COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)

Size: px
Start display at page:

Download "COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS. PREPARED BY CSD-Planning Division. City of Kitchener- Letter of Credit (2017)"

Transcription

1 This information is available in accessible formats upon request. Please call or TTY for assistance. COST ESTIMATE and LETTER OF CREDIT FOR SITE DEVELOPMENT WORKS PREPARED BY CSD-Planning Division

2 SITE DEVELOPMENT WORKS Requirements for Cost Estimate and Letter of Credit For development proposals approved under Section 41 of the Planning Act ( Site Plan Approval ), the City may require the posting of performance securities, such as a Letter of Credit to be held against the completion of required site development works. This security is most commonly in the form of a Letter of Credit. The City of Kitchener shall accept only the following approved securities: i) Letter of Credit (in prescribed form acceptable to the City Solicitor) issued by a Schedule I bank, Schedule II bank, Schedule III bank or Trust Company with a DBRS rating is R-1 (middle or high) or AAA, AA (low, middle or high) (or its equivalent if unavailable). ii) Letter of Credit (in prescribed form acceptable to the City Solicitor) issued by a Credit Union provided that: i) The Credit Union is verified as a member of the Central 1 Credit Union ii) The Central 1 Credit Union (rated R-1 (middle) maintains or improves on their rating) iii) The Credit Union has its Head Office in Ontario iv) The cumulative Letter of Credit do not exceed 1% of the Credit Union s Tier 1 Capital as per the Credit Union s most recent audited financial statements. If a Letter of Credit was previously accepted in accordance with the above, and the institution has since been downgraded and no longer meets the minimum requirements, the City may request a new acceptable Letter of Credit. forms of performance security, acceptable to the City Treasurer and City Solicitor, may be substituted (e.g. cash or a certified cheque made out to the City of Kitchener) The developer should contact Bev Grant-Campbell ext-7858 in advance of obtaining their Letter of Credit, in order to have the DBRS rating checked and pre-cleared. There are two alternatives for calculating the amount of the required Letter of Credit: 1. Complete a cost estimate for 100% of the cost of the site development works can be either itemized or lump sum include cost and installation of on-site and off-site development items 1-9 (listed below) as shown on the approved plans include cost of Project Management/Coordination, Site Supervision/Inspection of all required installations include cost of Certification of Compliance with the Site/Landscaping, CPTED Report, Grading and Storm Water Management, Outdoor Lighting Plans, and Noise Studies cost estimate is to be approved by the Manager of Site Development and Customer Service, Planning Division upon approval of cost estimate, the Letter of Credit may be submitted for 50% of the cost of all site development works to be installed by the developer 2. Fast Track Calculation does not require an itemized cost estimate saves time prior to the issuance of final site plan approval establishes the amount of the Letter of Credit based on the area of the lot, and the type of land use

3 1. Grading Rough Grading Erosion Control Site Development Works to be Installed by the Developer 2. Stormwater Management SWM Quantity Control SWM Quality Control 3. Servicing Storm Servicing Sanitary Servicing (included in calculating site plan review fee, excluded from letter of credit calculation) Water Servicing (included in calculating site plan review fee, excluded from letter of credit calculation) 4. Surfacing 5. Curbing 6. Vegetation Site Plantings SWM Pond Plantings Ground Cover 7. Landscape 8. Lighting 9. Consultant Fees Public Agencies Letters of Credit or other forms of financial securities will not apply to the City or any local board thereof, the Regional Municipality of Waterloo or any local board thereof, the Hydro-Electric Commission of Kitchener-Wilmot, the Waterloo Region District School, The Waterloo District Catholic School Board, or the Federal or Provincial Government or any crown agency thereof, or hospitals as defined in the Public Hospitals Act, R.S.O Development approvals for such agencies may be subject to the following Council requirement: A cost estimate and plan review fees will be required. That, in the event that the facilities or improvements required by the Agreement are not completed prior to occupancy, as specified by this agreement, due to adverse weather conditions or other extenuating circumstance, occupancy will be approved, provided that a Letter of Undertaking and Indemnity is given by the Owner to the City s Director of Planning agreeing to complete the outstanding site work within a specified time.

4 Letter of Credit Itemized Cost Estimate For: 100% Site Development Costs The following form is to be filled out by the Project Consultant(s) and submitted to the City of Kitchener, Planning Division for review. Date: Site Plan Number: Project Name: Address: Owner: Prepared by (Consultant(s)): Prime Consultant 1 Subconsultant - Civil Subconsultant - Lighting Subconsultant - Landscape Subconsultant - CPTED Subconsultant - Note: All estimated costs below to include material and installation costs of on-site and off-site works. FOR RELEASE OF SECURITIES 2 ITEM 1 GRADING a) Rough Grading Mobilization/demobilization Temporary site trailer Clearing and grubbing Topsoil stripping and stockpiling Pre-grading Import/export of soil Temporary site entrance Removals & disposals UNITS UNIT PRICE COST COMPLETE OUTSTANDING b) Erosion Control Silt fencing Temporary sedimentation ponds Catchbasin/manhole protection Tree protection fencing Temporary protective fencing Entrance protection (mud mat) Hickenbottom Temporary flow check dam Rip-rap Site maintenance 3

5 FOR RELEASE OF SECURITIES 2 ITEM UNITS UNIT PRICE COST COMPLETE OUTSTANDING 2 STORMWATER MANAGEMENT a) SWM Quantity Control Orifice Weir Infiltration chamber Cistern Pond grading Inlet structure Outlet structure Roof top storage device Access road Fencing Monitoring and sampling Pond cleanout and maintenance Rip-rap LID's (green roofs,bio swales, etc) b) SWM Quality Control Infiltration ponds/swales Sedimentation chambers Stormwater cooling facility Oil grit separator 3 SERVICING 4 Storm Servicing Catchbasin Double catchbasin Catchbasin manhole Ditch inlet catchbasin Storm manhole Splitter manhole Subdrains dia Storm sewer dia Storm sewer dia Storm sewer Pipe insulation Cleanout

6 ITEM Sanitary Servicing Sanitary Manhole Cleanout dia Sanitary Sewer dia Sanitary Sewer Pipe Insulation UNITS UNIT PRICE FOR RELEASE OF SECURITIES 2 COST COMPLETE OUTSTANDING Water Servicing Valves and Appurtneances dia Water Pipe Hydrant Metering 4 SURFACING Gravel areas Granular bases for pavement Concrete pavement Concrete pavement coloured Asphalt pavement Asphalt walkway Asphalt coloured Concrete sidewalk Pavement markings 5 CURBING Porta curbs Barrier curb Barrier curb & gutter Mountable curb & gutt er 6 VEGETATION a) Site Plantings (Botanical Name and Size)

7 ITEM UNITS a) Site Plantings (Botanical Name and Size) cont d UNIT PRICE FOR RELEASE OF SECURITIES 2 COST COMPLETE OUTSTANDING b) SWM Pond Plantings (Botanical Name and Size) c) Ground Cover Topsoil & sod Topsoil & seed SWM Pond topsoil & seed Mulch Geotextile fabric Edging Planting bed preparation Growing Media (min 10m3/tree) 7 LANDSCAPE Fencing Decks & patios Retaining wall Recycling and garbage enclosure Planter Play area and equipment Bike rack Irrigation system Site furniture Multiple Unit Identification Sign Noise Barrier Brick pavers Patio stones

8 ITEM UNITS UNIT PRICE FOR RELEASE OF SECURITIES 2 COST COMPLETE OUTSTANDING 8 LIGHTING Wallpack Pole, base and luminaire Electrical, conduit and wire 9 CONSULTING FEES (To Include: A minimum of 6% of sub totals is required, including Tendering, Project Management, Site Supervision, Inspection, Certification, ) Engineering Landscaping Lighting Acoustical CPTED Total Estimated Cost $ Total Works Outstanding $ Site Plan Review Fee (5% of Total Estimated Cost) $ Total Estimated Cost (excluding water and sanitary sewer) 5 $ Letter of Credit Required (50% of Total Estimated Cost) $ 1 The Prime Consultant is the contact for the City and is responsible for arranging sub-consultants as needed. 2 Release of any securities cannot be applied for until over 50% of the site development works have been completed. Letter of Credit will not be reduced below 50% of original letter of credit amount or $250,000 whichever is the lesser until all works are complete and all conditions have been met. 3 Includes: dust control, street cleaning, erosion control maintenance and removal. 4 Servicing Items to include all servicing related costs except for the portion to be installed and restored by City forces between the main and the subject property line. 5 Letter of credit is based on total estimated cost excluding water and sanitary sewers, however, site plan review fee includes the water and sanitary sewers as these are items reviewed by City staff. Click here for spreadsheet version

9 LETTER OF CREDIT BASED ON LOT AREA & USE If an itemized cost estimate is not completed the following formulae may be used for calculating the value of a required letter of credit: For new development, the amount of the letter of credit shall be based on the following, which may or may not represent 50% of the total cost of all site development works, but in no case shall the amount be less than $100,000.00: Residential: Industrial: Institutional: Commercial: $416,160. per hectare $312,120. per hectare $312,120. per hectare $416,160. per hectare For additions, alterations or additional buildings on developed sites, the amount of the letter of credit shall be based on the following, which may or may not represent 50% of the total cost of all site development works, but in no case shall the amount be less than $50,000.00: Residential: Industrial: Institutional: Commercial: $208,080. per hectare $156,060. per hectare $156,060. per hectare $208,080. per hectare After satisfactory completion of all site development works and receipt of all required certification forms, the total amount of security held by the City shall be released. Subsequent to the provision of performance securities based on the calculations above, a cost estimate may be submitted for approval in order to allow for partial reductions in the letter of credit.

10 BANK EXAMPLE OF IRREVOCABLE LETTER OF CREDIT To be typed on bank letterhead (name of Kitchener-Waterloo branch) LETTER OF CREDIT NO: DATE: TO: THE CORPORATION OF THE CITY OF KITCHENER UNCONDITIONAL IRREVOCABLE LETTER OF CREDIT We hereby authorize you to draw on the NAME OF BANK, KITCHENER-WATERLOO BRANCH for account of NAME OF CLIENT an aggregate amount of AMOUNT WRITTEN OUT IN FULL ($AMOUNT) DOLLARS of lawful money of Canada available by drafts at sight. Pursuant to the request of our customer NAME, we hereby establish and give to you an irrevocable letter of credit in your favour pursuant to an Agreement between the Corporation of the City of Kitchener and NAME ON SECTION 41 AGREEMENT dated the DAY of MONTH, YEAR, with respect to ADDRESS OF SITE in the total amount of AMOUNT WRITTEN IN FULL ($AMOUNT) DOLLARS, which may be drawn on by you at any time and from time to time upon written demand for payment made upon us by you, which demand we shall honour without enquiring whether you have a right as between yourself and our said customer, to make such demand and without recognizing any claim of our said customer. This letter of credit will continue in full force and effect for one year from the date hereof and thereafter from year to year unless we notify you in writing by registered mail not less than 30 days prior to the expiration of each year s term that this letter of credit will not be renewed. Upon receipt by you of such notice you may draw hereunder. Partial drawings are permitted. Drafts must be drawn at any time not later than the close of business at our counters on the date upon which this letter of credit will expire. Drafts shall state on their face that they are drawn under the NAME OF BANK, KITCHENER- WATERLOO BRANCH Letter of Credit No. dated the day of, 20. The amount of this letter of credit may be reduced from time to time as you advise us by notice in writing. We hereby agree with the drawers, endorsers and bona fide holders of the bills drawn in compliance with the terms of this letter of credit that the bills shall be duly honored upon presentation to us. ASSISTANT MANAGER MANAGER

11 Letter of Credit Release 1. The securities posted based on a cost estimate are to cover 50% of the cost of all site development works. Therefore, full or partial release of any securities cannot be applied for until over 50% of the site development works have been completed. 2. Any request for full or partial release of the letter of credit must be supported by the following documentation, which certifies that the site development works have been completed in accordance with the approved plans: a) A Site Development Works Certification Form for items #1-5 (SWM/Grading) from the Engineering Consultant who prepared the plan must be sent to: Engineering Technologist Engineering Division, 9 th Floor City of Kitchener, City Hall P.O. Box King Street West Kitchener, Ontario N2G 4G7 With copies to: (i) Administrative Assistant to the Director of Building Community Services, Building Division 5 th Floor (ii) Urban Designer, Planning Division 6 th Floor Community Services b) A Site Development Works Certification Form for items #6-7 from the Landscape Architect/ Consultant who prepared the Landscape Plan. c) A Site Development Works Certification Form for the site lighting (item #8) from the Lighting Engineer/Consultant who prepared the Lighting Plan. d) A Site Development Works Certification Form for the site noise from the Engineer/Consultants who prepared the Noise Study. These above noted forms must be sent to: Urban Designer, Community Services, Planning Division, 6th Floor P.O. Box King Street West Kitchener, Ontario N2G 4G7 e) A Site Development Works Certification Form from the CPTED Consultant (item #9) verifying the CPTED measures have been implemented in accordance with the approved report must be sent to: Planning Technician (Site Development) Community Services, Planning Division, 6th Floor P.O. Box King Street West Kitchener, Ontario N2G 4G7

12 Letter of Credit Release Letter of Credit Release (cont d) 3. Upon receipt of the five above noted forms, the Community Services Department will make an inspection to verify that the Site Development Works are installed in accordance with the approved plans. Should we find any discrepancies and/or deficiencies, an inspection report will be issued to the owner and the appropriate consultant(s). Any revisions to the approved Site, Landscaping, Tree Management, Lighting plans, CPTED Report and/or Noise studies require approval from the Manager of Site Development and Customer Service prior to installation of the works. Upon completion of the items outlined in the inspection report, the applicant shall notify the Community Services Department for further inspection in order to obtain a final release of the security. If more than one (1) inspection must be carried out to obtain a complete release of the security for site development works, an additional inspection fee will be required to be paid in advance. All site development works are to be maintained and all plant material is to be in a healthy vigorous state for approval. A landscape contractor s plant material guarantee is not acceptable to receive release related to dead or poor condition plant material. 4. Final acceptance of the site development works by the City may occur between May 1st and Oct.31st only. Due to environmental conditions, final inspection and/or acceptance of the installation of plant material, sodding and/or seeding may not be possible between November 1st and April 30th. Consequently between these months, it may not be possible to reduce the portion of the Letter of Credit held to ensure satisfactory completion of the installation of plant material, sodding and/or seeding. The reduction to the Letter of Credit will be based on the amount of site and landscape works that the Community Services Department is able to assess at the time of the site inspection. Please note that a reduction to the Letter of Credit does not necessarily constitute full acceptance of any of the site development works. The City will not reduce the Letter of Credit below 25% of the cost of all site development works (50% of `the value of the original letter of credit) or $250,000 whichever is the lesser, until the City has received all required Site Development Works Certification Forms, giving complete certification of the site, and the City is in complete agreement with the certification.

13 SITE DEVELOPMENT WORKS CERTIFICATION FORM FOR PROFESSIONAL ENGINEER/CONSULTANT For item number 1a, 1b, 2a, 2b, 3, 4, 5 on the Itemized Cost Estimate Form Date: Project Name: Site Address: Owner s Name: I, of Certify to the City of Kitchener that the following Site Development Works for the grading and storm water management scheme, as submitted and subsequently reviewed by the Community Services Department on, has been implemented and constructed in general accordance with all applicable Policies and Guidelines of the City of Kitchener. PLANS: Servicing plan Grading plan SWM plan SWM analysis WORKS: 1 GRADING a) Rough Grading Mobilization/demobilization Temporary site trailer Clearing and grubbing Topsoil stripping and stockpiling Pre-grading Import/export of soil Temporary site entrance Removals & disposals b) Erosion Control Silt fencing Temporary sedimentation ponds Catchbasin/manhole protection Tree protection fencing Temporary protective fencing Entrance protection (mud mat) Hickenbottom Temporary flow check dam Rip-rap Site maintenance 3 DATE OF CITY ACCEPTANCE DOLLAR VALUE OF OUTSTANDING WORK DATE OF COMPLETION/INSPECTION DATE OF COMPLETION/INSPECTION

14 WORKS: 2 STORMWATER MANAGEMENT a) SWM Quantity Control Orifice Weir Infiltration chamber Cistern Pond grading Inlet structure Outlet structure Roof top storage device Access road Fencing Monitoring and sampling Pond cleanout and maintenance Rip-rap b) SWM Quality Control Infiltration ponds/swales Sedimentation chambers Stormwater cooling facility Oil grit separator 3 SERVICING 4 Storm Servicing Catchbasin Double catchbasin Catchbasin manhole Ditch inlet catchbasin Storm manhole Splitter manhole Subdrains dia Storm sewer dia Storm sewer dia Storm sewer Pipe insulation Cleanout DOLLAR VALUE OF OUTSTANDING WORK DATE OF COMPLETION/INSPECTION

15 WORKS: 4 SURFACING Gravel areas Granular bases for pavement Concrete pavement Concrete pavement coloured Asphalt pavement Asphalt walkway Asphalt coloured Concrete sidewalk Pavement markings 5 CURBING Porta curbs Barrier curb Barrier curb & gutter Mountable curb & gutter DOLLAR VALUE OF OUTSTANDING WORK DATE OF COMPLETION/INSPECTION Please note all deviations from the design drawing below (e.g. increase in paved areas, shortage of pond volumes, roof drains, orifice installation, grade elevations at road right-of-way etc). Additional details may be required prior to the City accepting the certification. Professional Engineer/Consultant Signature: Date: AFFIX SEAL cc: Owner Landscape Architect/Consultant Lighting Engineer/Consultant Acoustical Engineer/Consultant CPTED Consultant PLEASE NOTE: This document is to be submitted on the Professional Engineer/Consultant letterhead.

16 This information is available in accessible formats upon request. Please call or TTY for assistance. SITE DEVELOPMENT WORKS CERTIFICATION FORM FOR LANDSCAPE ARCHITECT/DESIGNER For items numbered 6 and 7 on the Itemized Cost Estimate Form NOTE: The Site Development Works Certification Form for item number 1a, 1b, 2a, 2b, 3, 4, 5 from the Professional Engineer/Consultant must be submitted and have full and final certification prior to the submission of this form. Date: Project Name: Site Address: Owners Name: I, of certify to the City of Kitchener that the following applicable site development works, as submitted and subsequently reviewed by the Community Services Department have been installed and maintained in accordance with the City approved plans and reports and any subsequent City approved amendments to such plans and reports. ON SITE: Plant material & installation Topsoil spreading fine grading, sodding and seeding Landscape structures, including: -fencing -retaining walls -garbage/recycling enclosures -planters -play area & equipment Landscape paving materials Irrigation System OFF SITE: Boulevard works including: -fine grading and sodding or other DOLLAR VALUE OF OUTSTANDING WORK DOLLAR VALUE OF OUTSTANDING WORK DATE OF COMPLETION/ INSPECTION DATE OF COMPLETION/ INSPECTION

17 Please note all deviations from the design drawings below (all deviations to city approved plans are to be listed, i.e. change in plant material, extent of paving or any other item that has not been constructed in accordance with the city approved drawings and reports.) Additional details may be required prior to the City accepting the certification. Landscape Architect/Consultant Signature: AFFIX SEAL Date: cc: Owner SWM/Grading Engineer/Consultant Lighting Engineer/Consultant Acoustical Engineer/Consultant CPTED Consultant PLEASE NOTE: This document is to be submitted on the Landscape Architect/Designer s letterhead. Due to environmental conditions, final acceptance by the City of the Installation of plant material, sodding or seeding may not be carried out between November 1 and April 30.

18 SITE DEVELOPMENT WORKS CERTIFICATION FORM FOR LIGHTING ENGINEER/CONSULTANT For item 8 on the Itemized Cost Estimate Form Date: Project Name: Site Address: Owner s Name: I, of certify to the City of Kitchener that all outdoor lighting fixtures for this development have been installed and maintained in accordance with the City approved plans and any subsequent City approved amendments to such plans and reports: I further certify that: a) no additional outdoor lights have been installed. b) the illumination levels and uniformity ratios on site have been satisfied within generally accepted tolerances of the above noted plan. c) the lighting distribution pattern has not caused any veiling luminance (disability glare). d) no significant encroachment of light (0.5 Foot-candles or greater) or objectionable glare upon any adjacent property and that no light sources are visible from any adjacent residential site. Please note all deviations from the design drawings below (all deviations to city approved plans are to be listed, i.e. change in mounting height, light source type, model number, aiming direction, distribution patterns, location of poles). Additional details may be required prior to the City accepting the certification.

19 Lighting Engineer/Consultant Signature: AFFIX SEAL Date: cc: Owner SWM/Grading Engineer/Consultant Landscape Architect/Consultant Acoustical Engineer/Consultant CPTED Consultant PLEASE NOTE: This document is to be submitted on the Lighting Engineer/Consultant s letterhead.

20 SITE DEVELOPMENT WORKS CERTIFICATION FORM FOR ACOUSTICAL STUDY ENGINEER/CONSULTANT Date: Project Name: Site Address: Owners Name: I of certify to the City of Kitchener that the recommendations/findings of the noise study have been installed on site. There are no noise levels above the maximum levels specified in the City s Urban Design Standards and Policies from the stationary source (intercom ordering station), at the property line with adjacent residential and/or institutional land uses All required noise mitigation measures required by the Noise Study have been installed correctly and are functioning as designed. Acoustical Study Engineer/Consultant Signature: AFFIX SEAL Date: cc: Owner SWM/Grading Engineer/Consultant Lighting Engineer /Consultant Landscape Architect/Consultant CPTED Consultant PLEASE NOTE: This document is to be submitted on the Acoustical Study Engineer/Consultant s letterhead.

21 SITE DEVELOPMENT WORKS CERTIFICATION FORM FOR CPTED CONSULTANT Date: Project Name: Site Address: Owners Name: I, of certify to the City of Kitchener that the recommendations/findings of the CPTED Report approved by the City of Kitchener have been installed on site. All required CPTED measures approved in the CPTED Report have been installed correctly and are functioning as designed. ON SITE: Access Control DOLLAR VALUE OF OUTSTANDING WORK DATE OF COMPLETION/ INSPECTION Surveillance Territorial Reinforcement Maintenance Please note all deviations from the design drawings below (all deviations to city approved plans are to be listed, i.e. change in plant material, extent of paving or any other item that has not been constructed in accordance with the city approved drawings and reports.) Additional details may be required prior to the City accepting the certification.

22 CPTED Consultant Signature: AFFIX SEAL Date: cc: Owner SWM/Grading Engineer/Consultant Landscape Architect/Consultant Lighting Engineer/Consultant PLEASE NOTE: This document is to be submitted on the CPTED Consultant s letterhead. Due to environmental conditions, final acceptance by the City of the Installation of plant material, sodding or seeding may not be carried out between November 1 and April 30.

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University

Certified Bid Tabulation Southeast Residential Community Parking Development South Dakota State University Base Bid - Parking Lot Construction Number Grading and Surfacing Items Quantity Unit C-1 Mobilization 1 LS $ 60,000.00 $ 60,000.00 $ 82,000.00 $ 82,000.00 $ 18,255.59 $ 18,255.59 C-2 Traffic Control 1

More information

As outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below.

As outlined in Memo #2, a number of alternatives are being considered for the development of the stormwater credit program and are listed below. MEMORANDUM City of Kitchener City Hall, 200 King St. West P.O. Box 1118 Kitchener, ON N2G 4G7 Date: September 20, 2011 To: From: cc: Steering Committee Members Nick Gollan and Nancy Corbett Project Team

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 409 22nd Ave So PO Box 298 Brookings, SD 57006 Toll Free 1-855-323-6342 www.bannerassociates.com Project: Viborg Utility Improvements - 2017 Bid Date: 11:00 A.M., Local Time, March 15, 2017

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

What are Capital Reserves?

What are Capital Reserves? Capital Reserves What are Capital Reserves? A separate account set up by the Association to fund large, non-annual repairs Stormwater pond repair, dredging and drainage improvements Fence repair, retaining

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE

EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE 1. Building Permit EXHIBIT A CITY OF OLDSMAR PERMIT, INSPECTION AND PLANS EXAMINATION FEE SCHEDULE a. This fee schedule is applicable to all building permits issued by the City of Oldsmar, Building Division

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

Policy Title: Historic Downtown Patio Policy

Policy Title: Historic Downtown Patio Policy The Corporation of the City of Fernie 501-3 rd Avenue, Box 190, Fernie, B.C. V0B 1M0 (T) 250.423.6817 (F) 250.423.3034 (E) cityhall@fernie.ca (W) www.fernie.ca Policy Title: Historic Downtown Patio Policy

More information

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT 40555 Utica Road P.O. Box 8009 Sterling Heights, MI 48311-8009 TEL 586-446-2720 FAX 586-276-4061 CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

More information

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 1 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 1 10 th STREET WEST GAP CLOSURE This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans, and contract documents

More information

BID TABULATION PAGE 1 OF 6

BID TABULATION PAGE 1 OF 6 BID TABULATION PAGE 1 OF 6 BID PRE-BID ESTIMATE R.G. Huston Company, Inc. Kopplin & Kinas Co., Inc. Cottage Grove, WI Green Lake, WI NO. DESCRIPTION OF WORK QUANT. UNITS UNIT PRICE AMOUNT UNIT PRICE AMOUNT

More information

Code Reference: Section , F.S. Chapter ; FS Section ; Responsible Dept.: Community Development/Building Division

Code Reference: Section , F.S. Chapter ; FS Section ; Responsible Dept.: Community Development/Building Division Building Construction Permit Fees 322100 Building Division 341910 Planning Division 341940 Harbor/Code Division 322200/322300 Surcharge Building Permit Fees The governing bodies of local governments may

More information

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA

NAME OF CONTRACTOR CONTRACTORS ADDRESS Buffalo Road th ave Ct SW Walcott, IA North Liberty, IA Unit BID ITEMS 1 1070-206-A-3 TRAFFIC CONTROL 0.5 0.5 1 LS $ 2,200.00 $ 2,200.00 $ 2,800.00 $ 2,800.00 $ 2,688.00 $ 2,688.00 $ 2,500.00 $ 2,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 $ 1,500.00 2 2010-108-C-0

More information

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM

NC STATE SURPLUS PROPERTY AGENCY BID CONTRACT. RE-Bid # D05083 Bid Opening: May 8, 10:00AM Bids will be publicly opened at the NC State Surplus Property Agency (SSPA) at the time and date specified. By signature, I certify that all bidder information is accurate and I agree to the Instructions,

More information

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING

More information

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association

FLINT HILL MANOR FLINT HILL MANOR. Replacement Reserve Study. Oakton, Virginia. Property Management: Flint Hill Manor Townhouse Association Replacement Reserve Study REPLACEMENT RESERVE STUDY Oakton, Virginia Property Management: Flint Hill Manor Townhouse Association Jamie Critchfield Vice President Email: tommie0200@aol.com Consultant: RICHARD

More information

CORPORATE POLICY POLICY STATEMENT:

CORPORATE POLICY POLICY STATEMENT: CORPORATE POLICY Policy Title: Letter of Credit Policy and Standard Letter of Credit Format Policy Category: Letter of Credit Policy Policy No.: FC-001 Department: Finance Approval Date: May 14, 2012 Revision

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

PART D SUPPLEMENTAL CONDITIONS

PART D SUPPLEMENTAL CONDITIONS PART D SUPPLEMENTAL CONDITIONS Page 1 of 18 PART D - SUPPLEMENTAL CONDITIONS GENERAL D1. GENERAL D1.1 In addition to the General Conditions for Construction Contracts, these Supplemental Conditions are

More information

DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential

DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial Institutional - Multiple Family Residential FOR OFFICE USE ONLY 5 St. Anne Street St. Albert, AB T8N 3Z9 Phone: (780) 459-1642 Fax: (780) 458-1974 Project: Address: Date: File No.: DEVELOPMENT PERMIT APPLICATION CHECKLIST New: Commercial Industrial

More information

City of Galesburg Stormwater Utility Credits and Incentives Policy

City of Galesburg Stormwater Utility Credits and Incentives Policy Stormwater Utility Credits and Incentives Policy December, 2014 Table of Contents 1 Background... 2 2 Applicability of Incentives and Credits... 2 3 Incentives... 3 3.1.1 Rain Barrels... 3 3.1.2 Other

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY

DRAFT. Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY DRAFT Stormwater Management Program Credit Policy and Appeals Process Manual Policies & Procedures LOWER ALLEN TOWNSHIP STORMWATER AUTHORITY JANUARY 2019 Table of Contents Introduction 3 Definitions 3

More information

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN

Annual Services Construction Contract (ASCC) #15 Project Number: PUCN Annual Services Construction Contract (ASCC) #15 Project Number: PUCN-16-0023 Engineer's Estimate Inlet Construction, Inc. Peters & White Construction Inc. Worley Turf & Irrigation Inc. East West Construction

More information

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS

EST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

Right of Way Permits. Contact Information:

Right of Way Permits. Contact Information: Right of Way Permits A Right-of-Way Use Permit is required for any work performed in the public right-of-way (including but not limited to sewer or water extensions, franchise utility work, storm drainage,

More information

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant:

DUNN LORING VILLAGE SEQUOIA MANAGEMENT COMPANY. Craig Courtney Property Manager. Vienna, Virginia. Property Management: Consultant: Replacement Reserve Study DUNN LORING VILLAGE RSTUDY+ REPLACEMENT RESERVE STUDY DUNN LORING VILLAGE Vienna, Virginia Property Management: SEQUOIA MANAGEMENT COMPANY Craig Courtney Property Manager 13998

More information

BID TABULATION PAGE 1 OF 8

BID TABULATION PAGE 1 OF 8 BID TABULATION PAGE 1 OF 8 BID PRE-BID ESTIMATE A-1 Excavating, Inc. Maddrell Excavating, LLC Bloomer, WI Brodhead, WI BASE BID CTP P Utility Work 1. 8" SDR 35 Sanitary Sewer Main 3,656 lin. $ 69.00 $

More information

CITY OF FORT PIERCE BUILDING DEPARTMENT

CITY OF FORT PIERCE BUILDING DEPARTMENT CITY OF FORT PIERCE BUILDING DEPARTMENT APPLICATION FOR DETERMINATION OF SUBSTANTIAL IMPROVEMENT This is a request for determination by the City s Floodplain Administrator as to whether or not the project

More information

INSPECTION SERVICES DIVISION FEE SCHEDULE

INSPECTION SERVICES DIVISION FEE SCHEDULE BUILDING INSPECTION SERVICES DIVISION FEE SCHEDULE Effective January 1, 2017 ** To calculate fees for building projects use the higher of the fees by valuation or square footage ** New Buildings, Additions

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

RIGHT-OF-WAY PERMIT APPLICATION

RIGHT-OF-WAY PERMIT APPLICATION PERMIT EXPIRES 180 DAYS AFTER DATE OF ISSUANCE. RIGHT-OF-WAY PERMIT APPLICATION DESCRIPTION OF WORK: (Mark all applicable) Pavement Cut: Directional Bore: Sewer / Water Connection: Driveway Apron: Sidewalk

More information

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST

CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST CITY OF SOUTH SAN FRANCISCO GRADING PERMIT APPLICATION CHECKLIST Applicant shall provide three (3) copies of the following attachments: Geotechnical Report (Soils Report with grading specifications and

More information

CITY OF HAMILTON. PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Growth Management Division Parking and By-law Services Division

CITY OF HAMILTON. PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Growth Management Division Parking and By-law Services Division CITY OF HAMILTON PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT Growth Management Division Parking and By-law Services Division TO: Chair and Members Planning Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE

More information

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE GENERAL INSTRUCTIONS 1. This pamphlet lists services available or required to process your project and fees or charges for these services. 2. Fees or deposits

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

VILLAGE AT LAKE CHELAN

VILLAGE AT LAKE CHELAN VILLAGE AT LAKE CHELAN Manson, Washington STANDARD LEVEL 3 RESERVE STUDY UPDATE WITHOUT A SITE VISIT With funding recommendations for the 2019 fiscal year Issued October, 2018 Next Update: Level 3 by October,

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

IRREVOCABLE LETTER OF CREDIT NO.

IRREVOCABLE LETTER OF CREDIT NO. IRREVOCABLE LETTER OF CREDIT NO. Issue Date: Beneficiary: Amount: Expiration Date:, 20 The City of New Berlin, Wisconsin $, 20 RE: Name of Development This Letter of Credit covers Infrastructure Installation,

More information

TOWNSHIP OF HAMILTON TENDER # PR GORES LANDING WHARF REHABILITATION

TOWNSHIP OF HAMILTON TENDER # PR GORES LANDING WHARF REHABILITATION Submitted by, TOWNSHIP OF HAMILTON TENDER # PR2017-06 GORES LANDING WHARF REHABILITATION Name of Firm or Individual Address (Include postal code) Telephone No. (Include area code) Name of Person Signing

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

Electric Service Information Sheet Georgia Power Company

Electric Service Information Sheet Georgia Power Company Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918) CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box 2007 211 N. Elm Jenks, OK 74037(918) 299-5883 CERTIFICATE OF OCCUPANCY: DATE RECEIVED: BUILDING ADDRESS: LOT: BLOCK: ADDITION: SECTION: TOWNSHIP: RANGE:

More information

REQUEST FOR PROPOSALS. Demolition

REQUEST FOR PROPOSALS. Demolition JEFFERSON COUNTY, WEST VIRGINIA Engineering Department 116 East Washington Street P.O. Box 716 Charles Town, West Virginia 25414 Phone: 304-728-3257 Email: engineering@jeffersouncountywv.org Fax: 304-728-3953

More information

Invitation for Bid Re-Advertisement. Mowing, and Grounds Cleanup Services. IFB Number:

Invitation for Bid Re-Advertisement. Mowing, and Grounds Cleanup Services. IFB Number: Invitation for Bid Re-Advertisement Mowing, and Grounds Cleanup Services IFB Number: 17-0010 Response Deadline: 4:00 P.M. (EST), Tuesday, September 5, 2017 Responses will be opened on this date and time

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916)

CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA (916) CITY OF CITRUS HEIGHTS Planning Department 6237 Fountain Square Drive Citrus Heights, CA 95621 (916) 725-2448 Date: October 23, 2008 To: Mr. John Steitz 8310 Sunrise Boulevard Citrus Heights CA, 95610

More information

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager

REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA. Ravenel Associates, Inc. Community Management by: Chad Hammond, Property Manager REPLACEMENT RESERVE REPORT FY 2011 VILLAGE GREEN HOA VILLAGE GREEN HOA REPLACEMENT RESERVE REPORT FY 2011 Community Management by: Ravenel Associates, Inc. Chad Hammond, Property Manager 3690 Bohicket

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

GENERAL ADMINISTRATION AND CORPORATE SERVICES (Administration/Corporate/Finance Departments)

GENERAL ADMINISTRATION AND CORPORATE SERVICES (Administration/Corporate/Finance Departments) This document is provided as a comparison document for reference only. The years noted are based on the assumption that changes were considered for most or all sections of a respective bylaw, although

More information

CONTENTS. Greens at Lochmere Cary, NC

CONTENTS. Greens at Lochmere Cary, NC CONTENTS 1.0 INTRODUCTION... 1 2.0 EXECUTIVE SUMMARY... 2 3.0 PURPOSE & SCOPE... 3 3.1 PURPOSE... 3 3.2 SCOPE... 3 3.3 SOURCES OF INFORMATION... 4 4.0 DESCRIPTION... 6 5.0 OBSERVATIONS... 6 6.0 RESERVE

More information

DEPOSIT AGREEMENT GUARANTEEING SITE PLAN IMPROVEMENTS WITH LETTER OF CREDIT

DEPOSIT AGREEMENT GUARANTEEING SITE PLAN IMPROVEMENTS WITH LETTER OF CREDIT Cottleville Project Number DEPOSIT AGREEMENT GUARANTEEING SITE PLAN IMPROVEMENTS WITH LETTER OF CREDIT THIS DEPOSIT AGREEMENT GUARANTEEING IMPROVEMENTS WITH LETTER OF CREDIT (the AGREEMENT ) made and entered

More information

THE CORPORATION OF THE CITY OF WATERLOO

THE CORPORATION OF THE CITY OF WATERLOO PWS2012-070 Appendix A Page 1 of 16 THE CORPORATION OF THE CITY OF WATERLOO BY LAW NO. 2012- I J_ 5 BY-LAW TO IMPOSE A STORMWATER CHARGE AND IMPLEMENT A STORMWATER CREDIT PROGRAM WHEREAS municipalities

More information

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT

ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT UNIT PRICE AMOUNT Engineering Estimate R. D. Johnson Excavating Co., Inc 1 Mobilization Lump Sum 1 $ 85,000.00 $ 85,000.00 $ 18,000.00 $ 18,000.00 2 Contractor Construction Staking Lump Sum 1 $ 15,000.00 $ 15,000.00 $ 8,760.00

More information

SECTION 5 CONSTRUCTION RULES AND REGULATIONS 5.1 COMPLIANCE: This paragraph 5.1 was modified on See page 8A for the new paragraph CO

SECTION 5 CONSTRUCTION RULES AND REGULATIONS 5.1 COMPLIANCE: This paragraph 5.1 was modified on See page 8A for the new paragraph CO SECTION 5 CONSTRUCTION RULES AND REGULATIONS 5.1 COMPLIANCE: This paragraph 5.1 was modified on 6-27-06. See page 8A for the new paragraph 5.1. 5.2 CONSTRUCTION TRAILERS: Sarasota Ranch Club Associates,

More information

WESTBANK FIRST NATION

WESTBANK FIRST NATION WESTBANK FIRST NATION Request for Quotation 2018-07 Surveying Services Issue Date: February 15, 2018 Closing Date: 2pm PST, March 01, 2018 Surveying Services Prepared by: Westbank First Nation Purchasing

More information

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time

2018 Road Improvements Engineer's Project Number: LK 01 Bid Deadline: May 1, 2018 at 2:00 p.m. local time TABULATION PAGE 1 OF 6 PRE- ESTIMATE Pitlik and Wick, Inc. CONTRACT A - BASE Highway X (Friedle Road to Dam Road) A1.1 Single Layer Chip Seal 75,100 sq. yds. $ 2.50 $ 187,750.00 $ 1.60 $ 120,160.00 $ 1.19

More information

**REVISED BID PRICE FORM** October 24, 2018

**REVISED BID PRICE FORM** October 24, 2018 **REVISED BID PRICE FORM** October 24, 2018 (Date) TO: RE: CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 INVITATION FOR BID WANNAMAKER COUNTY PARK DOG

More information

INVITATION FOR BIDS. Agency Name: Culpeper SWCD. 351 Lakeside Drive. Culpeper, Virginia (540) Project Name & Location:

INVITATION FOR BIDS. Agency Name: Culpeper SWCD. 351 Lakeside Drive. Culpeper, Virginia (540) Project Name & Location: INVITATION FOR BIDS Agency Name: Culpeper SWCD 351 Lakeside Drive Culpeper, Virginia 22701 (540) 825-8591 Project Name & Location: Access Road Relocation 1) Mountain Run Dam 8A (04701) PROJECT CODE NO:

More information

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

Special Conditions, Regulations and Instructions for Right of Way Permit Applications Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid

More information

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF GALVESTON COUNTY MUNICIPAL UTILITY DISTRICT NO.

BE IT RESOLVED BY THE BOARD OF DIRECTORS OF GALVESTON COUNTY MUNICIPAL UTILITY DISTRICT NO. ORDER ESTABLISHING RATES FOR WATER AND SEWER SERVICE; PROVIDING FEES FOR CONNECTION AND RECONNECTION; ESTABLISHING REGULATIONS FOR WATER AND SEWER SERVICE; AND CONTAINING OTHER PROVISIONS RELATING TO THE

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

GP-4-1 of 9 GP-4 SCOPE OF WORK

GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4 SCOPE OF WORK GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4.01 CONTRACT INTENT The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections,

More information

Residential Permit Fee Schedule

Residential Permit Fee Schedule l home Residential Permit Fee Schedule City of Shenandoah 29955 I-45 North Shenandoah, Texas 77381 281-298-5522 New Residential Home Building Permit (includes all sub-contractors fees, plan review, and

More information

Gladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5

Gladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5 Page 1 of 5 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 9:30 A.M., EST, WEDNESDAY, March 9, 2016 Board of County Road Commissioners of the County of Gladwin, 301 South State Street, Gladwin, Michigan

More information

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2

TABLE OF CONTENTS. Table of Contents 3 List of Drawings 1. Procurement Requirements Advertisement for Bids 2 TABLE OF CONTENTS General Requirements Total Pages Table of Contents 3 List of Drawings 1 Procurement Requirements Advertisement for Bids 2 Instruction for Procurement Instructions to Bidders 8 Procurement

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique Greystone Village Inc. 1737 Woodward Drive, Unit.

More information

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103 WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section The following is (1) a list of the activities which utility companies will be allowed to undertake in Washtenaw County road Right-of-Way under

More information

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103

WASHTENAW COUNTY ROAD COMMISSION Permit Engineering Section 555 N. Zeeb Road Ann Arbor, MI 48103 WASHTENAW COUNTY ROAD COMMISSION The following is (1) a list of the activities which utility companies will be allowed to undertake in Washtenaw County road Right-of-Way under a Blanket Permit ; and, (2)

More information

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT

CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT CITY OF MEMPHIS CITY ENGINEER S OFFICE PROCEDURES FOR MONITORING WELL PERMIT Amended 6/09 APPLICABILITY: These procedures will apply where an individual desires to install or abandon a temporary monitoring

More information

TEMPORARY USE PERMIT APPLICATION PUMPKIN/CHRISTMAS TREE LOT

TEMPORARY USE PERMIT APPLICATION PUMPKIN/CHRISTMAS TREE LOT TEMPORARY USE PERMIT APPLICATION PUMPKIN/CHRISTMAS TREE LOT IT IS NECESSARY THAT YOUR APPLICATION INCLUDE ALL THE FOLLOWING INFORMATION TO AVOID DELAYED PROCESSING AS YOUR APPLICATION WILL BE RETURNED

More information

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029 SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

REPLACEMENT RESERVE REPORT FY 2016

REPLACEMENT RESERVE REPORT FY 2016 REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND REPLACEMENT RESERVE REPORT FY 2016 EVANS MILL POND Community Management by: EVANS MILL POND, HOA Evans Mill Road McLean, Virginia 22101 Consultant: 929

More information

TENDER FOR: CLEANING SERVICES CONTRACT. Name of Firm (The Contractor) Address. Telephone Number and Fax Number

TENDER FOR: CLEANING SERVICES CONTRACT. Name of Firm (The Contractor) Address. Telephone Number and Fax Number TENDER FOR: 2017-01 Name of Firm (The Contractor) Address Telephone Number and Fax Number Name and Position of Person Signing for Contractor Email TENDER CLOSING DATE: 1:30 Friday, June 16 th, 2017 Tenders

More information

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager

OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 POSTON & COMPANY. Community Management by: Melissa Blocker, Property Manager REPLACEMENT RESERVE REPORT FY 2017 OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION OCEAN NEIGHBORS HOMEOWNERS ASSOCIATION REPLACEMENT RESERVE REPORT FY 2017 Community Management by: POSTON & COMPANY Melissa Blocker,

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information