Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
|
|
- Edgar Neal
- 6 years ago
- Views:
Transcription
1 JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350, $ 906, $ 1,233, $ 1,233, $ 1,159, $ 1,159, $ 1,451, $ 1,451, $ 1,556, $ 1,556, MAINTENANCE OF TRAFFIC 1.0 LS $ 508, $ 656, $ 355, $ 355, $ 265, $ 265, $ 1,071, $ 1,071, $ 340, $ 340, MAINTENANCE OF TRAFFIC (I-95) 1.0 LS $ 2,001, $ 1,000, $ 2,393, $ 2,393, $ 2,363, $ 2,363, $ 2,051, $ 2,051, $ 1,200, $ 1,200, CLEARING AND GRUBBING 1.0 LS $ 440, $ 395, $ 178, $ 178, $ 216, $ 216, $ 982, $ 982, $ 386, $ 386, EXISTING WALL REMOVAL LF $ $ $ $ 2, $ $ 10, $ 5.00 $ 1, $ $ 3, REGULAR EXCAVATION CY $ 6.88 $ $ 5.47 $ 95, $ 8.75 $ 153, $ 5.00 $ 87, $ 8.30 $ 145, EMBANKMENT (COMPACTED IN PLACE) CY $ $ $ 5.06 $ 118, $ $ 380, $ $ 468, $ $ 424, " TYPE B STABILIZED SUBGRADE SY $ 4.84 $ 6.26 $ 5.86 $ 225, $ 6.60 $ 253, $ 3.00 $ 115, $ 3.90 $ 149, OPTIONAL BASE GROUP SY $ $ $ $ 5, $ $ 3, $ $ $ $ 2, OPTIONAL BASE GROUP SY $ $ $ 8.66 $ 295, $ $ 532, $ $ 392, $ $ 512, OPTIONAL BASE GROUP SY $ $ $ $ 100, $ $ 139, $ $ 123, $ $ 134, SUPERPAVE ASPHALTIC CONCRETE SP-12.5 (TRAFFIC LEVEL C) TN $ $ $ $ 397, $ $ 406, $ $ 319, $ $ 439, ASPHALTIC CONCRETE FRICTION COURSE (1")(FC-9.5) TN $ $ $ $ 513, $ $ 545, $ $ 436, $ $ 641, ASPHALTIC CONCRETE OVERBUILD TYPE SP TN $ $ $ $ 94, $ $ 111, $ $ 103, $ $ 117, MILL EXISTING ASPHALT PAVEMENT (1" AVG. DEPTH) SY $ 3.01 $ 3.90 $ 3.92 $ 87, $ 2.40 $ 53, $ 2.60 $ 57, $ 3.10 $ 69, PIPE CULVERT (15") 8.0 LF $ $ $ $ 3, $ $ $ $ 3, $ $ 1, PIPE CULVERT (18") LF $ $ $ $ 327, $ $ 408, $ $ 318, $ $ 531, PIPE CULVERT (24") LF $ $ $ $ 99, $ $ 110, $ $ 97, $ $ 152, PIPE CULVERT (29" X 45")(36" EQUIV) LF $ $ $ $ 34, $ $ 30, $ $ 34, $ $ 46, PIPE CULVERT (30") LF $ $ $ $ 47, $ $ 53, $ $ 46, $ $ 64, PIPE CULVERT (36") LF $ $ $ $ 253, $ $ 272, $ $ 245, $ $ 301, PIPE CULVERT (48") 4.0 LF $ 1, $ $ 2, $ 8, $ $ 2, $ 2, $ 8, $ 1, $ 5, INLETS (CURB) (TYPE P-5) (<10') 22.0 EA $ 5, $ 4, $ 6, $ 138, $ 3, $ 84, $ 6, $ 134, $ 6, $ 148, INLET (CURB) (TYPE J-5) (<10') 11.0 EA $ 8, $ 6, $ 9, $ 105, $ 5, $ 61, $ 9, $ 102, $ 9, $ 107, INLETS (CURB) (TYPE P-6) (<10') 12.0 EA $ 6, $ 6, $ 7, $ 85, $ 3, $ 46, $ 6, $ 82, $ 7, $ 88, INLET (CURB) (TYPE J-6) (<10') 3.0 EA $ 8, $ 7, $ 9, $ 28, $ 5, $ 17, $ 9, $ 27, $ 11, $ 33, INLET (DITCH BOTTOM) (TYPE C) 1.0 EA $ 3, $ 2, $ 3, $ 3, $ 2, $ 2, $ 3, $ 3, $ 4, $ 4, INLETS (CURB) (DITCH BOTTOM) (TYPE E) (<10') 3.0 EA $ 4, $ 4, $ 4, $ 13, $ 2, $ 8, $ 4, $ 13, $ 5, $ 17, INLET (DITCH BOTTOM) (TYPE E) (J-BOTTOM) 2.0 EA $ 7, $ 5, $ 8, $ 16, $ 4, $ 8, $ 8, $ 16, $ 8, $ 17, INLET (CURB) (TYPE P-9) 2.0 EA $ 4, $ 3, $ 4, $ 9, $ 2, $ 5, $ 4, $ 9, $ 5, $ 10, INLET (GUTTER) (TYPE S) 2.0 EA $ 4, $ 3, $ 5, $ 10, $ 2, $ 5, $ 5, $ 10, $ 5, $ 10, BARRIER WALL INLET 5.0 EA $ 6, $ 6, $ 6, $ 31, $ 4, $ 20, $ 6, $ 30, $ 8, $ 40, ADJUST INLETS 1.0 EA $ 1, $ 1, $ 2, $ 2, $ $ $ 2, $ 2, $ 2, $ 2, ADJUST MANHOLE 1.0 EA $ 1, $ $ 1, $ 1, $ $ $ 1, $ 1, $ 2, $ 2, MANHOLE (TYPE P-7) (<10') 2.0 EA $ 3, $ 4, $ 3, $ 7, $ 2, $ 5, $ 3, $ 7, $ 5, $ 10, MANHOLE (TYPE J-7) (<10') 2.0 EA $ 6, $ 9, $ 7, $ 14, $ 4, $ 8, $ 7, $ 14, $ 8, $ 16, MANHOLE (TYPE P-8) 15.0 EA $ 3, $ 4, $ 3, $ 52, $ 3, $ 46, $ 3, $ 50, $ 5, $ 76, MANHOLE (TYPE P-8) (PARTIAL) 1.0 EA $ 2, $ 3, $ 2, $ 2, $ 2, $ 2, $ 2, $ 2, $ 3, $ 3, MANHOLE (TYPE J-8) 8.0 EA $ 7, $ 4, $ 9, $ 72, $ 4, $ 34, $ 8, $ 70, $ 8, $ 68, MITERED END SECTION 18" (4:1) 1.0 EA $ 2, $ 1, $ 2, $ 2, $ $ $ 2, $ 2, $ 4, $ 4, MITERED END SECTION 36" (4:1) 3.0 EA $ 4, $ 2, $ 4, $ 12, $ 1, $ 5, $ 4, $ 12, $ 7, $ 23, STORM SEWER PUMPING (EXIST.) (24" OR LESS) (SEE S.P.'S) lf $ 6.64 $ 4.78 $ 5.55 $ 6, $ $ 12, $ 5.00 $ 5, $ 5.00 $ 5, MISCELLANEOUS ASPHALT PAVEMENT TN $ $ $ $ 37, $ $ 30, $ $ 46, $ $ 23, SODDING SY $ 3.19 $ 2.79 $ 3.84 $ 127, $ 3.00 $ 99, $ 3.00 $ 99, $ 2.90 $ 96, MONITOR EXIST STRUCTS - INSPECTION AND SETTLEMENT MONITORING 1.0 LS $ 9, $ 11, $ $ $ 14, $ 14, $ 1, $ 1, $ 20, $ 20, MONITOR EXIST STRUCTS - VIBRATION MONITORING 1.0 LS $ 8, $ 15, $ $ $ 19, $ 19, $ 1, $ 1, $ 12, $ 12, F:\ROADWAY\PRO\2014\ & \3_Award Spec Forms\1_Bid Tabulations\ & Bid Tabs Page 1 of 6
2 JW Cheatham, 47 RIP-RAP, SAND CEMENT 36.2 CY $ $ $ $ 19, $ $ 6, $ $ 19, $ 1, $ 40, FENCING, TYPE B, 6' HEIGHT LF $ $ $ $ 6, $ $ 8, $ $ 1, $ $ 5, FENCE GATE (TYPE B) SWINGING (12') 1.0 EA $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, " SCHD 80 PVC IRRIGATION SLEEVE LF $ $ $ $ 40, $ 4.75 $ 9, $ $ 39, $ $ 35, CONCRETE CURB TYPE D LF $ $ $ $ 2, $ $ 2, $ $ 2, $ $ 3, CONCRETE CURB AND GUTTER TYPE F LF $ $ $ $ 374, $ $ 342, $ $ 317, $ $ 352, CONCRETE BARRIER WALL (RIGID) (CURB AND GUTTER) LF $ $ $ $ 297, $ $ 302, $ $ 265, $ $ 287, CONCRETE SHOULDER GUTTER LF $ $ $ $ 11, $ $ 11, $ $ 11, $ $ 12, CONCRETE SIDEWALK (4" THICK) SY $ $ $ $ 266, $ $ 223, $ $ 214, $ $ 236, CONCRETE SIDEWALK (6" THICK) SY $ $ $ $ 63, $ $ 61, $ $ 37, $ $ 62, ENGRAVING OF CURB FACE 10.0 EA $ $ $ $ 3, $ $ 2, $ $ 2, $ $ 2, CLASS NS CONCRETE (GRAVITY WALL) CY $ $ $ $ 54, $ $ 89, $ $ 56, $ $ 89, STEEL GUIDERAIL LF $ $ $ $ 132, $ $ 131, $ $ 125, $ $ 119, ROADWAY GUARDRAIL LF $ $ $ $ 128, $ $ 92, $ $ 103, $ $ 96, GUARDRAIL REMOVAL LF $ 1.66 $ 3.75 $ 1.78 $ 9, $ 1.75 $ 8, $ 1.60 $ 8, $ 1.50 $ 7, THRIE-BEAM GUARDRAIL ATTACHMENT TO BRIDGE 4.0 EA $ 3, $ 2, $ 3, $ 14, $ 3, $ 14, $ 3, $ 14, $ 3, $ 14, SPECIAL SHOE GUARDRAIL ATTACHMENT TO BRIDGE 1.0 EA $ $ 2, $ 1, $ 1, $ 1, $ 1, $ $ $ $ GUARDRAIL END ANCHORAGE TYPE II 3.0 EA $ 1, $ $ 1, $ 3, $ 1, $ 3, $ $ 2, $ $ 2, GUARDRAIL END ANCHORAGE TYPE PARALLEL 6.0 EA $ 3, $ 2, $ 3, $ 19, $ 3, $ 19, $ 3, $ 19, $ 3, $ 18, SPECIAL GUARDRAIL POST 6.0 EA $ $ $ $ 1, $ $ 1, $ $ 1, $ $ 1, ENCASED GUARDRAIL POST 3.0 EA $ $ $ $ $ $ $ $ $ $ COLOR TREATED AND STAMPED CONCRETE SEPARATOR SY $ $ $ $ 25, $ $ 30, $ $ 23, $ $ 28, " PVC SCHD 40 CONDUIT TRAFFIC F/O CABLE LF $ 7.48 $ $ 7.45 $ 6, $ 6.80 $ 5, $ 7.25 $ 6, $ 8.40 $ 7, SUBTOTAL (ROADWAY) $ 9,141, $ 9,391, $ 10,442, $ 9,496, BRIDGE 70 CLASS II STRUCTURAL CONCRETE (DECK) CY $ $ $ $ 284, $ $ 228, $ $ 276, $ $ 295, REINFORCING STEEL (SUPERSTRUCTURE) LB $ 1.20 $ 1.00 $ 1.11 $ 92, $ 1.50 $ 125, $ 1.10 $ 91, $ 1.10 $ 91, BRIDGE DECK EXPANSION JOINTS 94.0 LF $ $ $ $ 6, $ $ 16, $ $ 6, $ $ 9, BRIDGE DECK GROOVING - DECK THICKNESS LESS THAN 8.5" SY $ $ 9.50 $ $ 15, $ $ 22, $ $ 15, $ $ 15, CLASS II STRUCTURAL CONCRETE (APPROACH SLAB) CY $ $ $ $ 56, $ $ 23, $ $ 54, $ $ 71, REINFORCING STEEL (APPROACH SLAB) LB $ 1.23 $ 1.00 $ 1.11 $ 24, $ 1.50 $ 32, $ 1.10 $ 23, $ 1.20 $ 25, CONCRETE TRAFFIC RAILING - BRIDGE 32" F-SHAPE LF $ $ $ $ 102, $ $ 148, $ $ 78, $ $ 76, CONCRETE PARAPET - PEDESTRIAN /BICYCLE LF $ $ $ $ 251, $ $ 264, $ $ 213, $ $ 236, ALUMINUM BULLET RAILING - DOUBLE RAIL LF $ $ $ $ 57, $ $ 79, $ $ 77, $ $ 53, PRESTRESSED BEAMS, FLORIDA I BEAMS, FIB LF $ $ $ $ 744, $ $ 943, $ $ 713, $ $ 734, NEOPRENE BEARING PADS 24.0 CF $ 1, $ $ 1, $ 26, $ 1, $ 35, $ 1, $ 25, $ $ 23, CLASS IV STRUCTURAL CONCRETE (SUBSTRUCTURE) 92.9 CY $ 1, $ 1, $ 1, $ 92, $ 1, $ 105, $ $ 90, $ 1, $ 135, CLASS IV STRUCTURAL CONCRETE (MASS-STRUCTURE) CY $ 1, $ $ $ 96, $ $ 100, $ $ 93, $ 1, $ 214, CLEANING AND COATING CONCRETE SURFACE, CLASS SF $ 1.69 $ 1.70 $ 1.40 $ 14, $ 3.30 $ 33, $ 1.05 $ 10, $ 1.00 $ 10, REINFORCING STEEL (SUBSTRUCTURE) LB $ 1.28 $ 1.00 $ 1.11 $ 42, $ 1.50 $ 57, $ 1.10 $ 42, $ 1.40 $ 53, STRUCTURAL CONCRETE (18" PRESTRESSED PILES) LF $ $ $ $ 76, $ $ 162, $ $ 74, $ $ 120, STRUCTURAL CONCRETE (24" PRESTRESSED PILES) LF $ $ $ $ 76, $ $ 142, $ $ 74, $ $ 118, TEST PILES - PRESTRESSED CONCRETE, 18" SQ 65.0 LF $ $ $ $ 21, $ $ 13, $ $ 21, $ $ 59, TEST PILES - PRESTRESSED CONCRETE, 24" SQ LF $ $ $ $ 68, $ $ 42, $ $ 67, $ $ 80, CONCRETE SLOPE PAVEMENT, 4" NON REINFORCED SY $ $ $ $ 12, $ $ 25, $ $ 12, $ $ 30, RETAINING WALL SYSTEM SF $ $ $ $ 1,187, $ $ 1,094, $ $ 1,122, $ $ 1,707, F:\ROADWAY\PRO\2014\ & \3_Award Spec Forms\1_Bid Tabulations\ & Bid Tabs Page 2 of 6
3 JW Cheatham, 91 EDC INSTRUMENTATION AND INSTALLATION (TEST & PRODUCTION PILES) 38.0 EA $ 1, $ 1, $ 1, $ 46, $ 1, $ 62, $ 1, $ 45, $ 1, $ 71, REMOVAL OF EXISTING STRUCTURES 1.0 LS $ 9, $ 10, $ 5, $ 5, $ 26, $ 26, $ 1, $ 1, $ 4, $ 4, CONCRETE TRAFFIC RAILING - BRIDGE 32" F-SHAPE LF $ $ $ $ 47, $ $ 83, $ $ 46, $ $ 40, CLASS II STRUCTURAL CONCRETE (APPROACH SLAB) 11.5 CY $ $ $ 1, $ 11, $ $ 6, $ $ 11, $ 1, $ 13, REINFORCING STEEL (APPROACH SLAB) LB $ 3.13 $ 1.25 $ 1.11 $ 2, $ 1.50 $ 2, $ 1.10 $ 2, $ 8.80 $ 16, ALUMINUM BULLET RAILING - DOUBLE RAIL LF $ $ $ $ 13, $ $ 18, $ $ 18, $ $ 12, BRIDGE DECK EXPANSION JOINT, REHAB, POURED JOINT W/BACKER ROD 11.0 LF $ $ $ $ 1, $ $ 1, $ $ 1, $ $ 4, SUBTOTAL (BRIDGE) $ 3,481, $ 3,901, $ 3,311, $ 4,327, ITS 98 CONDUIT (F&I) (OPEN TRENCH) LF $ 6.49 $ 7.25 $ 5.40 $ 4, $ 5.30 $ 4, $ 5.25 $ 4, $ $ 9, FIBER OPTIC CABLE (UNDERGROUND)( FIBERS) LF $ 3.88 $ 3.20 $ 3.90 $ 89, $ 4.00 $ 92, $ 3.80 $ 87, $ 3.80 $ 87, FIBER OPTIC CABLE (REMOVE) (UNDERGROUND) LF $ 0.49 $ 1.50 $ 0.45 $ 10, $ 0.55 $ 12, $ 0.45 $ 10, $ 0.50 $ 11, FIBER OPTIC CONNECTION (INSTALL) (SPLICE) EA $ $ $ $ 12, $ $ 15, $ $ 12, $ $ 14, PULL & SPLICE BOX (F&I) (24"X36" COVER SIZE) 1.0 EA $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, $ 1, ELECTRIC SERVICE WIRE LF $ 3.53 $ 6.00 $ 3.10 $ 2, $ 2.60 $ 2, $ 3.00 $ 2, $ 5.40 $ 5, FIBER OPTIC SPLICE ENCLOSURE 7.0 EA $ $ $ $ 6, $ 1, $ 7, $ $ 5, $ 1, $ 8, FIBER OPTIC TRAY 7.0 EA $ $ $ $ $ $ $ $ $ $ SUBTOTAL (ITS) $ 129, $ 136, $ 126, $ 138, SIGNALIZATION " PVC (SCH 40) UNDERGROUND CONDUIT LF $ 6.16 $ 7.25 $ 5.40 $ 30, $ 5.80 $ 33, $ 5.25 $ 30, $ 8.20 $ 46, " (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) LF $ $ $ $ 44, $ $ 45, $ $ 42, $ $ 38, " (HDPE SDR 11) UNDER PAVEMENT CONDUIT (DIRECTIONAL BORE) LF $ $ $ $ 27, $ $ 25, $ $ 26, $ $ 21, A SIGNAL CABLE (SPAN LENGTH 0' - 250') 1.0 PI $ 1, $ $ $ $ $ $ $ $ 4, $ 4, E SIGNAL CABLE (SPAN LENGTH 551' - 650') 2.0 PI $ 6, $ 7, $ 5, $ 10, $ 6, $ 13, $ 4, $ 9, $ 8, $ 16, G SIGNAL CABLE (SPAN LENGTH 751' - Greater) 2.0 PI $ 7, $ 6, $ 8, $ 16, $ 5, $ 10, $ 7, $ 15, $ 9, $ 19, A PEDESTRIAN SIGNAL CABLE - 4 CONDUCTOR 1.0 PI $ 1, $ 1, $ $ $ $ $ $ $ 1, $ 1, A PEDESTRIAN SIGNAL CABLE - 7 CONDUCTOR 1.0 PI $ 1, $ 1, $ 1, $ 1, $ 2, $ 2, $ 1, $ 1, $ 1, $ 1, FIBER OPTIC CABLE, (FSM) 12-COUNT (UNDERGROUND) LF $ 2.74 $ 1.75 $ 2.55 $ 1, $ 3.10 $ 1, $ 2.50 $ 1, $ 2.80 $ 1, FIBER OPTIC CABLE, (FSM) 48-COUNT (UNDERGROUND) LF $ 2.74 $ 1.95 $ 2.55 $ 13, $ 3.10 $ 16, $ 2.50 $ 13, $ 2.80 $ 14, FIBER OPTIC CONN. HADWR. (F&I) (SPLICE ENCLOSURE) 3.0 EA $ 1, $ $ $ 2, $ 1, $ 3, $ $ 2, $ 1, $ 4, FIBER OPTIC CONN. HADWR. (F&I) (SPLICE TRAY) 3.0 EA $ $ $ $ $ $ $ $ $ $ FIBER OPTIC CONNECTION, INSTALL SPLICE 36.0 EA $ $ $ $ 1, $ $ 1, $ $ 1, $ $ 1, FIBER OPTIC CONNECTION, INSTALL TERMINATION 3.0 EA $ 1, $ 1, $ 1, $ 4, $ 1, $ 5, $ 1, $ 4, $ 1, $ 5, PULL BOX (13" x 24" x 12"D) HEAVY DUTY COVERS (TIER 15) 60.0 EA $ $ $ $ 24, $ $ 52, $ $ 23, $ $ 49, A PULL BOX (17" x 30" x 12"D) HEAVY DUTY COVERS (TIER 15) 3.0 EA $ $ $ $ 1, $ $ 2, $ $ 1, $ 1, $ 3, B PULL BOX (17" x 30" x 24"D) HEAVY DUTY SPLIT COVERS (ITS) (TIER 15) 11.0 EA $ $ $ $ 7, $ 1, $ 11, $ $ 7, $ 1, $ 14, A PULL BOX (30" x 48" x 24"D) HEAVY DUTY SPLIT COVERS (ITS) (TIER 15) 5.0 EA $ 1, $ 1, $ 1, $ 9, $ 1, $ 7, $ 1, $ 9, $ 2, $ 11, ELECTRICAL POWER SERVICE (UNDERGROUND) 3.0 AS $ 2, $ 2, $ 2, $ 6, $ 2, $ 6, $ 2, $ 6, $ 3, $ 11, ELECTRICAL SERVICE WIRE (SIGLE PHASE 3-WIRE, TRIPLEX) LF $ 3.70 $ 6.00 $ 3.35 $ $ 2.70 $ $ 3.25 $ $ 5.50 $ 1, ELECTRICAL SERVICE DISCONNECT 3.0 EA $ $ $ $ $ $ 2, $ $ $ 1, $ 3, B CONCRETE POLE REMOVAL - DEEP (INCLUDES POLE AND COMPLETE 127 REMOVAL OF THE POLE FOUNDATIOND DEPTH OF UP TO 25 FEET) INCLUDES DISPOSAL EA $ 4, $ 5, $ 6, $ 24, $ 4, $ 19, $ 5, $ 23, $ 2, $ 8, OF POLE WHEN INSTRUCTED BY ENGINEER ALUMINUM SIGNALS POLE, PEDESTAL WITH TRANSFORMER BASE (8 FEET ABOVE GROUND) 25.0 EA $ 1, $ 1, $ $ 24, $ 1, $ 34, $ $ 23, $ 1, $ 26, SIGNAL PEDESTAL, REMOVE 8.0 EA $ $ $ $ $ $ $ $ $ $ 1, MAST ARM ASSY D3-S22 46' W/LUM (POWDER COATED FINISH) 2.0 EA $ 34, $ 31, $ 32, $ 65, $ 34, $ 68, $ 31, $ 63, $ 40, $ 80, F:\ROADWAY\PRO\2014\ & \3_Award Spec Forms\1_Bid Tabulations\ & Bid Tabs Page 3 of 6
4 JW Cheatham, MAST ARM ASSY D5-S23 60' W/LUM (POWDER COATED FINISH) 5.0 EA $ 41, $ 37, $ 39, $ 196, $ 41, $ 207, $ 38, $ 190, $ 46, $ 233, MAST ARM ASSY D6-S24 70' 6" W/LUM (POWDER COATED FINISH) 3.0 EA $ 47, $ 41, $ 46, $ 140, $ 48, $ 144, $ 45, $ 136, $ 50, $ 150, CUSTOM M.A CUSTOM M.A (F&I) (DOUBLE ARM/ W LUMINARE ) 1.0 EA $ 52, $ 50, $ 52, $ 52, $ 48, $ 48, $ 51, $ 51, $ 58, $ 58, REMOVE STEEL MAST ARM ASSEMBLY - DEEP REMOVAL (INCLUDES ARM (S), UPRIGHT AND WHOLE BURIED ATTACHMENTS TO THE DEPTH OF EXISTING FOUDATION BELOW GROUND) INCLUDES DELIVERY OF REMOVED MAST ARM EQUIPMENT) TRAFFIC SIGNAL HEAD ALUMINUM (3-SECTION, 1-WAY) INCLUDES EA $ 9, $ 10, $ 9, $ 9, $ 13, $ 13, $ 9, $ 9, $ 3, $ 3, BACKPLATES 35.0 AS $ 1, $ 1, $ 1, $ 35, $ 1, $ 37, $ $ 34, $ $ 34, TRAFFIC SIGNAL HEAD ALUMINUM (4-SECTION, 1-WAY) INCLUDES BACKPLATES 2.0 AS $ 1, $ 1, $ 1, $ 3, $ 1, $ 2, $ 1, $ 2, $ 1, $ 2, TRAFFIC SIGNAL HEAD ALUMINUM (5-SECTION, 1-WAY) INCLUDES BACKPLATES 6.0 AS $ 1, $ 1, $ 1, $ 9, $ 1, $ 10, $ 1, $ 9, $ 1, $ 8, TRAFFIC SIGNAL HEAD ASSEMBLY, REMOVAL 4.0 EA $ $ $ $ $ $ $ $ $ $ PEDESTRIAN SIGNAL - COUNT DOWN (1-WAY) ALUMINUM 22.0 EA $ $ $ $ 14, $ $ 15, $ $ 13, $ $ 16, PEDESTRIAN SIGNAL - COUNT DOWN (2-WAY) ALUMINUM 3.0 EA $ 1, $ 1, $ 1, $ 3, $ 1, $ 3, $ 1, $ 3, $ 1, $ 4, RECTANGULAR RAPID FLASHING BEACON, SOLAR POWERED, SINGLE DIRECTION 2.0 EA $ 9, $ 10, $ 10, $ 20, $ 6, $ 13, $ 9, $ 19, $ 9, $ 19, B3 VIDEO IMAGE DETECTION 3 - CAMERA SYSTEM (ITERIS) COMPLETE. 1.0 EA $ 25, $ 25, $ 25, $ 25, $ 24, $ 24, $ 25, $ 25, $ 26, $ 26, B4 VIDEO IMAGE DETECTION 4 - CAMERA SYSTEM (ITERIS) COMPLETE. 3.0 EA $ 30, $ 30, $ 32, $ 98, $ 29, $ 89, $ 31, $ 95, $ 29, $ 87, PEDESTRIAN DETECTOR (PUSH BUTTON) 28.0 EA $ $ $ $ 4, $ $ 4, $ $ 4, $ $ 6, A TRAFFIC CONTROLLER ASSEMBLY (TYPE 5) AS PER NAZTEC 3.0 AS $ 27, $ 31, $ 29, $ 87, $ 24, $ 74, $ 28, $ 84, $ 29, $ 87, REMOVE CONTROLLER ASSEMBLY COMPLETE WITH FOUNDATION - INCLUDES DELIVERY OF REMOVED CONTROLLER EQUIPMENT 1.0 EA $ $ $ $ $ $ $ $ $ $ MANAGED FIELD ETHERNET SWITCH (F&I) 3.0 EA $ 3, $ 2, $ 3, $ 9, $ 3, $ 11, $ 3, $ 9, $ 3, $ 10, UNINTERRUPTIBLE POWER SUPPLY (F&I) (LINE INTERACTIVE) 3.0 EA $ 6, $ 5, $ 9, $ 28, $ $ 1, $ 9, $ 27, $ 5, $ 17, REMOVE MISCELLANEOUS SIGNAL EQUIPMENT 5.0 EA $ $ 1, $ $ 4, $ $ $ $ 4, $ 1, $ 9, INTERNALLY ILLUMINATED SIGN (8') FLUORESCENT 10.0 EA $ 3, $ 3, $ 3, $ 33, $ 3, $ 30, $ 3, $ 33, $ 3, $ 33, SUBTOTAL (SIGNALIZATION) $ 1,099, $ 1,101, $ 1,069, $ 1,200, LIGHTING 149 CONDUIT (F&I) (OPEN TRENCH) LF $ 6.05 $ 7.25 $ 5.40 $ 3, $ 6.05 $ 3, $ 5.25 $ 3, $ 7.50 $ 4, CONDUIT (F&I) (DIRECTIONAL BORE) LF $ $ $ $ 5, $ $ 5, $ $ 5, $ $ 4, CONDUIT (F&I) (BRIDGE MOUNT) LF $ $ $ $ 6, $ 9.80 $ 4, $ $ 6, $ $ 5, PULL & SPLICE BOX (F&I) (13"X24" COVER SIZE) 6.0 EA $ $ $ $ 2, $ $ 5, $ $ 2, $ $ 4, JUNCTION BOX, (F&I), MOUNTED 2.0 EA $ $ $ $ $ $ $ $ $ 2.10 $ ELECTRIC POWER SERVICE (F&I)(UNDERGROUND)(METER NOT REQ) 1.0 AS $ 2, $ 2, $ 2, $ 2, $ 1, $ 1, $ 2, $ 2, $ 2, $ 2, ELECTRIC SERVICE WIRE LF $ 2.93 $ 6.00 $ 3.35 $ 3, $ 2.60 $ 2, $ 3.25 $ 3, $ 2.50 $ 2, LIGHTING CONDUCTORS (F&I) (INSULLATED)(NO. 10 OR <) LF $ 0.99 $ 1.10 $ 0.85 $ 1, $ 1.30 $ 1, $ 0.80 $ $ 1.00 $ 1, LIGHTING CONDUCTORS (F&I) (INSULLATED)(NO. 8 TO 6) LF $ 1.25 $ 4.60 $ 1.20 $ $ 1.00 $ $ 1.20 $ $ 1.60 $ LIGHTING CONDUCTORS (F&I) (INSULLATED)(NO. 4 TO 2) LF $ 1.83 $ 2.25 $ 1.65 $ 6, $ 1.30 $ 4, $ 1.65 $ 6, $ 2.70 $ 9, LIGHT POLE COMPLETE (RELOCATE) 1.0 EA $ 2, $ 2, $ $ $ 5, $ 5, $ $ $ 4, $ 4, LOAD CENTER (F&I) (SECONDARY VOLTAGE) 1.0 EA $ 15, $ 12, $ 14, $ 14, $ 17, $ 17, $ 13, $ 13, $ 16, $ 16, LOAD CENTER (REMOVE) (SECONDARY VOLTAGE) 1.0 EA $ 1, $ $ $ $ 1, $ 1, $ $ $ 1, $ 1, LUMINAIRE (F&I) (UNDERDECK) (WALL MOUNT) 4.0 EA $ $ $ $ 3, $ 1, $ 4, $ $ 2, $ $ 3, POLE CABLE DISTRIBUTION SYSTEM (CONVENTIONAL) 1.0 EA $ $ $ $ $ $ $ $ $ $ POLE CABLE DISTRIBUTION SYSTEM (WALL MOUNT) 4.0 EA $ $ $ $ 1, $ $ 2, $ $ 1, $ $ 1, SUBTOTAL (LIGHTING) $ 52, $ 61, $ 51, $ 64, F:\ROADWAY\PRO\2014\ & \3_Award Spec Forms\1_Bid Tabulations\ & Bid Tabs Page 4 of 6
5 JW Cheatham, UTILITY FT DIAMETER WATER MAIN CONFLICT STRUCTURE 3.0 EA $ 14, N/A $ 14, $ 42, $ 7, $ 22, $ 13, $ 40, $ 23, $ 69, REVISED STORM INLET STRUCTURE/ WATER MAIN CONFLICT STRUCTURE 2.0 EA $ 14, N/A $ 16, $ 33, $ 3, $ 6, $ 16, $ 32, $ 20, $ 41, RELOCATE EXISTING 8" WATER MAIN WITH (4) 45 DEGREE BENDS 1.0 EA $ 6, N/A $ 7, $ 7, $ $ $ 7, $ 7, $ 10, $ 10, RELOCATE EXISTING 10" WATER MAIN WITH (4) 45 DEGREE BENDS 2.0 EA $ 7, N/A $ 8, $ 16, $ $ $ 7, $ 15, $ 11, $ 22, RELOCATE EXISTING 4" FORCE MAIN WITH (4) 45 DEGREE BENDS 3.0 EA $ 6, N/A $ 7, $ 21, $ $ 1, $ 6, $ 20, $ 10, $ 31, ADJUST EXISTING VALVE BOX COVERS TO MATCH FINISHED GRADES 10.0 EA $ N/A $ $ 9, $ $ 1, $ $ 9, $ 1, $ 15, ADJUST EXISTING WATER/SEWER ARV MANHOLE TOPS 2.0 EA $ 1, N/A $ 2, $ 4, $ $ $ 2, $ 4, $ 1, $ 3, CUT, PLUG & REMOVE ABANDONED 4" FORCE MAIN -10 LF SECTION 5.0 EA $ 1, N/A $ 1, $ 9, $ $ 4, $ 1, $ 8, $ 2, $ 12, CONTINGENCY SUBTOTAL (UTILITY) $ 144, $ 39, $ 140, $ 206, Premium for Conflict Condition (See SP's) 1.0 EA $ 16, $ 10, $ 6, $ 6, $ 46, $ 46, $ 6, $ 6, $ 8, $ 8, Class I Concrete (Miscellaneous ) 30.0 CY $ $ $ $ 8, $ $ 4, $ $ 5, $ $ 18, Flowable Fill 30.0 CY $ $ $ $ 15, $ $ 3, $ $ 5, $ $ 7, Changeable (Variable Message) Sign (Non MOT) ED $ $ $ $ 3, $ $ 3, $ $ 3, $ $ 3, Traffic Control Officer (Non MOT) HR $ $ $ $ 20, $ $ 12, $ $ 15, $ $ 15, Removal and Disposal of Unsuitable Material CY $ $ $ $ 3, $ $ 1, $ $ 2, $ $ 2, Storm Sewer Cleaning (Exist.) ( 24" Or Less ) (See SP's) LF $ 6.93 $ 4.41 $ 7.80 $ 9, $ $ 13, $ 7.00 $ 8, $ 1.90 $ 2, TREE SPADE UNIT 20.0 EA $ 1, $ $ $ 5, $ $ 17, $ 1, $ 22, $ 2, $ 40, PALM TREES RELOCATION UNIT 20.0 EA $ $ $ $ 3, $ $ 11, $ $ 10, $ 1, $ 28, Storm Sewer Cleaning (Exist.) (>48") (See SP's) 65.0 LF $ $ 6.00 $ $ 2, $ $ 2, $ $ 2, $ 7.40 $ P-7 Manhole Partial 1.0 EA $ 3, $ 3, $ 3, $ 3, $ 2, $ 2, $ 3, $ 3, $ 3, $ 3, Relocate Street Light - Gross Pointe Drive 5.0 EA $ 1, $ 2, $ $ 3, $ 3, $ 16, $ $ 3, $ 2, $ 10, SUBTOTAL (CONTINGENCY) $ 86, $ 135, $ 88, $ 140, TOTAL BID AMOUNT $14,135, $14,767, $15,229, $15,575, F:\ROADWAY\PRO\2014\ & \3_Award Spec Forms\1_Bid Tabulations\ & Bid Tabs Page 5 of 6
6 THE AND QUANTITIES SHOWN, SHALL GOVERN OVER THE PLANS. PAY ITEM FOOTNOTES IN CONSTRUCTION PLANS SHALL ALSO BE INCLUDED IN ITEM UNIT PRICE. PAY ITEM FOOTNOTES: 1 MOT SHALL INCLUDE THE COST OF ANY TEMPORARY PAVEMENT, AND TEMPORARY CONC. BARRIERS AS REQUIRED. 2 ALL SHALL INCLUDE COST TO FURNISH AND INSTALL UNLESS OTHERWISE NOTED. 3 CONCRETE SAW CUT, REMOVAL OF GUARDRAIL AND DISPOSAL (AS REQUIRED) IS INCLUDED IN THE WORK FOR "CLEARING AND GRUBBING", LS. 4 OPTIONAL BASE GROUP & ASPHALTIC CONCRETE INCLUDE BITUMINOUS MATERIAL & TACK COAT AS REQUIRED. 5 ALL STRUCTURE BOXES ARE 10 FEET OR LESS IN DEPTH UNLESS OTHERWISE NOTED. 6 THE COST OF BREAKING INTO EXISTING STRUCTURES IS INCIDENTAL TO COST OF PIPE. 7 THE COST FOR "SAW CUT AND BUTT JOINT", AS REQUIRED, SHALL BE INCIDENTAL TO THE RELATED ASPHALT ITEM. 8 SODDING SHALL BE IN ACCORDANCE WITH THE GENERAL PROVISIONS OF THESE SPECIFICATIONS. 9 CHANGEABLE (VARIABLE) MESSAGE SIGN (NON-MOT) AND TRAFFIC CONTROL OFFICERS (NON-MOT) SHALL BE IN ACCORDANCE WITH THE GENERAL PROVISIONS. 10 TREE SPADE UNIT INCLUDES RELOCATION OF TREES WITHIN THE PROJECT LIMITS. 11 PALM TREES RELOCATION UNIT INCLUDES RELOCATION OF TREES WITHIN THE PROJECT LIMITS 12 PREMIUM FOR CONFLICT CONDITION SHALL INCLUDE COSTS OF REQUIRED STEEL CASING, AS DIRECTED BY THE ENGINEER. 13 MAINTENANCE OF TRAFFIC (I-95) INCLUDES ALL THE WORK ASSOCIATED WITH I-95 (PAVEMENT, SODDING, PAVEMENT MARKING, ETC ) Working days to complete project: 540 calendar days (See Special Provisions) Bids as read at opening on Friday, June 16, 2017; 2:00 PM All bids subject to OSBA SBE compliance and Board Approval. Prepared by: Donna Lewis Checked by: Holly B. Knight, P.E., Contracts Section Manager F:\ROADWAY\PRO\2014\ & \3_Award Spec Forms\1_Bid Tabulations\ & Bid Tabs 6 of 6
Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More information8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.
Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More information1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -
Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More information/2 1,!JM [ ] [] Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY. Meeting Date: May 16, 2017 [X] Consent
Recommended by: /2 1,!JM ~ F:\ROADW A Y\AIS\2002\2002109-utility receive & file.doc ~epartment Director Administrator.... Date Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationPALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY EXECUTIVE BRIEF
Agenda Item is over 5 pages; may be viewed in the Minutes Department Agenda Item #: 3-C-4 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: July 12, 216 [X] Consent [ ]
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationFor Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.
Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation
More information3\1:s11, Date. Agenda Item is over 50 pages; may be viewed in the Minutes Department. Agenda Item #: 3-C-7
Recommended by:./4 J ). {J...Jv.l Department Director 3\1:s11, Date Agenda Item is over 50 pages; may be viewed in the Minutes Department Agenda Item #: 3-C-7 PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationOpinion of Probable Cost
Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationJob No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL
Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2
Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This
More informationMSCAA PROJECT NO
TIME: RBID ENVELOPE MSCAA PROJECT NO. 08-1260-02 NAME OF PROJECT: GLYCOL MANAGEMENT PROGRAM- BRIDGES AND SITE CONSTRUCTION BIDS DUE: U7/27/2017 U U 2:00 PM Local Time UBIDDER IDENTIFICATIONU: MEMPHIS SHELBY
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationBID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as
Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual
More informationJob No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL
Solicitation No. B-11-030-BB Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationWAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)
WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) 2017 2026 DECEMBER 2015 Prepared For: Federal Aviation Administration Ohio Department of Transportation Office of Aviation Attachment A 10
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More informationBOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board.
BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: May 19, 2016 # 6 SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Identification of Construction Funding for Traffic
More informationPreliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More information2001 Average Bid Tabs
Municipality of Anchorage Department of Planning, Development and Public Works Project Management and Engineering Department 2001 Average Bid Tabs SPEC. 20.02 Clearing and Grubbing 1 L.S. $ 750.00 $ 11,793.52
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationBRIDGE ALTERNATE STUDY No. 1
BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812
More informationRevised Cal. P.U.C. Sheet No E Cancelling Original Cal. P.U.C. Sheet No E. ELECTRIC RULE NO. 15 Sheet 1 DISTRIBUTION LINE EXTENSIONS
Revised Cal. P.U.C. Sheet No. 20093-E Cancelling Original Cal. P.U.C. Sheet No. 15575-E ELECTRIC RULE NO. 15 Sheet 1 APPLICABILITY: This rule is applicable to extension of electric Distribution Lines*
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More informationApplying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA
Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationJob No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars
BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationFLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM
1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More information