Barnesville Public Schools Proposed Building Program

Size: px
Start display at page:

Download "Barnesville Public Schools Proposed Building Program"

Transcription

1 May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent School District No rd St. SE Barnesville, Minnesota Telephone: (218) Scott Loeslie Superintendent

2

3 TABLE OF CONTENTS Introduction 1. Geographic Area / Population Data 2. Existing School Facilities / Space and Service Alternatives 3. Facility Deficiencies / Anticipated Need / Benefits 4. Description of Project a. Site b. Building Program c. Floor Plans d. Cost Summary Analysis e. Schedule 5. Financing 6. Documentation Appendix 1 Property Tax Impact Analysis

4 INTRODUCTION The Board of Education of Barnesville Public Schools, after careful study, has decided to implement a facility program in the district consisting of upgrades to the existing Elementary School and High School facilities in Barnesville. The Board s decision was made in order to maintain a quality educational space into the future. Facility Improvements: Bond Referendum $35,190,000 LTFM Funds $2,250,000 High School Building: Demolition of existing 1936 and 1955 buildings Addition, including new Gymnasium, Auditorium, Locker Rooms, Music Suite, Dining/Commons and Kitchen. Addition for Industrial Tech. Science Lab renovation Deferred maintenance upgrades, including new fire sprinkler system, roof replacement, HVAC upgrades, accessibility, life-safety and finish improvements. Elementary School Building: Classroom and Gymnasium addition. Deferred maintenance upgrades, including new fire sprinkler system, roof replacement, HVAC upgrades, accessibility, life-safety and finish improvements. Referendum Date: August 9th, 2016 Funding: General Obligation Bonds Completion: August 2018 Elementary School December 2018 High School Architect: Construction Manager: Fiscal Consultant: Wendel R.A. Morton Ehlers The District has explored various alternatives and combinations of construction and remodeling. The information presented in this text clearly documents the need for this building program. Particular thanks are due to the Barnesville Public Schools Board of Education and its Facilities and Task Force for their participation of this educational facility analysis and planning study, and the resulting facilities proposal.

5 Barnesville Public Schools 1. GEOGRAPHIC AREA / POPULATION DATA The Barnesville Public School District is located in Clay, Otter Tail and Wilkin Counties, 145 miles northwest of Saint Cloud, Minnesota. School Districts adjacent to Barnesveille are Moorhead, Dilworth-Glyndon-Felton, and Hawley to the north, Pelican Rapids to the east, and Rothsay and Breckenridge to the south. The school district is approximately 344 square miles in area. The Barnesville Public School District currently operates an Elementary School and High School in Barnesville. The school district offices are housed in the High School building. The proposed building projects at Barnesville are predominantly to accommodate the educational needs of the school district, as well as to improve security and accessibility.

6 1. GEOGRAPHIC AREA / POPULATION DATA continued Barnesville Public Schools A. Table 1 depicts actual K-12 enrollment patterns for the Barnesville Public School District between , as provided by the School District. Table 1: Actual Past Enrollment / CURRENT K Total K

7 B. Table 2 depicts enrollment projections for the Barnesville Public School District through , as provided by the School District. The incoming kindergarten enrollments are actual student counts. Table 2: Enrollment Projections CURRENT K Total K

8 2. EXISTING SCHOOL FACILITIES / SPACE AND SERVICE ALTERNATIVES The Barnesville Public School District currently operates two facilities: a K-5 Elementary School, and a 6-12 High School located in Barnesville, MN Current K 5 Elementary School Building Ages: 1955, 1968, 1989 Building Areas: Elementary Main Level 56,600 SF Elementary Media Mezzanine 1,300 SF Total Building Area 57,900 SF Current 6-12 Junior/Senior High School Building Ages: 1936, 1955, 1968, 1989 Building Areas: Main Level 93,100 SF Second Level 4,500 SF Third Level 3,400 SF Total Building Area 101,000 SF

9 3. FACILITY DEFICIENCIES / ANTICIPATED NEEDS / BENEFITS Wendel Architecture has performed a comprehensive study of the district s two buildings. Both buildings are in need of educational upgrades as well as deferred maintenance improvements. Atkinson Elementary School a. The following are recognized as deficiencies of the existing school facilities th grade located in High School building due to lack of available space. 2. Pre-School program located in High School building due to lack of available space. (Only one room available in High School; no windows, no toilet.) 3. Gym space at capacity. No space available for other indoor activities. 4. Shortage of Special Needs spaces. 5. Administration location does not allow good supervision of main entry; building is difficult to secure. 6. Shortage of toilet rooms, lack of accessibility. 7. Most areas do not meet current IAQ standards. 8. No fire sprinkler system. 9. All roofs are 25+ years old and need replacement. 10. Miscellaneous accessibility, life-safety and deferred maintenance upgrades are needed. b. Benefits of proposed facility improvement for the Elementary School include: 1. Additions will allow adequate space for classrooms, pre-school programs and Special Needs spaces. 2. New Gym will provide physical education space for new grade levels and other indoor activities. 3. New administration area will be located adjacent to new main entry, greatly improving security and supervision. 4. Toilets will be added and existing toilets upgraded for accessibility and appearance. 5. Entire building will be reroofed. 6. New HVAC system will provide adequate fresh air.

10 7. New fire sprinkler system will improve life-safety. 8. Other upgrades will make the building compliant for accessibility and life-safety issues. c. Deficiencies that are not addressed by the proposed facility improvement program: 1. None. Barnesville High School a. The following are recognized as deficiencies of the existing High School facility and 1955 buildings are not compliant for several accessibility, life-safety and IAQ issues and 1955 buildings are in need of several deferred maintenance upgrades. 3. Kitchen facilities are inadequate to serve desired menu options. 4. Auditorium/Gym/Lunchroom shares 3 functions, making it inadequate for all Science labs are outdated and equipment is not adequate for teaching desired curriculum. 6. Music spaces not adequate, not accessible. 7. Industrial Tech area is not laid out well. 8. Several areas do not meet current IAQ standards. 9. Limited fire sprinkler system. 10. All roofs are 25+ years old and need replacement. 11. Miscellaneous accessibility and deferred maintenance upgrades are needed. b. Benefits of proposed facility improvement project for the High School include: 1. Demolition of 1936 and 1955 buildings eliminates the need for significant upgrades needed to meet educational, accessibility, life-safety and deferred maintenance needs. 2. New Gym provides adequate, dedicated space for physical education and activities.

11 3. New kitchen and Dining Commons provides space for lunch as well as gathering for Gym, Auditorium, and other events. 4. New auditorium provides dedicated space for concerts, plays, musicals, assemblies and other events, as well as enhanced opportunities for music, drama and other educational uses. 5. Renovated Science Labs will be laid out and equipped for current educational needs. 6. Entire building will be re-roofed. 7. HVAC upgrades will provide adequate fresh air. 8. New fire sprinkler system will improve life-safety. 9. Other upgrades will make the building compliant for accessibility and life-safety issues. a. Deficiencies that are not addressed by the proposed facility improvement program: 1. None.

12 4. DESCRIPTION OF PROJECT A. Barnesville Public Schools Sites Barnesville Schools currently operates two sites, Atkinson Elementary School and Barnesville High School, which are one block apart. The Elementary site is approximately 17.5 acres, and includes the district s athletic fields. The current High School site is approximately 5 acres. In anticipation of the proposed project, the district has acquired all but one lot on the block separating the Elementary School and High School. With the vacation of the street, this would add approximately 2.5 acres to the High School site, providing adequate space for the building addition. Additionally, the school leases fields at Reed Park (baseball), Blue Eagle Park (softball), and Clay County Fairgrounds (football and golf practice). All of these spaces are within ¾ mile of the High School. B. Barnesville Public Schools Building Programs a) Florence Atkinson K-5 Elementary School Site i. New Construction Classrooms Flex/Commons Administration Special Education Toilets Gymnasium Storage 11,035 SF 2,965 SF 2,290 SF 540 SF 1,065 SF 6,000 SF 935 SF ii. Remodeling Music Special Ed Toilets Net Area Net/Gross Factor 0.18 Total Area of Addition Total Area of Remodeling (net/gross factor included) 24,830 SF 5,340 SF 30,170 SF 1,260 SF 1,125 SF 945 SF 3,330 SF

13 b) Barnesville 6-12 Junior/High School Site i. New Construction Gymnasium Locker Rooms Wrestling Auditorium Music Commons Kitchen Concessions Shop Agriculture Toilets Mechanical/Custodial 12,586 SF 4,037 SF 2,684 SF 10,491 SF 5,778 SF 6,618 SF 3,585 SF 961 SF 6,687 SF 1,288 SF 2,293 SF 1,729 SF Net Area 58,737 Net/Gross Factor ,639 SF Total Area of Addition 67,376 SF ii. Remodeling Science Special Ed Health Total Area of Remodeling (net/gross factor included) 3,458 SF 2,023 SF 1,605 SF 7,086 SF

14 4. DESCRIPTION OF PROJECT continued C. Barnesville Public Schools Site Plans and Floor Plans

15 1936, 1955 BUILDINGS TO BE DEMOLISHED FUTURE EXPANSION ME. CU. TOILETS SHOP AG T T C SP. ED. SCI SP. ED. HEALTH 4836 SF SP. ED. LOCKER STOR KITCHEN GYMNASIUM C T TOILETS LOCKER T WRESTLING KINDERGARTEN / PRESCHOOL COMMONS FLEX / COMMONS MUS. ADMIN AUDITORIUM MUSIC GYMNASIUM PARKING (32,000 SF) 67,330 SF ADDITION 30,600 SF ADDITION 8,050 SF REMODEL 3,600 SF BARNESVILLE SCHOOLS REMODEL Proj. No.: Date: CONCEPT B /21/16 Ref. DWG.: Sheet No.: B8

16 BARNESVILLE PUBLIC SCHOOLS BUDGET - REVIEW AND COMMENT - OPTION B8 E L E M E N T A R Y S C H O O L Work Descriptive S.F. Hard Cost/SF Total Hard Costs Bond Budget LTFM Budget ELEMENTARY SCHOOL 88,500 $ $ 10,758,508 $ 10,082,689 $ 675,819 MAINTENANCE 57,900 $ $ 4,594,508 $ 3,918,689 $ 675,819 Building Exterior Repair - Windows/Doors/Brick $ 443,675 $ 443,675 Building Interior Updates - Ceilings/Counters/Doors/Bathrooms $ 660,600 $ 660,600 Mechanical/Electrical Updates and Controls 57,900 $ 46 $ 2,662,900 $ 2,662,900 Fire Sprinkle Remainder of Building 48,000 $ 3 $ 151,514 $ 151,514 ReRoofing , 1968, ,600 $ 12 $ 675,819 $ 675,819 ADDITIONS 30,600 $ $ 5,508,000 $ 5,508,000 $ - Classroom/Commons Addition 24,000 $ 180 $ 4,320,000 $ 4,320,000 Gymnasium Addition 6,600 $ 180 $ 1,188,000 $ 1,188,000 REMODEL 3,600 $ $ 432,000 $ 432,000 $ - Remodel - Heavy 3,600 $ 120 $ 432,000 $ 432,000 PARKING / SITE 32,000 $ 7.00 $ 224,000 $ 224,000 $ - Parking 32,000 $ 7 $ 224,000 $ 224,000 A&E Fees 7.20% $ 774,613 $ 725,954 $ 48,659 CM Fees 3.00% $ 322,755 $ 302,481 $ 20,275 Misc. Owner Expenses 1.80% $ 193,653 $ 181,488 $ 12,165 FF&E / Design Contingency 5.00% $ 537,925 $ 504,134 $ 33,791 Construction Contingency 10.00% $ 1,075,851 $ 1,008,269 $ 67,582 TOTAL SOFT COSTS $ 2,904,797 $ 2,722,326 $ 182,471 TOTAL ELEMENTARY PROJECT BUDGET $ 13,663,305 $ 12,805,016 $ 858,290 H I G H S C H O O L Work Descriptive S.F. Hard Cost/SF Total Hard Costs Bond Budget LTFM Budget HIGH SCHOOL 140,630 $ $ 18,538,165 $ 17,442,330 $ 1,095,835 $ - MAINTENANCE 73,300 $ $ 4,128,865 $ 3,033,030 $ 1,095,835 Building Exterior Repair - Windows/Doors/Brick $ 172,830 $ 172,830 Building Interior Updates - Ceilings/Counters/Doors/Bathrooms $ 627,900 $ 627,900 Mechanical/Electrical Updates and Controls 73,300 $ 30 $ 2,232,300 $ 2,232,300 Fire Sprinkle Remainder of Building 73,300 $ 3 $ 219,900 $ 219,900 ReRoofing , ,300 $ 12 $ 875,935 $ 875,935 $ - ADDITIONS 67,330 $ $ 12,663,300 $ 12,663,300 $ - Buidling Demolition 27,700 $ 7 $ 193,900 $ 193,900 Additions 44,253 $ 180 $ 7,965,540 $ 7,965,540 Gymnasium 12,586 $ 180 $ 2,265,480 $ 2,265,480 Auditorium 10,491 $ 180 $ 1,888,380 $ 1,888,380 Food Service Equipment 1 $ 350,000 $ 350,000 $ 350,000 $ - REMODEL 18,050 $ $ 1,466,000 $ 1,466,000 $ - Remodel - Heavy 8,050 $ 120 $ 966,000 $ 966,000 Remodel - Light 10,000 $ 50 $ 500,000 $ 500,000 $ - PARKING / SITE 40,000 $ 7.00 $ 280,000 $ 280,000 $ - Parking 40,000 $ 7 $ 280,000 $ 280,000 Work Descriptive A&E Fees 7.20% $ 1,334,748 $ 1,255,848 $ 78,900 CM Fees 3.00% $ 556,145 $ 523,270 $ 32,875 Misc. Owner Expenses 1.80% $ 333,687 $ 313,962 $ 19,725 FF&E / Design Contingency 5.00% $ 926,908 $ 872,116 $ 54,792 Construction Contingency 10.00% $ 1,853,816 $ 1,744,233 $ 109,584 TOTAL SOFT COSTS $ 5,005,305 $ 4,709,429 $ 295,875 TOTAL HIGH SCHOOL PROJECT BUDGET $ 23,543,470 $ 22,151,759 $ 1,391,710 TOTAL PROJECT BUDGET TOTAL BOND BUDGET TOTAL LTFM BUDGET TOTAL ELEMENTARY AND HIGH SCHOOL $ 37,206,775 $ 34,956,775 $ 2,250,000

17 4. DESCRIPTION OF PROJECT continued E. Schedule The following is a preliminary schedule for the planning, design and construction process for Barnesville Public Schools District: Referendum Date Elementary School: August 2016 Jan /Feb 2017 February/March 2017 Spring 2017 August 2018 August 2018 High School: August 2016 April 2017 May/June 2017 August 2017 December 2018 December 2018 August 9, 2016 Design/Construction Document preparation Bidding Elementary School Construction Elementary School Completion Design/Construction Document preparation Bidding High School Construction High School Completion 5. FINANCING The Barnesville Public Schools building program will be financed through the sale of General Obligation Bonds pending a successful referendum on August 9, The total amount of G.O. Bonds sold will be $35,190, and $2,250, will be raised through LTFM funds. Refer to Appendix 1 for financing information and tax impact statement from Ehlers who will be providing all the financial impact and preparation work.

18

19 APPENDIX 1 PROPERTY TAX IMPACT ANALYSIS The following Property Tax Impact Analysis was prepared by Ehlers for the Barnesville Public Schools project.

20 PRELIMINARY INFORMATION - FOR REVIEW AND COMMENT Barnesville Public Schools No. 146 Sources and Uses for Possible Construction Project August 2016 Election General Obligation School Building Bonds April 27, 2016 Bond Amount $35,190,000 Number of Years 20 Dated 11/1/2016 Sources of Funds Par Amount $35,190,000 Estimated Investment Earnings * 69,790 Total Sources $35,259,790 Uses of Funds Allowance for Discount Bidding $175,950 Legal and Fiscal Costs # 119,040 Net Available for Project Costs 34,964,800 Total Uses $35,259,790 * # Estimated investment earnings are based on an average interest rate of 0.2% and an average life of 12 months. Includes fees for financial advisor, bond counsel, rating agency, paying agent and county certificates. Sources Uses 16 RC

21 Totals ,190,000 16,012,594 (1,768,276) 51,994,447 51,994,447-51,994,447 April 27, 2016 Debt Plan 16 RC PRELIMINARY INFORMATION - FOR REVIEW AND COMMENT Barnesville Public Schools No. 146 Estimated Payments and Tax Levies for Existing Debt and Proposed New Debt $35,190,000 Building Bond August 2016 Election 20 years Principal Amount: Dated Date: Avg. Interest Rate: $35,190,000 11/1/ % Levy Existing Commitments Proposed New Debt Combined Totals Tax Capa- Pay. Fiscal city Value 1 Init Debt Levy 2 Debt Net Tax Add'l. Debt Adjusted Adjusted State Net Tax Year Year ($000s) Bldg Bonds Excess 4 Levy Rate Principal Interest Excess 4 Levy 3 Debt Levy 3 Debt Aid Levy Rate , % , % , % ,000 1,649,531-2,598,258 2,598,258-2,598, , % ,190,000 1,288,688-2,602,622 2,602,622-2,602, , % ,230,000 1,244,063-2,597,766 2,597,766-2,597, , % ,375,000 1,197,938 (103,911) 2,597,674 2,597,674-2,597, , % ,430,000 1,146,375 (103,907) 2,601,287 2,601,287-2,601, , % ,485,000 1,092,750 (104,051) 2,602,586 2,602,586-2,602, , % ,540,000 1,037,063 (104,103) 2,601,812 2,601,812-2,601, , % ,595, ,313 (104,072) 2,598,956 2,598,956-2,598, , % ,655, ,500 (103,958) 2,599,267 2,599,267-2,599, , % ,720, ,438 (103,971) 2,602,339 2,602,339-2,602, , % ,780, ,938 (104,094) 2,597,491 2,597,491-2,597, , % ,850, ,188 (103,900) 2,601,097 2,601,097-2,601, , % ,920, ,813 (104,044) 2,601,609 2,601,609-2,601, , % ,990, ,813 (104,064) 2,599,489 2,599,489-2,599, , % ,065, ,188 (103,980) 2,599,967 2,599,967-2,599, , % ,145, ,750 (103,999) 2,602,639 2,602,639-2,602, , % ,225, ,313 (104,106) 2,602,073 2,602,073-2,602, , % ,305, ,875 (104,083) 2,598,486 2,598,486-2,598, , % ,395, ,438 (103,939) 2,602,370 2,602,370-2,602, , % ,470,000 92,625 (104,095) 2,586,661 2,586,661-2,586, , % The estimated tax capacity value for taxes payable in 2015 is the final value and for taxes payable in 2016 is the preliminary estimate from the MN DOR. Estimates for later years are based on annual percentage changes shown above. 2 Initial debt service levies are set at 105 percent of the principal and interest payments during the next fiscal year. 3 The adjusted debt levy is the initial debt service levy less the debt excess adjustment. 4 Debt excess adjustments are estimated as 4% of the prior year's initial debt levy.

22 Estimated Tax Rate Debt Plan 16 RC PRELIMINARY INFORMATION - FOR REVIEW AND COMMENT Barnesville Public Schools No. 146 Estimated Tax Rates for Capital and Debt Service Levies Existing Commitments and Proposed New Debt $35,190,000 Building Bond August 2016 Election 20 years Date Prepared: April 27, Proposed New Debt Existing Commitments Year Taxes are Payable

23 PRELIMINARY INFORMATION - FOR REVIEW AND COMMENT Barnesville Public Schools No. 146 April 27, 2016 Analysis of Tax Impact for Potential Bond Issue August 2016 Election Bond Issue Amount $35,190,000 Number of Years 20 Estimated Debt Service Rate Payable in 2017, With Proposed Bond Issue 29.50% (Includes Principal & Interest Payments) Estimated Estimated Annual Tax Type of Property Market Value $50,000 Increase * $89 75, , , Residential 150, Homestead 175, , , , ,000 1,176 $50,000 $221 Commercial/ 100, Industrial 250,000 1, ,000 2,729 1,000,000 5,679 $500,000 $802 Agricultural 1,000,000 1,539 Homestead ** 1,500,000 2,277 3,000,000 5,610 $2,000 $5.90 Agricultural 3, Non-Homestead 4, (dollars per acre) 5, , * The figures in the table are based on school district taxes for bonded debt only, and do not include tax levies for other purposes. Tax increases shown above are gross increases, not including the impact of the state Property Tax Refund ("Circuit Breaker") program. Many owners of homestead property will qualify for a refund, based on their income and total property taxes. This will decrease the net effect of the proposed bond issue for many property owners. ** For agricultural homestead property, a value of $100,000 was assumed for the house, garage and one acre. Tax Impact 16 RC

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS) 1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal

More information

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

Public Presentation Capital Bond November 27, 2017

Public Presentation Capital Bond November 27, 2017 Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Freedom Area School District Community Survey Results. Fall 2018

Freedom Area School District Community Survey Results. Fall 2018 Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,

More information

Lake Mills Area School District Community Survey Results. Spring 2018

Lake Mills Area School District Community Survey Results. Spring 2018 Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.

More information

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR

REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR REQUEST FOR PROPOSALS CONSTRUCTION MANAGER AS CONSTRUCTOR Addendum No. 1 1. A preliminary Project Budget which includes all anticipated work items is included for reference in preparing a response to this

More information

Richland School District

Richland School District Richland School District April 5, 2016 Referendum Ballot and Cost Impact Presentation Presented by: Carol Wirth, President 1020 N. Broadway, Suite G-9 Milwaukee, WI 53202 Phone 414/434-9644 Question 1

More information

FACILITIES EVALUATIONS BACKGROUND REPORT

FACILITIES EVALUATIONS BACKGROUND REPORT for DRAFT FACILITIES EVALUATIONS BACKGROUND REPORT March 30, 2016 TABLE of CONTENTS PURPOSE. 2 SCOPE of the. 2 CAPACITY / UTILIZATION ANALYSIS UPDATE.. 4 FACILITIES EVALUATIONS :: BACKGROUND DATA REPORTS

More information

School District of Aitkin

School District of Aitkin School District of Aitkin Developing a Long Range Facility Plan Community Task Force Meeting 2 January 20 th, 2016 Objective: Develop a thoughtful, cost effective, long term plan for reinvestment in the

More information

APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES

APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES APPLICATION FOR COMMUNITY USE OF SCHOOL FACILITIES Please Submit Application To: COMMUNITY USE OF SCHOOLS OFFICE 3301 Stafford Drive Charlotte, NC 28208 980-343-5290 SCHOOL REQUESTED: (List In Order Of

More information

Muskego Norway Schools Community Survey Results. Fall 2015

Muskego Norway Schools Community Survey Results. Fall 2015 Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

Montville Township Public Schools

Montville Township Public Schools Montville Township Public Schools PRELIMINARY BUDGET PRESENTATION 2017-2018 SCHOOL YEAR Presented to the: Montville Township Board of Education February 21, 2017 Dr. Rene Rovtar, Superintendent of School

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

Guaranteed Energy Savings

Guaranteed Energy Savings Guaranteed Energy Savings Mark J. Gallick Account Manager Shayne Homan, P.E., C.E.M. - Director of Energy Services Brian Moore, LEED GA, CIPE Engineering Operations Manager Michael Grochalski, E.I.T.,

More information

RICHLAND-BEAN BLOSSOM COMMUNITY SCHOOL CORPORATION

RICHLAND-BEAN BLOSSOM COMMUNITY SCHOOL CORPORATION RICHLAND-BEAN BLOSSOM COMMUNITY SCHOOL CORPORATION CAPITAL PROJECTS FUND PLAN for the years 2017-2018-2019 September 19, 2016 Public Hearing CAPITAL PROJECTS PLAN (2017-2018-2019) September 19, 2016 RICHLAND-BEAN

More information

Beaver Dam Unified School District Community Survey Results. Spring 2016

Beaver Dam Unified School District Community Survey Results. Spring 2016 Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each

More information

2017 Bond Program Summary

2017 Bond Program Summary 2017 Bond Program Summary Middle School #3 (off Vail Divide) $ 76,225,750 Middle School #3 Off-site Utility and Road Construction $ 2,100,000 Elementary School #7 (in Rough Hollow) $ 33,130,150 Bee Cave

More information

Springfield High School

Springfield High School 5.1 Springfield High School Springfield School District Delaware County - Pennsylvania Master Plan Presentation Town Hall Meeting 5 Project Cost Estimates/ Project Financing Strategy / Tax Impact February

More information

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

Ss. Francis & John Strategic Planning Committee

Ss. Francis & John Strategic Planning Committee Ss. Francis & John Strategic Planning Committee Town Hall Meeting April 28, 2015 2 Agenda Update on Debt Reduction Update on One in Faith in Mission Expansion/Facilities Committee Report Questions Saint

More information

RECOMMENDATION. c. Approve a total project cost of $3,300,000

RECOMMENDATION. c. Approve a total project cost of $3,300,000 1. U. T. Arlington - Intramural and Recreation Complex - Phase I: Request for Approval to Amend the FY 2002-2007 Capital Improvement Program and the FY 2002-2003 Capital Budget to Include Project; Authorization

More information

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012

Performance Audit on 2008 and 2013 SPLOST Revenues For the Fiscal Year ended June 30, 2012 Thomas County School System Performance Audit on 2008 and 2013 SPLOST Revenues 300 Mulberry Street, Suite 300 P.O. Box 1877 Macon, Georgia 31202-1877 Phone: (800) 277-0050 Facsimile: (478) 464-8051 Web:

More information

KIMBERLY AREA SCHOOL DISTRICT

KIMBERLY AREA SCHOOL DISTRICT KIMBERLY AREA SCHOOL DISTRICT 2017 ANNUAL MEETING Monday, September 25, 2017 6:30 PM - Budget Hearing 7:15 PM - Annual Meeting KIMBERLY AREA SCHOOL DISTRICT Administrative Building 425 S. Washington St.

More information

Public Schools of Petoskey ANNUAL BUDGET Fiscal Year Final

Public Schools of Petoskey ANNUAL BUDGET Fiscal Year Final Public Schools of Petoskey ANNUAL BUDGET Fiscal Year 2007-2008 Final 6-19-2008 "A Special Place for Everyone" 1130 Howard Street Petoskey, Michigan 49770 Phone: 231-348-2100 Fax: 231-348-2342 PETOSKEY,

More information

School Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed

School Referendum Results School Amount Type of Debt Description Arrowhead UHS Failed School Referendum Results School Amount Type of Debt Description Arrowhead UHS Arrowhead UHS Baraboo Beaver Dam Belleville Cambridge Campbellsport Chippewa Falls Chippewa Falls $64,700,000.00 Issue Debt

More information

This workbook is designed as a supplement to the 2018 Department memo labeled "Capital Projects Plan Template and Notices for Budget Year 2019.

This workbook is designed as a supplement to the 2018 Department memo labeled Capital Projects Plan Template and Notices for Budget Year 2019. Capital Projects Plan Template and Notices for Budget Year 2019 Amended August 21, 2018 Pursuant to IC 20-40-18-6 and IC 20-40-18-7 and in conjunction with the implementation of HEA 1009-2017 and HEA 1167-2018,

More information

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures

Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures Ottawa USD 29 Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures KSDE Website Information Available Summary of Expenditures (Sumexpen.xls)

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

There hasn t been a bond referendum in our district since building the original facility in 1977.

There hasn t been a bond referendum in our district since building the original facility in 1977. The architect concept in this document was drawn by Howard & Helmer Architects (H&H) after several community, staff and board meetings over the last year. This concept plan was chosen after reviewing 5

More information

PROJECT BUDGET PRESENTATION

PROJECT BUDGET PRESENTATION PROJECT BUDGET PRESENTATION Monomoy Regional High School Building Committee Meeting June 19, 2012 Project Features Serves 700 Students Grades 8-12 8 th Grade Wing located near main entrance 168,000 GSF

More information

COMMUNITY INVESTMENT PLAN FOR FISCAL YEARS 2016 TO 2021

COMMUNITY INVESTMENT PLAN FOR FISCAL YEARS 2016 TO 2021 COMMUNITY INVESTMENT PLAN FOR FISCAL YEARS 2016 TO 2021 PUBLIC SCHOOLS: New Construction, Additions, Modernizations Fiscal Year 2016 2017 2018 2019 2020 2021 Allocation Complete Project Cost Career and

More information

BELLS INDEPENDENT SCHOOL DISTRICT

BELLS INDEPENDENT SCHOOL DISTRICT May 5, 2018 2018 BOND ELECTION Strong Schools BELLS INDEPENDENT SCHOOL DISTRICT Strong Community Committed to the Future \\\ Bond Election Information May 5, 2018 Bond to Improve Bells High School Committed

More information

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget? Over the last few weeks the Board of Education has received a number of questions regarding the proposed 2018-19 budget. We hope that the Frequently Asked Questions and our Answers below will help to shed

More information

Plainedge Public Schools Budget Presentation

Plainedge Public Schools Budget Presentation Plainedge Public Schools 2016-2017 Budget Presentation Budget Overview Final Draft Presentation to the Board of Education Peter Porrazzo, Assistant Superintendent for Business April 5 th, 2016 BUDGET PLANNING

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

27 September 2016 l WORK SESSION Board of Supervisors

27 September 2016 l WORK SESSION Board of Supervisors 27 September 2016 l WORK SESSION Board of Supervisors PRO JECT OPTIONS 1 2 3 OUTLINE THE PROBLEM ADDRESS SOLUTIONS ESTABLISH PLAN TO IMPLEMENT A S S E S S M E N T S T U D Y + L O N G - R A N G E V I S

More information

Montclair Public Schools

Montclair Public Schools Montclair Public Schools Budget Presentation 2014-2015 March 3, 2014 Dr. Penny MacCormack Superintendent of Schools Mr. Brian Fleischer Chief Operations Officer Budget Sources and Uses 2008-2013 Budget

More information

Rockford Area Schools

Rockford Area Schools Rockford Area Schools Referendum Presentation Given prior to the November 6 th, 2018 Election Neutral, District-Prepared Material. Prepared and paid for by Independent School District No. 883 Rockford

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R Under this measure, the Oxnard School District ( District ) is submitting a bond measure, described below, to the voters for

More information

Welcome Colome Consolidated School Public Meeting. January 17, 2019 January 21, 2019

Welcome Colome Consolidated School Public Meeting. January 17, 2019 January 21, 2019 Welcome School Public Meeting January 17, 2019 January 21, 2019 How Did We Get Here? August 2017 started talking to Architects and Construction Managers We retained an architectural firm to design a Conceptual

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

The Beverly Middle School Flexible Learning Academy

The Beverly Middle School Flexible Learning Academy Transformative Learning Through Architecture The Beverly Middle School Flexible Learning Academy Flexible Classroom Studios FLEXIBLE ACADEMY Flexible Configurations Flexible Support Exhibits Cross Discipline

More information

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016

DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 DeKalb County School District/High Schools Druid Hills High Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School Condition Summary

More information

Module 3 Feasibility Study

Module 3 Feasibility Study Timothy P. Cahill Chairman, State Treasurer Katherine P. Craven Executive Director Module 3 Feasibility Study July 2010 7/15/10 INTRODUCTION : If the District has completed all tasks defined in Module

More information

Overview of Public Schools CIP

Overview of Public Schools CIP Overview of Public Schools CIP The Public Schools Community Investment Plan (CIP) includes school construction, such as additions and modernizations, as well as other school-related projects. School construction

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

STATE OF MINNESOTA Office of the State Auditor

STATE OF MINNESOTA Office of the State Auditor STATE OF MINNESOTA Office of the State Auditor Rebecca Otto State Auditor PETITION ENGAGEMENT INDEPENDENT SCHOOL DISTRICT #23 FOR THE YEARS ENDED JUNE 30, 2007 AND 2008 Description of the Office of the

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

Measure G Quarterly Progress Update

Measure G Quarterly Progress Update Measure G Quarterly Progress Update February 3, 2016 Table of Contents Section I. Program and Projects Update...1 Section II. Financial Summary...4 I. Program & Projects Update PROGRAM UPDATE: Measure

More information

2019 Capital Projects Plan

2019 Capital Projects Plan Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects

More information

Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures

Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures Circle USD 375 Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures KSDE Website Information Available Summary of Expenditures (Sumexpen.xlsx)

More information

Comprehensive Facilities Assessment School Committee

Comprehensive Facilities Assessment School Committee C A N T O N P U B L I C S C H O O L S Comprehensive Facilities Assessment 3.23.2017 School Committee A g e n d a Introductions Schedule & Process Overview Progress Update Enrollment Targets Facilities

More information

Ronald E. McNair Discovery Learning Academy

Ronald E. McNair Discovery Learning Academy DeKalb County School District/Elementary Schools Ronald E. McNair Discovery Learning Academy Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive

More information

Two Ballot Proposals. August 8, 2017

Two Ballot Proposals. August 8, 2017 Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

USD #288 Central Heights

USD #288 Central Heights USD #288 Central Heights Budget General Information (characteristics of district) Supplemental Information for Tables in Summary of Expenditures KSDE Website Information Available Summary of Expenditures

More information

Piscataway Board of Education

Piscataway Board of Education Piscataway Board of Education State aid released in February as expected, flat. $15.7 million. Piscataway continues to be underfunded; district does not receive its fair share of state aid. State aid is

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

Budget Workshop #3

Budget Workshop #3 2018-19 Budget Workshop #3 March 22, 2018 Overview 1. Budget Gap Update 2. Projected Elementary Sections 3. Proposed Staffing 4. Remaining Preliminary Expenditures 5. Funding Sources 6. Review 2018-19

More information

Barneveld School District Community Survey Results. Spring 2017

Barneveld School District Community Survey Results. Spring 2017 Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey

More information

PUBLIC SCHOOLS OF PETOSKEY

PUBLIC SCHOOLS OF PETOSKEY "A Special Place for Everyone" ANNUAL BUDGET Fiscal Year 20062007 1130 Howard Street Petoskey, Michigan 49770 Phone: 2313482100 Fax: 2313482342 NOTICE OF A PUBLIC HEARING ON PROPOSED 20062007 BUDGET PLEASE

More information

76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school:

76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school: Mukwonago Area s c h o o l dis t ric t Your Feedback Counts! Thank you for your participation in the MASD Community Survey! The outstanding response rate of 2,766 completed surveys reflects a strong commitment

More information

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160

Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 - Page Item 153 Overview 154 Revenues 156 Expenditures 157 Elementary School Allocation 158 Middle School Allocation 159 High School Allocation 160 Special Education Allocation 161 Operational Services

More information

Climax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions

Climax Scotts Community Schools May 2018 Bond Election Frequently Asked Questions Climax Scotts Community Schools 1. BOND PROPOSAL What is the District asking for as part of this Bond Proposal? The Bond Proposals request funds to: Proposal 1 WILL: Raise $9.40 Million for projects at

More information

Approve a project to construct the Sports Performance Center

Approve a project to construct the Sports Performance Center Facilities Committee Michael S. Molina Vice Chancellor - Facilities Planning & Construction December 10-11, 2015 Texas Tech University Item 1 Approve a project to construct the Sports Performance Center

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Pleasantdale Elementary

Pleasantdale Elementary DeKalb County School District/Elementary Schools Pleasantdale Elementary Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 5 School

More information

University of Colorado Capital Construction Project Status SUMMARY - May 2017 (accounting noted by campus)

University of Colorado Capital Construction Project Status SUMMARY - May 2017 (accounting noted by campus) of Colorado Capital Project Status SUMMARY - May (accounting noted by campus) Legend On-Track Risks Approved - Adjustments Needed Awaiting $ Start-Up Phase In Bidding Phase In Closeout Project Completed

More information

Financing Education In Minnesota A Publication of the Minnesota House of Representatives Fiscal Analysis Department

Financing Education In Minnesota A Publication of the Minnesota House of Representatives Fiscal Analysis Department Financing Education In Minnesota 2011-12 A Publication of the Minnesota House of Representatives Fiscal Analysis Department September 2011 Financing Education in Minnesota 2011-12 A Publication of the

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District

Governing Board Bond Update. Measure G Bond Program. for. Solano Community College District Governing Board Bond Update for Measure G Bond Program prepared by Kitchell for the Solano Community College District Included in Booklet: Board Update Bond Financial Summary Completed Projects Projects

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

6.0 Support Facilities Element

6.0 Support Facilities Element 6.0 PURPOSE The purpose of this element is to ensure the provision of support facilities to meet University needs during the planning period. (1) DATA REQUIREMENTS. This element shall be based on the following

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

Use of State and District Construction Funds

Use of State and District Construction Funds 8 Use of State and District Construction Funds Through its long-range planning process, the district has met its facilities needs without issuing significant debt. To improve cost efficiency, however,

More information

Marple Newtown School District Delaware County, Pennsylvania. Act 34 Hearing for Culbertson Elementary School. Location of the Public Hearing

Marple Newtown School District Delaware County, Pennsylvania. Act 34 Hearing for Culbertson Elementary School. Location of the Public Hearing Marple Newtown School District Delaware County, Pennsylvania Act 34 Hearing for Culbertson Elementary School Location of the Public Hearing MARPLE NEWTOWN SCHOOL DISTIRCT ADMINISTRATION BUILDING 40 MEDIA

More information

Franklin Township Public Schools PRELIMINARY BUDGET PRESENTATION BOARD OF EDUCATION MEETING MARCH 23, 2017

Franklin Township Public Schools PRELIMINARY BUDGET PRESENTATION BOARD OF EDUCATION MEETING MARCH 23, 2017 Franklin Township Public Schools 2017 2018 PRELIMINARY BUDGET PRESENTATION BOARD OF EDUCATION MEETING MARCH 23, 2017 Franklin Township Board of Education Edward Potosnak, President Nancy LaCorte, Vice

More information

Overview of Public Schools CIP

Overview of Public Schools CIP Overview of Public Schools CIP The Board of Education CIP includes public school construction, addition and modernization projects as well as other school related projects. The primary sources of funding

More information

Harleton ISD May 7, 2016 Bond Proposal FAQs

Harleton ISD May 7, 2016 Bond Proposal FAQs Harleton May 7, 2016 Bond Proposal FAQs How was the total projected cost of the project developed? The cost of the project was based upon data concerning average costs of school construction found on the

More information

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation

Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Measure K Board Workshop December 1, 2008 Building on Success: Schools for the Next Generation Workshop Items Citizens Oversight Committee Measure K Next Steps Projects in Planning Milestones Board s Vision

More information

Board of Education Park Ridge Niles School District 64

Board of Education Park Ridge Niles School District 64 Board of Education Park Ridge Niles School District 64 Committee-of-the-Whole: Facilities Agenda Monday, September 10, 2018 Jefferson School Multipurpose Room Niles, IL 60714 On some occasions the order

More information

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010

DESERT COMMUNITY COLLEGE DISTRICT PROPOSITION 39, GENERAL OBLIGATION BONDS (MEASURE B, MARCH 2004) PERFORMANCE AUDIT JUNE 30, 2010 (MEASURE B, MARCH 2004) (MEASURE B, MARCH 2004) TABLE OF CONTENTS Page Independent Auditors Report 1 Objectives... 2 Scope of the Audit.. 2 Background Information. 2-3 Procedures Performed... 3-4 Results

More information

Galloway Township Public Schools

Galloway Township Public Schools Galloway Township Public Schools 2014-2015 PUBLIC BUDGET HEARING APRIL 28, 2014 Introduction Guiding Principles Core Values: respect, integrity, hard work, communication, diversity, excellence District

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Public Schools of the Tarrytowns

Public Schools of the Tarrytowns Union Free School District of the Tarrytowns Board of Education Fiscal 2018/2019 Budget Development Empower students to make informed choices as they become self-directed, lifelong learners committed to

More information

ROBBINSDALE AREA SCHOOLS BUDGET

ROBBINSDALE AREA SCHOOLS BUDGET ROBBINSDALE AREA SCHOOLS INDEPENDENT SCHOOL DISTRICT #281 NEW HOPE, MINNESOTA Serving the communities of Brooklyn Center, Brooklyn Park, Crystal, Golden Valley, New Hope, Plymouth and Robbinsdale 2018-2019

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519

$115,492 $2,963,834 $7,464,804 $7,856,304 $8,404,085 $26,804,519 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information