1 SHIPLEY S CHOICE DAM REHABILITATION COMMUNITY MEETING MINUTES A community meeting was held on September 13, 2018 at the Shipley s Choice Elementary School. County staff from the Watershed Protection and Restoration Program (WPRP) discussed the upcoming construction for the Shipley s Choice Dam Rehabilitation Project. Anne Arundel County Staff in Attendance: Larry Mathena Project Manager, WPRP (Presenter) Greg LeBlanc Assistant Project Manager, WPRP The meeting was called to order at 7:03 pm. Mr. Mathena opened the meeting with an introduction and project background, and then provided an overview of the Shipley s Dam Project construction with a PowerPoint presentation. The presentation included information on: Project Background - Shipley s Choice Dam was built in 1981, and in recent years has experience seepage and settlement issues. County repairs did not fix the problems, and the Maryland Department of the Environment deemed the dam unsafe and ordered the County to remove the dam. - The County hired an engineering consultant (JMT) to complete the design of the dam removal project, which is now complete. The County awarded the construction contract to Paydirt, LLC. Preconstruction Activities - The overhead line along West Benfield Road must be relocated to allow room for crane access during culvert construction and move a utility pole away from a new storm drain. BGE has completed electric line relocation, moving the lines to new poles placed north of the roadway. - Relocation of Comcast and Verizon overhead lines are ongoing. All overhead lines will be replaced along the roadway after culvert construction. Construction Phase 1 - Construction will begin with Phase 1 work along West Benfield Road to include the following features: installation of Erosion & Sediment Control (ESC) measures and a stream diversion, bypasses for numerous public utilities (gas, water, force main, sanitary/storm sewers), removal of the existing 66 culvert and installation of a new 7 x10 concrete box culvert. There will be no interruption in service for the impacted utilities. - The Phase 1 culvert construction requires pile driving, since the culvert will rest on soft material. A total of 78 concrete piles will be driven into the ground during daylight hours. Pile driving was explained as was the loud noise associated with this. Vibration levels will be monitoring during pile driving to ensure vibrations do not reach an unsafe level. 1

2 - Phase 1 construction also includes in stream grading upstream and downstream of the new culvert, and rock installed to stabilize the channel. West Benfield Road Closure - Phase 1 construction requires the closing of West Benfield Road. Installation of the utility bypass lines, removal of the existing culvert and installation of the new culvert require a large, deep excavation in the roadway. - West Benfield Road will closed in both directions between Pixie and Severnside Drive. The road will be closed for approximately 6 months. The Detour Plan was presented. - The Construction Contractor has proposed installing a precast concrete culvert in lieu of the cast-in-place culvert shown on the contract drawings. This change could reduce the time need to install the culvert and reduce the road closure duration. - Once West Benfield Road is closed, the County will observe traffic in the area. The County Traffic Engineer may approve signal changes to alleviate congestion. Construction Phase 2 - After completion of Phase 1 construction, the Contractor will begin Phase 2 construction which includes removal of the Shipley s Choice Dam. After installing filter logs, silt fence, and other ESC features, the Contractor will construct a haul road from the Oak Stump cul-de-sac down to the dam site. The earth embankment dam will be removed, with majority of the earth fill placed on the hillside just east of the dam. - A drain will be installed to intercept flow from the east hillside, and the Bear Branch channel will be restored after the dam and outlet works are removed. Planting Plan - Phase 1 and 2 construction requires earth disturbance and tree removal. After construction, all disturbed areas will be stabilized and seeded. - To replace trees and shrubs removed during construction, the Contractor will plant 141 trees, 493 shrubs, and 1676 live stakes along the streambanks. Construction Schedule - The following tentative schedule was presented: Oct 2018 Winter Spring 2019 Summer Late Fall 2019 Phase 1 Construction begins w/ ESC measures, Utility Relocations & Road Closure Phase 1 Culvert Installation Phase 1 Culvert completed & Road reopened Phase 2 Dam Removal begins Phase 2 Construction completed - The Contractor will provide a detailed construction schedule prior to starting work. 2

3 Project Updates - The County has been ing monthly updates on the Shipley s Dam Project to Homeowners Associations and will continue this during construction. - Project updates will also be posted on the Shipley s Dam Project website which can be found on the County website at: Capital_Projects/shipleys-choice-dam-rehabilitation - Minutes for this community meeting will be prepared and distributed to all attendees and all residents within 300 feet of the project site. County Contacts - Main Contact: Larry Mathena, Project Manager Watershed Protection and Restoration Program Anne Arundel County Department of Public Works 2662 Riva Road, MS 7217 Annapolis, MD (410) pwmath00@aacounty.org - Alternate Contact: Greg LeBlanc Same Address as above (410) pwlebl89@aacounty.org Attendees asked the following questions during the meeting, with answers provided by Mr. Mathena. For questions that went unanswered at the meeting, answers are provided in italics. 1. Question: What was the construction and total cost for the project? Answer: The construction cost per Paydirt s winning bid is $4.2 million. I do not recall the exact total project cost, which would include design costs and the County s costs. The total project cost, which includes construction and inspection costs as well as costs for design, right of way, County project management & administration is $7.1 million. 2. Question: Does the sewer interceptor get moved? Answer: Yes, the sewer interceptor that runs parallel to Bear Branch will be relocated around the new culvert along West Benfield Road. 3. Question: Will the sewer main be extended for future use? Answer: No, the sewer main along West Benfield Road will not be extended. It will be bypassed during culvert construction, then replaced back in the road after construction. 3

4 4. Question: What is the pile depth? Answer: The piles under the new culvert are approximately 20 feet long. 5. Question: Is the proposed culvert similar to box culverts constructed in other areas? Answer: I m not familiar with the other box culverts that the County has constructed. The County has constructed box culverts similar to the one proposed in the Shipley s Dam Project, but the other culverts did not include piles. 6. Question: How much more flow [capacity] will the new culvert have vs. the existing culvert? Answer: The new culvert is 3 times larger than the existing culvert, so the capacity is greatly increased. Not sure what the exact increase in flow capacity is. The new 10 x7 box culvert will have a flow capacity approximately 3 times greater than the existing 66 corrugated metal culvert. 7. Question: After the project is constructed, will more sediment be carried downstream? Answer: Removal of the dam could lead to increased erosion and sedimentation downstream due to higher flows after the dam is removed. The rock to be placed in stream and along the floodplain during construction will help to minimize erosion and sedimentation after dam removal, as will grading at the dam and culvert sites. 8. Question: Are there weirs [to be constructed]? Answer: There are rock sills that will be constructed along Bear Branch, but these are not the same as weirs. The rock sills to be constructed along Bear Branch will include buried rock, with top of rock even with the stream bottom. These sills act as grade controls, and will extend from the stream into the floodplain. Rock weirs typically extend above the stream bottom, are used to direct flow, and are contained within the channel. 9. Question: How long will it take to install the piles [for the culvert]? Answer: We estimate the pile driving will take approximately 2 weeks. 10. Question: What about homes that were not surveyed? [To assess preconstruction conditions and help determine if future damage may have been caused by pile driving] Answer: Homes located within 500 feet of the new culvert where piles will be driven were selected for a preconstruction survey. This is the maximum distance where significant vibration from pile driving would be expected. If a homeowner believes their house or property has been damaged from pile driving or other construction activities, they should 4

5 contact Larry Mathena. This applies to all homeowners, even those who did not receive a preconstruction survey. 11. Question: Will the road be open during construction? Answer: Once West Benfield Road is closed to traffic, it will remain closed until utilities are relocated and the culvert is installed. Due to the depth and extent of the excavation required to do this work and the steep banks along the road, it is not possible to leave one lane open during construction. 12. Question: Do you realize the volume of traffic that uses West Benfield Road? Was a traffic study conducted to determine the impacts? Answer: Yes I do. I will work with the Contractor to complete the culvert installation and reopen the road ASAP. I do not believe a traffic study was conducted. 13. Question: What about the school buses? I don t believe the bus companies are aware of the upcoming road closure. Answer: I am working with County Public Affairs to notify the schools, Fire, Police, and other entities of the road closure. Schools and other entities were notified of the road closure during the week of September 17 th. 14. Question: A temporary traffic light should be considered. What is the cost for a temporary light? Answer: I have discussed the road closure with the County Traffic Engineer. We will monitor traffic during the first couple of weeks after the road is closed, and notify the Traffic Engineer if signal changes should be considered to alleviate traffic. The County Traffic Engineer is not currently considering installation of a temporary light at West Benfield Road and Benfield Boulevard. Residents can drive to the intersection of Scarlett Oak Drive and Benfield Boulevard, which has a traffic signal. If traffic conditions warrant, a temporary light will be considered in the future. 15. Question: The road project on West Benfield Road (west end by new High s Store) has not been completed. The final asphalt top layer has not been placed, and the bike lane was not marked. Answer: I am not familiar with that project. I will check with the County Roads Department regarding that project. Work along West Benfield Road adjacent to the new High s Store is not completed. The following work remains: storm drain and guard rail installation, milling and overlaying the 5

6 existing pavement, striping the road and marking the bike lane. This work will be completed after BGE installs the power for the new traffic signalization. 16. Question: Where will the construction trailer be placed? Answer: The Contractor will place a construction trailer on County right-of-way on the east end of West Benfield Boulevard. The trailer will sit on the empty lot near the intersection with Benfield Boulevard. The trailer will be placed back from the intersection and away from the existing shrubs and will not obstruct sight lines at the intersection. 17. Question: Where will construction parking be for the dam portion? Answer: The Contractor will need to park vehicles at the end of the cul-de-sac on Oak Stump Drive, just above the dam site. They will be directed not to block driveways and avoid parking in front of homes. 18. Question: Will you place a steeper slope [at the dam]? Answer: Fill from the dam removal will be placed on the east hillside, just below Oak Stump Drive. The new slope will not be as steep as the existing slope, and a drain will be added to collect runoff from the slope and carry it to the bottom of the slope. 19. Question: What is intended with regard to construction oversight? Answer: The County has hired the engineering firm RK&K to provide construction oversight. An RK&K construction inspector will be onsite during all times that the Construction Contractor is working. 20. Question: Will the trees and shrubs to be planted [as part of the culvert construction and dam removal] be native species? Answer: I believe the plants specified in the drawings are native species. I have the drawings which include a planting plan listing all species to be planted, if anyone would like to review the plan. 21. Question: Will treatment grasses be planted? Answer: The Contractor is required to seed and stabilize all disturbed areas, but no special grasses are proposed. 22. Question: Was a concrete dam looked at to replace the existing dam? Answer: I am not sure if a replacement dam was considered. I doubt it, since a new concrete dam would be very expensive. I was told that the problems with the existing earth dam were caused by improper construction. We will have good construction oversight on the dam removal project. 6

7 23. Question: Has testing been done for existing sediments [behind the dam]? Answer: The existing dam does not have a permanent pool behind it. It only impounds water during a large rain event. There should not be a large amount of sediment that is washed downstream after the dam is removed. 24. Question: A County Contractor is cutting brush and trees downstream from West Benfield Road, and they left the branches along the streambank. These will be washed into the stream. Answer: I am not familiar with that maintenance project. I will check with others at the County regarding this. 25. Question: Did you consider starting construction in the summer? Answer: We intended to start construction in June However, the contractor bids came in much higher than the engineer s construction estimate. This delayed award of the construction contract. 26. Question: Are there contractor incentives to open the road quickly? Answer: There are no contractual incentives for the Contractor completing construction in less time than the contract duration [which is 440 calendar days]. The construction contract does include a value engineering clause, which allows the Contractor to submit a design change to save money. The Contractor will propose installation of a precast concrete culvert, which should be less expensive than a cast-in-place culvert and require less time to install. 27. Question: There were issues last year with getting snow cleared along West Benfield Road. One jurisdiction thought the other had it. There could be issues with snow clearing with the road closed. Answer: I will check with the appropriate County Office regarding snow clearing along West Benfield Road. Snow removal for West Benfield Road is serviced entirely by the County s Northern Road District. I alerted them to the road closure, and they stated that the snow removal will still occur but may take longer. If there are issues with snow removal, the Northern Road District can be reached at (410) Question: Is there a similar County culvert replacement project to look at? There was a $1 million dam replacement project, and the Shipley s Dam Replacement project costs $6 million. Answer: I am not familiar with another dam removal project that the County recently completed. Do you know the name of the other dam that was removed? My supervisor did investigate the design and costs for other culvert replacement projects in the County. She found that the other projects did not include piles, but utilized spread footings under the 7

8 culvert. We had the engineering consultant consider elimination of the piles, but the soft material under West Benfield Road requires the piles to support the large culvert. 29. Question: Won t a 7 x 10 culvert will allow people and animals to enter it? Answer: Yes, it is large enough for people and animals to enter. It is also designed for fish passage. 30. Question: Are piles driven to a specific resistance? Answer: They are. 31. Question: Please include a pdf of the presentation in the Shipley s Dam update. Answer: I will include the presentation pdf file in the update and the project website. 32. Question: The path near Oakshade Court that leads to Rustling Oaks Drive should be maintained. Children use the path to travel to Shipley s Choice Elementary School. Answer: This path lies within the project limits for the Bear Branch stream restoration project, which is separate from the Shipley s Choice Dam Rehabilitation. The Bear Branch project is currently under design. The County will discuss maintenance of the path with the engineering firm working on the design. The meeting adjourned at 8:20 pm. If you have any questions or comments regarding this document, please contact the undersigned. Larry R. Mathena, Jr. PMP Project Manager Anne Arundel County, Dept. of Public Works Watershed Protection & Restoration Program Ph: pwmath00@aacounty.org J:\Lmathena\_Projects\Q Shipleys Dam Rehab Copied \14_Public Outreach\Community Meetings\Meeting Preconstruction \Meeting Mins\Shipleys Dam Community Meeting Mins Docx 8

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number:

TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: TOWN OF TIBURON ENCROACHMENT PERMIT APPLICATION EP Number: APPLICATION DATE: ADDRESS OF WORK OR ENCROACHMENT: CROSS STREET: STARTING DATE: APN: - - No. Street City/Township ESTIMATED COST: $ COMPLETION

More information

Opinion of Probable Cost

Opinion of Probable Cost Appendix E Opinion of Probable Cost 01054/8410233/14/Rohner_Alt_Analysis_Report Rohner Creek Flood Control, Habitat and Seismic Improvement Project Alternatives Analysis Cost Alternative 1: Improved Channel

More information

6.0 MONITORING AND CONTINGENCY PLANS

6.0 MONITORING AND CONTINGENCY PLANS 6.0 MONITORING AND CONTINGENCY PLANS 6.1 MONITORING The primary objective of compliance and effects monitoring is to confirm whether mitigation and protective measures are effectively implemented and to

More information

TOTAL QUANTITY UNIT COST UNIT

TOTAL QUANTITY UNIT COST UNIT BASE BID DIVISION 1 - GENERAL 1 1070-206-A-0 TRAFFIC CONTROL LS 1 $ 10,000 $ 10,000 $3,000.00 $3,000.00 $5,600.00 $5,600.00 2 2010-108-B-0 CLEARING AND GRUBBING AC 5 $ 9,000 $ 45,000 $7,192.50 $35,962.50

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate

Northumberland County County Road 2 Class Environmental Assessment Construction Cost Estimate Date: Nov 12, 2012 Page: A - 1 CPR Bridge Rehabilitation - Construction Phase I Rehabilitation of C.P. Bridge L.S. $ 1,400,000.00 $ 1,400,000.00 SUBTOTAL $ 1,400,000.00 Engineering and Contingency (25%)

More information

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

FOR OFFICE USE ONLY CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT 40555 Utica Road P.O. Box 8009 Sterling Heights, MI 48311-8009 TEL 586-446-2720 FAX 586-276-4061 CONTRACTOR/DEVELOPER APPLICATION AND PERMIT TO CONSTRUCT, OPERATE, USE AND/OR MAINTAIN WITHIN THE RIGHT-OF-WAY/EASEMENT

More information

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.

BID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m. PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00

More information

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)

2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) 2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

TOWN OF PLATTEKILL REGULAR TOWN BOARD MEETING. August 1, SALUTE TO FLAG Supervisor Croce opened the meeting with a salute to the American Flag.

TOWN OF PLATTEKILL REGULAR TOWN BOARD MEETING. August 1, SALUTE TO FLAG Supervisor Croce opened the meeting with a salute to the American Flag. TOWN OF PLATTEKILL REGULAR TOWN BOARD MEETING Time: 7:00 PM August 1, 2018 SALUTE TO FLAG Supervisor Croce opened the meeting with a salute to the American Flag. ROLL CALL The following Town Board Members

More information

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918)

CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box N. Elm Jenks, OK 74037(918) CITY OF JENKS COMMERCIAL BUILDING PERMIT P.O. Box 2007 211 N. Elm Jenks, OK 74037(918) 299-5883 CERTIFICATE OF OCCUPANCY: DATE RECEIVED: BUILDING ADDRESS: LOT: BLOCK: ADDITION: SECTION: TOWNSHIP: RANGE:

More information

INVITATION FOR BIDS. Agency Name: Culpeper SWCD. 351 Lakeside Drive. Culpeper, Virginia (540) Project Name & Location:

INVITATION FOR BIDS. Agency Name: Culpeper SWCD. 351 Lakeside Drive. Culpeper, Virginia (540) Project Name & Location: INVITATION FOR BIDS Agency Name: Culpeper SWCD 351 Lakeside Drive Culpeper, Virginia 22701 (540) 825-8591 Project Name & Location: Access Road Relocation 1) Mountain Run Dam 8A (04701) PROJECT CODE NO:

More information

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal

ENGINEER'S ESTIMATE OF PROBABLE COST CCTA I 680 NORTH EXPRESS LANE PROJECT (SOUTHBOUND ONLY) EA 04 4H % PS&E Submittal Page: 1 of 8 (F) Description 1 050000A CONTRACTOR STAKING LS 1 $ $ 2 070030 LEAD COMPLIANCE PLAN LS 1 $ $ 3 080000A POTHOLING LS 1 $ 50,000.00 $ 50,000.00 4 080050 PROGRESS SCHEDULE (CRITICAL PATH METHOD)

More information

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS

PERMIT APPLICATION PLEASE PRINT CLEARLY AND FILL IN ALL APPLICABLE SECTIONS CONTRACTOR OWNER/ AGENT APPLICANT CITY OF DALY CITY DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 333 90 th Street, 1 st Floor, Daly City, CA 94015 Tel: (650) 991-8064 Fax: (650) 991-8243 ENGINEERING

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION

SUTTER BUTTER FLOOD CONTROL AGENCY FEATHER RIVER WEST LEVEE PROJECT PROJECT C, CONTRACT NO C BID TABULATION Bid Schedule A - Feather River West Levee Project C Improvements No. Item Description Quantity Unit Nordic/Magnus Pacific JV Engineer's Estimate Unit Price Total Price Unit Price Total Price A1 Injury

More information

Special Conditions, Regulations and Instructions for Right of Way Permit Applications

Special Conditions, Regulations and Instructions for Right of Way Permit Applications Special Conditions, Regulations and Instructions for Right of Way Permit Applications The Department of Environmental Services (DES) issues public right of way (PROW) permits to contractors with a valid

More information

LETTING : CALL : 056 COUNTIES : MILLE LACS

LETTING : CALL : 056 COUNTIES : MILLE LACS S T A T E O F M I N N E S O T A PAGE : -1 NUMBER OF DAYS: 0 BRIDGE COUNT : 3 CONTRACT DESCRIPTION : GRADING, BIT PAVING & SURFACING, ROUNDABOUT, AND BRIDGES. CONTRACT LOCATION: LOCATED ON T.H. 95 AT THE

More information

BARTOW COUNTY UTILITY PERMIT PROCEDURES

BARTOW COUNTY UTILITY PERMIT PROCEDURES BARTOW COUNTY UTILITY PERMIT PROCEDURES A Utility Permit is required for utility work as specified in the Bartow County Utility Accommodation Ordinance. Work in a Bartow County right-of-way without a permit,

More information

PALMER TOWNSHIP PLANNING COMMISSION PUBLIC MEETING APRIL 8, :00 P.M. PALMER LIBRARY COMMUNITY ROOM

PALMER TOWNSHIP PLANNING COMMISSION PUBLIC MEETING APRIL 8, :00 P.M. PALMER LIBRARY COMMUNITY ROOM PALMER TOWNSHIP PLANNING COMMISSION PUBLIC MEETING APRIL 8, 2014-7:00 P.M. PALMER LIBRARY COMMUNITY ROOM The regular monthly meeting of the Palmer Township Planning Commission was held on Tuesday, April

More information

Stormwater Runoff Controls

Stormwater Runoff Controls Project Title Page Chg Agst Closed Stormwater Pro 196 Harmans Road Culvert Rehab 193 New Cut Rd Cul Rep 194 Storm Drainage/SWM Infrastr 195 Stormwater Runoff Controls This page intentionally blank Anne

More information

Reviax Constracting Corp. DeSantis Construction

Reviax Constracting Corp. DeSantis Construction Denise Piszkowski, Q.P.A., Purchasing Agent Bid Results for: 2016-B08 Reconstrucion of Preston Drive Submitted By: JTG Construction Black Rock Enterprises Top Line Construction Reviax Constracting Corp.

More information

FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012

FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012 FURTHER TO EXECUTIVE COMMITTEE MEETING #13/11 To be held on Friday, February 3, 2012 FURTHER TO: Pages EX6. CORRESPONDENCE EX6.1 A letter dated January 11, 2012 from Mr. David de Launay, Assistant Deputy

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

TOWN OF CAROLINA SHORES BOARD OF COMMISSIONERS REGULAR MEETING MINUTES July 3, :00 p.m.

TOWN OF CAROLINA SHORES BOARD OF COMMISSIONERS REGULAR MEETING MINUTES July 3, :00 p.m. TOWN OF CAROLINA SHORES BOARD OF COMMISSIONERS REGULAR MEETING MINUTES July 3, 2013 2:00 p.m. Mayor Walter B. Goodenough called the July 3, 2013 meeting to order at 2:00 p.m. The Pledge of Allegiance was

More information

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER

CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS NEWCASTLE WAY, SUITE 200 DECEMBER 18, CALL TO ORDER CITY OF NEWCASTLE COUNCIL MEETING CITY HALL COUNCIL CHAMBERS 12835 NEWCASTLE WAY, SUITE 200 DECEMBER 18, 2012 SPECIAL MEETING 12:00 P.M. 1. CALL TO ORDER 2. GENERAL BUSINESS a. AB 12 077 Resolution Authorizing

More information

STORMWATER MANAGEMENT FUND Department of Environmental Services

STORMWATER MANAGEMENT FUND Department of Environmental Services Department of Environmental Services Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as

BID PROPOSAL. PROPOSAL OF, a corporation, a partnership consisting of. an individual doing business as Description 103 REMOVE, STORE AND REINSTALL EXISTING RETAINING WALL 107.1 EMBANKMENT (FINAL)(DENS CONT)(TY B) 203.1 TACK COAT BID PROPOSAL PROPOSAL OF, a corporation, a partnership consisting of an individual

More information

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122

Subject: Addendum No. 1 Project #C CCE Parking Lot Replacement Phase 2 Robert Bishop Drive 4380 Richmond Road, Highland Hills, Ohio 44122 Addendum No. 1 Page One To: From: All Plan Holders of Record CT Consultants, Inc. Gene E. Arters, P.E. on behalf of Cuyahoga Community College Subject: Addendum No. 1 Project #C20166009 CCE Parking Lot

More information

SUBDIVISION IMPROVEMENTS AGREEMENT

SUBDIVISION IMPROVEMENTS AGREEMENT SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El

More information

Engineer's Preliminary Estimate - 100% Submittal

Engineer's Preliminary Estimate - 100% Submittal EA 284700 1 070010 PROGRESS SCHEDULE (CRITICAL PATH) LS 1 $ 15,000 $ 15,000 2 071325 TEMPORARY FENCE (TYPE ESA) M 1250 $ 10 $ 12,500 3 074019 PREPARE STORM WATER POLLUTION PREVENTION PLAN LS 1 $ 7,000

More information

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221

Bid No.: PO Box Cone Rd Asphalt Ave th Ave. E. Dunedin, FL Tampa, FL Tampa, FL Palmetto, FL 34221 Bid : 7379 GENERAL 1 2 3 4 @ unit $ total $ @ unit $ total $ @ unit $ total $ @ unit $ total $ G-1.1 Mobilization 1 LS $ 450,000.00 $ 450,000.00 $ 720,000.00 $ 720,000.00 $ 750,000.00 $ 750,000.00 $ 530,000.00

More information

Standard Specifications for Work on Railroad Property

Standard Specifications for Work on Railroad Property Standard Specifications for Work on Railroad Property Section 1. Section 2. Section 3. Section 4. Section 5. Section 6. Section 7. Section 8. Section 9. Section 10. Section 11. Section 12. Section 13.

More information

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted,

JANUARY 18, Reference Specifications, Attachment to Form 96 (BID FORM), Bid Proposal: Respectfully submitted, ADDENDUM NO. 3 TO THE PLANS AND SPECIFICATIONS for STREET AND STORM SEWER IMPROVEMENTS ON HANCOCK AND WASHINGTON STREETS for the FRENCH LICK REDEVELOPMENT COMMISSION ORANGE COUNTY, INDIANA MEI PROJECT

More information

NON-MOTORIZED FACILITIES

NON-MOTORIZED FACILITIES NON-MOTORIZED FACILITIES POLICY The Board of Road Commissioners of the County of Kalamazoo non-motorized policy provides a guideline for the development of non-motorized facilities in the public right-of-way.

More information

Special Event Application

Special Event Application Special Event Application Please review the entire application to ensure the information is completed correctly. (Applicants are encouraged to review the Special Event Guidelines beginning on page 7, before

More information

I. Call to Order The meeting of the Board of Directors of UOA of Parkside at Eagles Landing was

I. Call to Order The meeting of the Board of Directors of UOA of Parkside at Eagles Landing was 1 2 3 4 5 6 7 8 9 10 Unit Owners Association of Parkside at Eagles Landing, A Condominium Board of Directors and Officers Meeting Minutes March 24, 2009 Directors and Officers Present / On Conference Jeff

More information

The Engineer has been requested to provide an estimate to complete Fontana 233 rd Avenue to 237 th Avenue.

The Engineer has been requested to provide an estimate to complete Fontana 233 rd Avenue to 237 th Avenue. January no Meeting LINWOOD TOWNSHIP ROAD & BRIDGE COMMITTEE February 2, 2016 7:00 p.m. Present: Chairman Bob Beckman, Craig Rylander, Tammie Lukkonen, Steve Strandland, Philip Osterhus - Township Supervisor

More information

Village of Lansing Planning Board Meeting February 26, 2013

Village of Lansing Planning Board Meeting February 26, 2013 Village of Lansing Planning Board Meeting February 26, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 The meeting of the was called to order at 7:35 P.M. by Chairman Mario Tomei. Present at the meeting were Planning

More information

Right-of-Way Utilization Permit Please complete a separate application for each road

Right-of-Way Utilization Permit Please complete a separate application for each road Right-of-Way Utilization Permit Please complete a separate application for each road Applicant Name: Date: / / Name Permit Will Be Returned To: Section Township Range Street Address Road Name / City, State,

More information

GENERAL PROVISIONS I. WORK REQUIREMENTS

GENERAL PROVISIONS I. WORK REQUIREMENTS GENERAL PROVISIONS I. WORK REQUIREMENTS 1. Inspection The Permittee shall request initial inspection from the County at 408-573-2429 a minimum of twenty-four (24) hours prior to any work being performed.

More information

Electric Service Information Sheet Georgia Power Company

Electric Service Information Sheet Georgia Power Company Electric Service Information Sheet Georgia Power Company Project: Location: Developer: (Name of S/D or Customer) (Street Address or road Name) (Developer s Name) Georgia Power Company (the Company) will

More information

Floodplain Development Permits A Technical Guidance Document

Floodplain Development Permits A Technical Guidance Document Floodplain Development Permits A Technical Guidance Document To Prevent Loss of Life, Reduce Property Damage and to Protect and Enhance the Natural and Beneficial Functions of Floodplains Iredell County

More information

REQUEST FOR PROPOSALS. Demolition

REQUEST FOR PROPOSALS. Demolition JEFFERSON COUNTY, WEST VIRGINIA Engineering Department 116 East Washington Street P.O. Box 716 Charles Town, West Virginia 25414 Phone: 304-728-3257 Email: engineering@jeffersouncountywv.org Fax: 304-728-3953

More information

Chapter 6 - Floodplains

Chapter 6 - Floodplains Chapter 6 - Floodplains 6.1 Overview The goal of floodplain management is to reduce the potential risks to both existing and future developments, and infrastructure, in the 100-year floodplain. Over the

More information

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT

MVMCC CAPITAL IMPROVEMENT PROGRAM (CIP) UPDATE AND ADOPTING A RESOLUTION APPROVING A MVMCC CAPITAL BUDGET ALLOCATION AMENDMENT STAFF REPORT MEETING DATE: October 20, 2015 TO: FROM: City Council Cathy Capriola, Assistant City Manager Matt Greenberg, Park General Manager Tony Williams, Senior Civil Engineer 922 Machin Avenue Novato,

More information

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE

CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE CITY OF MISSION VIEJO PUBLIC WORKS FEE SCHEDULE GENERAL INSTRUCTIONS 1. This pamphlet lists services available or required to process your project and fees or charges for these services. 2. Fees or deposits

More information

Monroe County Soil & Water Conservation District

Monroe County Soil & Water Conservation District Monroe County Soil & Water Conservation District Nature Based Shoreline Design Request for Qualifications (RFQ) Release Date: October 26, 2018 Response Deadline: 12/7/2018 Monroe County Soil & Water Conservation

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE

2016 CDM Smith All Rights Reserved July 2016 SECTION SAFETY, HEALTH, AND EMERGENCY RESPONSE PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 01 11 01 SAFETY, HEALTH, AND EMERGENCY RESPONSE A. Pursuant to Section 107 of the Contract Work Hours and Safety Standards Act and DOL Regulations set forth in

More information

TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH (435) BUSINESS MEETING February 2, 2005

TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH (435) BUSINESS MEETING February 2, 2005 TOOELE COUNTY PLANNING COMMISSION 47 SOUTH MAIN STREET, TOOELE, UTAH 84074 (435) 843-3160 BUSINESS MEETING February 2, 2005 The Tooele County Planning Commission Meeting was called to order at 7:00p.m.

More information

AECOM Redoubt Road - Mill Road Corridor Project Appendix B Cost Estimate Revision B 20-Jul-2014 Prepared for Auckland Transport Co No.: N/A Item Description Unit QTY Rates $ Alternative Alignment - Option

More information

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET

FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET FLOODPLAIN DEVELOPMENT VARIANCE APPLICATION PACKET Sutter County Water Resources Department 1130 Civic Center Boulevard Yuba City, California, 95993 (530) 822-7400 Floodplain management regulations cannot

More information

2664 RIVA ROAD, P.O. BOX 6675

2664 RIVA ROAD, P.O. BOX 6675 2664 RIVA ROAD, P.O. BOX 6675 County Executive John R. Leopold ANNAPOLIS, MARYLAND 21401 OFFICE OF PLANNING AND ZONING STORMWATER MANAGEMENT TAX CREDIT On January 7, 2008, the Anne Arundel County Council

More information

ADDENDUM No. 1 January 29, Paving Program Village of Milford

ADDENDUM No. 1 January 29, Paving Program Village of Milford ADDENDUM No. 1 2018 Paving Program Village of Milford The following changes, additions, and/or clarifications to the Contract Documents shall be incorporated in said documents and shall be allowed for

More information

PART #2 IDENTIFY WHO WILL PERFORM THE WORK (Complete either 2a or 2b)

PART #2 IDENTIFY WHO WILL PERFORM THE WORK (Complete either 2a or 2b) COUNTY OF SHASTA APPLICATION FOR PERMIT DEPARTMENT OF RESOURCE MANAGEMENT OFFICE: (530) 225-5761 BUILDING DIVISION FAX: (530) 245-6468 1855 PLACER STREET, SUITE 102, REDDING, CA 96001 WEB SITE: www.co.shasta.ca.us

More information

Montour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions

Montour Area Recreation Commission (MARC) North Branch Canal Trail Construction Invitation to Bid. Application Terms and Conditions (MARC) North Branch Canal Trail Construction Invitation to Bid Application Terms and Conditions Sealed bids for North Branch Canal Trail construction will be received by MARC at any time until Monday,

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

a) Ensure public safety through reducing the threats to life and personal injury.

a) Ensure public safety through reducing the threats to life and personal injury. SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate

More information

APPANOOSE COUNTY USE OF RIGHT OF WAY PERMIT Date

APPANOOSE COUNTY USE OF RIGHT OF WAY PERMIT Date Permit Number APPANOOSE COUNTY USE OF RIGHT OF WAY PERMIT Date To the Board of Supervisors, Appanoose County, Iowa: I,, on behalf of,, Installer/Contractor Owner Address do hereby make application requesting

More information

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option October 16, 2012 Q1. Why has the position on a ring-levee changed? The feasibility study recommended buy-outs for areas with staging

More information

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075

CECIL COUNTY, MARYLAND. ADDENDUM #3 Bid 18-14: Bohemia Church Road Culvert Replacements XCE1073, XCE1074 & XCE1075 Office of the County Executive Alan J. McCarthy County Executive Department of Finance Purchasing Division Ken Jackson Purchasing/Fleet/Leasing Mgr. Alfred C. Wein, Jr. Purchasing Office Director of Administration

More information

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS

CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center

More information

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES

STORMWATER MANAGEMENT FUND DEPARTMENT OF ENVIRONMENTAL SERVICES DEPARTMENT OF ENVIRONMENTAL SERVICES Mission: To implement a comprehensive stormwater management program that balances the following goals: 1) to reduce the potential for stormwater threats to public health,

More information

APPENDIX A-3: Cost Engineering

APPENDIX A-3: Cost Engineering APPENDIX A-3: Cost Engineering ALISO CREEK MAINSTEM ECOSYSTEM RESTORATION STUDY Orange County, California September 217 Orange County Public Works Environmental Resources Department This page intentionally

More information

OGUNQUIT PLANNING BOARD REGULAR BUSINESS MEETING MINUTES DUNAWAY CENTER MAIN AUDITORIUM JULY 23, 2018 REGULAR BUSINESS MEETING

OGUNQUIT PLANNING BOARD REGULAR BUSINESS MEETING MINUTES DUNAWAY CENTER MAIN AUDITORIUM JULY 23, 2018 REGULAR BUSINESS MEETING Mr. Town of Ogunquit Planning Board Post Office Box 875 Ogunquit, Maine 03907-0875 Tel: 207-646-9326 A. ROLL CALL 6:00 P.M. OGUNQUIT PLANNING BOARD REGULAR BUSINESS MEETING MINUTES DUNAWAY CENTER MAIN

More information

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017

FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017 FRANKLIN TOWNSHIP BOARD OF SUPERVISORS REGULAR MEETING April 12, 2017 ROLL CALL Present were Supervisors David Sprigg, Naomi Decker, Kevin Cummings, Eric Stonesifer and Michael Ryan. Also present were

More information

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by:

ASHLAND COCKEYSVILLE, MD Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION. Prepared by: RESERVE FUND STUDY ASHLAND COCKEYSVILLE, MD 21030 Prepared for: WPM REAL ESTATE GROUP, LLC AND ASHLAND HOMEOWNERS ASSOCIATION Prepared by: CRITERIUM-HARBOR ENGINEERS PO BOX 408 STEVENSON, MARYLAND 21153

More information

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES

CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES CHECKLIST FOR CONSTRUCTION STAGING PLAN IN CORAL GABLES _ A Construction Staging Plan is required prior to permit issuance for all commercial and multi-family residential projects. It is intended to reduce

More information

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018

CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex April 4, 2018 CITY OF ELKO BID TABULATION * RE-BID* FOR Sports Complex 2017-2018 April 4, 2018 Great Basin Engineering CLEARING EARTHWORK 1 337.01200 Mobilization @ Per Lump Sum 1 LS $445,350.00 $ 445,350.00 $481,768.00

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

County Barn Road RPUD. Deviation Justification

County Barn Road RPUD. Deviation Justification 1. Deviation 1 seeks relief from LDC Section 6.06.02.A.2 which requires dual sidewalks on local roads internal to the site, to allow a sidewalk on one side of the roadway where the property is permitted

More information

VILLAGE OF BARRINGTON HILLS

VILLAGE OF BARRINGTON HILLS VILLAGE OF BARRINGTON HILLS Roads & Bridges Committee NOTICE OF SPECIAL MEETING Tuesday, October 20, 2015 ~ 3:00 pm 112 Algonquin Road 1. Call to Order & Roll Call 2. Public Comments 3. [Vote] Minutes

More information

NE WEST KINGSTON ROAD CULVERT REPLACEMENT

NE WEST KINGSTON ROAD CULVERT REPLACEMENT NE WEST KINGSTON ROAD CULVERT REPLACEMENT KITSAP COUNTY MILE POST 1.28 TO 1.44 PUBLIC WORKS BID TABULATION SECTION PREPARED: BLB LENGTH: 0.16 Mile REVISED: DATE: March 7, 2017 SCHEDULE A - ROADWAY IMPROVEMENTS

More information

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA

Applying for a Kinder Morgan Canada. Proximity Permit. Design and Construction Guidelines CANADA Applying for a Kinder Morgan Canada Proximity Permit Design and Construction Guidelines CANADA A Guide to Applying for a Kinder Morgan Canada Proximity Permit Kinder Morgan Canada operates the Trans Mountain

More information

TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION

TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION TOWN OF FARMINGTON DEPARTMENT OF PUBLIC WORKS & DEVELOPMENT SERVICES ENGINEERING DIVISION Russell Arnold, Jr. Matt Walsh, P.E. Director of Public Works Assistant Town Engineer (860) 675-2305 (860) 675-2305

More information

CITY OF NORWALK PUBLIC WORKS COMMITTEE. March 5, 2019

CITY OF NORWALK PUBLIC WORKS COMMITTEE. March 5, 2019 C I T Y O F N O R W A L K N o r w a l k C i t y H a l l 1 2 5 E a s t A v e n u e, P O B o x 5 1 2 5 R o o m 2 2 5 N o r w a l k, C T 0 6 8 5 6-5 1 2 5 P : 2 0 3-8 5 4-7 7 9 1 / F : 2 0 3-8 5 7-0 1 4 3

More information

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET

AWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213

More information

DEPARTMENT OF MILITARY AFFAIRS CFMO CONTRACT MANAGEMENT BRANCH ISSUED ADDENDUM. From: Department of Military Affairs, CFMO Contracting Branch

DEPARTMENT OF MILITARY AFFAIRS CFMO CONTRACT MANAGEMENT BRANCH ISSUED ADDENDUM. From: Department of Military Affairs, CFMO Contracting Branch DEPARTMENT OF MILITARY AFFAIRS CFMO CONTRACT MANAGEMENT BRANCH ISSUED ADDENDUM October 9, 2018 ADDENDUM # 1 Project # 210032 Project Name: CBJTC RV Storage Lot From: Department of Military Affairs, CFMO

More information

** The due date has been extended to June 16, 2017 at 3:00 p.m. **

** The due date has been extended to June 16, 2017 at 3:00 p.m. ** June 8, 2017 To: All Potential Proposers Subject: RFP 17-Q Butterfly Lane Realignment Project Consisting of: RFIs and City Response, 3 PDFs Butterfly Ridge Elementary, Roadway Plan Sheet, Forest WRP This

More information

Town of Montrose Annex

Town of Montrose Annex Town of Montrose Annex Community Profile The Town of Montrose is located in the Southwest quadrant of the County, east of the Town of Primrose, south of the Town of Verona, and west of the Town of Oregon.

More information

CITY OF OGDEN 222 Riley Avenue, P.O. Box C (785) Ogden, Kansas

CITY OF OGDEN 222 Riley Avenue, P.O. Box C (785) Ogden, Kansas CITY OF OGDEN 222 Riley Avenue, P.O. Box C (785) 539-0311 Ogden, Kansas 66517-0843 Council Meeting The Regular Meeting of the Governing Body for the City of Ogden was scheduled for Wednesday, July 6,2011

More information

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY.

2011 PUBLIC PARKING LOT & ALLEY IMPROVEMENTS Village of Whitefish Bay Project No March 17, 2011 ITEM DESCRIPTION UNIT QTY. ALLEY: 5600 BLOCK OF N. LAKE DRIVE 1 Remove concrete pavement 800 SY $ 11.07 $ 8,856.00 $ 5.31 $ 4,248.00 $ 12.70 $ 10,160.00 $ 6.20 $ 4,960.00 $ 9.27 $ 7,416.00 $ 16.75 $ 13,400.00 2 6" Aggregate Dense

More information

TOWN OF DUCK PLANNING BOARD REGULAR MEETING. The Planning Board for the Town of Duck convened at the Duck Meeting Hall on Wednesday, August 14, 2013.

TOWN OF DUCK PLANNING BOARD REGULAR MEETING. The Planning Board for the Town of Duck convened at the Duck Meeting Hall on Wednesday, August 14, 2013. TOWN OF DUCK PLANNING BOARD REGULAR MEETING August 14, 2013 The Planning Board for the Town of Duck convened at the Duck Meeting Hall on Wednesday, August 14, 2013. Present were: Chair Joe Blakaitis, Vice-Chair

More information

EXCELLENCE INNOVATION SERVICE VALUE

EXCELLENCE INNOVATION SERVICE VALUE Incorporation of Geotechnical Elements as an Asset Class within Transportation Asset Management and Development of Risk Based and Life Cycle Cost Performance Strategies by Mark Vessely, P.E. Shannon &

More information

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL

BIDDER'S PROPOSAL TO THE HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL Bidders submitting proposals shall be very careful to follow all requirements in connection therewith. A checklist has been attached for guidance in complying with all phases of the bid process and project.

More information

State Conservation Commission

State Conservation Commission Agency 11 State Conservation Commission Articles 11-1. WATER RESOURCES COST-SHARE PROGRAM. 11-2. HIGH PRIORITY COST-SHARE PROGRAM. 11-3. WATERSHED DAM CONSTRUCTION PROGRAM. 11-4. MULTIPURPOSE SMALL LAKES

More information

CHAGRIN RIVER WATERSHED PARTNERS, INC. Lower Main Branch and East Branch Streambank Stabilization and Grassed Filter Strip Project

CHAGRIN RIVER WATERSHED PARTNERS, INC. Lower Main Branch and East Branch Streambank Stabilization and Grassed Filter Strip Project CHAGRIN RIVER WATERSHED PARTNERS, INC. Lower Main Branch and East Branch Streambank Stabilization and Grassed Filter Strip Project REQUEST FOR PROPOSALS August 4, 2014 SECTION A: SUPPLIES OR SERVICES AND

More information

ANNEX B: TOWN OF BLUE RIVER

ANNEX B: TOWN OF BLUE RIVER ANNEX B: TOWN OF BLUE RIVER B.1 Community Profile Figure B.1 shows a map of the Town of Blue River and its location within Summit County. Figure B.1. Map of Blue River Summit County (Blue River) Annex

More information

Department of Public Works Engineering

Department of Public Works Engineering Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012

BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 Page 1 BID TAB PROJECT: REPLACEMENT OF ALBON ROAD BRIDGE NO. 606, PID NO. 87786 BID OPEN: MAY 9, 2012 COMPLETION DATE: NOVEMBER 16, 2012 ROADWAY 1 201 CLEARING AND GRUBBING 1 LUMP $4,500.00 $4,500.00 $10,016.00

More information

Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements

Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements Tookany Creek Watershed Flood Damage Reduction Feasibility Study Data Collection Checklist General Information Requirements Date of Flooding Incident Time of Flood Peak (highest water point) Height of

More information

GP-4-1 of 9 GP-4 SCOPE OF WORK

GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4 SCOPE OF WORK GP-4-1 of 9 GP-4 SCOPE OF WORK GP-4.01 CONTRACT INTENT The Contractor shall (within specified tolerances) perform all work in accordance with the lines, grades, typical cross sections,

More information

CITY OF ABBOTSFORD MUNICIPAL TICKET INFORMATION BYLAW, 2007, AMENDMENT BYLAW NO. 39

CITY OF ABBOTSFORD MUNICIPAL TICKET INFORMATION BYLAW, 2007, AMENDMENT BYLAW NO. 39 No. 2616-2016 Page 1 The Council of the City of Abbotsford, in open meeting assembled, ENACTS AS FOLLOWS: 1. CITATION No. 2616-2016 may be cited as Municipal Ticket Information, 2007, Amendment No. 39.

More information

104 SCOPE OF WORK SECTION 104 SCOPE OF WORK

104 SCOPE OF WORK SECTION 104 SCOPE OF WORK SECTION 104 SCOPE OF WORK 104.1 INTENT OF CONTRACT AND SCOPE OF CONTRACT a. Perform all work necessary to construct or reconstruct the Project. Use the best general engineering and construction practices.

More information

TOWN OF DUCK PLANNING BOARD REGULAR MEETING. January 9, The Planning Board for the Town of Duck convened at the Duck Meeting Hall on Wednesday,

TOWN OF DUCK PLANNING BOARD REGULAR MEETING. January 9, The Planning Board for the Town of Duck convened at the Duck Meeting Hall on Wednesday, TOWN OF DUCK PLANNING BOARD REGULAR MEETING January 9, 2013 The Planning Board for the Town of Duck convened at the Duck Meeting Hall on Wednesday, January 9, 2013. Present were: Chair Joe Blakaitis, Vic-Chair

More information

F U L L R E S E RV E S T U DY R E P O RT

F U L L R E S E RV E S T U DY R E P O RT Office: (888) 927-7865 Fax: (813) 200-8448 Contact@customreserves.com 5470 E Busch Blvd., Unit 171 Tampa, FL 33617 Hawks Point Community Development District F U L L R E S E RV E S T U DY R E P O RT For

More information