1 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 Great Basin Engineering CLEARING EARTHWORK Per Lump Sum 1 LS $445, $ 445, $481, $ 481, $330, $ 330, $717, $ 717, City Standard SWPPP - Includes 10'X10' basin below existing storm water outflow pipe includes filter fence around soil and fill stockpile Per Lump Sum. 1 LS $180, $ 180, $648, $ 648, $109, $ 109, $175, $ 175, Site Cleaning, Grubbing to be stockpiled on site in future phase area, concrete and other manmade debris to be removed from the site., Concrete curb cutting/removal covered in Civil schedule, Includes clearing wetland/restoration Per Acre Acres $1, $ 91, $4, $ 263, $3, $ 229, $4, $ 275, Topsoil Stripping and Stockpile 6" depth Includes wetland/restoration area includes future work areas Includes fine grading of landscape Per Acre Acres $2, $ 140, $6, $ 402, $6, $ 382, $5, $ 305, Topsoil Placement Includes wetland/restoration area, future work areas, fine grading of landscape areas, lawn inside and outside of ball per Cubic Yard. 19,451 Cubic Yards $6.00 $ 116, $6.55 $ 127, $8.12 $ 157, $9.00 $ 175, Excavation and Rough Grading Includes wetland & restoration cut (approx. 40,000 yards) Includes stockpile of excess fill material (approx. 20,000 per Cubic Yards 158,702 Cubic Yards $7.00 $ 1,110, $7.72 $ 1,225, $7.49 $ 1,188, $10.00 $ 1,587, ELECTRICAL UTILITIES

2 7 Section E Electrical Service Connection, Include transformer and concrete pad, metering gear, conduit and pull boxes from Bullion Road to transformer, and conduit and pull boxes from transformer to per Lump Sum. 1 LS $120, $ 120, $84, $ 84, $107, $ 107, $94, $ 94, Section E Parking Lot Lighting Conduit Includes N-9 Junction Box and 2 conduit runs with pull strings, to future building for future parking lot light per Addendum #2. Includes trenching backfill, per lump Sum 1 LS $8, $ 8, $14, $ 14, $9, $ 9, $9, $ 9, Section E (P-1) Parking Lot Lighting - Removed from this bid $0.00 $ - $0.00 $ - $0.00 $ - $0.00 $ - 10 Section E (R-1) Roadway Lighting Removed from this bid $0.00 $ - $0.00 $ - $0.00 $ - $0.00 $ - 11 Section E 12 Section E 13 Section E 14 Section E (W-1) Walkway Lighting- Includes pole base, conduit, conductor, junction box, and pole, per plan. Includes trenching, backfill, per Each. (R-1) Roadway Lighting (Pole Base Only) Includes pole base, conduit & pull string, junction box Includes trenching, backfill, per Each. Scoreboard Power - Includes conduit, conductor junction box and connection to scoreboard- Includes trenching, backfill, per Lump Sum. Irrigation Pump Station Power - Includes conduit, conductor junction box Includes trenching, backfill, per Lump Sum. 8 Each $7, $ 57, $6, $ 52, $8, $ 64, $8, $ 64, Each $5, $ 21, $4, $ 17, $6, $ 24, $6, $ 24, LS $18, $ 18, $21, $ 21, $20, $ 20, $20, $ 20, LS $6, $ 6, $12, $ 12, $7, $ 7, $7, $ 7, Section E Flagpole Lighting Conduit- Includes conduit, pull strings, junction box, No conductor, no fixtures. Includes trenching, backfill, per Lump Sum 1 LS $6, $ 6, $7, $ 7, $7, $ 7, $7, $ 7, Section E Sports Lighting Components - Includes conduit, pull strings, junction boxes, no conductor. Includes trenching, backfill, and per Each. 15 Each $3, $ 48, $4, $ 65, $4, $ 68, $3, $ 49,500.00

3 SITE CONCRETE /ASPHALT (EXCLUDING ROADS OR PARKING LOT) 17 Per Detail 6' Precast Concrete Fence - Includes grading, footings for posts and aggregate per Lineal Foot 1950 LF $ $ 243, $93.00 $ 181, $ $ 402, $ $ 507, PLANTING AND MULCH (EXCLUDES PLAYING FIELDS) Rock Mulch in Drain Channel: 3"-6" Cobble 8" per Cubic Yard. 150 CY $ $ 37, $ $ 19, $ $ 42, $ $ 29, Per Detail IRRIGATION (EXCLUDES PLAYING FIELDS) Water Source to Wetlands 2" PVC pipe and per Lineal Foot Mainline Irrigation Installation Includes connection to pump station, mainline, communication wire, control valves, isolation valves, quick coupler valves, and associated equipment as shown on the LI per Lump Sum. 12" Ø reuse water line from point of connection includes trenching and per Lineal Foot. Pump Station Includes engineered shop drawings by vendor Includes offloading and set station, 10" Ø reuse line, connection to power stub, start up and testing includes concrete pad and cabinet as per Lump Sum. 700 LF $12.00 $ 8, $13.00 $ 9, $13.62 $ 9, $33.00 $ 23, LS $275, $ 275, $627, $ 627, $272, $ 272, $65, $ 65, LF $97.00 $ 24, $96.00 $ 24, $ $ 41, $83.00 $ 20, LS $200, $ 200, $145, $ 145, $226, $ 226, $200, $ 200, WETLAND MITIGATION AND RESTORATION AREA Wetland Seed Mix per Acre. 4.9 Acres $5, $ 26, $5, $ 28, $6, $ 29, $3, $ 14, Upland Seed Mix per Acres 5.1 Acres $4, $ 22, $5, $ 28, $4, $ 25, $3, $ 15, Transition Seed Mix per Acre. Deciduous Trees: 1" Caliper Furnish and install trees per plan and per Each. Shrubs: 1 Gallon - Furnish and install shrubs per plan and per Each. 1.5 Acres $4, $ 7, $5, $ 8, $5, $ 8, $3, $ 4, Each $ $ 66, $ $ 41, $ $ 74, $ $ 36, Each $92.00 $ 27, $69.00 $ 20, $ $ 30, $ $ 30,000.00

4 Willow Whips - Furnish and install willow whips per plan and per Each Sedge and Rush Seedlings - Furnish and install wetland seedlings per plan and per Each. CIVIL WORK 3900 Each $4.50 $ 17, $6.00 $ 23, $5.05 $ 19, $5.00 $ 19, ,200 Each $5.00 $ 271, $5.23 $ 283, $5.73 $ 310, $5.00 $ 271, Grading of 2' Depth Drainage per 100 Feet. 9 STA (100') $ $ 8, $1, $ 13, $3, $ 31, $ $ 8, Grading of 4' Depth Drainage per 100 Feet. 6 STA (100') $1, $ 7, $1, $ 10, $8, $ 50, $2, $ 12, " Drainage junction Each. 1 Each $4, $ 4, $4, $ 4, $2, $ 2, $5, $ 5, " Drainage Junction per Each 7 Each $4, $ 33, $4, $ 30, $4, $ 29, $6, $ 42, inch dia. Corrugated PP N-12 storm Per Lineal Foot. 10"dia. Corrugated PP N-12 storm drain per Lineal Foot. 12 inch dia. Corrugated PP N-12 storm drain per Lineal Foot 18" Dia. Corrugated PP N-12 storm drain per Line Foot. 24" dia. Corrugated PP N-12 Storm drain Lineal Foot. 30" dia. Corrugated PP N -12 storm per Lineal Foot. 42" dia. Corrugated PP N-12 storm per Lineal Foot. 48" dia. Corrugated PP N-12 storm per Lineal Foot. Concession & Field drainage per Each. 140 LF $77.00 $ 10, $38.00 $ 5, $46.38 $ 6, $65.00 $ 9, LF $90.00 $ 22, $54.00 $ 13, $64.24 $ 15, $80.00 $ 19, LF $ $ 4, $66.00 $ 2, $69.64 $ 2, , LF $95.00 $ 94, $62.00 $ 61, $50.57 $ 50, $ $ 99, LF $ $ 96, $92.00 $ 77, $74.88 $ 62, $ $ 134, LF $ $ 47, $ $ 39, $ $ 45, $ $ 56, LF $ $ 204, $ $ 189, $ $ 182, $ $ 190, LF $ $ 135, $ $ 116, $ $ 136, $ $ 140, Each $2, $ 17, $1, $ 7, $1, $ 7, $3, $ 18, Grading Fill - per Cubic Yards. 30 CY $ $ 5, $36.00 $ 1, $92.43 $ 2, $70.00 $ 2, Rock Riprap inlet and outlet per Square Yard. 130 SY $90.00 $ 11, $94.00 $ 12, $ $ 13, , Grouted per Square Yard. 300 SY 39, $89.00 $ 26, $93.24 $ 27, $ $ 42, Type 4R drainage per Each 4 Each $4, $ 19, $3, $ 13, $5, $ 22, $8, $ 32,000.00

5 " dia. Storm Drain per Each 5 Each $9, $ 46, $6, $ 33, $10, $ 50, $12, $ 60, " dia. Sanitary Sewer per Each. 7 Each $6, $ 48, $5, $ 37, $7, $ 52, $9, $ 63, " dia. PVC SDR-35 Sanitary Sewer per Lineal Foot. 8" dia. PVC SDR-35 Sanitary Sewer Service per Lineal Foot. 12" AWWA C900 Class 150 SDR 18 PVC Pressure per Lineal Foot. Cut 12" line, cap 12" line & remove valve per Lump Sum. 2" Backflow Prevention per Each. 2" ips, 200 psi Polly Water Service Line (includes per Lineal Foot. 6" AWWA C900 Fire Service per Lineal Foot. Fire Hydrant Assembly (includes 1 6" per Each. Special Construction Utility per Each. Remove and dispose of 12" diameter water per Lineal Foot. 2,035 LF $88.00 $ 179, $86.00 $ 175, $ $ 235, $ $ 244, LF $80.00 $ 4, $64.00 $ 3, $99.57 $ 4, , ,115 LF $ $ 243, $ $ 219, $97.07 $ 205, , LS $4, $ 4, $1, $ 1, $2, $ 2, $5, $ 5, $6, $ 6, $6, $ 6, $7, $ 7, $7, $ 7, LF $63.00 $ 28, $26.00 $ 11, $33.94 $ 15, $60.00 $ 27, LF $ $ 7, $ $ 6, $ $ 5, , Each $12, $ 24, $10, $ 20, $9, $ 19, $11, $ 22, Each $3, $ 30, $1, $ 11, $2, $ 18, $2, $ 16, ,000 LF $16.00 $ 16, $10.00 $ 10, $11.68 $ 11, $15.00 $ 15, Construction 5'x5' drainage structure as shown on sheet C-10 and detail 4 on sheet Per Each 1 Each $10, $ 10, $8, $ 8, $12, $ 12, $7, $ 7, Total Base s $ 5,011, $ 6,037, $ 5,536, $ 6,333, # 33 written amount should be $29, # 49 written amount should be $235,937.90

6 # 36 Sixty nine dollars and 24 cents is written. tab- Unit price is written $69.65 (off.01) ALTERNATES ADDITIVE ALTERNATE #1 1 Sports Light Plans Sports Light Poles and precast pole bases (owner provided poles and control equipment)-install per light pole provider per Each 15 EA $13, $ 202, $13, $ 196, $13, $ 203, $14, $ 210, Total Additive Alternate #1 $ 202, $ 196, $ 203, $ 210, Section E ADDITIVE ALTERNATE #2 Sports Field Lighting (wire only)-includes installation of conductor for sports light per Lump Sum 1 LS $27, $ 27, $0.00 $ 26, $27, $27, $30, $30, Total Additive Alternate #2 $ 27, $ 26, $27, $30, Section C ADDITIVE ALTERNATE #3-1 ~ 250' PLAYING (NATURAL GRASS) Fine per Square Foot. 102,465 SF $0.08 $ 8, $0.52 $ 53, $0.08 $8, $1.00 $102, Section C Infield Mix Compacted, in place. Includes fine grading of per Square Foot 47,173 SF $10.65 $ 502, $3.01 $ 141, $10.71 $505, $9.00 $424,557.00

7 3 Section C 4 Section C Warning Track Mix Compacted, in per Square Foot Dugout Includes fencing, roof, concrete pad, bench, and associated per Each 27,808 SF $6.44 $ 179, $2.05 $ 57, $6.48 $180, $6.00 $166, EA $31, $ 126, $29, $ 119, $67, $271, $84, $336, Section C Bullpen per Each 4 EA $5, $ 21, $9, $ 39, $4, $16, $1, $5, Section C 7 Section C 8 Section C 9 Section C Total Additive Alternate #3 Irrigation includes field mainlines, control valves, communication wire, isolation valves, laterals, head, and associated equipment as shown on the SR per Square Foot Backstop Fencing Per detail 1, sheet SR per Each Sports Equipment Includes bases, base anchors, home plates, and foul poles. (Pitching mounds are owner per field Bullpen Fencing Includes all fencing from the dugout to the far end of the bullpen, per detail 1, sheet SR per Each. 64,585 SF $1.96 $ 126, $1.51 $ 97, $1.97 $127, $4.00 $258, EA $42, $ 84, $42, $ 85, $36, $72, $39, $78, Fields $9, $ 19, $9, $ 19, $9, $19, $13, $26, EA $14, $ 58, $14, $ 59, $21, $84, $23, $92, $ 1,124, $ 673, $ 1,284, $1,489, Add Alt. No #4-5 written word is four-thousand eightyseven dollars and.92, Numerals reflects $4, Section C 2 Section C 3 Section C 4 Section C 5 Section C ADDITIVE ALTERNATE # ' PLAYING FIELD (NATURAL GRASS) Fine per Square Foot. Infield Mix Compacted, in place. Includes fine grading of per Square Foot Warning Track Mix Compacted, in per Square Foot Dugout Includes fencing, roof, concrete pad, bench, and associated per Each communication wire, isolation valves, laterals, head, and associated equipment as shown on the SR 63,855 SF $0.09 $ 5, $0.49 $ 31, $0.09 $5, $1.00 $63, ,842 SF $10.65 $ 147, $3.04 $ 42, $10.71 $148, $10.00 $138, ,142 SF $6.44 $ 58, $2.28 $ 20, $6.48 $59, $6.00 $54, EA $31, $ 63, $32, $ 65, $67, $135, $84, $168, ,871 SF $1.96 $ 80, $1.93 $ 78, $1.97 $80, $4.00 $163,484.00

8 6 Section C Bullpen per Each 2 EA $4, $ 9, $9, $ 19, $4, $9, $1, $2, Section C 8 Section C Total Additive Alternate #4 Sports Equipment Includes bases, base anchors, home plates, and foul poles. (Pitching mounds are owner per field Backstop Fencing Per detail 1, sheet SR per Lump Sum 1 Field $9, $ 9, $6, $ 6, $9, $9, $13, $13, LS $42, $ 42, $42, $ 42, $36, $36, $39, $39, Correct amount $ 416, $ 307, $ 484, $ 643, Total Base with Alternates $ 6,781, $ 7,241, $ 7,536, $8,705, st 2nd 3rd 4th Did not use proper "Revised " form # 33 written amount should be $29, # 49 written amount should be $235, Total Amount of bid balances. # 36 Sixty nine dollars and 24 cents is written. tab- Unit price is written $69.65 (off.01) Add Alt. No #4-5 written word is four-thousand eightyseven dollars and.92, Numerals reflects $4,787.92

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $

Fuel Adjustment Allowance USD 50,000 $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ 50, $ 1.00 $ SOLICITATION NO. 147850: VALENCIA ROAD: WADE ROAD TO MARK ROAD Achen Gardner Granite Hunter Borderland KE&G ITEM NO. ITEM DESCRIPTION UNIT QTY UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT PRICE AMOUNT UNIT

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No.

For Reference Only - Not for the Purpose of Bidding BP-1. Azucena Street 30-Inch Sewer Project Job No Solicitation No. Job 11-4518 Solicitation B-12-059-DD PROPOSAL of BID PROPOSAL, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER STEM: Pursuant to Instructions Invitation

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

PART II - Prospect Street 37. 8" Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050.

PART II - Prospect Street 37. 8 Ductile Iron CL52 Water Main 614 lin. ft. $ $ 49, $ $ 43, $ $ 46,050. BID TABULATION PAGE 1 OF 6 Engineer's Project Number: RI 124 Bid Deadline: Changed via addendum to July 2, 2018 at 2:00 p.m. local time BID PRE-BID ESTIMATE Kruczek Construction, Inc. Musson Bros., Inc.

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

CITY-TIF COMMISSION EXPENSES Cost Description Project Cost Data Reimbursable From Public Funds Developer Equity COST TIF Super TIF State TIF CID SCTC PRIVATE I. Legal $ 750,000 $ 750,000 $ - $ - $ - $

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT #

BID PROPOSAL ANNUAL PATHWAY & MINOR CONSTRUCTION CONTRACT PBC PROJECT # ENGINEERS Wynn & Sons Envir. ESTIMATE Construction, Inc. 1 Emergency Response, Less than 6 Hours 10 EA $ 50.00 $ 50.00 $ 500.00 2 Emergency Response, 6 Hours to 24 Hours 20 EA $ 50.00 $ 50.00 $ 1,000.00

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

CITY OF TAMPA ADDENDUM 2. April 18, 2018

CITY OF TAMPA ADDENDUM 2. April 18, 2018 CITY OF TAMPA Bob Buckhorn, Mayor CONTRACT ADMINISTRATION DEPARTMENT Michael W. Chucran, Director ADDENDUM 2 April 18, 2018 Contract 17-C-00021; Citywide Water Meter Bidders on the above referenced project

More information

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL

Job No Medina River Sewer Outfall, Segment 4 Solicitation No. B DD BID PROPOSAL Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00

TABULATION OF BIDS 1 L.S. $ 5, $ 5, $ 27, $ 27,000.00 TABULATION OF BIDS Jesse Viertel Memorial Airport Boonville, Missouri Bids Received: 6/12/2018 Lochner Job No.: 000011332 RECONSTRUCT RUNWAY 1836, NORTH CONNECTING TAXIWAY AND TURNAROUND REPLACE EXISTING

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00

More information

The bid due date has been changed to 2:50 p.m. May 25, 2018.

The bid due date has been changed to 2:50 p.m. May 25, 2018. May 18, 2018 BL051-18 Addendum #1 Construction and Rehab of Gravity and Sewer Force Mains on an Contract Make the following changes/additions or clarifications to the above referenced bid: The bid due

More information

BOPU RESOLUTION NO

BOPU RESOLUTION NO BOPU RESOLUTION NO. 2009 - ENTITLED: "A RESOLUTION APPROVING REVISED TAP FEES, WATER AND SEWER SYSTEM DEVELOPMENT FEES, PUMP STATION AND RELATED FEES SET BY THE BOARD OF PUBLIC UTILITIES." WHEREAS, the

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

Electric Service Information Sheet Georgia Power Company

Electric Service Information Sheet Georgia Power Company Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

BID TABULATION PAGE 1 OF 6

BID TABULATION PAGE 1 OF 6 BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate

More information

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19

More information

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

More information

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL

Job No Medina River Sewer Outfall, Segment 5 Solicitation No. B BB BID PROPOSAL Solicitation No. B-11-030-BB Date: BID PROPOSAL PROPOSAL OF A corporation A partnership consisting of An individual doing business as THE SAN ANTONIO WATER SYSTEM Pursuant to Instructions and Invitations

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

**REVISED BID PRICE FORM** October 24, 2018

**REVISED BID PRICE FORM** October 24, 2018 **REVISED BID PRICE FORM** October 24, 2018 (Date) TO: RE: CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 INVITATION FOR BID WANNAMAKER COUNTY PARK DOG

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

VETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1

VETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1 BID DOCUMENTS FOR VETERANS PARK ATHLETIC COMPLEX BUILD-OUT PHASE 1 BID NO. 18-033 PROJECT NO. HM1601 DUE DATE: January 9, 2018 @ 2:00 P.M. City of College Station, Texas Purchasing Division City Hall PO

More information

Market Street Gateway Improvements Phase 1

Market Street Gateway Improvements Phase 1 PROPOSAL FORM Market Street Gateway Improvements Phase 1 CITY OF PORTSMOUTH, N.H. To the City of Portsmouth, New Hampshire, herein called the Owner. The undersigned, as Bidder, herein referred to as singular

More information

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,

More information

Pflugerville, TX St. Hedwig, TX 78152

Pflugerville, TX St. Hedwig, TX 78152 Pesado Construction Co., Inc. 7054 Pipestone Schertz, TX 78154 Lewis Contractors, Inc. P.O. Box 1623 Bertram, TX 78605 Wauters Engineering, LLC 12870 Adkins St. Hedwig Rd. St. Hedwig, TX 78152 Cash Construction

More information

APPENDIX A-3: Cost Engineering

APPENDIX A-3: Cost Engineering APPENDIX A-3: Cost Engineering ALISO CREEK MAINSTEM ECOSYSTEM RESTORATION STUDY Orange County, California September 217 Orange County Public Works Environmental Resources Department This page intentionally

More information

Addendum 1 13 TH Street Streetscape. September 1, 2017

Addendum 1 13 TH Street Streetscape. September 1, 2017 Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

ACKNOWLEDGEMENT RECEIPT OF ADDENDUM #1 ITB 14-PW5 Upon receipt of documents, please , fax or mail this page to:

ACKNOWLEDGEMENT RECEIPT OF ADDENDUM #1 ITB 14-PW5 Upon receipt of documents, please  , fax or mail this page to: ACKNOWLEDGEMENT RECEIPT OF ADDENDUM #1 ITB 14-PW5 Upon receipt of documents, please email, fax or mail this page to: City of Milton Attn: Rick Pearce, Purchasing Office 13000 Deerfield Pkwy Suite 107G

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 FEE SCHEDULE FOR GRADING & IMPROVEMENT PLAN

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents

PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES. Table of Contents PWC SCHEDULE OF DEPOSITS, FEES AND CHARGES Table of Contents I. DEFINITIONS... 2 II. DEPOSITS... 3 A. Establishment of Credit... 3 B. Deposit Refunds... 4 III. CUSTOMER SERVICE FEES AND CHARGES... 4 A.

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) -

1 DEPARTMENT MAKING REQUEST 2 MEETING DATE 4 AGENDA 5 IS THIS ITEM BUDGETED ( IF APPLICABLE ) - Charlotte County Board Of County Commissioners Agenda Item Summary Item Number: R- 5 1 DEPARTMENT MAKING REQUEST 2 MEETING DATE Purchasing 6/24/2014 9:00:00 AM 3 REQUESTED MOTION/ACTION Award Bid #14-209

More information

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING

Sandalfoot Blvd. & SR 7 and SW 3rd St. & SR 7 Bridge Replacements WEEKLEY ASPHALT PAVING, INC. KIEWIT INFRASTRUCTURE CO. RUSSELL ENGINEERING ROADWAY 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 BRIDGE 37 38 39 40 41 42 43 REGULAR PAY Mobilization 1 LS $ 424,200.00 $ 238,930.61 $ 445,000.00

More information

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM

FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, Fargo City Commission Chambers 3:00 PM 1. Call to order FLOOD DIVERSION AUTHORITY FINANCE COMMITTEE AGENDA FOR THURSDAY, MAY 11, 2017 Fargo City Commission Chambers 3:00 PM 2. Recommended contracting actions a. Schmidt & Sons Construction,

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. LH 4710 Removal of existing twin 48 CMP culverts, construction of new 16 x5 concrete box culvert,

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

Exhibit 4 Page 1 of 8

Exhibit 4 Page 1 of 8 Page 1 of 8 Price Analysis Summary Bid #C2113975C1, Construction of Davie Road Extension Agency: Highway Construction and Engineering Division Bid Submittals: 4 Purchasing Agent: Cara M. Leisy, J.D. Declinations:

More information

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin

The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin The following documentation is an electronicallysubmitted vendor response to an advertised solicitation from the West Virginia Purchasing Bulletin within the Vendor Self Service portal at wvoasis.gov.

More information

Active Construction RV Associates Scarsella JR Hayes

Active Construction RV Associates Scarsella JR Hayes CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM Bids will be publicly opened at the NC State Surplus Property Agency (SSPA) at the time and date specified. By signature, I certify that all bidder information is accurate and I agree to the Instructions,

More information

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN

ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUN ALVAREZ ENGINEERS, INC. July 27, 2017 a) Evaluation Criteria PROJECT: ROADWAY IMPROVEMENTS TO DOLPHIN MALL OUTER RING ROAD for BEACON TRADEPORT COMMUNITY DEVELOPMENT DISTRICT CITY OF SWEETWATER, FLORIDA

More information

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)

COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017) This information is available in accessible formats upon request. Please call 519-741-2345 or TTY 1-866-969-9994 for assistance. COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS PREPARED BY

More information

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project

ADDENDUM 1. Bid# , Bosque Bonito Units 1 and 2 Sewer System Improvement Project County of El Paso Purchasing Department 500 East San Antonio, Room 500 El Paso, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 ADDENDUM 1 To: From: All Interested Proposers Claudia Sepulveda, Bid Clerk/Buyer

More information