1 JANUARY, 2017 What s Next! Welcome to our quarterly update of the projects the Denver Preconstruction Group is working on. Please remember that this is NOT a request for bids or budgets, but rather a way to communicate with and keep our valued subcontracting partners informed. At Mortenson Construction we understand the value of diversity, and as an industry leader and integral part of the fabric of this community we commit ourselves to support the people and businesses in the communities in which we live and work. On all Mortenson projects we involve small, minority and women-owned business enterprise (SMWBE) firms by developing project specific plans aimed to maximize participation. Below you will find brief descriptions of our current projects. Please direct project related questions to the Design Phase Manager, Lead Estimator, or Project Manager specified. Dan Mickelberry Chief Estimator We hope you find this update helpful, and appreciate your feedback! Feel free to send general questions or comments to me at dan.mickelberry@mortenson.com. Page 1 of 10

2 Projects under construction with FUTURE BID PACKAGES Denver Water Operational Campus Redevelopment (Phase 2) Phase 2 of Denver Water's Campus Redevelopment will commence in the 3 rd Quarter of This phase will include a new parking garage, administration building and wellness building. Core and Shell components of these buildings have been bought-out, interiors will be procured in June, Minority and Women Owned Businesses are encouraged to participate. Anticipated Construction Start: Phase 1 in construction and Phase 2 starting 3 rd Quarter, 2017 Anticipated Project Schedule: Phase 2 complete in 20 months Design Development Previously Awarded Work: MEP, Structure, Enclosure Date of Next Anticipated Budget: Interiors in March 2017 Design Phase Manager andrew.reisbeck@mortenson.com sean.wennerstrom@mortenson.com david.mclatchie@mortenson.com Stapleton Central Park Blvd. Bridge - Phase 2 Central Park Bridge Phase 2 is the completion of the western half of the Central Park Blvd. bridge. The project is located in the Stapleton Redevelopment area located at North Sand Creek and south of I-70 along Central Park Blvd. in Denver, CO. This Request for Proposal includes work associated with Erosion Control, Clear and Grubbing, Bridge Construction, Signage and Striping, Roadway, Cut/Export to stockpile/compact, Traffic Control, and Site Stabilization. Anticipated Construction Start: November, 2017 Anticipated Project Schedule: 10 Months Construction Documents Previously Awarded Work: Utilities, Earthwork, Bridge, and Roads Date of Next Anticipated Budget: August, 2017 aaron.britt@mortenson.com Sean.Saddler@mortenson.com Page 2 of 10

3 MLK Road Extension The MLK Road Extension is approximately 5,400 LF of four lane roadway and utility improvements in Denver, CO. This Request for Proposal includes Demolition, Erosion Control, Earthwork, Utilities, Concrete, Asphalt, Irrigation, Landscaping, and Traffic Control scopes of work for the area. Anticipated Construction Start: June, 2017 Anticipated Project Schedule: 16 Months Design Development Date of Next Anticipated Budget: April, Stapleton Section 10 Open Space Improvements This project consists of approximately 148 acres in Denver, CO in the area of the former Stapleton International Airport. This Request for Proposal includes the Landscaping, Earthwork, Irrigation, Concrete, Utilities, Site Amenities, Ped Lights, and Brick Pavers located in Filing 49, including the median work. Mortenson will be the Construction Manager of this work and is inviting responses to this Request for Proposal. Anticipated Construction Start: June, 2017 Anticipated Project Schedule: 12 Months Design Development Previously Awarded Work: Utilities, Earthwork, and Roadway Date of Next Anticipated Budget: April, Page 3 of 10

4 Projects we ve been AWARDED that are in preconstruction UCHealth Highlands Ranch Hospital The UCHealth Highlands Ranch Hospital is a new 150 bed (72 finished and 78 shelled), 343,600 SF inpatient hospital, a 71,250 SF medical office building, a 19,800 SF central utility plant, and a two-level approximately 550 space parking garage on a 32 acre greenfield site. It will include comprehensive inpatient and outpatient services, and public and administrative support functions. Anticipated Construction Start: 1 st Quarter, 2017 Anticipated Project Schedule: Completion in late 2018 Schematic Design Previously Awarded Work: Mechanical, Electrical, and Plumbing, Conveying Date of Next Anticipated Budget: Design Development Package in March, 2017 tim.clement@mortenson.com mike.ross@mortenson.com UCHealth Inverness MOB/ASC The UCHealth Inverness Medical Office Building and Ambulatory Surgery Center is located offsite and includes a new approximately 109,000 SF medical office building comprised of medical office and clinic space, ambulatory surgery space, along with shell space on an 8.26 acre site. Anticipated Construction Start: Summer 2017 Anticipated Project Schedule: TBD Schematic Design Date of Next Anticipated Budget: IGMP March 2017 ben.potson@mortenson.com ryan.may@mortenson.com Page 4 of 10

5 United Airlines Phase 3 Site Improvements United Airlines Phase 3 Includes Parking, Paving, Fencing, Landscape, and Security Upgrades to United s existing Campus located at Quebec and Martin Luther King Blvd in the Stapleton area. Anticipated Construction Start: April, 2017 Anticipated Project Schedule: 6 Months Schematic Design Previously Awarded Work: Mechanical, Electrical, and Plumbing Date of Next Anticipated Budget: October, 2016 Design Phase Manager matt.shannon@mortenson.com ann.churlik@mortenson.com michael.finn@mortenson.com Ballpark Hotel The Ballpark Hotel is a 150 room, eight-story hotel with one level of below-grade parking near Coors Field in Denver, CO. Anticipated Construction Start: July, 2017 Anticipated Project Schedule: 15 months Design Development Previously Awarded Work: Mechanical and Electrical Date of Next Anticipated Budget: March, 2017 Design Phase Manager doug.mcnichol@mortenson.com dan.kiesel@mortenson.com jessica.ostoyich@mortenson.com Page 5 of 10

6 4120 Brighton Blvd. Infrastructure Six city blocks of new street and/or utility infrastructure, and associated demolition and rehabilitation of existing buildings. Anticipated Construction Start: Summer, 2017 Anticipated Project Schedule: 6 Months Schematic Date of Next Anticipated Budget: March, 2017 parker.moore@mortenson.com Design Phase Manager doug.mcnichol@mortenson.com kent.reinart@mortenson.com Festival Park A two acre park in downtown Castle Rock, CO. Project to include creek restoration work, play areas, decorative concrete, earthwork, utilities, and specialty trades including decorative concrete, water features, signage, and pavers. Anticipated Construction Start: February, 2017 Anticipated Project Schedule: 10 Months 90% Construction Documents Date of Next Anticipated Budget: Through January 2017 parker.moore@mortenson.com jabin.bebo@mortenson.com Page 6 of 10

7 Sterling Ranch Development Filing 2 Infrastructure development of Filing 2 at Sterling Ranch to include earthwork, utilities, hardscape, landscape, roadway pavement, and other associated development improvements. Anticipated Construction Start: Early 2017 Anticipated Project Schedule: 8-10 Months Budget level with subcontractor input. Date of Next Anticipated Budget: March, 2017 Design Phase Manager dave.koechley@mortenson.com parker.moore@mortenson.com nathan.cutler@mortenson.com Sterling Ranch Development - Filing 3 Infrastructure development of Filing 3 at Sterling Ranch to include earthwork, utilities, hardscape, landscape, roadway pavement, and other associated development improvements. Anticipated Construction Start: Late 2017 Anticipated Project Schedule: TBD Cost Model with subcontractor input Date of Next Anticipated Budget: April, 2017 Design Phase Manager dave.koechley@mortenson.com parker.moore@mortenson.com nathan.cutler@mortenson.com Page 7 of 10

8 Sterling Gulch Detention and Storm Water Control Channel earthwork, structures, utility connection, box culvert, and landscape reclamation. Anticipated Construction Start: April, 2017 Anticipated Project Schedule: 8 Months 100% CD s Date of Next Anticipated Budget: February, 2017 Design Phase Manager dave.koechley@mortenson.com parker.moore@mortenson.com nathan.cutler@mortenson.com Page 8 of 10

9 Frequently Asked Questions: Q. HOW DO I GET ON THE BID INVITATION LIST? A. Please visit to complete the Get in Touch form to contact Marsha Nelson and be added to our trade partner database. Please include as much of the following information as possible - company name, contact name, phone number, fax number, , scopes of work performed, geographic interest and whether you are an S/DBE firm. Q. DO I HAVE TO BE PREQUALIFIED TO BID ON MORTENSON PROJECTS? A. Most of our bid packages are available for all firms to bid without advance prequalification. However, for your bid to be considered, you must be enrolled in our Subcontractor Default Insurance Program. Contact Christine.Widmaier@texturacorp.com to begin this process. Q. WILL I HAVE TO PROVIDE A PAYMENT AND PERFORMANCE BOND? A. We utilize Subcontractor Default Insurance in lieu of traditional subcontractor bonding. To qualify, you must be registered with Mortenson through Textura. Contact Christine.Widmaier@texturacorp.com to begin this process. Q. WHAT ARE MORTENSON S SAFETY REQUIREMENTS? A. Subcontractors are required to comply with our Zero Injury Program, including its procedures, practices and policies. Refer to our standard Subcontract Agreement, Exhibit E available on our Trade Partner page for more information. Q. DOES MORTENSON HAVE A DRUG & ALCOHOL TESTING REQUIREMENT? A. Yes. Mortenson is a drug and alcohol free workplace. By assigning employees to work at the Project, Subcontractor represents that it has conducted substance abuse screening of such employees to screen for the presence of drugs or alcohol. Q. CAN I ORDER BID DOCUMENTS DIRECT? A. Mortenson uses Isqft to communicate bid documents to our trade partners. Prints can be ordered directly through Isqft or downloaded and ordered through your normal print supplier. Page 9 of 10

10 Q. WHERE IS THE BEST PLACE TO LEARN ABOUT MORTENSON OPPORTUNITIES TO BID? A. Our website, is one place to find information on specific sub-bid opportunities with us. The Trade Partners section includes complete information on currently bidding projects, including: description of work, bid date, estimated value, pre-bid meeting information, and telephone, fax, or contact information for questions. If you are registered in our trade partner database, you will also receive a quarterly newsletter regarding upcoming bid opportunities. Current bidding projects will be uploaded to the Isqft quarterly What s Up link. Q. WHEN CAN I EXPECT TO GET BID RESULTS? A. Most projects will not have immediate bid results. We need time to properly evaluate each proposal to do a fair and complete analysis. Typically, two to four weeks following a bid we will have a good idea of who is the apparent low bidder for each trade and will do our best to contact all bidders with feedback. Page 10 of 10

AUGUST, Dan Mickelberry Chief Estimator

AUGUST, Dan Mickelberry Chief Estimator AUGUST, 2017 Welcome to our quarterly update of the projects the Denver Preconstruction Group is working on. Please remember that this is NOT a request for bids or budgets, but rather a way to communicate

More information

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE 1. Building Permit EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE a. This fee schedule is applicable to all building permits issued by the City of Oldsmar, Building Division

More information

SMALL WORKS ROSTER APPLICATION

SMALL WORKS ROSTER APPLICATION Small Works Roster Page 1 of 9 Introduction SMALL WORKS ROSTER APPLICATION Public Hospital District #4, King County (the District), is a taxpayer-supported special purpose district located in eastern King

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

BURLINGTON INTERNATIONAL AIRPORT South Burlington, VT INVITATION TO BIDDERS NOTICE OF PREQUALIFICATION

BURLINGTON INTERNATIONAL AIRPORT South Burlington, VT INVITATION TO BIDDERS NOTICE OF PREQUALIFICATION BURLINGTON INTERNATIONAL AIRPORT South Burlington, VT INVITATION TO BIDDERS NOTICE OF PREQUALIFICATION The Board of Airport Commissioners invites contractors to submit Letters of Interest and the City

More information

ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011

ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011 ADDENDUM NO. 3 to the PREQUALIFICATION DOCUMENTS AUGUST 26, 2011 HOUSING 4: THE SUMMITS PROJECT NO. 906270 CAMPUS, MERCED CALIFORNIA A. BID SUBMISSION DEADLINE: [The deadline for submitting prequalification

More information

MAIN TERMINAL PAVER REPLACEMENT AND FOUNTAIN PLAZA IMPROVEMENTS. Tampa International Airport

MAIN TERMINAL PAVER REPLACEMENT AND FOUNTAIN PLAZA IMPROVEMENTS. Tampa International Airport MAIN TERMINAL PAVER REPLACEMENT AND FOUNTAIN PLAZA IMPROVEMENTS Tampa International Airport Mandatory Pre-Solicitation Conference Main Terminal Paver Replacement and Fountain Plaza Improvements Project

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015

CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015 CITY OF BRENTWOOD DEVELOPMENT IMPACT FEE PROGRAM 2015 TABLE OF CONTENTS Page Introduction. 1 Program Overview. 1 Fee Summary 2 Land Use Categories and Growth Projections. 3 Administration 5 Community Facilities

More information

CONTRACTOR QUALIFICATION FORM

CONTRACTOR QUALIFICATION FORM CONTRACTOR QUALIFICATION FORM Please TYPE or print in all blanks accurately, provide attachments and fax, mail or e-mail to: INTEGRITY CONSTRUCTION SERVICES, LLC. 829 WEST MAIN STREET, SUITE C GAYLORD,

More information

Opinion of Probable Cost

Opinion of Probable Cost Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel

More information

Letter of Instructions

Letter of Instructions Letter of Instructions Trade Contractor Prequalification Statement Please complete the following and return at your earliest convenience by email to prequal@chanen.com. 1. Trade Contractor Prequalification

More information

**REVISED BID PRICE FORM** October 24, 2018

**REVISED BID PRICE FORM** October 24, 2018 **REVISED BID PRICE FORM** October 24, 2018 (Date) TO: RE: CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 INVITATION FOR BID WANNAMAKER COUNTY PARK DOG

More information

BASE BID and ALTERNATES WORK ITEM PROPOSAL 2017 Parking Structure #2 Renovations WSU #

BASE BID and ALTERNATES WORK ITEM PROPOSAL 2017 Parking Structure #2 Renovations WSU # VENDOR NAME GENERAL CONTRACT - PROPOSAL FORM (revised 4-2017) Please Note Vendors must Pre-qualify themselves when responding to this bid opportunity. Our Prequalification questions can be found on page

More information

Architect: WESKetch Architecture, Inc, Millington, NJ. William Kaufman/Tom Vierschilling

Architect: WESKetch Architecture, Inc, Millington, NJ. William Kaufman/Tom Vierschilling April 20, 2017 INVITATION FOR CONTRACTORS TO BID Project Address: 40 Maple Street Summit, NJ 07901 Project Summary Overview: Approximately 3,220 sf 3 rd story addition over existing 2 story building in

More information

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

CAPITAL PROJECTS BUDGET TAB 5

CAPITAL PROJECTS BUDGET TAB 5 CAPITAL PROJECTS BUDGET TAB 5 This page intentionally left blank. 2016-2018 CAPITAL BUDGET 5-1 This page intentionally left blank. City of Walnut Creek 2016-2018 Capital Budget Table of Contents Introduction

More information

Town of Belleair Request for Qualifications For Engineer of Record Professional Services

Town of Belleair Request for Qualifications For Engineer of Record Professional Services Town of Belleair Request for Qualifications For Engineer of Record Professional Services To Be Opened May 31, 2018 at 2:00 PM At Town Hall 901 Ponce de Leon Blvd. Belleair, FL 33756 Request For Qualifications

More information

Detailed Project Budget

Detailed Project Budget Detailed Project Budget *Packet must include Attachment A and Attachment B* Kit Carson School District R1 2/23/2018 Total Project Cost: 32,135,362.19 Division of Public School Capital Construction Assistance

More information

***This is a Registration Packet*** Not a Pre-Qualification Packet

***This is a Registration Packet*** Not a Pre-Qualification Packet ***This is a Registration Packet*** Not a Pre-Qualification Packet ROMOLAND SCHOOL DISTRICT Business Services Department 25900 Leon Road, Homeland, CA 92548 NOTICE TO CONTRACTORS TO REGISTER FOR PUBLIC

More information

Planned Procurement Opportunities Report. August 2015

Planned Procurement Opportunities Report. August 2015 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report August 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted

More information

Planned Procurement Opportunities Report. August 2015

Planned Procurement Opportunities Report. August 2015 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report August 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

Maximising value from your landscape investment

Maximising value from your landscape investment Maximising value from your landscape investment The Other Side Landscapes Pty Ltd Guide to engaging and undertaking works with a Landscape Contractor Foreword For most people their home is their largest

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

CITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $

More information

PRE-QUALIFICATION #504 FOR PAVING CONTRACTORS

PRE-QUALIFICATION #504 FOR PAVING CONTRACTORS PRE-QUALIFICATION #504 FOR Issue Date: Thursday, January 11, 2018 Stacey Shoemaker, Buyer Issued by: The Thames Valley District School Board Return Date: 12:00:00 noon, local time, Thursday, February 1,

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

City of Los Altos. Civic Center Master Plan Council Meeting. March 24, 2015

City of Los Altos. Civic Center Master Plan Council Meeting. March 24, 2015 City of Los Altos Civic Center Master Plan Council Meeting March 24, 2015 Agenda Context, Purpose, Intended Results Final Site Design Concept Cost Model & Budget Data Review Council Input Needed Context

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

Backlog Reduction Plan

Backlog Reduction Plan 2003-2013 Executive Summary proposes to achieve reductions in our facilities maintenance backlog by documenting and completing backlog projects on a priority basis and by minimizing or eliminating future

More information

LADOTD COST ESTIMATING PROCESS. Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225)

LADOTD COST ESTIMATING PROCESS. Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225) LADOTD COST ESTIMATING PROCESS Charles Nickel, P.E. Value Engineering & Cost Estimate Director Office: (225) 379-1078 E-mail: Charles.Nickel@la.gov Project Management Body of Knowledge (PMBOK) Cost Management

More information

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID

QUONSET DEVELOPMENT CORPORATION (QDC) INVITATION TO BID QUONSET DEVELOPMENT CORPORATION (QDC) A BID is solicited for the following work: INVITATION TO BID Name of Project: Background & Description of Work: Pavement Repairs: Utility Connections: On-Call Pavement

More information

PRIME CONTRACTOR PREQUALIFICATION APPLICATION

PRIME CONTRACTOR PREQUALIFICATION APPLICATION PRIME CONTRACTOR PREQUALIFICATION APPLICATION Director of Purchasing Services 3401 Walnut Street Suite 421 A Philadelphia, Pennsylvania 19104-6228 Issue Date 01/01/99 Revision 7 01/07/05 INSTRUCTIONS ON

More information

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION University of California, Irvine Bison Surface Parking Lot Project No. 5110396 NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION The University of California, Irvine (UCI) requests the qualifications

More information

Amendment Issue date

Amendment Issue date P.O. Box 40 Greenwood, South Carolina 29648-0040 www.cityofgreenwoodsc.com PROJECT NAME: DESCRIPTION: DATE ISSUED: 10/26/2018 REQUEST FOR BIDS Asbestos Abatement & Demolition Services 908 S. Main St (Parcel

More information

Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC CONTRACTOR PREQUALIFICATION APPLICATION

Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC CONTRACTOR PREQUALIFICATION APPLICATION Greenville-Spartanburg Airport District 2000 GSP Drive, Suite 1 Greer, SC 29651 CONTRACTOR PREQUALIFICATION APPLICATION Terminal Drop-off Improvements August 15, 2018 REQUEST FOR QUALIFICATIONS FOR LANDSCAPE

More information

TOWN HALL MEETING. Neighborhood Connector Street Projects. February 7, 2016

TOWN HALL MEETING. Neighborhood Connector Street Projects. February 7, 2016 TOWN HALL MEETING Neighborhood Connector Street Projects February 7, 2016 Neighborhood Connector Street Projects Overview April 17 2014 May 17 2014 November 20 2014 January 29 2015 March 5 2015 March 19

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER DENVER INTERNATIONAL AIRPORT BID FORMS CONTRACT NAME: Contract No.: 201206054 BID LETTER BIDDER Manager of Aviation City and County of Denver Business Management Services (Procurement) Office Airport Office

More information

NOTICE OF SPECIAL MEETING STERLING RANCH COMMUNITY AUTHORITY BOARD DOUGLAS COUNTY, COLORADO

NOTICE OF SPECIAL MEETING STERLING RANCH COMMUNITY AUTHORITY BOARD DOUGLAS COUNTY, COLORADO NOTICE OF SPECIAL MEETING STERLING RANCH COMMUNITY AUTHORITY BOARD DOUGLAS COUNTY, COLORADO NOTICE IS HEREBY GIVEN that the Board of Directors of Sterling Ranch Community Authority Board (the CAB ), Douglas

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

Appendix B Example Project Designs and Engineers Opinion of Costs

Appendix B Example Project Designs and Engineers Opinion of Costs Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility

More information

Town Square Redevelopment. Phase I Contract Discussion

Town Square Redevelopment. Phase I Contract Discussion Town Square Redevelopment Phase I Contract Discussion Date: June 8, 2017 Current Estimated Schedule Draft RFQ Review September 20, 2016 Final RFQ Publication October 10, 2016 Part I Team Shortlist January

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

INVITATION TO BID NEW TENNIS COURTS NEILLS CREEK PARK COUNTY OF HARNETT NORTH CAROLINA

INVITATION TO BID NEW TENNIS COURTS NEILLS CREEK PARK COUNTY OF HARNETT NORTH CAROLINA INVITATION TO BID NEW TENNIS COURTS NEILLS CREEK PARK COUNTY OF HARNETT NORTH CAROLINA SITE ADDRESS: BIDS DUE: NEILLS CREEK PARK 3885 NEILLS CREEK RD ANGIER, NC 27501 TUESDAY, APRIL 17th @ 2:00 PM HARNETT

More information

Date: June 28, All Attending

Date: June 28, All Attending Date: June 28, 2016 To: From: Re: All Attending Neil McCoy, Executive Director of Capital Improvements, HGTC Ms. Dianna Cecala, Procurement Manager, HGTC Andrew Cohen, Office State Engineers Michael W.

More information

Pavlick, Kenneth - DEN Date: :26:57-07'00'

Pavlick, Kenneth - DEN Date: :26:57-07'00' November 21, 2018 PIKES PEAK PARKING RESTORATION CONTRACT NO. 201845783 ADDENDUM NUMBER ONE This Addendum Number One supersedes and/or supplements all portions of the Contract Documents with which it conflicts.

More information

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details.

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details. STAFF REPORT MEETING DATE: September 12, 2017 TO: FROM: City Council David Dammuller, Senior Engineer Chris Blunk, Deputy Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/

More information

2018 BUDGET AND FINANCIAL PLAN

2018 BUDGET AND FINANCIAL PLAN Questionnaire 2018 BUDGET AND FINANCIAL PLAN January 1, 2018 - January 23, 2018 The Township of Langley is reviewing the Draft 2018 2022 Five-Year Financial Plan with emphasis on the 2018 Budget. Your

More information

Estimate Considerations. Estimate Considerations

Estimate Considerations. Estimate Considerations Estimate Considerations Estimate Considerations Every estimate, whether it is generated in the conceptual phase of a project or at bidding time, must consider a number of issues Project Size Project Quality

More information

I. PROJECT DESCRIPTION

I. PROJECT DESCRIPTION REQUEST FOR QUALIFICATIONS The Board of Education of the Mariemont City School District (the Owner ) is seeking sealed, signed, written qualification statements from qualified Construction Management firms

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

Information on latest happenings, items of interest. To see events posted on the city wide calendar please visit our website.

Information on latest happenings, items of interest. To see events posted on the city wide calendar please visit our website. FROM THE CITY MANAGER S OFFICE For the week of December 18, 2017 Inside the city Information on latest happenings, items of interest. To see events posted on the city wide calendar please visit our website.

More information

DESIGN BUILD PARKING LOT AND MODULAR FACILITY FOR LYNX PARATRANSIT OPERATIONS (LOC EXPANSION) RFP 18-R01 ADDENDUM NUMBER ONE (1) August 3, 2018

DESIGN BUILD PARKING LOT AND MODULAR FACILITY FOR LYNX PARATRANSIT OPERATIONS (LOC EXPANSION) RFP 18-R01 ADDENDUM NUMBER ONE (1) August 3, 2018 Clarification: DESIGN BUILD PARKING LOT AND MODULAR FACILITY FOR LYNX PARATRANSIT OPERATIONS (LOC EXPANSION) RFP 18-R01 ADDENDUM NUMBER ONE (1) August 3, 2018 Proposers may submit clarifying questions

More information

Self-Supported Municipal Improvement districts

Self-Supported Municipal Improvement districts Self-Supported Municipal Improvement districts Combined Annual Report Downtown Highland Park Ingersoll Sherman Hill June 30, 2012 FAQ s What is a self-supported municipal improvement district or SSMID?

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016

DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 DeKalb County School District/Elementary Schools Dunwoody Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

Status: Structural steel installation underway at primary building. Observatory construction underway.

Status: Structural steel installation underway at primary building. Observatory construction underway. Page 1 of 11 FACILITIES PLAN STATUS REPORT March 30, 2015 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid Allocation:

More information

VENDOR PREQUALIFICATION FORM

VENDOR PREQUALIFICATION FORM VENDOR PREQUALIFICATION FORM Date: Please complete this form and return to Rockford Construction via e mail (prequal@rockfordconstruction.com) or fax (1 616 285 8423 must include the 1 616). Name of Company

More information

REQUEST FOR PROPOSALS. Construction Related Services Retainer Contract

REQUEST FOR PROPOSALS. Construction Related Services Retainer Contract REQUEST FOR PROPOSALS Construction Related Services Retainer Contract ISSUE DATE: July 3, 2014 CLOSING DATE: August 31, 2016 CLOSING TIME: 5:00 PM Pacific Time {00312821;1} TABLE OF CONTENTS Page Section

More information

BOULEVARD CID FULTON INDUSTRIAL BOULEVARD STREETSCAPE IMPROVEMENTS CONSULTING/DESIGN SERVICES REQUEST FOR PROPOSAL RFP ID#:

BOULEVARD CID FULTON INDUSTRIAL BOULEVARD STREETSCAPE IMPROVEMENTS CONSULTING/DESIGN SERVICES REQUEST FOR PROPOSAL RFP ID#: BOULEVARD CID FULTON INDUSTRIAL BOULEVARD STREETSCAPE IMPROVEMENTS CONSULTING/DESIGN SERVICES REQUEST FOR PROPOSAL RFP ID#: 2018 01 1 INTRODUCTION: FULTON INDUSTRIAL COMMUNITY IMPROVEMENT DISTRICT REQUEST

More information

4. Please indicate whether you feel that there are too many, the right amount or not enough of each of the following in Littleton:

4. Please indicate whether you feel that there are too many, the right amount or not enough of each of the following in Littleton: Please complete this questionnaire if you are the person most knowledgeable about this business, typically the owner or manager. Please select the response (by circling the number or checking the box)

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS Construction Manager at Risk for Las Vegas Wash Main Branch Channel & Trail Improvements

REQUEST FOR STATEMENTS OF QUALIFICATIONS Construction Manager at Risk for Las Vegas Wash Main Branch Channel & Trail Improvements REQUEST FOR STATEMENTS OF QUALIFICATIONS Construction Manager at Risk for Las Vegas Wash Main Branch Channel & Trail Improvements RSOQ NO. 007 040 PWP CL 2011 181 May 2, 2011 CITY OF NORTH LAS VEGAS REQUEST

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

SEPTEMBER 2017 INVESTOR RELATIONS BUILDING A STRONG AMERICA

SEPTEMBER 2017 INVESTOR RELATIONS BUILDING A STRONG AMERICA SEPTEMBER 2017 INVESTOR RELATIONS FORWARD-LOOKING STATEMENTS During the course of this presentation, we will make certain forward-looking statements within the meaning of Section 21E of the Securities

More information

PRE BID CONFERENCE. IFB 1 18 C058 Northwest Security Fence Replacement at DCA January 9, 2018

PRE BID CONFERENCE. IFB 1 18 C058 Northwest Security Fence Replacement at DCA January 9, 2018 PRE BID CONFERENCE IFB 1 18 C058 Northwest Security Fence Replacement at DCA January 9, 2018 Disclaimer The information contained in this presentation is for informational purposes only In the event of

More information

Subcontractor Prequalification Statement

Subcontractor Prequalification Statement Subcontractor Prequalification Statement NAME FAX WEBSITE IS THIS YOUR HEADQUARTERS? Yes No (if no, include below) FAX NUMBER OF YEARS YOU VE BEEN IN BUSINESS NUMBER OF YEARS UNDER YOUR CURRENT NAME DESIGNATED

More information

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year

SOMERSET CREEK STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT. With funding recommendations for the 2019 fiscal year SOMERSET CREEK Bellevue, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued April, 2018 Next Update: Level 2 by April, 2019

More information

REQUEST FOR PROPOSALS (RFP) CONSTRUCTION MANAGER AS CONSTRUCTORS LAWRENCE POLICE DEPARTMENT HEADQUARTERS

REQUEST FOR PROPOSALS (RFP) CONSTRUCTION MANAGER AS CONSTRUCTORS LAWRENCE POLICE DEPARTMENT HEADQUARTERS April 12, 2018 REQUEST FOR PROPOSALS (RFP) CONSTRUCTION MANAGER AS CONSTRUCTORS LAWRENCE POLICE DEPARTMENT HEADQUARTERS I. Authority The City of Lawrence is seeking a Construction Manager as Constructor

More information

TOWN OF ORANGE BID SPECIFICATION PACKET PAVING WORK BID #PAV2019

TOWN OF ORANGE BID SPECIFICATION PACKET PAVING WORK BID #PAV2019 TOWN OF ORANGE BID SPECIFICATION PACKET PAVING WORK BID #PAV2019 NOTICE TO BIDDERS As a matter of general information, each bidder is encouraged to direct specific attention to each of the points outlined

More information

City of Garland. Fee List (2015) Zoning Change or Specific Use Provision Applications

City of Garland. Fee List (2015) Zoning Change or Specific Use Provision Applications Planning Department Collects the following fees: City of Garland Fee List (2015) Zoning Change or Specific Use Provision Applications Type of Application Fee Planned Development (PD) Zoning (New or revised

More information

Replacement Reserve Study Report

Replacement Reserve Study Report Replacement Reserve Study Report for Landscaping and Lighting Assessment District (Zone 1: La Vigne) For the Napa County, California August 6, 2012 (Revised March 5, 2014) Page i August 6, 2012 (revised

More information

DFW Airport SA01 Southgate Plaza Infrastructure. Bid date: June 4, 2013 Bid time: 11:00 AM

DFW Airport SA01 Southgate Plaza Infrastructure. Bid date: June 4, 2013 Bid time: 11:00 AM DFW Airport SA01 Southgate Plaza Infrastructure Bid date: June 4, 2013 Bid time: 11:00 AM Project Team Gary Ralls Project Executive Jeff Heimer Operations Manager Carlos House - Project Manager Lee Halencak

More information

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING

FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Page 1 of 11 FACILITIES PLAN STATUS REPORT July 21, 2014 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid Allocation:

More information

Amended Operating Budget Fiscal Year 2010

Amended Operating Budget Fiscal Year 2010 Amended Operating As Revised August 4, 2010 WWW.DMSUS.COM Amended Operating Table of Contents Section 1: Introduction Section 2: Operating Fund Balance Projections Section 3: Operating Comparative Analysis

More information

TULSA DEVELOPMENT AUTHORITY STAFF REPORT

TULSA DEVELOPMENT AUTHORITY STAFF REPORT TULSA DEVELOPMENT AUTHORITY STAFF REPORT MEETING DATE: July 6, 2017 TO: Chairman and Board Members FROM: O.C. Walker SUBJECT: Former Morton Hospital LOCATION: 605 East Pine Street, Tulsa, Oklahoma Background:

More information

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete.

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete. Page 1 of 14 FACILITIES PLAN STATUS REPORT August 24, 2015 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid

More information

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete.

Status: Structural steel installation complete at primary building. Observatory construction underway. Central Plant modifications are complete. Page 1 of 11 FACILITIES PLAN STATUS REPORT June 22, 2015 SADDLEBACK COLLEGE 1. SCIENCES BUILDING Project Budget: $52,234,000 $8,308,000 $67,358,000 State Match: $36,564,000 ($36,564,000) - Basic Aid Allocation:

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

205 CMR: MASSACHUSETTS GAMING COMMISSION 205 CMR : MONITORING OF PROJECT CONSTRUCTION AND LICENSEE REQUIREMENTS

205 CMR: MASSACHUSETTS GAMING COMMISSION 205 CMR : MONITORING OF PROJECT CONSTRUCTION AND LICENSEE REQUIREMENTS 205 CMR 135.00: MONITORING OF PROJECT CONSTRUCTION AND LICENSEE REQUIREMENTS Section 135.01: Definitions 135.02: Project Schedules and Reporting 135.03: Design Review Process 135.04: Inspection of Construction

More information

T h e W o r k s O f C h u c k B. E d w a r d s, A S L A L a n d s c a p e A r c h i t e c t

T h e W o r k s O f C h u c k B. E d w a r d s, A S L A L a n d s c a p e A r c h i t e c t T h e W o r k s O f C h u c k B. E d w a r d s, A S L A L a n d s c a p e A r c h i t e c t T a b l e o f C o n t e n t s R e s i d e n t i a l P r o j e c t H i g h l i g h t s M o d e r n F o o t h i

More information

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director

CIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program

More information

Street Excavation Permit

Street Excavation Permit Street Excavation Permit Application Checklist & Submission Package This document and all attachments are provided as assistance to persons seeking certain approvals and permits as required by various

More information

CHI Health Coverage Period: 01/01/ /31/2017 Employee Assistance Program

CHI Health Coverage Period: 01/01/ /31/2017 Employee Assistance Program Summary of Benefits and Coverage: What this Plan Covers & What it Costs Plan Type: (EAP) This is only a summary. If you want more detail about your coverage and costs, you can get the complete terms in

More information

SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES

SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES A community meeting was held on September 13, 2018 at the Shipley s Choice Elementary School. County staff from the Watershed Protection and

More information

PROJECT MANUAL BID FORMS. Taxiways P and P7 Drainage Improvements CONTRACT NO Issued for Bid August 25, 2014

PROJECT MANUAL BID FORMS. Taxiways P and P7 Drainage Improvements CONTRACT NO Issued for Bid August 25, 2014 PROJECT MANUAL Taxiways P and P7 Drainage Improvements CONTRACT NO. 201416594 BID FORMS Issued for Bid August 25, 2014 CITY & COUNTY OF DENVER DEPARTMENT OF AVIATION DENVER INTERNATIONAL AIRPORT BID FORMS

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

CITY OF SAN JACINTO Capital Improvement Program Project Details

CITY OF SAN JACINTO Capital Improvement Program Project Details UNFUNDED CITY OF SAN JACINTO Capital Improvement Program Project Details Project Title: 2009 Downtown Pavement Rehabilitation Project Description: Pavement rehabilitation in downtown area. Similar to prior

More information

Floodplain Development Permits A Technical Guidance Document

Floodplain Development Permits A Technical Guidance Document Floodplain Development Permits A Technical Guidance Document To Prevent Loss of Life, Reduce Property Damage and to Protect and Enhance the Natural and Beneficial Functions of Floodplains Iredell County

More information

Denver Public Schools Facility Management / Purchasing S. Acoma St. Denver, Colorado S. Acoma St. Denver, Colorado 80223

Denver Public Schools Facility Management / Purchasing S. Acoma St. Denver, Colorado S. Acoma St. Denver, Colorado 80223 Denver Public Schools Facility Management / Purchasing 1617 S. Acoma St. Denver, Colorado 80223 Date: March 4, 2014 RFQ Number: RFQ Title: RFQ will be received: 2014 DPS Contractor RFQ RFQ Construction

More information