JH New JH New Naiser HS Naiser Renovations How do I vote on Bond 2017? East Bernard ISD Voting Details LAST DAY TO REGISTER TO VOTE OCTOBER 10th Any registered voter whose primary residence is within in the boundaries of EBISD is eligible to vote. Voter registration is available online at the Wharton County Election Office website, or in person at the Wharton County Election office, 315 E. Milam St., Suite 103, Wharton, TX
5 East Bernard ISD Voting Details, cont. EARLY VOTING East Bernard Library, 746 Clubside, East Bernard Wharton County Annex D, Classroom 116, 315 E. Milam St., Wharton Monday, October 23 through Friday, October 27 8:00 a.m. 5:00 p.m. Monday, October 30 through Wednesday, November 1 8:00 a.m. 5:00 p.m. Thursday, November 2 through Friday, November 3 7:00 a.m. 7:00 p.m. EARLY VOTING BY MAIL Applications for voting by mail: Due no later than 5:00 p.m. on Friday, October 27, Applications should be sent to: Cindy Richter Wharton County Elections Administrator P.O. Box 390, Wharton, Texas cindy.richter@co.wharton.tx.us ELECTION DAY NOVEMBER 7, a.m. to 7 p.m. at the following locations: East Bernard Library, 746 Clubside, East Bernard Wharton Civic Center Duncan Auditorium 1924 N. Fulton, Wharton Wharton County Library, El Campo Branch, 200 W. Church St., El Campo
School District of Horicon Community Survey Results. Fall 2017
School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey
More informationBELLS INDEPENDENT SCHOOL DISTRICT
May 5, 2018 2018 BOND ELECTION Strong Schools BELLS INDEPENDENT SCHOOL DISTRICT Strong Community Committed to the Future \\\ Bond Election Information May 5, 2018 Bond to Improve Bells High School Committed
More informationFreedom Area School District Community Survey Results. Fall 2018
Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.
More informationWest Bend School District Community Survey Results. Spring 2018
West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a
More informationBallot Measures-T Section
T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and
More informationLake Mills Area School District Community Survey Results. Spring 2018
Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.
More informationSOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S
SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters
More informationFREQUENTLY ASKED QUESTIONS (FAQs)
FREQUENTLY ASKED QUESTIONS (FAQs) Q. What is a school bond? A. A bond election requires the voter to express support for or against the district selling school bonds. If the bond election is approved,
More informationProgress Update Identified Needs & Capital Plan
Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary
More informationDISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)
1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal
More informationPOJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016
POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,
More informationAdopted Tentative Budget. Final Public Hearing
2013-14 Adopted Tentative Budget Final Public Hearing September 5, 2013 Presentation Outline Proposed Millage Budget Information Enrollment Projections vs. State Recalibration Proposed Employee Positions
More informationContents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR
More informationBarneveld School District Community Survey Results. Spring 2017
Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey
More informationBallot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools
Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,
More informationBeaver Dam Unified School District Community Survey Results. Spring 2016
Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each
More informationMUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA
KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S
More informationHayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future
Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15
More information2017 Bond Program Summary
2017 Bond Program Summary Middle School #3 (off Vail Divide) $ 76,225,750 Middle School #3 Off-site Utility and Road Construction $ 2,100,000 Elementary School #7 (in Rough Hollow) $ 33,130,150 Bee Cave
More informationBaldwinsville Central School District. Capital Project Proposal November 9, 2015 Board of Education Meeting
Baldwinsville Central School District Capital Project Proposal November 9, 2015 Board of Education Meeting Why a Capital Project Now? To maintain our facilities, or build new facilities, school districts
More informationOXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R
OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R Under this measure, the Oxnard School District ( District ) is submitting a bond measure, described below, to the voters for
More informationContents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)
More informationAPPENDIX A FULL TEXT OF BOND MEASURE
APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass
More informationHUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T
HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,
More informationFACILITIES EVALUATIONS BACKGROUND REPORT
for DRAFT FACILITIES EVALUATIONS BACKGROUND REPORT March 30, 2016 TABLE of CONTENTS PURPOSE. 2 SCOPE of the. 2 CAPACITY / UTILIZATION ANALYSIS UPDATE.. 4 FACILITIES EVALUATIONS :: BACKGROUND DATA REPORTS
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationSchool Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed
School Referendum Results School Amount Type of Debt Description Arrowhead UHS Arrowhead UHS Baraboo Beaver Dam Belleville Cambridge Campbellsport Chippewa Falls Chippewa Falls $64,700,000.00 Issue Debt
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationNovember 7, 2017 $18,000,000 Capital Improvements Bond. Public Information Forum
LONDON INDEPENDENT S CHOOL D ISTRICT November 7, 2017 $18,000,000 Capital Improvements Bond Public Information Forum Austin Corpus Christi Dallas Fort Worth Houston Permian Basin Rio Grande Valley San
More informationGoverning Board Bond Update. Measure G Bond Program. for. Solano Community College District
Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects
More informationBarnesville Public Schools Proposed Building Program
August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent
More informationCapital Projects Completed since 1988
Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990
More informationTwo Ballot Proposals. August 8, 2017
Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010
More informationBurlington Area School District Community Survey Results. Winter 2016
Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationCARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018
CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018 SDCTA Position: SUPPORT Rationale for Position: The District has provided all requested information and has adopted all SDCTA recommended
More informationLocal ballot measure: B. Redding School District Bond Measure
B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,
More informationPublic Presentation Capital Bond November 27, 2017
Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect
More informationMuskego Norway Schools Community Survey Results. Fall 2015
Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included
More informationHarleton ISD May 7, 2016 Bond Proposal FAQs
Harleton May 7, 2016 Bond Proposal FAQs How was the total projected cost of the project developed? The cost of the project was based upon data concerning average costs of school construction found on the
More informationPROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue
PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,
More informationBond 2018 Referendum
1 Bond 2018 Referendum November 6, 2018 Election $992.6 million bond plan Projected tax rate of $1.35 3 pennies higher than current tax rate $1.32 1 penny higher than 2016 tax rate $1.34 Three year plan
More informationInvesting in Our Schools:
Investing in Our Schools: History of Measures A & B & Potential New Bond Facilities Workshop Special Board Meeting July 13, 2010 Cindy Cathey, Superintendent Song Chin-Bendib, Assistant Superintendent,
More informationBallot Measures-LL Section
LL To repair and modernize aging classrooms/school facilities at local elementary/intermediate schools, repair termite damage, dry rot, deteriorating roofs, plumbing, and electrical, improve student safety/security,
More informationAction Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List
Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationFort Wayne Community Schools. Capital Projects Planning March 15, 2011
Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of
More informationFacility and Financial Overview. Brandywine Heights Area School District
Facility and Financial Overview Brandywine Heights Area School District BHASD Mission: Our Mission is to enable students to strive for success in an ever-changing global society. Agenda 1. Overview of
More information2019 Capital Projects Plan
Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects
More informationBarnesville Public Schools Proposed Building Program
May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent
More informationSPACE UTILIZATION STUDY ANALYSIS November 5, 2013
SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions
More informationSchool Finance 101 & Bonds 101 CHRISTOPHER J. SMITH CHIEF FINANCIAL OFFICER APRIL 4, 2017
School Finance 101 & Bonds 101 CHRISTOPHER J. SMITH CHIEF FINANCIAL OFFICER APRIL 4, 2017 School Finance 101 HOW DO WE PAY FOR KATY ISD? EXERCISING GOOD STEWARDSHIP OF EVERY DOLLAR WORKING SMART DOING
More informationSummary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017
Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business
More informationTumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent
Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved
More informationSanta Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015
Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'
More informationClimax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions
Climax Scotts Community Schools 1. BOND PROPOSAL What is the District asking for as part of this Bond Proposal? The Bond Proposals request funds to: Proposal 1 WILL: Raise $9.40 Million for projects at
More informationRichland School District
Richland School District April 5, 2016 Referendum Ballot and Cost Impact Presentation Presented by: Carol Wirth, President 1020 N. Broadway, Suite G-9 Milwaukee, WI 53202 Phone 414/434-9644 Question 1
More informationMeasure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation
Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Workshop Items Citizens Oversight Committee Measure K Next Steps Projects in Planning Milestones Board s Vision
More informationRiver Forest Community School Corporation. Forging Ingots Together
2020 Circuit Breaker Impact FUNDING CLIFF! River Forest Community School Corporation Forging Ingots Together Presented by: Dr. Steven Disney and Umbaugh and Associates 1 School Fund Structure 2018 & Prior
More informationSEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * *
SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT For the Year Ended June 30, 2016 * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information2016 Bond Steering Committee Meeting
2016 Bond Steering Committee Meeting Meeting 1: June 23, 2016 Bond Blueprint Meeting Agenda 1. Background and Overview 2. Capital Needs 3. Debt Position 4. Voter Survey 5. Wrap up and Questions Background
More informationYOSEMITE COMMUNITY COLLEGE DISTRICT. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016
PERFORMANCE AUDIT June 30, 2016 Modesto, California PERFORMANCE AUDIT June 30, 2016 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2... 2 PERFORMANCE AUDIT: OBJECTIVES...
More informationFY 2017 Stockton University Expenditure Report as of May 31, 2017
FY 2017 Stockton University Expenditure Report Table of Contents Page Operational Budgets 1-2 Internal Capital Projects Summary 3 FY17 Internal Capital Projects 4 State Bond/Grants 5 STOCKTON UNIVERSITY
More information27 September 2016 l WORK SESSION Board of Supervisors
27 September 2016 l WORK SESSION Board of Supervisors PRO JECT OPTIONS 1 2 3 OUTLINE THE PROBLEM ADDRESS SOLUTIONS ESTABLISH PLAN TO IMPLEMENT A S S E S S M E N T S T U D Y + L O N G - R A N G E V I S
More informationALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I
MEASURE I Chabot-Las Positas Community College District Parcel Tax To provide Chabot and Las Positas Community Colleges funds that cannot be taken by the state, ensure affordable quality education, prepare
More informationBudget Development
2018 2019 Budget Development Budget Reductions Since 2010 School Year Reductions Enrollment 2010-2011 $2,018,287 1986 2011-2012 $1,468,541 1990 2012-2013 $603,876 1932 2013-2014 $584,748 1850 2014-2015
More informationCapital Allocation Plan OCTOBER 24, 2017
Capital Allocation Plan OCTOBER 24, 2017 Capital Allocation Request Form Capital Allocation Committee Purpose evaluate each request on its individual merits Met in the Sunshine Weekly through out the month
More information2015 CERTIFIED TOTALS CPP - City of Pilot Point
Property Count: 2 ARB Approved Totals 8/3/2016 5:05:53PM Land Homesite: 0 Non Homesite: 0 Ag Market: 329,670 Timber Market: 0 Total Land (+) 329,670 Improvement Homesite: 0 Non Homesite: 0 Total Improvements
More informationSanta Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013
Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'
More informationSpringfield High School
5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February
More informationProposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT
2018-19 Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT GENERAL FUND FINANCIAL STATEMENT (Current financial position) 2017-18 Budget 2017-18 Projected 2017-18 Variance
More informationWhy did we undertake a comprehensive Educational Facility Master Plan?
NUSD EDUCATIONAL FACILITY MASTER PLAN Why did we undertake a comprehensive Educational Facility Master Plan? Novato Unified School District (NUSD) has thirteen school sites that provide the educational
More informationCMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)
2006-20 CMP Strategy Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) Architectural Research Consultants, Incorporated October, 2004 Cluster: Albuquerque 244 DOLORES
More informationWeston Public Schools PROPOSED BUDGET OF EXPENDITURES
Weston Public Schools PROPOSED BUDGET OF EXPENDITURES 2012-2013 School Facilities 2012-2013 Budget Presentation Please refer to pages 111-117 in the Budget Binder Budget Preface The Past: Unreliable boilers
More informationConstruction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717
Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400
More informationJACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)
Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -
More informationThere hasn t been a bond referendum in our district since building the original facility in 1977.
The architect concept in this document was drawn by Howard & Helmer Architects (H&H) after several community, staff and board meetings over the last year. This concept plan was chosen after reviewing 5
More informationTotal Revenues $6,275,083 $2,394,299 $2,301,985 $2,481,307 $2,587,681 $16,040,355
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationTotal Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More information2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects. June 27, 2018 // Board of Trustees Meeting
2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects June 27, 2018 // Board of Trustees Meeting Proposed Bond Projects Overall Phasing Phase 1A Phase 1B Phase 2 Phase 3 Phase TBD
More informationOVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE
MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure
More informationCentral Michigan University Capital Budget
Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital
More informationUse of State and District Construction Funds
8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,
More informationCIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5
CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)
More informationINTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION
INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local
More informationKIMBERLY AREA SCHOOL DISTRICT
KIMBERLY AREA SCHOOL DISTRICT 2017 ANNUAL MEETING Monday, September 25, 2017 6:30 PM - Budget Hearing 7:15 PM - Annual Meeting KIMBERLY AREA SCHOOL DISTRICT Administrative Building 425 S. Washington St.
More informationPerformance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012
Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:
More informationREDWOODS COMMUNITY COLLEGE DISTRICT
REDWOODS COMMUNITY COLLEGE DISTRICT Eureka, California SCHEDULE OF PROCEEDS AND USE OF GENERAL OBLIGATION BONDS (ELECTION OF 2004, SERIES 2005 AND 2007) WITH INDEPENDENT AUDITORS REPORT TABLE OF CONTENTS
More informationNovember 7, 2017 Sinking Fund Election FREQUENTLY ASKED QUESTIONS
November 7, 2017 Sinking Fund Election FREQUENTLY ASKED QUESTIONS HISTORY AND FEATURES 1. What school proposal will appear on the November 7, 2017 ballot? On the November 7, 2017 ballot, voters in Troy
More informationFREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a
More informationGeorgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development
Georgia Institute of Technology Advanced Computing Technology Building Draft Program Initial Program Development Issued April 2, 2001 Introduction Scope This document is a summary of the Session for the
More informationMeasure G Quarterly Progress Update
Measure G Quarterly Progress Update May 4, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure G is
More informationTax Ratification Election
Tax Ratification Election 1 What is a Tax Ratification Election or TRE? A Tax Ratification Election (TRE) is a special election, called by the Board of Trustees, asking the voters to approve a tax rate
More informationUnderstanding the Costs: Frequently Asked Questions
Understanding the Costs: Frequently Asked Questions As of 9/6/2016 What is the total proposed project cost? The total project cost is $54.9 M and cannot, by state law, exceed that amount if approved by
More informationMeasure G Quarterly Progress Update
Measure G Quarterly Progress Update February 3, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure
More informationBudget. Enrollment Debt Service March 13, 2017
2017-18 Budget Enrollment Debt Service March 13, 2017 1 Mission-Focused Budgeting All students are provided the opportunity and necessary support to engage in relevant, challenging work which contributes
More informationBANNING UNIFIED SCHOOL DISTRICT BUILDING FUND GENERAL OBLIGATION BONDS (MEASURE R) FINANCIAL AND PERFORMANCE AUDITS MARCH 31, 2017
BUILDING FUND GENERAL OBLIGATION BONDS FINANCIAL AND PERFORMANCE AUDITS BUILDING FUND GENERAL OBLIGATION BONDS FINANCIAL AUDIT FINANCIAL AUDIT TABLE OF CONTENTS FINANCIAL SECTION Independent Auditor's
More informationWelcome. Dr. Buck Gilcrease Alvin ISD Superintendent. David Becker Paul Ingamells CAC Co-Chairs
June 15, 2015 Welcome Dr. Buck Gilcrease Alvin ISD Superintendent David Becker Paul Ingamells CAC Co-Chairs Committee Rankings 1. New Elementary School #17 2. New Elementary School #18 3. New Junior High
More informationDESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008
(MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit. 2 Background Information 2-3 Procedures Performed... 3-4 Results
More information