ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
|
|
- Loreen Chloe Hall
- 5 years ago
- Views:
Transcription
1 Page: 1 of 8 (F) Description A CONTRACTOR STAKING LS 1 $ $ LEAD COMPLIANCE PLAN LS 1 $ $ A POTHOLING LS 1 $ 50, $ 50, PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1 $ 15, $ 15, DEVELOP WATER SUPPLY LS 1 $ 50, $ 50, CONSTRUCTION AREA SIGNS LS 1 $ 99, $ 99, TRAFFIC CONTROL SYSTEM LS 1 $ 2,000, $ 2,000, TYPE III BARRICADE EA 90 $ $ 9, TEMPORARY PAVEMENT MARKING (PAINT) SQFT 3,240 $ 3.00 $ 9, A TEMPORARY TRAFFIC STRIPE (TAPE) ("3M StaMark 710 Series", 6" White) LF 26,300 $ 5.00 $ 131, A TEMPORARY TRAFFIC STRIPE (TAPE) ("3M StaMark 710 Series", 8" White) LF 18,000 $ 5.00 $ 90, A TEMPORARY TRAFFIC STRIPE (TAPE) ("3M StaMark 710 Series", 6" Yellow) LF 6,820 $ 5.00 $ 34, TEMPORARY TRAFFIC STRIPE (PAINT) LF 485,000 $ 0.25 $ 121, CHANNELIZER (SURFACE MOUNTED) EA 900 $ $ 36, TEMPORARY PAVEMENT MARKER EA 12,800 $ 4.00 $ 51, TEMPORARY TERMINAL SECTION (TYPE K) EA 11 $ 4, $ PORTABLE CHANGEABLE MESSAGE SIGN LS 1 $ 90, $ 90, TEMPORARY RAILING (TYPE K) LF 90,900 $ 9.00 $ 818, A TEMPORARY ALTERNATIVE CRASH CUSHION EA 68 $ 4, $ 306, TEMPORARY TRAFFIC SCREEN LF 90,900 $ 2.00 $ 181, JOB SITE MANAGEMENT LS 1 $ 50, $ 50, PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 29, $ 29, RAIN EVENT ACTION PLAN EA 110 $ $ 55, STORM WATER SAMPLING AND ANALYSIS DAY EA 75 $ 2, $ 157, STORM WATER ANNUAL REPORT EA 4 $ 2, $ 8, MOVE IN/MOVE OUT (TEMPORARY EROSION CONTROL) EA 5 $ 1, $ 5, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) SQYD 51,100 $2.00 $ 102, TEMPORARY CHECK DAM LF 390 $10.00 $ 3, TEMPORARY DRAINAGE INLET PROTECTION EA 330 $ $ 75, TEMPORARY FIBER ROLL LF 17,100 $3.00 $ 51, TEMPORARY REINFORCED SILT FENCE (TYPE 1) LF 2,780 $ 8.00 $ 22, A TEMPORARY REINFORCED SILT FENCE (TYPE 1 MOD) LF 1,010 $ 9.00 $ 9, TEMPORARY SILT FENCE LF 2,090 $4.00 $ 8, TEMPORARY CONSTRUCTION ENTRANCE EA 11 $4, $ STREET SWEEPING LS 1 $ 38, $ 38, A TEMPORARY DEWATERING AND NON STORM WATER DISCHARGE CONTROL SYSTEM LS 1 $ 80, $ 80, TEMPORARY CONCRETE WASHOUT LS 1 $ 15, $ 15, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) LF 42,800 $ 0.75 $ 32, TREATED WOOD WASTE LB 31,000 $ 0.30 $ 9,300.00
2 Page: 2 of 8 (F) Description NOISE MONITORING LS 1 $ $ TEMPORARY HIGH VISIBILITY FENCE LF 10,900 $ 6.00 $ 65, CLEARING AND GRUBBING (LS) LS 1 $ $ ROADWAY EXCAVATION CY 65,600 $ $ 2,296, A ROADWAY EXCAVATION (TYPE R 1) (AERIALLY DEPOSITED LEAD) CY 1,770 $ $ 97, F STRUCTURE EXCAVATION (BRIDGE) CY 775 $ $ 81, F STRUCTURE EXCAVATION (RETAINING WALL) CY 3,379 $ $ 185, F STRUCTURE EXCAVATION (SOIL NAIL WALL) CY 905 $ $ 85, F STRUCTURE BACKFILL (BRIDGE) CY 954 $ $ 85, F STRUCTURE BACKFILL (SLURRY CEMENT) CY $ $ 21, F STRUCTURE BACKFILL (RETAINING WALL) CY 2,573 $ $ 154, F CONCRETE BACKFILL (SOLDIER PILE WALL) CY 1,070 $ $ 374, DITCH EXCAVATION CY 1,090 $ $ 54, A LIGHTWEIGHT EMBANKMENT MATERIAL (CELLULAR CONCRETE) CLASS II CY 12,884 $ $ 837, A LIGHTWEIGHT EMBANKMENT MATERIAL (CELLULAR CONCRETE) CLASS III CY 2,648 $ $ 172, SUBGRADE ENHANCEMENT GEOGRID SQYD 10,500 $ $ 126, DECOMPOSED GRANITE SQFT 210 $ $ 3, REMOVE IRRIGATION FACIITY LS 1 $ 7, $ 7, " CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT LF 180 $ $ 13, MOVE IN/MOVE OUT (EROSION CONTROL) EA 5 $ 1, $ 5, ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 23,700 $ 1.00 $ 23, ROLLED EROSION CONTROL PRODUCT (BLANKET) SQFT 43,400 $ 1.00 $ 43, HYDROMULCH SQFT 271,000 $ 0.30 $ 81, FIBER ROLLS LF 28,800 $ 3.00 $ 86, STRAW SQFT 204,000 $ 0.25 $ 51, HYDROSEED SQFT 271,000 $ 0.50 $ 135, A IMPORTED BIOFILTRATION SOIL CY 2,410 $ $ 313, COMPOST (CY) CY 2,200 $ $ 184, INCORPORATE MATERIALS SQFT 228,000 $ 0.30 $ 68, CLASS 4 AGGREGATE SUBBASE CY 12,000 $ $ 420, CLASS 2 AGGREGATE BASE CY 3,140 $ $ 157, LEAN CONCRETE BASE CY 2,970 $ $ 594, ASPHALT TREATED PERMEABLE BASE CY 1,080 $ $ 189, HOT MIX ASPHALT (TYPE A) TON 20,000 $ $ 2,400, RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 4,790 $ $ 814, RUBBERIZED HOT MIX ASPHALT OPEN GRADED (OPEN GRADED FRICTION COURSE) TON 18,400 $ $ 2,392, PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 620 $ 9.00 $ 5, PLACE HOT MIX ASPHALT DIKE (TYPE D) LF 180 $ 8.00 $ 1, PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 670 $ $ 6,700.00
3 Page: 3 of 8 (F) Description PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 740 $ $ 8, PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA) SQYD 0.10 $ $ REMOVE ASHPALT CONCRETE PAVEMENT SQFT 6,400 $ 5.00 $ 32, REMOVE ASPHALT CONCRETE DIKE LF 2,740 $ $ 32, COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 267,000 $ 3.00 $ 801, CONTINUOUSLY REINFORCED CONCRETE PAVEMENT CY 1,250 $ $ 687, SOIL NAIL LF 7,058 $ $ 317, F MECHANICALLY STABILIZED EMBANKMENT, LOCATION A SQFT 27,634 $ $ 1,519, F MECHANICALLY STABILIZED EMBANKMENT, LOCATION B SQFT 25,996 $ $ 649, TEMPORARY SHORING LS 1 $ 725, $ 725, A STEEL SOLDIER PILE (W18X86) LF 4,931 $ $ 369, B STEEL SOLDIER PILE (W18X106) LF 2,556 $ $ 268, C STEEL SOLDIER PILE (W18X143) LF 709 $ $ 109, D STEEL SOLDIER PILE (W18X175) LF 149 $ $ 28, E STEEL SOLDIER PILE (W24X176) LF 85 $ $ 16, F STEEL SOLDIER PILE (W30X191) LF 191 $ $ 39, " DRILLED HOLE LF 9,638 $ $ 433, " DRILLED HOLE LF 93 $ $ 16, " DRILLED HOLE LF 207 $ $ 41, CAST IN DRILLED HOLE CONCRETE PILING LF 2,798 $ $ 699, " CAST IN DRILLED HOLE CONCRETE PILE (SIGN FOUNDATION) LF $ $ 74, " CAST IN DRILLED HOLE CONCRETE PILE (SIGN FOUNDATION) LF $ 2, $ 629, " CAST IN DRILLED HOLE CONCRETE PILE (SIGN FOUNDATION) LF $ 1, $ 46, " CAST IN DRILLED HOLE CONCRETE PILE (SIGN FOUNDATION) LF $ 1, $ 658, PRESTRESSING CAST IN PLACE CONCRETE LS 1 $ 30, $ 30, A CONCRETE PAD AND BACKWALL (STRUCTURAL CONCRETE AND REINFORCEMENT) LS 1 $ 15, $ 15, F STRUCTURAL CONCRETE, BRIDGE FOOTING CY 141 $ $ 98, F STRUCTURAL CONCRETE, BRIDGE CY 877 $ 1, $ 877, STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER) CY 103 $ 1, $ 113, F STRUCTURAL CONCRETE, RETAINING WALL CY 2,011 $ 1, $ 3,016, F STRUCTURAL CONCRETE, BARRIER SLAB CY 2,781 $ $ 1,738, F STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N MODIFIED) CY 87 $ $ 60, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE R MODIFIED) CY 22 $ 1, $ 30, F STRUCTURAL CONCRETE, DRAINAGE INLET CY 205 $2, $ 512, MINOR CONCRETE CY 86 $ $ 43, MINOR CONCRETE (MINOR STRUCTURE) CY 100 $ 2, $ 200, PAVING NOTCH EXTENSION CY 1 $ $ ARCHITECTURAL TREATMENT SQFT 24,729 $ $ 1,285, A ARCHITECTURAL TREATMENT (BRIDGE) SQFT 430 $ $ 22,360.00
4 Page: 4 of 8 (F) Description DRILL & BOND DOWEL LF 313 $ $ 15, DRILL & BOND DOWEL (CHEMICAL ADHESIVE) EA 19 $ $ 1, JOINT SEAL (MR 1") LF 140 $ $ 9, F BAR REINFORCING STEEL (BRIDGE) LB 250,570 $ 1.10 $ 275, F BAR REINFORCING STEEL (RETAINING WALL) LB 589,087 $ 1.00 $ 589, F STRUCTURAL SHOTCRETE CY 171 $ $ 136, F FURNISH SIGN STRUCTURE (TUBULAR) LB 129,045 $6.00 $ 774, F INSTALL SIGN STRUCTURE (TUBULAR) LB 129,045 $0.50 $ 64, F FURNISH SIGN STRUCTURE (TRUSS) LB 122,487 $ 4.00 $ 489, F INSTALL SIGN STRUCTURE (TRUSS) LB 122,487 $ 0.50 $ 61, REMOVE PEDESTRIAN BARRICADE EA 3 $ $ 1, REMOVE SIGN STRUCTURE (EA) EA 5 $ 5, $ 25, PEDESTRIAN BARRICADE EA 3 $ 1, $ 3, TIMBER LAGGING MFBM 76 $ 3, $ 262, F SOUND WALL (MASONRY BLOCK) SQFT 17,921 $ $ 501, A F SOUND WALL (MASONRY BLOCK) (BRIDGE) SQFT 1,150 $ $ 32, CLEAN AND PAINT STEEL SOLDIER PILING LS 1 $ 25, $ 25, A REMOVE RETAINING WALL (PORTION) (LS), LOCATION A LS 1 $ 25, $ 25, B REMOVE RETAINING WALL (PORTION) (LS), LOCATION B LS 1 $ $ A REMOVE SOUND WALL (SQFT), LOCATION A SQFT 9,615 $ 4.00 $ 38, B REMOVE SOUND WALL (SQFT), LOCATION B SQFT 17,535 $ 5.00 $ 87, BRIDGE REMOVAL (PORTION) LS 1 $ $ " ALTERNATIVE PIPE CULVERT (TYPE A) LF 4,570 $ $ 365, " ALTERNATIVE PIPE CULVERT (TYPE B) LF 310 $ $ 24, " ALTERNATIVE PIPE CULVERT (TYPE A) LF 30 $ $ 9, " REINFORCED CONCRETE PIPE LF 70 $ $ 12, " CORRUGATED STEEL PIPE (.064" THICK) LF 45 $ $ 13, " SLOTTED CORRUGATED STEEL PIPE (.064" THICK) LF 570 $ $ 79, " PERFORATED PLASTIC PIPE UNDERDRAIN LF 1,530 $ $ 68, " NON PERFORATED PLASTIC PIPE UNDERDRAIN LF 2,332 $ $ 104, " PLASTIC PIPE (EDGE DRAIN) LF 7,560 $ $ 113, " PLASTIC PIPE (EDGE DRAIN OUTLET) LF 610 $ $ 15, " CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK) LF 40 $ $ 7, " CORRUGATED STEEL PIPE DOWNDRAIN (.064" THICK) LF 180 $ $ 32, DRAINAGE INLET MARKER EA 70 $ $ 7, " WELDED STEEL PIPE (.105" THICK) LF 53 $ $ 16, REMOVE FLARED END SECTION (EA) EA 1 $ $ " ALTERNATIVE FLARED END SECTION EA 7 $ $ 4, INLET DEPRESSION EA 55 $ 1, $ 71,500.00
5 Page: 5 of 8 (F) Description REMOVE CULVERT (LF) LF 1,400 $ $ 119, REMOVE INLET EA 15 $ 1, $ 27, ADJUST INLET EA 4 $ 2, $ MODIFY INLET TO MANHOLE EA 2 $ 3, $ 7, CAP INLET EA 3 $ 3, $ 9, ROCK SLOPE PROTECTION (300 lb, Class IV, METHOD B) (CY) CY 45 $ $ 27, ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 130 $ $ 1, MINOR CONCRETE (CURB) (LF) LF 120 $ $ 9, MINOR CONCRETE (GUTTER) (CY) CY 23 $ $ 18, DETECTABLE WARNING SURFACE SQFT 95 $ $ 5, MINOR CONCRETE (CURB AND GUTTER) CY 59 $ $ 42, MINOR CONCRETE (DRIVEWAY) CY 9 $ 1, $ 11, MINOR CONCRETE (BRUSHED CONCRETE) CY 100 $ 1, $ MINOR CONCRETE (SIDEWALK) CY 45 $ $ 27, MINOR CONCRETE (CURB RAMP) CY 12 $ 1, $ 20, REMOVE CONCRETE CURB (LF) LF 140 $ $ 5, REMOVE CONCRETE SIDEWALK (SQYD) SQYD 390 $ $ 15, REMOVE CONCRETE (CURB AND GUTTER) LF 500 $ $ 17, F MISCELLANEOUS IRON AND STEEL LB 27,207 $ 2.50 $ 68, MISCELLANEOUS METAL LB 1,066 $ $ 42, SIGNAL AND LIGHTING (CITY) LS 1 $ 132, $ 132, A TEMPORARY SIGNAL AND LIGHTING SYSTEM (CITY) LS 1 $ 21, $ 21, B LIGHTING AND ELECTRONIC TOLLING SYSTEM LS 1 $ 5,702, $ 5,702, C TEMPORARY LIGHTING AND ELECTRONIC TOLLING SYSTEM LS 1 $ 205, $ 205, TEMPORARY FENCE (TYPE CL 6) LF 2,290 $ $ 34, CHAIN LINK FENCE (TYPE CL 4) LF 1,077 $ $ 21, CHAIN LINK FENCE (TYPE CL 6) LF 54 $ $ 4, ' CHAIN LINK GATE (TYPE CL 6) EA 1 $ 4, $ 4, REMOVE FENCE LF 56 $ $ 4, REMOVE GATE EA 1 $ $ REMOVE PAVEMENT MARKER EA 24,500 $ 1.50 $ 36, REMOVE DELINEATOR EA 6 $ $ DELINEATOR (CLASS 1) EA 83 $ $ 4, PAVEMENT MARKER (RETROREFLECTIVE) EA 9,130 $ 3.50 $ 31, A CONCRETE BARRIER MARKER EA 820 $ $ 20, OBJECT MARKER (TYPE P) EA 77 $ $ 3, A OBJECT MARKER (TYPE P MOD) EA 45 $ $ 3, SPECIAL MARKER EA 20 $ $ 1, REMOVE ROADSIDE SIGN PANEL EA 43 $ $ 3,870.00
6 Page: 6 of 8 (F) Description REMOVE SIGN OVERLAY EA 8 $ $ 2, A RESET OVERHEAD SIGN PANEL EA 2 $ 5, $ RELOCATE ROADSIDE SIGN (WOOD POST) EA 15 $ $ 3, RELOCATE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD) EA 4 $ $ 1, RELOCATE SIGN PANEL EA 3 $ $ FURNISH LAMINATED PANEL SIGN (1" TYPE A) SQFT 1,550 $ $ 46, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063" UNFRAMED) SQFT 1,380 $ $ 22, ROADSIDE SIGN ONE POST EA 11 $ $ 3, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD) EA 60 $ $ 12, INSTALL SIGN OVERLAY SQFT 460 $ $ 18, INSTALL SIGN (MAST ARM HANGER METHOD) EA 2 $ $ 1, INSTALL SIGN PANEL ON EXISTING FRAME SQFT 150 $ $ 3, MIDWEST GUARDRAIL SYSTEM (WOOD POST) LF 1,310 $ $ 52, VEGETATION CONTROL (MINOR CONCRETE) SQYD 1,480 $ $ 148, CABLE RAILING LF 46 $ $ 5, TRANSITION RAILING (TYPE WB 31) EA 6 $ 5, $ 30, END CAP (TC) EA 3 $ $ END ANCHOR ASSEMBLY (TYPE SFT) EA 10 $ $ 8, ALTERNATIVE IN LINE TERMINAL SYSTEM EA 5 $ 3, $ 19, ALTERNATIVE FLARED TERMINAL SYSTEM EA 8 $ 3, $ 24, A ALTERNATIVE CRASH CUSHION (TYPE 1) EA 2 $ 22, $ A ALTERNATIVE CRASH CUSHION (TYPE 2) EA 2 $ 22, $ A CONCRETE BARRIER (TYPE 60GE MOD CHP) LF 130 $ $ 46, A CONCRETE BARRIER (TYPE 60C MOD CHP) LF 420 $ $ 105, A CONCRETE BARRIER (TYPE 60P MOD CHP) LF 48 $ $ 19, A CONCRETE RETAINING BARRIER LF 780 $ $ 156, A CONCRETE BARRIER (TYPE 60R MOD) LF 55 $ $ 27, A CONCRETE BARRIER (TYPE 60R MOD SIGN BRIDGE) LF 270 $ $ 135, A CONCRETE BARRIER (TYPE 60C MOD 24) LF 1,050 $ $ 525, A CONCRETE BARRIER (TYPE 60 MOD) LF 370 $ $ 129, A CONCRETE BARRIER (TYPE 60C MOD) LF 500 $ $ 187, A CONCRETE BARRIER (TYPE 60G MOD) LF 430 $ $ 172, A CONCRETE BARRIER (TYPE 60GC MOD) LF 790 $ $ 335, A CONCRETE BARRIER (TYPE 60GE MOD) LF 2,840 $ $ 1,704, CONCRETE BARRIER (TYPE 60P) LF 36 $ $ 14, CONCRETE BARRIER (TYPE 60) LF 3,310 $ $ 331, CONCRETE BARRIER (TYPE 60C) LF 6,830 $ $ 1,024, CONCRETE BARRIER (TYPE 60D) LF 1,423 $ $ 170, A CONCRETE BARRIER (TYPE 60A MODIFIED) LF 87 $ $ 10,440.00
7 Page: 7 of 8 (F) Description CONCRETE BARRIER (TYPE 60G) LF 2,450 $ $ 490, CONCRETE BARRIER (TYPE 60GC) LF 4,880 $ $ 1,220, CONCRETE BARRIER (TYPE 60GE) LF 360 $ $ F CONCRETE BARRIER (TYPE 736) LF 98 $ $ 9, F CONCRETE BARRIER (TYPE 736A) LF 363 $ $ 36, F CONCRETE BARRIER (TYPE 736 MODIFIED) LF 4,223 $ $ 485, A F CONCRETE BARRIER (TYPE 736 MODIFIED) (BRIDGE) LF 214 $ $ 24, CONCRETE BARRIER (TYPE 736B) LF 40 $ $ 4, A CONCRETE ANCHOR BLOCK LF 20 $ $ 13, REMOVE GUARDRAIL LF 1,990 $ $ 19, REMOVE CONCRETE BARRIER LF 26,200 $ $ 1,572, REMOVE CRASH CUSHION EA 3 $ 1, $ 4, A 12" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 1,330 $ 5.00 $ 6, " THERMOPLASTIC TRAFFIC STRIPE LF 19,700 $ 1.00 $ 19, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) SQFT 6,160 $ 6.00 $ 36, " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6 1) LF 400 $ 1.00 $ " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17 7) LF 2,470 $ 1.00 $ 2, " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36 12) LF 150,000 $ 1.00 $ 150, A CONTRAST PAVEMENT STRIPE (BLACK PAINT) LF 13,500 $ 0.75 $ 10, A CONTRAST PAVEMENT STRIPE (BLACK PAINT)(BROKEN) LF 33,000 $ 0.75 $ 24, " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 86,200 $ 0.75 $ 64, " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) LF 62,800 $ 1.00 $ 62, " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12 3) LF 7,110 $ 1.00 $ 7, " THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36 12) LF 23,500 $ 1.00 $ 23, A 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 34 14) LF 25,700 $ 1.00 $ 25, REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 111,000 $ 0.25 $ 27, REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 830 $ 5.00 $ 4, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS 1 $ $ TEMPORARY LIGHTING SYSTEM LS 1 $ 206, $ 206, MODIFYING EXISTING ELECTRICAL SYSTEM LS 1 $ 3,840, $ 3,840, A BACKHAUL COMMUNICATIONS SYSTEM LS 1 $ 640, $ 640, MOBILIZATION LS 1 $ 9,400, $ 9,400, $ 69,608, TOTAL CONSTRUCTION ITEMS
Engineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationLETTING : CALL : 056 COUNTIES : MILLE LACS
S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationAVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationOpinion of Probable Cost
Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationPublic Works Maintenance STORMWATER AND
Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationNew Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS
PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF
More informationNew Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS
PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationTABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00
TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More informationAddendum 1 Downtown North CRA Sidewalks
Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationN E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS
N E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS (a) All prospective bidders for construction in excess of $50,000.00 shall be prequalified
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationMaintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION
Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million
More informationBRIDGE ALTERNATE STUDY No. 1
BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812
More informationPROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02
AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More information8 EA $ 1, $ $ 1, $ 8, $ 1, $ 8, EA $ 6, $6, $ 7, $ 7, $ 5, $ 5,445.
Palmetto Park Road, SW 7th AVE. To SW 5th Avenue LWDD E4 (E Rio) Canal ENGECON CONSTRUCTON RUSSELL ENGNEERNG TEM# TEM DESCRPTON QTY UNTS Total Total ROADWAY TEMS 5 Regular Excavation 937 CY $ 14.28 $17.52
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More information1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -
Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More informationPERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS
CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING
More informationRFB Addendum 3
Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER
More informationTOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:
TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationFULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I
FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...
More informationAPPENDICES APPENDICES
APPENDICES APPENDICES A PPENDIX A. ABBREVIATIONS A A BBREVIATIONS Common abbreviations used at NDOT are listed below: AEB Agreement Estimate Breakout AP Agreed Price B/L Bill of Ladings BMP Best Management
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate
More informationTAUSSIG. Annual Report Fiscal Year City of Irvine Community Facilities District No (Great Park) & Associates, Inc.
DAVID TAUSSIG & Associates, Inc. Annual Report Fiscal Year 2014-2015 City of Irvine Community Facilities District No. 2013-3 (Great Park) October 27, 2015 Public Finance Public Private Partnerships Urban
More informationLCC Methodology. Håkan Sundquist Structural Design and Bridges KTH. ETSI Methodology 1
LCC Methodology Håkan Sundquist Structural Design and Bridges KTH 1 There are many requirements on a bridge 2 The classic task 3 The classic bridge design task 4 LCC optimization 5 LCC/Construction cost
More informationPRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST
PRELIMINARY DESIGN OF AIRFIELD COMPONENTS (25%) ESTIMATE OF PROBABLE CONSTRUCTION COST Table of Contents 1. Introduction...2 2. Scope of Estimate...2 3. Subpackage Breakout....2 4. Assumptions Used in
More informationCITY OF PALM DESERT PUBLIC WORKS DEPARTMENT
BEFORE YOU CAN PERFORM ANY CONSTRUCTION OR MAINTENANCE WORK IN THE PUBLIC RIGHT-OF-WAY, YOU MUST HAVE A VALID ENCROACHMENT PERMIT ISSUED BY THIS DEPARTMENT This work includes but is not limited to driveway
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,
More information