LETTING : CALL : 056 COUNTIES : MILLE LACS
|
|
- Peter White
- 5 years ago
- Views:
Transcription
1 S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE CSAH 29 INTERSECTION. RECOMMENDATION: AWARD TO LOW BIDDER I, THE UNDERSIGNED CERTIFY THAT THIS ABSTRACT IS A CORRECT TABULATION OF ALL BIDS RECEIVED ON THIS (THESE) PROJECT(S): THAT THE LEGAL REQUIREMENTS RELATING TO COMPETITIVE BIDDING ON PUBLIC PROJECTS HAVE BEEN COMPLIED WITH: THAT SAID BIDS WERE OPENED IN PUBLIC AND AWARD HAS BEEN MADE TO THE LOWEST RESPONSIBLE BIDDER. APPROVED: STATE AID OR CONSTRUCTION ENGR ASST. DIV. DIRECTOR, OPERATIONS TOTAL % OVER % OVER RANK VENDOR NO./NAME BID LOW BID EST EST- ENGINEER'S ESTIMATE $ 5,978, % % 1 L550 LUNDA CONSTRUCTION CO $ 6,676, % % 2 R140 REDSTONE CONSTRUCTION COMPANY INC $ 6,844, % % SECTION 0001 FEDERAL 80%/STATE 20% SP /00010 LUMP MOBILIZATION / EACH COMBINATION FIELD LABORATORY-OFFICE / HOUR TRAINEES
2 p\lcp2a9.tmp: Page 2 PAGE : /00010 LUMP MAINT AND RESTORATION OF HAUL ROADS /00010 LUMP CLEARING AND GRUBBING / L F PAVEMENT MARKING REMOVAL-PERMANENT / L F REMOVE WATER MAIN / L F REMOVE SEWER PIPE (STORM) / L F REMOVE CURB AND GUTTER / L F REMOVE STONE RETAINING WALL / L F REMOVE WOVEN WIRE FENCE / L F REMOVE WOOD FENCE / L F REMOVE GUARD RAIL-PLATE BEAM / S Y REMOVE CONCRETE MEDIAN / S Y REMOVE CONCRETE WALK / S Y REMOVE PAVEMENT / S Y REMOVE CONCRETE DRIVEWAY PAVEMENT / S Y REMOVE CONCRETE APPROACH PANEL / S Y REMOVE BITUMINOUS DRIVEWAY PAVEMENT / S Y REMOVE BITUMINOUS PAVEMENT / S Y REMOVE BITUMINOUS SHOULDER PAVEMENT
3 p\lcp2a9.tmp: Page 3 PAGE : / EACH REMOVE CONCRETE APRON / EACH REMOVE MISCELLANEOUS STRUCTURES / EACH REMOVE LIGHTING UNIT / EACH REMOVE MANHOLE OR CATCH BASIN / EACH REMOVE MARKER / EACH REMOVE SIGN TYPE C / EACH REMOVE SIGN TYPE D / EACH REMOVE SIGNAL SYSTEM / EACH REMOVE LIGHT STANDARD BASE / L F SAWING CONCRETE PAVEMENT (FULL DEPTH) / L F SAWING BITUMINOUS PAVEMENT (FULL DEPTH) / EACH SALVAGE CASTING / EACH SALVAGE ENERGY ABSORBING TERMINAL / EACH SALVAGE SIGN TYPE C / EACH SALVAGE SIGN TYPE D / EACH SALVAGE SIGN TYPE SPECIAL / EACH SALVAGE BENCH /01011 LUMP HAUL SALVAGED MATERIAL
4 p\lcp2a9.tmp: Page 4 PAGE : / L F ABANDON WATER MAIN / S F SALVAGE CONCRETE PAVERS / C Y COMMON EXCAVATION / C Y SELECT GRANULAR BORROW (EV) / C Y SELECT GRANULAR BORROW MOD 10% (EV) / C Y SALVAGED TOPSOIL FROM STOCKPILE (SV) / C Y TOPSOIL BORROW MOD (LV) / S Y SHOULDER PREPARATION / C Y AGGREGATE SURFACING (CV) CLASS / C Y AGGREGATE BASE (CV) CLASS / TON AGGREGATE SHOULDERING SPECIAL / S Y MILL BITUMINOUS SURFACE (3.0") / L F EXPANSION JOINTS DESIGN E8H / S Y BRIDGE APPROACH PANELS / EACH DOWEL BARS / S Y CONCRETE PAVEMENT 8.0" / TON TYPE SP 12.5 WEARING COURSE MIXTURE (4, F)
5 p\lcp2a9.tmp: Page 5 PAGE : / C Y STRUCTURE EXCAVATION CLASS E / L F EXPANSION JOINT DEVICES TYPE SPECIAL / EACH " RC PIPE APRON / EACH " RC PIPE APRON / EACH " RC PIPE APRON / EACH TRASH GUARD FOR 27" PIPE APRON / EACH TRASH GUARD FOR 30" PIPE APRON / L F " TP PIPE DRAIN / L F " PERF PE PIPE DRAIN / EACH " PVC PIPE DRAIN CLEANOUT / L F " RC PIPE SEWER DESIGN 3006 CLASS III / L F " RC PIPE SEWER DESIGN 3006 CLASS III / L F " RC PIPE SEWER DESIGN 3006 CLASS V / L F " RC PIPE SEWER DESIGN 3006 CLASS III / L F " RC PIPE SEWER DESIGN 3006 CLASS III / L F " RC PIPE SEWER DESIGN 3006 CLASS III / L F " RC PIPE SEWER DESIGN 3006 CLASS III / L F " RC PIPE SEWER DESIGN 3006 CLASS III
6 p\lcp2a9.tmp: Page 6 PAGE : / EACH CONNECT TO EXISTING STORM SEWER /00001 LUMP IRRIGATION SYSTEM / EACH CONNECT TO EXISTING WATER MAIN / EACH HYDRANT / EACH ADJUST GATE VALVE / EACH " GATE VALVE / EACH " GATE VALVE / L F " WATERMAIN DUCTILE IRON CL / L F " WATERMAIN DUCTILE IRON CL / L F " STEEL CASING PIPE / LB DUCTILE IRON FITTINGS / L F CONSTRUCT DRAINAGE STRUCTURE DESIGN A OR F / L F CONSTRUCT DRAINAGE STRUCTURE DESIGN C OR G / L F CONSTRUCT DRAINAGE STRUCTURE DESIGN H / L F CONSTRUCT DRAINAGE STRUCTURE DESIGN / L F CONSTRUCT DRAINAGE STRUCTURE DESIGN
7 p\lcp2a9.tmp: Page 7 PAGE : / L F CONSTRUCT DRAINAGE STRUCTURE DESIGN / EACH CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL / EACH CASTING ASSEMBLY / EACH INSTALL CASTING / EACH ADJUST FRAME & RING CASTING / EACH CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL / C Y RANDOM RIPRAP CLASS III / S F " CONCRETE WALK / S F " CONCRETE WALK SPECIAL / S F " CONCRETE WALK / L F SAWING CONCRETE WALK / L F CONCRETE CURB & GUTTER DESIGN B / L F CONCRETE CURB & GUTTER DESIGN B / L F CONCRETE CURB & GUTTER DESIGN B / L F CONCRETE CURB & GUTTER DESIGN B / L F CONCRETE CURB & GUTTER DESIGN D424
8 p\lcp2a9.tmp: Page 8 PAGE : / L F CONCRETE CURB DESIGN B / L F CONCRETE CURB DESIGN V / S Y " CONCRETE DRIVEWAY PAVEMENT / S Y " CONCRETE DRIVEWAY PAVEMENT / S F TRUNCATED DOMES / EACH RELOCATE PLANTER / EACH SUPPLEMENTAL DESCRIPTION INSTALL BENCH / S F INSTALL CONCRETE PAVERS / EACH LIGHTING UNIT TYPE GD / EACH LIGHTING UNIT TYPE SPECIAL / EACH LIGHTING UNIT TYPE / EACH LIGHT BASE DESIGN E / EACH LIGHT BASE DESIGN E MODIFIED / L F " NON-METALLIC CONDUIT / L F " NON-METALLIC CONDUIT / L F UNDERGROUND WIRE 1 COND NO / L F UNDERGROUND WIRE 1 COND NO / L F ARMORED CABLE 4 COND NO 4
9 p\lcp2a9.tmp: Page 9 PAGE : / EACH SERVICE CABINET SECONDARY TYPE L / EACH EQUIPMENT PAD B / EACH HANDHOLE / EACH SERVICE EQUIPMENT / EACH UNDERGROUND CABLE SPLICE / L F TRAFFIC BARRIER DESIGN SPECIAL / L F TRAFFIC BARRIER DESIGN SPECIAL A / L F TRAFFIC BARRIER DESIGN B / EACH GUIDE POST TYPE B / EACH INSTALL ENERGY ABSORBING TERMINAL /00010 LUMP TRAFFIC CONTROL /00200 LUMP DETOUR SIGNING / EACH TRAFFIC CONTROL (SPECIAL) / EACH PORTABLE CHANGEABLE MESSAGE SIGN / S F SIGN PANELS TYPE SPECIAL / S F SIGN PANELS TYPE C / S F SIGN PANELS TYPE D / S F SIGN PANELS TYPE OVERLAY
10 p\lcp2a9.tmp: Page 10 PAGE : / EACH INSTALL SIGN TYPE C / EACH INSTALL SIGN TYPE D / EACH INSTALL SIGN TYPE SPECIAL / EACH REFERENCE POST MARKER / EACH HAZARD MARKER X / EACH SNOW PLOW MARKER X / SYS TEMPORARY SIGNAL SYSTEM / L F BALE BARRIER / L F SILT FENCE, TYPE HEAVY DUTY / L F SILT FENCE, TYPE SUPER DUTY / L F SILT FENCE, TYPE MACHINE SLICED / L F FLOTATION SILT CURTAIN TYPE STILL WATER / L F FLOTATION SILT CURTAIN TYPE MOVING WATE / EACH STORM DRAIN INLET PROTECTION / ACRE SEEDING / LB SEED MIXTURE / S Y SODDING TYPE LAWN / S Y EROSION CONTROL BLANKETS CATEGORY 3
11 p\lcp2a9.tmp: Page 11 PAGE : / S Y EROSION CONTROL BLANKETS CATEGORY / LB FERTILIZER TYPE / TON AGRICULTURAL LIME / ACRE RAPID STABILIZATION METHOD / L F REMOVABLE PREFORMED PLASTIC MARKING / EACH PAVEMENT MESSAGE (LEFT-THRU ARROW) PAIN / EACH PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM-GROUND IN / EACH PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM-GROUND IN / EACH PAVEMENT MESSAGE (THRU ARROW) POLY PREFORM-GROUND IN / L F " SOLID LINE WHITE-PAINT / L F " DOTTED LINE WHITE-PAINT / L F " SOLID LINE YELLOW-PAINT / L F " BROKEN LINE YELLOW-PAINT / L F " SOLID LINE WHITE-EPOXY / L F " BROKEN LINE WHITE-EPOXY / L F " DOTTED LINE WHITE-EPOXY
12 p\lcp2a9.tmp: Page 12 PAGE : / L F " SOLID LINE YELLOW-EPOXY / L F " SOLID LINE YELLOW-EPOXY / L F " BROKEN LINE YELLOW-EPOXY / L F " DOUBLE SOLID LINE YELLOW-EPOXY / L F " SOLID LINE WHITE-EPOXY (GROUND IN) / L F " DOTTED LINE WHITE-EPOXY (GROUND IN) / L F " SOLID LINE YELLOW-EPOXY (GROUND IN) / L F " SOLID LINE YELLOW-EPOXY (GROUND IN) / L F " BROKEN LINE YELLOW-EPOXY (GROUND IN) / S F CROSSWALK MARKING-POLY PREFORM (GROUND IN) SECTION TOTALS $ 1,920, $ 1,799, $ 1,950, SECTION 0002 BRIDGE NO / S F RAISED MEDIAN CONCRETE (3Y46) / S F BLASTING (SPECIAL) / S F REMOVE CONCRETE WEARING COURSE / S F REMOVE SLAB TYPE /00011 LUMP CONDUIT SYSTEM (LIGHTING) SECTION TOTALS $ 20, $ 22, $ 20, SECTION 0003 BRIDGE NO 48028
13 p\lcp2a9.tmp: Page 13 PAGE : /00221 LUMP REMOVE REGULATED WASTE MATERIAL A / C Y STRUCTURAL CONCRETE (1A43) / C Y STRUCTURAL CONCRETE (3Y43) / S F BRIDGE SLAB CONCRETE (3Y36) / L F TYPE MOD P-1 (TL-2) RAILING CONCRETE (3Y46) / S F SIDEWALK CONCRETE (3Y46) / S F RAISED MEDIAN CONCRETE (3Y46) / LB REINFORCEMENT BARS / LB REINFORCEMENT BARS (EPOXY COATED) /00010 LUMP STRUCTURE EXCAVATION /00060 LUMP SLOPE PREPARATION /00075 LUMP FOUNDATION PREPARATION / L F ORNAMENTAL METAL RAILING TYPE SPECIAL / EACH ELASTOMERIC BEARING PAD TYPE / S F CONCRETE WEARING COURSE (3U17A) / EACH SUPPLEMENTAL DESCRIPTION PRECAST CONCRETE PANEL /00011 LUMP REMOVE EXISTING BRIDGE A
14 p\lcp2a9.tmp: Page 14 PAGE : / L F STEEL H-PILING DRIVEN 12" / L F STEEL H-PILING DELIVERED 12" / EACH STEEL H-TEST PILE 35 FT LONG 12" / EACH PILE ANALYSIS / EACH PILE TIP PROTECTION 12" / L F SUPPLEMENTAL DESCRIPTION PILE ADVANCEMENT /00010 LUMP DRAINAGE SYSTEM TYPE (B910) / C Y RANDOM RIPRAP CLASS III / S Y GEOTEXTILE FILTER TYPE IV (MOD) /00011 LUMP CONDUIT SYSTEM (LIGHTING) SECTION TOTALS $ 2,028, $ 2,414, $ 2,417, SECTION 0004 BRIDGE NO /00210 LUMP REMOVE REGULATED WASTE MATERIAL (BRIDGE / C Y STRUCTURAL CONCRETE (1A43) / C Y STRUCTURAL CONCRETE (3Y43) / S F BRIDGE SLAB CONCRETE (3Y36) / L F TYPE MOD P-1 (TL-2) RAILING CONCRETE (3Y46)
15 p\lcp2a9.tmp: Page 15 PAGE : / S F SIDEWALK CONCRETE (3Y46) / S F RAISED MEDIAN CONCRETE (3Y46) / LB REINFORCEMENT BARS / LB REINFORCEMENT BARS (EPOXY COATED) /00010 LUMP STRUCTURE EXCAVATION /00060 LUMP SLOPE PREPARATION /00075 LUMP FOUNDATION PREPARATION / L F ORNAMENTAL METAL RAILING TYPE SPECIAL / EACH ELASTOMERIC BEARING PAD TYPE / S F CONCRETE WEARING COURSE (3U17A) / EACH SUPPLEMENTAL DESCRIPTION PRECAST CONCRETE PANEL /00010 LUMP REMOVE EXISTING BRIDGE / L F STEEL H-PILING DRIVEN 12" / L F STEEL H-PILING DELIVERED 12" / EACH STEEL H-TEST PILE 35 FT LONG 12" / EACH PILE ANALYSIS / EACH PILE TIP PROTECTION 12"
16 p\lcp2a9.tmp: Page 16 PAGE : / L F SUPPLEMENTAL DESCRIPTION PILE ADVANCEMENT /00010 LUMP DRAINAGE SYSTEM TYPE (B910) / C Y RANDOM RIPRAP CLASS III / S Y GEOTEXTILE FILTER TYPE IV (MOD) /00011 LUMP CONDUIT SYSTEM (LIGHTING) SECTION TOTALS $ 2,008, $ 2,440, $ 2,456, CONTRACT TOTALS $ 5,978, $ 6,676, $ 6,844,967.69
AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP
AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32
More informationS T A T E O F M I N N E S O T A D E P A R T M E N T O F T R A N S P O R T A T I O N DATE : 05/17/00 PAGE : 1 TABULATION OF BIDS
PAGE : 1 CONTRACT DESCRIPTION : SP 03-626-17/ PLH 0399 (248) CONTRACT LOCATION: CSAH 26 WITHIN THE TAMARAC NATIONAL WILDLIFE REFUGE RECOMMENDATION: AWARD TO LOW BIDDER --------------------------------------------------------------------
More informationBID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012
Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00
More informationEngineer's Preliminary Estimate - 100% Submittal
EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000
More informationBID TABULATION BID REQUEST NO
BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS
More informationBIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL
Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.
More informationTOTAL QUANTITY UNIT COST UNIT
BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50
More informationENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal
Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
More informationBid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221
Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00
More informationJANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,
ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT
More informationPART A ROADWAY - BASE BID
May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00
More informationNE WEST KINGSTON ROAD CULVERT REPLACEMENT
NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS
More informationBID TABULATION. Engineer's Estmated Opinion of Costs
Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationSubject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122
Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More information19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown
19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20
More informationRANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price
2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF
More information69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11
69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to
More informationCertified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University
Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1
More informationPART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.
BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.
More informationOKLAHOMA TURNPIKE AUTHORITY
PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING
More informationBID TABULATION PAGE 1 OF 8
BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $
More informationCONTRACT TIME DETERMINATION
CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during
More informationFuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $
SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More informationSandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING
ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationFailure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.
Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017
More informationREPLACEMENT OF MERCER COUNTY BRIDGE
ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationPROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02
AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT
More informationCrushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:
Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and
More information2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.
ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense
More informationMunilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL
JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE
More informationSUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION
Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury
More informationExhibit 4 Page 1 of 8
Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:
More informationAnnual Services Construction Contract (ASCC) #15 Project Number: PUCN
Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction
More informationALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN
ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA
More informationADDENDUM No. 1 January 29, Paving Program Village of Milford
ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for
More informationRock Chalk Park - Infrastructure Report. July 2013
Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the
More informationNOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1. Project No. 253F Contract No
NOTICE OF AWARD OF CONTRACT S.R. 408/S.R.417 INTERCHANGE IMPROVEMENTS PHASE 1 Project No. 253F Contract No. 001118 October 8, 2015 Bids for this project were received and opened on September 16, 2015,
More informationITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT
Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00
More informationCITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018
CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00
More information2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationCITY OF TAMPA ADDENDUM 2. April 18, 2018
CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project
More information7 31 32 33 34 35 37 38 39 40 41 42 43 A G R E E M E N T Between Morrison County, The City of Pierz and Rich Prairie Sewer and Water District THIS AGREEMENT is made and entered into between Morrison
More informationActive Construction RV Associates Scarsella JR Hayes
CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92
More informationA DESIGN-BUILD PROJECT
Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,
More informationCITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $
RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement
More informationADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:
ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation
More informationTabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT
Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationNorthumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate
Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)
More information33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.
CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler
More informationAGENDA. Sartell City Council Special Meeting Sartell City Hall July 31, :30 pm. 2. Public Hearing - Vacation of Drainage and Utility Easements
AGENDA Sartell City Council Special Meeting Sartell City Hall July 31, 2017 5:30 pm 1. Agenda Review and Adoption 2. Public Hearing - Vacation of Drainage and Utility Easements 3. 4 th Avenue South Bid
More informationTown of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562
Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated
More informationCITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS
1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating
More informationFLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM
1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,
More informationCECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075
Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration
More informationNOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS
NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all
More informationAddendum 1 13 TH Street Streetscape. September 1, 2017
Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE
More informationReviax Constracting Corp. DeSantis Construction
Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.
More informationMarket Street Gateway Improvements Phase 1
PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular
More informationNorth Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL
More informationCITY OF DEERFIELD BEACH Request for City Commission Agenda
Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018
LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT
More informationBID TABULATION PAGE 1 OF 6
BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT
More information2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time
TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19
More informationAECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option
More informationNAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA
Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0
More informationPRESENTER: Christopher J. Blunk, Deputy Public Works Director / City Engineer
G-7 STAFF REPORT MEETING DATE: November 27, 2018 TO: FROM: City Council Petr Skala, Associate Engineer 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org PRESENTER: Christopher
More informationBID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #
ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00
More informationI. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL
WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division
More informationFALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00
More informationSunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List
Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements
More informationUtility Committee Meeting AGENDA. October 3, 2017
Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid
More informationBRIDGE ALTERNATE STUDY No. 1
BRIDGE ALTERNATE STUDY No. 1 RURAL STREAM CROSSING Prepared for U. S. Bridge Cambridge, Ohio Prepared by RICHLAND ENGINEERING LIMITED 29 North Park Street, Mansfield, Ohio 44902-1769 419/524-0074 FAX 419/524-1812
More information2001 Average Bid Tabs
Municipality of Anchorage Department of Planning, Development and Public Works Project Management and Engineering Department 2001 Average Bid Tabs SPEC. 20.02 Clearing and Grubbing 1 L.S. $ 750.00 $ 11,793.52
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate
More informationCITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $
More informationAugust 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA
August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection
More informationThe bid due date has been changed to 2:50 p.m. May 25, 2018.
May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due
More informationBid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location:
Bid Comparison Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Projects(s): Cass Avenue over North Branch Clinton River Clinton Township, Macomb County 1651 Rank Bidder
More informationADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO
ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents
More information2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD
BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and
More informationN E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS
N E W J E R S E Y T U R N P I K E A U T H O R I T Y PROCEDURE FOR PREQUALIFICATION AND AWARD OF CONSTRUCTION CONTRACTS (a) All prospective bidders for construction in excess of $50,000.00 shall be prequalified
More informationTITLE: Authorization to Award Contract for Construction and Construction Oversight Contract for the Powell Road Stormwater Diversion Project
Minnehaha Creek Watershed District REQUEST FOR BOARD ACTION MEETING DATE: March 26, 2015 TITLE: Authorization to Award Contract for Construction and Construction Oversight Contract for the Powell Road
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More informationPROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM
NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,
More informationPROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2
NAME OF CONTRACTOR: PROPOSAL AND SPECIFICATIONS FOR COUNTY PRIMARY HOT MIX ASPHALT PAVING #2 APRIL 18, 2018 1. PH 3546 WAYLAND TOWNSHIP On 10 th Street, M-179 (129 th Avenue) to the Wayland City Limits
More informationNew Jersey Department of Transportation DATE : 11/16/10 PAGE : TABULATION OF BIDS
PAGE : 131-1 CONTRACT TIME : 11/30/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : STP-5042(107) ROUTE 129 RESURFACING FROM ROUTE 1 TO LAMBERTON ROAD CONNECTOR CITY OF TRENTON, TOWNSHIP OF
More informationNew Jersey Department of Transportation DATE : 06/22/10 PAGE : TABULATION OF BIDS
PAGE : 107-1 CONTRACT TIME : 01/24/11 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : FS-0022(105) ROUTE 37 FROM ROUTE 70 TO GARDEN STATE PARKWAY RESURFACING CONTRACT NO. 000103080 TOWNSHIP OF
More informationRIGHT-OF-WAY PERMIT APPLICATION
PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. RIGHT-OF-WAY PERMIT APPLICATION DESCRIPTION OF WORK: (Mark all applicable) Pavement Cut: Directional Bore: Sewer / Water Connection: Driveway Apron: Sidewalk
More informationCITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER
CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing
More informationBID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements
BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $
More informationLETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY
LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines
More informationITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-
ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-4") 3,218 S.Y. $ $ 2 ASPHALTIC CONCRETE TYPE SPR 2,619
More information