2001 Average Bid Tabs

Size: px
Start display at page:

Download "2001 Average Bid Tabs"

Transcription

1 Municipality of Anchorage Department of Planning, Development and Public Works Project Management and Engineering Department 2001 Average Bid Tabs SPEC Clearing and Grubbing 1 L.S. $ $ 11, $ 62, Clearing and Grubbing L.S. $ $ $ Clearing for Sidewalk 2 A.C. $ 1, $ 6, $ 10, Clearing for Sidewalk 50 L.F. $ $ $ Unusable Excavation C.Y. $ 4.00 $ $ Unusable Excavation C.Y. $ 2.00 $ 8.82 $ Unusable Excavation C.Y. $ 5.12 $ 6.39 $ Unusable Excavation ,000 C.Y. $ 4.00 $ 6.71 $ Unusable Excavation Over C.Y. $ 3.00 $ 5.71 $ Usable Excavation C.Y. $ 2.00 $ $ Usable Excavation C.Y. $ 2.00 $ $ Usable Excavation Over 500 C.Y. $ 1.00 $ 7.45 $ Type II Classified Fill and Backfill Ton $ 5.00 $ $ Type II Classified Fill and Backfill ,000 Ton $ 1.50 $ 8.80 $ Type II Classified Fill and Backfill Over 10,000 Ton $ 8.50 $ 9.53 $ Type IIA Classified Fill and Backfill Ton $ 7.35 $ 9.00 $ Type IIA Classified Fill and Backfill ,000 Ton $ 1.50 $ 9.85 $ Type IIA Classified Fill and Backfill Over 10,000 Ton $ 7.50 $ 9.45 $ Type III Classified Fill and Backfill Ton $ 3.00 $ 8.46 $ Type IV Unclassified Fill Ton $ 2.15 $ $ Washed Sand (12" Depth) Ton $ $ $ Washed Sand (12" Depth) Ton $ $ $ Leveling Course Ton $ 4.00 $ $ Leveling Course Ton $ $ $ Leveling Course Ton $ 8.75 $ $ Leveling Course Over 1500 Ton $ $ $ Trench Excavation and Backfill (Various Depths) Under 2000 L.F. $ 2.00 $ $ Furnish Trench Backfill (Type II) Ton $ 3.00 $ 9.62 $ Furnish Trench Backfill (Type II) Over 300 Ton $ 6.00 $ 8.79 $ Furnish Trench Backfill (Type IIA) Ton $ 1.00 $ $ Furnsh Trench Backfill, Type III Ton $ 6.00 $ 9.83 $ Foundation Backfill (Type IV) Ton $ 5.00 $ $ Contact Duane Maney with any questions:

2 20.10 Foundation Backfill (Type IV) Ton $ 3.00 $ $ Foundation Backfill (Type IV) Over 250 Ton $ 3.00 $ $ Bedding Material (Class B) Ton $ 1.00 $ $ Bedding Material (Class B) Over 300 Ton $ 1.80 $ 3.88 $ Bedding Material (Class C) Ton $ 1.00 $ $ Disposal of Unusuable or Surplus Material C.Y. $ 1.50 $ 7.98 $ Disposal of Unusuable or Surplus Material Over 300 C.Y. $ 4.10 $ 7.52 $ Mechanical Compaction L.F. $ 1.00 $ 3.49 $ Mechanical Compaction L.F. $ 1.00 $ 2.57 $ Mechanical Compaction Over 300 L.F. $ 1.50 $ 3.58 $ Remove Existing Sidewalk or Concrete Apron S.Y. $ 1.20 $ $ Remove Existing Sidewalk or Concrete Apron S.Y. $ 4.00 $ 7.76 $ Remove Existing Sidewalk or Concrete Apron Over 200 S.Y. $ 3.00 $ 8.61 $ Remove Existing Curb and Gutter L.F. $ 1.00 $ $ Remove Existing Curb and Gutter L.F. $ 2.00 $ 5.03 $ Remove Existing Curb and Gutter L.F. $ 1.25 $ 3.42 $ Remove Existing Curb and Gutter Over 2000 L.F. $ 1.35 $ 2.84 $ Remove Existing Pavement S.Y. $ 1.73 $ $ Remove Existing Pavement S.Y. $ 1.00 $ 2.69 $ Remove Existing Pavement S.Y. $ 1.00 $ 2.35 $ Remove Existing Pavement ,000 S.Y. $ 0.90 $ 1.80 $ Remove Existing Pavement Over 15,000 S.Y. $ 1.00 $ 2.00 $ Tree Removal 5 Each $ $ $ Tree Removal 10 Each $ $ $ Grading Existing Surfaces L.F. $ 2.00 $ 3.25 $ Grading Existing Surfaces Over 500 L.F. $ 1.50 $ 2.56 $ Geotextile Fabric (Separation) S.Y. $ 1.00 $ 6.63 $ Geotextile Fabric (Separation) ,000 S.Y. $ 1.00 $ 1.36 $ Geotextile Fabric (Separation) Over 10,000 S.Y. $ 0.70 $ 1.12 $ Geotextile Fabric for Surface Drainage & Rip Rap Liner 500 S.Y. $ 1.00 $ 1.28 $ Rip Rap (Class I) Ton $ $ $ Rip Rap (Class I) Over 100 Ton $ $ $ Pavement Rotomilling 1-25,000 S.Y. $ 2.00 $ 2.00 $ Pavement Rotomilling Over 25,000 S.Y. $ 1.00 $ 1.75 $ Dewatering 1 L.S. $ $ 9, $ 28, Grading for Traffic Way Surfacing 1 L.S. $ 2, $ 9, $ 49, Geogrid for Subbase Reinforcement 1,350 S.Y. $ 3.00 $ 4.20 $ Stormwater Pollution Prevention Plan 1 L.S. $ 1, $ 4, $ 10, Curb Nose 0-10 Each $ $ $ 1, Curb Nose Over 10 Each $ $ $ P.C.C. Curb & Cutter, Type I L.F. $ $ $ P.C.C. Curb & Cutter, Type I Over 500 L.F. $ $ $ Contact Duane Maney with any questions:

3 30.02 P.C.C. Curb & Cutter, Type I I L.F. $ $ $ P.C.C. Curb & Cutter, Type I I Over 1500 L.F. $ 9.00 $ $ P.C.C. Curb & Cutter, Type III 20 L.F. $ $ $ P.C.C. Curb & Cutter, Type III 5,000 L.F. $ $ $ P.C.C. Curb & Cutter, Type III, Colored, Imprinted Gutter Pan 640 L.F. $ $ $ P.C.C. Curb & Cutter, Type VI 350 L.F. $ $ $ P.C.C. Curb & Cutter, Type VI 1,250 L.F. $ $ $ P.C.C. Curb & Cutter, Type VI 5,000 L.F. $ $ $ P.C.C. Curb and Gutter (All Types) 100 L.F. $ $ $ P.C.C. Curb and Gutter (All Types) 200 L.F. $ $ $ P.C.C. Valley Gutter 0-50 L.F. $ $ $ P.C.C Paving S.Y. $ $ $ P.C.C. Apron, 6" Thick, Colored, Exposed Aggreate 270 S.Y. $ $ $ P.C.C. Apron, 6" Thick, Colored, Pattern 100 S.Y. $ $ $ P.C.C. Pads for Bench & Trash Receptacle 1 L.S. $ $ $ 1, P.C.C. Sidewalk, 4" Thick S.Y. $ $ $ P.C.C. Sidewalk, 4" Thick S.Y. $ $ $ P.C.C. Sidewalk, 4" Thick Over 200 S.Y. $ $ $ P.C.C. Sidewalk, 4" Thick, Exposed Aggregate Finish S.Y. $ $ $ P.C.C. Sidewalk, 6" Thick S.Y. $ $ $ P.C.C. Sidewalk, 6" Thick Over 150 S.Y. $ $ $ P.C.C. Sidewalk, 6" Thick, Exposed Aggregate Finish S.Y. $ $ $ P.C.C. Sidewalk, 8" Thick 50 S.Y. $ $ $ P.C.C. Sidewalk, 8" Thick 500 S.Y. $ $ $ Portland Cement Concrete Class A C.Y. $ $ $ 1, Structures and Retaining Walls L.F. $ $ $ 1, P.C.C. Curb Ramp, 6" Thick 0-10 S.Y. $ $ $ 1, P.C.C. Curb Ramp, 6" Thick S.Y. $ $ $ P.C.C. Curb Ramp, 6" Thick Over 100 S.Y. $ $ $ Parallel Curb Ramp 15 Each $ $ $ 1, Perpendicular Curb Ramp 10 Each $ $ $ Imprinted Colored Concrete S.Y. $ $ $ P.C.C. Cluster Mailbox Base 0-5 S.Y. $ $ 1, $ 2, Concrete Modular Block Retaining Wall 350 S.Y. $ $ $ Remove and Replace Concrete Driveway S.Y. $ $ $ Sidewalk Joint Sealant L.F. $ 1.50 $ 6.10 $ A.C. Pavement (Class B) 0-30 Ton $ $ $ A.C. Pavement (Class D) Ton $ $ $ A.C. Pavement (Class D) Ton $ $ $ A.C. Pavement (Class D) Ton $ $ $ A.C. Pavement (Class D) Over 5000 Ton $ $ $ A.C. Pavement (Class E) Ton $ $ $ A.C. Pavement (Class E) Ton $ $ $ Contact Duane Maney with any questions:

4 40.02 A.C. Pavement (Class E) Over 1500 Ton $ $ $ A.C. Pavement Hand Spreading (All Classes) 500 Ton $ $ $ Asphalt for Seal Coat 20 Ton $ $ $ 1, Asphalt for Seal Coat 100 Ton $ $ $ Asphalt for Seal Coat 500 Ton $ $ $ Cover Aggregate 20 Ton $ $ $ Cover Aggregate 100 Ton $ $ $ Cover Aggregate 500 Ton $ $ $ Asphalt for Tack Coat 0-25 Ton $ 1.00 $ $ 1, Remove and Replace Existing Asphalt Surfacing, c/2, 2" AC & 2 " LC 100 S.Y. $ 2.50 $ $ Remove and Replace Existing Asphalt Surfacing, Class D 3,500 S.Y. $ 9.00 $ $ Remove and Replace Existing Asphalt Surfacing S.Y. $ $ $ Remove and Replace Existing Asphalt Surfacing 750-2,500 S.Y. $ $ $ Furnish and Install R.A.P Ton $ $ $ Furnish and Install R.A.P Ton $ $ $ Furnish and Install R.A.P. Over 1500 Ton $ $ $ Asphalt Emusion for RAP Surface Treatment 5 L.F. $ $ $ Crack Sealing L.F. $ 1.20 $ 5.70 $ Crack Sealing L.F. $ 1.00 $ 2.38 $ Crack Sealing L.F. $ 1.00 $ 1.31 $ Crack Sealing ,000 L.F. $ 1.00 $ 1.31 $ Crack Sealing Over 10,000 L.F. $ 0.50 $ 1.03 $ Extend Sanitary Sewer Service 7 Each $ $ 1, $ 2, Furnish and Install 8" DIP Sewer Main, Class L.F. $ $ $ Construct Manhole (Type A & Standard Depth) 1 Each $ 3, $ 3, $ 5, Sanitary Sewer Service Connnect, 4" 4 Each $ 1, $ 1, $ 2, Sanitary Sewer Service Connnect, 8" 1 Each $ 1, $ 2, $ 4, Construct Sewer Cleanout 1 Each $ $ 1, $ 3, Relocate Fire Hydrant 1 Each $ $ 2, $ 6, Remove Fire Hydrant Assembly 2 Each $ $ 1, $ 3, Reset/Reseal Manhole Cone & Barrel Section 1 Each $ $ 1, $ 2, Construct Type I Storm Drain Manhole 2 Each $ 1, $ 2, $ 4, Furnish and Install 10" CPEP 500 L.F. $ 5.00 $ $ Furnish and Install 10" CPEP, Type S 50 L.F. $ $ $ Furnish and Install 10" CPEP, Type S 200 L.F. $ 5.50 $ $ Furnish and Install 10" CPEP, Type S 300 L.F. $ $ $ Furnish and Install 12" Arctic Pipe 400 L.F. $ $ $ Furnish and Install 12" CPEP (Storm Sewer) 100 L.F. $ 5.00 $ $ Furnish and Install 12" CPEP (Storm Sewer) 300 L.F. $ 5.00 $ $ Furnish and Install 12" CPEP, Type S 100 L.F. $ $ $ Furnish and Install 12" CPEP, Type S 200 L.F. $ 6.00 $ $ Furnish and Install 12" CPEP, Type S 350 L.F. $ 6.00 $ $ Contact Duane Maney with any questions:

5 55.02 Furnish and Install 12" Flared End Section 5 Each $ $ $ Furnish and Install 12" Storm Drain Pipe 1,200 L.F. $ $ $ Furnish and Install 15" CPEP (Storm Sewer) 100 L.F. $ 8.00 $ $ Furnish and Install 15" CPEP (Storm Sewer) 300 L.F. $ 8.00 $ $ Furnish and Install 18" CPEP 500 L.F. $ $ $ Furnish and Install 18" CPEP (Storm Sewer) 100 L.F. $ $ $ Furnish and Install 18" CPEP (Storm Sewer) 300 L.F. $ $ $ Furnish and Install 18" CPEP, Type S 50 L.F. $ $ $ Furnish and Install 18" Flared End Section 5 Each $ $ $ Furnish and Install 24" CPEP (Storm Sewer) 300 L.F. $ $ $ Furnish and Install 24" CPEP (Storm Sewer) 100 L.F. $ $ $ Furnish and Install 24" Flared End Section 2 Each $ $ $ 1, Furnish and Install 30" CPEP (Storm Sewer) 100 L.F. $ $ $ Furnish and Install 30" CPEP (Storm Sewer) 300 L.F. $ $ $ Furnish and Install 36" CPEP (Storm Sewer) 100 L.F. $ $ $ Furnish and Install 36" CPEP (Storm Sewer) 300 L.F. $ $ $ Furnish and Install 42" CPEP (Storm Sewer) 100 L.F. $ $ $ Furnish and Install 42" CPEP (Storm Sewer) 300 L.F. $ $ $ Subdrain, 8" CPEP, Type SP, Type C Filter Material & Drainage Geotextile 330 L.F. $ $ $ Subdrain, 8" CPEP, Type SP, Type C Filter Material & Drainage Geotextile 772 L.F. $ $ $ Subdrain, 12" CPEP, Type SP, Type B Filter Material & Drainage Geotextile 250 L.F. $ $ $ Subdrain, 12" CPEP, Type SP, Type B Filter Material & Drainage Geotextile 1,000 L.F. $ $ $ Subdrain, 12" CPEP, Type SP, Type B Filter Material & Drainage Geotextile 1,500 L.F. $ $ $ Subdrain, 15" CPEP, Type C Filter Material and Drainage Geotextile 100 L.F. $ $ $ Subdrain, 15" CPEP, Type C Filter Material and Drainage Geotextile 250 L.F. $ $ $ Subdrain, 18" CPEP, Type C Filter Material and Drainage Geotextile 2,210 L.F. $ $ $ Additional Depth to Type II Manhole 1 Each $ $ $ Construct (Type I) Catch Basin 1 Each $ 1, $ 2, $ 4, Construct (Type I) Manhole 0-10 Each $ 1, $ 3, $ 7, Construct (Type II) Manhole 1 Each $ 4, $ 4, $ 9, Construct Catch Basin 0-10 Each $ 1, $ 2, $ 3, Construct Catch Basin 10 to 30 Each $ 1, $ 2, $ 2, Connect to Existing Storm Drain Manholes 0-5 Each $ $ 1, $ 1, Construct Cleanout 5 Each $ $ $ 2, Construct Open Ditch L.F. $ 5.00 $ $ Construct Open Ditch Over 100 L.F. $ 2.00 $ $ Furnish and Install Culvert, 12" CMP 70 L.F. $ $ $ Furnish and Install Culvert, 13" CMP, 16 Ga. W/End Sections 5 L.F. $ $ $ Furnish and Install Culvert, 13" CMP, 16 Ga. W/End Sections 15 L.F. $ $ $ Furnish and Install Culvert, 15" CMP, 16 Ga. W/End Sections 10 L.F. $ $ $ Furnish and Install Culvert, 15" CMP, 16 Ga. W/End Sections 50 L.F. $ $ $ Furnish and Install Culvert, 15" CPEP or PCMP W/End Sections 100 L.F. $ $ $ Furnish and Install Culvert, 18" CMP, 16 GA. 75 L.F. $ $ $ Furnish and Install Culvert, 18" CPEP or PCMP W/End Sections 100 L.F. $ $ $ Contact Duane Maney with any questions:

6 55.12 Furnish and Install Culvert, 18" CPEP or PCMP W/End Sections 250 L.F. $ $ $ Furnish and Install Culvert, 18" PCMP, Round 30 L.F. $ $ $ Furnish and Install Culvert, 24" CMP, 16 GA. 30 L.F. $ $ $ Furnish and Install Culvert, 24" CMP, 16 Ga. W/End Sections 10 L.F. $ $ $ Furnish and Install Culvert, 24" CMP, 16 Ga. W/End Sections 30 L.F. $ $ $ Construct Beehive Intake 5 Each $ $ $ 1, Furnish and Install Fin Drain, 8" CPEP Type SP L.F. $ $ $ Furnish and Install Fin Drain, 8" CPEP Type SP L.F. $ 3.95 $ $ Furnish and Install Fin Drain, 8" CPEP Type SP 500-1,000 L.F. $ $ $ Furnish and Install Fin Drain, 8" CPEP Type SP Over 1,000 L.F. $ 6.50 $ $ Oil and Grit Separator STC Each $ 4, $ 9, $ 21, Oil and Grit Separator STC Each $ 10, $ 16, $ 33, Oil and Grit Separator STC Each $ 15, $ 32, $ 53, Storm Drain Service Connect, 6" 50 Each $ $ 1, $ 1, Foundation Drain Stubout, 4" CPEP Type SP 25 Each $ $ 1, $ 1, Foundation Drain Stubout, 6" CPEP Type SP 50 Each $ $ $ Remove and Replace 12" Storm Drain Pipe 100 L.F. $ $ $ Furnish and Install 2" HDPE Butt Elbow 1 Each $ $ $ Furnish and Install 2" HDPE Butt Tee 2 Each $ $ $ Furnish and Install 2" HDPE Water Line 1,000 L.F. $ 2.75 $ 5.07 $ Furnish and Install 4" TO 2" HDPE Butt Reducer 5 Each $ $ $ Furnish and Install 6" DIP, Class L.F. $ $ $ 1, Furnish and Install 8" DIP, Class L.F. $ $ $ Furnish and Install 8" DIP, Class L.F. $ $ $ Furnish and Install 12" DIP, Class-52 2 L.F. $ $ $ 1, Furnish and Install 2" Gate Valve in Valve Box 1 Each $ $ $ Furnish and Install 4" Gate Valve in Valve Box 1 Each $ $ $ 1, Furnish and Install 4" HDPE Butt Elbow 1 Each $ $ $ Furnish and Install 4" HDPE Butt Tee 5 Each $ $ $ Furnish and Install 4" HDPE Water Line 500 L.F. $ 4.00 $ 7.20 $ Furnish and Install 6" Gate Valve, Valve Box, and Marker 1 Each $ $ 1, $ 3, Furnish and Install 6" HDPE Butt Tee 2 Each $ $ $ Furnish and Install 6" TO 2" HDPE Butt Reducer 1 Each $ $ $ Furnish and Install 6" TO 4" HDPE Butt Reducer 1 Each $ $ $ Furnish and Install 8" Gate Valve, Valve Box and Marker 1 Each $ $ 1, $ 1, Furnish and Install 8" Gate Valve, Valve Box and Marker 2 Each $ $ 1, $ 1, Furnish and Install 12" Gate Valve, Valve Box and Marker 1 Each $ 1, $ 2, $ 3, Furnish and Install RAINBIRD #7 QC and Valve Box 2 Each $ $ $ Furnish and Install Standpipe and Gate Valve 5 Each $ $ $ Relocate Rainbird #7 QC and Valve Box 1 Each $ $ $ Furnish and Install Fire Hydrant Assembly, Double Pumper 2 Each $ 2, $ 3, $ 4, Furnish and Install Fire Hydrant Assembly, Single Pumper 1 Each $ 2, $ 4, $ 5, Furnish and Install 1 1/2" Water Service 5 Each $ 1, $ 2, $ 3, Contact Duane Maney with any questions:

7 60.06 Furnish and Install 1" Water Service 5 Each $ 1, $ 1, $ 3, Furnish and Install 8" Water Service 2 Each $ 1, $ 3, $ 5, Polyethylene Encasement 75 L.F. $ 1.00 $ 3.29 $ Polyethylene Encasement 200 L.F. $ 1.00 $ 0.96 $ Connect to Existing HDPE 6"Water Line 2 Each $ $ $ 1, Replace Section of Existing 6" HDPE MAIN 200 L.F. $ 8.00 $ $ Replace Valve Box 1 Each $ $ $ 2, Replace Valve Box 5 Each $ $ $ 1, Replace Valve Box Top Section 0-10 Each $ $ $ 2, Reset Valve Box 0-5 Each $ $ $ 1, Adjust Key Box 20 Each $ $ $ Adjust Key Box In Concrete Slab 1 Each $ $ $ 1, Provide Temporary Water System 1 L.S. $ 1.00 $ 4, $ 20, Relocate Fire Hydrant 1 Each $ 2, $ 2, $ 4, Person Survey Crew 5 H.R. $ $ $ Person Survey Crew 50 H.R. $ $ $ Person Survey Crew 5 H.R. $ $ $ Person Survey Crew 25 H.R. $ $ $ Person Survey Crew 5 H.R. $ $ $ Person Survey Crew 100 H.R. $ $ $ Adjust Survey Monument Case 1 Each $ $ $ 1, Adjust Survey Monument Case 5 Each $ $ $ Adjust Survey Monument Case 25 Each $ $ $ Construction Survey Measurement 1 L.S. $ $ 8, $ 50, Existing Monument Search 1 L.S. $ $ 1, $ 3, Survey Monument Installed in Monument Case 0-5 Each $ $ $ Survey Monument Installed in Monument Case Over 5 Each $ $ $ Adjust Manhole Cone 0-5 Each $ $ 1, $ 1, Adjust Manhole Cone to Finish Grade 0-5 Each $ $ $ 1, Adjust Manhole Ring 0-10 Each $ $ $ 1, Adjust Manhole Ring Over 10 Each $ $ $ Adjust Manhole Ring to Finish Grade 0-5 Each $ $ $ Adjust Catch Basin to Finish Grade 1 Each $ $ $ 1, Remove Existing Manhole or Catch Basin 0-10 Each $ $ $ 5, Adjust Main Line Valve Box to Finish Grade 0-5 Each $ $ $ 1, Adjust Main Line Valve Box to Finish Grade Over 5 Each $ $ $ Adjust Service Key Box to Finish Grade 0-5 Each $ $ $ Adjust Gas Valve Manhole to Finish Grade 2 Each $ $ $ 1, Adjust Cleanout to Finish Grade 1 Each $ $ $ Raise or Lower Sewer Service 2 Each $ 1.00 $ $ 2, Reset Fence 0-50 L.F. $ $ $ Reset Fence L.F. $ $ $ Contact Duane Maney with any questions:

8 70.14 Reset Fence L.F. $ $ $ Guardrail (Standard W Beam w/metal Posts) 0-50 L.F. $ $ $ Guardrail (Standard W Beam w/metal Posts) Over 50 L.F. $ $ $ Insulation Board (R=4.5) 800 S.F. $ 0.50 $ 0.77 $ Insulation Board (R=4.5) 1,200 S.F. $ 0.50 $ 0.77 $ Insulation Board (R=4.5) 6,000 S.F. $ 0.50 $ 0.89 $ Insulation Board (R=5) 4,000 S.F. $ 0.45 $ 0.77 $ Insulation Board (R=5) 15,000 S.F. $ 0.45 $ 0.75 $ Insulation Board (R=9) 100 S.F. $ 1.25 $ 2.31 $ Insulation Board (R=9) 250 S.F. $ 1.10 $ 1.71 $ Insulation Board (R=9) 13,000 S.F. $ 0.85 $ 1.11 $ Insulation Board (R=9) 40,000 S.F. $ 0.85 $ 1.11 $ Insulation Board (R=9) 75,000 S.F. $ 0.80 $ 0.97 $ Insulation Board (R=9) 200,000 S.F. $ 0.80 $ 0.93 $ Insulation Board (R=10) 15 S.F. $ 3.00 $ 1.01 $ Insulation Board (R=10) 40,000 S.F. $ 0.90 $ 1.05 $ Insulation Board (R=10) 120,000 S.F. $ 0.90 $ 1.01 $ Insulation Board (R=10) 200,000 S.F. $ 0.75 $ 0.96 $ Insulation Board (R=18) 75 S.F. $ 1.75 $ 3.63 $ Insulation Board (R=18) 200 S.F. $ 1.60 $ 3.11 $ Insulation Board (R=18) 250 S.F. $ 1.00 $ 2.71 $ Methylemethacrylate Painted Traffic Markings 0-50 L.F. $ $ $ Methylemethacrylate Painted Traffic Markings L.F. $ 0.65 $ 3.56 $ Methylemethacrylate Painted Traffic Markings (4") L.F. $ 4.00 $ $ Methylemethacrylate Painted Traffic Markings (4") L.F. $ 1.35 $ 3.63 $ Methylemethacrylate Painted Traffic Markings (4") L.F. $ 0.50 $ 1.37 $ Methylemethacrylate Painted Traffic Markings (4") 5,000-10,000 L.F. $ 1.00 $ 1.38 $ Methylemethacrylate Painted Traffic Markings (4") Over 25,000 L.F. $ 1.00 $ 1.29 $ Methylemethacrylate Painted Traffic Markings (8") L.F. $ 2.90 $ 3.23 $ Methylemethacrylate Painted Traffic Markings (8") 1,000 L.F. $ 2.00 $ 2.85 $ Methylemethacrylate Painted Traffic Markings (8") 1,000-5,000 L.F. $ 2.00 $ 2.66 $ Methylemethacrylate Painted Traffic Markings (12") 100 L.F. $ 4.50 $ 7.33 $ Methylemethacrylate Painted Traffic Markings (18") L.F. $ 3.00 $ 8.85 $ Methylemethacrylate Painted Traffic Markings (18") Over 150 L.F. $ 3.50 $ 5.43 $ Methylemethacrylate Painted Traffic Markings (24") L.F. $ 1.70 $ 9.68 $ Methylemethacrylate Painted Traffic Markings (24") 150-1,000 L.F. $ 3.00 $ 9.02 $ Methylemethacrylate Painted Traffic Markings (24") 1,000-5,000 L.F. $ 6.00 $ 8.76 $ Methylemethacrylate Painted Traffic Markings (24") Over 5,000 L.F. $ 0.97 $ 1.35 $ Methylemethacrylate Painted Traffic Markings (Island Noses and Returns) 1 Each $ $ 1, $ 4, Methylemethacrylate Painted Traffic Markings (Right Turn Arrow) 50 Each $ $ $ Methylemethacrylate Traffic Markings (Arrow) 0-15 Each $ $ $ Methylemethacrylate Traffic Markings (Words and Legends) 1 L.S. $ $ 4, $ 14, Traffic Markings (Highway/rail Crossing) 5 Each $ $ $ 5, Traffic Markings (Left Turn Arrow) 0-50 Each $ $ $ Contact Duane Maney with any questions:

9 70.19 Traffic Markings (Only) 0-15 Each $ $ $ Traffic Markings (Only) Over 30 Each $ $ $ Traffic Markings (Right Turn Only) 0-5 Each $ $ $ Traffic Markings (Right Turn Only) Over 5 Each $ $ $ Install New Bus Stop Sign 5 Each $ $ $ Install New Bus Stop Sign 10 Each $ $ $ Remove and Relocate Sign 0-10 Each $ $ 1, $ 7, Remove and Relocate Sign 60 Each $ $ $ Salvage Sign 10 Each $ $ $ Salvage Sign 20 Each $ $ $ Salvage Sign 50 Each $ $ $ Sign, "Van" for Handicap Parking 1 Each $ $ $ Sign, Handicap Parking 5 Each $ $ $ Standard Signs 0-50 S.F. $ $ $ Standard Signs S.F. $ $ $ 2, Standard Signs Over 200 S.F. $ $ $ Traffic Maintenance 1 L.S. $ 24, $ 31, $ 200, Traffic Maintenance 1 L.S./Site $ $ 1, $ 4, Adjust Electrical/ Telephone Manhole 0-10 Each $ $ $ 2, Adjust Precast Polymer Box 1 Each $ $ $ 3, Remove Existing Pipe Each $ 6.00 $ $ 1, Reset Grave Markers 30 Each $ $ $ Temporary Group Mailboxes 1 L.S. $ 1, $ 1, $ 3, Temporary Group Mailboxes 1 L.S. $ 1, $ 2, $ 5, Temporary Mailbox Relocation 10 Each $ $ $ Temporary Mailbox Relocation 50 Each $ $ $ Existing Driveway Reconstruction, Asphalt S.F. $ 2.50 $ 4.73 $ Existing Driveway Reconstruction, Concrete S.F. $ 5.00 $ 8.42 $ Upgrade Cone 5 Each $ $ 2, $ 4, Precast Concrete Pavers 1,500 Each $ 6.92 $ $ Relocate Existing Mailboxes 0-10 Each $ $ $ Relocate Existing Mailboxes Over 10 Each $ $ $ Remove and Repair or Replace and Reset Mailbox Assembly 50 Each $ $ $ Relocate Shelter 1 Each $ $ 1, $ 2, Bolt-On Bench (Owner-Frunished) 5 Each $ $ $ Foundation Bench (Owner-Frunished) 5 Each $ $ $ 1, Furnish and Install Bench 1 Each $ $ 1, $ 2, Furnish and Install Bench (model #127-20) 1 Each $ 1, $ 1, $ 2, Furnish and Install Bench (Owner Supplied) 1 Each $ $ $ 1, Furnish and Install Bench w/back, Armrests, 6' Long 1 Each $ 1, $ 1, $ 2, Furnish and Install Garden Bench 2 Each $ 1, $ 1, $ 1, Install Bench, Owner Furnished 5 Each $ $ $ Install Trash Reciptical, Owner-Furnished 0-10 Each $ $ $ 1, Trash Receptacle 1 Each $ $ 1, $ 1, Contact Duane Maney with any questions:

10 70.33 Remove Existing Bench or Trash Can and Cover 5 Each $ $ $ Furnish and Install Complete Transit Shelter 3 Each $ 23, $ 35, $ 51, Construct Transit Shelter Foundation 3 Each $ 2, $ 2, $ 4, Furnish and Install Rear Screen 1 Each $ 2, $ 3, $ 9, Furnish and Install Side Screen, Option 2 2 L.S. $ 1, $ 2, $ 6, Remove and Replace Manhole Frame 5 Each $ $ $ 1, Remove and Replace Manhole Frame 75 Each $ $ $ Remove and Replace Manhole Frame and Cover 5 Each $ $ $ 1, Remove and Replace Manhole Frame and Rings 2 Each $ $ $ 1, Remove Timber Retaining Wall 0-20 L.F. $ $ $ Remove Timber Retaining Wall Over 20 L.F. $ $ $ Replace Structure Top 0-20 Each $ $ $ 1, Repair Concrete Storm Drain Pipe 30 L.F. $ $ 11, $ 26, Remove Existing Pipe 1,000 L.F. $ 5.00 $ $ Two Person Labor Crew 50 H.R. $ $ $ Sawcut Asphalt and Concrete L.F. $ 1.25 $ 4.00 $ Sawcut Asphalt and Concrete L.F. $ 1.25 $ 3.99 $ Heat Trace 500 L.F. $ 6.00 $ $ Remove Junction Box 2 Each $ $ $ 1, Adjust Traffic J-box to Finish Grade 1 Each $ $ $ Furnish and Install Bollard Fence 75 Each $ $ $ Furnish and Install Wood Bollard 25 Each $ $ $ Relocate Existing Bollard 1 Each $ $ $ Remove Bollard 0-30 Each $ $ $ Reset Existing Bollard 1 Each $ $ $ Wood Bollard 0-15 Each $ $ $ Wood Bollard Over 15 Each $ $ $ Furnish and Install Handrail 10 L.F. $ $ $ Furnish and Install Handrail 50 L.F. $ $ $ Sodier Pile Retaining Wall 10,000 S.F. $ $ $ Wood Retaining Wall 40 L.F. $ 0.72 $ $ Mugo Pine 100 Each $ $ $ Perennials 150 Each $ $ $ Picea Glauca (White Spruce), 10' Ht. 0-5 Each $ $ $ 1, Prunus Padus (Mayday Tree) 2 1/2" cal./8'-10' Ht. 0-5 Each $ $ $ 1, PrunusVirginiana 'Canada Red' Canada Red Cherry 2 1/2" cal./8'-10' Ht. 0-5 Each $ $ $ 1, Rosa Rugosa 'Agnes' (Sitka Rose) 5 Gallon, 18" Spr. x 18" Ht Each $ $ $ Shrubs 20 Each $ $ $ Shrubs, Bumald Spiera, 2" - 3" Caliper 50 Each $ $ $ Shrubs, False Spire, 3-GAL, 24" HT. 100 Each $ $ $ Shrubs, Peking Cotton Each Ster 100 Each $ $ $ Shrubs, Pinus Mugo 'Mugo'/Mugo Pine, 24" 20 Each $ $ $ Shrubs, Potentilla 50 Each $ $ $ Contact Duane Maney with any questions:

11 75.02 Shrubs, Potentilla, 18" Tall 100 Each $ $ $ Shrubs, Rosa Rugosa, 24" Height 150 Each $ $ $ Shrubs, Rugosa Rose, 2" - 3" Caliper 50 Each $ $ $ Shrubs, Spire X Vanhouttei, 24" Height 50 Each $ $ $ Shrubs, Spire X Vanhoutten,Vanhoutte Spire, 30' 25 Each $ $ $ Shrubs, Ural False Spire, 18" Tall 150 Each $ $ $ Sorbaria Sorbifolia (False Spirea) 5 Gallon 12" Spread, 18" Ht. 0-5 Each $ $ $ Transplant Tree, Betual Papyrifera, 2" Caliper 10 Each $ $ $ Transplant Tree, Birch 8' - 14' Height 50 Each $ $ $ Transplant Tree, Colorado Spruce, 5' Min. Ht. 5 Each $ $ $ 1, Transplant Tree, Lodgepole Pine, 10' - 15' Height 50 Each $ $ $ Transplant Tree, Mayday, 2" TO 4" Caliper 2 Each $ $ $ Transplant Tree, Paper Birch, 10' Min. Ht. 15 Each $ $ $ 1, Transplant Tree, Picpugens, 8' Height 10 Each $ $ $ Transplant Tree, Spruce 8' - 10' Height 15 Each $ $ $ Transplant Tree, Spruce, 2" Caliper 1 Each $ $ $ Transplant Trees 5 Each $ $ $ Trees 5 Each $ $ $ Trees, Pic Each Pungens/Colorade Green Spruce, 6' Ht. 5 Each $ $ $ Trees, Amur Chokecherry, 2 1/2" Caliper 0-25 Each $ $ $ Trees, Amur Chokecherry, 2 1/2" Caliper Over 125 Each $ $ $ Trees, Amur Chokecherry, 2" Caliper 15 Each $ $ $ Trees, Amur Maple, 2" Caliper 25 Each $ $ $ Trees, Colorado Blue Spruce 25 Each $ $ $ Trees, Colorado Green Spruce, 8' 50 Each $ $ $ Trees, Common Chokecherry, 2" Caliper 0-30 Each $ $ $ Trees, Larix Russica/Siberian Larch, 6' Ht. 5 Each $ $ $ Trees, Pinus Contora 8" 1 Each $ $ $ Trees, Showy Mt. Ash, 2" Caliper 15 Each $ $ $ Trees, Siberian Larch, 10' 15 Each $ $ $ Trees, Snowdrift Crabapple, 1-1/2" Caliper 15 Each $ $ $ Tree, Amur Chokecherry 8' Minimum Height 5 Each $ $ $ 1, " Topsoil 0-5 M.S.F. $ $ $ " Topsoil 0-5 M.S.F. $ $ $ 2, " Topsoil 5 to 25 M.S.F. $ $ $ " Topsoil Over 25 M.S.F. $ $ $ " Topsoil 2 M.S.F. $ $ $ " Topsoil 200 M.S.F. $ $ $ " Topsoil 1 M.S.F. $ 1, $ 2, $ 5, " Topsoil 1 M.S.F. $ $ 2, $ 5, " Infield Mix 450 M.S.F. $ $ $ Seeding (All Types) 2 M.S.F. $ $ $ 1, Seeding (Schedule A) 0-5 M.S.F. $ $ $ 2, Seeding (Schedule A) 0-50 M.S.F. $ $ $ Contact Duane Maney with any questions:

12 75.05 Seeding (Schedule A) Over 50 M.S.F. $ $ $ Seeding (Schedule B) 10 M.S.F. $ $ $ Seeding (Schedule C) 120 M.S.F. $ $ $ Seeding (Schedule E) 0-5 M.S.F. $ $ $ Seeding (Schedule E) Over 5 M.S.F. $ $ $ Seeding (Schedule F) 0-5 M.S.F. $ $ $ Seeding (Schedule F) Over 5 M.S.F. $ $ $ Backstop, 20' Height 1 Each $ 3, $ 5, $ 10, Chain Link Fence (11 Gage) 50 L.F. $ $ $ Chain Link Fence (9 Gage) 50 L.F. $ $ $ Chain Link Fence 6' (11 Gage) 100 L.F. $ $ $ Chain Link Fence 6' (9 Gage) 100 L.F. $ $ $ Chainlink Fence (10' Height, 9 Gauge) 500 L.F. $ $ $ Chainlink Fence (8' Height, 9 Gauge) 1,000 L.F. $ $ $ Wood Screen Fence and Gate 50 L.F. 1 Each $ 3, $ 6, $ 10, Gate, Maintenance, 12' Wide 1 Each $ $ $ 1, Gate, Maintenance, 4' Wide 5 Each $ $ $ Concrete Pipe Bollard with sleeve, Color 0-15 Each $ $ $ 1, Concrete Pipe Bollard with sleeve, Color Over 15 Each $ $ $ 1, Concrete Pipe Bollard, Color 1 Each $ $ $ 1, Dissasemble, Move and Reassemble Existing Bleachers 2 Each $ $ 2, $ 5, Furnish and Install Base and Anchor Kit 1 Each $ $ $ 2, Furnish and Install Home Plate 1 Each $ $ $ Furnish and Install Pitchers Rubber 1 Each $ $ $ Sod 0-10 M.S.F. $ $ $ 1, Sod (with 2" topsoil) S.F. $ $ $ Landscape Edging L.F. $ 1.60 $ $ Wood Chips, 3" Depth S.F. $ 0.50 $ 6.52 $ Wood Chips, 3" Depth Over 100 S.F. $ 0.50 $ 7.04 $ Concrete Planters with Nautical Motif 25 S.Y. $ 1, $ 1, $ 3, Landscape Fabric 0-10 S.Y. $ 0.50 $ $ Landscape Fabric Over 10 S.Y. $ 0.50 $ 6.53 $ Weed Fabric (under crushed wood and D-1 leveling course) 175 L.F. $ 1.50 $ 5.19 $ Erosion Control Blanket 150 M.S.F. $ $ $ Furnish and Install Rails 9 Each $ $ $ Picnic Shelter Liner, Base Course, Concrete 1 L.S $ 9, $ 14, $ 18, Furnish and Install Fence on Retaining Wall 1 L.S $ 10, $ 31, $ 37, Trench and Backfill L.F. $ 3.00 $ $ Trench and Backfill L.F. $ 5.00 $ $ Trench and Backfill 500-1,000 L.F. $ 4.00 $ 5.83 $ Trench and Backfill Over 1000 L.F. $ 3.00 $ 5.02 $ Trench and Backfill (18" width) (30" depth) 125 L.F. $ 8.75 $ $ Contact Duane Maney with any questions:

13 80.04 Controller Cabinet Foundation 1 Each $ $ 5, $ 12, Driven Pile Luminaire Pole Foundations 0-10 Each $ $ 1, $ 1, Driven Pile Luminaire Pole Foundations Over 10 Each $ $ 1, $ 1, Load Center Foundation (Type 3) 1 Each $ $ 1, $ 4, Load Center Foundation (Type 4) 1 Each $ 1, $ 2, $ 5, Load Center Foundation (Type 5) 1 Each $ $ 1, $ 1, Load Center Foundation (Type 6) 1 Each $ 1, $ 1, $ 3, Load Center Foundation (Type 7) 1 Each $ 1, $ 1, $ 2, Load Center Foundation (Type 8) 1 Each $ $ 1, $ 3, Retaining Wall Luminare Pole Foundation 5 Each $ $ 1, $ 3, Signal Mast Arm Pole Foundation 1 Each $ 1, $ 2, $ 2, ' Slip Base Luminare Pole 0-20 Each $ 1, $ 1, $ 1, ' Fixed Base Luminaire Pole 0-20 Each $ 1, $ 1, $ 1, ' Slip Base Luminare Pole 0-20 Each $ $ 1, $ 3, Combination Signal/Luminaire Pole (30') 1 Each $ 3, $ 3, $ 4, Luminaire Arm 10 FT. Length 0-20 Each $ $ $ Luminaire Arm FT. Length 0-20 Each $ $ $ Luminaire Arm 6 FT. Length 0-20 Each $ $ $ Luminaire Arm 6-10 FT. Length 0-20 Each $ $ $ Luminaire Arm 8 FT. Length 0-20 Each $ $ $ Signal Mast Arm 40' Length 1 Each $ 2, $ 2, $ 3, " Galvanized Steel Conduit 75 L.F. $ 5.00 $ $ " Schedule 40 P.V.C. Conduit L.F. $ 2.55 $ 4.97 $ " Schedule 40 P.V.C. Conduit 750-1,500 L.F. $ 1.75 $ 4.49 $ " Schedule 40 P.V.C. Conduit ,500 L.F. $ 3.00 $ 4.55 $ " Schedule 40 P.V.C. Conduit Over 3,500 L.F. $ 2.55 $ 4.64 $ " Steel Conduit L.F. $ 2.75 $ 5.96 $ " Steel Conduit L.F. $ 6.67 $ 9.69 $ " Steel Conduit 350-1,000 L.F. $ 6.71 $ $ " Steel Conduit Over 1,000 L.F. $ 4.50 $ $ " Steel Conduit L.F. $ 2.80 $ $ " Steel Conduit 0-50 L.F. $ 9.00 $ $ " Schedule 40 P.V.C. Conduit L.F. $ $ $ Adjust Junction Box to Finish Grade 0-5 Each $ $ $ Adjust Junction Box to Finish Grade Over 5 Each $ $ $ Adjust Type I-A Junction Box to Finished Grade 0-10 Each $ $ $ 1, Adjust Type I-A Junction Box to Finished Grade Over 10 Each $ $ $ Type II Junction Box 0-5 Each $ $ 1, $ 3, Type III Junction Box 1 Each $ 1, $ 2, $ 4, C #8, W/GND L.F. $ 1.00 $ 1.78 $ C #8, W/GND Over 750 L.F. $ 1.00 $ 1.89 $ C #8, XHHW 2,000 L.F. $ 1.50 $ 2.16 $ (3/C #8 AWG) L.F. $ 2.50 $ $ C#4 W/#6 GND L.F. $ 2.50 $ 3.13 $ 5.40 Contact Duane Maney with any questions:

14 C#4 W/#6 GND. Over 500 L.F. $ 1.22 $ 1.65 $ C-#8 AWG L.F. $ $ 4.07 $ C-#8 AWG Over 500 L.F. $ 1.25 $ 3.64 $ PR-#18 AWG SHIELDED 350 L.F. $ 2.40 $ 4.87 $ PR#18 Lead-IN Cable 1,500 L.F. $ 1.00 $ 1.83 $ PR#18 Lead-IN Cable 6,000 L.F. $ 2.60 $ 2.80 $ # L.F. $ 1.60 $ 3.33 $ Single Meter Pad-Mount Load Center, Type IV 1 Each $ 4, $ 5, $ 6, Install Loop Detecter, Existing Pavement 0-25 Each $ $ 1, $ 1, Install Loop Detecter, Existing Pavement Over 25 Each $ $ $ Install Loop Detector, New Work 0-5 Each $ $ 1, $ 1, Install Loop Detector, New Work Over 10 Each $ $ $ 1, " 4-Face LED Signal Head 5 Each $ 1, $ 2, $ 2, Crosswalk Illuminated Sign Beacon 1 Each $ 4, $ 6, $ 11, Luminaire, 150 W HPS, Cutoff, Type III 0-10 Each $ $ $ Luminaire, 150 W HPS, Cutoff, Type III Over 10 Each $ $ $ Luminaire, 150 W MC, Type III 0-15 Each $ $ $ Luminaire, 150 W MC, Type III Over 15 Each $ $ $ Luminaire, 150 W MC, Type IV 1 Each $ $ $ Salvage Luminaire 1 Each $ $ $ Relocate Electricoller 2 Each $ 1, $ 2, $ 6, Luminaire Cutoff Visor 20 Each $ $ $ Pedestal Pole Foundation Excavation 1 Each $ 1, $ 5, $ 4, Bus Stop Light (Owner -Furnished) 1 Each $ $ 1, $ 2, Photocell Installation, Complete 1 Each $ $ $ Play Equipment 'Aquilia'-Supply & Install 1 Each $ 18, $ 20, $ 23, Play Equipment 'Arch Swing' + Bay-Supply & Install 1 Each $ 4, $ 6, $ 8, Play Equipment 'Arch Swings'-Supply & Install 1 Each $ 3, $ 5, $ 9, Play Equipment 'Green House'-Supply & Install 1 Each $ 4, $ 4, $ 5, Play Equipment 'Lightening Slide' -Supply & Install 1 Each $ 5, $ 5, $ 6, Play Equipment 'Magic House'-Supply & Install 1 Each $ 4, $ 5, $ 7, Play Equipment 'Red House'-Supply & Install 1 Each $ 4, $ 5, $ 5, Play Equipment 'Scrambler'-Supply & Install 1 Each $ 1, $ 1, $ 1, Play Equipment 'Sirius'-Supply & Install 1 Each $ 2, $ 11, $ 18, Play Equipment 'Tot Mosaiq'-Supply & Install 1 Each $ 7, $ 8, $ 9, Play Equipment 'Yellow House'-Supply & Install 1 Each $ 4, $ 4, $ 5, Arch-Supply & Install 1 L.S. $ 2, $ 3, $ 4, Furnish and Install Children's Play Structure, complete 1 L.S. $ 16, $ 22, $ 29, Furnish and Install Tot's Play Structure, complete 1 L.S. $ 8, $ 13, $ 22, Spring Toy (Relocate Existing) 1 L.S. $ $ $ 1, Furnish and Install Picnic Shelter Structure 1 L.S. $ 15, $ 27, $ 45, Furnish and Install Picnic Table, 8' Long 1 Each $ $ 1, $ 2, Furnish and Install Picnic Table, 8' Long; Handicap 1 Each $ $ 1, $ 2, Contact Duane Maney with any questions:

15 90.04 Play Area Safety Edging For Loose Fill 115 L.F. $ $ $ Play Area Safety Surfacing, "Vitriturf" Poured-in-Place 500 C.Y. $ $ $ Play Area Safety Surfacing, Crushed Wood Loose Fill 50 L.B. $ $ $ Play Area Safety Surfacing-Loose Rubber Fill 25,000 S.F $ 0.58 $ 0.83 $ Play Area Safety Surfacing-Poured-in-Place 200 S.F. $ $ $ Entry Fence Panels w/ Icons 1 Each $ $ 2, $ 5, Header, Plastic, 4" High "Black Diamond" or equal 75 L.F. $ 2.00 $ 7.82 $ Concrete Play Curb L.F. $ $ $ Entry Fence Posts 4 Each $ $ $ Entry Posts w/ Icons 2 Each $ $ 1, $ 1, Entry post-sea Dragon 1 Each $ 1, $ 3, $ 5, Mobilization 1 L.S. $ 1, $ 6, $ 15, Demolition 1 L.S. $ 2, $ 7, $ 16, Contact Duane Maney with any questions:

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32

More information

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00

More information

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

BID TABULATION PAGE 1 OF 6

BID TABULATION PAGE 1 OF 6 BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

Market Street Gateway Improvements Phase 1

Market Street Gateway Improvements Phase 1 PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular

More information

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

PART II - Prospect Street 37. 8 Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050. BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

Active Construction RV Associates Scarsella JR Hayes

Active Construction RV Associates Scarsella JR Hayes CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92

More information

Addendum 1 13 TH Street Streetscape. September 1, 2017

Addendum 1 13 TH Street Streetscape. September 1, 2017 Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

CONTRACT TIME DETERMINATION

CONTRACT TIME DETERMINATION CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during

More information

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

More information

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST

PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

The bid due date has been changed to 2:50 p.m. May 25, 2018.

The bid due date has been changed to 2:50 p.m. May 25, 2018. May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due

More information

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher

More information

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018 LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT

More information

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00 TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

ADOPTED BY SIV BOARD

ADOPTED BY SIV BOARD SAN IGNACIO VISTAS INC. FUNDING PLAN 2016-2050 FOR THE RRP (REPLALCEMENT RESERVE PLAN) This plan is reviewed and adjusted as needed on an annual basis Year Contributions Expenditures Opening RETURN Reserve

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

CITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) - Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017) This information is available in accessible formats upon request. Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS PREPARED BY

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445. Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52

More information

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing

More information

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $ PAVEMENT MARKING STRAIGHT STRIPE PAINTING, AMERICAN PAVEMENT MARKING, LLC ITEM UNIT TOTAL UNIT TOTAL NUMBER DESCRIPTION UNIT QUANTITY COST AMOUNT COST AMOUNT 1 Mobilization L.S. 3 $ 400.00 $ 1,200.00 $

More information

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029 SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the

More information

CONTENTS. Sparger Springs Townhomes Durham, NC

CONTENTS. Sparger Springs Townhomes Durham, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 5 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by:

DRAFT FOR BOARD REVIEW. Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION & ALLENTON MANAGEMENT. Prepared by: DRAFT FOR BOARD REVIEW FULL RESERVE STUDY SPARGER SPRINGS TOWNHOMES DURHAM, NC Prepared for: SPARGER SPRINGS TOWNHOME OWNER S ASSOCIATION DURHAM, NC & ALLENTON MANAGEMENT Prepared by: CRITERIUM GILES ENGINEERS