Addendum 1 13 TH Street Streetscape. September 1, 2017

Size: px
Start display at page:

Download "Addendum 1 13 TH Street Streetscape. September 1, 2017"

Transcription

1 Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE OR CONTACT PATRICE SMART AT THE CITY, , PRIOR TO PROPOSAL OPENING TO RECEIVE A LISTING OF ALL ADDENDA. THE FOLLOWING NOTICE IS ISSUED BY THIS ADDENDUM: 1. The Due Date remains Thursday, September 7, 2017 by 2:00 p.m. local time at the Purchasing Office, 519 E. 7th Street, Panama City, Florida, Pre-bid meeting minutes and attendance sheet are attached. 3. Revised Bid Schedule is attached. Cabbage Palm, Crepe Myrtle, Muhly Grass, Sod, Mulch, 1 ½ PVC Sleeve, Irrigation System, and Temp. Spigot line items have been added, Line Item Drop Inlet removed, Milling & Superpave 9.5 quantities revised. 4. Please see revised Plan set 13 th St. Streetscape Rev posted on the website. 5. Landscape Detail Sheet 12 and Electrical Plans have been added to the Plan set. Detail Sheet 12 posted on the website. End of Addendum 1 Page 1 of 6

2 13 th Street Streetscape Pre-Bid Meeting Notes Thursday, August 31, :00 pm; City Hall Conference Commission Room Bid date is Thursday, September 7 th at 2:00pm. We go by the Purchasing Office clock. Pre-bid meeting is not mandatory. Will not repeat the administrative/contractual information in the bid docs. Bid docs are a contract and contractors are to read and understand them. Jimmy Appleby will likely be the inspector on this project. Contract time for substantial completion is 100 days. 30 days to final completion. Liquidated damages are $500 per day. The proposal is a mix of LS and unit prices. It is the contractor s job to familiarize himself with the site work and work required. No work shall be done on weekends and holidays without advance approval by city. An addendum with meeting notes, landscaping plans, and revised bid schedule will be posted by close of business tomorrow, Friday September 1st. No FDOT connection permit or stormwater permit needed for this project. City still trying to confirm if the city must get an FDOT drainage connection permit for the storm pipe connection to the FDOT storm inlet at Beck Ave. Local Preference will not apply to this project since the cost is less than $250K. Same for requirement that contractors be pre-qualified by the city. Follow FDOT Specifications as amended by Special Provisions. Irrigation system to be constructed west of Beck Ave; just a hose bib to be constructed east of Beck for use in watering for grow-in. City will provide meter boxes for contractor to connect to, although on west side city may direct contractor to connect to the existing 1 (+/-) service line instead of a new meter box. Contractor to construct BFPs as listed in plan. Milling west of Beck Avenue is intended to reduce cross slope of pavement. Single core by city found over 6 1/2 of existing asphalt; lower portions appeared to be SAHM; top inch or so looked like S3. Leveling tonnage in bid schedule is in case it is needed. Questions? 1. Is there a lighting plan? Answer Yes, posted on website. Page 2 of 6

3 THE BIDDER PROPOSES TO PERFORM THE FOLLOWING; Improvements to 13th Street Streetscape including milling and resurfacing, concrete driveway and sidewalk construction, selective demolition, landscaping, street lighting, and other minor construction. IN ACCORDANCE WITH THE FOLLOWING BID TABULATION: 13 th Street Streetscape Project Item No. Item Unit Qty Unit Price Total Unit Price 1.01 Mobilization LS 1 $ $ Maintenance of Traffic LS 1 $ $ Concrete Driveway SY 48 $ $ Fence LS 1 $ $ Curb & Gutter LF 35 $ $ Sidewalk SY 41 $ $ 1.07 Remove Palm Trees EA 4 $ $ Speed Hump EA 1 $ $ Remove/Relocate Existing Sign EA 3 $ $ Mailbox EA 4 $ $ 1.11 Milling SY 1457 $ $ 1.12 (.5 avg) Leveling Course Superpave 9.5 TONS 51 $ $ (1.5 ) Superpave 9.5, Traffic Level C TONS 175 $ $ 4 Thick Concrete Sidewalk SY 274 $ $ 6 Thick Concrete Turnout (Flared, incl. HC Ramps) LS 1 $ $ Page 3 of 6

4 Thick Concrete Turnout (Radial, incl. HC Ramps) LS 1 $ $ FDOT Concrete SY 41 $ $ Concrete Driveway Pad SY 56 $ $ FDOT F Curb & Gutter (Include Drop Curb) LF 554 $ $ Handicap Ramps Blue Truncated Dome EA 6 $ $ 4 White Thermoplastic Parking Space LF 310 $ $ Double Yellow Thermoplastic Line LF 200 $ $ 1.23 Curb Inlet EA 2 $ $ FDOT Type C Grate Inlet (Doghouse) EA 1 $ $ Manhole Grate & Ring Cover (Incl. Elevation Adjust) EA 1 $ $ Storm Pipe LF 97 $ $ 1.27 Crosswalk Thermoplastic LF 100 $ $ 1.28 Stop Bar EA 2 $ $ 1.29 Electrical/Lighting LS 1 $ $ Page 4 of 6

5 1.30 Cabbage Palm 8 10 EA 9 $ $ 1.31 Cabbage Palm EA 3 $ $ 1.32 Red Crepe Myrtle 4-6 EA 2 $ $ 1.33 White Crepe Myrtle 7-9 EA 2 $ $ 1.34 Muhly Grass 1 Gal (min.) EA 50 $ $ 1.35 Sod SY 340 $ $ 1.36 Mulch SY 82 $ $ ½ PVC Sleeve LF 506 $ $ 1.38 Irrigation System (west of Beck Ave.) LS 1 $ $ 1.39 Temp. Spigot (east of Beck Ave.) LS 1 $ $ Total Project Cost $ In words The bidder further agrees that, in the event of his failure to execute the appropriate contract documents within ten (10) consecutive calendar days after his receipt of written notice of the award of the contract, the check or bid bond accompanying his bid, and the moneys payable thereon, shall become the property of and be retained and used by the Page 5 of 6

6 City as liquidated dates; otherwise, the check or bid bond shall be returned by the City to the undersigned. Attached hereto is a cashier s check on the Bank of or Bid Bond for the sum of Dollars ($ ) made payable to the City of Panama City, Florida. The list of parties interested in this proposal, the list of equipment references, and financial statement which are furnished to assist the City in making the award of contract are true and correct. (In the event the bidder is a corporation, there shall be attached hereto a certified copy of a resolution of the board of directors of the corporation authorizing the officer who signs the proposal and bid bond to do so in its behalf.) BIDDER HEREBY ACKNOWLEDGES THAT THIS PROPOSAL INCORPORATES ALL CHANGES ISSUED BY ADDENDA PRIOR TO THE BID OPENING DATE AND THAT THE BIDDER HAS CHECKED WITH THE PANAMA CITY ENGINEERING DIVISION AT (850) TO ENSURE RECEIPT OF ALL ADDENDA. Bidder (Name of Company) By: Title & Corporate Seal ATTEST: By: Business Address Contact Person: Telephone: Fax No.: Page 6 of 6

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

City of Newnan, Georgia

City of Newnan, Georgia City of Newnan, Georgia Invitation to Bid Mill & Resurfacing of Various Streets- 2017 Issue Date: May 25, 2017 Issued By: Inquiries: Proposals Due: Bid Opening: City of Newnan Public Works Department 25

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

PUBLIC WORKS DEPARTMENT CURB, GUTTER, SIDEWALK REPAIR AND CURB- RAMP INSTALLATION, PHASE 2 PROJECT NO. PW1531

PUBLIC WORKS DEPARTMENT CURB, GUTTER, SIDEWALK REPAIR AND CURB- RAMP INSTALLATION, PHASE 2 PROJECT NO. PW1531 PUBLIC WORKS DEPARTMENT BID FORMS FOR CURB, GUTTER, SIDEWALK REPAIR AND CURB- RAMP INSTALLATION, PHASE 2 PROJECT NO. PW1531 DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL SUBMIT

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

BID FORM WATER SERVICE REPLACEMENTS ON CRUISER LN., BELVEDERE ST. AND VIKINGS LN. CITY BID NO CITY OF ATLANTIC BEACH, FLORIDA

BID FORM WATER SERVICE REPLACEMENTS ON CRUISER LN., BELVEDERE ST. AND VIKINGS LN. CITY BID NO CITY OF ATLANTIC BEACH, FLORIDA BID FORM WATER SERVICE REPLACEMENTS ON CRUISER LN., BELVEDERE ST. AND VIKINGS LN. CITY BID NO. 1617-04 CITY OF ATLANTIC BEACH, FLORIDA SUBMITTED BY: DATE: The undersigned, as bidder, hereby declares that

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

Project Manual. City of Winter Springs. Town Center Parking Lot. Bid # ITB 06/18/BS

Project Manual. City of Winter Springs. Town Center Parking Lot. Bid # ITB 06/18/BS Project Manual City of Winter Springs Town Center Parking Lot Bid # ITB 06/18/BS October 2018 INDEX TO PROJECT MANUAL City of Winter Springs Town Center Parking Lot City Bid No. ITB 06/18/BS October 2018

More information

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other

More information

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

City of Dade City Beauchamp Ave Drainage Improvements CDBG Contract #: 17DB-OL N19 City Project #: 1603ST

City of Dade City Beauchamp Ave Drainage Improvements CDBG Contract #: 17DB-OL N19 City Project #: 1603ST CONTRACT DOCUMENTS For City of Dade City Beauchamp Ave Drainage Improvements CDBG Contract #: 17DB-OL-08-61-02-N19 City Project #: 1603ST Located in the City of Dade City (Pasco County), Florida Client:

More information

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT CPL 14064.08 BID FORM SECTION 00 300-1 BID FORM BID NUMBER: CH2019-001Dev SUBMITTAL DATE: BY: (Bidder) PROJECT DESCRIPTION: The project consists of the construction of a sidewalk and associated grading,

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 15-075 Subject: Authorize the City Manager to Negotiate and Execute a Contract with for the Palmer 2015 ADA Sidewalk Improvement Project in the Amount of $62,837 Agenda

More information

ADDENDUM NO. 1 SCHOOL BOARD OF LEON COUNTY, FLORIDA

ADDENDUM NO. 1 SCHOOL BOARD OF LEON COUNTY, FLORIDA ADDENDUM NO. 1 Invitation to Bid (ITB) 5517-2018 Asphalt or Site Contractor for Leon County Schools Technology Center Parking Lot Milling and Resurfacing Project SCHOOL BOARD OF LEON COUNTY, FLORIDA ITEM

More information

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer

PRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 6/5/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

REQUEST FOR PROPOSALS ADA SIDEWALK RAMP REPLACEMENT 2019 Construction Season. SUBMITTAL DUE DATE: 2:00 p.m. on Tuesday, March 19, 2019

REQUEST FOR PROPOSALS ADA SIDEWALK RAMP REPLACEMENT 2019 Construction Season. SUBMITTAL DUE DATE: 2:00 p.m. on Tuesday, March 19, 2019 REQUEST FOR PROPOSALS ADA SIDEWALK RAMP REPLACEMENT 2019 Construction Season SUBMITTAL DUE DATE: 2:00 p.m. on Tuesday, March 19, 2019 PROPOSALS MUST BE MAILED OR DELIVERD TO: City of Kearney, Attn: Lauren

More information

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029 SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX:

VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA PHONE: (352) * FAX: VILLAGE COMMUNITY DEVELOPMENT DISTRICTS PURCHASING DEPARTMENT 940 LAKESHORE DRIVE, SUITE 200 THE VILLAGES, FLORIDA 32162 PHONE: (352) 751-6700 * FAX: (352) 751-6715 E-mail: melissa.schaar@districtgov.org

More information

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: March 22, 2016 AGENDA ITEM #G-10 ITEM: Consider Approval of a Budget Amendment & Award of a Contract Asphalt Repairs to Hutch Paving, Inc. the Wayne

More information

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS NOTICE IS HEREBY GIVEN, that Sealed bids will be received at the office of the County Manager/Clerk of the Board of Supervisors, Hall of Justice

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

TABLE OF CONTENTS BIDDING REQUIREMENTS:

TABLE OF CONTENTS BIDDING REQUIREMENTS: TABLE OF CONTENTS Form # Name of Form BIDDING REQUIREMENTS: SBP 6.12 Information for Bidders SBP 6.13 Bid Bid Schedule A Base Bid Bid Schedule B Add Alternates (SBP-6.131) Bid Item Take Off o Both PDF

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER

DENVER INTERNATIONAL AIRPORT BID FORMS. CONTRACT NAME: Rehabilitate East Employee Parking Lot Contract No.: BID LETTER DENVER INTERNATIONAL AIRPORT BID FORMS CONTRACT NAME: Contract No.: 201206054 BID LETTER BIDDER Manager of Aviation City and County of Denver Business Management Services (Procurement) Office Airport Office

More information

SAN RAFAEL CITY COUNCIL AGENDA REPORT

SAN RAFAEL CITY COUNCIL AGENDA REPORT Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City

More information

BID FORM. PROJECT: 2017 Water line replacement

BID FORM. PROJECT: 2017 Water line replacement Project Town of Georgetown P.O. Box 426 Georgetown, CO 80444 BID FORM PROJECT: 2017 Water line replacement THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents,

More information

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,

More information

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

PART II - Prospect Street 37. 8 Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050. BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.

More information

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

The bid due date has been changed to 2:50 p.m. May 25, 2018.

The bid due date has been changed to 2:50 p.m. May 25, 2018. May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due

More information

PUBLIC WORKS DEPARTMENT 2017 SPEED HUMP, SPEED CUSHION, AND SPEED TABLE PROJECT PROJECT NO. PW1608

PUBLIC WORKS DEPARTMENT 2017 SPEED HUMP, SPEED CUSHION, AND SPEED TABLE PROJECT PROJECT NO. PW1608 PUBLIC WORKS DEPARTMENT BID FORMS FOR 2017 SPEED HUMP, SPEED CUSHION, AND SPEED TABLE PROJECT PROJECT NO. PW1608 DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL SUBMIT ONE ORIGINAL

More information

The deadline for submitting bids under this RFP is Monday, March 26, 2017 at 2:00pm.

The deadline for submitting bids under this RFP is Monday, March 26, 2017 at 2:00pm. The City of Clinton is soliciting bids for resurfacing city (Powell Bill) streets, cemetery streets, as well as parking and service roads at the Police Department and the Water and Wastewater Treatment

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Sealed bids for the Sloss Streetscape Phase II Street Improvements, PTK 143270, under PEP129CP 003880, will be received by the City Engineer in Room 220, City Hall, Birmingham, Alabama

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.

8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445. Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52

More information

Right of Way Permits. Contact Information:

Right of Way Permits. Contact Information: Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,

More information

CITIES OF BOYNE CITY AND CHARLEVOIX. INVITATION TO BID Pavement Marking Services

CITIES OF BOYNE CITY AND CHARLEVOIX. INVITATION TO BID Pavement Marking Services CITIES OF BOYNE CITY AND CHARLEVOIX INVITATION TO BID Pavement Marking Services Sealed bids are now being accepted by the Cities of Boyne City and Charlevoix for Pavement Marking of Roadways and Parking

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT

CITY OF PALM DESERT PUBLIC WORKS DEPARTMENT BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.880 OXNARD WASTEWATER TREATMENT PLANT MAIN ELECTRICAL BUILDING TRANSFORMER REPLACEMENT PROJECT

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

2014 SEWER REHABILITATION PROJECT. Project #: Bid Date: Tuesday, October 28, 2014

2014 SEWER REHABILITATION PROJECT. Project #: Bid Date: Tuesday, October 28, 2014 Community Development Department Engineering Division 2014 SEWER REHABILITATION PROJECT Cameron and Henderson Area Sewer Project #: 2014-03 Bid Date: Tuesday, October 28, 2014 1. Notice Inviting Bids 2.

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

BID DOCUMENTS & SPECIFICATIONS

BID DOCUMENTS & SPECIFICATIONS BID DOCUMENTS & SPECIFICATIONS For WILDERNESS DRIVE DRAIN Sections 2-3 & 10, DeWitt Township Clinton County, Michigan Prepared for Phil Hanses 100 M-21 St Johns, MI 48879 October 25, 2016 Prepared by:

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

MEETING NOTICE. City Council will be held at 5:30 p.m. in the City Council Chambers. located at 305 Third Avenue East.

MEETING NOTICE. City Council will be held at 5:30 p.m. in the City Council Chambers. located at 305 Third Avenue East. CITY OF TWIN FALLS, IDAHO MEETING NOTICE * * * * The Monday, November 19, 2012, regular meeting of the Twin Falls City Council will be held at 5:30 p.m. in the City Council Chambers located at 305 Third

More information

CITY of NOVI CITY COUNCIL

CITY of NOVI CITY COUNCIL CITY of NOVI CITY COUNCIL Agenda Item 10 May 21, 2018 SUBJECT: Approval to award the construction contract for 2018 and 2019 Concrete Neighborhood Roads Program to Mattioli Cement Company LLC, the low-bidder,

More information

PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2

PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2 NAME OF CONTRACTOR: PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2 APRIL 18, 2018 1. PH 3546 WAYLAND TOWNSHIP On 10 th Street, M-179 (129 th Avenue) to the Wayland City Limits

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

CITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

**REVISED BID PRICE FORM** October 24, 2018

**REVISED BID PRICE FORM** October 24, 2018 **REVISED BID PRICE FORM** October 24, 2018 (Date) TO: RE: CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 INVITATION FOR BID WANNAMAKER COUNTY PARK DOG

More information