OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

Size: px
Start display at page:

Download "OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018"

Transcription

1 LETTING DATE : CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : ESTIMATE NUMBER : PROJECT NUMBER : NHPP-267N(062)PM PROJECT NAME : BRIDGE AND APPROACHES BRIDGE AND APPROACHES TOTAL PROJECT LENGTH : TOTAL BRIDGE LENGTH : MILES FEET SH-99: OVER SANDY CREEK AND SALT CREEK, 6.0 MILES AND 7.9 MILES NORTH OF THE SH-56 INTERSECTION NEAR SEMINOLE. BRIDGE AND APPROACHES COUNTIES: SEMINOLE This Engineer's Estimate is furnished in compliance with 61 O.S. 116 B. No representation is made or intended as to its accuracy or fitness for use for any purpose. The Engineer's Estimate is composed of units which are expressed as Mathematical Averages for work units which may be required for a project. The mathematical averages are derived by adding dollar amounts bid for work under a specific item code over the preceding eighteen (18) months within a specific field division and dividing the resultant total by the number of bids included. The resultant average unit amount does not and is not intended to portray difficulties or resources which may be required to perform any specific unit of work on any specific project. THE ENGINEER'S ESTIMATE SHOULD NOT BE USED OR RELIED ON TO PREPARE ANY CONTRACTOR'S BID PROPOSAL FOR SUBMISSION FOR DEPARTMENT CONSIDERATION ON ANY DEPARTMENT PROJECT.

2 DETAIL ESTIMATE COST SUMMARY DATE PRINTED : PAGE: 1 ESTIMATE NUMBER : PROJECT NO.: NHPP-267N(062)PM - PROJECT NO. PCN STAT TYPE COST CONST ENGR TOTAL FUNDING LIMIT FUNDING - FUND CLASS 0FED FEDERAL FUND PLACE HOLDER NHPP-267N(062)PM B 11 10,753, , ,393, ,393, FUND CLASS 0FED TOTALS 10,753, , ,393, ,393, =============================================================================== ESTIMATE TOTALS 10,753, , ,393, ,393,381.79

3 PAGE NO. 1 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0100 ROADWAY 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : K000 ALL OTHERS WORK CLASSIFICATION : 0200 ROADWAY CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 0102 CLEARING AND GRUBBING LSUM 35, , (A) 0183 UNCLASSIFIED EXCAVATION 103, CY , (D) 0184 UNCLASSIFIED BORROW 169, CY ,358, (A) 4229 TYPE A-SALVAGED TOPSOIL LSUM 33, , (C) 2801 TEMPORARY SILT FENCE 16, LF , (G) 0151 TEMPORARY ROCK FILTER DAM TYPE CY , (K) 0600 TEMPORARY FIBER LOG LF , DITCH LINER PROTECTION 4, LF , (A) 2806 SOLID SLAB SODDING 160, SY , (A) 2817 VEGETATIVE MULCHING AC , MOWING AC , (A) 2100 AGGREGATE BASE TYPE A 14, CY , (K) 4300 STABILIZED SUBGRADE 60, SY , SEPARATOR FABRIC 51, SY , (E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E 5, TON , (A) 4659 FOG SEAL GAL (B) 0250 TACK COAT 6, GAL , PRIME COAT 31, GAL , (B) 5940 SUPERPAVE, TYPE S3(PG OK) 4, TON , (B) 5945 SUPERPAVE, TYPE S3(PG OK) 10, TON , (C) 5955 SUPERPAVE, TYPE S4(PG OK) 3, TON , (C) 5960 SUPERPAVE, TYPE S4(PG OK) 2, TON , COLD MILLING PAVEMENT 5, SY , (A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED CY (A) 0319 CLASS AA CONCRETE CY ,331.60

4 PAGE NO. 2 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0100 ROADWAY (B) 0321 CLASS A CONCRETE CY , (D) 0325 CLASS C CONCRETE CY , (C) 6135 SLOPE WALL (5") SY , (A) 0332 REINFORCING STEEL 17, LB , (B) 0536 TYPE I-A PLAIN RIPRAP 1, TON , (C) 0538 TYPE I-A FILTER BLANKET TON , (B) " CONCRETE DRIVEWAY SY , (G) 6002 INLET (SMD-TYPE 2) EA 2, , (A) " R.C.PIPE CLASS III LF , (A) " R.C.PIPE CLASS III LF , (A) " R.C.PIPE CLASS III LF , (A) " R.C.PIPE CLASS III LF , (B) " CORR. GALV. STEEL PIPE LF , (B) " CORR. GALV. STEEL PIPE LF , (L) " PREFAB. CULVERT END SECTION, ROUND EA (L) " PREFAB. CULVERT END SECTION, ROUND EA , (L) " PREFAB. CULVERT END SECTION, ROUND EA 1, , (L) " PREFAB. CULVERT END SECTION, ROUND EA 1, , (M) 7187 TYPE B4 CULVERT END TREATMENT EA , (M) 7196 TYPE A6 CULVERT END TREATMENT EA 1, , (M) 7197 TYPE B6 CULVERT END TREATMENT EA 1, , (A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS LSUM 14, , (B) 0291 REMOVAL OF HEADWALL EA 1, , (B) 4725 REMOVAL OF FENCE 11, LF , (B) 4728 REMOVAL OF ASPHALT PAVEMENT 47, SY , (C) 0924 SAWING PAVEMENT LF , (PL)GUARDRAIL CURBING EA , (A) 0932 BEAM GUARDRAIL W-BEAM SINGLE 2, LF , (G) 8590 GUARDRAIL END TREATMENT (31") EA 2, , (I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31") EA 1, , (C) 4459 FENCE-STYLE SWF (5 BARBED WIRE) 9, LF , (A) 4958 MAILBOX INSTALLATION-SINGLE EA (D) 4961 REMOVAL OF MAILBOX INSTALLATION EA CATEGORY TOTAL $ 6,172,303.14

5 PAGE NO. 3 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0200 BRIDGE 'A' - NBI FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : X921 HWY OVER MISC STR CONCRETE GIRDER WORK CLASSIFICATION : 0300 STRUCTURES CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 1307 SUBSTRUCTURE EXCAVATION COMMON CY , (G) 6309 CLSM BACKFILL CY , (A) 1312 PRESTRESSED CONCRETE BEAMS (TYPE III) 1, LF , (A) 1304 APPROACH SLAB SY , (B) 1305 SAW-CUT GROOVING 1, SY , (C) 6250 SEALED EXPANSION JOINT LF , (D) 6245 CONCRETE RAIL (TR4) LF , (A) 1322 STRUCTURAL STEEL 1, LB , (A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY EA 2, , (B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY EA 2, , (A) 1326 CLASS AA CONCRETE CY , (B) 1328 CLASS A CONCRETE CY , (A) 1332 REINFORCING STEEL 1, LB , (B) 6010 EPOXY COATED REINFORCING STEEL 111, LB , (A) 6010 PILES, FURNISHED (HP 10X42) LF , (A) 6011 PILES, FURNISHED (HP 12X53) 1, LF , (B) 6292 PILES, DRIVEN (HP 10X42) LF , (B) 6294 PILES, DRIVEN (HP 12X53) 1, LF , (L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE) EA (A) 6013 WATER REPELLENT (VISUALLY INSPECTED) 1, SY , (A) 6096 DRILLED SHAFTS 60" DIAMETER LF , (C) 6200 CROSSHOLE SONIC LOGGING EA 3, , (A) 6550 SEALER CRACK PREPARATION LF (B) 6560 SEALER RESIN GAL (B) 1353 TYPE I-A PLAIN RIPRAP 5, TON ,300.00

6 PAGE NO. 4 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0200 BRIDGE 'A' - NBI (C) 1355 TYPE I-A FILTER BLANKET 1, TON , (H) " PERFORATED PIPE UNDERDRAIN ROUND LF , (I) " NON-PERF.PIPE UNDERDRAIN RND LF , (D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE LSUM 30, , CATEGORY TOTAL $ 1,444, CATEGORY : 0201 BRIDGE 'B' - NBI FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : X921 HWY OVER MISC STR CONCRETE GIRDER WORK CLASSIFICATION : 0300 STRUCTURES CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 1307 SUBSTRUCTURE EXCAVATION COMMON CY , (G) 6309 CLSM BACKFILL CY , (A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV) 2, LF , (A) 1304 APPROACH SLAB SY , (B) 1305 SAW-CUT GROOVING 2, SY , (C) 6250 SEALED EXPANSION JOINT LF , (D) 6245 CONCRETE RAIL (TR4) 1, LF , (A) 1322 STRUCTURAL STEEL 2, LB , (A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY EA 2, , (B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY EA 2, , (A) 1326 CLASS AA CONCRETE CY ,172.00

7 PAGE NO. 5 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0201 BRIDGE 'B' - NBI (B) 1328 CLASS A CONCRETE CY , (A) 1332 REINFORCING STEEL 2, LB , (B) 6010 EPOXY COATED REINFORCING STEEL 200, LB , (A) 6010 PILES, FURNISHED (HP 10X42) LF , (A) 6011 PILES, FURNISHED (HP 12X53) 1, LF , (B) 6292 PILES, DRIVEN (HP 10X42) LF , (B) 6294 PILES, DRIVEN (HP 12X53) 1, LF , (L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE) EA (A) 6013 WATER REPELLENT (VISUALLY INSPECTED) 2, SY , (A) 6096 DRILLED SHAFTS 60" DIAMETER LF , (C) 6200 CROSSHOLE SONIC LOGGING EA 3, , (A) 6550 SEALER CRACK PREPARATION LF (B) 6560 SEALER RESIN GAL (B) 1353 TYPE I-A PLAIN RIPRAP 1, TON , (C) 1355 TYPE I-A FILTER BLANKET TON , (H) " PERFORATED PIPE UNDERDRAIN ROUND LF , (I) " NON-PERF.PIPE UNDERDRAIN RND LF (D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE LSUM 75, , CATEGORY TOTAL $ 2,452,931.88

8 PAGE NO. 6 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0300 TRAFFIC 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y031 TRAFFIC SIGNALS WORK CLASSIFICATION : 0400 TRAFFIC CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 4863 RUMBLE STRIP-METHOD HMA-CYC 17, LF , (A) 8110 SHEET ALUMINUM SIGNS SF , (C) " SQUARE TUBE POST LF , DELINEATORS(TYPE 2, CODE 1) EA , (A) 8840 TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) 45, LF , (A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 19, LF , (E) 8887 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX 2, EA , TAB)TYPE (F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 1, LF (B) 8705 (SP)CONST.ZONE IMPACT ATTEN. 1, SD , (B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER 4, LF , (C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 3, LF , (B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF 7, SD , (B) 8821 CONSTRUCTION SIGNS 6.26 SF TO SF 6, SD , (B) 8824 CONSTRUCTION SIGNS 16.0 SF TO SF 9, SD , (C) 8842 CONSTRUCTION BARRICADES(TYPE III) 1, SD (C) 8848 WING BARRICADES 1, SD , (D) 8854 VERTICAL PANELS 1, SD (E) 8860 WARNING LIGHTS(TYPE A) 5, SD , (F) 8878 DRUMS 7, SD , (G) 8884 TUBE CHANNELIZERS 2, SD (A) 8306 PORT.CHANGEABLE MESSAGE SIGN SD , CATEGORY TOTAL $ 154,824.22

9 PAGE NO. 7 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPP-267N(062)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0600 STAKING 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : STAK STAKING WORK CLASSIFICATION : 0600 STAKING CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 0096 CONSTRUCTION STAKING LEVEL II LSUM 90, , CATEGORY TOTAL $ 90, CATEGORY : 0640 CONSTRUCTION 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : CONS CONSTRUCTION FOR CATEGORY #0640 WORK CLASSIFICATION : 0640 CONSTRUCTION CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET SWPPP DOCUMENTATION AND MANAGEMENT LSUM 4, , (A) 1398 FIELD OFFICE EA 10, , MOBILIZATION LSUM 425, , CATEGORY TOTAL $ 439, PROJECT TOTAL $ 10,753, ESTIMATE TOTAL $ 10,753,567.73

10 DETAIL ESTIMATE FUNDING SUMMARY PAGE NO. 1 ESTIMATE NUMBER: PROJECT CONSTRUCTION ENGINEERING TOTAL FUNDING FUNDING CONTROL NO. CATEGORY COST PERCENT AMOUNT AMOUNT SOURCE AMOUNT ROADWAY $ 6,172, $ 370, $ 6,542, FED $ 6,542, TOTAL FOR CATEGORY 0100 $ 6,542, BRIDGE 'A' - NBI $ 1,444, $ 86, $ 1,530, FED $ 1,530, TOTAL FOR CATEGORY 0200 $ 1,530, BRIDGE 'B' - NBI $ 2,452, $ 147, $ 2,600, FED $ 2,600, TOTAL FOR CATEGORY 0201 $ 2,600, TRAFFIC STAKING CONSTRUCTION $ 154, $ 9, $ 164, FED $ 164, TOTAL FOR CATEGORY 0300 $ 164, $ 90, $ 0.00 $ 90, FED $ 90, TOTAL FOR CATEGORY 0600 $ 90, $ 439, $ 26, $ 465, FED $ 465, TOTAL FOR CATEGORY 0640 $ 465, TOTAL FOR PROJECT $ 11,393, ================================================================ ESTIMATE TOTAL $ 11,393,381.79

11 FUNDING SUMMARY BY UNIT PAGE NO. 1 PROJECT CONTROL NUMBER : PROJECT NUMBER : NHPP-267N(062)PM - UNIT COST CONST ENGR TOTAL FUNDING - FUND CLASS 0FED FEDERAL FUND PLACE HOLDER 000 $ 10,753, $ 639, $ 11,393, $ 11,393, FUND CLASS 0FED TOTALS $ 10,753, $ 639, $ 11,393, $ 11,393, ================================================================== PROJECT TOTALS $ 10,753, $ 639, $ 11,393, $ 11,393,381.79

12 CATEGORY FUNDING SUMMARY BY FUND PAGE NO. 1 PROJECT CONTROL NUMBER : PROJECT NUMBER : NHPP-267N(062)PM - CATEGORY COST CONST ENGR TOTAL FUNDING - FUND CLASS 0FED FEDERAL FUND PLACE HOLDER 0100 ROADWAY $ 6,172, $ 370, $ 6,542, $ 6,542, BRIDGE 'A' - NBI $ 1,444, $ 86, $ 1,530, $ 1,530, BRIDGE 'B' - NBI $ 2,452, $ 147, $ 2,600, $ 2,600, TRAFFIC $ 154, $ 9, $ 164, $ 164, STAKING $ 90, $ 0.00 $ 90, $ 90, CONSTRUCTION $ 439, $ 26, $ 465, $ 465, FUND CLASS 0FED TOTALS $ 10,753, $ 639, $ 11,393, $ 11,393, ================================================================== PROJECT TOTALS $ 10,753, $ 639, $ 11,393, $ 11,393,381.79

13 LETTING DATE : CALL NUMBER : 770 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : ESTIMATE NUMBER : PROJECT NUMBER : STP-256C(047)PM PROJECT NAME : BRIDGE AND APPROACHES BRIDGE AND APPROACHES TOTAL PROJECT LENGTH : TOTAL BRIDGE LENGTH : MILES FEET SH-56: OVER BRIER CREEK AND TRIBUTARY, 0.4 MILES AND 0.6 MILES EAST OF THE OKFUSKEE COUNTY LINE. BRIDGE AND APPROACHES COUNTIES: OKMULGEE This Engineer's Estimate is furnished in compliance with 61 O.S. 116 B. No representation is made or intended as to its accuracy or fitness for use for any purpose. The Engineer's Estimate is composed of units which are expressed as Mathematical Averages for work units which may be required for a project. The mathematical averages are derived by adding dollar amounts bid for work under a specific item code over the preceding eighteen (18) months within a specific field division and dividing the resultant total by the number of bids included. The resultant average unit amount does not and is not intended to portray difficulties or resources which may be required to perform any specific unit of work on any specific project. THE ENGINEER'S ESTIMATE SHOULD NOT BE USED OR RELIED ON TO PREPARE ANY CONTRACTOR'S BID PROPOSAL FOR SUBMISSION FOR DEPARTMENT CONSIDERATION ON ANY DEPARTMENT PROJECT.

14 DETAIL ESTIMATE COST SUMMARY DATE PRINTED : PAGE: 1 ESTIMATE NUMBER : PROJECT NO.: STP-256C(047)PM - PROJECT NO. PCN STAT TYPE COST CONST ENGR TOTAL FUNDING LIMIT FUNDING - FUND CLASS 0FED FEDERAL FUND PLACE HOLDER STP-256C(047)PM B 11 3,409, , ,611, ,611, FUND CLASS 0FED TOTALS 3,409, , ,611, ,611, =============================================================================== ESTIMATE TOTALS 3,409, , ,611, ,611,812.61

15 PAGE NO. 1 ESTIMATE NUMBER : PCN : PROJECT NO. : STP-256C(047)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0100 ROADWAY 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : I000 BITUMINOUS CONCRETE WORK CLASSIFICATION : 0200 ROADWAY CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 0102 CLEARING AND GRUBBING LSUM 25, , (A) 0183 UNCLASSIFIED EXCAVATION 50, CY , (D) 0184 UNCLASSIFIED BORROW 20, CY , (A) 4229 TYPE A-SALVAGED TOPSOIL LSUM 35, , (F) 0100 TEMPORARY SILT DIKE LF , (G) 0150 TEMPORARY ROCK FILTER DAM TYPE 1 1, CY , DITCH LINER PROTECTION 1, LF , (A) 2806 SOLID SLAB SODDING 28, SY , (B) 2814 SEEDING METHOD B AC , (A) 2817 VEGETATIVE MULCHING AC , MOWING AC , (A) 2100 AGGREGATE BASE TYPE A 3, CY , (D) 4230 LIME TON , (H) 4270 LIME STABILIZED SUBGRADE 25, SY , SEPARATOR FABRIC 18, SY , (B) 0100 GEOGRID REINFORCEMENT 1, SY , (E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E 2, TON , (B) 0250 TACK COAT 2, GAL , PRIME COAT 13, GAL , (B) 5945 SUPERPAVE, TYPE S3(PG OK) 6, TON , (C) 5960 SUPERPAVE, TYPE S4(PG OK) 2, TON , COLD MILLING PAVEMENT 2, SY , (A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED 2, CY , (A) 0319 CLASS AA CONCRETE CY , (D) 0325 CLASS C CONCRETE CY ,575.00

16 PAGE NO. 2 ESTIMATE NUMBER : PCN : PROJECT NO. : STP-256C(047)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0100 ROADWAY (A) 1332 REINFORCING STEEL 74, LB , (B) " CORR. GALV. STEEL PIPE LF , (B) " CORR. GALV. STEEL PIPE LF , (B) " CORR. GALV. STEEL PIPE LF , (B) " X 15" CORR. GALV. STEEL PIPE ARCH LF , (H) " PERFORATED PIPE UNDERDRAIN ROUND LF , (I) " NON-PERF.PIPE UNDERDRAIN RND LF (M) 7197 TYPE B6 CULVERT END TREATMENT EA 1, , (M) 7201 TYPE AA6 CULVERT END TREATMENT EA 1, , (Q) 5946 OUTLET LATERAL HEADWALL EA (A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS LSUM 20, , (B) 4763 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT 9, SY , OVERLAY (B) 4780 REMOVAL OF GUARDRAIL LF , (C) 0924 SAWING PAVEMENT 1, LF , (C) 4458 FENCE-STYLE SWF (4 BARBED WIRE) 2, LF , (C) 4459 FENCE-STYLE SWF (5 BARBED WIRE) 4, LF , (A) 4958 MAILBOX INSTALLATION-SINGLE EA (C) 4960 MAILBOX EA (D) 4961 REMOVAL OF MAILBOX INSTALLATION EA CATEGORY TOTAL $ 2,529,540.06

17 PAGE NO. 3 ESTIMATE NUMBER : PCN : PROJECT NO. : STP-256C(047)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0200 BRIDGE 'A' (NBI# 01554) 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : X028 HWY OVER WTRWAY CONCRETE BOX CULVERT # OF SPANS : 3 BRIDGE ID : WORK CLASSIFICATION : 0300 STRUCTURES SPAN LENGTH : CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS SPAN WIDTH : CAT WIDTH : FEET (A) 1301 UNCLASSIFIED EXCAVATION 1, CY , (A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED CY , (A) 1326 CLASS AA CONCRETE CY , (B) 6010 EPOXY COATED REINFORCING STEEL 90, LB , (D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE LSUM 42, , CATEGORY TOTAL $ 591, CATEGORY : 0300 TRAFFIC CONTROL 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y000 TRAFFIC WORK CLASSIFICATION : 0450 TRAFFIC CONTROL CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 23, LF , (F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 2, LF

18 PAGE NO. 4 ESTIMATE NUMBER : PCN : PROJECT NO. : STP-256C(047)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0300 TRAFFIC CONTROL (A) 8482 (PL)TRUCK MOUNTED ATTENUATOR SD , (B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF 3, SD , (B) 8821 CONSTRUCTION SIGNS 6.26 SF TO SF 1, SD (B) 8824 CONSTRUCTION SIGNS 16.0 SF TO SF 3, SD , (C) 8842 CONSTRUCTION BARRICADES(TYPE III) 2, SD , (C) 8848 WING BARRICADES SD (D) 8854 VERTICAL PANELS 10, SD , (E) 8860 WARNING LIGHTS(TYPE A) 7, SD , (F) 8878 DRUMS 8, SD , (G) 8890 CHANNELIZER CONES 6, SD , (A) 8306 PORT.CHANGEABLE MESSAGE SIGN SD , CATEGORY TOTAL $ 35, CATEGORY : 0301 TRAFFIC SIGNING AND STRIPING 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y002 TRAFFIC SIGNS WORK CLASSIFICATION : 0400 TRAFFIC CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 8724 (PL)REMOVAL OF EXISTING SIGNS EA (D) 8756 (PL)REMOVE & RESET EXISTING SIGNS EA (A) 8110 SHEET ALUMINUM SIGNS SF (C) " SQUARE TUBE POST LF

19 PAGE NO. 5 ESTIMATE NUMBER : PCN : PROJECT NO. : STP-256C(047)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0301 TRAFFIC SIGNING AND STRIPING (A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 13, LF , CATEGORY TOTAL $ 10, CATEGORY : 0600 STAKING 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : STAK STAKING WORK CLASSIFICATION : 0600 STAKING CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 0096 CONSTRUCTION STAKING LEVEL II LSUM 45, , CATEGORY TOTAL $ 45,000.00

20 PAGE NO. 6 ESTIMATE NUMBER : PCN : PROJECT NO. : STP-256C(047)PM CONTRACT ID : PCN : BRIDGE AND APPROACHES CATEGORY : 0640 CONSTRUCTION 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : CONS CONSTRUCTION FOR CATEGORY #0640 WORK CLASSIFICATION : 0640 CONSTRUCTION CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET SWPPP DOCUMENTATION AND MANAGEMENT LSUM 10, , (A) 1398 FIELD OFFICE EA 8, , MOBILIZATION LSUM 180, , CATEGORY TOTAL $ 198, PROJECT TOTAL $ 3,409, ESTIMATE TOTAL $ 3,409,917.56

21 DETAIL ESTIMATE FUNDING SUMMARY PAGE NO. 1 ESTIMATE NUMBER: PROJECT CONSTRUCTION ENGINEERING TOTAL FUNDING FUNDING CONTROL NO. CATEGORY COST PERCENT AMOUNT AMOUNT SOURCE AMOUNT ROADWAY $ 2,529, $ 151, $ 2,681, FED $ 2,681, TOTAL FOR CATEGORY 0100 $ 2,681, BRIDGE 'A' (NBI# 01554) $ 591, $ 35, $ 627, FED $ 627, TOTAL FOR CATEGORY 0200 $ 627, TRAFFIC CONTROL $ 35, $ 2, $ 37, FED $ 37, TOTAL FOR CATEGORY 0300 $ 37, TRAFFIC SIGNING AND STRIPING $ 10, $ $ 10, FED $ 10, TOTAL FOR CATEGORY 0301 $ 10, STAKING CONSTRUCTION $ 45, $ 0.00 $ 45, FED $ 45, TOTAL FOR CATEGORY 0600 $ 45, $ 198, $ 11, $ 209, FED $ 209, TOTAL FOR CATEGORY 0640 $ 209, TOTAL FOR PROJECT $ 3,611, ================================================================ ESTIMATE TOTAL $ 3,611,812.61

22 FUNDING SUMMARY BY UNIT PAGE NO. 1 PROJECT CONTROL NUMBER : PROJECT NUMBER : STP-256C(047)PM - UNIT COST CONST ENGR TOTAL FUNDING - FUND CLASS 0FED FEDERAL FUND PLACE HOLDER 000 $ 3,409, $ 201, $ 3,611, $ 3,611, FUND CLASS 0FED TOTALS $ 3,409, $ 201, $ 3,611, $ 3,611, ================================================================== PROJECT TOTALS $ 3,409, $ 201, $ 3,611, $ 3,611,812.61

23 CATEGORY FUNDING SUMMARY BY FUND PAGE NO. 1 PROJECT CONTROL NUMBER : PROJECT NUMBER : STP-256C(047)PM - CATEGORY COST CONST ENGR TOTAL FUNDING - FUND CLASS 0FED FEDERAL FUND PLACE HOLDER 0100 ROADWAY $ 2,529, $ 151, $ 2,681, $ 2,681, BRIDGE 'A' (NBI# 01554) $ 591, $ 35, $ 627, $ 627, TRAFFIC CONTROL $ 35, $ 2, $ 37, $ 37, TRAFFIC SIGNING AND STRIPING $ 10, $ $ 10, $ 10, STAKING $ 45, $ 0.00 $ 45, $ 45, CONSTRUCTION $ 198, $ 11, $ 209, $ 209, FUND CLASS 0FED TOTALS $ 3,409, $ 201, $ 3,611, $ 3,611, ================================================================== PROJECT TOTALS $ 3,409, $ 201, $ 3,611, $ 3,611,812.61

24 LETTING DATE : CALL NUMBER : 715 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : ESTIMATE NUMBER : PROJECT NUMBER : NHPPI-3500(065) PROJECT NAME : GRADE, DRAIN, SURFACE, AND BRIDGE GRADE, DRAIN, SURFACE, AND BRIDGE TOTAL PROJECT LENGTH : TOTAL BRIDGE LENGTH : MILES FEET CITY STREET (SW 34TH STREET): OVER I-35 AND LITTLE RIVER, 3.7 MILES AND 3.6 MILES WEST OF SH-77H IN MOORE. GRADE, DRAIN, SURFACE AND BRIDGE COUNTIES: CLEVELAND This Engineer's Estimate is furnished in compliance with 61 O.S. 116 B. No representation is made or intended as to its accuracy or fitness for use for any purpose. The Engineer's Estimate is composed of units which are expressed as Mathematical Averages for work units which may be required for a project. The mathematical averages are derived by adding dollar amounts bid for work under a specific item code over the preceding eighteen (18) months within a specific field division and dividing the resultant total by the number of bids included. The resultant average unit amount does not and is not intended to portray difficulties or resources which may be required to perform any specific unit of work on any specific project. THE ENGINEER'S ESTIMATE SHOULD NOT BE USED OR RELIED ON TO PREPARE ANY CONTRACTOR'S BID PROPOSAL FOR SUBMISSION FOR DEPARTMENT CONSIDERATION ON ANY DEPARTMENT PROJECT.

25 DETAIL ESTIMATE COST SUMMARY DATE PRINTED : PAGE: 1 ESTIMATE NUMBER : PROJECT NO.: NHPPI-3500(065) - PROJECT NO. PCN STAT TYPE COST CONST ENGR TOTAL FUNDING LIMIT FUNDING - FUND CLASS 0CTY CITY PARTICIPATION NHPPI-3500(065) B 07 11,645, , ,337, ,402, FUND CLASS 0CTY TOTALS 11,645, , ,337, ,402, FUND CLASS 0FED FEDERAL FUND PLACE HOLDER NHPPI-3500(065) B 07 11,645, , ,337, ,935, FUND CLASS 0FED TOTALS 11,645, , ,337, ,935, =============================================================================== ESTIMATE TOTALS 11,645, , ,337, ,337,537.50

26 PAGE NO. 1 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0100 ROADWAY 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : I000 BITUMINOUS CONCRETE WORK CLASSIFICATION : 0200 ROADWAY CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 0102 CLEARING AND GRUBBING LSUM 60, , (A) 0183 UNCLASSIFIED EXCAVATION 36, CY , (D) 0184 UNCLASSIFIED BORROW 85, CY , (A) 4229 TYPE A-SALVAGED TOPSOIL LSUM 70, , (C) 2801 TEMPORARY SILT FENCE 8, LF , (K) 0600 TEMPORARY FIBER LOG 4, LF , (A) 2806 SOLID SLAB SODDING 50, SY , (F) 2812 WATERING 2, KGAL , (A) 2817 VEGETATIVE MULCHING AC , (A) 2824 FERTILIZING ( ) TON , (A) 4409 FERTILIZING ( ) TON MOWING AC , (PL)STABILIZED CONSTRUCTION EXIT EA 2, , (K) 4300 STABILIZED SUBGRADE 43, SY , (B) 0250 TACK COAT 1, GAL , PRIME COAT 3, GAL , (A) 4242 FABRIC REINFORCEMENT 1, SY , (B) 5940 SUPERPAVE, TYPE S3(PG OK) 1, TON , (B) 5945 SUPERPAVE, TYPE S3(PG OK) 2, TON , (C) 5955 SUPERPAVE, TYPE S4(PG OK) 1, TON , COLD MILLING PAVEMENT 70, SY , (A) 0210 P.C.CONCRETE PAVEMENT(PLACEMENT) SY , (B) 5725 DOWEL JOINTED P.C. CONCRETE 31, SY , PAVEMENT(PLACEMENT )

27 PAGE NO. 2 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0100 ROADWAY (G) 5275 P.C. CONCRETE FOR PAVEMENT 7, CY , (A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED CY SPECIAL CONCRETE FINISH SY , (A) 0319 CLASS AA CONCRETE CY , (B) 0325 CLASS A CONCRETE(LONG. BAR. DES. 1-A) CY , (C) 0322 CLASS A CONCRETE, SMALL STRUCTURES CY , (D) 0325 CLASS C CONCRETE CY , (A) 6333 RETAINING WALL SY , (A) 0332 REINFORCING STEEL 5, LB , (A) 0297 TYPE I PLAIN RIPRAP TON (C) 4155 FILTER FABRIC SY (A) 0300 CONCRETE CURB (6" BARRIER-INTEGRAL) 7, LF , (B) '-8" COMB. CURB & GUTTER (6" BARRIER) 1, LF , (A) " CONCRETE SIDEWALK 3, SY , (B) " CONCRETE DRIVEWAY SY , (I) 4610 TACTILE WARNING DEVICE-NEW SF , (A) 2657 MANHOLE (4' DIAMETER) EA 1, , (G) 5113 INLET CI DES. 2 (B) EA 4, , (G) 5117 INLET CI DES. 2 (2B) EA 4, , (G) 5121 INLET CI DES. 3 (B) EA 7, , (G) 5699 INLET - LONGITUDINAL BARRIER - TYPE I, DES EA 4, , (H) 5325 ADD'L DEPTH IN INLET CI DES VF , (H) 5330 ADD'L DEPTH IN INLET CI DES VF (L) 0487 JUNCTION BOXES CF , (A) " R.C.PIPE CLASS III LF , (A) " R.C.PIPE CLASS III LF , (A) " X 13" R.C.PIPE ARCH CLASS A-III LF , (A) " X 18" R.C.PIPE ARCH CLASS A-III LF , (A) " X 26" R.C.PIPE ARCH CLASS A-III LF , (H) " PERFORATED PIPE UNDERDRAIN ROUND LF (H) " PERFORATED PIPE UNDERDRAIN ROUND LF , (I) " NON-PERF.PIPE UNDERDRAIN RND LF

28 PAGE NO. 3 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0100 ROADWAY (I) " NON-PERF.PIPE UNDERDRAIN RND LF , (L) " X 13" PREFAB. CULVERT END SEC., ARCH EA , (L) " X 18" PREFAB. CULVERT END SECTION, ARCH EA , (L) " X 26" PREFAB. CULVERT END SECTION, ARCH EA 1, , (L) " PREFAB. CULVERT END SECTION, ROUND EA , (L) " PREFAB. CULVERT END SECTION, ROUND EA , (Q) 5946 OUTLET LATERAL HEADWALL EA , (S) 1186 STANDARD BEDDING MATERIAL, CLASS B CY , (T) 1187 STANDARD BEDDING MATERIAL, CLASS C CY , (U) 1100 PIPE UNDERDRAIN COVER MAT'L CY , (V) 1180 TRENCH EXCAVATION CY , (A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS LSUM 25, , (B) 4725 REMOVAL OF FENCE 3, LF , (B) 4726 REMOVAL OF CURB AND GUTTER 1, LF , (B) 4728 REMOVAL OF ASPHALT PAVEMENT 13, SY , (B) 4766 REMOVAL OF CONCRETE DRIVEWAY SY , (B) 4915 REMOVAL OF CONCRETE MEDIAN BARRIER LF , (C) 0924 SAWING PAVEMENT 5, LF , (A) 0932 BEAM GUARDRAIL W-BEAM SINGLE LF (G) 8571 GUARDRAIL END TREATMENT (GET) EA 2, , (I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31") EA 1, , (A) 4281 FENCE-STYLE WWF 1, LF , CATEGORY TOTAL $ 4,460,253.94

29 PAGE NO. 4 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0200 BRIDGE 'A' - NBI# SW 34TH STREET OVER I-35 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : X031 HWY OVER WTRWAY STEEL GIRDER WORK CLASSIFICATION : 0300 STRUCTURES CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 1307 SUBSTRUCTURE EXCAVATION COMMON CY , (G) 6309 CLSM BACKFILL CY , (A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV) 3, LF , (A) 1304 APPROACH SLAB SY , (B) 1305 SAW-CUT GROOVING 3, SY , (C) 6250 SEALED EXPANSION JOINT LF , (E) 1381 CONCRETE PARAPET LF , (A) 1322 STRUCTURAL STEEL 3, LB , (A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY EA 1, , (B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY EA 1, , SPECIAL CONCRETE FINISH 4, SY , (A) 1326 CLASS AA CONCRETE CY , (B) 1328 CLASS A CONCRETE CY , (C) 6135 SLOPE WALL (5") SY , (B) 6010 EPOXY COATED REINFORCING STEEL 396, LB , (A) 6010 PILES, FURNISHED (HP 10X42) LF , (A) 6011 PILES, FURNISHED (HP 12X53) LF , (B) 6292 PILES, DRIVEN (HP 10X42) LF , (B) 6294 PILES, DRIVEN (HP 12X53) LF , (L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE) EA (A) 6013 WATER REPELLENT (VISUALLY INSPECTED) 3, SY , (A) 6098 DRILLED SHAFTS 72" DIAMETER LF , (C) 6200 CROSSHOLE SONIC LOGGING EA 4, , (A) 6550 SEALER CRACK PREPARATION LF

30 PAGE NO. 5 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0200 BRIDGE 'A' - NBI# SW 34TH STREET OVER I (B) 6560 SEALER RESIN GAL (H) " PERFORATED PIPE UNDERDRAIN ROUND LF , (I) " NON-PERF.PIPE UNDERDRAIN RND LF , (Q) 5946 OUTLET LATERAL HEADWALL EA 1, , (PL) ORNAMENTAL FENCE LF , CATEGORY TOTAL $ 4,170, CATEGORY : 0201 BRIDGE 'B' - NBI# SW 34TH STREET OVER LITTLE RIVER 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : X031 HWY OVER WTRWAY STEEL GIRDER WORK CLASSIFICATION : 0300 STRUCTURES CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) 1307 SUBSTRUCTURE EXCAVATION COMMON CY , (G) 6309 CLSM BACKFILL CY , (A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV) LF , (A) 1304 APPROACH SLAB SY , (B) 1305 SAW-CUT GROOVING 1, SY , (E) 1381 CONCRETE PARAPET LF , (A) 1322 STRUCTURAL STEEL LB (A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY EA 1, , (A) 1326 CLASS AA CONCRETE CY ,600.00

31 PAGE NO. 6 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0201 BRIDGE 'B' - NBI# SW 34TH STREET OVER LITTLE RIVER (B) 1328 CLASS A CONCRETE CY , (B) 6010 EPOXY COATED REINFORCING STEEL 87, LB , (A) 6010 PILES, FURNISHED (HP 10X42) LF , (B) 6292 PILES, DRIVEN (HP 10X42) LF , (L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE) EA (A) 6013 WATER REPELLENT (VISUALLY INSPECTED) SY , (B) 1353 TYPE I-A PLAIN RIPRAP 1, TON , (C) 1355 TYPE I-A FILTER BLANKET TON , (H) " PERFORATED PIPE UNDERDRAIN ROUND LF , (I) " NON-PERF.PIPE UNDERDRAIN RND LF CATEGORY TOTAL $ 826, CATEGORY : 0300 SIGNING AND STRIPING 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y002 TRAFFIC SIGNS WORK CLASSIFICATION : 0400 TRAFFIC CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 8110 SHEET ALUMINUM SIGNS SF , (C) /2" SQUARE TUBE POST LF , BARRIER DELINEATORS(TYPE 2, CODE 1) EA GUARDRAIL DELINEATORS(TYPE 2, CODE 1) EA

32 PAGE NO. 7 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0300 SIGNING AND STRIPING (A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 47, LF , (A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 4, LF , (A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) 1, LF , (B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) EA , (F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 18, LF , (A) 8325 (SP)IMPACT ATTENUATOR EA 23, , CATEGORY TOTAL $ 156, CATEGORY : 0301 TRAFFIC CONTROL 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y000 TRAFFIC WORK CLASSIFICATION : 0450 TRAFFIC CONTROL CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) 8722 (PL)REMOVAL OF EXISTING SIGNS LSUM 1, , (SP)PORTABLE TRAFFIC SIGNAL SYSTEM SD , (E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX 4, EA , TAB)TYPE (B) 8705 (SP)CONST.ZONE IMPACT ATTEN SD , (B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER 2, LF , (C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 2, LF , (A) 8812 ARROW DISPLAY(TYPE C) SD

33 PAGE NO. 8 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0301 TRAFFIC CONTROL (B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF 43, SD , (B) 8821 CONSTRUCTION SIGNS 6.26 SF TO SF 4, SD , (B) 8824 CONSTRUCTION SIGNS 16.0 SF TO SF 10, SD , (C) 8842 CONSTRUCTION BARRICADES(TYPE III) 7, SD , (C) 8848 WING BARRICADES SD (E) 8860 WARNING LIGHTS(TYPE A) 19, SD , (F) 8878 DRUMS 27, SD , (L) 8911 TRAFFIC SURVEILLANCE, POLICE HOUR , (A) 8306 PORT.CHANGEABLE MESSAGE SIGN 3, SD , CATEGORY TOTAL $ 294, CATEGORY : 0302 TRAFFIC SIGNALS 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y030 HIGHWAY LIGHTING WORK CLASSIFICATION : 0400 TRAFFIC CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (B) " PVC SCH.40 PLASTIC CONDUIT TRENCHED LF , (B) " PVC SCH.40 PLASTIC CONDUIT BORED LF , (B) " PVC SCH.40 PLASTIC CONDUIT TRENCHED LF , (A) 8065 PULL BOX(SIZE I) EA , (A) 8066 PULL BOX(SIZE II) EA ,400.00

34 PAGE NO. 9 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0302 TRAFFIC SIGNALS (A) 2915 STRUCTURAL CONCRETE CY , (B) 2916 REINFORCING STEEL 11, LB , (A) 'MH POLE 35'TS & 10'LMA(G.STL.) EA 11, , (A) 'MH POLE 40'TS & 10'LMA(G.STL.) EA 12, , (A) 'MH POLE 45'TS & 10'LMA(G.STL.) EA 13, , (A) 'MH POLE 50'TS & 10'LMA(G.STL.) EA 14, , (A) 'MH POLE,30'TS & 10'LMA(G.STL.) EA 10, , (A) 'MH POLE 25',TS & 10'LMA(G.STL.) EA 9, , (A) 'MH POLE,55'TS & 10'LMA(G.STL.) EA 37, , (B) ' MTG.HT.TS PED.POLE(G.STL.) EA 2, , (B) ' MTG.HT.TS PED.POLE(G.STL.) EA 2, , (A) 8090 ROADWAY LUMINAIRE EA , /C NO.6 ELECTRICAL CONDUCTOR LF /C NO.10 ELECTRICAL CONDUCTOR 1, LF , TRAFFIC SIGNAL CONTROLLER ASSEMBLY EA 31, , (PL)DETECTION SYSTEM (VIDEO) LSUM 104, , PEDESTRIAN PUSH BUTTON EA , WAY 3SEC. ADJ. SIG. HD. S EA , WAY 3SEC. ADJ. SIG. HD.S EA , WAY 4SEC. ADJ. SIG. HD.S EA 1, , WAY 2SEC. ADJ. PED. SIG. HD. S EA , BACKPLATE EA , (A) /C TRAFFIC SIGNAL ELECTRICAL CABLE 1, LF , (A) /C TRAFFIC SIGNAL ELECTRICAL CABLE LF , (A) /C TRAFFIC SIGNAL ELECTRICAL CABLE LF , (A) /C TRAFFIC SIGNAL ELECTRICAL CABLE LF , (A) /C TRAFFIC SIGNAL ELECTRICAL CABLE LF , (B) /C SHIELDED LOOP DETECTOR LEAD-IN CABLE LF (B) /C SHIELDED LOOP DETECTOR LEAD-IN CABLE LF , (B) 8593 E.P.S. OPTICAL DETECTOR EA 1, , (D) 8595 E.P.S. 2 CHANNEL PHASE SELECTOR EA 2, , (C) 8118 MAST ARM MOUNTED SIGNS(ALUMINUM) SF , CATEGORY TOTAL $ 681,291.50

35 PAGE NO. 10 ESTIMATE NUMBER : PCN : PROJECT NO. : NHPPI-3500(065) CONTRACT ID : PCN : GRADE, DRAIN, SURFACE, AND BRIDGE CATEGORY : 0303 LIGHTING 0CTY CITY PARTICIPATION % 0FED FEDERAL FUND PLACE HOLDER % CONSTRUCTION TYPE : Y030 HIGHWAY LIGHTING WORK CLASSIFICATION : 0400 TRAFFIC CAT LENGTH : MILES CONSTRUCTION CLASS : B BIDDABLE ITEMS CAT WIDTH : FEET (A) " GALV. STEEL ELECTRICAL CONDUIT EXPOSED 3, LF , (A) " GALV. STEEL ELECTRICAL CONDUIT TRENCHED LF , (B) " PVC SCH.40 PLASTIC CONDUIT TRENCHED LF , (B) 8570 (PL)LIQUID TIGHT FLEXIBLE CONDUIT LF , (E) 8370 JUNCTION BOX(6" X 6" X 4") EA , (A) 8060 PULL BOX EA , ENHANCEMENT LIGHTING (COMPLETE) LSUM 169, , (B) 8098 UNDERPASS LUMINIARE EA , (A) 3118 SERVICE POLE EA 3, , /C NO.10 ELECTRICAL CONDUCTOR 8, LF , /C NO.12 ELECTRICAL CONDUCTOR LF CATEGORY TOTAL $ 394,670.00

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

CONTRACT TIME DETERMINATION

CONTRACT TIME DETERMINATION CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00

More information

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No

NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 217 10.00 CONTRACT ID: 187601030 PROJECT: BR 1502(017) CONTRACT: 04153032 AWARD : 3,278,223.27 PROJECTED : 3,289,223.27 ADJ. PROJECTED : 3,289,223.27

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

Market Street Gateway Improvements Phase 1

Market Street Gateway Improvements Phase 1 PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular

More information

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP)

WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) WAYNE COUNTY AIRPORT AIRPORT CAPITAL IMPROVEMENT PROGRAM (ACIP) 2017 2026 DECEMBER 2015 Prepared For: Federal Aviation Administration Ohio Department of Transportation Office of Aviation Attachment A 10

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

Opinion of Probable Cost

Opinion of Probable Cost Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00 TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection

More information

DISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT

DISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT 100 MOBILIZATION LS $ 20,000.00 $ 143,384.14 $ 74,567.11 BRSTL 101 CONSTRUCTION SURVEYING (CONSTR.) LS $ 2,500.00 $ 59,277.82 $ 13,090.66 BRSTL 102 CONSTRUCTION SURVEYING(MIN. PLAN) LS $ 15,000.00 $ 15,000.00

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate

More information

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19

More information

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC -73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD: 216,972.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 388 6 CONTRACT ID: 627908001 PROJECT: RMC - 627908001 CONTRACT: 11144009 AWARD AMOUNT: $319,350.50 PROJECTED AMOUNT: $319,351.50 ADJ. PROJECTED

More information

RIGHT-OF-WAY PERMIT APPLICATION

RIGHT-OF-WAY PERMIT APPLICATION PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. RIGHT-OF-WAY PERMIT APPLICATION DESCRIPTION OF WORK: (Mark all applicable) Pavement Cut: Directional Bore: Sewer / Water Connection: Driveway Apron: Sidewalk

More information

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT

CITY OF CHAMBLEE PIERCE DRIVE STORM SYSTEM EXTENSION PROJECT CPL 14064.08 BID FORM SECTION 00 300-1 BID FORM BID NUMBER: CH2019-001Dev SUBMITTAL DATE: BY: (Bidder) PROJECT DESCRIPTION: The project consists of the construction of a sidewalk and associated grading,

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00

More information

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS

S T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

The bid due date has been changed to 2:50 p.m. May 25, 2018.

The bid due date has been changed to 2:50 p.m. May 25, 2018. May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due

More information

PROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04

PROJECT NO PID SCI NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04 AWARDED PROJECT PROJECT NO. 010178 PID. 11858 SCI-23-0.00 NON-FEDERAL TYPE: BRIDGE REPLACEMENT (1 BRIDGE) LETTING: 04/18/01 COMPLETION DATE: 06/30/04 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR

More information

MSCAA PROJECT NO

MSCAA PROJECT NO TIME: RBID ENVELOPE MSCAA PROJECT NO. 08-1260-02 NAME OF PROJECT: GLYCOL MANAGEMENT PROGRAM- BRIDGES AND SITE CONSTRUCTION BIDS DUE: U7/27/2017 U U 2:00 PM Local Time UBIDDER IDENTIFICATIONU: MEMPHIS SHELBY

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED: 143,230.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 77 4.00 CONTRACT ID: 041902041 PROJECT: STP 2016(746) CONTRACT: 02163223 AWARD : $3,653,777.19 PROJECTED : $3,823,809.19 ADJ. PROJECTED :

More information

DISTRICT AVERAGES 1, 2016 THROUGH 1, 2018 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT

DISTRICT AVERAGES 1, 2016 THROUGH 1, 2018 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT 100 MOBILIZATION LS $ 15,000.00 $ 143,384.14 $ 69,597.83 BRSTL 101 CONSTRUCTION SURVEYING CONSTR. LS $ 2,000.00 $ 59,277.82 $ 12,621.73 BRSTL 102 CONSTRUCTION SURVEYING MIN.-PLAN LS $ 15,000.00 $ 15,000.00

More information

ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION

ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION SMALL BUSINESS PROVISION TITLE 49 CODE OF FEDERAL REGULATIONS PART 26 ARKANSAS SMALL BUSINESS PROVISION CERTIFICATION APPLICATION 10324 Interstate 30, P. O. Box 2261 Little Rock, Arkansas 72203-2261 Natasha

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information