1 Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60, $ 60, $ 82, $ 82, $ 18, $ 18, C-2 Traffic Control 1 LS $ 1, $ 1, $ 3, $ 3, $ 2, $ 2, C-3 Chain Link Fence 640 Ft $ $ 11, $ $ 11, $ $ 11, C-4 Chain Link Fence with Privacy Slats 355 Ft $ $ 7, $ $ 11, $ $ 11, C-5 Clearing & Grubbing 1 LS $ 25, $ 25, $ 35, $ 35, $ 14, $ 14, C-6 Building Demolition 1 Each $ 2, $ 2, $ 2, $ 2, $ $ C-7 Remove Curb & Gutter 400 Ft $ 3.50 $ 1, $ 3.00 $ 1, $ 5.58 $ 2, C-8 Remove & Dispose Fire Hydrant 1 Each $ $ $ $ $ $ C-9 Remove Existing Waterline 610 Ft $ 5.00 $ 3, $ $ 9, $ 4.34 $ 2, C-10 Cap Existing Waterline 1 Each $ 1, $ 1, $ $ $ $ C-11 Remove Light Pole & Concrete Base 1 Each $ $ $ $ $ $ C-12 Unclassified Excavation 30,559 CuYd $ 3.00 $ 91, $ 3.00 $ 91, $ 2.50 $ 76, C-13 Placing Topsoil (12") 2,330 CuYd $ 6.00 $ 13, $ 5.00 $ 11, $ 6.00 $ 13, C-14 Waste 21,741 CuYd $ 5.50 $ 119, $ 4.50 $ 97, $ 4.00 $ 86, C-15 Scarify and Recompact (8") 6,099 CuYd $ 8.00 $ 48, $ 2.50 $ 15, $ 2.50 $ 15, C-16 Type 2 Turf Reinforcement Mat 400 SqYd $ 5.00 $ 2, $ 5.94 $ 2, $ 6.13 $ 2, C-17 High Flow Silt Fence 2,487 Ft $ 3.00 $ 7, $ 2.10 $ 5, $ 2.17 $ 5, C-18 Concrete Washout Facility 1 Each $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, C-19 Temporary Tracking Control 1 Each $ 1, $ 1, $ 1, $ 1, $ 2, $ 2, C-20 Pull Manhole Modifications 1 LS $ 1, $ 1, $ 5, $ 5, $ 2, $ 2, Page 1 of 9
2 C-21 Concrete Splash Pad 288 SqFt $ 5.50 $ 1, $ $ 4, $ 5.69 $ 1, C-22 15" RCP Storm Sewer, Furnish 236 Ft $ $ 5, $ $ 4, $ $ 4, C-23 15" RCP Storm Sewer, Install 236 Ft $ $ 3, $ $ 4, $ $ 3, C-24 24" RCP Storm Sewer, Furnish 468 Ft $ $ 14, $ $ 16, $ $ 13, C-25 24" RCP Storm Sewer, Install 468 Ft $ $ 7, $ $ 10, $ $ 7, C-26 27" RCP Storm Sewer, Furnish 404 Ft $ $ 14, $ $ 18, $ $ 16, C-27 27" RCP Storm Sewer, Install 404 FT $ $ 7, $ $ 9, $ $ 6, C-28 2'x3' Type B - Drop Inlet 6 Each $ 1, $ 10, $ 1, $ 10, $ 2, $ 13, C 'x10' Type S Drop Inlet 2 Each $ 4, $ 8, $ 3, $ 7, $ 3, $ 6, C-30 4" Draintile (PVC or Dual-Walled Polyethylene) 3,472 Ft $ 8.50 $ 29, $ $ 46, $ $ 41, C-31 6" Draintile (PVC or Dual-Walled Polyethylene) 304 Ft $ 9.50 $ 2, $ $ 4, $ $ 5, C-32 High Performance Geotextile Fabric 27,443 SqYd $ 3.00 $ 82, $ 2.50 $ 68, $ 1.96 $ 53, C-33 Base Course (15") 22,900 Ton $ 9.00 $ 206, $ 8.75 $ 200, $ 8.75 $ 200, C-34 Curb and Gutter, Rollover 1,398 Ft $ $ 15, $ $ 14, $ 9.16 $ 12, C-35 6" PCC Fillet Section 4.5 SqYd $ $ $ $ $ $ C-36 Concrete Valley Gutter 7,995 SqFt $ 5.00 $ 39, $ 3.94 $ 31, $ 4.45 $ 35, C-37 Asphalt Concrete, Class E,Type 1, Natural Agg. 2,150 Ton $ $ 154, $ $ 167, $ $ 150, C-38 Asphalt Concrete, Class G,Type 2, 85% Quartzite 2,150 Ton $ $ 184, $ $ 175, $ $ 183, C-39 SS-1h or CSS-1h Asphalt for Tack 5.7 Ton $ 1, $ 6, $ $ 4, $ $ 4, C-40 Pavement Marking Paint, White 85.0 Gal $ $ 9, $ $ 8, $ $ 8, C-41 Soil Preparation, Seeding, Fertilizing & Mulching 735 CSF $ 8.00 $ 5, $ 5.78 $ 4, $ 5.96 $ 4, Subtotal: $ 1,212, $ 1,203, $ 1,046, Corrected Anomaly Page 2 of 9
3 Base Bid - Lighting for New Parking Lot Number Lighting / Electrical Items Quantity Unit E-1 Type PL2 Luminaires - Includes pole, base & grounding 18 Each $ 5, $ 90, $ 6, $ 124, $ 7, $ 128, E-2 Type PL Luminaire - Includes pole, base & grounding 1 Each $ 4, $ 4, $ 5, $ 5, $ 5, $ 5, E-3 E-4 E-5 E-6 E-7 E-8 Lighting Control Panels - Includes two lighting control panels, concrete pad, & secondary service from padmounted transformer 2"C - 4 #1/0 - Includes conduit, conductors, trenching, 2"C - 4 #2 - Includes conduit, conductors, trenching, 1-1/2"C - 4 #6 - Includes conduit, conductors, trenching, 1-1/2"C - 3 #6- Includes conduit, conductors, trenching, Reconnect Lighting Circuits to Existing Panel - Direct burial (Intramural Field) 1 LS $ 38, $ 38, $ 51, $ 51, $ 52, $ 52, ,800 Ft $ $ 37, $ $ 32, $ $ 33, Ft $ $ 7, $ $ 6, $ $ 6, Ft $ $ 10, $ 8.46 $ 6, $ 8.73 $ 6, Ft $ $ 10, $ 7.48 $ 5, $ 7.72 $ 5, LS $ 5, $ 5, $ 3, $ 3, $ 3, $ 3, E-9 Remove Existing Transformer at Intramural Field 1 LS $ $ $ 3, $ 3, $ 3, $ 3, E-10 E-11 E-12 E-13 E-14 Relocated Existing Lighting Control Panel at Intramural Field - Includes concrete pad and providing secondary service to panel Remove Existing Sectionalizing Switch - Includes splicing loop circuit conductors & storing as directed Extend Primary Circuit from 11th Street Sectionalizing Switch - Includes connecting to padmounted transformer Extend Primary Circuit from 8th Street Sectionalizing Switch - Includes reconnecting Caldwell Hall Transformer Pad - Includes relocating and installing concrete pad for padmounted transformer 1 LS $ 4, $ 4, $ 2, $ 2, $ 3, $ 3, LS $ 3, $ 3, $ 1, $ 1, $ 1, $ 1, LS $ 6, $ 6, $ 16, $ 16, $ 17, $ 17, LS $ 12, $ 12, $ 31, $ 31, $ 32, $ 32, LS $ 2, $ 2, $ 3, $ 3, $ 3, $ 3, Base Bid Total: Subtotal: $ 231, $ 294, $ 303, $ 1,444, $ 1,497, $ 1,350, Corrected Anomaly Page 3 of 9
4 Alternate #1 - Access Road to 11th Street Number Grading and Surfacing Items Quantity Unit 1.1 Mobilization 1 LS $ 8, $ 8, $ 9, $ 9, $ 1, $ 1, Traffic Control 1 LS $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, Remove Concrete Sidewalk/Surfacing 436 SqFt $ 0.50 $ $ 1.50 $ $ 1.00 $ Remove Curb & Gutter 75 Ft $ 3.50 $ $ 3.00 $ $ 4.50 $ Adjust Manhole Casting 1 Each $ $ $ $ $ $ Unclassified Excavation 545 CuYd $ 3.00 $ 1, $ 3.00 $ 1, $ 2.50 $ 1, Placing Topsoil 350 CuYd $ 6.00 $ 2, $ 5.00 $ 1, $ 6.00 $ 2, Waste 195 CuYd $ 6.00 $ 1, $ 4.50 $ $ 4.50 $ Scarify and Recompact (8") 353 CuYd $ 8.00 $ 2, $ 2.50 $ $ 2.50 $ High Flow Silt Fence 356 Ft $ 3.00 $ 1, $ 2.10 $ $ 2.17 $ " Draintile (PVC or Dual-Walled Polyethylene) 482 Ft $ 9.00 $ 4, $ $ 7, $ $ 8, High Performance Geotextile Fabric 1,588 SqYd $ 3.00 $ 4, $ 2.50 $ 3, $ 1.92 $ 3, Base Course (15") 1,350 Ton $ 9.00 $ 12, $ 8.75 $ 11, $ 8.75 $ 11, Curb and Gutter (Standard 30" Wide) 836 Ft $ $ 8, $ $ 8, $ 9.16 $ 7, Sidewalk 250 SqFt $ 4.50 $ 1, $ 4.20 $ 1, $ 3.20 $ Detectable Warning Panel 2 Each $ $ $ $ $ $ Page 4 of 9
5 1.17 6" PCC Fillet Section 69.0 SqYd $ $ 4, $ $ 4, $ $ 4, Concrete Valley Gutter 150 SqFt $ 6.00 $ $ 4.20 $ $ 4.45 $ Asphalt Concrete, Class E, Natural Agg. (2.5") 180 Ton $ $ 12, $ $ 14, $ $ 12, Asphalt Concrete, Class G, 85% Quartzite (1.5") 120 Ton $ $ 10, $ $ 9, $ $ 10, SS-1h or CSS-1h Asphalt for Tack 0.3 Ton $ 1, $ $ $ $ $ Pavement Marking Paint, White 1.6 Gal $ $ $ $ $ $ Stop Sign 1 Each $ $ $ $ $ $ Subtotal: $ 79, $ 81, $ 70, Alternate #1 - Lighting for Access Road Number Lighting / Electrical Items Quantity Unit 1.24 Relocated Existing Pole & Fixtures 1 LS $ $ $ 1, $ 1, $ 1, $ 1, Type PL Luminaire - Includes pole, base & grounding 4 Each $ 4, $ 18, $ 5, $ 22, $ 5, $ 23, /2"C - 3 #6- Includes conduit, conductors, trenching, 1-1/2"C - 4 #6- Includes conduit, conductors, trenching, 120 Ft $ $ 1, $ 7.48 $ $ 7.72 $ Ft $ $ 5, $ 8.46 $ 3, $ 8.73 $ 3, Alternate #1 Total Subtotal: $ 26, $ 28, $ 29, $ 105, $ 109, $ 99, Page 5 of 9
6 Alternate #2 - Extend North Parking Lot, Connect North Parking Lot to New Parking Lot & Flush Seals Number Grading and Surfacing Items Quantity Unit 2.1 Mobilization 1 LS $ 15, $ 15, $ 22, $ 22, $ 1, $ 1, Traffic Control 1 LS $ $ $ 1, $ 1, $ 1, $ 1, Remove Asphalt Surfacing 152 SqYd $ 1.50 $ $ 5.00 $ $ 4.00 $ Remove Concrete Sidewalk/Surfacing 4,381 SqFt $ 0.50 $ 2, $ 1.50 $ 6, $ 0.50 $ 2, Remove Curb & Gutter 1,037 Ft $ 3.50 $ 3, $ 3.00 $ 3, $ 3.00 $ 3, Unclassified Excavation 3,297 CuYd $ 3.00 $ 9, $ 3.00 $ 9, $ 2.50 $ 8, Placing Topsoil 467 CuYd $ 6.00 $ 2, $ 5.00 $ 2, $ 6.00 $ 2, Waste 2,765 CuYd $ 6.00 $ 16, $ 4.50 $ 12, $ 4.00 $ 11, Scarify and Recompact (8") 1,359 CuYd $ 8.00 $ 10, $ 2.50 $ 3, $ 2.50 $ 3, High Flow Silt Fence 550 Ft $ 3.00 $ 1, $ 2.10 $ 1, $ 2.17 $ 1, " Draintile (PVC or Dual-Walled Polyethylene) 988 Ft $ 8.50 $ 8, $ $ 13, $ $ 11, " Draintile (PVC or Dual-Walled Polyethylene) 507 Ft $ 9.50 $ 4, $ $ 7, $ $ 8, High Performance Geotextile Fabric 6,114 SqYd $ 3.00 $ 18, $ 2.50 $ 15, $ 1.92 $ 11, Base Course (15") 5,100 Ton $ 9.00 $ 45, $ 8.75 $ 44, $ 8.75 $ 44, Curb and Gutter, Rollover 550 Ft $ $ 6, $ $ 5, $ 9.16 $ 5, " PCC Fillet Section 50.0 SqYd $ $ 3, $ $ 3, $ $ 2, Concrete Valley Gutter 250 SqFt $ 6.00 $ 1, $ 4.20 $ 1, $ 4.45 $ 1, Page 6 of 9
7 2.18 Asphalt Concrete, Class E, Natural Agg. 540 Ton $ $ 38, $ $ 42, $ $ 37, Asphalt Concrete, Class G, 85% Quartzite 540 Ton $ $ 46, $ $ 44, $ $ 46, SS-1h or CSS-1h Asphalt for Tack 1.4 Ton $ 1, $ 1, $ $ 1, $ $ 1, SS-1h or CSS-1h Asphalt for Flush 12.4 Ton $ 1, $ 14, $ 2, $ 31, $ $ 9, Sand for Flush Seal 230 Ton $ $ 8, $ $ 7, $ $ 9, Sweeping Asphalt Parking Lot 1 LS $ 2, $ 2, $ 2, $ 2, $ 1, $ 1, Pavement Marking Paint, White 85.0 Gal $ $ 9, $ $ 8, $ $ 8, Alternate #2 - Lighting to Extend North Parking Lot Number Lighting / Electrical Items Quantity Unit Subtotal: $ 273, $ 291, $ 235, Corrected Anomaly 2.25 Type PL Luminaires - Includes pole, base & grounding 5 Each $ 5, $ 25, $ 5, $ 28, $ 5, $ 29, /2"C - 3 #6- Includes conduit, conductors, trenching, 1-1/2"C - 4 #6- Includes conduit, conductors, trenching, 140 Ft $ $ 1, $ 7.48 $ 1, $ 7.72 $ 1, Ft $ $ 7, $ 8.46 $ 4, $ 8.73 $ 4, Alternate #2 Total: Subtotal: $ 34, $ 33, $ 34, $ 307, $ 325, $ 270, Corrected Anomaly Page 7 of 9
8 Alternate #3 - Connect Existing Parking Lots Number Grading and Surfacing Items Quantity Unit 3.1 Mobilization 1 LS $ 12, $ 12, $ 20, $ 20, $ 1, $ 1, Traffic Control 1 LS $ $ $ 1, $ 1, $ 1, $ 1, Remove Street Surfacing, Asphalt 137 SqYd $ 3.00 $ $ 5.00 $ $ 4.00 $ Remove Concrete Sidewalk/Surfacing 4,223 SqFt $ 0.50 $ 2, $ 1.50 $ 6, $ 0.50 $ 2, Remove Curb & Gutter 1,142 Ft $ 3.50 $ 3, $ 3.00 $ 3, $ 3.00 $ 3, Remove SDSU Permit Parking Sign 2 Each $ $ 1, $ $ $ $ Unclassified Excavation 1,627 CuYd $ 3.00 $ 4, $ 3.00 $ 4, $ 2.50 $ 4, Waste 1,494 CuYd $ 4.00 $ 5, $ 4.50 $ 6, $ 4.00 $ 5, Scarify and Recompact (8") 766 CuYd $ 8.00 $ 6, $ 2.50 $ 1, $ 2.50 $ 1, " Draintile (PVC or Dual-Walled Polyethylene) 956 Ft $ 9.00 $ 8, $ $ 12, $ $ 11, High Performance Geotextile Fabric 3,445 SqYd $ 3.00 $ 10, $ 2.50 $ 8, $ 2.17 $ 7, Base Course (15") 2,900 Ton $ 9.00 $ 26, $ 8.75 $ 25, $ 8.50 $ 24, Curb and Gutter (Standard 30" Wide) 203 Ft $ $ 2, $ $ 2, $ 9.16 $ 1, Concrete Valley Gutter 2,585 SqFt $ 6.00 $ 15, $ 3.94 $ 10, $ 4.45 $ 11, Asphalt Concrete, Class E, Natural Agg. 320 Ton $ $ 23, $ $ 24, $ $ 22, Asphalt Concrete, Class G, 85% Quartzite 320 Ton $ $ 27, $ $ 26, $ $ 27, SS-1h or CSS-1h Asphalt for Tack 0.8 Ton $ 1, $ $ $ $ $ Pavement Marking Paint, White 12.0 Gal $ $ 1, $ $ 1, $ $ 1, Alternate #3 Total: $ 152, $ 157, $ 130, Page 8 of 9
9
BID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationPROJECT COST. Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project
PROJECT COST Prepared for City of Burlington, Iowa Downtown/Riverfront Revitalization Project City of Burlington Downtown/Riverfront Revitalization Project TIGER Grant Budget Date: 4/29/2016 Project Budget
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationOpinion of Probable Cost
Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationCOST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)
This information is available in accessible formats upon request. Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS PREPARED BY
More informationITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-
ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-4") 3,218 S.Y. $ $ 2 ASPHALTIC CONCRETE TYPE SPR 2,619
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationBID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA
Bid No. 1 Bid No. 2 Foley Construction Company JB Holland Construction, Inc. 5401 Victoria Avenue 2092 Hwy 9 W Project: Construct the James Street Davenport, IA 52807 Decorah, IA 52101 1.1 Construction
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationARKANSAS PUBLIC SERVICE COMMISSION
2 nd Revised Sheet No. 61.0.1 Schedule Sheet 1 of 18 Replacing: 1 st Revised Sheet No. 61.0.1 61.0. TARIFF GOVERNING THE INSTALLATION OF ELECTRIC UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS AND UNDERGROUND
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationPROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02
AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationSTRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $
PAVEMENT MARKING STRAIGHT STRIPE PAINTING, AMERICAN PAVEMENT MARKING, LLC ITEM UNIT TOTAL UNIT TOTAL NUMBER DESCRIPTION UNIT QUANTITY COST AMOUNT COST AMOUNT 1 Mobilization L.S. 3 $ 400.00 $ 1,200.00 $
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL
II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
More information2001 Average Bid Tabs
Municipality of Anchorage Department of Planning, Development and Public Works Project Management and Engineering Department 2001 Average Bid Tabs SPEC. 20.02 Clearing and Grubbing 1 L.S. $ 750.00 $ 11,793.52
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationFLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM
1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,
More informationSECTION BID. Valley Court Force Main Replacement Contract No. BE17-029
SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationEXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE
1. Building Permit EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE a. This fee schedule is applicable to all building permits issued by the City of Oldsmar, Building Division
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban
More informationPatchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.
Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2016-2017 City of Irvine Community Facilities District No. 2013-3 (Great Park) September 26, 2017 Public Finance Public Private Partnerships Urban