1 Appendix E Opinion of Probable Cost 01054/ /14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis
2 Cost Alternative 1: Improved Channel 10 year flow Main St to Beech St Beech St to Alder Drive Alder Drive to Forbusco Vehicle Bridge Hillside 12 th Street Crossing
3 Alternative 2: New Rohner Creek Alignment 100 year flow Main St to Beech St New Channel 12 th Street Crossing Hillside Lower Floodplain
4 Alternative 3: Improved Channel with Field Bypass Culvert 100 year flow Main St to Beech St I. Field Bypass Beech St to Alder Drive 12 th Street Crossing Hillside Alder Drive to Forbusco Vehicle Bridge Upper and Lower Floodplain
5 Alternative 4: Improved Channel with Fortuna Blvd Bypass Culvert 100 year flow Main St to Beech St Fortuna Bypass Beech St to Alder Drive Alder Drive to Forbusco Vehicle Bridge 12 th Street Crossing Hillside Forbusco Vehicle Bridge to Floodplain Terrace A Upper and Lower Floodplain
6 Rohner Creek Flood Control and Habitat Improvements 5/30/ :11 City of Fortuna, California Opinion of Probable Construction Cost Based on 10% Plans Alternative 1 Cost Alternative 2 Cost Mobilization/Demobilization (5% of subtotal) $ 255,000 Mobilization/Demobilization (5% of subtotal) $ 256,000 Water Management $ 150,000 Water Management $ 100,000 Temp Signage, Public Notification, Temp Fencing $ 10,000 Temp Signage, Public Notification, Temp Fencing $ 10,000 Traffic Control $ 30,000 Traffic Control $ 20,000 Erosion/Sediment Control $ 100,000 Erosion/Sediment Control $ 100,000 Subsection Subtotals: Subsection Subtotals: A. Main St Crossing to Beech St Crossing Subtotal $ 459,230 A. Main St Crossing to Beech St Crossing Subtotal $ 459,230 B. Beech St Crossing to Alder Drive Crossing Subtotal $ 1,039,740 H. New Channel Alignment Subtotal $ 2,490,570 C. Alder Drive Crossing to Forbusco Vehicle Bridge Subtotal $ 2,234,700 F. Lower Floodplain Subtotal $ 856,560 G. Hillside Creek Improvements Subtotal $ 814,000 G. Hillside Creek Improvements Subtotal $ 814,000 K. 12th Steet Crossing Subtotal $ 250,000 K. 12th Steet Crossing Subtotal $ 250,000 Subtotal $ 5,342,670 Subtotal $ 5,356,360 Total Alternative 1, less 15% = $ 4,541,270 Total Alternative 2, less 15% = $ 4,552,906 Total Alternative 1, plus 30% = $ 6,945,471 Total Alternative 2, plus 30% = $ 6,963,268 Alternative 3 Cost Alternative 4 Cost Mobilization/Demobilization (5% of subtotal) $ 534,000 Mobilization/Demobilization (5% of subtotal) $ 638,000 Water Management $ 150,000 Water Management $ 150,000 Temp Signage, Public Notification, Temp Fencing $ 10,000 Temp Signage, Public Notification, Temp Fencing $ 10,000 Traffic Control $ 20,000 Traffic Control $ 60,000 Erosion/Sediment Control $ 100,000 Erosion/Sediment Control $ 100,000 Subsection Subtotals: Subsection Subtotals: A. Main St Crossing to Beech St Crossing Subtotal $ 459,230 A. Main St Crossing to Beech St Crossing Subtotal $ 459,230 B. Beech St Crossing to Alder Drive Crossing Subtotal $ 1,039,740 B. Beech St Crossing to Alder Drive Crossing Subtotal $ 1,039,740 C. Alder Drive Crossing to Forbusco Vehicle Bridge Subtotal $ 2,234,700 C. Alder Drive Crossing to Forbusco Vehicle Bridge Subtotal $ 2,234,700 E. Upper Floodplain Subtotal $ 576,420 D. Forbusco Vehicle Bridge to Upper Floodplain $ 718,880 F. Lower Floodplain Subtotal $ 856,560 E. Upper Floodplain Subtotal $ 576,420 G. Hillside Creek Improvements Subtotal $ 814,000 F. Lower Floodplain Subtotal $ 856,560 I. Field Bypass Weir, Culvert and Alcove Subtotal $ 4,163,200 G. Hillside Creek Improvements Subtotal $ 814,000 K. 12th Steet Crossing Subtotal $ 250,000 J. Fortuna Boulevard Bypass Weir and Culvert Subtotal $ 5,722,210 K. 12th Steet Crossing Subtotal $ 250,000 Subtotal $ 11,207,850 Subtotal $ 13,379,740 Total Alternative 3, less 15% = $ 9,526,673 Total Alternative 4, less 15% = $ 11,372,779 Total Alternative 3, plus 30% = $ 14,570,205 Total Alternative 4, plus 30% = $ 17,393,662
7 Rohner Creek Flood Control and Habitat Improvements 5/30/ :11 City of Fortuna, California Opinion of Probable Construction Cost Based on 10% Plans Subsection Subtotals Item No. Item Description Quantity Unit Unit Cost Cost A. Main St to Beech St Crossing 1 Excavation & Disposal, creek locations 6,500 CY $ 30 $ 195,000 2 Engineered Streambed Material 450 CY $ 100 $ 45,000 3 Rock Grade Control Structures 4 EA $ 6,000 $ 24,000 4 Log Habitat Structures 3 EA $ 5,000 $ 15,000 5 Rock Slope Protection 112 TONS $ 160 $ 17,920 6 Riparian Planting 3,810 SQ.YD. $ 4 $ 15,240 7 Biodegradable Fabric (COIR) 1,130 SQ.YD. $ 9 $ 10,170 8 Concrete Bridge Foundation, 12 ft wide 1 EA $ 25,000 $ 25,000 9 Bridge, Precast Prestressed, 12 ft wide, delivered 34 LF $ 1,000 $ 34, Bridge Demolition & Installation 1 EA $ 40,000 $ 40, Bridge Guardrails 68 LF $ 175 $ 11, Preservation of Property 1 LS $ 26,000 $ 26,000 A. Main St Crossing to Beech St Crossing Subtotal $ 459,230 B. Beech St Crossing to Alder Drive Crossing 1 Excavation & Disposal, creek locations 6,500 CY $ 30 $ 195,000 2 Engineered Streambed Material 550 CY $ 100 $ 55,000 3 Rock Grade Control Structures 5 EA $ 6,000 $ 30,000 4 Log Habitat Structures 5 EA $ 5,000 $ 25,000 5 Rock Slope Protection 154 TONS $ 160 $ 24,640 6 Riparian Planting 2,560 SQ.YD. $ 4 $ 10,240 7 Biodegradable Fabric (COIR) 1,290 SQ.YD. $ 9 $ 11,610 8 Concrete Bridge Foundation, 12 ft wide 2 EA $ 25,000 $ 50,000 9 Bridge, Precast Prestressed, 12 ft wide, delivered 86 LF $ 1,000 $ 86, Concrete Bridge Foundation, 24 ft wide 1 EA $ 40,000 $ 40, Bridge, Precast Prestressed, 24 ft wide, delivered 41 LF $ 1,800 $ 73, Bridge Demolition & Installation 3 EA $ 40,000 $ 120, Bridge Guardrails 254 LF $ 175 $ 44, Soldier Pile Wall before Alder Drive Culvert 110 LF $ 2,200 $ 242, Preservation of Property 1 LS $ 32,000 $ 32,000 B. Beech St Crossing to Alder Drive Crossing Subtotal $ 1,039,740 C. Alder Drive Crossing to Forbusco Vehicle Bridge 1 Excavation & Disposal, creek locations 1,700 CY $ 30 $ 51,000 2 Rock Grade Control Structures 6 EA $ 6,000 $ 36,000 3 Rock Slope Protection 21 TONS $ 160 $ 3,360 4 Riparian Planting 260 SQ.YD. $ 4 $ 1,040 5 Soldier Pile Wall materials & installation (11 ft avg height) 904 LF $ 2,200 $ 1,988,800 6 Concrete Bridge Foundation, 12 ft wide 1 EA $ 25,000 $ 25,000 7 Bridge, Precast Prestressed, 12 ft wide, delivered 50 LF $ 1,000 $ 50,000 8 Bridge Demolition & Installation 1 EA $ 40,000 $ 40,000 9 Bridge Guardrails 100 LF $ 175 $ 17, Preservation of Property 1 LS $ 22,000 $ 22,000 C. Alder Drive Crossing to Forbusco Vehicle Bridge Subtotal $ 2,234,700 D. Forbusco Vehicle Bridge to Upper Floodplain 1 Excavation & Disposal, creek locations 700 CY $ 30 $ 21,000 2 Rock Slope Protection 14 TONS $ 160 $ 2,240 3 Riparian Planting 110 SQ.YD. $ 4 $ Soldier Pile Wall materials & installation (11 ft avg height) 316 LF $ 2,200 $ 695,200 D. Forbusco Vehicle Bridge to Upper Floodplain $ 718,880
8 Rohner Creek Flood Control and Habitat Improvements 5/30/ :11 City of Fortuna, California Opinion of Probable Construction Cost Based on 10% Plans Subsection Subtotals Item No. Item Description Quantity Unit Unit Cost Cost E. Upper Floodplain 1 Excavation & Disposal, creek locations 10,700 CY $ 30 $ 321,000 2 Rock Grade Control Structures 1 EA $ 6,000 $ 6,000 3 Log Habitat Structures 8 EA $ 5,000 $ 40,000 4 Riparian Planting 7,340 SQ.YD. $ 4 $ 29,360 5 Biodegradable Fabric (COIR) 1,340 SQ.YD. $ 9 $ 12,060 6 Straw Mulch 6000 SQ.YD. $ 3 $ 18,000 7 Private Property Acquisition, developable 2 Acre $ 100,000 $ 150,000 E. Upper Floodplain Subtotal $ 576,420 F. Lower Floodplain 1 Excavation & Disposal, creek locations 14,800 CY $ 30 $ 444,000 2 Rock Grade Control Structures 1 EA $ 6,000 $ 6,000 3 Log Habitat Structures 12 EA $ 5,000 $ 60,000 4 Riparian Planting 11,620 SQ.YD. $ 4 $ 46,480 5 Biodegradable Fabric (COIR) 2,120 SQ.YD. $ 9 $ 19,080 6 Straw Mulch 7000 SQ.YD. $ 3 $ 21,000 7 Private Property Acquisition, developable 3 Acre $ 100,000 $ 260,000 F. Lower Floodplain Subtotal $ 856,560 G. Hillside Creek Improvements 1 Excavation & Disposal, creek locations 900 CY $ 30 $ 27,000 2 Engineered Streambed Material 280 CY $ 100 $ 28,000 3 Rock Slope Protection 84 TONS $ 160 $ 13,440 4 Riparian Planting 480 SQ.YD. $ 4 $ 1,920 5 Biodegradable Fabric (COIR) 960 SQ.YD. $ 9 $ 8,640 6 Precast Reinforced Concrete Box Culvert, material 370 LF $ 1,350 $ 499,500 7 Precast Reinforced Concrete Box Culvert, installation 370 LF $ 150 $ 55,500 8 Precast Reinforced Concrete Box Culvert, headwalls 6 EA $ 30,000 $ 180,000 G. Hillside Creek Improvements Subtotal $ 814,000 H. New Channel Alignment 1 Excavation & Disposal, field locations 44,900 CY $ 20 $ 898,000 2 Engineered Streambed Material 1,500 CY $ 100 $ 150,000 3 Rock Grade Control Structures 15 EA $ 6,000 $ 90,000 4 Log Habitat Structures 12 EA $ 5,000 $ 60,000 5 Rock Slope Protection 511 TONS $ 160 $ 81,760 6 Riparian Planting 17,700 SQ.YD. $ 4 $ 70,800 7 Biodegradable Fabric (COIR) 14,700 SQ.YD. $ 9 $ 132,300 8 Fence 4,774 LF $ 10 $ 47,740 9 Gravel path 1,200 CY $ 60 $ 72, Rohner Creek plug for diversion 40 CY $ 100 $ 4, Utility Conflicts 1 LS $ 170,000 $ 170, Sheet pile wall (includes sheet piles and concrete face) 419 LF $ 600 $ 251, Railing on sheet pile wall 419 LF $ 30 $ 12, Private Property Acquisition, developable 4.0 Acre $ 100,000 $ 400, Private Property Acquisition, non/less developable 1.0 Acre $ 50,000 $ 50,000 H. New Channel Alignment Subtotal $ 2,490,570
9 Rohner Creek Flood Control and Habitat Improvements 5/30/ :11 City of Fortuna, California Opinion of Probable Construction Cost Based on 10% Plans Subsection Subtotals Item No. Item Description Quantity Unit Unit Cost Cost I. Field Bypass Weir, Culvert and Alcove 1 Labyrinth Weir 1 LS $ 156,500 $ 156,500 2 Labyrinth Weir installation 1 LS $ 50,000 $ 50,000 3 Excavation & Stockpile, field location 19,000 CY $ 15 $ 285,000 4 Rock Slope Protection 1000 TONS $ 160 $ 160,000 5 Backfill with native, field location 12,900 CY $ 10 $ 129,000 6 Material Disposal, field locations 6,100 CY $ 5 $ 30,500 7 Field Rehab 15,400 SQ.YD. $ 18 $ 277,200 8 Utility Conflicts 1 LS $ 40,000 $ 40,000 9 Precast Reinforced Concrete Box Culvert, material 1,970 LF $ 1,350 $ 2,659, Precast Reinforced Concrete Box Culvert, installation 1,970 LF $ 150 $ 295, Precast Reinforced Concrete Box Culvert, headwall downstream 1 EA $ 30,000 $ 30, Private Property Easement Development 1 LS $ 50,000 $ 50,000 I. Field Bypass Weir, Culvert and Alcove Subtotal $ 4,163,200 J. Fortuna Boulevard Bypass Weir and Culvert 1 Labyrinth Weir 1 LS $ 156,500 $ 156,500 2 Labyrinth Weir installation 1 LS $ 50,000 $ 50,000 3 Rock Slope Protection 1000 TONS $ 160 $ 160,000 4 Excavation & Stockpile, Fortuna Blvd. 15,000 CY $ 20 $ 300,000 5 Hazardous Material excavation & disposal 6,400 CY $ 50 $ 320,000 6 Material Disposal (non hazardous) 1,800 CY $ 5 $ 9,000 7 Backfill with native, Fortuna Blvd. 13,200 CY $ 15 $ 198,000 8 Utility Conflicts 1 LS $ 89,000 $ 89,000 9 Precast Reinforced Concrete Box Culvert, material 2,617 LF $ 1,350 $ 3,532, Precast Reinforced Concrete Box Culvert, installation 2,617 LF $ 150 $ 392, Precast Reinforced Concrete Box Culvert, headwall downstream 1 EA $ 30,000 $ 30, Temporary shoring 1 LS $ 100,000 $ 100, Asphalt Rehab (3" AC, 1 ft base, misc striping) 2,950 SQ.YD. $ 75 $ 221, Median Rehab 5,820 SQ.YD. $ 28 $ 162,960 J. Fortuna Boulevard Bypass Weir and Culvert Subtotal $ 5,722,210 K. 12th Steet Crossing 1 Rock Grade Control Structures 14 EA $ 6,000 $ 84,000 2 Offset Baffle removal 1 LS $ 15,000 $ 15,000 3 Inlet Apron modifications 1 LS $ 151,000 $ 151,000 4 Estimated additional 5 6 K. 12th Steet Crossing Subtotal $ 250,000
10 Rohner Creek Flood Control and Habitat Improvements 5/30/ :11 City of Fortuna, California Opinion of Probable Construction Cost Based on 10% Plans Subsection Subtotals Item No. Item Description Quantity Unit Unit Cost Cost I. Field Bypass Weir, Culvert and Alcove HDPE 1 Labyrinth Weir 1 LS $ 156,500 $ 156,500 2 Labyrinth Weir installation 1 LS $ 100,000 $ 100,000 3 Excavation & Stockpile, field location 19,000 CY $ 15 $ 285,000 4 Rock Slope Protection 1000 TONS $ 160 $ 160,000 5 Backfill with native, field location 12,900 CY $ 10 $ 129,000 6 Material Disposal, field locations 6,100 CY $ 5 $ 30,500 7 Field Rehab 15,400 SQ.YD. $ 18 $ 277,200 8 Utility Conflicts 1 LS $ 40,000 $ 40,000 9 HDPE pipe, 3 parallel lines, 60" dia, material 1,970 LF $ 600 $ 1,182, HDPE pipe, 3 parallel lines, installation 1,970 LF $ 100 $ 197, HDPE headwall downstream 1 EA $ 30,000 $ 30, Manholes, special bends, etc 10 EA $ 10,000 $ 100, HDPE pipe, fusion equipment rental 1 LS $ 40,000 $ 40, Private Property Easement Development 1 LS $ 50,000 $ 50,000 I. Field Bypass Weir, Culvert and Alcove Subtotal HDPE $ 2,777,200 J. Fortuna Boulevard Bypass Weir and Culvert HDPE 1 Labyrinth Weir 1 LS $ 156,481 $ 156,481 2 Labyrinth Weir installation 1 LS $ 100,000 $ 100,000 3 Rock Slope Protection 1000 TONS $ 160 $ 160,000 4 Excavation & Stockpile, Fortuna Blvd. 15,000 CY $ 20 $ 300,000 5 Hazardous Material excavation & disposal 6,400 CY $ 50 $ 320,000 6 Material Disposal (non hazardous) 1,800 CY $ 5 $ 9,000 7 Backfill with native, Fortuna Blvd. 13,200 CY $ 15 $ 198,000 8 Utility Conflicts 1 LS $ 89,000 $ 89,000 9 HDPE pipe, 3 parallel lines, 60" dia, material 2,617 LF $ 600 $ 1,570, HDPE pipe, 3 parallel lines, installation 2,617 LF $ 100 $ 261, HDPE headwall downstream 1 EA $ 30,000 $ 30, Manholes, special bends, etc 10 EA $ 10,000 $ 100, HDPE pipe, fusion equipment rental 1 LS $ 50,000 $ 50, Temporary shoring 1 LS $ 100,000 $ 100, Asphalt Rehab (3" AC, 1 ft base, misc striping) 2,950 SQ.YD. $ 75 $ 221, Median Rehab 5,820 SQ.YD. $ 28 $ 162,960 J. Fortuna Boulevard Bypass Weir and Culvert Subtotal HDPE $ 3,828,591
ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationCity of Fortuna. Construction Services for the CITY OF FORTUNA (CIP# 9983) HILLSIDE AND ROHNER CREEKS MINOR FLOOD CONTROL IMPROVEMENTS PROJECT
City of Fortuna Construction Services for the CITY OF FORTUNA (CIP# 9983) HILLSIDE AND ROHNER CREEKS MINOR FLOOD CONTROL IMPROVEMENTS PROJECT March 20 th, 2019 Prepared by 718 Third Street Eureka, California
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationAPPENDIX A-3: Cost Engineering
APPENDIX A-3: Cost Engineering ALISO CREEK MAINSTEM ECOSYSTEM RESTORATION STUDY Orange County, California September 217 Orange County Public Works Environmental Resources Department This page intentionally
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationEngineer s Report: School Section Lake Outlet 2017
WENCK File #0002-0230 June 2017 Revised August 2017 Engineer s Report: School Section Lake Outlet 2017 Prepared for: Clearwater River Watershed District 75 Elm St E PO Box 481 Annandale, MN 55389 Prepared
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationSHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES
SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES A community meeting was held on September 13, 2018 at the Shipley s Choice Elementary School. County staff from the Watershed Protection and
More informationA Financial Impact Assessment of LD 1725: Stream Crossings
A Financial Impact Assessment of LD 1725: Stream Crossings Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning Edmund S.
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationJob No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL
Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationWAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)
WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) 2017 2026 DECEMBER 2015 Prepared For: Federal Aviation Administration Ohio Department of Transportation Office of Aviation Attachment A 10
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationTITLE: Authorization to Award Contract for Construction and Construction Oversight Contract for the Powell Road Stormwater Diversion Project
Minnehaha Creek Watershed District REQUEST FOR BOARD ACTION MEETING DATE: March 26, 2015 TITLE: Authorization to Award Contract for Construction and Construction Oversight Contract for the Powell Road
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More information$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC
-73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL
II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationBoth bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details.
STAFF REPORT MEETING DATE: September 12, 2017 TO: FROM: City Council David Dammuller, Senior Engineer Chris Blunk, Deputy Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationFloodplain Development Permits A Technical Guidance Document
Floodplain Development Permits A Technical Guidance Document To Prevent Loss of Life, Reduce Property Damage and to Protect and Enhance the Natural and Beneficial Functions of Floodplains Iredell County
More informationPreliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $
More informationFURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012
FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012 FURTHER TO: Pages EX6. CORRESPONDENCE EX6.1 A letter dated January 11, 2012 from Mr. David de Launay, Assistant Deputy
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationFLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM
1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,
More informationJANUARY, Dan Mickelberry Chief Estimator
JANUARY, 2017 What s Next! Welcome to our quarterly update of the projects the Denver Preconstruction Group is working on. Please remember that this is NOT a request for bids or budgets, but rather a way
More informationCITY OF LAKE ELSINORE CALIFORNIA CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS FOR
CALIFORNIA CONTRACT DOCUMENTS, SPECIFICATIONS AND PLANS FOR CANYON ESTATES DRIVE-CAMINO DEL NORTE IMPROVEMENTS CIP PROJECT NO. Z10030 Approved: City Engineer Proposals will be received at the Office of
More informationJob No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL
Solicitation No. B-11-030-BB Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2
Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This
More informationAppendix B Example Project Designs and Engineers Opinion of Costs
Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility
More informationCity of Pacifica General Fund Budget
City of Pacifica 2017-18 General Fund Budget General Government Lorenzo Hines Jr. City Manager s Office May 2, 2017 City of Pacifica 1 General Government 2017-18 DRAFT Budget Mission We strive to manage
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationPROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02
AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationCONTRACTING OPERATIONS INFORMATION
t m CONTRACTOR S SUPPLEMENTAL QUESTIONNAIRE Note: Throughout this questionnaire the words you and your include all entities seeking coverage. BASIC INFORMATION Name(s) of Applicant: License Number: Years
More informationHillaire-Skyline Park Area Estimated Project Cost
Hillaire-Skyline Park Area Estimated Project Cost ITEM ITEM QUANTITY UNIT UNIT AMOUNT NO. PRICE 1 Detention Basin 1 LS $ 200,000 $ 200,000 2 Culvert Improvements 40 LF $ 100 $ 4,000 3 Channel Improvements