FY 2017 Stockton University Expenditure Report as of May 31, 2017
|
|
- Chastity Barrett
- 5 years ago
- Views:
Transcription
1 FY 2017 Stockton University Expenditure Report Table of Contents Page Operational Budgets 1-2 Internal Capital Projects Summary 3 FY17 Internal Capital Projects 4 State Bond/Grants 5
2 STOCKTON UNIVERSITY Operational Budget Status Report Main Campus Period Ending May 31, 2017 with May 31, 2016 comparison Operational Budget FY17 FY16 State Appropriation $ 18,391, $ 18,391, $ 16,858, % $ 18,391, $ 18,391, $ 16,858, % Central Appropriation* 27,574, ,574, ,094, % 28,199, ,199, ,933, % Undergraduate Tuition 62,697, ,697, ,976, ,557, ,557, ,331, % Graduate Tuition 8,584, ,584, ,916, % 7,540, ,540, ,129, % Educational & General Fee 26,713, ,713, ,635, ,977, ,977, ,768, % Facilities Fee 7,526, ,526, ,487, % 5,899, ,899, ,813, % Other Fees/Income 4,227, ,227, ,412, % 2,900, ,900, ,981, % Summer Gross Revenue 6,153, ,153, ,464, % 4,500, ,500, ,808, % Admin Cost Recovery 9,464, ,464, , % 2,828, ,828, , % Investment Income 4,000, ,000, , % TOTAL REVENUE $ 171,332, $ 171,332, $ 154,607, % $ 150,793, $ 150,793, $ 134,524, % Fund Balance 6,847, ,847, % 7,696, ,696, % Total Available funds $ 178,179, $ 178,179, $ 154,607, % $ 158,490, $ 158,490, $ 134,524, % *Central Appropriation is an estimated amount that the State pays for fringe benefits. The University reimburses the State on a quarterly basis for non-state funded positions and auxiliaries enterprises. **Student Life & Rec Program revenue moved from Auxiliaries in FY17 EXPENSES Budget Expenses Commitments Realized Budget Budget Expenses Commitments Realized President $ 4,690, $ 4,242, $ 3,527, $ 432, % $ 4,008, $ 9,876, $ 7,601, $ 1,058, % Academic Affairs 60,035, ,593, ,331, ,287, % 67,069, ,275, ,332, ,083, % Student Affairs 8,884, ,225, ,680, ,054, % 8,858, ,075, ,473, , % Development 1,523, ,528, ,217, , % 1,468, ,527, ,290, , % University Relations/Mktg 1,971, ,202, ,744, , % 2,864, ,999, ,379, , % Administration & Finance 9,577, ,746, ,758, ,176, % 9,394, ,613, ,397, ,090, % Plant 8,345, ,547, ,210, , % 8,518, ,495, ,839, ,047, % Information Technology Svs 6,562, ,637, ,660, , % - Student Aid 15,830, ,835, ,813, % 12,500, ,500, ,661, % Institutional General 15,836, ,282, ,716, ,313, % 13,109, ,449, ,346, , % Student Life* 13,115, ,215, ,271, , % - Rec Program* 1,291, ,373, ,097, , % Fringe Benefits 30,516, ,502, ,562, % 30,699, ,677, ,600, % TOTAL EXPENSES $ 178,179, $ 177,933, $ 143,593, $ 14,955, % $ 158,490, $ 158,490, $ 126,921, $ 13,389, % Year to Date expenses do not include Depreciation or Internal Capital Projects Commitments include estimated salary expenses for the remainder of the fiscal year. *Student Life & Rec Program expenses moved from Auxiliaries in FY17 1
3 Auxiliaries FY17 FY16 Housing Revenue $ 25,377, $ 25,377, $ 24,552, % $ 24,706, $ 24,706, $ 24,745, Student Life* 14,582, ,582, ,556, Recreational Program* 1,499, ,499, ,506, TOTAL REVENUE $ 25,377, $ 25,377, $ 24,552, % $ 40,788, $ 40,788, $ 40,808, Fund Balance , , % Total Available funds $ 25,377, $ 25,377, $ 24,552, % $ 40,820, $ 40,820, $ 40,808, *see FY17 Main Campus Summary EXPENSES Budget Expenses Commitments Realized Budget Budget Expenses Commitments Realized Housing $ 25,377, $ 25,371, $ 12,941, $ 1,863, % $ 24,706, $ 24,663, $ 14,327, $ 891, % Student Life* 14,582, ,584, ,667, , % Recreational Program* 1,531, ,559, ,220, , % TOTAL EXPENSES $ 25,377, $ 25,371, $ 12,941, $ 1,863, % $ 40,820, $ 40,806, $ 25,215, $ 1,550, % *see FY17 Main Campus Summary Independent Operations FY17 FY16 Seaview HTMS $ 21,351, $ 21,351, $ 15,406, % $ 21,703, $ 21,703, $ 15,270, % TOTAL REVENUE $ 21,351, $ 21,351, $ 15,406, % $ 21,703, $ 21,703, $ 15,270, % EXPENSES Budget Expenses Commitments Realized Budget Budget Expenses Commitments Realized Seaview HTMS $ 21,351, $ 21,351, $ 14,977, % $ 21,703, $ 21,703, $ 14,439, $ % TOTAL EXPENSES $ 21,351, $ 21,351, $ 14,977, $ - 70% $ 21,703, $ 21,703, $ 14,439, $ % Year to Date expenses do not include Depreciation or Internal Capital Projects Commitments include estimated salary expenses for the remainder of the fiscal year. STOCKTON UNIVERSITY Operational Budget Status Report Auxiliaries, Independent Operations, & Activities Period Ending May 31, 2017 with May 31, 2016 comparison Agency Budget FY17 FY16 Health Activity Program $ 1,521, $ 1,521, $ 1,527, $ 1,515, $ 1,515, $ 1,503, % Student Activity Program 1,081, ,081, ,075, % 1,071, ,071, ,074, TOTAL REVENUE $ 2,602, $ 2,602, $ 2,603, $ 2,587, $ 2,587, $ 2,578, Fund Balance 231, , , , Total Available funds $ 2,833, $ 2,833, $ 2,603, % $ 2,719, $ 2,719, $ 2,578, % EXPENSES Budget Expenses Commitments Realized Budget Expenses Commitments Realized Health Activity Program $ 1,752, $ 1,752, $ 1,371, $ 234, % $ 1,647, $ 1,647, $ 1,229, $ 194, % Student Activity Program 1,081, ,083, ,031, , % 1,071, ,120, ,037, , % TOTAL EXPENSES $ 2,833, $ 2,835, $ 2,403, $ 275, % $ 2,719, $ 2,768, $ 2,267, $ 255, % Year to Date expenses do not include Depreciation or Internal Capital Projects Commitments include estimated salary expenses for the remainder of the fiscal year. 2
4 Internal Capital Summary Carryforward FY17 FY17 FY17 FY17 Budget Budget Expenses Encumbrances Available Budget FY17 Internal Capital Projects-University 17,842, ,743, ,071, ,121, ,391, FY17 Internal Capital Projects-Housing 213, ,455, , ,767, , FY17 Internal Capital Projects-Seaview - 2,450, ,381, ,068, State Grant Projects- University Match - 13,031, ,370, ,147, , Total FY17 18,055, ,680, ,529, ,036, ,169,
5 FY17 Internal Capital Projects Summary Carryforward FY17 FY17 FY17 FY17 FY17 Funding Project Description Budget Original Budget Budget Adjustments Actual Expenses Encumbrances Available Budget University Capital Projects Facilities/Plant Science Building-University Fund 3,903, (139,025.39) 214, ,828, Stairwell & Elevator Upgrade(ADA) 322, (308,000.00) , Tennis Cts Overlay Barlow (Phase 1) 54, , Parking Lot Zero 203, , , , Motor Pool Needs , , C,H,J & Plant/FP Roof Rplcmnt 130, , , I & L Wing Ramp and Terrace Project 340, (443.21) 17, , Police Building #71 Renovation/Expansion 15, (2,268.23) 2, , Add Cadaver Lab to USC2 4,000, ,000, Parking Lot at Pomona Road/Community of Learning 299, (11,331.41) 259, , University Signage 941, , , , Unified Science Building Expansion 5,688, , ,346, ,041, Independence Walk 146, , , , AC Gateway Admin Bldg 235, , , , Additional Classroom 1,004, , , , Parking & Sidewalk (Lot 6 and Lot 5 Expansion) - 872, , , Software for Building Management System - 125, , Nacote Creek - 100, , Manahawkin FIt-Out Suite , , Building 31-Hot Water Boilers - 200, , , Building 32-3 Cooling Towers&Cntrls - 20, , , Flooring & Furniture Upgrades & Replacement 106, , , , , ADA Compliance Initiatives -closed project 47, (44,995.55) (661.50) - 3, Electronic and Mechanical Upgrades & Replacement 22, , , , , Grounds Equipment & Material Handling Needs 4, , , , Restroom Accessibility Improvements 39, , , , HVAC system renov-presidents Suite - 80, , , Student Life Maintenance Flooring & Furniture Upgrades & Replacement 105, , , Tennis Court Overlay (Phase 2 & 3)-closed project 126, (31,421.14) 94, MPRC floor covering replacement in the Sports Ctr-closed project - 310, (310,000.00) Grounds Equipment & Material Handling Needs 1, , , , Student Life Spring/Summer Ground & Field Maint & Refurb 78, , , Information Technology Services Academic Facilities Equipment Replacement - 350, , , , Enterprise Datacenter Server Replacement - 60, , Upgrade to Mail Server - 165, , Wireless Access Point Expansion and Upgrade - 275, , Network Equipment Replacement - 225, , , Cameras & Digital Asset Management 2, , Web Content Management System 12, , ERP Software Supp Operational Fndng 1, , Cbord Upgrade-closed project 13, (13,939.44) Increasing Bandwidth Charges & Equipment Maint Chrgs-closed project 6, (6,033.96) Spam Gateway Upgrade - 55, , Total $ 17,842, $ 3,854, $ (111,741.50) $ 3,071, $ 9,121, $ 9,391, Housing Capital Projects Housing Maintenance Replace kitchen appliances and cabinets in H-1-closed project - 480, (480,000.00) Replace exterior caulk and paint panels in H-2 & 3-closed project - 174, (174,200.00) Housing 2 & 3 Lock System Upgrade (Phase 1 of 3)-closed project - 107, (107,750.00) Housing 2 & 3 Lock System Upgrade-Telecomm - 240, , , Housing 2 Lower Level Entry Door Replacement (ADA)-closed project 160, (160,000.00) Housing Summer Refurbishing, Painting & Maintenance 8, , , , Housing Flooring & Furniture Upgrades & Replacement 44, , , , , Installation LED Lighting from Main Campus to H-1, 4&5-closed project - 63, (37,668.90) 25, Housing 4 HVAC Renovation 1,900, , ,692, , Total $ 213, $ 1,515, $ 940, $ 706, $ 1,767, $ 195, Stockton Seaview Projects Seaview Contingency - 92, , Rooms Renovation - 105, , , Agilysis POS System - 77, , , Boiler Replacement - 35, , Seaview Window & Stucco Renovation - - 1,450, , , Seaview Outdoor Pool Repairs - 35, , Elevator Refurbishing Golf Carts - - (800.00) Student Residences - Phase IV - 513, , ADA Review - 15, , DCA Deficiency List - 24, , Kitchen Hot Boxes - 13, , , Chiller Repairs - 17, , Elevator Repair - 4, , AHU Damage Repair - 14, , Oval Patio 35, , , Computer Rotation - 6, , Golf Range Picker - 10, , Total $ - $ 1,000, $ 1,450, $ 1,381, $ - $ 1,068, Grand Total $ 18,055, $ 6,370, $ 2,278, $ 5,158, $ 10,889, ,656,303.08
6 Bond Projects Summary Original FY17 FY17 FY17 FY17 Project Budget Budget Expenses Encumbrances Available Budget HETI-Education Technology Infrastructure 775, , , ELF-Education Technology Project 1,195, , , ELF-Science Equipment Grant 6,400, , , , , GO-Science Building Addition 21,465, ,507, ,306, ,200, GO-Additional Classroom Building 13,522, ,044, ,411, ,443, , CIF-Carnegie Chiller Replacement 300, , , , CIF-Utility Plant Infrastructure 3,100, ,125, , , , CIF-Modernization HVAC Equipment 3,000, , , , CIF-A&S Reno-Exterior Repair 2,100, ,031, , , , CIF-A&S Reno-Modern of Utilities 2,100, ,588, , ,526, , Total 53,957, ,346, ,084, ,238, ,023, Project -University Match HETI-Education Technology Match 775, , , , ELF-Education Technology Match - 9, , ELF-Science Equipment Match - 76, , , , GO-Science Building Addition Match 7,155, ,500, ,433, ,066, GO-Additional Classroom Building Match 4,507, ,012, ,134, ,814, , CIF-Carnegie Chiller Replacement Match - 54, , , CIF-Utility Plant Infrastructure Match - 565, , , , CIF-Modernization HVAC Equipment Match - 236, , , CIF-A&S Exterior Repair Match - 516, , , , CIF-A&S Modern of Utilities Match - 794, , , , Total 12,437, ,031, ,370, ,147, , Total Bond and Match 66,395, ,377, ,454, ,385, ,537, *Budget and Expenses as they appear in Banner Chart 1 (does not include reimbursements) 5
FY 2018 Stockton University Operational & Capital Report as of May 31, 2018
FY 2018 Stockton University Operational & Capital Report Table of Contents Page Operational Budgets 1-2 Internal Capital Projects Summary 3 Internal Capital Projects 4-5 Other Capital Projects 6 State
More informationStockton University FY 2019 Operational and Capital Report as of January 31, 2019
Stockton University FY 2019 Operational and Capital Report Stockton University FY 2019 Operational and Capital Report Table of Contents Page Operational Budget Summary: University, Auxiliaries, and Agency
More information2018 Institutional Program Review. stockton.edu
2018 Institutional Program Review 2018 Institutional Program Review Broad, comprehensive overview Institutional perspective Collaborative planning process 2018 Institutional Program Review Mr. Michael
More informationGoverning Board Bond Update. Measure G Bond Program. for. Solano Community College District
Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects
More informationFY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL
Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000
More informationProgress Update Identified Needs & Capital Plan
Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary
More informationCapital Projects Completed since 1988
Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990
More informationBuilding and Site Sinking Fund Millage. Election Date: November 7th 2017
Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount
More informationUniversity of Houston System
UNIVERSITY of HOUSTON SYSTEM University of Houston System FY2014 Annual Budget August 14, 2013 1 UNIVERSITY of HOUSTON SYSTEM FY2013 Current year Total Budget $ Millions Operating Budget $ 1,247.5 Capital
More informationPELLISSIPPI STATE COMMUNITY COLLEGE BUDGET ANALYSIS OCTOBER
PELLISSIPPI STATE COMMUNITY COLLEGE BUDGET ANALYSIS OCTOBER 2011-2012 PELLISSIPPI STATE COMMUNITY COLLEGE 2011-2012 OCTOBER BUDGET ANALYSIS TABLE OF CONTENTS Organization Charts 1 Form 1 Form 1(A) Form
More informationPage Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182
Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School
More informationFY2019 MEIF / Auxiliary Services / E&G Budget Discussion
1 of 20 FY2019 MEIF / Auxiliary Services / E&G Budget Discussion Kody Varahramyan Vice President for Research and Dean of the Graduate School Susan J. Hunter President Claire Strickland Chief Business
More informationWHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT?
WHAT IS A RESERVE STUDY AND WHY ARE THEY IMPORTANT? Tom Larson, PE, RS, PRA Facility Engineering Associates, PC What is a Reserve Study? A budget planning tool which identifies the current status of the
More informationMeasure G Quarterly Progress Update
Measure G Quarterly Progress Update May 4, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure G is
More informationMeasure G Quarterly Progress Update
Measure G Quarterly Progress Update February 3, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure
More informationTHE FLORIDA INTERNATIONAL UNIVERSITY BOARD OF TRUSTEES December 5, 2018
Consent Agenda FF2 THE FLORIDA INTERNATIONAL UNIVERSITY BOARD OF TRUSTEES December 5, 2018 Subject: Approval of Carryforward Funds Proposed Board Action: Approve the Florida International University (FIU)
More informationThe University of Memphis. October Analysis
October 2017-2018 Analysis 2018 October Budget Analysis Table of Contents Form 3 Summary by Unit - R & R and Contingency Allocation Computations Form 4 (A) Centers of Excellence/Emphasis - Actual 2016-17
More information2017/18 Annual Budget Report. Charlie Faas VP Administration & Finance/CFO
2017/18 Annual Budget Report Charlie Faas VP Administration & Finance/CFO Fiscal Year Budget Overview Increase in tuition and General Fund appropriation Tuition rate increase ($270, 4.9% increase) +240
More informationSanta Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015
Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'
More informationRockville Science Center (P036600)
Rockville Science Center (P036600) (AAGE15) Rockville Date Last Modified 2/26/14 N/A-PS Planning, Design and Supervision 6,492 6,477 15 0 0 0 0 0 0 0 0 Construction 56,300 56,272 28 0 0 0 0 0 0 0 0 6,598
More informationReserve Analysis Report
Reserve Analysis Report Parkway Towers 1155 Ash St Denver, CO 80220 Level I Study with Site Inspection Fiscal Year End Date: 12/31/2014 8597 Via Mallorca Suite E La Jolla, CA 92037 Phone: 858-764-1895
More informationCH-UH Board of Education Meeting. June 27, 2017
CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle
More informationMeasure RR Bond Budget by Project. Measure RR BAN Measure RR BAN Interest Measure RR Series AB Measure RR Series AB Interest
6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 Thru 6/30/15 15/16 A Library, Learning Resources and Campus Center 217,200 GSF; State Funding component; begin design est. 2015/16 771120 $ 197,529.21
More informationAPPENDIX A FULL TEXT OF BOND MEASURE
APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass
More informationAttachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017
A. Approval - New (Non-State and Other State Funds) Name (Other State) (Other State) Non-State Funds/ Undetermined 1 N/A B. Approval - Amended (Non-State and Other State Funds) 1 Coastal Carolina Main
More informationPROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue
PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,
More informationThe University of Memphis. October Analysis
October 2018-2019 Analysis 2019 October Budget Analysis Table of Contents Page Form 3 Summary by Unit - R & R and Contingency Allocation Computations 1 Form 4 (A) Center of Excellence Actual 2017-18 2
More informationSubject: Capital Reserve Expenditure Guidelines. *incl. former OCHAP/CSHP Peel Access to Housing (PATH)
HIP Housing In Peel Subject: Capital Reserve Expenditure Guidelines Date: August 1, 2012 Applicable To The information contained in this document applies to the following: Municipal & Private Non- Federal
More informationSanta Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013
Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'
More informationFiscal Year (FY13) Operating Budget and Capital Budget Overview
Approved by President Rush Fiscal Year 2012-2013 (FY13) Operating Budget and Capital Budget Overview Background A university budget represents the complex interchange between revenue streams that support
More informationDepartment Report. Cultural Affairs Commission June 15, Cliff Gillespie, Business Operations Manager Office of Cultural Affairs City of Dallas
Department Report Cultural Affairs Commission June 15, 2017 Cliff Gillespie, Business Operations Manager Office of Cultural Affairs City of Dallas Agenda FY 2017-18 Budget Update 2017 Bond Program Moody
More informationSECTION 6: CAPITAL IMPROVEMENT DETAIL
SECTION 6: CAPITAL IMPROVEMENT DETAIL Summary... 1 General Government... 2 Public Safety... 6 Public Works... 12 Recreation and Leisure... 18 Education... 24 SUMMARY TOTALS CAPITAL IMPROVEMENT PLAN AND
More informationPROPOSED BUDGET San Jacinto Community College District Budget Hearing August 4, 2014
PROPOSED BUDGET 2014-2015 San Jacinto Community College District Budget Hearing August 4, 2014 1 Highlights of the Proposed 2014 2015 Budget State Revenue Major Revenue Assumptions No change in rate FY15,
More informationThe University of Memphis. July Analysis
July 2018-2019 Analysis BUDGET ANALYSIS FORMS Form Title Page 2 Summary of Total Budget Changes D. Contra Revenue Accounts for Bad Debt 19 4 Athletic Analysis A. Revenues 22 B. Expenditures 23 5 Auxiliary
More informationAbilene Independent School District Bond Oversight Committee. Meeting Agenda
Abilene Independent School District Bond Oversight Committee Meeting Agenda May 12, 2014 12:00 noon Type of Meeting: Meeting of 2013 Bond Oversight Committee Meeting Facilitator: Cary Etter Invitees: Oversight
More informationSEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2015 * * *
AUDIT REPORT * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180 SAN JOSE, CA 95129 Table of Contents Page No. FINANCIAL SECTION: Independent Auditor s Report... 1-2
More informationFacilities Planning & Construction Report nd Quarter Ending December 31, 2017
Facilities Planning & Construction Report 2017 18 2 nd Quarter Ending December 31, 2017 Overview District SRID Spending (MG100) Summary By College By Site District Measure J Spending (MJ100) Summary By
More informationAPPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES
APPENDIX E ALLOWABLE CAPITAL EXPENDITURE GUIDELINES Introduction State capital appropriations are funded primarily through the issuance of State bonds. State bonds must be authorized by Ohio voters via
More informationInternal Service Funds
Internal Service Funds Summary of Expenditures by Fund: Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year Fiscal Year 2012-13 2013-14 2013-14 2013-14 2014-15 2013-14 2015-16
More informationBallot Measures-T Section
T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and
More informationFY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL DRAFT
DRAFT 1 Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT - HVAC Design - Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT - HVAC Design - replacement
More informationGENERAL FUND. For the Three Months Ended September 30, 2018
GENERAL FUND For the Three Months Ended September 30, 2018 FY19 Annual Budget with results for the three months ended September 30, 2018 Approved Budget Actual $ Budget Variance % of Budget Tuition & General
More informationAction Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List
Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities
More informationBOARD OF TRUSTEES MEETING. September 22, :30 p.m.
BOARD OF TRUSTEES MEETING September 22, 2016 6:30 p.m. 1 Belmont College District Board of Trustees Meeting September 22, 2016 6:30 p.m. AGENDA CALL TO ORDER Mrs. Elizabeth Gates, Chair ROLL CALL PLEDGE
More informationCIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5
CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)
More informationDeKalb County Government FY 2012 BUDGET PLAN. Public Building Commission
DeKalb County Government FY 2012 BUDGET PLAN Public Building Commission DEPARTMENT: GENERAL OPERATIONS (7110) FUND: GENERAL FUND (8100) 5501 Interest 134 200 200 0 5899 Miscellaneous 0 0 200 0 5964 Contr
More informationTABLE OF CONTENTS CAPITAL BUDGET
TABLE OF CONTENTS BUDGET Capital Organization Chart... 569 Capital Items Defined as Fixed Assets... 569 Programs... 571 Summary of Programs (schedule)... 571 Buildings and Building Improvements Program...
More information2018 PROPOSED CAPITAL AND DEBT PRESENTATION
2018 PROPOSED CAPITAL AND DEBT PRESENTATION Capital Improvement Plan Purpose Capital Planning Process Definition of a Capital Project Capital Project Evaluation Criteria Ranking and Prioritization of Proposed
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationCentral Michigan University Capital Budget
Central Michigan University Capital Budget 1999-2000 Table of Contents Central Michigan University Capital Budget Table of Contents I. Narrative A. Overview and Process...1 B. Funding Sources...2 C. Capital
More informationSONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA
SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of
More informationBallot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools
Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,
More information7th Draft Projected Adopted Proposed. Summary
Summary Central High School $ 15,700 $ 523,000 $ 363,000 $ 513,000 $ 13,000 $ 13,000 Holgate Middle School $ 44,600 $ 12 $ 10 $ $ $ Simmons Middle School $ 22,600 $ 46 $ 10 $ $ $ C.C. Lee Elementary $
More informationBERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee
BERKELEY UNIFIED SCHOOL DISTRICT Measure I Construction Oversight Committee AGENDA November 17, 2011 6:00 7:30 PM 1720 Oregon Street Berkeley, CA 94703 (510) 644-6066 1. Call to Order 2. Approval of Meeting
More informationThompson Rivers University
Thompson Rivers University Operating Budget 2011 2012 Senate Presentation April 2011 Budget Committee of Senate BCOS Regular monthly meetings Regular capital construction updates Presentations from School
More informationEAST TENNESSEE STATE UNIVERSITY BOARD OF TRUSTEES FINANCE AND ADMINISTRATION COMMITTEE MARCH 2018 SPECIAL CALLED MEETING AGENDA
EAST TENNESSEE STATE UNIVERSITY BOARD OF TRUSTEES FINANCE AND ADMINISTRATION COMMITTEE MARCH 2018 SPECIAL CALLED MEETING 3:00-4:00pm EDT Thursday March 29, 2018 President s Conference Room Burgin Dossett
More informationOVERSIGHT OF MEASURE C SPENDING THE CITIZENS OVERSIGHT COMMITTEE
MEASURE C SCHOOL SAFETY AND MODERNIZATION On November 3, 2009 the voters residing in the Mill Valley School District (MVSD) approved the Measure C Safety and Modernization Bond of 2009 (Measure C). Measure
More informationAdopted Tentative Budget. Final Public Hearing
2013-14 Adopted Tentative Budget Final Public Hearing September 5, 2013 Presentation Outline Proposed Millage Budget Information Enrollment Projections vs. State Recalibration Proposed Employee Positions
More informationJACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)
Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -
More informationSummary of Capital Budget Request Tennessee Board of Regents. of the. September 21, 2017
Summary of Capital Budget Request 2018-2019 of the Tennessee Board of Regents September 21, 2017 1 This is the Summary of the Capital Budget Request for Fiscal Year 2018-2019 for the Finance and Business
More informationUnion WELL Inc. Budget and Finance Committee, Union Advisory Group and WELL Advisory Group. Agenda
Budget and Finance Committee, Union Advisory Group and WELL Advisory Group Agenda April 11, 2018 7:30am, WELL Terrace Suite (2nd floor) 1. Call to order: 7:30 am, Woldeyohannes 2. Public Comment: Members
More informationThompson Rivers University
Thompson Rivers University Operating Budget 2010 2011 Senate Presentation April 2010 Budget Committee of Senate BCOS Regular monthly meetings Regular capital construction updates Presentations from Faculty
More informationUNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2017
UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2017 OVERVIEW Financial highlights of the fiscal year 2016-17 3 rd quarter financial report are summarized below: Cash (pages 2-3) The University
More informationTHE PARKSHORE CONDOMINIUM ASSOCIATION. Financial Statements December 31, 2017 and 2016
THE PARKSHORE CONDOMINIUM ASSOCIATION Financial Statements December 31, 2017 and 2016 THE PARKSHORE CONDOMINIUM ASSOCIATION - 2 - FINANCIAL STATEMENTS DECEMBER 31, 2017 AND 2016 TABLE OF CONTENTS PAGE(S)
More informationContents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...
Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)
More informationPublic Schools of Petoskey ANNUAL BUDGET Fiscal Year Final
Public Schools of Petoskey ANNUAL BUDGET Fiscal Year 2007-2008 Final 6-19-2008 "A Special Place for Everyone" 1130 Howard Street Petoskey, Michigan 49770 Phone: 231-348-2100 Fax: 231-348-2342 PETOSKEY,
More informationTEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER OPERATING BUDGET FISCAL YEAR 2019
TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER 7335191 OPERATING BUDGET FISCAL YEAR 2019 Fiscal Year 2019 Operating Budget Summary TABLE OF CONTENTS Fiscal Year 2019 Operating Budget - Source of Funds (Graph)......................
More informationBudget FY 2018 Approved by the Board of Trustees June 15, 2017
Budget FY 2018 Approved by the Board of Trustees June 15, 2017 STLCC VISION St. Louis Community College is the first choice for academic excellence: leading the way in student success, innovation, and
More informationRESERVE STUDY FUNDING ANALYSIS
RESERVE STUDY FUNDING ANALYSIS There are two generally accepted means of estimating reserves; the Component Funding Analysis and (he Cash Flow Analysis methodologies. The Component Funding Analysis (or
More informationAmount Requested. Project Name
The City University of New York FY 2008-09 Capital Results State Five-Year Capital Plan FY 2008-09 to FY 2012-13 SENIOR COLLEGES Requested 2008-09 Enacted CUNY-Wide Seniors C.A.: Health & Safety $ 165,769
More informationPROPOSED FY 2018 GENERAL FEE & RELATED AUXILIARY BUDGETS
PROPOSED FY 2018 GENERAL FEE & RELATED AUXILIARY BUDGETS Proposed to Board of Trustees Prepared by the Office of Finance and Administration June 2017 TABLE OF CONTENTS Page No. Summary of General Fee Allocation
More informationCity School District of Albany Five Year Facilities Plan 3/14/2019
Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255
More informationPhysical Plant. Detailed Assessment Report
Physical Plant Detailed Assessment Report 2011-2012 Mission / Purpose The Physical Plant Department enhances the University of West Alabama's mission to provide opportunities for students to pursue a quality
More informationMUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA
KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S
More informationPublic Presentation Capital Bond November 27, 2017
Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect
More informationSEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT. For the Year Ended June 30, 2016 * * *
SEQUOIA UNION HIGH SCHOOL DISTRICT PROPOSITION 39/MEASURE A BOND AUDIT REPORT For the Year Ended June 30, 2016 * * * CHAVAN & ASSOCIATES, LLP CERTIFIED PUBLIC ACCOUNTANTS 1475 SARATOGA AVE., SUITE 180
More informationBeaver Dam Unified School District Community Survey Results. Spring 2016
Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each
More informationThe William Paterson University of New Jersey
The William Paterson University of New Jersey (A Component Unit of the State of New Jersey) Financial Statements and Management s Discussion and Analysis Table of Contents Page Independent Auditors Report
More informationBudget Analysis Fiscal Year John A. Logan College Carterville, IL 62918
Budget Analysis Fiscal Year 2017 John A. Logan College Carterville, IL 62918 June 28, 2016 1 JOHN A. LOGAN COLLEGE TABLE OF CONTENTS BUDGET ANALYSIS FY 2017 ITEM PAGE BUDGET CALENDAR... 1 BUDGET PROCESS...
More information(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I
SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY
More informationAgenda Item # 5b Page 1 of 43
Page 1 of 43 Page 2 of 43 Page 3 of 43 Page 4 of 43 Page 5 of 43 Page 6 of 43 Page 7 of 43 Page 8 of 43 Page 9 of 43 Page 10 of 43 Page 11 of 43 Page 12 of 43 Page 13 of 43 Page 14 of 43 Page 15 of 43
More informationBUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS June 7, 2018
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS June 7, 2018 APPLICANT Blue School and Blue School Real Estate, LLC 241 Water Street New York, NY 10038 PROJECT LOCATION 156 William Street
More informationSAMPLE CONDO RESERVE STUDY for fiscal year 2012
SAMPLE CONDO RESERVE STUDY for fiscal year 2012 RDA REPORT - UPDATED RESERVE ANALYSIS FOR FISCAL YEAR 2012 RESERVE DATA ANALYSIS, INC MPLS (612) 616-4817 TOLL FREE (866) 780-7943 WWW.RDAMIDWEST.COM UPDATE
More informationMandatory Fee Request Form Fiscal Year 2016 Budget
Institution Name: Name of Fee: Type of Fee: Health/Wellness PPV Fee? No New fee or existing fee? Health Fee - Spring/Fall Existing Mandatory Fee Request Form Fiscal Year 2016 Budget Georgia Institute of
More informationTwo-Year Program Facilities Management Capital Renewal & Deferred Maintenance
Two-Year Program Facilities Management Capital Renewal & Deferred Maintenance Table of Contents I. Program Mission Statement...3 II. Program Executive Summary...3 III. Primary Customers/Stakeholders...4
More informationUNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 06/30/2017
UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 06/30/2017 OVERVIEW Financial highlights of the fiscal year ending June 30, 2017 financial report are summarized below: Cash (pages 2-3) The University
More informationHUNTERS RIDGE COMMUNITY ASSOCIATION 2019 BUDGET
2019 SUMMARY OF ANNUAL DUES: Golf Dues $ 2,990.00 $ 2,900.00 Golf Assessment $ 60.00 $ - (Assessment to all equity golf and charter members for golf course reserves.) Trackage $ 1,500.00 $ 1,500.00 Social
More informationUNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT 03/31/2013
UNIVERSITY OF NORTHERN COLORADO: FINANCIAL REPORT OVERVIEW Financial highlights of the Fiscal Year 2012-13 3 rd quarter financial report are summarized below: Cash (pages 2-3) The University s cash position
More informationProjects Approved to Move Forward FY Capital Investment Program (CIP) August 31, 2012
Projects to Move FY203 7 Capital Investment Program (CIP) August 3, 202 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 Expenses FY203 Athletics Projects from $40M Line of Credit $ 40.0
More informationCapital Improvement Plan USD#497 Lawrence Public Schools January 14, 2019
Capital Improvement Plan USD#497 Lawrence Public Schools January 14, 2019 Capital Improvement Plan Introduction A Capital Improvement Plan (CIP) provides an overview of school facility maintenance and
More informationSTUDENT HOUSING SERVICES 2012/2013 BUDGET PREPARED FOR THE FINANCE COMMITTEE OF THE BOARD OF GOVERNORS APRIL 2012
PREPARED FOR THE FINANCE COMMITTEE OF THE BOARD OF GOVERNORS APRIL 2012 TABLE OF CONTENTS Page # Introduction & Consultation Process 1 Facilities Improvements 1 2011/2012 Forecast Compared to Budget 2
More informationSummary of Capital Budget Request Tennessee Board of Regents. of the. September 16, 2015
Summary of Capital Budget Request 2016-2017 of the Tennessee Board of Regents September 16, 2015 1 This is the Summary of the Capital Budget Request for Fiscal Year 2016-2017 for the Finance and Business
More informationBond Amount: $18,470,000. Proposed I&S Tax Rate Increase: $.3180
Bond Amount: $18,470,000 Proposed I&S Tax Rate : $.3180 How was the EBISD 2017 Bond developed? The bond package was developed from K-12 academic needs identified by our fifty-member community facilities
More informationReserve Request Instructions: Documentation Requirements
Reserve Request Instructions: Documentation Requirements These instructions specify documentation that must be submitted with requests for withdrawals from property reserve accounts held by IHDA. All requests
More informationButler School District 53. Budget Hearing Presentation Board of Education Meeting September 17, 2018
Butler School District 53 Budget Hearing Presentation Board of Education Meeting September 17, 2018 Presentation Overview 2 I. Legal Requirements for Budget Adoption & Budget Development Process II. Overview
More informationProposed Operating, Capital Outlay, & Reserves Budgets
UNIVERSITY STUDENT UNION, INC. CALIFORNIA STATE UNIVERSITY, NORTHRIDGE BUDGET BINDER 20132014 Proposed Operating, Capital Outlay, & Reserves Budgets University Student Union, Inc California
More informationWeston Public Schools PROPOSED BUDGET OF EXPENDITURES
Weston Public Schools PROPOSED BUDGET OF EXPENDITURES 2012-2013 School Facilities 2012-2013 Budget Presentation Please refer to pages 111-117 in the Budget Binder Budget Preface The Past: Unreliable boilers
More informationBUDGET AND FINANCE COMMITTEE. March 19, Minutes
BOARD OF GOVERNORS BUDGET AND FINANCE COMMITTEE March 19, 2003 Minutes The meeting was called to order at 1:05 p.m. by Governor Driker in the Alumni Lounge. Secretary Miller called the roll. A quorum was
More informationFFY 2014 FFY 2015 FFY 2016 FFY 2017 FFY
Capital Fund Program - Five Year Action Plan Part I Summary Office of Public and Indian Housing OMB No. 2577-0226 PHA Name/Number Locality (City/County State) Housing Authority of the City of Brownsville
More informationTwo Ballot Proposals. August 8, 2017
Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010
More information