Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180

Size: px
Start display at page:

Download "Bond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180"

Transcription

1 Bond Amount: $18,470,000 Proposed I&S Tax Rate : $.3180 How was the EBISD 2017 Bond developed? The bond package was developed from K-12 academic needs identified by our fifty-member community facilities committee, input from community members who attended the district walk through, input from all EBISD staff members, feedback from community members regarding previous bonds, architect forensic analysis of facilities, and maintenance and facility records. The fifty-member facilities committee ranged in age, race, profession, number of years in EB, ages of children, stages of life, and opinions regarding previous bond issues. Two staff per campus were also on the committee. The committee divided into three sub-committees one per campus. The sub-committees conducted their own walk through and met back together to prioritize needs at their campus as well as the district as a whole. The committee held seven meetings from March 2017 to July 2017 discussing facility conditions, true necessities and priorities, demographic data, community trends, financial impact, and overall bond pricing. The research and information guiding all of these factors ultimately drove the Bond 2017plan that was presented for consideration to the EBISD Board of Trustees on August 7, The Board unanimously approved the committee s recommendation on August 14, 2017 and called for a November bond election. What needs were identified, and how does the 2017 Bond plan address these needs? Forensic facility data along with the committee s input identified the following in need of remodel, repair, upgrade, increase, or replace: HVAC, plumbing, electrical, lighting, technology infrastructure, classroom and instructional space, secure entry points, covered drop off, cafeteria dining space, ADA compliance, and parking. Three additional factors of importance to the committee were: 1) Remain a geographically unified K-12 District in the current city location (not moving outside of town) 2) Focus strictly on needs for daily academic performance for all students K-12 3) Bring a new and equitable plan to the table 4)

2 NEEDS ASSESSED: Plumbing: leaking, corroded pipes; additional faculty restrooms; upgrades to existing for sanitation and ADA compliance HVAC: pneumatic leaks and chiller malfunctions; staff complaints of noise and size impeding instruction; thermostats regulated on outside temperature create discrepancies on when heat or A/C should be in use, lacks consistent humidity control; classroom learning temperatures inconsistent Electrical: out of current code; lack of wiring infrastructure; insufficient outlets; breakers at max capacity or in need of replacement. Lighting: low illumination; faulty wiring in fixtures; energy inefficient Technology infrastructure: current infrastructure does not support demand needed for 21st century instruction; lacks necessary support for additional connectivity & accessibility in learning environment Classroom space: size below current TAC standards; additional space needed for special programs; lack of space for technology labs, small group instruction, core subjects Secure entry points: multiple, unsecured access points to buildings; lacks ability to quickly and safely lock down facilities in emergencies Covered drop-off: no covered drop-off available for K-8 students in inclement weather Cafeteria dining: early serving of lunch to elementary; lack of seating for students as well as visitors eating with a student; need for additional serving space ADA compliance: lacking in facilities, restrooms, classrooms, and nurses office Parking & Student Pick Up/Drop Off: Current drop off/pick up locations are utilized by more than one campus creating congestion; lack of parking for visitors, lack of staff parking away from congested areas; congestion on Fitzgerald St. due to logistics associated with drop off/pick up (parked cars, thru traffic, pickup/drop off points) How are the $18,470,000 funds estimated to be distributed across the district? Elementary: New construction & remodel 3rd/4th wing for special programs $ 6,029,754 Junior High: New construction & remodel of existing JH $ 4,622,056 High School: New construction, remodel of Naiser & Science Bldg $ 6,439,649 Convert library to additional dining, new maintenance Bldg, relocate bus canopy & fuel station, demo existing elem, Geotech/Civil/Survey, Contingency $ 1,373,650 GRAND TOTAL: $18,465,109* *NOTE: BOND AMOUNT IS $18,470,000 DUE TO BONDS SOLD IN $5,000 INCREMENTS.

3 What will this bond referendum cost me? $50,000 value $79.50 per year $6.63 per month 22 per day $100,000 value $ per year $19.88 per month 65 per day $150,000 value $ per year $33.13 per month $1.09 per day $200,000 value $ per year $46.38 per month $1.52 per day Average home value in EBISD is $123,160 $250,000 value $ per year $59.63 per month $1.96 per day $350,000 value $1, per year $86.13 per month $2.83 per day Taxpayers 65 yrs of age & over: Once you receive an over-65 homestead exemption, you receive a school tax ceiling for your home. The tax ceiling is the amount you pay in the year that you qualify for the exemption and cannot increase as long as you live in that home and make no additions to your home. With the exemption, you will see no increase in your taxes as a result of the bond. Exemptions are filed with the Wharton County Appraisal District. EFFECT ON AG VALUE PROPERTY Taxable Value of Annual Monthly Taxable Value of Annual Monthly Land Type 100 acres 200 acres Aquaculture $ 55,000 $ $ $ 110,000 $ $ Dryland $ 51,200 $ $ $ 102,400 $ $ Irrigated $ 51,100 $ $ $ 102,200 $ $ Native Brush $ 10,500 $ $ 2.78 $ 21,000 $ $ 5.57 Orchard $ 65,000 $ $ $ 130,000 $ $ Range Land $ 16,000 $ $ 4.24 $ 32,000 $ $ 8.48 Turf Grass $ 65,000 $ $ $ 130,000 $ $ If the bond is approved, when will I see an increase in my tax rate? It is not likely that all of the bonds will be sold at one time. Therefore, the tax rate will increase over time to the maximum increase of $.318 once all of the bonds have been issued. The first increase you will see will be on taxes due in February with the second increase in February of Remember, those 65 and older will not see an increase of your residential homestead tax if you file for the 65+ or disabled exemption with the Wharton County CAD.

4 What is the estimated construction timeline and will construction require relocation of students? The estimated timeline is below. Staggering the projects will potentially avoid student and staff displacement and the expense associated with portable buildings. The existing 1939 High School building will not be used for everyday instruction, BUT, will be used for transient programs, small group STAAR/EOC testing, meetings, etc. during the year and certainly for campus storage. The existing High School Gymnasium will continue to be used as it is used now but no renovations are planned for the Gym. The existing outdoor wing classrooms will not be used for everyday instruction, BUT, will be used by maintenance or storage for a variety of departments and organizations. FALL FALL BUS BARN Relocation MAINTENANCE BLDG New Elem Demo Existing Elem Renovation of JH New JH New Naiser HS Naiser Renovations How do I vote on Bond 2017? East Bernard ISD Voting Details LAST DAY TO REGISTER TO VOTE OCTOBER 10th Any registered voter whose primary residence is within in the boundaries of EBISD is eligible to vote. Voter registration is available online at the Wharton County Election Office website, or in person at the Wharton County Election office, 315 E. Milam St., Suite 103, Wharton, TX

5 East Bernard ISD Voting Details, cont. EARLY VOTING East Bernard Library, 746 Clubside, East Bernard Wharton County Annex D, Classroom 116, 315 E. Milam St., Wharton Monday, October 23 through Friday, October 27 8:00 a.m. 5:00 p.m. Monday, October 30 through Wednesday, November 1 8:00 a.m. 5:00 p.m. Thursday, November 2 through Friday, November 3 7:00 a.m. 7:00 p.m. EARLY VOTING BY MAIL Applications for voting by mail: Due no later than 5:00 p.m. on Friday, October 27, Applications should be sent to: Cindy Richter Wharton County Elections Administrator P.O. Box 390, Wharton, Texas cindy.richter@co.wharton.tx.us ELECTION DAY NOVEMBER 7, a.m. to 7 p.m. at the following locations: East Bernard Library, 746 Clubside, East Bernard Wharton Civic Center Duncan Auditorium 1924 N. Fulton, Wharton Wharton County Library, El Campo Branch, 200 W. Church St., El Campo

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

BELLS INDEPENDENT SCHOOL DISTRICT

BELLS INDEPENDENT SCHOOL DISTRICT May 5, 2018 2018 BOND ELECTION Strong Schools BELLS INDEPENDENT SCHOOL DISTRICT Strong Community Committed to the Future \\\ Bond Election Information May 5, 2018 Bond to Improve Bells High School Committed

More information

Freedom Area School District Community Survey Results. Fall 2018

Freedom Area School District Community Survey Results. Fall 2018 Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

Lake Mills Area School District Community Survey Results. Spring 2018

Lake Mills Area School District Community Survey Results. Spring 2018 Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

FREQUENTLY ASKED QUESTIONS (FAQs)

FREQUENTLY ASKED QUESTIONS (FAQs) FREQUENTLY ASKED QUESTIONS (FAQs) Q. What is a school bond? A. A bond election requires the voter to express support for or against the district selling school bonds. If the bond election is approved,

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS) 1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal

More information

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016 POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,

More information

Adopted Tentative Budget. Final Public Hearing

Adopted Tentative Budget. Final Public Hearing 2013-14 Adopted Tentative Budget Final Public Hearing September 5, 2013 Presentation Outline Proposed Millage Budget Information Enrollment Projections vs. State Recalibration Proposed Employee Positions

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

Barneveld School District Community Survey Results. Spring 2017

Barneveld School District Community Survey Results. Spring 2017 Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

Beaver Dam Unified School District Community Survey Results. Spring 2016

Beaver Dam Unified School District Community Survey Results. Spring 2016 Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

2017 Bond Program Summary

2017 Bond Program Summary 2017 Bond Program Summary Middle School #3 (off Vail Divide) $ 76,225,750 Middle School #3 Off-site Utility and Road Construction $ 2,100,000 Elementary School #7 (in Rough Hollow) $ 33,130,150 Bee Cave

More information

Baldwinsville Central School District. Capital Project Proposal November 9, 2015 Board of Education Meeting

Baldwinsville Central School District. Capital Project Proposal November 9, 2015 Board of Education Meeting Baldwinsville Central School District Capital Project Proposal November 9, 2015 Board of Education Meeting Why a Capital Project Now? To maintain our facilities, or build new facilities, school districts

More information

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R Under this measure, the Oxnard School District ( District ) is submitting a bond measure, described below, to the voters for

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,

More information

FACILITIES EVALUATIONS BACKGROUND REPORT

FACILITIES EVALUATIONS BACKGROUND REPORT for DRAFT FACILITIES EVALUATIONS BACKGROUND REPORT March 30, 2016 TABLE of CONTENTS PURPOSE. 2 SCOPE of the. 2 CAPACITY / UTILIZATION ANALYSIS UPDATE.. 4 FACILITIES EVALUATIONS :: BACKGROUND DATA REPORTS

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

School Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed

School Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed School Referendum Results School Amount Type of Debt Description Arrowhead UHS Arrowhead UHS Baraboo Beaver Dam Belleville Cambridge Campbellsport Chippewa Falls Chippewa Falls $64,700,000.00 Issue Debt

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

November 7, 2017 $18,000,000 Capital Improvements Bond. Public Information Forum

November 7, 2017 $18,000,000 Capital Improvements Bond. Public Information Forum LONDON INDEPENDENT S CHOOL D ISTRICT November 7, 2017 $18,000,000 Capital Improvements Bond Public Information Forum Austin Corpus Christi Dallas Fort Worth Houston Permian Basin Rio Grande Valley San

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

Two Ballot Proposals. August 8, 2017

Two Ballot Proposals. August 8, 2017 Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018

CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018 CARLSBAD UNIFIED SCHOOL DISTRICT $265 MILLION BOND MEASURE July 2018 SDCTA Position: SUPPORT Rationale for Position: The District has provided all requested information and has adopted all SDCTA recommended

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

Public Presentation Capital Bond November 27, 2017

Public Presentation Capital Bond November 27, 2017 Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect

More information

Muskego Norway Schools Community Survey Results. Fall 2015

Muskego Norway Schools Community Survey Results. Fall 2015 Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included

More information

Harleton ISD May 7, 2016 Bond Proposal FAQs

Harleton ISD May 7, 2016 Bond Proposal FAQs Harleton May 7, 2016 Bond Proposal FAQs How was the total projected cost of the project developed? The cost of the project was based upon data concerning average costs of school construction found on the

More information

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,

More information

Bond 2018 Referendum

Bond 2018 Referendum 1 Bond 2018 Referendum November 6, 2018 Election $992.6 million bond plan Projected tax rate of $1.35 3 pennies higher than current tax rate $1.32 1 penny higher than 2016 tax rate $1.34 Three year plan

More information

Investing in Our Schools:

Investing in Our Schools: Investing in Our Schools: History of Measures A & B & Potential New Bond Facilities Workshop Special Board Meeting July 13, 2010 Cindy Cathey, Superintendent Song Chin-Bendib, Assistant Superintendent,

More information

Ballot Measures-LL Section

Ballot Measures-LL Section LL To repair and modernize aging classrooms/school facilities at local elementary/intermediate schools, repair termite damage, dry rot, deteriorating roofs, plumbing, and electrical, improve student safety/security,

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011 Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of

More information

Facility and Financial Overview. Brandywine Heights Area School District

Facility and Financial Overview. Brandywine Heights Area School District Facility and Financial Overview Brandywine Heights Area School District BHASD Mission: Our Mission is to enable students to strive for success in an ever-changing global society. Agenda 1. Overview of

More information

2019 Capital Projects Plan

2019 Capital Projects Plan Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013

SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 SPACE UTILIZATION STUDY ANALYSIS November 5, 2013 Space Utilization Study Analysis Ongoing questions regarding enrollment and the use of our facilities 2010 an internal analysis was performed with no decisions

More information

School Finance 101 & Bonds 101 CHRISTOPHER J. SMITH CHIEF FINANCIAL OFFICER APRIL 4, 2017

School Finance 101 & Bonds 101 CHRISTOPHER J. SMITH CHIEF FINANCIAL OFFICER APRIL 4, 2017 School Finance 101 & Bonds 101 CHRISTOPHER J. SMITH CHIEF FINANCIAL OFFICER APRIL 4, 2017 School Finance 101 HOW DO WE PAY FOR KATY ISD? EXERCISING GOOD STEWARDSHIP OF EVERY DOLLAR WORKING SMART DOING

More information

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017

Summary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017 Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'

More information

Climax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions

Climax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions Climax Scotts Community Schools 1. BOND PROPOSAL What is the District asking for as part of this Bond Proposal? The Bond Proposals request funds to: Proposal 1 WILL: Raise $9.40 Million for projects at

More information

Richland School District

Richland School District Richland School District April 5, 2016 Referendum Ballot and Cost Impact Presentation Presented by: Carol Wirth, President 1020 N. Broadway, Suite G-9 Milwaukee, WI 53202 Phone 414/434-9644 Question 1

More information

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Workshop Items Citizens Oversight Committee Measure K Next Steps Projects in Planning Milestones Board s Vision

More information

River Forest Community School Corporation. Forging Ingots Together

River Forest Community School Corporation. Forging Ingots Together 2020 Circuit Breaker Impact FUNDING CLIFF! River Forest Community School Corporation Forging Ingots Together Presented by: Dr. Steven Disney and Umbaugh and Associates 1 School Fund Structure 2018 & Prior

More information

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * *

SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * * SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT For the Year Ended June 30, 2016 * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

2016 Bond Steering Committee Meeting

2016 Bond Steering Committee Meeting 2016 Bond Steering Committee Meeting Meeting 1: June 23, 2016 Bond Blueprint Meeting Agenda 1. Background and Overview 2. Capital Needs 3. Debt Position 4. Voter Survey 5. Wrap up and Questions Background

More information

YOSEMITE COMMUNITY COLLEGE DISTRICT. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016

YOSEMITE COMMUNITY COLLEGE DISTRICT. MEASURE E GENERAL OBLIGATION BONDS PERFORMANCE AUDIT June 30, 2016 PERFORMANCE AUDIT June 30, 2016 Modesto, California PERFORMANCE AUDIT June 30, 2016 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2... 2 PERFORMANCE AUDIT: OBJECTIVES...

More information

FY 2017 Stockton University Expenditure Report as of May 31, 2017

FY 2017 Stockton University Expenditure Report as of May 31, 2017 FY 2017 Stockton University Expenditure Report Table of Contents Page Operational Budgets 1-2 Internal Capital Projects Summary 3 FY17 Internal Capital Projects 4 State Bond/Grants 5 STOCKTON UNIVERSITY

More information

27 September 2016 l WORK SESSION Board of Supervisors

27 September 2016 l WORK SESSION Board of Supervisors 27 September 2016 l WORK SESSION Board of Supervisors PRO JECT OPTIONS 1 2 3 OUTLINE THE PROBLEM ADDRESS SOLUTIONS ESTABLISH PLAN TO IMPLEMENT A S S E S S M E N T S T U D Y + L O N G - R A N G E V I S

More information

ALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I

ALAMEDA COUNTY REGISTRAR OF VOTERS LIST OF LOCAL MEASURES November 6, 2012 GENERAL ELECTION MEASURE I MEASURE I Chabot-Las Positas Community College District Parcel Tax To provide Chabot and Las Positas Community Colleges funds that cannot be taken by the state, ensure affordable quality education, prepare

More information

Budget Development

Budget Development 2018 2019 Budget Development Budget Reductions Since 2010 School Year Reductions Enrollment 2010-2011 $2,018,287 1986 2011-2012 $1,468,541 1990 2012-2013 $603,876 1932 2013-2014 $584,748 1850 2014-2015

More information

Capital Allocation Plan OCTOBER 24, 2017

Capital Allocation Plan OCTOBER 24, 2017 Capital Allocation Plan OCTOBER 24, 2017 Capital Allocation Request Form Capital Allocation Committee Purpose evaluate each request on its individual merits Met in the Sunshine Weekly through out the month

More information

2015 CERTIFIED TOTALS CPP - City of Pilot Point

2015 CERTIFIED TOTALS CPP - City of Pilot Point Property Count: 2 ARB Approved Totals 8/3/2016 5:05:53PM Land Homesite: 0 Non Homesite: 0 Ag Market: 329,670 Timber Market: 0 Total Land (+) 329,670 Improvement Homesite: 0 Non Homesite: 0 Total Improvements

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT 2018-19 Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT GENERAL FUND FINANCIAL STATEMENT (Current financial position) 2017-18 Budget 2017-18 Projected 2017-18 Variance

More information

Why did we undertake a comprehensive Educational Facility Master Plan?

Why did we undertake a comprehensive Educational Facility Master Plan? NUSD EDUCATIONAL FACILITY MASTER PLAN Why did we undertake a comprehensive Educational Facility Master Plan? Novato Unified School District (NUSD) has thirteen school sites that provide the educational

More information

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects)

CMP Strategy Project Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) 2006-20 CMP Strategy Listing by Cluster (Includes Technology and SIPs. Does not include SB9-08 M&O projects) Architectural Research Consultants, Incorporated October, 2004 Cluster: Albuquerque 244 DOLORES

More information

Weston Public Schools PROPOSED BUDGET OF EXPENDITURES

Weston Public Schools PROPOSED BUDGET OF EXPENDITURES Weston Public Schools PROPOSED BUDGET OF EXPENDITURES 2012-2013 School Facilities 2012-2013 Budget Presentation Please refer to pages 111-117 in the Budget Binder Budget Preface The Past: Unreliable boilers

More information

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717

Construction Total. Subtotal: $ 863,540 $ 172,708 $ 124,350 $ 1,160,598 $ 232,120 $ 1,392,717 Page 1 of 14 Hamilton School K-8 Phase District Basic Upgrades to Schools / Code Requirements Quantity Unit /Unit Soft s at 1 ADA path of travel walkways 1 LS $ 100,000 $ 100,000 $ 20,000 $ 14,400 $ 134,400

More information

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY) Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -

More information

There hasn t been a bond referendum in our district since building the original facility in 1977.

There hasn t been a bond referendum in our district since building the original facility in 1977. The architect concept in this document was drawn by Howard & Helmer Architects (H&H) after several community, staff and board meetings over the last year. This concept plan was chosen after reviewing 5

More information

Total Revenues $6,275,083 $2,394,299 $2,301,985 $2,481,307 $2,587,681 $16,040,355

Total Revenues $6,275,083 $2,394,299 $2,301,985 $2,481,307 $2,587,681 $16,040,355 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects. June 27, 2018 // Board of Trustees Meeting

2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects. June 27, 2018 // Board of Trustees Meeting 2018 Educational and Facilities Master Plan (EFMP) and Proposed Bond Projects June 27, 2018 // Board of Trustees Meeting Proposed Bond Projects Overall Phasing Phase 1A Phase 1B Phase 2 Phase 3 Phase TBD

More information

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE

OVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure

More information

Central Michigan University Capital Budget

Central Michigan University Capital Budget Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital

More information

Use of State and District Construction Funds

Use of State and District Construction Funds 8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,

More information

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

KIMBERLY AREA SCHOOL DISTRICT

KIMBERLY AREA SCHOOL DISTRICT KIMBERLY AREA SCHOOL DISTRICT 2017 ANNUAL MEETING Monday, September 25, 2017 6:30 PM - Budget Hearing 7:15 PM - Annual Meeting KIMBERLY AREA SCHOOL DISTRICT Administrative Building 425 S. Washington St.

More information

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012 Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:

More information

REDWOODS COMMUNITY COLLEGE DISTRICT

REDWOODS COMMUNITY COLLEGE DISTRICT REDWOODS COMMUNITY COLLEGE DISTRICT Eureka, California SCHEDULE OF PROCEEDS AND USE OF GENERAL OBLIGATION BONDS (ELECTION OF 2004, SERIES 2005 AND 2007) WITH INDEPENDENT AUDITORS REPORT TABLE OF CONTENTS

More information

November 7, 2017 Sinking Fund Election FREQUENTLY ASKED QUESTIONS

November 7, 2017 Sinking Fund Election FREQUENTLY ASKED QUESTIONS November 7, 2017 Sinking Fund Election FREQUENTLY ASKED QUESTIONS HISTORY AND FEATURES 1. What school proposal will appear on the November 7, 2017 ballot? On the November 7, 2017 ballot, voters in Troy

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Mission Model Initial Program Development Georgia Institute of Technology Advanced Computing Technology Building Draft Program Initial Program Development Issued April 2, 2001 Introduction Scope This document is a summary of the Session for the

More information

Measure G Quarterly Progress Update

Measure G Quarterly Progress Update Measure G Quarterly Progress Update May 4, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure G is

More information

Tax Ratification Election

Tax Ratification Election Tax Ratification Election 1 What is a Tax Ratification Election or TRE? A Tax Ratification Election (TRE) is a special election, called by the Board of Trustees, asking the voters to approve a tax rate

More information

Understanding the Costs: Frequently Asked Questions

Understanding the Costs: Frequently Asked Questions Understanding the Costs: Frequently Asked Questions As of 9/6/2016 What is the total proposed project cost? The total project cost is $54.9 M and cannot, by state law, exceed that amount if approved by

More information

Measure G Quarterly Progress Update

Measure G Quarterly Progress Update Measure G Quarterly Progress Update February 3, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure

More information

Budget. Enrollment Debt Service March 13, 2017

Budget. Enrollment Debt Service March 13, 2017 2017-18 Budget Enrollment Debt Service March 13, 2017 1 Mission-Focused Budgeting All students are provided the opportunity and necessary support to engage in relevant, challenging work which contributes

More information

BANNING UNIFIED SCHOOL DISTRICT BUILDING FUND GENERAL OBLIGATION BONDS (MEASURE R) FINANCIAL AND PERFORMANCE AUDITS MARCH 31, 2017

BANNING UNIFIED SCHOOL DISTRICT BUILDING FUND GENERAL OBLIGATION BONDS (MEASURE R) FINANCIAL AND PERFORMANCE AUDITS MARCH 31, 2017 BUILDING FUND GENERAL OBLIGATION BONDS FINANCIAL AND PERFORMANCE AUDITS BUILDING FUND GENERAL OBLIGATION BONDS FINANCIAL AUDIT FINANCIAL AUDIT TABLE OF CONTENTS FINANCIAL SECTION Independent Auditor's

More information

Welcome. Dr. Buck Gilcrease Alvin ISD Superintendent. David Becker Paul Ingamells CAC Co-Chairs

Welcome. Dr. Buck Gilcrease Alvin ISD Superintendent. David Becker Paul Ingamells CAC Co-Chairs June 15, 2015 Welcome Dr. Buck Gilcrease Alvin ISD Superintendent David Becker Paul Ingamells CAC Co-Chairs Committee Rankings 1. New Elementary School #17 2. New Elementary School #18 3. New Junior High

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2008 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit. 2 Background Information 2-3 Procedures Performed... 3-4 Results

More information