5 NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY Amendment Conformity Report for August 20, 2008 Amendments (Amendment # thru ) On August 20, 2008 the Executive Board of the Nashville Area MPO voted to approve the following amendments to the FY Transportation Improvement Program: Item # Amend # TIP # LRTP # Description b E+C E+C 40 SR-247 (Duplex Road) - Spring Hill. Widen from 2 to 3 lanes and correct vertical alignment issues. SR-840 South - TDOT. Stage construction of a new 4 lane roadway from west of Leipers Creek Road (SR-46) to west of Carters Creek Pike (SR-246). SR-840 South - TDOT. Stage construction of a new 4 lane roadway from west of Carters Creek Pike (SR-246) to west of Columbia Pike (SR-6). LRTP Conformity These projects are consistent with the conforming LRTP. They are exempt from conformity and as such meet the requirements of 40 CFR State/Federal Regulation Conformity The TIP amendments conform to the State Implementation Plan (SIP) and comply with the Clean Air Act, the Transportation Conformity Regulation, the Statewide and Metropolitan Planning Regulations and all other applicable Federal and State requirements. Resolutions Adopting resolutions for the TIP and LRTP are included in this packet. Project Cross References The Long Range Transportation Plan Project number for each TIP amendment is provided in the table above. Public Participation Public participation processes as described in the Nashville Area MPO s Public Participation Plan were followed. The Executive Board released the amendments for public review on July 16, Amendments were placed in all local public libraries for the required 21-day public comment period. Newspaper ads were run announcing the public review period and the public hearing schedule. Two public hearings were held to receive public comments. The first hearing was held on August 6, 2008 at the meeting of the Technical Coordinating Committee. The second and final public hearing was held on August 20, 2008 at the meeting of the Executive Board. No public comments were received regarding these projects. Inter-Agency Consultation Process Exempt projects were determined during the Inter-agency Consultation (IAC) process and generally follow the requirements of 40 CFR Projects were classified as exempt from conformity analysis if they: 1
6 (1) add only bicycle or pedestrian facilities (2) fund operations, vehicles, or other equipment for transit/rideshare agencies (3) add or upgrade signals without changing the total number of thru lanes (4) add signs, lighting, crosswalks or other amenities without changing the total number of thru lanes (5) reconstruct roadways or bridges without changing the total number of lanes, including shoulder improvements and bringing lane widths up to standards It was also agreed through Inter-agency Consultation that two additional types of projects would be reviewed on a case-by-case basis to determine exempt status: (6) extend an auxiliary lane between interchanges on an access-controlled facility (7) signal interconnects or other corridor-wide signal projects. These two project types were not included in the conformity modeling. The IAC committee determined that inclusion of these projects in a future Transportation Improvement Program may require a Long Range Plan amendment, at which point they will be discussed in the Interagency Consultation process and explicitly included in a new conformity determination. Exempt Projects: All these projects are existing projects in the MPO s 2030 LRTP that have undergone conformity determination and as such meet the requirements of 40 CFR
7
8
9
10
11 Nashville Area Metropolitan Planning Organization FY TIP Amendment August 2008 TIP Amendment # TIP #: 407b LRTP#: E+C 39 Project: SR-840 South Requested By: TDOT Phase: Stage Construction Fiscal Year(s): 2009 Proposed Changes: Increase funding amount Total Project Cost: $ 83,440,000 From: FY Work Funding Total Federal State Local 2009 STG CONST BOND $ 38,500,000 $ 38,500,000 To: FY Work Funding Total Federal State Local 2009 STG CONST BOND $ 80,040,000 $ 80,040,000 Description: Stage Construction of new 4 lane roadway from west of Leipers Creek Road (SR-46) to west of Carters Creek Pike (SR-246). Background: This is an existing project in the FY TIP. The project is being amended to add additional funds in FY 2009.
12 Fiscal Years Transportation Improvement Program TIP # 407b TDOT PIN # Improvement Type New Roadway Lead Agency TDOT County Williamson Length 3.2 mi LRTP# E+C 39 Conformity Status E+C Route/Project Name SR-840 South Total Project Cost $41,900,000 Termini or Intersection Project Description West Leipers Creek Road (SR-46) to west of Carters Creek Pike (SR-246) Stage Construction of new 4 lane roadway Fiscal Year Type of Work Funding Type Total Funds Fed Funds State Funds Local Funds 2009 STG CONST BOND $38,500,000 $38,500,000 Amendment 1 # Amended on Adjustment 1 # Adjusted on Remarks This project funds CNST for a portion of old TIP # 407 that funded ROW for a larger segment Amendment 2 # Amended on Adjustment 2 # Adjusted on This map is for illustrative purposes only. Drawings depict conceptual project corridors and areas, not approved alignments. Nashville Area Metropolitan Planning Organization FY TIP 6/16/ :02:41 AM Page 219 of 247
13 Fiscal Years Transportation Improvement Program TIP # 407b TDOT PIN # Improvement Type New Roadway Lead Agency TDOT County Williamson Length 3.2 mi LRTP# E+C 39 Conformity Status E+C Route/Project Name SR-840 South Total Project Cost $83,440,000 Termini or Intersection Project Description West Leipers Creek Road (SR-46) to west of Carters Creek Pike (SR-246) Stage Construction of new 4 lane roadway Fiscal Year Type of Work Funding Type Total Funds Fed Funds State Funds Local Funds 2009 STG CONST BOND $80,040,000 $80,040,000 Amendment 1 # Amended on 8/20/2008 Adjustment 1 # Adjusted on Remarks This project funds CNST for a portion of old TIP # 407 that funded ROW for a larger segment. Amendment 2 # Amended on Adjustment 2 # Adjusted on This map is for illustrative purposes only. Drawings depict conceptual project corridors and areas, not approved alignments. Nashville Area Metropolitan Planning Organization FY TIP 8/21/2008 9:23:47 AM Page 225 of 261
14 Nashville Area Metropolitan Planning Organization FY TIP Amendment August 2008 TIP Amendment # TIP #: (New) LRTP#: E+C 40 Project: SR-840 South Requested By: TDOT Phase: Stage Construction Fiscal Year(s): 2009 Proposed Changes: Add project to TIP Total Project Cost: $ 82,660,000 To: FY Work Funding Total Federal State Local 2009 STG CONST BOND $ 57,960,000 $ 57,960,000 Description: Stage Construction of a new 4 lane roadway from west of Carter s Creek Pike (SR-246) to west of Columbia Pike (SR-6). Background: This is a new project for inclusion in the FY TIP.
15 Fiscal Years Transportation Improvement Program TIP # TDOT PIN # Improvement Type New Roadway Lead Agency TDOT County Williamson Length 3.1 mi LRTP# E+C 40 Conformity Status Non-Exempt Route/Project Name SR-840 South Total Project Cost $82,660,000 Termini or Intersection Project Description From west of Carters Creek Pike (SR-246) to west of Columbia Pike (SR-6) Stage construction of new 4 lane roadway Fiscal Year Type of Work Funding Type Total Funds Fed Funds State Funds Local Funds 2009 STG CONST BOND $57,960,000 $57,960,000 Amendment 1 # Adjustment 1 # Remarks Project funded through bond issue Amended on 8/20/2008 Adjusted on Amendment 2 # Adjustment 2 # Amended on Adjusted on This map is for illustrative purposes only. Drawings depict conceptual project corridors and areas, not approved alignments. Nashville Area Metropolitan Planning Organization FY TIP 8/21/2008 9:25:39 AM Page 224 of 261
16 ORIGINAL Table 4. FY Programmed Funds by Funding Source Funding Program FY 2008 FY 2009 FY 2010 FY 2011 Total Amount Programmed $ 444,916, $ 231,470, $ 118,588, $ 149,764, BRR-L (Bridge Replacement & Rehabilitation - Local) $ 432, $ 408, $ 408, $ 408, BRR-S (Bridge Replacement & Rehabilitation - State) $ 3,320, $ 4,040, $ 4,040, $ 4,040, DEMO (Section 115) $ 2,083, $ 354, $ - $ - ENH (Enhancement Grants) $ 11,389, $ 320, $ - $ - Federal Lands Hwy $ 500, $ - $ - $ - FTA-5307 (Capital & Operations) $ 17,072, $ 9,685, $ 9,681, $ 9,460, FTA-5309 (Capital Grant) $ 19,039, $ 10,092, $ 6,000, $ 6,200, FTA-5310 (Elderly & Disabled) $ 212, $ - $ - $ - FTA-5316 (Job Access & Reverse Commute) $ 1,818, $ 548, $ 381, $ 381, FTA-5317 (New Freedom) $ 410, $ - $ - $ - HPP (High Priority Projects) $ 44,784, $ 13,123, $ 4,464, $ 776, HSIP (Highway Safety Improvement Program) $ 1,800, $ 1,800, $ 1,800, $ 1,800, IM (Interstate Maintenance) $ 23,806, $ 8,370, $ 35,014, $ 86,307, ITS (Intelligent Transportation Systems) $ 3,285, $ - $ - $ - LIC (Local Interstate Connector) $ - $ - $ - $ - NHS (National Highway System) $ 2,944, $ 2,024, $ 800, $ 800, PLHD (Public Lands Highway Discretionary) $ 905, $ - $ - $ - TCSP (Transp, Community, & System Preservation) $ 250, $ - $ - $ - S-CMAQ (State Congestion Mitigation & Air Quality) $ 6,362, $ - $ 400, $ - CMAQ (Regional CMAQ) $ 13,064, $ 4,023, $ 3,460, $ 3,099, STP-S (State Surface Transportation Program) $ 59,692, $ 17,283, $ 3,912, $ 2,930, SRTS (Safe Routes to School) $ 750, $ 750, $ 750, $ 750, U-STP (Nashville Urban STP) $ 51,481, $ 23,686, $ 13,547, $ 13,508, M-STP (Murfreesboro Urban STP) $ 1,910, $ - $ - $ - L-STP (Local STP) $ 3,862, $ 511, $ 384, $ 176, State (includes matching amounts for federal funds) $ 90,377, $ 116,988, $ 9,269, $ 14,074, Local (includes matching amounts for federal funds) $ 83,361, $ 17,461, $ 24,273, $ 5,051, Table 5. FY Remaining Funds by Funding Source Funding Program FY 2008 FY 2009 FY 2010 FY 2011 Amount Remaining $ 21,110, $ 12,911, $ 13,929, $ 15,570, CMAQ (Regional CMAQ) $ 1,570, $ 1,186, $ 578, $ 173, U-STP (Nashville Urban STP) $ 12,250, $ 1,435, $ 1,050, $ 703, M-STP (Murfreesboro Urban STP) $ 5,819, $ 7,938, $ 9,618, $ 11,298, L-STP (Local STP) $ 1,471, $ 2,350, $ 2,682, $ 3,395, NASHVILLE AREA MPO FY TIP - ADOPTED AUGUST 22, 2007 (REV. 08/08/08) 13
17 REVISED Table 4. FY Programmed Funds by Funding Source Funding Program FY 2008 FY 2009 FY 2010 FY 2011 Total Amount Programmed $ 445,296, $ 330,970, $ 118,588, $ 149,764, BRR-L (Bridge Replacement & Rehabilitation - Local) $ 432, $ 408, $ 408, $ 408, BRR-S (Bridge Replacement & Rehabilitation - State) $ 3,320, $ 4,040, $ 4,040, $ 4,040, DEMO (Section 115) $ 2,083, $ 354, $ - $ - ENH (Enhancement Grants) $ 11,389, $ 320, $ - $ - Federal Lands Hwy $ 500, $ - $ - $ - FTA-5307 (Capital & Operations) $ 17,072, $ 9,685, $ 9,681, $ 9,460, FTA-5309 (Capital Grant) $ 19,039, $ 10,092, $ 6,000, $ 6,200, FTA-5310 (Elderly & Disabled) $ 212, $ - $ - $ - FTA-5316 (Job Access & Reverse Commute) $ 1,818, $ 548, $ 381, $ 381, FTA-5317 (New Freedom) $ 410, $ - $ - $ - HPP (High Priority Projects) $ 44,784, $ 13,123, $ 4,464, $ 776, HSIP (Highway Safety Improvement Program) $ 1,800, $ 1,800, $ 1,800, $ 1,800, IM (Interstate Maintenance) $ 23,806, $ 8,370, $ 35,014, $ 86,307, ITS (Intelligent Transportation Systems) $ 3,285, $ - $ - $ - LIC (Local Interstate Connector) $ - $ - $ - $ - NHS (National Highway System) $ 2,944, $ 2,024, $ 800, $ 800, PLHD (Public Lands Highway Discretionary) $ 905, $ - $ - $ - TCSP (Transp, Community, & System Preservation) $ 250, $ - $ - $ - S-CMAQ (State Congestion Mitigation & Air Quality) $ 6,362, $ - $ 400, $ - CMAQ (Regional CMAQ) $ 13,064, $ 4,023, $ 3,460, $ 3,099, STP-S (State Surface Transportation Program) $ 59,692, $ 17,283, $ 3,912, $ 2,930, SRTS (Safe Routes to School) $ 750, $ 750, $ 750, $ 750, U-STP (Nashville Urban STP) $ 51,481, $ 23,686, $ 13,547, $ 13,508, M-STP (Murfreesboro Urban STP) $ 1,910, $ - $ - $ - L-STP (Local STP) $ 4,166, $ 511, $ 384, $ 176, State (includes matching amounts for federal funds) $ 90,277, $ 216,488, $ 9,269, $ 14,074, Local (includes matching amounts for federal funds) $ 83,537, $ 17,461, $ 24,273, $ 5,051, Table 5. FY Remaining Funds by Funding Source Funding Program FY 2008 FY 2009 FY 2010 FY 2011 Amount Remaining $ 20,806, $ 12,607, $ 13,625, $ 15,266, CMAQ (Regional CMAQ) $ 1,570, $ 1,186, $ 578, $ 173, U-STP (Nashville Urban STP) $ 12,250, $ 1,435, $ 1,050, $ 703, M-STP (Murfreesboro Urban STP) $ 5,819, $ 7,938, $ 9,618, $ 11,298, L-STP (Local STP) $ 1,167, $ 2,046, $ 2,378, $ 3,091, * Bond funds are coded under the State category NASHVILLE AREA MPO FY TIP - ADOPTED AUGUST 22, 2007 (REV. 08/21/08) 13
Transportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More information2008 UTILITIES STP 2,200,000 1,760, , CONST ES 11,200,000 11,200,000. FY Work Funding Total Fed State Local
NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Adjustment Number: 2009022 TIP Number: 2004068a FROM: TIP# 2004068a Agency/Jurisdiction: TDOT / Mt. Juliet Project: SR171 / Mt. Juliet Road Termini:
More informationNASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:
NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:
More informationFY Work Funding Total Fed State Local
NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2010024 TIP Number: 2006201 FROM: TIP# 2006201 Jurisdiction: City of Murfreesboro Project:
More informationTransportation Improvement Program
Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address
More informationMemphis and Shelby County Division of Planning & Development
Memphis and Shelby County Division of Planning & Development 125 NORTH MAIN STREET, MEMPHIS, TENNESSEE 38103 Tel: (901) 576 7190 Fax: (901) 576 7272 Mark H. Luttrell, Jr. Mayor, Shelby County A C Wharton,
More informationCC: Ms. Rhiannon Chambers, State Program Development Office, TDOT Mr. Nate Brugler, Local Programs Development Office, TDOT Ms. Meghan Wilson, Local
CC: Ms. Rhiannon Chambers, State Program Development Office, TDOT Mr. Nate Brugler, Local Programs Development Office, TDOT Ms. Meghan Wilson, Local Programs Development Office, TDOT Ms. Whitney Britt,
More informationCity County Building, Suite Main Street Knoxville, Tennessee (865)
City County Building, Suite 403 400 Main Street Knoxville, Tennessee 37902 (865) 215-2500 www.knoxtrans.org January 12, 2017 Tennessee Department of Transportation James K. Polk Building, Suite 600 505
More informationWASATCH FRONT REGIONAL TRANSPORTATION PLAN FINANCIAL PLAN. Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER
WASATCH FRONT REGIONAL TRANSPORTATION PLAN 2007-2030 FINANCIAL PLAN Technical Report 47 May 2007 DAVIS MORGAN SALT LAKE TOOELE WEBER 2030 RTP Financial Plan WASATCH FRONT REGIONAL TRANSPORTATION PLAN
More information7.0 Financially Feasible Plan
Livability 2040 Regional Transportation Plan 7-1 7.0 Financially Feasible Plan The Memphis MPO used a performance-based approach to rank projects for Livability 2040 and incorporated state and local priorities
More informationMEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for TIP M odifications
MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study's Procedures for 2017-2020 TIP M odifications Purpose This Memorandum of Understanding (MOU) establishes a set of procedures to be used by
More informationFinancial Capacity Analysis
FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is
More informationINVESTMENT STRATEGIES
3 INVESTMENT STRATEGIES 70 INVESTMENT STRATEGIES 71 A key role of Mobilizing Tomorrow is to outline a strategy for how the region will invest in transportation infrastructure over the next 35 years. This
More informationTEXAS DEPARTMENT OF TRANSPORTATION
TEXAS DEPARTMENT OF TRANSPORTATION FY 2013-2016 2016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HOUSTON DISTRICT AUGUST 2014 Quarterly Revision HIGHWAY August 2014 . HOUSTON-GALVESTON AREA COUNCIL
More informationPennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Revisions
MEMORANDUM OF UNDERSTANDING Pennsylvania Department of Transportation s Statewide Procedures for 2017-2020 STIP and TIP Revisions Purpose This Memorandum of Understanding (MOU) establishes a set of procedures
More information2012 Boston MPO Transportation Improvement Program
Non- Indicates a change in project cost Indicates removed from TIP (cost not reflected in total) Indicates a project moved in from another TIP element Indicates a project moved out to another TIP element
More informationFY STIP. Paris District STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM. October Out-of-Cycle Revisions HIGHWAY
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Paris District October Out-of-Cycle Revisions October 2011 FY 2012 PAGE: 1 OF 4 1 - PARIS FANNIN 0045-20-017 US 82 LIMITS FROM GRAYSON
More informationPioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017
2017-2021 Pioneer Valley Transportation Improvement Program (TIP) Proposed Amendments January 2017 HIGHWAY AMENDMENTS FEDERAL FISCAL YEAR 2017 Part 1A: Federal Aid Target Projects Increase cost of (604033)
More informationMEMORANDUM OF UNDERSTANDING PROCEDURES FOR STIP AND TIP MODIFICATIONS
MEMORANDUM OF UNDERSTANDING PROCEDURES FOR 2015-2018 STIP AND TIP MODIFICATIONS Lackawanna-Luzerne Transportation Study Metropolitan Planning Organization PURPOSE This Memorandum of Understanding (MOU)
More informationTerre Haute Seelyville West Terre Haute Vigo County. Brazil Harmony Knightsville Clay County
TRANSPORTATION IMPROVEMENT PROGRAM Terre Haute Seelyville West Terre Haute Vigo County Brazil Harmony Knightsville Clay County SFY 2018 2021 Metropolitan Planning Organization West Central Indiana Economic
More informationChapter 6: Financial Resources
Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation
More informationAnnual Listing of Obligated Projects Federal Fiscal Year 2013
Annual Listing of Obligated Projects Federal Fiscal Year 2013 Nashua Regional Planning Commission 9 Executive Park Drive Suite 201 Merrimack, NH 03054 (603) 424-2240 www.nashuarpc.org A N N U A L L I S
More informationMEMORANDUM OF UNDERSTANDING Pennsylvania Department of Transportation s Statewide Procedures for STIP and TIP Modifications
MEMORANDUM OF UNDERSTANDING Pennsylvania Department of Transportation s Statewide Procedures for 2015-2018 STIP and TIP Modifications Purpose This Memorandum of Understanding (MOU) establishes a set of
More informationINVESTING STRATEGICALLY
11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program
More informationAnnual Listing of Federally Obligated Projects
Annual Listing of Federally Projects A summary of Federal transportation obligations in the Jonesboro Metropolitan Planning Area between October 1, 2012, and September 30, 2013 Jonesboro Metropolitan Planning
More information2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION
2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION TEMPO Meeting July 21, 2016 Current Initiatives On-going efforts to address performance-based planning and programming processes as required
More informationChapter 5: Cost and Revenues Assumptions
Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the
More informationCHAPTER 5 INVESTMENT PLAN
CHAPTER 5 INVESTMENT PLAN This chapter of the 2014 RTP/SCS plan illustrates the transportation investments for the Stanislaus region. Funding for transportation improvements is limited and has generally
More informationOkaloosa-Walton 2035 Long Range Transportation Plan Amendment
Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida
More informationAppendix. G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY
Appendix G RTP Revenue Assumptions REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Exhibit G-1 2014 RTP REVENUE FORECAST ASSUMPTIONS LOCAL REVENUES Measure K Sales Tax Renewal Program: Description:
More informationPrioritization and Programming Process. NCDOT Division of Planning and Programming November 16, 2016
Prioritization and Programming Process NCDOT Division of Planning and Programming November 16, 2016 Today s Roadmap 1. Planning and Programming Division Overview 2. Strategic Investments (STI) Law 3. Prioritization
More informationProgram (TIP) to add a new Section 5310 transit project for the Jonesborough Senior Center s vehicle purchase Resolution (Vote Required)
AGENDA JOHNSON CITY MTPO Executive Board / Executive Staff Wednesday, November 14, 2018 at 10:00 a.m. 137 West Market Street, Johnson City, TN Johnson City Transit Center, Training Room Call to Order Item
More informationQUALITY TRANSPORTATION SUMMARY
QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...
More informationDevelopment of the Cost Feasible Plan
March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development
More informationTechnical Memorandum. Finance. Prepared for: Prepared by: In cooperation with: High Street Consulting Group
Technical Memorandum Finance Prepared for: Prepared by: In cooperation with: High Street Consulting Group April 25, 2013 i Table of Contents 1. Ohio Finance... 1 1.1 Baseline Projection -- Highways...
More information2040 Long Range Transportation Plan. Financial Summary
2040 Long Range Transportation Plan Financial Summary FINANCIAL OUTLOOK Establishing MPO Transportation Plan fiscal forecasts for a twenty year planning horizon in today s transportation environment is
More informationAPPENDIX B HIGH PRIORITY INVESTMENT PROGRAM (HPP) ( )
APPENDIX B HIGH PRIORITY INVESTMENT PROGRAM (HPP) (2017-2020) (replaces previous Transportation Improvement Program) ACCESS2040 APPENDIX B HIGH PRIORITY INVESTMENT PROGRAM The High Priority Investment
More informationSTAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION
STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July
More informationSummary Narrative of Amendment 3 to the FFY Transportation Improvement Program for the Northern Middlesex Region
Summary Narrative of Amendment 3 to the FFY 2017 2021 Transportation Improvement Program for the Northern Middlesex Region The following summarizes a proposed amendment to Fiscal Year 2017 of the FFY 2017
More informationTransportation Improvement Program (TIP) Fiscal Year 2018 to 2021
Transportation Improvement Program (TIP) Fiscal Year 2018 to 2021 Approved by the MPO Policy Board on May 24, 2017 Table of Contents Purpose of this Document... 4 Introduction to Charlottesville/Albemarle
More informationFEDERAL FISCAL YEARS TRANSPORTATION IMPROVEMENT PROGRAM. REVISION #12 Amendment 6/3/16 DRAFT. July 2016
FEDERAL FISCAL YEARS 215-218 TRANSPORTATION IMPROVEMENT PROGRAM REVISION #12 Amendment July 216 Oahu Metropolitan Planning Organization 77 Richards Street, Suite 2 Honolulu, Hawaii 96813-4623 (88) 587-215
More information2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION
2017 UNIFIED TRANSPORTATION PROGRAM AND HB 20 IMPLEMENTATION HGAC Transportation Policy Council Meeting Current Initiatives On-going efforts to address performance-based planning and programming processes
More informationFY TRANSPORTATION IMPROVEMENT PROGRAM
FY 2019 2022 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 16, 2018 Approved by the Policy Board: May 21, 2018 Table of Contents Permian Basin MPO Membership and Structure...
More informationBRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION
BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)
More informationAPPENDIX 5 FINANCIAL ANALYSIS
APPENDIX 5 FINANCIAL ANALYSIS Background Starting with the Intermodal Surface Transportation Equity Act of 1991, it has been a consistent requirement of federal law and regulation that the projects included
More informationSKATS FY 2018-FY 2023
SKATS FY 2018-FY 2023 Metropolitan Transportation Improvement Program and Air Quality Conformity Determination PUBLIC REVIEW Salem-Keizer Area Transportation Study Cover Photos Top left: 45th Avenue NE
More informationFAIRBANKS METROPOLITAN AREA TRANSPORTATION SYSTEM POLICIES & PROCEDURES
FAIRBANKS METROPOLITAN AREA TRANSPORTATION SYSTEM POLICIES & PROCEDURES REVISED & APPROVED OCTOBER 21, 2015 P a g e 2 P a g e 3 TABLE OF CONTENTS FMATS POLICIES AND PROCEDURES... 4 No.1 Background Information...
More informationFY TRANSPORTATION IMPROVEMENT PROGRAM
FY 2017 2020 TRANSPORTATION IMPROVEMENT PROGRAM Approved for Public Review and Comment: April 18, 2016 Table of Contents Permian Basin MPO Membership and Structure... 3 Mission Statement... 3 Vision Statement...
More informationTEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P
TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015
More informationOHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY
OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015
More informationTRANSPORTATION IMPROVEMENT PROGRAM REVISION 19 F E D E R A L F I S C A L Y E A R S Expedited Administrative Modifications
TRANSPORTATION IMPROVEMENT PROGRAM F E D E R A L F I S C A L Y E A R S 2 0 1 5 2 0 1 8 REVISION 19 Expedited Administrative Modifications TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2015-2018
More informationContents. Alamo Area Metropolitan Planning Organization. Introduction S. St. Mary s Street San Antonio, Texas 78205
Contents Introduction 1 Alamo Area Metropolitan Planning Organization Tel 210.227.8651 Fax 210.227.9321 825 S. St. Mary s Street San Antonio, Texas 78205 www.alamoareampo.org aampo@alamoareampo.org Pg.
More informationLehigh Valley Transportation Study s Procedures for Transportation Improvement Program Revisions
Purpose MEMORANDUM OF UNDERSTANDING Lehigh Valley Transportation Study s Procedures for 2019-2022 Transportation Improvement Program Revisions This Memorandum of Understanding (MOU) between the Pennsylvania
More informationFinancial Analysis. Regional Transportation Plan
Financial Analysis Regional Transportation Plan 2030 161 Regional Transportation Plan 2030 162 Financial Capacity Analysis Introduction This section of the Regional Transportation Plan 2030 presents an
More informationMEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.
MEMORANDUM To: MPO Technical and Citizens Advisory Committees From: Joshua Desmond, AICP BMCMPO Director Date: March 15, 2017 Re: FY 20182021 TIP s Proposal The MPO is developing the s 2018 through 2021
More informationGLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.
Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding
More information3. Performance targets for asset condition and system performance (Attached) John Madera, NSVRC
Winchester-Frederick County MPO Policy Board Meeting Agenda Frederick County Administrative Offices - First Floor Conference Room 107 N. Kent Street, Winchester, VA October 17, 2018-10:00 a.m. 1. ADMINISTRATIVE
More information2016 Boston Region MPO Transportation Improvement Program
Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected
More informationTRANSPORTATION IMPROVEMENT PROGRAM MODIFICATION POLICY Policies and Procedures to Streamline Project Delivery
The Transportation Improvement Program (TIP) is a staged, multi-year program of projects approved for funding with federal, State, and local funds within the Dallas-Fort Worth area. A new TIP is approved
More informationRegional Transportation Plan 2040
South Jersey Transportation Planning Organization Regional Transportation Plan 2040 Technical Appendix #6: Financial Plan SJTPO July 2012 Version: July 16, 2012 The FHWA and FTA developed and issued the
More informationCity Engineers Association of Minnesota Annual Conference January 31, 2013
City Engineers Association of Minnesota Annual Conference January 31, 2013 Highway User Tax Distribution (HUTD) Fund Gas Tax Registration Tax Motor Vehicle Sales Tax (MVST) Trunk Highway Fund County State
More informationMetroplan White Paper
Background White Paper 30 Crossing Plan and TIP Amendments The 30 Crossing Project is a major design-build-finance reconstruction and expansion project on I-40 from the US 67/167 interchange to the north
More informationJACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)
HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N
More informationFunding Update. House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.
Funding Update House Transportation Subcommittee on Long-Term Infrastructure Planning September 10, 2015, 9:00 A.M. Capitol Extension E2.012 Transportation Funding Sources for the FY 2016-2017 Biennium
More informationWednesday, June 6, 2018
Wednesday, June 6, 2018 Excellence in Program Administration Award 2018 AASHTO Civil Rights Training Symposium Excellence in Program Administration Award Joanna McFadden EEO/DBE Section Head APRIL 2017-2018
More informationUNIFIED TRANSPORTATION PROGRAM
2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION
More informationFEDERAL FISCAL YEAR TRANSPORTATION IMPROVEMENT PROGRAM
FEDERAL FISCAL YEAR 2016 2019 TRANSPORTATION IMPROVEMENT PROGRAM A regional program of surface transportation improvement projects to enhance the movement of goods and people along the greater Des Moines
More informationChapter 15. Transportation Improvements Financing. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan
Chapter 15 Transportation Improvements Financing Ohio Kentucky Indiana Regional Council of Governments 2030 Regional Transportation Plan CHAPTER 15 TRANSPORTATION IMPROVEMENTS FINANCING INTRODUCTION As
More informationMINUTES. TECHNICAL COORDINATING COMMITTEE Of the. Nashville Area Metropolitan Planning Organization. March 3, 2010
MINUTES TECHNICAL COORDINATING COMMITTEE Of the Nashville Area Metropolitan Planning Organization March 3, 2010 Attendees: Ms. Lora Baulsir, Mr. Kirk Bednar, Mr. Rick Bernhardt, Mr. Tom Brashear, Mr. Michael
More informationFY Transportation Improvement Program (TIP)
Corvallis Area Metropolitan Planning Organization (CAMPO) FY2015-2018 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board July 27, 2016
More informationPotential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3
Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation
More informationTwin Cities Area Transportation Study (TwinCATS) Adopted:
Introduction Twin Cities Area Transportation Study (TwinCATS) Transportation Improvement Program Administrative Modification & Amendment Policy Adopted: This document provides guidance that defines the
More informationFY February Quarterly Revision. Bryan DISTRICT
FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation
More informationI-64 Capacity Improvements Segment III Initial Financial Plan
I-64 Capacity Improvements Segment III Initial Financial Plan State Project # 0064-965-229/0064-099-229 P101, R201, C501, B638, B639, B640, B641, B642, B643, D609, D610, D611 Federal # NHPP-064-3(498)/
More information...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.
DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend
More information10-Year Capital Highway Investment Plan DRAFT
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway
More informationALL Counties. ALL Districts
TEXAS TRANSPORTATION COMMISSION ALL Counties rhnute ORDER Page of ALL Districts The Texas Transportation Commission (commission) finds it necessary to propose amendments to. and., relating to Transportation
More informationFY Transportation Improvement Program: STP-MM Project Selection. Transportation Policy Board Meeting March 26, 2018
FY 2019-2022 Transportation Improvement Program: STP-MM Project Selection Transportation Policy Board Meeting March 26, 2018 Timeline July 26, 2017 2 STP-MM: Overview $150 - $170 million available to program
More informationDRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0
UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering
More informationBirmingham-Jefferson County Transit Authority P.O. Box Birmingham, AL Phone: (205) Fax: (205)
Birmingham-Jefferson County Transit Authority P.O. Box 10212 Birmingham, AL 35202-0212 Phone: (205) 521-0161 - Fax: (205) 521-0154 Program of Projects For Federal Fiscal Year 2018 (Utilizing FFY 2017 Apportionments)
More informationTransportation Committee
Business Item No. 2013-341 Consent Transportation Committee Meeting date: December 9, 2013 For the Metropolitan Council meeting of January 15, 2014 Subject: 2014-2017 TIP Amendment for North Urban Regional
More informationAmendments and Administrative Actions Guidelines
NORTHEASTERN PENNSYLVANIA METROPOLITAN PLANNING ORGANIZATION (NEPA MPO) 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AMENDMENTS AND ADMINISTRATIVE ACTIONS GUIDELINES AND PROCEDURES MEMORANDUM OF
More informationOHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY
OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY Revised 9/19/2017 TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW... 3 MPO AND LARGE CITY SFY 2017 STBG BUDGET SUMMARY... 4 MPO AND LARGE CITY
More informationTechnical Report No. 4. Revenue and Costs
Technical Report No. 4 Revenue and Costs Technical Report No. 4 REVENUE AND COSTS PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph (727) 847-8140, fax (727)
More informationMemphis Urban Area Metropolitan Planning Organization Department of Regional Services 125 North Main Street, Suite 450 Memphis, TN
1 Memphis Urban Area Metropolitan Planning Organization Department of Regional Services 125 North Main Street, Suite 450 Memphis, TN 38103 901.576.7190 (phone) 901.576.7272 (fax) www.memphismpo.org 2 This
More informationCapital Improvement Projects
Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend
More informationTransportation Improvement Program Page 39
Fiscal Year CSJ Project # Facility From To 1 - Preventive Maintenance 2019 2022 Transportation Improvement Program Page 39 2U - Urban Mobility 3LC - Local Contribution 4 - Congestion, Connectivity, Corridor
More informationFY Transportation Improvement Program (TIP)
Corvallis Area Metropolitan Planning Organization (CAMPO) FY2018-2021 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board May 17, 2017
More informationSubject: Completeness Determination Amendment to the Memphis Urban Area FY Transportation Improvement Program (TIP)
Date: May 6, 2016 Subject: Completeness Determination Amendment to the Memphis Urban Area FY 2014-17 Transportation Improvement Program (TIP) From: Pragati Srivastava, Administrator Memphis MPO The Memphis
More information2035 Long Range Transportation Plan Update
Broward MPO 2035 Long Range Transportation Plan Update Technical Report # 6 Prepared by: In association with: December 2009 TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Purpose... 1 1.2 Methodology and
More informationPENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE
November 20, 2015 Revised December 18, 2015 to reflect FAST Act PENNSYLVANIA S 2017 TRANSPORTATION PROGRAM FINANCIAL GUIDANCE This is a collaborative product jointly developed by the Pennsylvania Planning
More informationANNUAL PERFORMANCE AND EXPENDITURE REPORT
ANNUAL PERFORMANCE AND EXPENDITURE REPORT FY 2014 Task 1 ADMINISTRATION AND MANAGEMENT Task 1 encompasses the general administration of the Victoria MPO s transportation planning process. This is achieved
More informationSFY 2018 (July 1, 2017 to June 30, 2018) Annual Report
SFY 2018 (July 1, 2017 to June 30, 2018) Annual Report Thurston Regional Planning Council UNIFIED PLANNING WORK PROGRAM Annual Report for second year of TRPC s UPWP State Fiscal Years 2017-2018 (July 1,
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM TIP FY 2006-2008 METROPOLITAN PLANNING ORGANIZATIONS - FY 2006 FEDERAL STATE LOCAL OTHER PART TOTAL FUNDING ESTIMATED COST BROWNSVILLE HARLINGEN-SAN BENITO
More informationChapter 4: Regional Transportation Finance
4.1 Chapter 4: Regional Transportation Finance 2040 4.2 CONTENTS Chapter 4: Transportation Finance Overview 4.3 Two Funding Scenarios 4.4 Current Revenue Scenario Assumptions 4.5 State Highway Revenues
More informationAmendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN
Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN February, 2011 Prepared by the Ohio-Kentucky-Indiana Regional Council of Governments Acknowledgments Title Amendment 6 - OKI 2030 Regional Transportation
More informationTEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE
TEXAS TRANSPORTATION FUNDING, INCLUDING TEXAS CLEAR LANES AND CONGESTION RELIEF UPDATE Presentation for Texas Transportation Commission March 28, 2018 Purposes of the Workshop The Texas Transportation
More information4.A.14-2
4.A.14-1 4.A.14-2 Administration and Projects Committee STAFF REPORT Meeting Date: June 2, 2016 Subject Summary of Issues FY 2016-17 Proposed Budget for the Contra Costa Transportation Authority and Congestion
More informationApril 24, Subject: Amendments to the FY Transportation Improvement Program
CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments
More information