1 157, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 39 CONTRACT ID: PROJECT: NH 2016(147) CONTRACT: AWARD AMOUNT: $3,213, PROJECTED AMOUNT: $3,243, ADJ. PROJECTED AMOUNT: $3,401, CONTRACT: CONTRACTOR: NORTHEASTERN PAVERS, INC. HIGHWAY: US 377 DISTRICT NAME: Fort Worth COUNTY: HOOD AREA ENGINEER: David Fowler, P.E. AREA NUMBER: 056 ESTIMATE NUMBER: 0009 LETTING DATE: 01/04/2017 ESTIMATE PAID: AWARD DATE: 01/26/2017 ESTIMATE PERIOD: 09/28/2017 to 10/27/2017 NOTICE TO PROCEED DATE: 01/26/2017 ESTIMATE TYPE: PROG WORK BEGIN DATE: 01/30/2017 % COMPLETE: ACCEPTED DATE: 11/06/2017 % TIME USED: PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL TO DATE PREV TO DATE THIS ESTIMATE EARNINGS $3,318, $3,290, PARTICIPATING NON-PARTICIPATING $3,318, $3,290, RETAINAGE LIQUIDATED DAMAGES ($6,79) ($6,79) INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS PAID TO CONTRACTOR $3,311, $3,283, CONTRACT ADJUSTMENTS THIS ESTIMATE LINE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT DESCRIPTION: ADJUSTMENT AMOUNT: REMARKS: ADJUSTMENT DESCRIPTION: ADJUSTMENT AMOUNT: REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

2 CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 6 CONTRACT TIME STATEMENT WORK BEGIN DATE: 01/30/2017 ASSESSED LIQ DAMAGES: 7 TIME CHARGES BEGIN: 01/30/2017 LIQ DAMAGE RATE: $97 BID DAYS: 32 LIQUIDATED DAMAGES: 7 C. O. ADJUSTED DAYS: 0 DAYS AT CURRENT DAYS: 32 PER DAY $97 DAYS CHARGED TO DATE: 39 TOTAL: $6,79 PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date or Charged Credited 09/28/ TIME SUENDED 09/29/ TIME SUENDED 09/30/ SATURDAY 10/01/ SUNDAY 10/02/ TIME SUENDED 10/03/ TIME SUENDED 10/04/ TIME SUENDED 10/05/ TIME SUENDED 10/06/ TIME SUENDED 10/07/ SATURDAY 10/08/ SUNDAY 10/09/ TIME SUENDED 10/10/ TIME SUENDED 10/11/ TIME SUENDED 10/12/ TIME SUENDED 10/13/ TIME SUENDED 10/14/ SATURDAY 10/15/ SUNDAY 10/16/ TIME SUENDED 10/17/ TIME SUENDED 10/18/ TIME SUENDED 10/19/ TIME SUENDED 10/20/ TIME SUENDED 10/21/ SATURDAY 10/22/ SUNDAY 10/23/ TIME SUENDED 10/24/ TIME SUENDED 10/25/ TIME SUENDED 10/26/ TIME SUENDED 10/27/ WORK COMPLETED Diary Adjustment Date or PERIOD SUMMARY Charged Credited SATURDAY 4 SUNDAY 4 TIME SUENDED 21 WORK COMPLETED 1

3 CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 6 WORK PERFORMED THIS PERIOD PROJECT NH 2016(147) CONTROL CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION QTY THIS ESTIMATE AMOUNT PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF $ , , REFL PAV MRK TY I (W)(WORD)(100MIL) EA $ WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF ,600 $27, ,60 118, REFL PAV MRKR TY II-A-A EA $ , , TOTAL EARNINGS THIS ESTIMATE

4 CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 6 CONTRACT LINE S PROJECT CATEGORY NH 2016(147) CONTROL DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT $ TOM (AHALT) PG TON , , , TOM-C (AGGREGATE) SAC-A TON , , , TOM - C (AGGREGATE) SAC - B TON , , , PLAN & TEXT AH CONC PAV(0" TO 2") SY , , , MOBILIZATION LS 300, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5, , WK ZN PAV MRK SHT TERM (TAB)TY W EA , , , WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF ,130 13,97 3, WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , , , WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA , , , REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF , , , REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , , , REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) LF ,130 12,13 8, REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF , , , REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF REFL PAV MRK TY I (W)(ARROW)(100MIL) EA , REFL PAV MRK TY I (W)(WORD)(100MIL) EA , REFL PAV MRK TY I (W)(RR XING)(100MIL) EA REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF , RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF , ,75 5, RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF , , , WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF , ,60 27, RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF , ,07 1, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , , , REFL PAV MRKR TY I-C EA , ,22 3, REFL PAV MRKR TY II-A-A EA , , , Category Subtotal $3,318, PROJECT NH 2016(147) CONTROL CATEGORY 001 DESCRIPTION ALL S LINE DESCRIPTION SUPP DESCRIPTION BID NET CO QTY PAID TO DATE AMOUNT ($) BACKFILL (TY B) STA EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY BIODEG EROSN CONT LOGS (INSTL) (12") LF , BIODEG EROSN CONT LOGS (REMOVE) LF , RUMBLE STRIPS (SHOULDER) LF , FORCE ACCOUNT - SAFETY CONTINGENCY DOL , MATERIAL ON HAND DOL , PAYMENT ADJUSTMENT-POS DOL ,

5 CONTRACTOR'S ESTIMATE PACKAGE Page 5 of PAYMENT ADJUSTMENT-NEG DOL , Category Subtotal TOTAL EARNINGS THIS CONTRACT $3,318,330.40

6 CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 6 CONSTRUCTION ESTIMATE COMBINED DESCRIPTION BID QTY PAID TO DATE AMOUNT ($) TOM (AHALT) PG TON , , , TOM-C (AGGREGATE) SAC-A TON , , , TOM - C (AGGREGATE) SAC - B TON , , , PLAN & TEXT AH CONC PAV(0" TO 2") SY , , , MOBILIZATION LS 300, , BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5, , WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF ,600 27, WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF ,970 3, WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF , , WK ZN PAV MRK SHT TERM (TAB)TY W EA , , , WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA ,21 2, , REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF , , , REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF REFL PAV MRK TY I (W)(ARROW)(100MIL) EA , REFL PAV MRK TY I (W)(WORD)(100MIL) EA , REFL PAV MRK TY I (W)(RR XING)(100MIL) EA REFL PAV MRK TY I (Y)24"(SLD)(100MIL) LF , RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF ,75 16,750 5, RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF , , , RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF ,59 4,070 1, RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF , , , REF PROF PAV MRK TY I(W)4"(SLD)(100MIL) LF , , REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL) LF ,130 8, REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL) LF , , REFL PAV MRKR TY I-C EA , ,220 3, REFL PAV MRKR TY II-A-A EA , , , TOTAL EARNINGS TO DATE $3,318,330.40

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: US 59 COUNTY: 02/02/2017 ESTIMATE PAID: AWARD DATE: 02/23/2017 ESTIMATE PERIOD: 48,793.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 69 18.00 CONTRACT ID: 017701102 PROJECT: NH 2017(641) CONTRACT: 02173007 AWARD : $2,215,251.08 PROJECTED : $2,257,251.08 ADJ. PROJECTED : $2,306,044.60

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 HIGHWAY: COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 HIGHWAY: COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: -18,600.75 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/16 CONTRACT ID: 628405001 PROJECT: RMC - 628405001 CONTRACT: 04154013 AWARD : $597,778.20 PROJECTED : $597,783.20 ADJ. PROJECTED : $579,182.45

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: SH 29 COUNTY: 01/06/2016 ESTIMATE PAID: AWARD DATE: 01/28/2016 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 31 CONTRACT ID: 033702041 PROJECT: STP 2016(576) CONTRACT: 01163208 AWARD : $1,499,000.00 PROJECTED : $1,520,990.00 ADJ. PROJECTED : $1,520,990.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD: 10/31/2016 % TIME USED: 143,230.65 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 77 4.00 CONTRACT ID: 041902041 PROJECT: STP 2016(746) CONTRACT: 02163223 AWARD : $3,653,777.19 PROJECTED : $3,823,809.19 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 03/08/2017 ESTIMATE PAID: AWARD DATE: 03/28/2017 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 03/08/2017 ESTIMATE PAID: AWARD DATE: 03/28/2017 ESTIMATE PERIOD: 00/00/0000 % TIME USED: 8,370.50 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 118 20.00 CONTRACT ID: 004901092 PROJECT: NH 2017(876) CONTRACT: 03173229 AWARD : $3,877,223.25 PROJECTED : $4,018,765.25 ADJ. PROJECTED : $4,027,135.75

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: US 82 COUNTY: 02/01/2018 ESTIMATE PAID: AWARD DATE: 02/22/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: US 82 COUNTY: 02/01/2018 ESTIMATE PAID: AWARD DATE: 02/22/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 45 CONTRACT ID: 004501061 PROJECT: NH 2018(556) CONTRACT: 02183025 AWARD : $2,124,211.95 PROJECTED : $2,130,211.95 ADJ. PROJECTED : $2,130,211.95 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: US 82 COUNTY: 12/03/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: US 82 COUNTY: 12/03/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 27 CONTRACT ID: 004408068 PROJECT: NH 2015(403) CONTRACT: 12143209 AWARD : $1,673,272.77 PROJECTED : $1,714,072.77 ADJ. PROJECTED : $1,714,072.77 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: US 84 COUNTY: 04/04/2017 ESTIMATE PAID: AWARD DATE: 04/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: US 84 COUNTY: 04/04/2017 ESTIMATE PAID: AWARD DATE: 04/27/2017 ESTIMATE PERIOD: 176,501.60 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 83 15.00 CONTRACT ID: 005207070 PROJECT: C 52-7-70 CONTRACT: 04173021 AWARD : 5,963,457.12 PROJECTED : 6,553,090.02 ADJ. PROJECTED : 6,729,591.62

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 211,476.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 112 27.00 CONTRACT ID: 027104091 PROJECT: NH 2016(724) CONTRACT: 02163035 AWARD AMOUNT: $4,962,242.32 PROJECTED AMOUNT: $4,962,249.32 ADJ.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 123 COUNTY: 11/03/2016 ESTIMATE PAID: AWARD DATE: 11/17/2016 ESTIMATE PERIOD: 10,070.68 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 37 5.00 CONTRACT ID: 036605044 PROJECT: STP 2017(285) CONTRACT: 11163011 AWARD : $611,559.93 PROJECTED : $611,559.93 ADJ. PROJECTED : $621,630.61

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 958 COUNTY: 06/08/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 166 CONTRACT ID: 100802018 PROJECT: C 1008-2-18 CONTRACT: 06163219 AWARD : $3,498,600.69 PROJECTED : $3,564,104.69 ADJ. PROJECTED : $3,564,104.69 CONTRACT:

More information

$ CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 234, PROJECT: RMC SH0020

$ CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 234, PROJECT: RMC SH0020 234,238.82 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/11/18 43 3 CONTRACT ID: 630941001 PROJECT: RMC - 630941001 CONTRACT: 02172404 AWARD AMOUNT: $83,876.21 PROJECTED AMOUNT: $83,876.21 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: SL 467 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: SL 467 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD: 86,108.12 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 40 CONTRACT ID: 014114016 PROJECT: STP 2018(362) CONTRACT: 12173225 AWARD : $5,905,799.12 PROJECTED : $5,905,799.12 ADJ. PROJECTED : $5,991,907.24

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15 68,460.45 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/15 101 28.00 CONTRACT ID: 207501053 PROJECT: NH 2013(466) CONTRACT: 03133207 AWARD : $3,794,106.27 PROJECTED : $3,958,638.27 ADJ. PROJECTED :

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 HIGHWAY: FM 1186 COUNTY: 12/01/2016 ESTIMATE PAID: AWARD DATE: 12/15/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 HIGHWAY: FM 1186 COUNTY: 12/01/2016 ESTIMATE PAID: AWARD DATE: 12/15/2016 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/11/18 104 CONTRACT ID: 006301092 PROJECT: STP 2017(336)HESG CONTRACT: 12163008 AWARD : $814,705.35 PROJECTED : $819,706.34 ADJ. PROJECTED : $819,706.34 CONTRACT:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14 -137,738.34 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/06/14 42 CONTRACT ID: 050201208 PROJECT: NH 2012(709) CONTRACT: 08123017 AWARD AMOUNT: $2,342,263.41 PROJECTED AMOUNT: $2,347,563.41 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17 -33,427.31 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/10/17 78 CONTRACT ID: 017605175 PROJECT: NH 2014(292) CONTRACT: 12133220 AWARD AMOUNT: $1,316,346.55 PROJECTED AMOUNT: $1,319,346.55 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/15 HIGHWAY: COUNTY: 12/08/2014 ESTIMATE PAID: AWARD DATE: 12/09/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/15 HIGHWAY: COUNTY: 12/08/2014 ESTIMATE PAID: AWARD DATE: 12/09/2014 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/8/15 19 CONTRACT ID: 628471 : RMC - 628471 CONTRACT: 1214131 AWARD : $133,948.82 ED : $133,951.82 ADJ. ED : $133,951.82 CONTRACT: CONTRACTOR: BRYDL CONTRACTING,

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 240 0.00 CONTRACT ID: 090249068 PROJECT: STP 2014(119)TE CONTRACT: 08163051 AWARD AMOUNT: $2,150,084.20 PROJECTED AMOUNT: $2,344,277.78 ADJ. PROJECTED

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: FM 1988 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD: 0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 217 10.00 CONTRACT ID: 187601030 PROJECT: BR 1502(017) CONTRACT: 04153032 AWARD : 3,278,223.27 PROJECTED : 3,289,223.27 ADJ. PROJECTED : 3,289,223.27

More information

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC

$4, CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 -73, FM0317 DISTRICT NAME: Tyler COUNTY: PROJECT: RMC -73,034.10 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/08/17 56 5.00 CONTRACT ID: 629625001 PROJECT: RMC - 629625001 CONTRACT: 02164011 AWARD : $446,216.00 PROJECTED : $446,222.00 ADJ. PROJECTED : $373,187.90

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 04/11/2017 ESTIMATE PAID: AWARD DATE: 04/17/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 04/11/2017 ESTIMATE PAID: AWARD DATE: 04/17/2017 ESTIMATE PERIOD: 7,254.5 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/7/18 CONTRACT ID: 6313261 : RMC - 6313261 CONTRACT: 417124 AWARD : $264,4. ED : $273,38. ADJ. ED : $343,292.5 CONTRACT: CONTRACTOR: FORDE CONSTRUCTION

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD: 2,325,732.17 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/7/18 359 CONTRACT ID: 6317221 HIGHWAY: US8 : RMC - 6317221 DISTRICT NAME: Dallas CONTRACT: 717421 COUNTY: KAUFMAN AWARD : ED : $2,64,374. $2,63,59.

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: SH 103 COUNTY: 10/03/2017 ESTIMATE PAID: AWARD DATE: 10/26/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: SH 103 COUNTY: 10/03/2017 ESTIMATE PAID: AWARD DATE: 10/26/2017 ESTIMATE PERIOD: 13,138.91 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 90 19.00 CONTRACT ID: 033606028 PROJECT: STP 2018(156)HES CONTRACT: 10173013 AWARD : $597,891.99 PROJECTED : $600,891.99 ADJ. PROJECTED : $614,030.90

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 334 CONTRACT ID: 632165001 PROJECT: SUP - 632165001 CONTRACT: 08170930 AWARD AMOUNT: $33,300.00 PROJECTED AMOUNT: $33,300.00 ADJ. PROJECTED AMOUNT: $33,300.00

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: COUNTY: 03/09/2016 ESTIMATE PAID: AWARD DATE: 03/10/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 HIGHWAY: COUNTY: 03/09/2016 ESTIMATE PAID: AWARD DATE: 03/10/2016 ESTIMATE PERIOD: 158,697.80 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/18 552 365.00 CONTRACT ID: 629164001 : RMC - 629164001 CONTRACT: 03161902 AWARD : $138,98 ED : $138,983.00 ADJ. ED : $297,680.80 CONTRACT: CONTRACTOR:

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 09/08/2016 ESTIMATE PAID: AWARD DATE: 09/29/2016 ESTIMATE PERIOD: 10/03/2017 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/09/18 09/08/2016 ESTIMATE PAID: AWARD DATE: 09/29/2016 ESTIMATE PERIOD: 10/03/2017 % TIME USED: -1,1.54 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 4/9/18 35 CONTRACT ID: 49676 : STP 217(8)HES CONTRACT: 916321 AWARD : $83,985.19 ED : $86,485.19 ADJ. ED : $85,483.65 CONTRACT: CONTRACTOR: THIRD COAST

More information

$0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 2, IH PROJECT: RMC

$0.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 2, IH PROJECT: RMC 2,2. CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 3/12/18 617 CONTRACT ID: : RMC - CONTRACT: 11531 AWARD : $212,6. ED : $212,6. ADJ. ED : $214,8. CONTRACT: CONTRACTOR: BRYDL CONTRACTING, INC. HIGHWAY: IH35

More information

RFB Addendum 3

RFB Addendum 3 Yes GENERAL CONDITIONS 1.00 MOBLIZATION AND DEMOBILIZATION 1 LS $ 293,750.00 $ 293,750.00 1.01 STORMWATER POLLUTION PREVENTION PLAN (INCLUDES EROSION CONTROL AND SEDIMENT IMPLEMATION PLAN) 1.02 STORMWATER

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: COUNTY: 03/05/2015 ESTIMATE PAID: AWARD DATE: 03/26/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 HIGHWAY: COUNTY: 03/05/2015 ESTIMATE PAID: AWARD DATE: 03/26/2015 ESTIMATE PERIOD: 144,842.30 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/08/16 364 CONTRACT ID: 628367001 PROJECT: RMC - 628367001 CONTRACT: 03154002 AWARD : $466,825.00 PROJECTED : $466,825.00 ADJ. PROJECTED : $611,667.30

More information

ADDENDUM ACKNOWLEDGMENT

ADDENDUM ACKNOWLEDGMENT Control 0200-04-024, ETC. Project NH 2019(629) Highway US 69 County JASPER, ETC. ADDENDUM ACKNOWLEDGMENT Each bidder is required to acknowledge receipt of an addendum issued for a specific project. This

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 HIGHWAY: 11/04/2014 ESTIMATE PAID: AWARD DATE: 11/20/2014 ESTIMATE PERIOD: 216,972.00 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/07/16 388 6 CONTRACT ID: 627908001 PROJECT: RMC - 627908001 CONTRACT: 11144009 AWARD AMOUNT: $319,350.50 PROJECTED AMOUNT: $319,351.50 ADJ. PROJECTED

More information

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List

Sunset Street West Sidewalk Projects Opinion of Anticipated Construction Costs March 12, 2012 Project Summary. Project List Project Summary Project List Anticipated Construction Cost 1 Sunset/Benton Intersection: Curb Ramp and Sight Distance Improvements $ 18,700 2 Sunset/Oakcrest Intersection: West Right-of-Way Drainage Improvements

More information

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affec

FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY (CRRMA) The undersigned having familiarized themselves with the local conditions affec FORM G PRICE PROPOSAL CAMINO REAL REGIONAL MOBILITY AUTHORITY ("CRRMA") The undersigned having familiarized themselves with the local conditions affecting the cost of work and with the Request for Proposals

More information

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown

19th & Barker Roundabout / Waterline Improvement Project No. 56-CP12-901(C) Cost Breakdown 19th & Barker Roundabout / Waterline Improvement Project No. 56CP12901(C) Cost Breakdown Engineering Fees: Original Contract $ 71,861.00 Additional Services $ 8,744.00 Waterline Contract $ 17,500.00 TOTAL

More information

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address.

NOTICE TO BIDDERS. Specifications and bidding blanks may be obtained at the Road Commission office at the above address. NOTICE TO BIDDERS Sealed proposals will be received by the Ottawa County Road Commission, at its offices at 14110 Lakeshore Drive, Grand Haven, Michigan 49417, until Wednesday July 26, 2017 at 10:00am

More information

2015 Williamson County INVITATION FOR BID

2015 Williamson County INVITATION FOR BID 2015 Williamson County INVITATION FOR BID Chandler Road Overlay and Striping Bid # 15IFB115 Williamson County Purchasing Department 901 S. Austin Avenue Georgetown, TX. 78626 www.wilco.org/purchasing 512-943-3553

More information

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2

ITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

THIS SECTION INTENTIONALLY LEFT BLANK

THIS SECTION INTENTIONALLY LEFT BLANK SUPPLEMENTAL INFORMATION ADDENDUM NO. 2 PROJECT: ITB No. 18-010 2018 Road Resurfacing CONTACT: Fiona Charleton, Purchasing Agent 912-754-2159 fcharleton@effinghamcounty.org DATE ISSUED: May 31, 2018 ITB

More information

ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES

ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES ADVERTISEMENT FOR BIDS WATER SERVICE LINE REPAIR & METER BOX REPLACEMENT CITY / COUNTY UTILITIES Pursuant to N.C.G.S. 143-131, sealed bid proposals endorsed Water Line & Meter Box Contract FB19188 will

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 4 1 4-1 Module Content Adjustments in SiteManager Line Item Adjustments Contract Adjustments

More information

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562

Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 Town of Middleton Salt Storage Building Pioneer Road Pioneer Lands Town of Middleton Dane County, WI 53562 1 T100 PROJECT LOCATION MAP Scale: NTS N Revisions: No. Date: Description: Scale As Indicated

More information

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA

August 22, Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA August 22, 2016 Mr. David Lobue Airport Director Hammond Northshore Regional Airport 600 Judge Leon Ford Drive Hammond, LA RE: Hammond Northshore Regional Airport Runway 18-36/13-31 Runway Intersection

More information

City of Palmer Action Memorandum No

City of Palmer Action Memorandum No City of Palmer Action Memorandum No. 15-075 Subject: Authorize the City Manager to Negotiate and Execute a Contract with for the Palmer 2015 ADA Sidewalk Improvement Project in the Amount of $62,837 Agenda

More information

BID FORM. PROJECT: 2017 Water line replacement

BID FORM. PROJECT: 2017 Water line replacement Project Town of Georgetown P.O. Box 426 Georgetown, CO 80444 BID FORM PROJECT: 2017 Water line replacement THE UNDERSIGNED BIDDER, having familiarized himself with the Work required by the Contract Documents,

More information

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL

I. J~ /.. RrECE~VfEfD 9J7J:. 13~ 7b 1/1~ COUNCIL. ~ 1-j r-(lk. 1 1-'> lft:; WHATCOM COUNTY COUNCIL AGENDA BILL WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2016-248 CLEARANCES Initial Date Date Received in Council Office AxendaDate Assixned to: Originator: James Karcher, P.E. 9J7J:. 1 1-'> lft:; RrECE~VfEfD Division

More information

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors.

Patchogue Road Culvert Crossing IFB ADDENDUM #1 07/13/2015. Addendum #1 addresses the questions submitted by contractors. Patchogue Road Culvert Crossing IFB 2015-03 ADDENDUM #1 07/13/2015 Addendum #1 addresses the questions submitted by contractors. Q1: Bid Item shows 22 LF of 60 RCP but plans show 27 LF, please clarify.

More information

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following:

Crushed Surfacing Base Course, per ton. Pages 8-8, Special Provisions Section , Materials. This Section is supplemented with the following: Crushed Surfacing Base Course, per ton. The unit contract price per ton for Crushed Surfacing Top Course and Crushed Surfacing Base Course shall include the cost for all labor, materials, equipment and

More information

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars

Job No Wastewater Collection System Small Main Rehabilitation at Focus Areas Pipebursting Method BID PROPOSAL. Dollars Cents $ $ Dollars BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE I SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600.

33 Ditch Bottom Inlet (DBI) -Type E $ 2, EA - 0 $ - 35 Ditch Bottom Inlet (DBI) -Type H (Modified) $ 5, EA $ 5,600. CITY OF PLANT CITY WHEELER STREET RE-ALIGNMENT Opinion of Probable Construction Costs (Final Plans) Rev 7/22/2010 Rev 8/2/2010 Rev 8/27/20012 Bid Cost per Estimated Extended Item Item Unit Units Wheeler

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-

ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2) 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3- ITEM ESTIMATED UNIT NO. DESCRIPTION QUANTITIES UNIT PRICE AMOUNT 1a COLD MILLING CLASS 3 (Approx.2") 7,386 S.Y. $ $ 1b COLD MILLING CLASS 3 (Approx 3-4") 3,218 S.Y. $ $ 2 ASPHALTIC CONCRETE TYPE SPR 2,619

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

BID OPENING: FRIDAY, September 16,2016 County Engineer \...-/

BID OPENING: FRIDAY, September 16,2016 County Engineer \...-/ I hereby certify this to be a true copy of the tabulation of the bids as received and opened. BID OPENING: FRIDAY, September 16,2016 County Engineer \...-/ GrouR 1 - Ke~ Peninsula Highwa~ 1 LUMP SUM Mobilization

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact

Regular. NECESSARY RESOURCES/IMPACTS (OTHER) n/a. Fiscal Impact CITY COUNCIL AGENDA Meeting Date: 09/16/2013 TITLE: Hatley Way Sidewalk Improvements 2013 Bid Award Responsible Staff: Ron Crumley Backup Material: Backup material attached Digital Presentation: Yes Other

More information

Preliminary Budget Cost Estimate-Raft Island RIIA Roads 26952 SY Construction Items Budget Preliminary Temporary Erosion Control/Miscellaneous Work $ 18,500.00 Traffic Control $ 10,000.00 Pulverizing $

More information

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS

NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 CHANGES TO PROPOSAL OR PLANS NOTICE TO BIDDERS LETTING OF NOVEMBER 9, 2018 ADDENDUM NO. 1 This Addendum changes the terms of the Bid Proposal and/or plans associated with the project indicated below. By submitting a bid, any and all

More information

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements

BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BID TABULATION 32-04MAY06-Asphalt Overlay & Roadway Drainage Improvements BETHEL CHURCH ROAD BID Description Unit Qty Unit Price Extended Total Unit Price Extended Total Mobilization LS 1 $ 2,500.00 $

More information

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY

LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY LETTER OF INTENT FOR: HERITAGE HILLS COMMUNITY January 5, 205 2 Partially Completed Single Family Lots (65' x 5' typical) 46 Completed Townhome Pads (22' x 50' typical) Sale. This letter of intent outlines

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL

2012 WATER & SEWER CONSTRUCTION CONTRACT, PACKAGE IV SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial

More information

OKLAHOMA TURNPIKE AUTHORITY

OKLAHOMA TURNPIKE AUTHORITY PART A - BASE BID 106 QUALITY CONTROL & ACCEPTANCE LSUM 1.00 $ 70,000.00 $70,000.00 $ 15,735.00 $ 15,735.00 $ 60,000.00 $ 60,000.00 $ 25,000.00 $ 25,000.00 $ 20,000.00 $ 20,000.00 201(A) CLEARING & GRUBBING

More information

Manistee County Road Commission Bid Forms and Requirements for Manistee County 2019 Local County-wide HMA Wedging and Chip Sealing for Various Roads

Manistee County Road Commission Bid Forms and Requirements for Manistee County 2019 Local County-wide HMA Wedging and Chip Sealing for Various Roads Page 1 of 4 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 3:00 PM, EDT, MONDAY, FEBRUARY 4, 2019 Board of County Road Commissioners of the County of Manistee, 8946 Chippewa Highway, Manistee, Michigan

More information

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11

69889/AV/lm. Recipients of C-TRAN ITB # Fourth Plain BRT Maintenance Facility Expansion. DATE: June 25, SUBJECT: Addendum #11 69889/AV/lm TO: Recipients of C-TRAN ITB #2015-04 Fourth Plain BRT Maintenance Facility Expansion DATE: June 25, 2015 SUBJECT: Addendum #11 C-TRAN has revised the following sections of the Invitation to

More information

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL

ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL II. ADDITIONS, MODIFICATIONS, AND/OR DELETIONS TO THE PROPOSAL ITEM NO. 1: Page P-1, Proposal DELETE the Proposal (pages P-1 through P-9) in its entirety and REPLACE with the attached Proposal (pages P-1R

More information

CHARLES COUNTY GOVERNMENT ITB NO LITTER & DEBRIS REMOVAL SERVICES

CHARLES COUNTY GOVERNMENT ITB NO LITTER & DEBRIS REMOVAL SERVICES CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 April 26, 2017 ITB NO. 17-32 LITTER & DEBRIS REMOVAL SERVICES ADDENDUM NUMBER ONE

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

Addendum 1 Downtown North CRA Sidewalks

Addendum 1 Downtown North CRA Sidewalks Addendum 1 Downtown North CRA Sidewalks January 12, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDA ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

Utility Committee Meeting AGENDA. October 3, 2017

Utility Committee Meeting AGENDA. October 3, 2017 Utility Committee Meeting AGENDA October 3, 2017 I. CALL TO ORDER II. MATTERS BEFORE COMMITTEE 1. Purchase - Gas Materials for Estates at Dean Hill Farms 2. Approval - 2016 CDBG Grant Construction Bid

More information

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS

COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS COUNTY OF SAN MATEO STATE OF CALIFORNIA NOTICE TO CONTRACTORS NOTICE IS HEREBY GIVEN, that Sealed bids will be received at the office of the County Manager/Clerk of the Board of Supervisors, Hall of Justice

More information

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location:

Bid Comparison. Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Bid Comparison Contract ID: 1651 Description: Joint replacement on the Cass Avenue bridge. Location: Projects(s): Cass Avenue over North Branch Clinton River Clinton Township, Macomb County 1651 Rank Bidder

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST

FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST FALCON FIELD RELOCATE PARALLEL TAXIWAY 'E' (B II SM.) 1 Contractor Quality Control 1 LS $50,000.00 $50,000.00 2 Mobilization 1 LS $100,000.00 $100,000.00 3 Location of Underground Utilities 1 LS $25,000.00

More information

Galveston County MUD No. 6 Page 1 Operating Fund September 10, 2018

Galveston County MUD No. 6 Page 1 Operating Fund September 10, 2018 A Galveston County MUD No. 6 Page 1 Operating Fund September 10, 2018 CASH-CHECKING (End of last report) ($6,819.44) ADD: Maintenance tax $217.73 From M.M. $10,000.00 Voided Checks From Construction Interest

More information

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029

SECTION BID. Valley Court Force Main Replacement Contract No. BE17-029 SECTION 00300 - BID BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

Specifications and Bid Forms for. Riprap at Bridge Berm Structure # rd Street, Yankton South Dakota, Yankton County,

Specifications and Bid Forms for. Riprap at Bridge Berm Structure # rd Street, Yankton South Dakota, Yankton County, Specifications and Bid Forms for Riprap at Bridge Berm Structure #68-134-120 44138 303 rd Street, Yankton South Dakota, Yankton County, 57078 For Yankton County Highway Department 3302 W City Limits Road

More information

INVITATION TO BID. CONTRACT PERIOD: The contract shall cover the County s needs for the period of July 21, 2015 through July 20, 2015.

INVITATION TO BID. CONTRACT PERIOD: The contract shall cover the County s needs for the period of July 21, 2015 through July 20, 2015. INVITATION TO BID The Etowah County Commission will, on June 22, 2015 in the Commission Chambers, 1st floor, 800 Forrest Avenue, Gadsden, AL, receive competitive bids on SUPERPAVE BITUMINOUS CONCRETE ASPHALT

More information

A Galveston County MUD No. 6 Page 1 Operating Fund August 6, 2018 CASH-CHECKING (End of last report) ($10,592.38) ADD: Maintenance tax $625.32 From M.M. $20,000.00 Voided Checks From Construction Interest

More information

Florida Department of TRANSPORTATION

Florida Department of TRANSPORTATION Florida Department of TRANSPORTATION 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 7 1 7-1 Module Content Importance of Contract Time Liquidated Damages Contract Time Documentation File Federal

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 July 11, 2018 To Whom It May Concern: The Burt County Board

More information

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA

BID TABULATION JAMES STREET TRUNK SEWER IMPROVEMENTS CORALVILLE, IOWA Bid No. 1 Bid No. 2 Foley Construction Company JB Holland Construction, Inc. 5401 Victoria Avenue 2092 Hwy 9 W Project: Construct the James Street Davenport, IA 52807 Decorah, IA 52101 1.1 Construction

More information

CITY OF FULTON, MISSOURI

CITY OF FULTON, MISSOURI MAIL BIDS TO: CITY OF FULTON C/O Carolyn Laswell, City Clerk P.O. BOX 30 FULTON, MO 6525-030 HAND DELIVER TO: 8 ST 4 TH. STREET RECEIVED FROM: CITY OF FULTON, MISSOURI INVITATION FOR BID IFB NO. B - 20225

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board.

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM. At the pleasure of the Board. BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: May 19, 2016 # 6 SUBJECT: ELECTION DISTRICT: CRITICAL ACTION DATE: STAFF CONTACTS: Identification of Construction Funding for Traffic

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 February 25, 2019 To Whom It May Concern: The Platte County

More information

CANTON COMMUNITY REQUEST FOR BOARD ACTION

CANTON COMMUNITY REQUEST FOR BOARD ACTION CANTON COMMUNITY REQUEST FOR BOARD ACTION MEETING DATE: March 22, 2016 AGENDA ITEM #G-10 ITEM: Consider Approval of a Budget Amendment & Award of a Contract Asphalt Repairs to Hutch Paving, Inc. the Wayne

More information

LOCAL AGENCY BILLING SUMMARY

LOCAL AGENCY BILLING SUMMARY LOCAL AGENCY BILLING SUMMARY INDIRECT COST RATES Date: October 5, 2011 Approved by Caltrans: YES / NO Agency: City of Moreland Rate(s) Fiscal Year(s) Local Assistance Project Number: STPL 2596(107) 9.73%

More information

Addendum 1 13 TH Street Streetscape. September 1, 2017

Addendum 1 13 TH Street Streetscape. September 1, 2017 Addendum 1 13 TH Street Streetscape September 1, 2017 ACKNOWLEDGEMENT OF RECEIPT OF THIS ADDENDUM IS NOT REQUIRED. ADDENDUMS ARE POSTED ON THE CITY WEB SITE AND PROPOSER IS RESPONSIBLE TO CHECK THIS SITE

More information

BID PRICE FORM. (Date) CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412

BID PRICE FORM. (Date) CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 BID PRICE FORM (Date) TO: RE: CHARLESTON COUNTY PARK AND RECREATION COMMISSION (CCPRC) 861 RIVERLAND DRIVE CHARLESTON, SC 29412 INVITATION FOR BID BOARDWALK AND GATEHOUSE REPLACEMENT BEACHWALKER COUNTY

More information

CITY OF DEERFIELD BEACH Request for City Commission Agenda

CITY OF DEERFIELD BEACH Request for City Commission Agenda Item: CITY OF DEERFIELD BEACH Request for City Commission Agenda Agenda Date Requested: 7/10/2012 Contact Person: Charles DaBrusco, P.E., Director of Environmental Services Description: Award of contract

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

A DESIGN-BUILD PROJECT

A DESIGN-BUILD PROJECT Price Proposal A DESIGN-BUILD PROJECT Fall Hill Avenue Widening and Mary Washington Boulevard Extension From: 0.12 Miles West of Gordon W. Shelton Boulevard To: Route 1 at Mary Washington Boulevard Fredericksburg,

More information

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details.

Both bids are substantially higher than the engineer s estimate of $362, The attached Bid Abstract shows the bid details. STAFF REPORT MEETING DATE: September 12, 2017 TO: FROM: City Council David Dammuller, Senior Engineer Chris Blunk, Deputy Public Works Director 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/

More information