Region 5 Upcoming Projects for Summer/Fall 2018
|
|
- Eric Wilcox
- 6 years ago
- Views:
Transcription
1 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The projects listed are not guaranteed to go to advertisement. Projects located in Archuleta, La Plata, Montezuma and Mineral Counties US 160 Resurfacing on Elmore s East; Planned Ad Date: December 14, 2017 Approximate Budget: $6 million County: La Plata Work: This surface treatment project will resurface the roadway on US 160 from MP from the Jct of US 172 to Bayfield. US 160 SH 84 to Treasure Falls Surface Treatment; Planned Ad Date: January 11, 2018 Approximate Budget: $8 million County: Archuleta and Mineral Work: This surface treatment project will resurface the roadway from MP , and includes a chain up and down station at MP SH 145 Dolores Sidewalk Ramps; ESB-Restricted Project Planned Ad Date: November 30, 2017 Approximate Budget: $400,000 County: Montezuma Work: Project work includes construction of sidewalk and ADA compliant curb ramps in Dolores at MP on SH 145. Other work includes concrete flatwork for cross-pan curb and gutter, inlet repair, and minor landscaping repair. Signs, light poles, and a fence will be reset.
2 R5 Guardrail End Treatment Replacement; Planned Ad Date: To Be Determined Approximate Budget: $2 million Work: Replace old standard guardrail end treatments throughout Region 5. Projects located in Fremont (Region 2) & Saguache Counties US 50 Passing Lanes East of Salida (Fremont County); Planned Ad Date: To Be Determined Approximate Budget: $5 million County: Fremont Work: This project located in Fremont County on US 50 between MP and consists of the addition of a passing lane in both directions and the addition of slow vehicle pullouts. US 50 Structure Replacement; Planned Ad Date: February 15, 2018 Approximate Budget: $2 million County: Saguache Work: This project includes the replacement of a two lane bridge structure with a concrete box culvert. Traffic/Safety and Maintenance Projects US 550 Traffic Signal Replacement and ADA Ramp Construction; Planned Ad Date: November 30, 2017 Approximate Budget: $3.9 million County: La Plata Work: Replace signals, upgrade infrastructure and reconfigure side street approaches. Construct ADA Accessible Pedestrian Signals and sidewalk ramps at 3 intersections in Durango. US 550 and SH 62 Striping and Rumble Strips; Planned Ad Date: January 4, 2018 Approximate Budget: $1 million County: La Plata, Ouray, San Juan, San Miguel Work: Rumble strips and restriping on US 550 MP & , and SH 62 MP
3 US 160 Wolf Creek Pass RSA; Planned Ad Date: January 18, 2018 Approximate Budget: $2.2 million County: Mineral Work: Signage and striping upgrades on US 160 from MP 160 to Includes inlaid restriping, centerline rumble strips, two sign bridges, sign removal, sign panel replacements, and type 7 barrier with embankment, asphalt removal, and shoulder improvements. US 550 Chain Station & VMS at MP 94; Planned Ad Date: February 8, 2018 Approximate Budget: $750,000 County: Ouray Work: Work includes chipseal, restriping for chain up station, roadway widening for chain down station, install lighting and VMS board. R5 Region-wide Re-Stripe; Planned Ad Date: January 4, 2018 Approximate Budget: $1.3 million Work: Yearly restriping of highways in Region 5 R5 Chain Station Improvements; Planned Ad Date: May 18, 2018 Approximate Budget: $1.2 million Work: Providing improvements to chain stations, adding or upgrading lighting, improving striping, and potential widening. US 550 Riverside Snowshed Tunnel; Planned Ad Date: March 18, 2018 Approximate Budget: $750,000 County: Ouray, Red Mountain Pass Work: This project includes the upgrade of lighting in the Riverside Snowshed Tunnel.
4 Local Agency Projects Salida US 50 Sidewalks Phase 4; Local Agency: City of Salida Approximate Budget: $500,000 Work: This project involves the construction of concrete sidewalk separated from the back of curb with a colored, textured concrete buffer on both sides of US 50 from Palmer St to the intersection of SH 291 on US 50 in Salida. Some curb and gutter and curb ramps may be replaced. Some accesses may be moved or changed. Pagosa Springs North 8 th Street SRTS; Local Agency: Town of Pagosa Springs Approximate Budget: $400,000 Work: This project involves construction of sidewalks and curb and gutter in the north Pagosa Springs residential neighborhood on North 8 th St and Florida St. San Miguel Lawson Hill Park and Ride; Local Agency: San Miguel County Approximate Budget: $1.5 million Work: This is a Senate Bill 228 funded Transit project that will be advertised by San Miguel County. This project involves construction of a paved park-andride facility on Lot Hub-2C between Society Drive and SH 145 just west of Telluride. Archuleta CO Pagosa Junction BRO; Approximate Budget: $250,000 Work: This is an Archuleta County project for the rehabilitation of bridge structure AR S151 located on CR 500 (Trujillo Rd) at Pagosa Junction within the Southern Ute Indian Tribe Reservation. The bridge is currently structurally deficient and will be rehabilitated and brought up to current standards with this project.
5 FY 17 Durango School Signs SRTS; Local Agency: City of Durango Planned Ad Date: Summer of 2018 Approximate Budget: $75,000 Work: Procurement of school signs at various locations around the City of Durango. Region 5 Local Agency Projects for Design Archuleta CO Pagosa Junction BRO; Planned Ad Date: Fall/Winter 2017 Approximate budget for overall project: $250,000 Work: This is an Archuleta County project for the rehabilitation of bridge structure AR S151 located on County Road 500 (Trujillo Rd) at Pagosa Junction within the Southern Ute Indian Tribe Reservation. The bridge is currently structurally deficient and will be rehabilitated and brought up to current standards with this project. CDOT Staff Bridge has offered to complete Bridge Rehab Design but a Consulting Engineering Firm will be needed to complete clearances, finalize plans and specs and prepare bid package. Durango College Dr and E 8 th Ave; Local Agency: City of Durango Planned Ad Date: Fall/Winter 2018 Approximate budget for overall project: $1 million Work: Trolley stop improvements using CDOT FASTER Transit funding and road diet/safety improvements using CDOT HSIP funding on College Dr from E 3rd Ave to E 8th Ave and on E 8th Ave from College Dr to 1st St. Archuleta County CR 600 Guardrail; Planned Ad Date: Fall/Winter 2017 Approximate budget for overall project: $100,000 Work: Improvements to guardrail on Archuleta CR600 (Piedra Rd). Approximately 6 recently installed guardrail end treatments are too close to the travelled way and need to be flared away from traffic on the approach end. Design appropriate modifications and work through enviro, ROW and utility clearances and prepare bid documents.
Appendix B Example Project Designs and Engineers Opinion of Costs
Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility
More informationTRANSPORTATION CAPITAL PROGRAM
TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily
More informationLIVABLE WAGES. Livable Wages Revised June * assumes 2 children requiring full time day care
LIVABLE WAGES What level of income is necessary to support a given size and type of household? A livable wage addresses the essential financial needs for basic living tools such as shelter, healthcare,
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationThis page intentionally left blank
197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.
More informationMaintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION
Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million
More informationMemo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:
To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan
More informationPublic Works Maintenance STORMWATER AND
Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C
More informationCapital Improvement Program. Fiscal Years
Capital Improvement Program Fiscal Years 2014-2021 1 Capital Improvement Program Fiscal Years 2014-2021 Agenda Background Significant Accomplishments (2012-2014) Proposed Work Plan (2014-2016) and 7- Year
More informationCITY OF SAN JACINTO Capital Improvement Program Project Details
UNFUNDED CITY OF SAN JACINTO Capital Improvement Program Project Details Project Title: 2009 Downtown Pavement Rehabilitation Project Description: Pavement rehabilitation in downtown area. Similar to prior
More informationEXHIBIT A DONATIONS Cullen Blvd, An Individual Series of Forefunders Partners, LLC. Houston District
EXHIBIT A DONATIONS NO. DONOR D/D/O COUNTY DESCRIPTION 1 9607 Cullen Blvd, An Individual Series of Forefunders Partners, LLC 2 Apache Corporation Houston District Harris The donor is donating the design
More informationHIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP)
HSIP GUIDEBOOK & APPLICATION FORM HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for District Projects State Fiscal Years 2019, 2020, 2021 and 2022 September 2017 2017 HSIP Solicitation
More informationProgramed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0
WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)
More informationRECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC
J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED
More informationDRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6
C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation
More informationBID TABULATION REPORT ABRAM STREET (SH CITY LIMITS) PROJECT No. PWST09016 BID OPENED : April 22, 2014 at 1:30 p.m.
PAVING IMPROVEMENTS 101 Mobilization and Bonds, LS 1 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 $ 225,000.00 102 Right-of-way Preparation LS 1 $ 365,500.00
More informationAppendix E: Revenues and Cost Estimates
Appendix E: Revenues and Cost Estimates Photo Source: Mission Media Regional Financial Plan 2020-2040 Each metropolitan transportation plan must include a financial plan. In this financial plan, the region
More informationApproved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019
3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad
More informationCapital Investment Program (CIP) About CIP
Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The
More informationCIP. PUBLIC WORKS DEPARTMENT Timm Borden, Director
PUBLIC WORKS DEPARTMENT Timm Borden, Director CITY HALL 10300 TORRE AVENUE ~ CUPERTINO, CA 95014-3266 (408) 777-3354 ~ FAX (408) 777-3333 CIP 2015-2016 Budget report of the Capital Improvement Program
More informationBHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM
TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM
More informationHIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020.
HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) Greater Minnesota Solicitation for Local Projects for 2017, 2018, 2019, and 2020 August 2015 GUIDEBOOK & APPLICATION FORM HSIP HSIP Funding Guide Page 1 HSIP Funding
More informationFunding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500
FY 2017-18 Capital Improvement Program Detail STREETS Raised Median on Pipeline Avenue S14009 Program Year Initiated: FY 2013-14 Construction Year: FY 2016-17 Project Description: Install raised median
More informationLocal Option Sales Tax Report Card Your Penny At Work. District 4
Local Option Sales Tax Report Card Your Penny At Work District 4 Local Option Sales Tax 2007-2017 Report Card Your Penny At Work Transportation $153,816,450 Public Facilities $50,384,889 Natural Resources/
More informationOkaloosa-Walton 2035 Long Range Transportation Plan Amendment
Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationCITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS
CITY OF YUBA CITY STATE OF CALIFORNIA PUBLIC WORKS DEPARTMENT NOTICE TO CONTRACTORS Sealed proposals will be received at the City Clerk s Office, City of Yuba City, located at City Hall, 1201 Civic Center
More information2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD
AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION
More informationRevenue Sharing Program Guidelines
Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
More information10-Year Capital Highway Investment Plan DRAFT
10-Year Capital Highway Investment Plan DRAFT 2018-2027 DRAFT AUGUST 2017 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN... 1 This page intentionally left blank. SUMMARY OF INVESTMENT
More informationDepartment of Public Works Engineering
Department of Public Works Engineering DATE: January 27, 2016 TO: Honorable Chairman and Public Utility Authority Members FROM: Cynthia M. Herrera, MMC, Interim Executive Director/ City Clerk BY: Nathan
More informationCapital Improvement Project Profile Fiscal Year
Capital Improvement Projects Transportation Fund Funding Sources: Measure I TDA Federal-State-County Grants Transportation DIF Transportation Fund 237 Pine Avenue Connection Project ST061 - G7016 - C7011-8745
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More information2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation
2016 Bond Referenda 1. Metro and Transportation bonds in the maximum principal amount of $58,785,000 to finance, together with other available funds, the cost of various capital projects for the Washington
More informationPRESENTER: Christopher Blunk, Deputy Public Works Director/City Engineer
G-6 STAFF REPORT MEETING DATE: June 12, 2018 TO: FROM: City Council Petr Skala, Assistant Engineer 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213 www.novato.org PRESENTER: Christopher
More informationPublic Works and Development Services
City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement
More informationCAPITAL PROJECTS BUDGET TAB 5
CAPITAL PROJECTS BUDGET TAB 5 This page intentionally left blank. 2016-2018 CAPITAL BUDGET 5-1 This page intentionally left blank. City of Walnut Creek 2016-2018 Capital Budget Table of Contents Introduction
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Fremont Date: 12/21/2018 Primary Point of Contact Name: Tish Saini
More informationLAKE~SUMTER MPO - COST FEASIBLE PROJECTS
- COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS
More informationProject Programmed / budgeted in pool. Project's funds have been rolled forward. Project Sponsor TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM
Transportation Improvement FY 2016 - FY 2019 med / budgeted in pool 's funds have been rolled forward Description/Location HIGHWAYS BRIDGE - ON STATE SYSTEM SR46598 Region 4 Bridge - On System Pool CDOT
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six
DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade
More informationEST. UNIT UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS UNIT PRICE TOTALS
BID TAB PROJECT: City of Steamboat Springs / Emerald Park Access & Railroad Crossing Phase I (2017) JOB NO: 1340-067 DATE: 6/15/2017 Oldcastle SW Group, Inc. dba Engineer's Estimate United Companies Native
More informationCAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000
CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION On-Going Pavement Management Program: In 2009/2010 the city completed the initial 3-year plan
More informationNOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000
NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the
More informationQUALITY TRANSPORTATION SUMMARY
SUMMARY Transportation systems influence virtually every aspect of community life. They are the means for moving people, goods, and services throughout the community, and they play a significant role in
More information$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.
ST AVE TH AVE TH AVE BIG SIOUX RD TH AVE TH AVE TH AVE TH AVE TH AVE 9 9 0 Miles TH AVE $+ 0 $+ 0 TH AVE TH AVE 9 Humboldt TH ST TH AVE $+ 0 0 0-0-00 0 Construction 09 Construction 00 Construction 0 Construction
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2017-2026 OCTOBER 2016 1 Table of Contents PURPOSE OF 10-YEAR CAPITAL HIGHWAY INVESTMENT PLAN...1 This page intentionally left blank. SUMMARY OF INVESTMENT PLANS...6
More informationQUALITY TRANSPORTATION SUMMARY
QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...
More informationProject Programmed / budgeted in pool. Project's funds have been rolled forward TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM.
Transportation Improvement FY 2016 - FY 2019 med / budgeted in pool 's funds have been rolled forward Description/Location HIGHWAYS BRIDGE - ON STATE SYSTEM Revised Entry Increased Funding & Lists s SR46598
More informationCapital District Transportation Committee March 3, Amendments to the TIP
Capital District Transportation Committee March 3, 2017 Amendments to the 2016-21 TIP At its March 1, 2017 and March 2, 2017 meetings, CDTC made the following amendments to the Transportation Improvement
More informationDRAFT. Summary of Projects List UNOFFICIAL. UNOFFICIAL Project Name Project No. Const. Yr Total UNOFFICIAL.
Summary of Projects List Osage Nation Project Name Project No. Const. Yr 2019 2020 2021 2022 2023 Total Wildland Fire Management Building 2018 $0 $50,000 $0 $0 $0 $50,000 Dog Thresher Creek BR176 2018
More informationTEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P
TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015
More informationNASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY
NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board
More informationTransportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationTEXAS TRANSPORTATION COMMISSION
TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create
More informationLa Plata County Combined** $672,187 $536,875 $2,688, $1,200,000 $415,000 LAND ( In Town )
STATISTICS Year 2015 DATES: 1-1-2015-12-31-2015 Number Avg. Days on Property Type Average Price Median Price Total Volume * Sold Market High Price Low Price Residential Sales * IN TOWN HOMES (La Plata
More information2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction)
2015 Financial Assurance 8/6/2015 Estimate Form (with pre-plat construction) Project Information The Glen at Widefield Filing No. 9 PDD File: SF-185 9/25/2018 Project Name Section 1 - Grading and Erosion
More informationSUBDIVISION IMPROVEMENTS AGREEMENT
SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT, made between GLEN DEVELOPMENT COMPANY, hereinafter called the "Subdivider," and El Paso County by and through the Board of County Commissioners of El
More informationCOUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013
COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013 Pictures Key Front Cover Top Row 1) Administration Building Second Row, left to right 2) Brigden EMS Station 3) Judith & Norman Alix Art Gallery Third row,
More informationADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET
CITY OF PLACERVILLE ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET 2014/2015 CAPITAL IMPROVEMENT PROGRAM POLICY Each year the City faces the challenge of meeting infrastructure and equipment needs with limited
More informationRevenue Sharing Program Guidelines
Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 20172018 AGENCY CONTACT INFORMATION Agency Name: City of Alameda Date: 11/29/2018 Primary Point of Contact Name: Scott Wikstrom
More informationTABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures
Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column
More informationBRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)
More informationState of the Industry
Florida Department of TRANSPORTATION State of the Industry Howie Moseley State Bituminous Materials Engineer State Highway System 43,920 lane miles of roadway 8,242 interstate lane miles 33,465 arterial
More informationEXHIBIT A DONATIONS April 26, 2018
EXHIBIT A DONATIONS April 26, 2018 1 830 Investors, Ltd. 2 AASA Holdings Humble The donor is donating the design and construction of a traffic signal from SH 99 at Imperial Promenade/Townsen Blvd into
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five
DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within
More informationCHAPTER 4 1 Transportation Financial Analysis
CHAPTER 4 1 Transportation Financial Analysis COMPASS commissioned a financial analysis, finalized in 2012, to support the CIM 2040 update. The analysis, Financial Forecast for the Funding of Transportation
More informationAWARD CONSTRUCTION CONTRACT FOR NAVE DRIVE MULTI USE PATH (MUP) AND ADOPT A RESOLUTION AMENDING CIP BUDGET
STAFF REPORT MEETING DATE: June 9, 2015 TO: City Council FROM: Petr Skala, Engineer II PRESENTER: Russ Thompson, Public Works Director 922 Machin Avenue Novato, CA 94945 (415) 899-8900 FAX (415) 899-8213
More informationSALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR
SALT LAKE CITY COUNCIL STAFF REPORT BUDGET AMENDMENT ANALYSIS FISCAL YEAR 2002-03 DATE: May 7, 2002 BUDGET FOR: STAFF REPORT BY: cc: DEPARTMENT OF AIRPORTS Gary Mumford Rocky Fluhart, David Nimkin, Tim
More informationMICHIGAN STATEWIDE GPA GUIDANCE 2017
Introduction Federal regulation 23 CFR 450.324 (f) states projects that are not considered to be of appropriate scale for individual identification in a given program year may be grouped by function, work
More informationSOLUTIONS FOR SAVING LIVES ON TEXAS ROADS
SOLUTIONS FOR SAVING LIVES ON TEXAS ROADS Darren McDaniel Texas Department of Transportation December 2016 Texas Traffic Safety Task Force Texas Traffic Safety Task Force was created in August 2015 with
More informationChapter 5: Cost and Revenues Assumptions
Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the
More informationYork Region Rapid Transit Corporation Board of Directors. YRRTC 2016 Metrolinx Multi-Year Capital Expenditures Budget
Meeting of the Board of Directors on November 19, 2015 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President YRRTC 2016 Metrolinx Multi-Year Capital
More informationNON-MOTORIZED FACILITIES
NON-MOTORIZED FACILITIES POLICY The Board of Road Commissioners of the County of Kalamazoo non-motorized policy provides a guideline for the development of non-motorized facilities in the public right-of-way.
More informationChapter 6 Transportation Improvements & Financial Plan
Chapter 6 Transportation Improvements & Financial Plan Introduction Up to this point, this plan has provided a regional profile (the population, employment, and commuting patterns) of the RTPO and MPO
More informationCity of Littleton Page 1
City of Littleton Littleton Center 2255 West Berry Avenue Littleton, CO 80120 Meeting Agenda City Council Tuesday, April 25, 2017 6:30 PM Community Room Study Session 1. Study Session Topics a) b) c) ID#
More informationAGENDA THE UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES. Finance, Facilities & Operations Committee Meeting November 18, 2016
AGENDA THE UNIVERSITY OF WEST FLORIDA BOARD OF TRUSTEES Finance, Facilities & Operations Committee Meeting University of West Florida Conference Center, Bldg. 22 11000 University Parkway, Pensacola, FL
More informationCity of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016
City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities
More informationJuly 25, Members of City Council City of League City, Texas
Mark Rohr City Manager 300 W Walker League City, TX 77573 Main: 281.554.1000 Direct: 281.554.1005 www.leaguecity.com July 25, 2016 Members of City Council City of League City, Texas Transmitted herewith
More informationWednesday, June 6, 2018
Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018
More informationMETRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):
METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit
More informationSANTA ANA COLLEGE FACILITIES COMMITTEE MEETING MAY 15, 2018
FACILITIES COMMITTEE MEETING MAY 15, 2018 1 PROJECTS Dunlap Hall Renovation - Completed Central Plant & Infrastructure - Completed Johnson Student Center Johnson Demolition Science Center & Building J
More informationDORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates
DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix I Cost Estimates (Alternative 1 - Doran Overpass) PROJECT DESCRIPTION Limits Doran Street from Commercial
More information$500,000 - $999,999 La Plata County Combined $ - $ - $ $ - $ - LAND (IN TOWN)
Quarter: 1st DATES: January 1, 2006 to March 31, 2006 Durango Area Association of REALTORS, Inc, Avg. Days on (La Plata County Only)** Durango $ 459,950 $ 394,000 $ 13,98,500 30 213 $ 980,000 $ 218,000
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Five
DISTICT FIVE POJECT OVEVIE Florida s Turnpike Enterprise continues to make significant project investments in District Five. In FY 2017 and FY 2018, current Turnpike projects total over $419 million within
More informationTELFORD HILLS CONDOMINIUM ASSOCIATION, INC. FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION
FINANCIAL STATEMENTS AND SUPPLEMENTARY INFORMATION TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR S REPORT... 1-2 FINANCIAL STATEMENTS Balance Sheet... 3 Statement of Revenues, Expenses and Changes in Fund
More informationFAIRBANKS METROPOLITAN AREA TRANSPORTATION SYSTEM POLICIES & PROCEDURES
FAIRBANKS METROPOLITAN AREA TRANSPORTATION SYSTEM POLICIES & PROCEDURES REVISED & APPROVED OCTOBER 21, 2015 P a g e 2 P a g e 3 TABLE OF CONTENTS FMATS POLICIES AND PROCEDURES... 4 No.1 Background Information...
More informationTRANSPORTATION EXECUTIVE SUMMARY
EXECUTIVE SUMMARY The Sacramento County Department of Transportation (SACDOT) is responsible for improving, operating and maintaining the transportation infrastructure of the Unincorporated Area of the
More informationAgenda. Background Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement
1 Agenda Background 2013-2014 Budget / PW General Fund Budget Streets & Infrastructure Citizen Engagement Sustainable Transportation Funding Dedicated Revenues Potential Rate Impact Clarification Proposed
More informationCity of Piedmont COUNCIL AGENDA REPORT
City of Piedmont COUNCIL AGENDA REPORT DATE: April 20, 2015 TO: FROM: Mayor and Council Paul Benoit, City Administrator SUBJECT: Street Selection Criteria and Discussion of Budget for the Proposed 2015
More informationDRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0
UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH
More informationSTREETS DEPARTMENT FISCAL YEAR 2018 BUDGET TESTIMONY APRIL 26, 2017
INTRODUCTION STREETS DEPARTMENT FISCAL YEAR 2018 BUDGET TESTIMONY APRIL 26, 2017 Good morning, President Clarke and Members of City Council. I am Carlton Williams, Commissioner of the Streets Department.
More informationReview and Update of Year 2035 Regional Transportation Plan
Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One
DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee
More information10-Year Capital Highway Investment Plan
10-Year Capital Highway Investment Plan 2016-2025 DECEMBER 2015 1 This page intentionally left blank. TABLE OF CONTENTS Purpose of 10-Year Capital Highway Investment Plan...1 Summary of 10 Year Plan Investments...5
More informationJACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N
More informationAVERAGE OF BID ITEMS ENGINEERS ESTIMATE
ROADWAY 1 Mobilization 1 LS $ 990,048.50 $ 80,000.00 $ 880,000.00 $ 880,000.00 $ 950,000.00 $ 950,000.00 $ 967,510.00 $ 967,510.00 $ 1,162,684.00 $ 1,162,684.00 2 Maintenance of Traffic ( incl. Pedestrian
More information