1 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/ CONTRACT ID: PROJECT: BR 1502(017) CONTRACT: AWARD : 3,278, PROJECTED : 3,289, ADJ. PROJECTED : 3,289, CONTRACT: CONTRACTOR: LONGVIEW BRIDGE AND ROAD, LTD. HIGHWAY: FM 1988 DISTRICT NAME: Lufkin COUNTY: POLK AREA ENGINEER: Kevin Harbuck, P.E. AREA NUMBER: 052 ESTIMATE NUMBER: 0026 LETTING DATE: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 08/01/2017 to 08/25/2017 NOTICE TO PROCEED DATE: 06/11/2015 ESTIMATE TYPE: FINL WORK BEGIN DATE: 09/23/2015 % COMPLETE: ACCEPTED DATE: 08/25/2017 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: 0.00 RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS 3,203, ,171, PARTICIPATING NON-PARTICIPATING 3,203, ,171, RETAINAGE LIQUIDATED DAMAGES (18,430.00) (18,430.00) INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS 31, , PAID TO CONTRACTOR 3,184, ,153, , CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 8 CONTRACT TIME STATEMENT WORK BEGIN DATE: 09/23/2015 ASSESSED LIQ DAMAGES: 19 TIME CHARGES BEGIN: 07/12/2015 LIQ DAMAGE RATE: DAYS: 188 LIQUIDATED DAMAGES: 19 C. O. ADJUSTED DAYS: 10 DAYS AT CURRENT DAYS: 198 PER DAY DAYS CHARGED : 217 TOTAL: 18, PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date or Charged Credited 08/01/ VEG ESTABLISHMENT 08/02/ VEG ESTABLISHMENT 08/03/ VEG ESTABLISHMENT 08/04/ VEG ESTABLISHMENT 08/05/ SATURDAY 08/06/ SUNDAY 08/07/ VEG ESTABLISHMENT 08/08/ VEG ESTABLISHMENT 08/09/ VEG ESTABLISHMENT 08/10/ VEG ESTABLISHMENT 08/11/ VEG ESTABLISHMENT 08/12/ SATURDAY 08/13/ SUNDAY 08/14/ VEG ESTABLISHMENT 08/15/ VEG ESTABLISHMENT 08/16/ VEG ESTABLISHMENT 08/17/ VEG ESTABLISHMENT 08/18/ VEG ESTABLISHMENT 08/19/ SATURDAY 08/20/ SUNDAY 08/21/ VEG ESTABLISHMENT 08/22/ VEG ESTABLISHMENT 08/23/ VEG ESTABLISHMENT 08/24/ VEG ESTABLISHMENT 08/25/ WORK COMPL & ACCEP Diary Adjustment Date or PERIOD SUMMARY Charged Credited SATURDAY 3 SUNDAY 3 VEG ESTABLISHMENT 18 WORK COMPL & ACC 1

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 8 WORK PERFORMED THIS PERIOD PROJECT BR 1502(017) CONTROL ROADWAY QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date MOBILIZATION LS 300, , TEMP SEDMT CONT FENCE (REMOVE) LF , , ,26 3, TOTAL EARNINGS THIS ESTIMATE 31,411.50

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 8 CONTRACT S PROJECT BR 1502(017) CONTROL ROADWAY SUPP PREPARING ROW STA 3, , REM STAB BASE & AH (6"-12") SY , , , EXCAVATION (ROADWAY) CY , ,29 26, EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 10 9, ,69 106, COMPOST MANUF TOPSOIL (4") SY , , , BLOCK SODDING SY CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY , , , CELL FBR MLCH SEED(TEMP)(COOL) SY , , , SOIL RETENTION BLANKETS (CL 1) (TY B) SY , ,71 1, FL BS (RDWY DEL) (TY D GR 1-2) TON , , , CEMENT TON , CEMENT TREAT (NEW BASE 14") SY , ,87 24, CEM TRT(MX EXST MTL & NEW BS)(14") SY , , , CEMENT TREAT (SUBGRADE)(12") SY , , , SALV, HAUL & STKPL RECLM AH PAV CY , AH (RC-250) GAL , , , AH (AC-15P OR AC-10-2TR OR CRS-2P) GAL , ,00 32, AGGR (TY-PE, E, L OR PL GR 3) CY , AGGR (TY E OR L, PE OR PL GR 4) CY , AGGR (TY E OR L GR 5) CY , D-GR HMA(SQ) TY-C PG64-22 TON , D-GR HMA TY-C SAC-A PG70-22 TON , , , CL C CONC (COLLAR) EA 1, , RC PIPE (CL III)(18 IN) LF , RC PIPE (CL III)(24 IN) LF , SET (TY II) (18 IN) (RCP) (6: 1) (P) EA , SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 1, , REMOV STR (BRIDGE FT LENGTH) EA 60, , REMOV STR (PIPE) EA , REMOV STR (SMALL FENCE) LF , , , MOBILIZATION LS 300, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , ROCK FILTER DAMS (INSTALL) (TY 2) LF , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , CONSTRUCTION EXITS (REMOVE) SY , CONSTRUCTION PERIMETER FENCE LF , , TEMP SEDMT CONT FENCE (INSTALL) LF , , , TEMP SEDMT CONT FENCE (REMOVE) LF , , , PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL) LF , PTB (REMOVE)(SGL SLP)(TY 1) OR (STL) LF , DRIVEWAYS (ACP) SY , ,06 42, MTL W-BEAM GD FEN (TIM POST) LF ,515.00

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of ROADWAY SUPP MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2, , REMOVE METAL BEAM GUARD FENCE LF , GUARDRAIL END TREATMENT (INSTALL) EA 2, , CRASH CUSH ATTEN (INSTL) EA 6, , CRASH CUSH ATTEN (REMOVE) EA 1, , GATE (REMOVE) EA WIRE FENCE (TY A) LF , , , MAILBOX INSTALL-S (TWG-POST) TY 1 EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN SM RD SN SUP&AM TYTWT(1)UA(P) EA , INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA WK ZN PAV MRK REMOV (REFL) TY II-A-A EA , WK ZN PAV MRK REMOV (REFL) TY I-C EA , WK ZN PAV MRK REMOV (TRAF BTN) TY W LF , WK ZN PAV MRK REMOV (TRAF BTN) TY Y LF , WK ZN PAV MRK SHT TERM (TAB)TY Y EA RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF , , , RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF , ,39 2, PREFAB PAV MRK TY B (W)(RR XING) EA PREFAB PAV MRK TY C (W) (24") (SLD) LF REFL PAV MRKR TY II-A-A EA PAV SURF PREP FOR MRK (4") LF , , , PORTABLE CHANGEABLE MESSAGE SIGN EA 15, , PAV SURF PREP FOR MRK (RR XING) EA CONTRACTOR FORCE ACCOUNT WORK Category Subtotal 1,548, SUPP FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1, , , BRIDGE Category Subtotal 7, SUPP CEM STABIL BKFL CY , DRILL SHAFT (18 IN) LF , DRILL SHAFT (36 IN) LF , , , CL C CONC (ABUT) CY 1, , CL C CONC (BENT) CY 1, , CL C CONC (COLUMN) CY , REINF CONC SLAB SF , , , APPROACH SLAB CY , PRESTR CONC GIRDER (TX40) LF , , , PRESTR CONC GIRDER (TX46) LF , , ,835.00

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of BRIDGE SUPP RIPRAP (STONE PROTECTION)(18 IN) CY , RAIL (TY T223) LF , ,13 124, ARMOR JOINT LF , Category Subtotal 1,647, PROJECT BR 1502(017) CONTROL ROADWAY SUPP () CELL FBR MLCH SEED(TEMP)(WARM) SY , VEGETATIVE WATERING MG 10 1, CUT & RESTORING PAV SY TRENCH EXCAVATION PROTECTION LF ROCK FILTER DAMS (REMOVE) LF REMOVE TERMINAL ANCHOR SECTION EA REMOVE SM RD SN SUP&AM EA PRODUCTION BONUS/PENALTY DOL 0 3, PLACEMENT BONUS/PENALTY DOL 0 1, RIDE BONUS/PENALTY ( 341) DOL 0 3, MATERIAL ON HAND DOL 0 1, CONTRACTOR FORCE ACCOUNT WORK Category Subtotal 0.00 SUPP () FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1, Category Subtotal 0.00 TOTAL EARNINGS THIS CONTRACT 3,203,300.56

7 CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 8 CONSTRUCTION ESTIMATE COMBINED () PREPARING ROW STA 3, , REM STAB BASE & AH (6"-12") SY , , , EXCAVATION (ROADWAY) CY ,29 5,290 26, EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 10 9,69 9, , COMPOST MANUF TOPSOIL (4") SY ,18 17, , BLOCK SODDING SY CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY ,18 21, , CELL FBR MLCH SEED(TEMP)(COOL) SY ,09 21, , SOIL RETENTION BLANKETS (CL 1) (TY B) SY , ,710 1, FL BS (RDWY DEL) (TY D GR 1-2) TON , , , CEMENT TON , CEMENT TREAT (NEW BASE 14") SY , ,870 24, CEM TRT(MX EXST MTL & NEW BS)(14") SY , , , CEMENT TREAT (SUBGRADE)(12") SY , , , SALV, HAUL & STKPL RECLM AH PAV CY , AH (RC-250) GAL , , , AH (AC-15P OR AC-10-2TR OR CRS-2P) GAL , ,000 32, AGGR (TY-PE, E, L OR PL GR 3) CY , AGGR (TY E OR L, PE OR PL GR 4) CY , AGGR (TY E OR L GR 5) CY , D-GR HMA(SQ) TY-C PG64-22 TON , D-GR HMA TY-C SAC-A PG70-22 TON ,11 1, , CEM STABIL BKFL CY , DRILL SHAFT (18 IN) LF , DRILL SHAFT (36 IN) LF , , , CL C CONC (ABUT) CY 1, , CL C CONC (BENT) CY 1, , CL C CONC (COLUMN) CY , CL C CONC (COLLAR) EA 1, , REINF CONC SLAB SF , , , APPROACH SLAB CY , PRESTR CONC GIRDER (TX40) LF , , , PRESTR CONC GIRDER (TX46) LF , , , RIPRAP (STONE PROTECTION)(18 IN) CY , RAIL (TY T223) LF ,13 1, , ARMOR JOINT LF , RC PIPE (CL III)(18 IN) LF , RC PIPE (CL III)(24 IN) LF , SET (TY II) (18 IN) (RCP) (6: 1) (P) EA , SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1, , SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 1, , REMOV STR (BRIDGE FT LENGTH) EA 60, ,000.00

8 CONTRACTOR'S ESTIMATE PACKAGE Page 8 of REMOV STR (PIPE) EA , REMOV STR (SMALL FENCE) LF , , , MOBILIZATION LS 300, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1, , ROCK FILTER DAMS (INSTALL) (TY 2) LF , CONSTRUCTION EXITS (INSTALL) (TY 1) SY , CONSTRUCTION EXITS (REMOVE) SY , CONSTRUCTION PERIMETER FENCE LF , , TEMP SEDMT CONT FENCE (INSTALL) LF ,26 3, , TEMP SEDMT CONT FENCE (REMOVE) LF ,26 3, , PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL) LF , PTB (REMOVE)(SGL SLP)(TY 1) OR (STL) LF , DRIVEWAYS (ACP) SY ,00 1,060 42, MTL W-BEAM GD FEN (TIM POST) LF , MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2, , REMOVE METAL BEAM GUARD FENCE LF , GUARDRAIL END TREATMENT (INSTALL) EA 2, , CRASH CUSH ATTEN (INSTL) EA 6, , CRASH CUSH ATTEN (REMOVE) EA 1, , GATE (REMOVE) EA WIRE FENCE (TY A) LF , , , MAILBOX INSTALL-S (TWG-POST) TY 1 EA IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA IN SM RD SN SUP&AM TYTWT(1)UA(P) EA , INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA WK ZN PAV MRK REMOV (REFL) TY I-C EA , WK ZN PAV MRK REMOV (REFL) TY II-A-A EA , WK ZN PAV MRK REMOV (TRAF BTN) TY W LF , WK ZN PAV MRK REMOV (TRAF BTN) TY Y LF , WK ZN PAV MRK SHT TERM (TAB)TY Y EA RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF , , , RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF , ,390 2, PREFAB PAV MRK TY B (W)(RR XING) EA PREFAB PAV MRK TY C (W) (24") (SLD) LF REFL PAV MRKR TY II-A-A EA PAV SURF PREP FOR MRK (4") LF , , , PAV SURF PREP FOR MRK (RR XING) EA PORTABLE CHANGEABLE MESSAGE SIGN EA 15, , FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1, , , TOTAL EARNINGS 3,203,300.56

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 166 CONTRACT ID: 100802018 PROJECT: C 1008-2-18 CONTRACT: 06163219 AWARD : $3,498,600.69 PROJECTED : $3,564,104.69 ADJ. PROJECTED : $3,564,104.69 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD: 48,793.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 69 18.00 CONTRACT ID: 017701102 PROJECT: NH 2017(641) CONTRACT: 02173007 AWARD : $2,215,251.08 PROJECTED : $2,257,251.08 ADJ. PROJECTED : $2,306,044.60

More information

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC -73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 31 CONTRACT ID: 033702041 PROJECT: STP 2016(576) CONTRACT: 01163208 AWARD : $1,499,000.00 PROJECTED : $1,520,990.00 ADJ. PROJECTED : $1,520,990.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: US 82 COUNTY: 02/01/2018 ESTIMATE PAID: AWARD DATE: 02/22/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: US 82 COUNTY: 02/01/2018 ESTIMATE PAID: AWARD DATE: 02/22/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 45 CONTRACT ID: 004501061 PROJECT: NH 2018(556) CONTRACT: 02183025 AWARD : $2,124,211.95 PROJECTED : $2,130,211.95 ADJ. PROJECTED : $2,130,211.95 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED: 143,230.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 77 4.00 CONTRACT ID: 041902041 PROJECT: STP 2016(746) CONTRACT: 02163223 AWARD : $3,653,777.19 PROJECTED : $3,823,809.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 HIGHWAY: COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 HIGHWAY: COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: -18,600.75 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 CONTRACT ID: 628405001 PROJECT: RMC - 628405001 CONTRACT: 04154013 AWARD : $597,778.20 PROJECTED : $597,783.20 ADJ. PROJECTED : $579,182.45

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15 68,460.45 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15 101 28.00 CONTRACT ID: 207501053 PROJECT: NH 2013(466) CONTRACT: 03133207 AWARD : $3,794,106.27 PROJECTED : $3,958,638.27 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: SH 103 COUNTY: 10/03/2017 ESTIMATE PAID: AWARD DATE: 10/26/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: SH 103 COUNTY: 10/03/2017 ESTIMATE PAID: AWARD DATE: 10/26/2017 ESTIMATE PERIOD: 13,138.91 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 90 19.00 CONTRACT ID: 033606028 PROJECT: STP 2018(156)HES CONTRACT: 10173013 AWARD : $597,891.99 PROJECTED : $600,891.99 ADJ. PROJECTED : $614,030.90

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 03/08/2017 ESTIMATE PAID: AWARD DATE: 03/28/2017 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 03/08/2017 ESTIMATE PAID: AWARD DATE: 03/28/2017 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 8,370.50 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 118 20.00 CONTRACT ID: 004901092 PROJECT: NH 2017(876) CONTRACT: 03173229 AWARD : $3,877,223.25 PROJECTED : $4,018,765.25 ADJ. PROJECTED : $4,027,135.75

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD: 10,070.68 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 37 5.00 CONTRACT ID: 036605044 PROJECT: STP 2017(285) CONTRACT: 11163011 AWARD : $611,559.93 PROJECTED : $611,559.93 ADJ. PROJECTED : $621,630.61

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: US 84 COUNTY: 04/04/2017 ESTIMATE PAID: AWARD DATE: 04/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: US 84 COUNTY: 04/04/2017 ESTIMATE PAID: AWARD DATE: 04/27/2017 ESTIMATE PERIOD: 176,501.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 83 15.00 CONTRACT ID: 005207070 PROJECT: C 52-7-70 CONTRACT: 04173021 AWARD : 5,963,457.12 PROJECTED : 6,553,090.02 ADJ. PROJECTED : 6,729,591.62

More information

$ CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 234, PROJECT: RMC SH0020

$ CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 234, PROJECT: RMC SH0020 234,238.82 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 43 3 CONTRACT ID: 630941001 PROJECT: RMC - 630941001 CONTRACT: 02172404 AWARD AMOUNT: $83,876.21 PROJECTED AMOUNT: $83,876.21 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: SL 467 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: SL 467 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 86,108.12 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 40 CONTRACT ID: 014114016 PROJECT: STP 2018(362) CONTRACT: 12173225 AWARD : $5,905,799.12 PROJECTED : $5,905,799.12 ADJ. PROJECTED : $5,991,907.24

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: US 82 COUNTY: 12/03/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: US 82 COUNTY: 12/03/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 27 CONTRACT ID: 004408068 PROJECT: NH 2015(403) CONTRACT: 12143209 AWARD : $1,673,272.77 PROJECTED : $1,714,072.77 ADJ. PROJECTED : $1,714,072.77 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 HIGHWAY: US 377 COUNTY: 01/04/2017 ESTIMATE PAID: AWARD DATE: 01/26/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 HIGHWAY: US 377 COUNTY: 01/04/2017 ESTIMATE PAID: AWARD DATE: 01/26/2017 ESTIMATE PERIOD: 157,856.43 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 39 CONTRACT ID: 008004096 PROJECT: NH 2016(147) CONTRACT: 01173019 AWARD AMOUNT: $3,213,559.48 PROJECTED AMOUNT: $3,243,559.48 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 211,476.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 112 27.00 CONTRACT ID: 027104091 PROJECT: NH 2016(724) CONTRACT: 02163035 AWARD AMOUNT: $4,962,242.32 PROJECTED AMOUNT: $4,962,249.32 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 2,325,732.17 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/7/18 359 CONTRACT ID: 6317221 HIGHWAY: US8 : RMC - 6317221 DISTRICT NAME: Dallas CONTRACT: 717421 COUNTY: KAUFMAN AWARD : ED : $2,64,374. $2,63,59.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17 -33,427.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17 78 CONTRACT ID: 017605175 PROJECT: NH 2014(292) CONTRACT: 12133220 AWARD AMOUNT: $1,316,346.55 PROJECTED AMOUNT: $1,319,346.55 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14 -137,738.34 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14 42 CONTRACT ID: 050201208 PROJECT: NH 2012(709) CONTRACT: 08123017 AWARD AMOUNT: $2,342,263.41 PROJECTED AMOUNT: $2,347,563.41 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD: 216,972.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 388 6 CONTRACT ID: 627908001 PROJECT: RMC - 627908001 CONTRACT: 11144009 AWARD AMOUNT: $319,350.50 PROJECTED AMOUNT: $319,351.50 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/15 HIGHWAY: COUNTY: 12/08/2014 ESTIMATE PAID: AWARD DATE: 12/09/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/15 HIGHWAY: COUNTY: 12/08/2014 ESTIMATE PAID: AWARD DATE: 12/09/2014 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/8/15 19 CONTRACT ID: 628471 : RMC - 628471 CONTRACT: 1214131 AWARD : $133,948.82 ED : $133,951.82 ADJ. ED : $133,951.82 CONTRACT: CONTRACTOR: BRYDL CONTRACTING,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 HIGHWAY: FM 1186 COUNTY: 12/01/2016 ESTIMATE PAID: AWARD DATE: 12/15/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 HIGHWAY: FM 1186 COUNTY: 12/01/2016 ESTIMATE PAID: AWARD DATE: 12/15/2016 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 104 CONTRACT ID: 006301092 PROJECT: STP 2017(336)HESG CONTRACT: 12163008 AWARD : $814,705.35 PROJECTED : $819,706.34 ADJ. PROJECTED : $819,706.34 CONTRACT:

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 04/11/2017 ESTIMATE PAID: AWARD DATE: 04/17/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 04/11/2017 ESTIMATE PAID: AWARD DATE: 04/17/2017 ESTIMATE PERIOD: 7,254.5 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/7/18 CONTRACT ID: 6313261 : RMC - 6313261 CONTRACT: 417124 AWARD : $264,4. ED : $273,38. ADJ. ED : $343,292.5 CONTRACT: CONTRACTOR: FORDE CONSTRUCTION

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: COUNTY: 03/05/2015 ESTIMATE PAID: AWARD DATE: 03/26/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: COUNTY: 03/05/2015 ESTIMATE PAID: AWARD DATE: 03/26/2015 ESTIMATE PERIOD: 144,842.30 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 364 CONTRACT ID: 628367001 PROJECT: RMC - 628367001 CONTRACT: 03154002 AWARD : $466,825.00 PROJECTED : $466,825.00 ADJ. PROJECTED : $611,667.30

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 09/08/2016 ESTIMATE PAID: AWARD DATE: 09/29/2016 ESTIMATE PERIOD: 10/03/2017 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 09/08/2016 ESTIMATE PAID: AWARD DATE: 09/29/2016 ESTIMATE PERIOD: 10/03/2017 % TIME USED: -1,1.54 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 4/9/18 35 CONTRACT ID: 49676 : STP 217(8)HES CONTRACT: 916321 AWARD : $83,985.19 ED : $86,485.19 ADJ. ED : $85,483.65 CONTRACT: CONTRACTOR: THIRD COAST

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 40,000.00 $40,000.00 $ 61,320.82 $ 61,320.82 $ 45,000.00 $ 45,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 150,000.00 $150,000.00

More information

$0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 2, IH PROJECT: RMC

$0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 2, IH PROJECT: RMC 2,2. CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 3/12/18 617 CONTRACT ID: : RMC - CONTRACT: 11531 AWARD : $212,6. ED : $212,6. ADJ. ED : $214,8. CONTRACT: CONTRACTOR: BRYDL CONTRACTING, INC. HIGHWAY: IH35

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: COUNTY: 03/09/2016 ESTIMATE PAID: AWARD DATE: 03/10/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: COUNTY: 03/09/2016 ESTIMATE PAID: AWARD DATE: 03/10/2016 ESTIMATE PERIOD: 158,697.80 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 552 365.00 CONTRACT ID: 629164001 : RMC - 629164001 CONTRACT: 03161902 AWARD : $138,98 ED : $138,983.00 ADJ. ED : $297,680.80 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 334 CONTRACT ID: 632165001 PROJECT: SUP - 632165001 CONTRACT: 08170930 AWARD AMOUNT: $33,300.00 PROJECTED AMOUNT: $33,300.00 ADJ. PROJECTED AMOUNT: $33,300.00

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

PART A ROADWAY - BASE BID

PART A ROADWAY - BASE BID May 10, 2016 HEB-MC-61 PART A ROADWAY - BASE BID 202(A) - UNCLASSIFIED EXCAVATION - CY 34,946.00 $ 6.00 209,676.00 $ 7.98 $ 278,869.08 205(A) - TYPE A-SALVAGED TOPSOIL - LSUM 1.00 $ 22,500.00 $ 22,500.00

More information

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affec

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY (CRRMA) The undersigned having familiarized themselves with the local conditions affec FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals

More information

ADDENDUM ACKNOWLEDGMENT

ADDENDUM ACKNOWLEDGMENT Control 0200-04-024, ETC. Project NH 2019(629) Highway US 69 County JASPER, ETC. ADDENDUM ACKNOWLEDGMENT Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This

More information

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02

PROJECT NO PID BEL TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 AWARDED PROJECT PROJECT NO. 016002 PID. 19109 BEL-7-3.68 TE21-G990(217) TYPE: SLIDE REPAIR LETTING: 06/07/01 COMPLETION DATE: 09/30/02 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 250,000.00 $250,000.00 $ 240,978.56 $ 240,978.56 260,000.00 $ 260,000.00 201(A) CLEARING & GRUBBING LSUM 1.00 $ 30,000.00 $30,000.00 $ 17,188.20

More information

REPLACEMENT OF MERCER COUNTY BRIDGE

REPLACEMENT OF MERCER COUNTY BRIDGE ADDENDUM NO. ONE Notice is hereby given that on April 26, 2019 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Department in the Mercer County McDade

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018

OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE. PAGE NO. 1 DATE PRINTED : May 22, 2018 LETTING DATE : 2018-06-14 CALL NUMBER : 772 OKLAHOMA DEPARTMENT OF TRANSPORTATION PRELIMINARY HIGHWAY DETAIL CONSTRUCTION ESTIMATE PAGE NO. 1 DATE PRINTED : JOB NUMBER : 170236 ESTIMATE NUMBER : PROJECT

More information

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE

AVERAGE OF BID ITEMS ENGINEERS ESTIMATE ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

KANE COUNTY DIVISION of TRANSPORTATION

KANE COUNTY DIVISION of TRANSPORTATION Carl Schoedel, P.E. Director of Transportation County Engineer KANE COUNTY DIVISION of TRANSPORTATION 41W011 Burlington Road St. Charles, IL 60175 (630) 584-1170 Fax: (630) 584-5265 Section 13-00176-02-BR

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

BID TABULATION BID REQUEST NO

BID TABULATION BID REQUEST NO BID TABULATION BID REQUEST NO. 13-1046 1 LOWEST RESPONSIVE BIDDER Dakota Contracting Bidder: Corporation D & G Concrete Bidder: Construction, Inc. Carl V. Carlson Bidder: Company Address: 431 NORTH PHILLIPS

More information

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all

More information

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP

AVGPR14.Y01 2/11/2014 DOES NOT INCLUDE STATE AID PROJECTS ALL ITEMS BETWEEN 12/01/13 AND 12/31/13 BY ITEM GROUP AVERAGE BID PRICES FOR AWARDED PROJECTS 14:48 Tuesday, February 11, 2014 1 2011 2011.601/00003 CONSTRUCTION SURVEYING LS 1 $19 $18,500.00 1 2013 2013.602/00022 ROAD/WEATHER SENSOR AND CABLE EACH 3 $32

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

CONTRACT TIME DETERMINATION

CONTRACT TIME DETERMINATION CONTRACT TIME DETERMINATION MISSOURI DEPARTMENT OF TRANSPORTATION March 15, 2004 DEFINITIONS Calendar Day: Any day shown on the calendar beginning and ending at midnight. Working Day: A calendar day during

More information

OFFICIAL BID TABULATION AWARDED PROJECT

OFFICIAL BID TABULATION AWARDED PROJECT AWARDED PROJECT PROJECT NO. 990206 PID. 17900 HAN-37-5.118 TE21-G990(271) TYPE: SIGNALIZATION LETTING: 04/28/99 COMPLETION DATE: 10/31/99 OHIO DEPARTMENT OF TRANSPORTATION GORDON PROCTOR, DIRECTOR CONTRACT

More information

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT:

ADDENDUM #1 March 12, 2019 BID FORM. Moore, Oklahoma DATE: PROJECT: ADDENDU #1 arch 12, 2019 BID FOR PLACE DATE: PROJECT: oore, Oklahoma 34 th Street, Telephone Rd to Santa Fe Ave Roadway Widening Proposal of (hereinafter called BIDDER ), doing business as a Corporation

More information

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $

More information

BID TABULATION. Engineer's Estmated Opinion of Costs

BID TABULATION. Engineer's Estmated Opinion of Costs Street Resurfacing Project - 2018 Rank Vendor Name Total Bid % of Low Bid % of Estimate File 2018-004 Engineer's $ 5,032,397.47 102.11% 100.00% Bid 4529 1 Ajax Paving Industries, Inc $ 4,928,322.54 100.00%

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT

Tabulation of Bids. Counties: ROUTE 94 BLACK CREEK TRIBUTARY CULVERT REPLACEMENT Page 1 of 20 16 SSSEX ROTE 94 BLACK CREEK TRIBTARY CLVERT REPLACEMENT CONSTRCTION CORP INC. (2) KONKS CORPORATION (3) NORTHEAST REMSCO CONSTRCTION INC Quantity and nits nit Price nit Price nit Price 0001

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location:

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Bid Comparison Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Projects(s): Cass Avenue over North Branch Clinton River Clinton Township, Macomb County 1651 Rank Bidder

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price

RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO Item Description Est. Qty. Units Unit Price 2. BID SCHEDULE RANCHERO ROAD AND BNSF GRADE SEPARATION PROJECT, C.O. NO. 7046 To the Honorable Mayor and City Council of the City of Hesperia: Schedule of prices to construct the Ranchero Road and BNSF

More information

2015 Williamson County INVITATION FOR BID

2015 Williamson County INVITATION FOR BID 2015 Williamson County INVITATION FOR BID Chandler Road Overlay and Striping Bid # 15IFB115 Williamson County Purchasing Department 901 S. Austin Avenue Georgetown, TX. 78626 www.wilco.org/purchasing 512-943-3553

More information

DISTRICT AVERAGES 1, 2016 THROUGH 1, 2018 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT

DISTRICT AVERAGES 1, 2016 THROUGH 1, 2018 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT 100 MOBILIZATION LS $ 15,000.00 $ 143,384.14 $ 69,597.83 BRSTL 101 CONSTRUCTION SURVEYING CONSTR. LS $ 2,000.00 $ 59,277.82 $ 12,621.73 BRSTL 102 CONSTRUCTION SURVEYING MIN.-PLAN LS $ 15,000.00 $ 15,000.00

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address. NOTICE TO BIDDERS Sealed proposals will be received by the Ottawa County Road Commission, at its offices at 14110 Lakeshore Drive, Grand Haven, Michigan 49417, until Wednesday November 16, 2016 at 10:00am

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS

CITY ENGINEER'S ESTIMATE ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL UNIT PRICE ITEM TOTAL REMOVALS 1 2 3 4 5 6 MOBILIZATION per the General Requirements, Sections 01292 and 01721 ALLOWANCE for Differing Site Condition per the General Requirements, Sections 01212 and 01253 ALLOWANCE for Participating

More information

Active Construction RV Associates Scarsella JR Hayes

Active Construction RV Associates Scarsella JR Hayes CITY OF PORT ORCHARD PUBLIC WORKS DEPARTMENT TREMONT STREET IMPROVEMENTS SR 16 to Port Orchard Boulevard Opening: 6/6/2017 Fed Aid Proj No: STPUS-6610(004) $ 12,779,179.17 $ 12,855,082.55 $ 12,901,887.92

More information

DISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT

DISTRICT AVERAGES 31, 2014 THROUGH 1, 2016 ITEM ITEM DESCRIPTION UNIT MINIMUM MAXIMUM AVERAGE DISTRICT 100 MOBILIZATION LS $ 20,000.00 $ 143,384.14 $ 74,567.11 BRSTL 101 CONSTRUCTION SURVEYING (CONSTR.) LS $ 2,500.00 $ 59,277.82 $ 13,090.66 BRSTL 102 CONSTRUCTION SURVEYING(MIN. PLAN) LS $ 15,000.00 $ 15,000.00

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: March 22, 2016 AGENDA ITEM #G-10 ITEM: Consider Approval of a Budget Amendment & Award of a Contract Asphalt Repairs to Hutch Paving, Inc. the Wayne

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4735 1.00 miles of roadway reconstruction including grade establishment, sand subbase, aggregate

More information

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL

Munilla Construction HOOD RD., E. OF FLORIDA'S TURNPIKE TO W. OF CENTRAL BLVD. AND HOOD RD. & CENTRAL JW Cheatham, ROADWAY 1 MOBILIZATION 1.0 LS $ 1,350,116.25 $ 906,000.00 $ 1,233,000.00 $ 1,233,000.00 $ 1,159,208.36 $ 1,159,208.36 $ 1,451,835.00 $ 1,451,835.00 $ 1,556,421.65 $ 1,556,421.65 2 MAINTENANCE

More information

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM

PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM NAME OF CONTRACTOR PROPOSAL AND SPECIFICATIONS FOR HIGHWAY CONSTRUCTION COUNTY LOCAL ROAD SYSTEM PROJECT NO. 4907 1.08 miles of roadway reconstruction including clearing, grade establishment, sand subbase,

More information

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL North Baker Ave. - City Limits to 23rd St. NE Bid Documents BD-1 To the Board of County Commissioners Douglas County, Washington Gentlemen: North Baker Ave - City Limits to 23rd St NE CRP 949 PROPOSAL

More information