AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

Size: px
Start display at page:

Download "AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET"

Transcription

1 STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA (415) FAX (415) SUBJECT: AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET REQUEST Consider 1.) Awarding the construction contract for Nave Drive Multi Use Path, CIP Project No for the base bid plus additive alternate bid item 2A (Substitute Wooden Split-Rail Fence) in the total amount of $617, to Maggiora & Ghilotti, Inc. as the lowest responsible bidder submitting the lowest responsive bid and 2.) Adopting a resolution amending the CIP Budget in the amount of $222,370 for the Nave Drive Multi Use Path, CIP Project No RECOMMENDATION Award construction contract and adopt resolution. DISCUSSION This proposed project will construct a 1,590 lineal feet class I multi-use path along Nave Drive between Main Gate Road and Bolling Drive and a new left turn pocket in southbound Nave Drive. The work to be done includes construction of a retaining wall, pathway lighting, bioretention facility, wooden split-rail fence between the path and street, upgrade to shoulder parking, removal and construction of concrete curb, gutter and sidewalk, removal and replacement of (9) trees, hot mix asphalt road widening, roadway signs installation and pavement striping and markings as shown on the Nave Drive Multi Use Path, CIP project No plans. On April 14, 2015 City Council authorized the advertising for construction bids and staff subsequently advertised the project for public bids. A public bid opening was held on May 19, 2015 and a total of three (3) bids were received. After examination of the same, Maggiora & Ghilotti, Inc. was determined to be the lowest responsible bidder, with a bid amount of $573, The low bid is higher than the engineer s estimate of $486, Received bids are summarized below: cc15_

2 1 2 3 BIDDER Maggiora & Ghilotti, Inc. Team Ghilotti, Inc. W.R. Forde Associates LOCATION BASE BID ($) ALT - 1A ($) ALT - 2A ($) RECOMMENDED AWARD (BASE BID + ALT-2A) San Rafael, CA 573, , , $617, Petaluma, CA 601, , , Richmond, CA 654, , , The attached Bid Abstract shows the bid details. Two alternate bid items were considered for this project. Alternate Bid Item 1A Substitute Solar LED Lighting consists of substituting solar powered luminaires in lieu of the electrically powered luminaires. After a detailed evaluation it was determined that substituting the proposed solar powered LED luminaires for the specified base bid lighting would not be cost effective. Alternate Bid Item 2A Substitute Wooden Split-Rail Fence consists of substituting wooden split rail fencing in lieu of the Landscape Berms. Staff is recommending inclusion of the alternate bid item 2A in the contract. Additional cost for wooden split-rail fence will be offset by eliminating future maintenance needs including the cost of irrigation. The low bidder was determined by the base bid only and not the base bid with Alternates. Staff reviewed the received bids and although the low bid exceeds the engineer s estimate, does not find the low bid to be unreasonably high, and is of the opinion that rebidding the project would not yield a lower bid. Due to the time limit on use of the BAAQMD Grant funds, and the potential cost and uncertainty of rebidding, staff recommends that the City Council allocate additional local funds to the project and award the construction contract to Maggiora & Ghilotti Inc. ENVIRONMENTAL ASSESSMENT This project has been determined to be Categorically Exempt from CEQA as detailed in the staff report presented at the April 14, 2015 City Council meeting. FISCAL IMPACT The Nave Drive Multi Use Path (CIP Project No ) is funded by BAAQMD Grant funds (283), and Gas Tax (272) funds. This project is included in the City of Novato Adopted Capital Improvement Program Budget for 2014/2015. There are insufficient funds in the Construction (430) account to award a contract based on the low bid, inclusive of the alternate bid item 2A and allowing for the standard 10% contingency allowance. Current accounting shows that the Project Development (410) account is $12,000 underfunded, compared with expended funds. cc15_

3 Adoption of a budget resolution is required to cover the Project Development (410) increase and the anticipated Construction (430) cost based on low bid and allowing for 10% contingency. There are no available supplemental funds from the granting agency, and without transferring already allocated local funds designated for pavement rehabilitation there are limited gap fund sources. Staff is proposing an allocation of General Fund (101) in the total amount of $222,370 to fill the funding gap. The specific allocations are as follows. 1. Allocate General Fund (101) in the amount of $12,000 to Project Development (410) account of CIP Project No , Nave Drive Multi-Use Path and 2. Allocate General Fund (101) in the amount of $210,370 to Construction (430) account of CIP Project No , Nave Drive Multi-Use Path. ALTERNATIVES 1. Take no action at this time; direct staff as to action requested. 2. Award base bid only. 3. Award base bid plus Alternate Bid Item 1A Substitute Solar LED Lighting. 4. Award base bid plus Alternate Bid Item 2A Substitute Wooden Split-Rail Fence. 5. Award base bid plus Alternate Bid Item 1A and Alternate Bid Item 2A. ATTACHMENTS 1. Bid Abstract 2. Resolution 3. Vicinity Map 4. CIP Budget Excerpt cc15_

4 CITY OF NOVATO ABSTRACT OF BIDS AND AWARD OF CONTRACT PROJECT NAME : Nave Drive Multi Use Path (MUP) BID NO. : PROJECT NO. : CIP DATE : 19-May-2015 BID OPENING : 2:00 pm BIDDERS Engineer's Estimate Maggiora & Ghilotti, Inc Team Ghilotti, Inc W.R. Forde Associates Item TOTAL BID $486, $573, $601, $654, No. DESCRIPTION Unit Qty Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 Temporary Water Pollution Control ( ) LS 1 $ 5, $ 5, $ 1, $ 1, $ 2, $ 2, $ 10, $ 10, Removal of Existing Portland Cement Concrete "LF" ( ) LF 690 $ 6.00 $ 4, $ 7.50 $ 5, $ $ 6, $ $ 6, Removal of Existing Portland Cement Concrete "SF" ( ) SF 600 $ 5.00 $ 3, $ 4.75 $ 2, $ 2.00 $ 1, $ 8.00 $ 4, Removal of Existing Asphalt Concrete ( ) SF 2,200 $ 4.00 $ 8, $ 2.25 $ 4, $ 2.00 $ 4, $ 2.00 $ 4, Temporary Removal and Replacement of Bus Shelter ( ) LS 1 $ 2, $ 2, $ 3, $ 3, $ 5, $ 5, $ 6, $ 6, Removal of Existing Pavement Markings and Striping ( ) LS 1 $ 1, $ 1, $ $ $ $ $ $ Construction Area Signs ( ) LS 1 $ 1, $ 1, $ 1, $ 1, $ 2, $ 2, $ 4, $ 4, Maintaining Traffic ( ) LS 1 $ 5, $ 5, $ 3, $ 3, $ 1, $ 1, $ 15, $ 15, Traffic Control System for Lane Closure ( ) LS 1 $ 10, $ 10, $ 2, $ 2, $ 2, $ 2, $ 25, $ 25, Clearing and Grubbing ( ) LS 1 $ 15, $ 15, $ 14, $ 14, $ 25, $ 25, $ 30, $ 30, Tree Removal ( ) EACH 9 $ $ 7, $ $ 4, $ $ 5, $ $ 4, Tree Stump Removal ( ) EACH 1 $ $ $ $ $ $ $ $ Common Excavation (Cut and Fill) ( ) CY 500 $ $ 10, $ $ 42, $ $ 50, $ $ 32, Landscape - Berm ( ) LF 955 $ $ 14, $ $ 11, $ $ 19, $ $ 14, Final Stabilization - Hydroseeding ( ) LS 1 $ 5, $ 5, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, Class 2 Aggregate Base ( ) TON 530 $ $ 31, $ $ 31, $ $ 59, $ $ 18, Class 2 Aggregate Base - Shoulder Parking ( ) TON 60 $ $ 3, $ $ 9, $ $ 12, $ $ 2, Concrete Sidewalk ( ) SF 332 $ $ 5, $ $ 4, $ $ 3, $ $ 3, Type "A" Curb ( ) LF 41 $ $ 2, $ $ 2, $ $ 1, $ $ 1, Type "E" Curb ( ) LF 555 $ $ 30, $ $ 16, $ $ 13, $ $ 19, Concrete Driveway Approach ( ) SF 360 $ $ 7, $ $ 5, $ $ 9, $ $ 5, Concrete Bus Pad ( ) SF 106 $ $ 2, $ $ 7, $ $ 5, $ $ 2, Remove and Construct Concrete Stairs ( ) LS 1 $ 7, $ 7, $ 5, $ 5, $ 9, $ 9, $ 11, $ 11, Structural Excavation (Retaining Wall) ( ) CY 230 $ $ 8, $ $ 31, $ $ 14, $ $ 14, Structural Concrete (Retaining Wall - Footing) ( ) CY 30 $ $ 19, $ 1, $ 30, $ $ 20, $ 1, $ 30, Page 41 of 2

5 CITY OF NOVATO ABSTRACT OF BIDS AND AWARD OF CONTRACT PROJECT NAME : Nave Drive Multi Use Path (MUP) BID NO. : PROJECT NO. : CIP DATE : 19-May-2015 BID OPENING : 2:00 pm BIDDERS Engineer's Estimate Maggiora & Ghilotti, Inc Team Ghilotti, Inc W.R. Forde Associates Item TOTAL BID $486, $573, $601, $654, No. DESCRIPTION Unit Qty Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 26 Structural Concrete (Retaining Wall) ( ) CY 40 $ $ 32, $ 1, $ 54, $ 1, $ 56, $ 2, $ 104, Pervious Backfill (Retaining Wall) ( ) CY 130 $ $ 3, $ $ 23, $ $ 16, $ $ 11, Bioretention Facility ( ) LS 1 $ 25, $ 25, $ 20, $ 20, $ 20, $ 20, $ 35, $ 35, Self-Retaining Area ( ) LS 1 $ 7, $ 7, $ 10, $ 10, $ 12, $ 12, $ 10, $ 10, Road Widening Deep Lift HMA ( ) TON 200 $ $ 40, $ $ 50, $ $ 38, $ $ 60, HMA Base Course ( ) TON 55 $ $ 9, $ $ 8, $ $ 10, $ $ 11, Plane Existing AC Pavement 0.15' ( ) SY 390 $ 7.00 $ 2, $ $ 8, $ $ 5, $ $ 5, Pavement Reinforcing Fabric ( ) SY 440 $ 4.00 $ 1, $ 8.50 $ 3, $ 8.50 $ 3, $ 5.00 $ 2, HMA Surface Course (0.15') ( ) TON 180 $ $ 23, $ $ 36, $ $ 27, $ $ 27, Thermoplastic Pavement Stripe Detail 22 ( ) LF 385 $ 2.00 $ $ 1.80 $ $ 1.75 $ $ 2.00 $ Thermoplastic Pavement Stripe Detail 29 ( ) LF 530 $ 3.50 $ 1, $ 3.50 $ 1, $ 3.50 $ 1, $ 3.50 $ 1, Thermoplastic Pavement Stripe Detail 38 ( ) LF 330 $ 2.00 $ $ 1.50 $ $ 1.50 $ $ 1.50 $ Thermoplastic Pavement Stripe Detail 39 ( ) LF 1,700 $ 1.25 $ 2, $ 0.75 $ 1, $ 0.75 $ 1, $ 0.75 $ 1, Thermoplastic Pavement Stripe Detail 39A ( ) LF 144 $ 1.25 $ $ 0.50 $ $ 0.45 $ $ 0.50 $ Thermoplastic Pavement Marking - White ( ) SF 90 $ 4.00 $ $ 4.00 $ $ 4.00 $ $ 4.00 $ MUP Marking - 4" Retroreflective Yellow Stripe ( ) LF 320 $ 2.00 $ $ 1.25 $ $ 1.25 $ $ 1.35 $ Roadway Signs ( ) EACH 10 $ $ 3, $ $ 2, $ $ 2, $ $ 2, Chain Link Railing ( ) LF 125 $ $ 3, $ $ 6, $ $ 11, $ $ 6, Fixed Bollard ( ) EACH 11 $ $ 4, $ $ 3, $ $ 6, $ $ 3, Removable Bollard ( ) EACH 6 $ $ 3, $ 1, $ 7, $ 1, $ 8, $ 1, $ 7, Replacement Tree - 15 Gallon ( ) EACH 9 $ $ 4, $ $ 7, $ $ 4, $ $ 7, Construct MUP Lighting Trench (10-3) LF 1,590 $ $ 23, $ $ 31, $ $ 23, $ $ 31, MUP Lighting (10-3) EACH 21 $ 3, $ 69, $ 2, $ 42, $ 2, $ 60, $ 2, $ 42, Extra Work Allowance ( ) LS 1 $ 10, $ 10, $ 10, $ 10, $ 10, $ 10, $ 10, $ 10, TOTAL BASE BID $486, $573, $601, $654, Alternate Bid Items 1A Substitute Solar LED Lighting ( ) EACH $6, , $95, , $62, , $84, A Substitute Wooden Split-Rail Fence ( ) LF $31, $43, $53, $38, RECOMMENDATION : OTHER INFORMATION : Award contract to Maggiora Ghilotti, Inc. Verified By : Julian Skinner Submitted By : Petr Skala as the lowest responsible bidder for the Base Bid in the amount of $573, Page 2 of 2

6 CITY COUNCIL OF THE CITY OF NOVATO RESOLUTION NO. RESOLUTION AMENDING BUDGET RESOLUTION ALLOCATING GENERAL FUND (101) IN TOTAL AMOUNT OF $222,370 TO NAVE DRIVE MULTI USE PATH, CIP PROJECT NO WHEREAS, the City Council of the City of Novato has adopted a final Capital Improvement Program (CIP) budget for fiscal Year 2014/2015; and WHEREAS, the Project Development (410) account for CIP project , Nave Drive Multi Use Path is underfunded compared with expended funds; and WHEREAS, there are insufficient funds in the Construction (430) account for CIP project , Nave Drive Multi Use Path to award a contract based on the apparent low bid and allowing for 10% contingency; and WHEREAS, adoption of a budget resolution is required to cover the Project Development (410) increase and anticipated Construction (430) cost based on low bid and allowing for 10% contingency; and WHEREAS, there is funding available as an allocation of General Fund (101); and WHEREAS, it is necessary to revise Resolution to amend the budget amounts for CIP Project No , Nave Drive Multi Use Path. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Novato hereby approves this budget amendment for CIP project , Nave Drive Multi Use Path and providing for the revised appropriations as follows: 1. Allocate General Fund (101) in the amount of $12,000 to Project Development (410) account of CIP Project No , Nave Drive Multi-Use Path and 2. Allocate General Fund (101) in the amount of $210,370 to Construction (430) account of CIP Project No , Nave Drive Multi-Use Path. * * * * * * I HEREBY CERTIFY that the foregoing resolution was duly and regularly adopted by the City Council of the City of Novato, Marin County, California, at a meeting thereof, held on the 9 th day of June, 2015, by the following vote, to wit: AYES: NOES: ABSTAIN: ABSENT: Councilmembers Councilmembers Councilmembers Councilmembers res

7 City Clerk of the City of Novato Approved as to form: City Attorney of the City of Novato res

8 GRAPHIC SCALE PROJECT LOCATION SCALE: 1:24,000 PROJECT NAME: Nave Multi Use Path; CIP No: PROJECT LOCATION: Nave Drive between Main Gate Road and Bolling Drive. LOCATION MAP 8

9 Nave Drive Multi Use Path Project No.: R1 Base Code: 431 Funded Project Objective: To improve Nave Drive from Main Gate Road to Bolling Drive to include a multi-use path along the east side and a dedicated left turn lane for southbound traffic entering the Hamilton School/ Gym parking lot. Project Description and Background: In 2013 staff started receiving requests from residents in the Hamilton area for improved pedestrian facilities along Nave Drive in the vicinity of the Hamilton Meadows school and new gym. Staff applied for and recieved two consecutive rounds of Transportation for Clean Air (TFCA) grant through the Bay Area Air Quality Management District, that provide the majority of the funding. Since the filing of the first TFCA grant, an additional improvement (left turn lane) has been identified as a benefit, increasing the proposed cost. Basis for Cost Estimate: The costs are based on the engineer's estimate, which is based on preliminary plans only. Basis for Schedule: Construction is tentatively scheduled to take place in summer of 2015; The first round of TFCA funding has a November 2015 deadline for expenditure. Revenue Considerations: being funded with Gas Tax. Partial funding has been secured through the TFCA grant, and the gap closure is Sub Prior to Project Expenditure Objects 14/15 14/15 15/16 16/17 17/18 18/19 Total Proj Develop ,000 70,000 Construction , ,883 Construction Mgt ,000 47,000 TOTAL 585, ,883 Sub Prior to Funding Source Objects 14/15 14/15 15/16 16/17 17/18 18/19 Total Gas Tax (272) ,000 29,000 Gas Tax (272) ,050 65,050 Gas Tax (272) ,554 12,554 Grant BAAQMD (283) ,000 41,000 Grant BAAQMD (283) , ,833 Grant BAAQMD (283) ,446 34,446 TOTAL 0 585, ,883 CARRYOVER 0 PROPOSED E-41 10/20/2014 9

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details.

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details. STAFF REPORT MEETING DATE: September 12, 2017 TO: FROM: City Council David Dammuller, Senior Engineer Chris Blunk, Deputy Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City

More information

PRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer

PRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer G-6 STAFF REPORT MEETING DATE: June 12, 2018 TO: FROM: City Council Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213 www.novato.org PRESENTER: Christopher

More information

Petr Skala, Engineer II Christopher J. Blunk, Deputy Public Works Director/City Engineer

Petr Skala, Engineer II Christopher J. Blunk, Deputy Public Works Director/City Engineer STAFF REPORT MEETING DATE: March 28, 2017 TO: FROM: City Council Petr Skala, Engineer II Christopher J. Blunk, Deputy Public Works Director/City Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer

PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer STAFF REPORT MEETING DATE: July 11, 2017 TO: City Council FROM: Chris Blunk, Deputy Public Works Director/City Engineer PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer 922 Machin Avenue

More information

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT STAFF REPORT MEETING DATE: October 20, 2015 TO: FROM: City Council Cathy Capriola, Assistant City Manager Matt Greenberg, Park General Manager Tony Williams, Senior Civil Engineer 922 Machin Avenue Novato,

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager SAN PABLO SUBDIVISION LANDSCAPE & LIGHTING DISTRICT A-03

Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager SAN PABLO SUBDIVISION LANDSCAPE & LIGHTING DISTRICT A-03 I-10 STAFF REPORT MEETING DATE: May 22, 2018 TO: City Council FROM: Heather Hafer, Senior Management Analyst Kate Whan, Public Works Administrative Manager 922 Machin Avenue Novato, CA 94945 (415) 899-8900

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER ADVERTISEMENT FOR BIDS FOR THE MOFFETT DRIVE ( CIP 70224)

DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER ADVERTISEMENT FOR BIDS FOR THE MOFFETT DRIVE ( CIP 70224) AGENDA REPORT Agenda Item 9 Reviewed City Manager Finance Director N/ A MEETING DATE: APRIL 21, 2015 TO: JEFFREY C. PARKER, CITY MANAGER FROM: DOUGLAS S. STACK, DIRECTOR OF PUBLIC WORKS /CITY ENGINEER

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

Carla Hansen, Management Analyst II Peggy Flynn, Public Communications Coordinator Cathy Capriola, Assistant City Manager

Carla Hansen, Management Analyst II Peggy Flynn, Public Communications Coordinator Cathy Capriola, Assistant City Manager STAFF REPORT MEETING DATE: October 27, 2015 TO: FROM: City Council Carla Hansen, Management Analyst II Peggy Flynn, Public Communications Coordinator Cathy Capriola, Assistant City Manager 922 Machin Avenue

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

NOVATO GENERAL PLAN 2035 ENVIRONMENTAL IMPACT REPORT CONSULTANT SERVICES AGREEMENT AMENDMENT

NOVATO GENERAL PLAN 2035 ENVIRONMENTAL IMPACT REPORT CONSULTANT SERVICES AGREEMENT AMENDMENT G-3 STAFF REPORT MEETING DATE: September 26, 2017 TO: FROM: City Council Steve Marshall, Planning Manager 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org SUBJECT: NOVATO

More information

CONSULTANT SERVICES AGREEMENT AMENDMENT NO. 2 WITH RINCON CONSULTANTS FOR WORK ON THE NOVATO GENERAL PLAN 2035 ENVIRONMENTAL IMPACT REPORT

CONSULTANT SERVICES AGREEMENT AMENDMENT NO. 2 WITH RINCON CONSULTANTS FOR WORK ON THE NOVATO GENERAL PLAN 2035 ENVIRONMENTAL IMPACT REPORT STAFF REPORT MEETING DATE: January 9, 2018 TO: City Council FROM: Steve Marshall, Planning Manager PRESENTER: N/A 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org SUBJECT:

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

Addendum 1 13 TH Street Streetscape. September 1, 2017

Addendum 1 13 TH Street Streetscape. September 1, 2017 Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

Appendix B Example Project Designs and Engineers Opinion of Costs

Appendix B Example Project Designs and Engineers Opinion of Costs Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other

More information

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: FROM: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL STEVE MYRTER, P.E. DIRECTOR OF PUBLIC WORKS SUBJECT: RESOLUTION DECLARING

More information

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $

STRAIGHT STRIPE PAINTING, INC. 22b Remove Pavement Markings with Sand Blasting Per Hour 1 $ $ $ $ PAVEMENT MARKING STRAIGHT STRIPE PAINTING, AMERICAN PAVEMENT MARKING, LLC ITEM UNIT TOTAL UNIT TOTAL NUMBER DESCRIPTION UNIT QUANTITY COST AMOUNT COST AMOUNT 1 Mobilization L.S. 3 $ 400.00 $ 1,200.00 $

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 6.b Meeting Date: April 3, 2017 Department: Public Works Prepared by: Bill Guerin, Director of Public Works TOPIC: SAN RAFAEL CITY COUNCIL AGENDA REPORT City Manager Approval: File No.:

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Bob Brown, Community Development Director Annette Chavez, Chief Building Official Gail Papworth, Principal Human Resources Analyst

Bob Brown, Community Development Director Annette Chavez, Chief Building Official Gail Papworth, Principal Human Resources Analyst STAFF REPORT MEETING DATE: September 12, 2017 TO: FROM: City Council Bob Brown, Community Development Director Annette Chavez, Chief Building Official Gail Papworth, Principal Human Resources Analyst 922

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

STAFF REPORT. MEETING October 24, City Council. Regan M. Candelario, City Manager Jessica Deakyne, Senior Management Analyst

STAFF REPORT. MEETING October 24, City Council. Regan M. Candelario, City Manager Jessica Deakyne, Senior Management Analyst J-18 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Regan M. Candelario, City Manager Jessica Deakyne, Senior Management Analyst 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX

More information

MEETING NOTICE. City Council will be held at 5:30 p.m. in the City Council Chambers. located at 305 Third Avenue East.

MEETING NOTICE. City Council will be held at 5:30 p.m. in the City Council Chambers. located at 305 Third Avenue East. CITY OF TWIN FALLS, IDAHO MEETING NOTICE * * * * The Monday, November 19, 2012, regular meeting of the Twin Falls City Council will be held at 5:30 p.m. in the City Council Chambers located at 305 Third

More information

APPROVAL OF AGREEMENTS AUTHORIZING A NEW DEPOSITORY BANKING RELATIONSHIP WITH UMPQUA BANK

APPROVAL OF AGREEMENTS AUTHORIZING A NEW DEPOSITORY BANKING RELATIONSHIP WITH UMPQUA BANK STAFF REPORT MEETING DATE: January 27, 2015 TO: FROM: City Council Michael Frank, City Manager Cathy Capriola, Assistant City Manager Brian Cochran, Finance Manager Maureen Chapman, Accounting Supervisor

More information

SUBJECT: ADOPT RESOLUTIONS TO APPROVE STREET RESURFACING, CITY PROJECT NO :

SUBJECT: ADOPT RESOLUTIONS TO APPROVE STREET RESURFACING, CITY PROJECT NO : Agenda Item No: 6.b Meeting Date: April 16, 2018 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Public Works Prepared by: Bill Guerin, Director of Public Works City Manager Approval: File No.: 16.06.87

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: March 22, 2016 AGENDA ITEM #G-10 ITEM: Consider Approval of a Budget Amendment & Award of a Contract Asphalt Repairs to Hutch Paving, Inc. the Wayne

More information

Pavlick, Kenneth - DEN Date: :26:57-07'00'

Pavlick, Kenneth - DEN Date: :26:57-07'00' November 21, 2018 PIKES PEAK PARKING RESTORATION CONTRACT NO. 201845783 ADDENDUM NUMBER ONE This Addendum Number One supersedes and/or supplements all portions of the Contract Documents with which it conflicts.

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029 SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS NOTICE IS HEREBY GIVEN, that Sealed bids will be received at the office of the County Manager/Clerk of the Board of Supervisors, Hall of Justice

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project Public Works Commission ACTION CALENDAR July 14, 2009 To: From: Honorable Mayor and Members of the City Council Public Works Commission Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT

CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA ITEM NO. 8.11 CITY OF ELK GROVE CITY COUNCIL STAFF REPORT AGENDA TITLE: Adopt resolution approving the Rural Roads Shoulder Backing Improvements Project (WRM001) (Re-bid), authorizing the City Manager

More information

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF

More information

CA: RMM: rmd254/hpca City Council Meeting Santa Monica, California RESOLUTION NUMBER 7231(CCS) (City Council Series)

CA: RMM: rmd254/hpca City Council Meeting Santa Monica, California RESOLUTION NUMBER 7231(CCS) (City Council Series) CA: RMM: rmd254/hpca City Council Meeting 6-10-86 Santa Monica, California RESOLUTION NUMBER 7231(CCS) (City Council Series) A RESOLUTION OF THE CITY COUNCIL OF CITY OF SANTA MONICA ADOPTING THE PERCENT

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 22, 2008 DATE: July 15, 2008 SUBJECT: Approval of Resolutions and Questions to include in the 2008 Bond Referenda C. M. RECOMMENDATION:

More information

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

More information

2017/2018 OPERATING BUDGET AMENDMENT REQUEST FOR LIEB PROPERTY (1519 / 1521 / 1525 HILL ROAD, APNs , , -033, NOVATO)

2017/2018 OPERATING BUDGET AMENDMENT REQUEST FOR LIEB PROPERTY (1519 / 1521 / 1525 HILL ROAD, APNs , , -033, NOVATO) J-15 STAFF REPORT MEETING DATE: September 26, 2017 TO: FROM: City Council Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org SUBJECT:

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE 1. Building Permit EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE a. This fee schedule is applicable to all building permits issued by the City of Oldsmar, Building Division

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 6/5/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

Appendix E: Revenues and Cost Estimates

Appendix E: Revenues and Cost Estimates Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region

More information

CITY COUNCIL Quasi-Judicial Matter

CITY COUNCIL Quasi-Judicial Matter SUMMARY REPORT CITY COUNCIL Quasi-Judicial Matter c:::::t f Agenda No. Key Words: Landscaping Lighting District Meeting Date: July 12, 2016 PREPARED BY: ~ Janet Koster, Public Works Operations Manager~

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARSON, CALIFORNIA, REAFFIRMING RESOLUTION

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARSON, CALIFORNIA, REAFFIRMING RESOLUTION RESOLUTION NO. 17-111 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARSON, CALIFORNIA, REAFFIRMING RESOLUTION NO. 17-079 AND DECLARING A FISCAL EMERGENCY PURSUANT TO ARTICLE XIII C SECTION 2( b) OF

More information