1 ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT NO JANUARY 18, 2019 The following items shall amend, clarify, and/or correct plans and/or specifications for the above project and shall take precedence over items in conflict herein: ITEM NO. 1 - CLARIFICATION: Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: The bid proposal has been updated and is included with this addendum. Please be sure to submit the updated bid proposal (dated at the bottom of the page) with the bid package. Changes include the following: 1) Addition of Item No. 30 (Borrow) to A. Base Bid Street and Storm Water Improvements Hancock Street STA 0+00 to ) Addition of Item No. 83 (Borrow) to B. Base Bid Street and Storm Water Improvements Hancock Street STA 1+72 to ) Change of quantity for Item No. 4 (Pavement Removal) to E. Mandatory Alternate Bid Street and Storm Water Improvements Maryland Street. ITEM NO. 2 - REMOVE: ADD: Reference Specifications, Measurement and Payment, Item No. 15 (Storm Pipe, General), Page MP-6: Stone backfill for bedding of stormwater pipe and trench will be paid for at the unit price per ton in place. Stone backfill for bedding of stormwater pipe and trench shall be included with the unit price per foot of storm pipe submitted. Stone backfill for bedding of stormwater pipe and trench is not a separate pay item. Respectfully submitted, MIDWESTERN ENGINEERS, INC. Enclosures Clint W. Roos, P.E. Sr. Project Engineer CWR/cwr
2 A. BASE BID STREET AND STORM WATER IMPROVEMENTS HANCOCK STREET STA 0+00 to CONSTRUCTION ENGINEERING 1 LS $ $ MOBILIZATION AND DEMOBILIZATION 1 LS $ $ CLEARING RIGHT OF WAY 1 LS $ $ TREE 24 IN., REMOVE 1 EACH $ $ PAVEMENT REMOVAL 380 SYS $ $ 6 EROSION CONTROL EROSION CONTROL 1 LS $ $ COMPACTED AGGREGATE NO. 53 BASE 140 TON $ $ MILLING, ASPHALT 160 SYS $ $ CEMENT CONCRETE PAVEMENT FOR DRIVEWAYS 36 SYS $ $ GUARDRAIL, STEEL BEAM, GALVANIZED 160 LFT $ $ CURB AND GUTTER, CONCRETE 355 LFT $ $ CURB AND GUTTER, CONCRETE, MODIFIED 43 LFT $ $ A RETAINING WALL, 0 4 FT, CONCRETE 13 LFT $ $ B RETAINING WALL, 4 6 FT, CONCRETE 8 LFT $ $ C RETAINING WALL, 6 8 FT, CONCRETE 12 LFT $ $ D RETAINING WALL, 8 10 FT, CONCRETE 19 LFT $ $ E RETAINING WALL, FT, CONCRETE 30 LFT $ $ F RETAINING WALL, FT, CONCRETE 38 LFT $ $ G RETAINING WALL, FT, CONCRETE 15 LFT $ $ 20 FENCE BLACK VINYL CHAIN LINK FENCE 135 LFT $ $ SODDING 360 SYS $ $ CASTING, ADJUST TO GRADE 1 EACH $ $ MAINTAINING TRAFFIC 1 LS $ $ 24 HMA SURFACE HMA SURFACE TYPE B, 9.5 mm 48 TON $ $ 25 HMA INTER HMA INTERMEDIATE TYPE B, 19.0 mm 145 TON $ $ LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. 360 LFT $ $ LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN. 320 LFT $ $ TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN. 20 LFT $ $ GUARDRAIL, END TREATMENT, II 1 EACH $ $ BORROW 1,500 CYS $ $ 1A. MANDATORY ALTERNATE BID, ITEM NOS. 13.A thru 19.A BID PROPOSAL FOR STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS FOR THE FRENCH LICK REDEVELOPMENT COMMISSION FRENCH LICK, ORANGE COUNTY, INDIANA SUBTOTAL A. BASE BID, HANCOCK STREET STA 0+00 TO 1+72 $ 13.A A RETAINING WALL, 0 4 FT, MODULAR BLOCK IN LIEU OF CONCRETE 13 LFT $ $ 14.A B RETAINING WALL, 4 6 FT, MODULAR BLOCK IN LIEU OF CONCRETE 8 LFT $ $ 15.A C RETAINING WALL, 6 8 FT, MODULAR BLOCK IN LIEU OF CONCRETE 12 LFT $ $ 16.A D RETAINING WALL, 8 10 FT, MODULAR BLOCK IN LIEU OF CONCRETE 19 LFT $ $ 17.A E RETAINING WALL, FT, MODULAR BLOCK IN LIEU OF CONCRETE 30 LFT $ $ 18.A F RETAINING WALL, FT, MODULAR BLOCK IN LIEU OF CONCRETE 38 LFT $ $ 19.A G RETAINING WALL, FT, MODULAR BLOCK IN LIEU OF CONCRETE 15 LFT $ $ SUBTOTAL 1A. MANDATORY ALTERNATE BIDS, ITEM NOS. 13A 19A $ 23 REVISED
3 B. BASE BID STREET AND STORM WATER IMPROVEMENTS HANCOCK STREET STA 1+72 to CONSTRUCTION ENGINEERING 1.00 LS $ $ MOBILIZATION AND DEMOBILIZATION 1.00 LS $ $ CLEARING RIGHT OF WAY 1.00 LS $ $ TREE 6 IN., REMOVE 2.00 EACH $ $ TREE 18 IN., REMOVE 1.00 EACH $ $ TREE 12 IN, REMOVE 1.00 EACH $ $ TREE 24 IN., REMOVE 4.00 EACH $ $ TREE 36 IN., REMOVE 1.00 EACH $ $ PAVEMENT REMOVAL SYS $ $ CURB, CONCRETE, REMOVE LFT $ $ CONCRETE STEPS, REMOVE 1.00 EACH $ $ SIDEWALK CONCRETE, REMOVE SYS $ $ HEADWALL, REMOVE 3.00 EACH $ $ PIPE, REMOVE LFT $ $ GUARDRAIL, REMOVE LFT $ $ 16 EROSION CONTROL EROSION CONTROL 1 LS $ $ GUARDRAIL, END TREATMENT, II 7.00 EACH $ $ COMPACTED AGGREGATE NO. 53 BASE TON $ $ MILLING, ASPHALT SYS $ $ CEMENT CONCRETE PAVEMENT FOR DRIVEWAYS SYS $ $ SIDEWALK, CONCRETE SYS $ $ GUARDRAIL, STEEL BEAM, GALVANIZED LFT $ $ STEPS, CONCRETE 7.00 CYS $ $ CURB AND GUTTER, CONCRETE LFT $ $ CURB AND GUTTER, CONCRETE, MODIFIED LFT $ $ H RETAINING WALL, 0 4 FT, MODULAR BLOCK LFT $ $ J RETAINING WALL, 4 6 FT, MODULAR BLOCK LFT $ $ 28 FENCE BLACK VINYL CHAIN LINK FENCE LFT $ $ SODDING SYS $ $ STRUCTURE, REINFORCED CONCRETE, BOX SECTIONS, 10 FT. X 4 FT LFT $ $ PIPE, TYPE 2 CIRCULAR 60 IN LFT $ $ PIPE, TYPE 2, CIRCULAR, 48 IN LFT $ $ PIPE, TYPE 2, CIRCULAR, 36 IN LFT $ $ PIPE, TYPE 2, CIRCULAR, 30 IN LFT $ $ PIPE, TYPE 2, CIRCULAR, 24 IN LFT $ $ PIPE, TYPE 2, CIRCULAR, 18 IN LFT $ $ PIPE, TYPE 2, CIRCULAR, 12 IN LFT $ $ PIPE, SLOTTED DRAIN, 12 IN LFT $ $ MANHOLE, L EACH $ $ MANHOLE, K EACH $ $ MANHOLE, J EACH $ $ 23A REVISED
4 B. BASE BID STREET AND STORM WATER IMPROVEMENTS HANCOCK STREET STA 1+72 to (CONTINUED) MANHOLE, H EACH $ $ A MANHOLE, L4, ADDITIONAL DEPTH OVER 4 FT EACH $ $ A MANHOLE, K4, ADDITIONAL DEPTH OVER 4 FT 8.50 EACH $ $ A MANHOLE, J4, ADDITIONAL DEPTH OVER 4 FT 9.00 EACH $ $ A MANHOLE, H4, ADDITIONAL DEPTH OVER 4 FT 7.00 EACH $ $ 47 PRECAST END SEC. PIPE END SECTION DIA 48 IN 3.00 EACH $ $ PIPE END SECTION DIA 36 IN 1.00 EACH $ $ PIPE END SECTION DIA 30 IN 1.00 EACH $ $ PIPE END SECTION DIA 24 IN 1.00 EACH $ $ PIPE END SECTION DIA 18 IN 1.00 EACH $ $ 52 DETENTION 1 DETENTION STRUCTURE EACH $ $ 53 DETENTION 2 DETENTION STRUCTURE EACH $ $ WATER METER RELOCATE EACH $ $ A WATER METER RECONNECTION 1.00 EACH $ $ 56 HEADWALL 1 HEADWALL EACH $ $ (STATION ~10+45) 57 HEADWALL 2 HEADWALL EACH $ $ (STATION ~12+70) (B) WATER SERVICE LINE, 0.75 IN, BORE LFT $ $ WATER SERVICE LINE, 0.75 IN LFT $ $ FIRE HYDRANT ASSEMBLY RELOCATE 3.00 EACH $ $ CASTING, WATER VALVE, ADJUST TO GRADE 2.00 EACH $ $ CASTING, ADJUST TO GRADE 7.00 EACH $ $ INLET, J EACH $ $ INLET, E EACH $ $ INLET, R EACH $ $ MAILBOX ASSEMBLY, SINGLE RESET 4.00 EACH $ $ CONSTRUCTION SIGN, A 3.00 EACH $ $ CONSTRUCTION SIGN, B 9.00 EACH $ $ MAINTAINING TRAFFIC 1.00 LS $ $ BARRICADE, III A LFT $ $ SIGN POST, SQUARE TYPE 1 UNREINFORCED ANCHOR BASE LFT $ $ SIGN, SHEET, ASSEMBLY RELOCATE 6.00 EACH $ $ 73 HMA SURFACE HMA SURFACE TYPE B, 9.5 mm TON $ $ 74 HMA INTER HMA INTERMEDIATE TYPE B, 19.0 mm TON $ $ LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN LFT $ $ LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN LFT $ $ TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN LFT $ $ RIPRAP, CLASS II TON $ $ RIPRAP, CLASS I TON $ $ RIPRAP, REVETMENT TON $ $ PIPE, SANITARY SEWER, 8 IN LFT $ $ 82 MISC ARMORFLEX BANK STABILIZATION AT STA 0+08 ON SHEET LS $ $ BORROW 500 CYS $ $ SUBTOTAL B. BASE BID, HANCOCK STREET STA 1+72 TO $ 23B REVISED
5 1B. MANDATORY ALTERNATE BID, ITEM NOS. 31A TO 37A 31A PIPE, TYPE 2 CIRCULAR 60 IN LFT $ $ 32A PIPE, TYPE 2 CIRCULAR 48 IN LFT $ $ 33A PIPE, TYPE 2 CIRCULAR 36 IN LFT $ $ 34A PIPE, TYPE 2 CIRCULAR 30 IN LFT $ $ 35A PIPE, TYPE 2 CIRCULAR 24 IN LFT $ $ 36A PIPE, TYPE 2 CIRCULAR 18 IN LFT $ $ 37A PIPE, TYPE 2 CIRCULAR 12 IN LFT $ $ SUBTOTAL 1B. MANDATORY ALTERNATE BIDS, ITEM NOS. 31A TO 37A $ 2B. MANDATORY ALTERNATE BID, ITEM NOS. 31B TO 37B 31B PIPE, TYPE 2 CIRCULAR 60 IN LFT $ $ 32B PIPE, TYPE 2 CIRCULAR 48 IN LFT $ $ 33B PIPE, TYPE 2 CIRCULAR 36 IN LFT $ $ 34B PIPE, TYPE 2 CIRCULAR 30 IN LFT $ $ 35B PIPE, TYPE 2 CIRCULAR 24 IN LFT $ $ 36B PIPE, TYPE 2 CIRCULAR 18 IN LFT $ $ 37B PIPE, TYPE 2 CIRCULAR 12 IN LFT $ $ SUBTOTAL 2B. MANDATORY ALTERNATE BIDS, ITEM NOS. 31B TO 37B $ C. BASE BID STREET AND STORM WATER IMPROVEMENTS WASHINGTON STREET CONSTRUCTION ENGINEERING 1.00 LS $ $ MOBILIZATION AND DEMOBILIZATION 1.00 LS $ $ CLEARING RIGHT OF WAY 1.00 LS $ $ PAVEMENT REMOVAL SYS $ $ CURB, CONCRETE, REMOVE LFT $ $ CONCRETE WALL, REMOVE 7.00 LFT $ $ 7 EROSION CONTROL EROSION CONTROL 1.00 LS $ $ STRUCTURE BACKFILL, TYPE CYS $ $ COMPACTED AGGREGATE NO. 53 BASE TON $ $ MILLING, ASPHALT SYS $ $ CEMENT CONCRETE PAVEMENT FOR DRIVEWAYS SYS $ $ CURB AND GUTTER, CONCRETE LFT $ $ CURB AND GUTTER, CONCRETE, MODIFIED LFT $ $ H RETAINING WALL, 0 4 FT, MODULAR BLOCK LFT $ $ J RETAINING WALL, 4 6 FT, MODULAR BLOCK LFT $ $ K RETAINING WALL, 6 8 FT, MODULAR BLOCK LFT $ $ L RETAINING WALL, 8 10 FT, MODULAR BLOCK LFT $ $ 18 FENCE BLACK VINYL CHAIN LINK FENCE LFT $ $ SODDING SYS $ $ PIPE, TYPE 2, CIRCULAR, 12 IN LFT $ $ WATER METER RELOCATE 1.00 EACH $ $ (B) WATER SERVICE LINE, 0.75 IN, BORE LFT $ $ CASTING, WATER VALVE, ADJUST TO GRADE 2.00 EACH $ $ CASTING, ADJUST TO GRADE 2.00 EACH $ $ 23C REVISED
6 C. BASE BID STREET AND STORM WATER IMPROVEMENTS WASHINGTON STREET (CONTINUED) INLET, J EACH $ $ INLET, R EACH $ $ A INLET, J10, ADDITIONAL DEPTH OVER 4 FT EACH $ $ A INLET, R13, ADDITIONAL DEPTH OVER 4 FT 4.00 EACH $ $ CONSTRUCTION SIGN, A 2.00 EACH $ $ CONSTRUCTION SIGN, B 2.00 EACH $ $ MAINTAINING TRAFFIC 1.00 LS $ $ BARRICADE, III A LFT $ $ SIGN POST, SQUARE TYPE 1 UNREINFORCED ANCHOR BASE LFT $ $ SIGN, SHEET, ASSEMBLY RELOCATE 3.00 EACH $ $ 35 HMA SURFACE HMA SURFACE TYPE B, 9.5 mm TON $ $ 36 HMA INTER HMA INTERMEDIATE TYPE B, 19.0 mm TON $ $ LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN LFT $ $ LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN LFT $ $ TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN LFT $ $ SUBTOTAL C. BASE BID, WASHINGTON STREET $ D. BASE BID ROCK EXCAVATION (ALL STREETS) ROCK EXCAVATION 1.00 ALL $50, $50, E. MANDATORY ALTERNATE BID STREET AND STORM WATER IMPROVEMENTS MARYLAND STREET CONSTRUCTION ENGINEERING 1.00 LS $ $ MOBILIZATION AND DEMOBILIZATION 1.00 LS $ $ CLEARING RIGHT OF WAY 1.00 LS $ $ PAVEMENT REMOVAL SYS $ $ 5 EROSION CONTROL EROSION CONTROL 1.00 LS $ $ COMPACTED AGGREGATE NO. 53 BASE TON $ $ MILLING, ASPHALT SYS $ $ CEMENT CONCRETE PAVEMENT FOR DRIVEWAYS SYS $ $ CURB AND GUTTER, CONCRETE LFT $ $ CURB AND GUTTER, CONCRETE, MODIFIED LFT $ $ SODDING SYS $ $ 12 HMA SURFACE HMA SURFACE TYPE B, 9.5 mm TON $ $ 13 HMA INTER HMA INTERMEDIATE TYPE B, 19.0 mm TON $ $ LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN LFT $ LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN LFT $ $ TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN LFT $ $ SUBTOTAL E. MANDATORY ALTERNATE BID, MARYLAND STREET $ 23D REVISED
7 SUMMARY OF BIDS: SUBTOTAL A. BASE BID, HANCOCK STREET STA 0+00 TO 1+72 $ SUBTOTAL B. BASE BID, HANCOCK STREET STA 1+72 TO $ SUBTOTAL C. BASE BID, WASHINGTON STREET $ SUBTOTAL D. BASE BID, ROCK EXCAVATION $50, TOTAL BASE BID (SUMMARY OF ITEMS A, B, C, AND D) $ (Figures) SUBTOTAL 1A. MANDATORY ALTERNATE BIDS, ITEM NOS. 13.A TO 19.A $ SUBTOTAL 1B. MANDATORY ALTERNATE BIDS, ITEM NOS. 31.A TO 37.A $ SUBTOTAL 2B. MANDATORY ALTERNATE BIDS, ITEM NOS. 31.B TO 37.B $ SUBTOTAL E. MANDATORY ALTERNATE BID, MARYLAND STREET $ THE BASIS OF AWARD MAY CONSIDER EITHER THE BASE BID OR THE BASE BID AND ANY COMBINATION OF MANDATORY ALTERNATE BIDS IN THE DETERMINATION OF THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER. Respectfully, Signature Address Title Date (SEAL) (If BID is by a Corporation) License Number (if applicable) 23E REVISED
19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL
II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationJob No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationOpinion of Probable Cost
Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-
ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-4") 3,218 S.Y. $ $ 2 ASPHALTIC CONCRETE TYPE SPR 2,619
More information$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC
-73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationSECTION BID. Valley Court Force Main Replacement Contract No. BE17-029
SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the
More informationITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2
Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationCITY OF DEERFIELD BEACH Request for City Commission Agenda
Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract
More informationJob No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL
Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationJob No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL
Solicitation No. B-11-030-BB Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationCONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED:
143,230.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 77 4.00 CONTRACT ID: 041902041 PROJECT: STP 2016(746) CONTRACT: 02163223 AWARD : $3,653,777.19 PROJECTED : $3,823,809.19 ADJ. PROJECTED :
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationCITY OF SURREY (the Owner ) INVITATION TO TENDER (ITT)
CITY OF SURREY (the Owner ) INVITATION TO TENDER (ITT) Contract Name: District Energy System Phase 2a: Distribution Piping System (DPS), Energy Transfer Stations (ETS) and Containerized Boiler Plant (CBP)
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More information7 31 32 33 34 35 37 38 39 40 41 42 43 A G R E E M E N T Between Morrison County, The City of Pierz and Rich Prairie Sewer and Water District THIS AGREEMENT is made and entered into between Morrison
More informationCANTON COMMUNITY REQUEST FOR BOARD ACTION
CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: March 22, 2016 AGENDA ITEM #G-10 ITEM: Consider Approval of a Budget Amendment & Award of a Contract Asphalt Repairs to Hutch Paving, Inc. the Wayne
More informationI. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL
WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division
More informationPavlick, Kenneth - DEN Date: :26:57-07'00'
November 21, 2018 PIKES PEAK PARKING RESTORATION CONTRACT NO. 201845783 ADDENDUM NUMBER ONE This Addendum Number One supersedes and/or supplements all portions of the Contract Documents with which it conflicts.
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationStorm Water Mitigation Services ITB SEMINOLE TRIBE OF FLORIDA INVITATION TO BID
SEMINOLE TRIBE OF FLORIDA INVITATION TO BID Solicitation #: ITB 58-2018 Title: Description: Storm Water Mitigation Services The Seminole Tribe of Florida ( Tribe or STOF ) is requesting proposals from
More informationPROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2
NAME OF CONTRACTOR: PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2 APRIL 18, 2018 1. PH 3546 WAYLAND TOWNSHIP On 10 th Street, M-179 (129 th Avenue) to the Wayland City Limits
More informationCITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT
CPL 14064.08 BID FORM SECTION 00 300-1 BID FORM BID NUMBER: CH2019-001Dev SUBMITTAL DATE: BY: (Bidder) PROJECT DESCRIPTION: The project consists of the construction of a sidewalk and associated grading,
More informationREPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager
REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket
More information