1 METRO METRO METRO CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit service to the Washington Metropolitan region. WMATA's Adopted FY FY 2022 Capital Budget consists of $6.0 billion of critical system projects necessary to maintain the Metrobus, Metrorail, and Metroaccess systems over the next six years. The program focuses heavily on replacement / rehab of the system's aging rail infrastructure with minimal enhancement investments. Also included is the funding of an additional series railcars and associated rail power system upgrades. These additional railcars will be used to retire all 192 of the original 5000-series railcars, one of the most unreliable series in the current fleet. The remaining 28 railcars will be used for minimal capacity expansion along the red line. Funding for the WMATA capital program is from a combination of state, federal, regional and local sources. For Arlington, the total adopted six-year funding commitment is approximately $186 million, consisting of $106 million of annual subsidy payments, and $80 million of planned debt issuance by WMATA. Over ten-years, Arlington has programmed $280 million, with increased funding in the out-years primarily for service expansion projects. This fully funds Arlington's baseline funding of WMATA, and funds $55 million of planned debt issuance based on historical capital program execution rates. A combination of general obligation bonds, state grants and regional gas tax are used to fund Arlington's share of WMATA subsidy. A new multi-year capital funding agreement is currently being drafted among WMATA contributing jurisdictions to cover fiscal years and is anticipated to begin in the fall of Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Neighborhood(s): Project Justification Arlington County participates in funding of WMATA operating and capital needs as required and agreed to in the WMATA Compact. Annual capital commitments are determined by formula which sets forth the County's share of rail, bus, and other general capital improvements. Currently, the formula provides that Arlington County funds approximately 8.3% local jurisdictional capital costs. WMATA's multi-year capital improvement program (CIP) is the planning document that is adopted annually by contributing jurisdictions and reaffirms each locality's annual funding commitment for capital projects. More information on WMATA's CIP can be found at E-1

2 Changes from Prior CIP WMATA planned debt has increased an additional $544 million to a total of $984 million due to the exercising of two options contracts for 220 additional rail cars and associated power upgrades. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $280,200 Costs include the County's share of debt service on $56 million in WMATA issued debt in Fiscal Years Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 11,400 11,400 11,900 5,600 9,300 8,300 8,800 8,300 8,700 8,700 92,400 Developer Contributions New Bond Issue 15,000 15,000 13,000 15,000 9,000 10,600 10,200 10,700 11,300 11, ,100 PAYG Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF)-C&I ,000 7,000 7,000 7,000 7,000 7,000 41,000 TCF - HB2313 Local Subtotal New Funding 26,400 26,400 24,900 20,600 24,300 25,900 26,000 26,000 27,000 27, ,500 Previously Approved Funding Authorized but Unissued Bonds 10,000 6, ,000 Issued but Unspent Bonds 9, ,700 Other Previously Approved Funds Subtotal Previously Approved Funding 19,700 6, ,700 Revenues 46,100 32,400 24,900 20,600 24,300 25,900 26,000 26,000 27,000 27, ,200 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs 1,050 2,385 3,733 5,145 6,114 7,068 7,924 8,606 9,389 10,285 61,699 Net Operating Cost 1,050 2,385 3,733 5,145 6,114 7,068 7,924 8,606 9,389 10,285 61,699 Notes on Funding Schedule Funding in Fiscal Years includes $41 million of funding from the Transportation Capital Fund. This funding is above and beyond the funding commitment in the current WMATA Capital Funding Agreement (CFA), and is for new projects to be negotiated as part of the next CFA that will be adopted in Notes on Operating Costs New FTEs (#): 0 E-2

3 Arlington County, Virginia TRANSPORTATION PROGRAMS Program Description The FY FY 2026 Transportation Capital Improvement Plan (CIP) continues Arlington County's commitment to developing, maintaining and managing a multimodal transportation system that expands travel choice and provides equal access for all users. During the next 10 years, Arlington plans to invest $1.3 billion in a range of capital improvements that seek to enhance the quality of life and economic well-being of its residents, workers and visitors. The plan funds a broad range of complete street projects to enhance accessibility in the County s neighborhoods, Metrorail station projects to improve accessibility and safety for users, efforts to maintain and reconstruct County bridges, improvements to street lights and signals, and enhancements to parking and the pedestrian and bicycle network. The CIP program reflects the goals and objectives set forth in Arlington's Master Transportation Plan and other County planning efforts. In response to the cancellation of the Columbia Pike-Crystal City streetcar program from the previous CIP, this proposed CIP includes investments to create a Premium Transit Network that will offer faster, more reliable and easier-to-use bus service connecting Columbia Pike, Pentagon City, Crystal City and Potomac Yard. Projects supporting this effort include street improvements such as dedicated bus lanes and transit signal priority, new transit stations, real-time bus arrival information, bus purchases and development of bus maintenance/parking facilities. Funding for the transportation CIP program comes from a balance of federal, state, regional and local sources. Two primary sources of local revenues for this program are the Transportation Capital Fund (TCF) Commercial and Industrial (C&I) Tax and Crystal City, Potomac Yard, Pentagon City Tax Increment Financing (TIF). The TCF is funded by an additional real estate tax on commercial and industrial properties for transportation initiatives; the rate is currently set at $0.125 per $100 of assessed value. The TIF uses a portion of incremental property tax revenue generated by new development and property appreciation in Crystal City, Potomac Yard and Pentagon City to fund infrastructure improvements in those areas. Arlington s transportation CIP program also benefits from transportation funding legislation (House Bill 2313) enacted by the 2013 Virginia General Assembly. This legislation raises transportation revenues for Northern Virginia localities through a series of state-imposed regional taxes and fees. Revenues are collected by the state and distributed to the Northern Virginia Transportation Authority (NVTA). Of these revenues, 70 percent (NVTA Regional) are retained by the NVTA to fund regional transportation projects through a competitive selection process. The remaining 30 percent (NVTA Local) is returned to the member localities, based on the amount of revenue generated by the taxes and fees within the locality, to be used for locally selected transportation projects. The CIP includes information on individual projects and an estimate of required funding. The CIP is structured to provide maximum flexibility, enabling the County to adapt project priorities to fluctuations in available state and federal dollars. The actual projects undertaken during this 10-year plan may vary in order to maximize state and federal reimbursements. E-3

4 Arlington, Virginia CRYSTAL CITY PLAN IMPROVEMENTS The Crystal City Sector Plan establishes an overall vision and planning framework for the Crystal City, Potomac Yard, Pentagon City neighborhoods to thrive following the economic dislocation caused by the federal Base Realignment and Closure Commission (BRAC) decisions. The plan envisions significant public infrastructure improvements in streets, transit, and public open spaces over the next 20 years that will benefit the area. The proposed FY 2017 FY 2026 CIP includes an expenditure plan for these improvements that totals over $225 million in new and previously approved funding. In response to the cancellation of the Columbia Pike-Crystal City streetcar program from the previous CIP, this proposed CIP includes investments to create a Premium Transit Network (PrTN) that will offer faster, more reliable and easier-to-use bus service connecting Columbia Pike, Pentagon City, Crystal City and Potomac Yard. Projects supporting this effort include street improvements such as dedicated bus lanes and transit signal priority, new transit stations, real-time bus arrival information, bus purchases and development of bus maintenance/parking facilities. The Crystal City/Potomac Yard/Pentagon City Tax Increment Financing district (TIF) was created in FY 2011, and provides a portion of the financing for implementing the sector plan. TIF funding totals $54.6 million in the current 10-year CIP. Additional funding will be provided by the state and federal governments, Arlington s Transportation Capital Fund (TCF), general obligation bonds, and developer contributions. The following projects in the FY 2017 FY 2026 CIP funded (fully or partially) by TIF are: Project Name Page Reference Army Navy Drive Street Improvements E-78 Potomac Yard / Four Mile Run Trail Connection E-81 (See BikeArlington) Boundary Channel Drive Interchange E-83 Crystal City Parks and Open Space C-21 Crystal City, Pentagon City, Potomac Yard Streets E-96 PrTN Off Vehicle Fare Collection E-61 PrTN Transitway Extension to Pentagon City E-66 PrTN Transitway Extension (Potomac Ave-Alexandria) E-69 E-4

5 In addition, the following projects are not part of the Crystal City Sector plan and are not funded by the TIF but could benefit the areas in the sector plan: Project Name Page Reference Crystal City Metro Station East Entrance E-47 Commuter Store E-94 Pentagon City Metro Station Second Elevator E-52 E-5

6 10-YEAR TRANSPORTATION CAPITAL FUND BALANCE FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Sources: Beginning Balance 131, ,515 72,525 51,317 44,061 48,900 68,418 81,920 96, ,705 Commercial Real Estate Tax Revenues 24,783 25,068 25,445 26,018 26,695 27,443 28,266 29,114 29,987 30,887 NVTA Local 30% Revenues 11,814 12,071 12,305 12,551 12,842 13,140 13,486 13,843 14,211 14,589 Sources 168, , ,275 89,887 83,597 89, , , , ,182 Uses: Current Year Capital Projects 7,346 15,621 41,529 29,502 21,404 13,849 20,842 20,912 12,153 9,780 Spending for Projects Authorized in Prior Years 55,025 43,224 10,751 9,492 6, Program Administration 3,659 3,714 3,775 3,857 3,953 4,058 4,176 4,295 4,420 4,548 Existing Debt Service Operating Costs 2 1,372 1,897 2,238 2,311 2,421 2,494 2,569 2,107 2,118 2,183 Uses 68,075 65,129 58,958 45,826 34,697 21,065 28,250 28,018 19,352 17,172 TCF Balance 100,515 72,525 51,317 44,061 48,900 68,418 81,920 96, , ,010 Reserve 3,660 3,714 3,775 3,857 3,954 4,058 4,175 4,296 4,420 4, IDA bonds for transportation improvements at Buckingham Village neighborhood. 2 Operating costs includes lease costs for ART bus storage and other operating costs of projects as permitted for each revenue source under Virginia Code. E-6

7 10-YEAR TAX INCREMENT FINANCING FUND BALANCE FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 Sources: Beginning Balance 11,273 6,964 5,160 3,150 2,887 4,007 7,145 8,574 10,841 15,535 Real Estate Tax Revenues 4,812 5,085 5,634 6,190 6,851 7,618 8,499 9,499 10,524 11,574 Sources 16,085 12,049 10,794 9,340 9,738 11,625 15,643 18,073 21,365 27,109 Uses: Current Year Capital Projects 1,193 4,671 5,137 5,821 5,337 4,074 6,651 6,802 5,387 4,562 Spending for Projects Authorized in Prior Years 7,578 1,857 2, Program Administration Uses 9,121 6,889 7,644 6,453 5,731 4,480 7,069 7,232 5,830 5,019 TIF Balance 6,964 5,160 3,150 2,887 4,007 7,145 8,574 10,841 15,535 22,090 Reserve ,052 1,157 E-7

8 FY 2017 FY 2026 Transportation Funding Plan E-8

9 Program Previous Funding Transp Cap Fund FY 2017 (000s) Transp Cap Fund FY 2018 (000s) NVTA 30% Local Crystal City NVTA 70% County GO Complete Streets $0.125 C&I Tax TIF Regional County PAYG Bonds Fed State Developer /Other FY 2017 $0.125 C&I Tax TIF Regional County PAYG Bonds Fed State Developer /Other FY 2018 Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street 4, BIKEArlington 4, Boundary Channel Drive Interchange 8, Bridge Renovation 4, , ,051 Capital Bikeshare Columbia Pike Streets 71,140-5,050 5,050 Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets 13, ,600 12, ,282 4,679 East Falls Church Streets 1, Improvements Outside Major Corridors 19, ,875 2, ,233 2,580 Intelligent Transportation Systems 4, , , , ,950 Lee Highway Multimodal Improvements Neighborhood Complete Streets 1, Parking Meters ,363 1,363 Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements 18,009 3,320 2, ,055 5,060 5,060 Safe Routes To Schools 1, ,500 1, ,500 1,895 Strategic Network Analysis and Planning Street Lighting , ,041 Transportation Asset Management Transportation Systems & Traffic Signals 12, , ,193 WALKArlington 1, TOTAL COMPLETE STREETS 168,700 4,321 2,643 1,111 14,600 1,345 1,485 1,100 4,675 2,235 33,515 6,386 5,083 4, ,816 3,207 1,718 2,487 6,550 36,471 Transit 4 - ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ,507 2, , ,149 ART Fueling and Bus Wash Facility 5, ART Heavy Maintenance Facilities 5,358 2,735 2,735 1, ,951 ART Satellite Parking Facility Ballston Multimodal Improvements 3, Ballston-MU Metro Station West Entrance 14, Bus Bay Expansion-East Falls Church Metro Station ,841 1,980 5,821 Bus Stop Accessibility Improvements 1, Bus Stop and Shelter Program Court House Metro Station Second Elevator 1, ,549 1,796 5,345 Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Pentagon City Metro Station Second Elevator 4, PrTN: ART Fleet Expansion ,558 6,064 PrTN: Columbia Pike Transit Stations 11, PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program 1, PrTN: Transitway Extension to Pentagon City 14, PrTN: Transitway Extension(Potomac Ave-Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Transit Development Plan Updates TOTAL TRANSIT 67, ,824-7,009 4, , ,689 13,673-26,413 Maintenance Capital Bridge Maintenance Curb & Gutter Missing Links Paving 7,173 1,297 11,990 13,287 2,710 11,900 14,610 Traffic Calming Device Maintenance TOTAL MAINTENANCE CAPITAL 7, ,547 12, , ,181 12, ,184 Program Administration - 2,478 1, ,009 2,507 1, ,075 TOTAL CAPITAL 244,161 7,040 3,965 1,543 14,600 3,613 13,575 1,100 10,499 2,235 58,170 13,045 6,290 5,032 6,613 9,836 15,210 3,407 16,160 6,550 82,143 Operating ,075 1, ,591 1,897 TOTAL TRANSPORTATION PROGRAM 244,161 7,337 5,040 1,543 14,600 3,613 13,575 1,100 10,499 2,235 59,542 13,351 7,881 5,032 6,613 9,836 15,210 3,407 16,160 6,550 84,040 NVTA 30% Local Crystal City NVTA 70% County GO E-9

10 Program Transp Cap Fund FY 2019 (000s) Transp Cap Fund FY 2020 (000s) Complete Streets Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street BIKEArlington Boundary Channel Drive Interchange Bridge Renovation Capital Bikeshare Columbia Pike Streets Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets East Falls Church Streets Improvements Outside Major Corridors Intelligent Transportation Systems Lee Highway Multimodal Improvements Neighborhood Complete Streets Parking Meters Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements Safe Routes To Schools Strategic Network Analysis and Planning Street Lighting Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington Transit 4 ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ART Fueling and Bus Wash Facility ART Heavy Maintenance Facilities ART Satellite Parking Facility Ballston Multimodal Improvements Ballston-MU Metro Station West Entrance TOTAL COMPLETE STREETS Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metro Station Second Elevator Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Pentagon City Metro Station Second Elevator PrTN: ART Fleet Expansion PrTN: Columbia Pike Transit Stations PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension(Potomac Ave-Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Transit Development Plan Updates Maintenance Capital Bridge Maintenance Curb & Gutter Missing Links Paving Traffic Calming Device Maintenance TOTAL TRANSIT TOTAL MAINTENANCE CAPITAL $0.125 C&I Tax NVTA 30% Local Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Developer /Other FY 2019 $0.125 C&I Tax Fed State ,625 4,411 7, ,061 1,061 2,814 1,459 1,340 5, , ,724 16,724 5,976 5, ,379 3,320 2,038 3,812 5, , , , ,121 1, , ,200 3, , , , ,000 3, ,026 1,404 1, ,300 7,300 6,787 1,213 8, ,500 1, ,000 1, ,188 1, , , , , , , ,826 6,393 5,037 7,411 5,342 1,899 2,303 1,795 1,700 59,706 16,920 8,860 5,271 3,000 3,550 4,426 1,316 1,464 2,413 47, , , , , , ,657 4,459 13,116 9,026 4,650 13, ,371 19,971 18,357 9,584 27, , , ,536 3,149 1,577 9, , , , ,362 8,570 25, ,248 2,809 5, ,185-1, ,360 3, , ,178 1, , ,401-1,840 5, , , , ,178 1,114-2,220 31,198 1,577 56,697 2,262 1, , ,787 30, , ,790 10,400 13,190 2,870 10,710 13, ,267 10, , ,361 10, ,180 NVTA 30% Local Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Fed State Developer /Other FY 2020 Program Administration Operating TOTAL CAPITAL TOTAL TRANSPORTATION PROGRAM 2,544 1, ,146 2,602 1, ,239 37,061 8,243 5,508 20,589 9,723 12,405 4,523 32,993 3, ,322 21,784 11,575 6,203 56,074 7,841 15,245 3,103 32,070 3, , ,923 2, ,986 2,311 37,376 10,166 5,508 20,589 9,723 12,405 4,523 32,993 3, ,560 22,109 13,561 6,203 56,074 7,841 15,245 3,103 32,070 3, ,419 E-10

11 Program Transp Cap Fund FY 2021 (000s) Transp Cap Fund FY 2022 (000s) Complete Streets Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street BIKEArlington Boundary Channel Drive Interchange Bridge Renovation Capital Bikeshare Columbia Pike Streets Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets East Falls Church Streets Improvements Outside Major Corridors Intelligent Transportation Systems Lee Highway Multimodal Improvements Neighborhood Complete Streets Parking Meters Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements Safe Routes To Schools Strategic Network Analysis and Planning Street Lighting Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington Transit 4 ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ART Fueling and Bus Wash Facility ART Heavy Maintenance Facilities ART Satellite Parking Facility Ballston Multimodal Improvements Ballston-MU Metro Station West Entrance TOTAL COMPLETE STREETS Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metro Station Second Elevator Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Pentagon City Metro Station Second Elevator PrTN: ART Fleet Expansion PrTN: Columbia Pike Transit Stations PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension(Potomac Ave-Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Transit Development Plan Updates Maintenance Capital Bridge Maintenance Curb & Gutter Missing Links Paving Traffic Calming Device Maintenance TOTAL TRANSIT TOTAL MAINTENANCE CAPITAL $0.125 C&I Tax NVTA 30% Local Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Developer /Other FY 2021 $0.125 C&I Tax Fed State ,500 2, ,716 2,000 3, ,182 1,932 1, ,031 1,238 1,238 1,792 1, ,188 5,337 7,525 1,124 4,051 5, , ,371 1, , , , ,970 2,000 2, , , ,000 1,750 6, ,000 2, ,000 1, , ,745 1, , ,050 2, , , , ,376 11,818 5,337 5,000 4,551 4, ,482 2,950 44,911 3,365 9,312 4, ,979 3,119 1,396 1,575 2,050 29, , , , , ,200 8,323 5,957 24,480 1,509 5,660 9,477 16, , , ,852 8,826 25, ,890 6,274 18,454-2,455 4,766 7, , , ,300 1,870 5, , ,658 1,138-1,691 20,706 5,957 64, ,418 2,237-4,984 16,232 14,243 52, ,960 11,030 13,990 3,050 11,360 14, ,467 11, , ,572 11, ,048 NVTA 30% Local Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Fed State Developer /Other FY 2022 Program Administration Operating TOTAL CAPITAL TOTAL TRANSPORTATION PROGRAM 2,669 1, ,347 2,744 1, ,464 11,669 13,688 5,731 38,658 9,156 15,840 2,391 22,188 8, ,228 6,731 11,176 4,480 13,918 9,788 14,595 6,380 17,807 16, , ,087 2, ,150 2,494 12,003 15,775 5,731 38,658 9,156 15,840 2,391 22,188 8, ,649 7,075 13,326 4,480 13,918 9,788 14,595 6,380 17,807 16, ,662 E-11

12 Program Transp Cap Fund FY 2023 (000s) Transp Cap Fund FY 2024 (000s) Complete Streets Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street BIKEArlington Boundary Channel Drive Interchange Bridge Renovation Capital Bikeshare Columbia Pike Streets Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets East Falls Church Streets Improvements Outside Major Corridors Intelligent Transportation Systems Lee Highway Multimodal Improvements Neighborhood Complete Streets Parking Meters Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements Safe Routes To Schools Strategic Network Analysis and Planning Street Lighting Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington Transit 4 ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ART Fueling and Bus Wash Facility ART Heavy Maintenance Facilities ART Satellite Parking Facility Ballston Multimodal Improvements Ballston-MU Metro Station West Entrance TOTAL COMPLETE STREETS Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metro Station Second Elevator Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Pentagon City Metro Station Second Elevator PrTN: ART Fleet Expansion PrTN: Columbia Pike Transit Stations PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension(Potomac Ave-Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Transit Development Plan Updates Maintenance Capital Bridge Maintenance Curb & Gutter Missing Links Paving Traffic Calming Device Maintenance TOTAL TRANSIT TOTAL MAINTENANCE CAPITAL $0.125 C&I Tax NVTA 30% Local Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Fed State Developer /Other FY 2023 $0.125 C&I Tax Fed State 2,000 2, , ,757 1,228 2, ,000 6, , ,230 1,720 1, ,187 1,231 1, ,187 6,413 10,600 4,459 5,516 9, , ,382 1, , , , ,970 1,000 1,000 7,700 7, , , ,025 5,000 1, , , ,855 1, , , ,250 1,050 2, , ,379 10,461 6,413 4,000 4,225 3,291 1, ,575 41,508 8,902 10,512 5,516 7,700 4,327 2, ,530 2,750 45, , , , ,194 10,762 6,625 19, , , ,186 3,582 2, ,568 17,296 8,910 26, ,976 2,470 4, , , ,242 2, , , , ,149 1,286 19,272 2,294-8,307 14,017-46, ,140 11,700 14,840 3,230 12,050 15, ,677 11, , ,783 12, ,956 NVTA 30% Local Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Developer /Other FY 2024 Program Administration Operating TOTAL CAPITAL TOTAL TRANSPORTATION PROGRAM 2,827 1, ,594 2,911 1, ,725 10,448 14,570 7,069 18,344 8,845 15,110 2,208 10,939 4,802 92,335 12,162 13,045 7,232 26,972 10,404 15,160 9,207 15,547 2, , ,214 2, ,742 2,107 10,803 16,784 7,069 18,344 8,845 15,110 2,208 10,939 4,802 94,904 12,527 14,787 7,232 26,972 10,404 15,160 9,207 15,547 2, ,586 E-12

13 Complete Streets Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street BIKEArlington Boundary Channel Drive Interchange Bridge Renovation Capital Bikeshare Columbia Pike Streets Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets East Falls Church Streets Improvements Outside Major Corridors Intelligent Transportation Systems Lee Highway Multimodal Improvements Neighborhood Complete Streets Parking Meters Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements Safe Routes To Schools Strategic Network Analysis and Planning Street Lighting Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington Transit 4 ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ART Fueling and Bus Wash Facility ART Heavy Maintenance Facilities ART Satellite Parking Facility Ballston Multimodal Improvements Ballston-MU Metro Station West Entrance TOTAL COMPLETE STREETS Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metro Station Second Elevator Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Pentagon City Metro Station Second Elevator PrTN: ART Fleet Expansion PrTN: Columbia Pike Transit Stations PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension(Potomac Ave-Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Program Transit Development Plan Updates Maintenance Capital Bridge Maintenance Curb & Gutter Missing Links Paving Traffic Calming Device Maintenance TOTAL TRANSIT TOTAL MAINTENANCE CAPITAL Transp Cap Fund $0.125 C&I Tax NVTA 30% Local Crystal City TIF NVTA 70% Regional FY 2025 (000s) County PAYG County GO Bonds Developer /Other FY 2025 Transp Cap Fund $0.125 C&I Tax NVTA 30% Local FY 2026 (000s) Funding Through 2026 Project Cost Fed State Fed State - - 5,150 5, ,058 12, ,000 1, ,049 20, ,685 19,331 1,270 1,267 2, ,305 1,379 16,482 21, ,215 1,215 9,961 10, ,900 99, ,421 2,421 3,288 5,387 8, ,562 5,325 73,840 87, ,056 6,106 1, ,527 1, ,603 27,350 47, , ,970 31,090 35,190 4,000 4,000 1,700 1,700 20,000 20, , ,206 8,043 9, ,527 6, ,397 3, , ,750 3,000 3,000 48,665 66, ,845 10, ,100 6,100 1, ,960 1, ,025 19,951 20, ,330 5, , , , ,250 32,707 45, ,828 7,560 4,936 6,448 5,387 4,000 4,824 3,383 1,700 1,567 1,500 33,745 2,101 6,813 4,562 1,700 5,008 3, ,000 27, , , , ,206-27,445 27, , ,733 11, , ,478 36, ,698 20, , , , ,993 6, , ,886 15,025 16, ,349 4, ,984 18, ,302 72,495 18,638 9,601 28,239 17,706 9,122 26,828 96,062 96, , ,019 16, ,705 13, ,177 11, ,950 7, ,889 26, ,352 2, ,850 2, , ,122 1, ,638 1,825-7,404 11,353-39, ,706 1, ,108-30, , , ,819 4, ,147 1,147 3,330 12,410 15,740 3,430 12,790 16, , , ,146 1, ,900 12, , ,017 12, , , ,245 Crystal City TIF NVTA 70% Regional County PAYG County GO Bonds Developer /Other FY 2026 Program Administration Operating TOTAL CAPITAL TOTAL TRANSPORTATION PROGRAM 2,999 1, ,863 3,089 1, ,005 44,467 44,467 8,301 8,272 5,830 22,638 10,549 15,920 9,104 12,920 1,500 95,034 5,567 8,761 5,019 19,406 10,198 16,400 1,392 10,408 3,000 80,151 1,041,138 1,285, ,742 2, ,795 2,183 21,710 21,710 8,677 10,014 5,830 22,638 10,549 15,920 9,104 12,920 1,500 97,152 5,955 10,556 5,019 19,406 10,198 16,400 1,392 10,408 3,000 82,334 1,062,848 1,307,009 E-13

14 Program GO Bonds Breakdown of Previous Funding by Project Transp Cap Fund Complete Streets Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street BIKEArlington Boundary Channel Drive Interchange Bridge Renovation Capital Bikeshare Columbia Pike Streets Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets East Falls Church Streets Improvements Outside Major Corridors Intelligent Transportation Systems Lee Highway Multimodal Improvements Neighborhood Complete Streets Parking Meters Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements Safe Routes To Schools Strategic Network Analysis and Planning Street Lighting Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington Transit 4 ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ART Fueling and Bus Wash Facility ART Heavy Maintenance Facilities ART Satellite Parking Facility Ballston Multimodal Improvements Ballston-MU Metro Station West Entrance TOTAL COMPLETE STREETS Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metro Station Second Elevator Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance Pentagon City Metro Station Second Elevator PrTN: ART Fleet Expansion PrTN: Columbia Pike Transit Stations PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension(Potomac Ave-Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Transit Development Plan Updates Maintenance Capital Bridge Maintenance Curb & Gutter Missing Links Paving Traffic Calming Device Maintenance TOTAL TRANSIT TOTAL MAINTENANCE CAPITAL Previous Funding Issued Unspent $0.125 C&I Tax NVTA 30% Local Crystal City TIF NVTA 70% Regional PAYG / Other Unissued State Federal - 4,951 2,156 1,415 1,380 4, , ,152 1, ,646 2,326 4,335 1,985 4,818 1, , ,140 49,440 21,700-13,761 5,167 8,594 1, , ,055 8,526 2, ,945 4,100 1,000 1, ,500-1, ,009 12, ,850 1, ,574 1,658 4,048 4, ,421 1, ,700 2,396 8,002 77,002 14,877 10,853 27,535 8,050 6,396 13, ,828 4,598 1,230 5,358 2,030 3, ,927 2, ,785 14, ,000 1, ,162 1, , , , , ,424 1,120 5,666-1, , ,417 13, ,475 2, ,745 5, ,000 5,817 11,511 1, ,173 6, ,986 6, ,586 PREVIOUS FUNDING Program Administration Operating TOTAL CAPITAL TOTAL TRANSPORTATION PROGRAM - 244,161 10,826 8, ,747 20,042 11,821 39,535 13,867 17,907 16, ,161 10,826 8, ,747 20,042 11,821 39,535 13,867 17,907 16,806 E-14

15 Arlington, Virginia TRANSPORTATION: PROGRAM FUNDING SUMMARY CIP Arlington Transit Program Complete Arlington Streets Maintenance Capital Transportation Capital Program Administration 10 YEAR PROGRAMMED CATEGORY SUMMARY (in $1,000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY ,101 40,887 67,404 97,374 70,616 52,308 30,737 46,716 39,989 30, ,677 95, ,327 89,637 56,330 45,516 29,174 42,301 44,308 33,792 28, ,910 21,360 15,447 13,773 14,180 14,610 15,048 15,496 15,956 16,437 16, ,245 4,009 4,075 4,146 4,239 4,347 4,464 4,594 4,725 4,863 5,005 44,467 Recommendation 158, , , , , ,994 93, ,705 95,081 81,332 1,285,299 PROGRAM FUNDING SOURCES (in $1,000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 New Funding Federal Funding 1,100 3,407 4,523 3,103 2,391 6,380 2,208 9,207 9,104 1,392 42,815 State Funding 10,499 16,160 32,993 32,070 22,188 17,807 10,939 15,547 12,920 10, ,531 Developer Contributions ,577 2,013 7,707 11,477 4, ,000 31,834 New Bond Issue 13,575 15,210 12,405 15,245 15,840 14,595 15,110 15,160 15,920 16, ,460 PAYG 3,613 9,836 9,723 7,841 9,156 9,788 8,845 10,404 10,549 10,198 89,953 Other Funding 1,500 6,550 1,700 1,200 1,200 4, ,000 1, ,693 Transportation Capital Fund (TCF)-C&I 7,040 13,045 37,061 21,784 11,669 6,731 10,448 12,162 8,301 5, ,808 TCF - HB2313 Local 3,965 6,290 8,243 11,575 13,688 11,176 14,570 13,045 8,272 8,761 99,585 HB2313 Regional 14,600 6,613 20,589 56,074 38,658 13,918 18,344 26,972 22,638 19, ,812 Tax Increment Financing (TIF) 1,543 5,032 5,508 6,203 5,731 4,480 7,069 7,232 5,830 5,019 53,647 Subtotal New Funding 58,170 82, , , , ,168 92, ,479 95,034 80,151 1,041,138 Previously Approved Funding Authorized but Unissued Bonds 10, ,826 Issued but Unspent Bonds 5,346 1, ,610 Transportation Capital Fund (TCF)-C&I 42,919 37,412 9,689 8,472 6, ,747 TCF - HB2313 Local 12,106 5,812 1,062 1, ,042 HB2313 Regional 10,223 13,983 14, ,535 Other Previously Approved Funds 34,646 16,642 7,315 1, ,401 Subtotal Previously Approved Funding 115,285 75,776 33,857 12,946 6, ,161 Funding Sources 173, , , , , ,168 92, ,521 95,034 80,151 1,285,299 E-15

16 Arlington County, Virginia TRANSPORTATION-TRANSIT: PROGRAM FUNDING SUMMARY CIP ART Bus Fareboxes Upgrade ART Bus Maintenance Equipment ART Fleet & Equipment Replacement ART Fleet Rehabilitation and Major Repairs ART Fueling and Bus Wash Facility ART Heavy Maintenance Facilities ART Satellite Parking Facility Ballston Multimodal Improvements Ballston-MU Metro Station West Entrance Bus Bay Expansion-East Falls Church Metro Station Bus Stop Accessibility Improvements Bus Stop and Shelter Program Court House Metro Station Second Elevator Crystal City Metro Station East Entrance East Falls Church Metro Station Second Entrance 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY ,719 1,328 1,368 5, ,363 8, ,445 2,216 2,111 1, ,020 1, ,733 5, ,828 8,045 1,999 13,116 13, , , ,227 3,196 1, ,843 3,443 3,720 28,065 27,941 24,480 16, , , ,328 1,610 1,282 1,453 1,497 1,569 1,618 1,696 1,746 1,830 1,886 16, ,789 1,429 5,376 9,262 2, , ,877 25,205 25,960 18, , ,221 7,568 26,206 28,239 26,828 96,062 E-16

17 Pentagon City Metro Station Second Elevator PrTN: ART Fleet Expansion PrTN: Columbia Pike Transit Stations PrTN: Off Vehicle Fare Collection PrTN: Transit ITS and Security Program PrTN: Transitway Extension to Pentagon City PrTN: Transitway Extension(Potomac Ave- Alexandria) Shirlington Bus Station Expansion STAR Call Center Office Space Transit Development Plan Updates 712 3, , , , , ,623 5,322 6,162 1, , ,360 4,403 3, ,177 1,552 1,026 1,178 1, , ,233 1,617 11,134 11, , , , ,411 1, ,850 1, , , ,122 Recommendation 37,101 40,887 67,404 97,374 70,616 52,308 30,737 46,716 39,989 30, ,677 E-17

18 CATEGORY FUNDING SOURCES (in $1,000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 New Funding Federal Funding 0 1,689 2,220 1,787 1,691 4, ,307 7, ,566 State Funding 5,824 13,673 31,198 30,606 20,706 16,232 10,191 14,017 11,353 10, ,908 Developer Contributions 0 0 1, ,957 9, ,811 New Bond Issue PAYG , ,138 2, ,294 1,825 1,173 13,214 Master Lease Sanitary District Tax Other Funding , ,993 Transportation Capital Fund (TCF)-C&I 241 4,152 6,691 2, , ,926 TCF - HB2313 Local , ,760 1, ,157 HB2313 Regional 0 5,863 13,178 53,074 33,658 13,418 14,344 19,272 18,638 17, ,151 TCF Bonds Tax Increment Financing (TIF) , ,476 TIF Bonds Subtotal New Funding 7,009 26,413 56,697 91,469 64,360 52,309 30,737 46,674 39,989 30, ,202 Previously Approved Funding Authorized but Unissued Bonds 2, ,030 Issued but Unspent Bonds Transportation Capital Fund (TCF)-C&I 11,419 2,814 1,914 5,343 6, ,745 TCF - HB2313 Local 3,464 1, ,165 HB2313 Regional 1,873 2,033 8, ,000 Other Previously Approved Funds 10,860 8, ,927 Subtotal Previously Approved Funding 30,054 14,512 10,707 5,905 6, ,475 Funding Sources 37,063 40,925 67,404 97,374 70,615 52,309 30,737 46,716 39,989 30, ,677 E-18

19 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP ART Bus Fareboxes Upgrade Project Description The ART buses are equipped with electronic fareboxes for fare collection. A component of the fareboxes will need to be upgraded in the next several years. The electronics in the fareboxes which support SmarTrip fare collection, are no longer manufactured and need to be replaced with a new component model. All 65 fareboxes plus a spare unit should be upgraded in FY18. All bus agencies in the region will be upgrading their fareboxes to address this need. Costs for each electronics board is $6,500 per farebox plus staff costs to make each farebox compatible with Next Generation Fare Equipment. The funding plan assumes 17% state capital reimbursement grant and 83% NVTA local. ART Bus Maintenance Equipment Project Description Bus maintenance equipment is needed in order to perform regular preventive maintenance and handle repairs and other unscheduled maintenance work on the ART fleet. The ART operations contractor uses County-owned equipment in its leased maintenance facility to make the facility compliant for compressed natural gas (CNG) requirements and to maintain buses. This project would enable the County to finance additional equipment needed for safety, maintenance and greater efficiency. All equipment would be transferred to a County-owned bus maintenance facility once such a facility is available. This is an ongoing program initiative necessary for bus maintenance, which will be included in the County's Transit Asset Management program and upcoming reporting requirements. The funding in fiscal years 2020, 2022 and 2024 will enable ART to meet unanticipated needs arising from new bus technologies, federal transit asset management guidelines, and replace worn-out equipment. The funding plan assumes 17% state capital reimbursement grant and 83% PAYG. E-19

20 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP ART Fleet & Equipment Replacement Project Description This project is for the replacement of aging buses that have completed their useful life in accordance with public transit standards. Arlington County's local bus system, ART, has a fleet of 65 buses of four different sizes. All buses are low-floor vehicles powered by compressed natural gas (CNG) and many of the buses will need to be replaced during the next ten fiscal years. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): VARIOUS Critical Milestones: Four 28-foot replacement buses FY 2019 Three 28-foot replacement buses FY 2020 Three 28-foot replacement buses FY 2021 Eight 40-foot replacement buses FY 2022 Twelve 31-foot replacement buses FY 2024 Two 40-foot replacement buses FY 2024 Eleven 40-foot replacement buses FY 2025 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification Since FY 2005, with the introduction of the ART 41, ART has experienced an average annual growth of 16 percent in ridership. In FY 2007, ART initiated a fleet conversion plan to replace light duty vehicles with heavy duty, low floor, CNG powered buses that could better handle the increased passenger loads, and improve reliability and accessibility of the ART fleet. The light duty vehicles were not designed for the number of revenue hours or miles of service necessary for the level of service ART was providing to the community. Replacement of these vehicles at the end of their useful life will allow ART to continue to meet the current demand for transit in the County. The replacement schedule is based on industry standards. Changes from Prior CIP This is an on-going capital project. The bus replacement schedule is updated through FY2026 and reflects the age of heavy duty buses after mid-life rebuild. E-20

21 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $27,445 Funding Schedule (in $1,000s) New Funding Federal Funding 0 0 1,375 1,062 1,094 4, ,491 6, ,955 State Funding ,745 Developer Contributions New Bond Issue PAYG ,745 Subtotal New Funding 0 0 1,719 1,328 1,368 5, ,363 8, ,445 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues 0 0 1,719 1,328 1,368 5, ,363 8, ,445 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Funding plan supports the bus replacement schedule shown in the County's approved Transit Development Plan. Notes on Operating Costs New FTEs (#): 0 E-21

22 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP ART Fleet Rehabilitation and Major Repairs Project Description This project involves the rehabilitation of ART's heavy-duty buses. These buses are all low-floor vehicles powered by compressed natural gasoline (CNG) rated by the Federal Transit Administration for a 12-year life. A mid-life rehabilitation typically occurs during the sixth year of service, but rehab work may be warranted earlier or later depending upon the actual mileage and bus condition. A mid-life rehabilitation will extend the useful life of a bus to 16 years of revenue service. This project started with the rehab of the first eight heavy duty buses that the County put into service in August 2007 and will continue to encompass the remaining 44 buses purchased from North American Bus Industries (NABI) plus 19 new buses to be acquired in future years. This project also includes unscheduled major repairs for the buses with significant mileage. Associated Master Plan: Transit Development Plan Neighborhood(s): VARIOUS Critical Milestones: Thirteen buses rehabilitated FY 2017 Twelve buses rehabilitated FY 2018 Six buses rehabilitated FY 2019 Five buses rehabilitated FY 2020 Four buses rehabilitated FY 2021 Four buses rehabilitated FY 2022 Five buses rehabilitated FY 2023 Five buses rehabilitated FY 2024 Five buses rehabilitated FY 2025 Four buses rehabilitated FY 2026 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification Mid-life bus rehabilitation will reduce the on-going maintenance costs inherent in older buses and help meet new federal mandates regarding State of Good Repair and Transit Asset Management. Rehabilitation of the heavy duty buses will extend the useful life of the bus by three to five years and improve reliability of bus operation, and thus reduce the need for new additional buses to accommodate new routes and service expansion as described in the forthcoming Transit Development Plan. Changes from Prior CIP This is a continuing project with updated milestones and cost schedule. In the previous CIP, this project was titled 'ART Fleet Rehabilitation.' E-22

23 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $11,733 Funding Schedule (in $1,000s) New Funding Federal Funding 0 1, ,611 State Funding 1, ,460 Developer Contributions New Bond Issue PAYG ,662 Subtotal New Funding 2,178 2,149 1, ,020 1, ,733 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues 2,178 2,149 1, ,020 1, ,733 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule New PAYG funds will be used to match anticipated FY17 state grant for 13 bus rehabs in FY17, at a rate of 68% state and 32% local. The Transit Bureau will apply to the Federal Transit Administration for federal funding for the remainder of the buses starting in year FY18 which will require a 20% local/state match so funding plan assumes (80% federal, 10% local PAYG, 10% state). Notes on Operating Costs New FTEs (#): 0 E-23

24 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP ART Fueling and Bus Wash Facility Project Description This project will result in the development of a compressed natural gas (CNG) fueling station, a bus wash and light duty maintenance facility for the ART bus services and fleet. The development of the ART House facilities will be completed in phases. The initial phases included site improvements on 2900 Jefferson Davis Highway, utilities, a CNG fueling station and a bus wash and light duty maintenance facility. The old office building on the north lot has been removed and the site repaved during this phase of the project. This phase also included roadway and streetscape improvements along S. Eads St. and Route 1 adjacent to the facility site. An Operations center located at 2900 S. Eads St. was completed and occupied in FY Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Construction Completion FY 2017 Advisory Commission: Transit Advisory Committee, Transportation Commission Neighborhood(s): Arlington Ridge, Aurora Highlands Project Justification Since FY 2005 with the introduction of the ART 41, ART has experienced an average annual growth of 16% in ridership. In FY 2007, ART initiated a fleet conversion plan that would replace light duty vehicles with heavy duty, low floor, CNG powered buses that could better handle the increased passenger loads. Until FY 2008, ART was operated at facilities located outside Arlington. The purchase and development of the ART House sites will provide the essential foundation the ART program needs to maintain the quality and growth of the service in future years. Working with a consultant and stakeholders such as the Virginia Department of Rail and Public Transportation, the transit bureau and facilities and engineering staff are completing design of the CNG fueling station and bus wash and light duty maintenance facility. E-24

25 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $5,828 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue PAYG Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) ,598 C&I 4, TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 1, ,230 Subtotal Previously Approved Funding 5, ,828 Revenues 5, ,828 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) ,950 Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,950 New FTEs (#): 0 Notes on Funding Schedule Other Previously Approved Funding consists of $1.230M in State capital reimbursement grants Notes on Operating Costs The addition of facilities will require additional ongoing utility and maintenance costs, thereby increasing ART's operating cost. E-25

26 ART Fueling and Bus Wash Facility Associated Costs and Funding Sources Project Cost $26,579,927 Previous Funding Bond $ 2,500,000 State Funding $ 7,308,427 TCF HB2313 Local $ 2,375,000 TCF C&I $14,396,500 Previous Funding $26,579,927 Project Funding $26,579,927 E-26

27 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP ART Heavy Maintenance Facility Project Description This project addresses the need for a maintenance facility for Arlington County's growing fleet of ART buses. The County's local transit service has increased the number of routes and hours of service significantly during the past ten years. The local bus fleet currently totals 65 buses. The plan is for transit services to continue to increase during the next 10 years requiring a fleet of 90 buses. The County must acquire land and construct a heavy maintenance facility in order to perform regular preventive maintenance and handle repairs and other unscheduled maintenance work. The site should be sized to accommodate parking for at least 10% of the 90 bus fleet. This project involves land acquisition as well as planning, design and construction of the heavy maintenance facility and related site. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): Critical Milestones: Land Acquisition FY 2017 Planning and Design FY FY 2018 Complete Construction FY 2020 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification A heavy maintenance facility is needed to support the ART Bus fleet and its operations. Currently, heavy maintenance services and facility are contracted to an outside vendor. The purchasing and development of a county owned facility would broaden the pool of service providers and reduce annual operating costs. Changes from Prior CIP This project was included as part of the phased project for ART Facilities in the prior CIP. The project is listed separately because it has a different location, different procurement process, and different funding needs from the other phases of implementing needed facilities to support ART's operations and maintenance. E-27

28 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $36,836 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 2, ,459 4, ,524 Developer Contributions New Bond Issue PAYG Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional 0 1,271 8,657 9, ,954 TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 2,735 1,951 13,116 13, ,478 Previously Approved Funding Authorized but Unissued Bonds 2, ,030 Issued but Unspent Bonds Transportation Capital Fund (TCF) ,275 C&I 3, TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding 5, ,358 Revenues 8,045 1,999 13,116 13, ,836 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) ,800 Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,800 Notes on Funding Schedule Funding plan assumes 34% state capital reimbursement grant. The $2,030,000 in Authorized but Unissued Bonds is from the 2010 Referenda. Notes on Operating Costs Operating costs are for ongoing cleaning, maintenance, utility and repairs of the facility New FTEs (#): 0 E-28

29 ART Heavy Maintenance Facility Associated Costs and Funding Sources Project Cost $36,986,000 Previous Funding Authorized but Unissued Bonds $ 2,030,000 State Funding $ 288 TCF C&I $ 3,343,712 TCF HB2313 Local $ 134,000 Previous Funding $ 5,508,000 New Funding State Funding $12,524,000 HB2313 Regional $18,954,000 New Funding $31,478,000 Project Funding $36,986,000 E-29

30 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP ART Satellite Parking Facility Project Description This project addresses the County's need for additional parking and facilities to house ART buses and a storage facility for bus stop and shelter equipment. This will entail a phased approach to address the interim solution as well as a permanent solution. As an interim plan, the County will lease land (approximately 2.5 acres) and fit out the area for secured parking and a butler type building or double wide trailer for dispatching, and bus operation room. The County will also construct a 4700 sq. ft. storage facility and loading dock to store bus shelters, benches, flag poles, racks, stanchions, and other spare parts for bus stops and transit stations. The County will modify the existing paved parking lot and install crushed concrete fill, stone base, asphalt pavement, lighting, security cameras, fencing, trailer, 4700 sq. ft. storage facility, and pavement markings. In FY2017, the site will also be used for parking/storage for vehicles displaced during the construction of the third level of the parking deck at the County's Trade Center. The lease agreement is for seven years so this project is considered an interim solution to provide additional parking needed to park ART buses. The site needs to be at least 2.5 acres, near arterial streets, and have appropriate zoning designation. The second phase represents a permanent solution to the County s ART parking needs after the seven year lease expires. This addresses the out-year need for the County to provide a long-term satellite area to park ART buses and house related bus operations plus provide a transit storage facility for the County's bus stop and shelter program. Permanent property is needed to accommodate secured parking for approximately 50 buses, a building for dispatch and bus operators, and a facility for storing bus shelters, benches, and related bus stop equipment for the long-term future. The location is to be determined. Associated Master Plan: Transit Development Plan Neighborhood(s): Shirlington Critical Milestones: Negotiate lease agreement July 2016 Prepare site August October 2016 Occupy site November 2016 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification Service is growing rapidly as ART aims to keep pace with the increasing demand for transit. By 2022, the ART fleet is expected to grow from 65 to 90 buses. A portion of the fleet will operate out of the ART House under construction at S. Eads Street, but additional space is needed to house the rest of the fleet. Changes from Prior CIP: This is a new capital project. E-30

31 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $20,227 Interim costs include preparation of the area and installing fencing for both Transit Bureau satellite parking needs and equipment storage facility. Permanent costs for the parking facility is unknown until a location is identified. The CIP reflects a placeholder with assumed state and other funding sources. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding , ,698 Developer Contributions Transportation Capital Fund (TCF) C&I TCF - HB2313 Local , ,335 HB2313 Regional , ,762 Subtotal New Funding , ,698 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues , ,227 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) ,007 1,038 1,069 1,102 1, ,268 Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,007 1,038 1,069 1,102 1, ,268 Notes on Funding Schedule Interim parking facility includes $180K in previously approved state capital reimbursement grant and $349K from NVTC local. Funding plan for the permanent parking facility assumes 34% state capital reimbursement grant and 66% of local match form TCF-C&I, NVTA local, and NVTA Regional. Notes on Operating Costs Operating costs for lease and dispatch related expenses are for the interim parking facility New FTEs (#): 0 E-31

32 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Ballston Multimodal Improvements Project Description This project involves the planning, design and construction of a variety of surface level transportation facilities, street improvements, and sidewalk improvements around the Ballston- MU Metrorail station. County staff is finalizing the concept design plan for the project which includes improvements to the pedestrian plaza area, curbside uses, street operational improvements, and multi-modal facility accommodation. Specifically, the County's multimodal plan for this area is to modify the curb-use plan, reconstruct and add bus bays, replace bus shelters and benches with newer, more modern structures, improve pedestrian amenities, add more bicycle parking, design and install real time information displays, revise and improve the landscaping, preserve and/or expand dedicated spaces for taxis and car-sharing, and add dedicated short-term spaces for private shuttles and kiss-n-ride users. Associated Master Plan: Ballston Sector Plan, Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Complete Construction Winter FY 2018 Advisory Commission: Transit Advisory Committee, Transportation Commission Neighborhood(s): Ballston-Virginia Square Project Justification County staff has identified needed improvements to the Ballston-MU Metrorail station area. Modifications are needed to the public plaza and bus passenger waiting areas to improve pedestrian circulation and relieve crowded conditions. Additional bicycle parking capacity is required to support increase in demand for bicycle users at the station. Transit service information requires improvement to encourage broader transit use and improve wayfinding on the plaza. In addition, bus traffic exceeds the capacity of the current arrangement of bus bays, given multiple transit operators (Metrobus and ART) as well as private shuttles, kiss-and-ride, and taxi stand functions. Expansion of bus service to the Ballston-MU Metro station is anticipated as Metrorail service is extended to Tysons Corner and Dulles Airport. The existing public plaza and its features (pavers, bus shelters, landscaping areas, etc.) are becoming dated and reaching the end of their useful life; they will require refurbishment or replacement. E-32

33 Changes from Prior CIP The prior CIP had a cost estimate and schedule based on a conceptual level plan. In the past two years, the project has moved forward with design and public outreach. The project is currently at the 60% design phase. The cost estimates reflect the current design, plus the appropriate level of contingency for a project at this level of design. The new cost estimate, including contingencies, is approximately $916,000 more than the concept level estimate from the last CIP. The schedule has been modified due to a longer-than-anticipated design process as well as additional time for procurement and board approval of the construction contracts. E-33

34 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $4,843 Construction costs have increased as the project design has been refined and greater details of actual project requirements have been identified. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue Transportation Capital Fund (TCF)- C&I Subtotal New Funding Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) ,013 C&I 1, TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 1, ,914 Subtotal Previously Approved Funding 3, ,927 Revenues 3,196 1, ,843 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Previously Approved Funds include $1.785 million in federal money, and $129,000 from the state. Additional funding anticipated through state capital reimbursement grant application in 2018 with associated local match. Notes on Operating Costs Estimated maintenance and operation cost upon completion. Costs include electricity, routine shelter maintenance and repair, realtime-information data and software updates, and landscaping upkeep, and stormwater infrastructure maintenance and monitoring. Escalation in future years due to aging equipment maintenance requirements. New FTEs (#): 0 E-34

35 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Ballston-MU Metro Station West Entrance Project Description The access improvement plan for the Ballston-MU Metro Station includes a new entrance at the west end of the station to provide easier access from the Glebe Road area and growing development in the western part of Ballston. This new entrance will be located at the intersection of N. Fairfax Drive and N. Vermont Street and will include two street level elevators and escalators connecting to an underground passageway and new mezzanine with stairs and elevators to the train platform. The new entrance will have fare gates, fare vending machines, and an attended kiosk. The project is a carryover from past CIPs. The land owner/developer of adjacent property began the engineering and design of the west entrance as part of the approved site plan for redevelopment of the adjacent private property. The developer advanced the design work to the 30% design level, but put work on hold in 2006 due to market conditions and postponement of the approved site plan for the adjacent private property of which the new entrance was part. Subsequently, the property has changed ownership and the new developer may submit a revision to the site plan. The proposed funding plan consists of local, state, and private sector funding. Arlington will coordinate with WMATA to complete the design to 100% final construction documents. Arlington and WMATA need to develop and approve a project coordination agreement. In addition, Arlington, WMATA and the adjacent property owner will need to develop and approve a tri-party project agreement. This project also includes associated on-street transit facilities for connecting bus service. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): Ballston-Virginia Square Critical Milestones: Begin final design FY 2017 Obtain ROW FY 2018 Begin construction FY 2019 Substantial completion FY 2022 Open for public use FY 2022 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification The weekday daily ridership at the Ballston-MU Station is approximately 25,000 boardings/alightings and is expected to increase significantly with completion of planned development / redevelopment in Ballston and the opening of the Silver Line. Ridership is forecasted to grow to 40,000 daily boardings and alightings by the year A west entrance will be closer and more convenient to the rapidly growing high-density, mixed-land use development occurring around the intersection of N. Glebe Road and N. Fairfax Drive as well as adjacent neighborhoods west of Ballston, thereby reducing travel time to the station for those users coming from western parts of Ballston. A west entrance will reduce congestion at the main entrance of the station. The additional entrance will also improve emergency egress in the event of a fire or other unsafe incident requiring emergency evacuation from the station and train platforms. E-35

36 Changes from Prior CIP The project schedule and costs are updated to reflect delays in advancing the design phase. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $104,295 Costs incurred prior to FY 2017 include preliminary engineering, subsurface utility investigation, feasibility review and other site plan related work. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,371 9,584 8,323 5, ,761 Developer Contributions ,957 9, ,434 HB2313 Regional ,357 10,200 1, ,666 Subtotal New Funding ,971 27,941 24,480 16, ,861 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds TCF - HB2313 Local HB2313 Regional 1,873 2,033 8, ,000 Other Previously Approved Funds 1, ,035 Subtotal Previously Approved Funding 3,443 2,897 8, ,434 Revenues 3,443 3,720 28,065 27,941 24,480 16, ,295 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Other Previously approved funding consists of: $1.684M of DRPT State grants and $351,000 of WMATA TIIF. Developer contributions include: Marymount site plan #64 - $4,568,000 (under construction); Fairmont/Spire site plan #331 - $10,866,000 (site plan approved in 2006; new owner in 2015). Notes on Operating Costs All new operating and maintenance costs that result from the opening and use of the West Entrance will be covered by the Metrorail regionally allocated operating subsidy. E-36

37 Ballston-MU Metro Station West Entrance Associated Costs and Funding Sources Project Cost $104,547,000 Previous Funding State Funding $1,812,000 WMATA TIIF $351,000 TCF C&I $23,000 TCF HB2313 Local $500,000 TCF HB2313 Regional $12,000,000 Previous Funding $14,686,000 New Funding State Funding $43,761,000 HB2313 Regional $30,666,000 Developer Contribution $15,434,000 New Funding $89,861,000 Project Funding $104,547,000 E-37

38 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Bus Bay Expansion-East Falls Church Metro Station Project Description This project will expand bus bay capacity by adding one to two new bus bays at the East Falls Church Metro Station and replace the existing shelters. The project also includes pedestrian access improvements from the park-and-ride lot, improvements to the accessible parking access, and the addition of a signal and crosswalk at the entrance to the park-and-ride lot on Washington Boulevard. The project will be coordinated with a complete streets project on Sycamore Street as well as a Capital Bikeshare expansion project in the area in both Arlington and City of Falls Church. Associated Master Plan: East Falls Church Area Plan Neighborhood(s): Arlington-East Falls Church Critical Milestones: Complete Design FY 2017 Construction FY 2018 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification The East Falls Church metro station currently has four bus bays that are at maximum capacity. Additional service is likely to happen in the immediate future with the implementation of new commuter bus service on the adjacent I-66 corridor. This project will expand the capacity of the station with one to two additional bus bays. Once design progresses further along, it will inform the feasibility of fitting two bays. Changes from Prior CIP This is a new project added to the County's CIP. E-38

39 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $6,328 Costs based on East Falls Church Station Bus Facilities Study (WMATA and Arlington County 2015). Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 172 1, ,152 Developer Contributions HB2313 Regional 0 3, ,841 TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 172 5, ,993 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues 507 5, ,328 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule The funding plan includes previous funding of $335,000 from TCF-HB2313 Local for the design phase. The County will apply for HB2313 Regional funding for construction in FY Notes on Operating Costs All new operating and maintenance costs that result from the opening and use of the second elevator will be covered by the Metrorail regionally allocated operating subsidy. New FTEs (#): 0 E-39

40 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Bus Stop Accessibility Improvements Project Description Design and construct bus stop accessibility improvements at bus stops throughout the County that currently do not meet Americans with Disabilities Act (ADA) requirements. Bus stop accessibility improvements provided under this project include: ADA-compliant bus boarding areas, pedestrian facilities that connect passengers to bus stops (sidewalks, crosswalks, ramps), and provision of waiting areas for wheelchair users inside bus shelters. In addition to improving safety and pedestrian access, this project will help preserve and enhance the County's investment in transit infrastructure and transit services. Associated Master Plan: Transit Development Plan Neighborhood(s): VARIOUS Critical Milestones: Complete design & begin construction for approx bus stop improvements in each fiscal year Advisory Commission: Transit Advisory Committee Project Justification Approximately 600 bus stops in Arlington County are currently in need of varying levels of accessibility improvements required to bring them into compliance with ADA Accessibility Guidelines (ADAAG). Changes from Prior CIP In the prior adopted CIP, the initial phase of this project was included as part of the Bus Stop and Shelter Program; whereas now the project is expanded and listed as a separate project in the FY FY 2026 CIP. This CIP adds local funds to increase the number of bus stop ADA/Accessibility improvements from the prior FY FY 2024 CIP and provides funding to bring all of the bus stops in Arlington County into compliance with ADA requirements. E-40

41 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $16,187 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,002 Developer Contributions New Bond Issue PAYG ,370 Transportation Capital Fund (TCF) ,019 C&I TCF - HB2313 Local ,634 HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding ,453 1,497 1,569 1,618 1,696 1,746 1,830 1,886 15,025 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local ,162 HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding ,162 Revenues 1,610 1,282 1,453 1,497 1,569 1,618 1,696 1,746 1,830 1,886 16,187 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Funding plan assumes 34% state capital reimbursement grants and a FY 2018 HB2 Smart Scale grant of $500,000. Notes on Operating Costs New FTEs (#): 0 E-41

42 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Bus Stop and Shelter Program Project Description Through this on-going annual program, the Transit Bureau replaces aging transit shelters, installs shelters where needed, makes repairs and site improvements, and provides other passenger amenities (such as benches, litter receptacles and customer information) at bus stops throughout the County. Placement of these shelters, passenger amenities and other improvements are determined by the survey data from the continuously updated Bus Stop Database, current bus route strategies in the Transit Development Plan, citizen input, and through coordination with other County initiated transportation capital improvement projects. In addition, the program includes planning, designing and constructing new bus stops as the County adds or modifies bus routes. Associated Master Plan: Transit Development Plan Neighborhood(s): VARIOUS Critical Milestones: Annual Goals: Replace 10 old shelters Install 5 new shelters Install 10 new freestanding benches Install 5 new trash receptacles Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification The goal of the Bus Stop & Shelter Program is to provide all Arlington County transit riders of varying abilities with safe, accessible and comfortable passenger waiting facilities - an important factor in encouraging public transit use. This program provides on-going capital maintenance and infrastructure improvements for the growing number of bus stops (currently over 1,100) serving the local ART bus service and Metrobus service. Nearly 25 bus shelters in Arlington County are well beyond their useful life and almost 85 other shelters are nearing that age. Funding will allow for replacement of 10 outdated shelters per year and will also provide program support to continue making improvements and upgrades to various customer information elements at ART stops. Currently, more than 150 bus stop poles, 275 bus information/schedule cases and nearly 250 bus stop signs are in need of repair or replacement. Bus stops and shelters also require periodic repairs and upgrades to keep them safe, accessible, and attractive for the traveling public. This program will utilize funding to repair and maintain the entire Arlington County bus stop network and construction of bus stop upgrades (e.g. curb extensions) based on transit service needs. E-42

43 Changes from Prior CIP In order to expedite the ADA accessibility improvements for the entire network of County bus stops, a separate, new Bus Stop Accessibility Improvement Project is being created in the CIP with partial funding from the Bus Stop and Shelter Program. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $4,789 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,630 PAYG ,719 Subtotal New Funding ,349 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds TCF - HB2313 Local Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,789 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Other Previously Approved Funds consist of development contributions from site plans 389, 405, 406, 407, and 418. Notes on Operating Costs Additional solid waste personnel labor and material will be required for cleaning new shelters and removing trash from new cans. New FTEs (#): 0 E-43

44 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Court House Metro Station Second Elevator Project Description This project will provide for engineering, design, and construction of a second elevator to the Court House Metro Station from the street level to the station mezzanine. The Washington Metropolitan Area Transit Authority (WMATA) completed reviewing alternative location options for the second elevator in February of WMATA developed a concept plan and cost estimate covering three (3) alternatives which were forwarded for the County's consideration. The recommended and lowest cost option covers construction of two new elevators to replace the existing one. The new elevators would utilize a common vestibule on the south side of Clarendon Boulevard east of the existing elevator, which will be decommissioned after the new elevators are placed in service. Prior to the start of preliminary engineering, the County will reconfirm options with WMATA. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Court House Sector Plan, Transit Development Plan Neighborhood(s): Courthouse Critical Milestones: Start Preliminary Engineering FY 2017 Complete 100% Design FY 2018 Start Construction FY 2018 Complete Construction FY 2020 Advisory Commission: Courthouse Clarendon Civic Association, Disability Advisory Commission, Transit Advisory Committee, Transportation Commission Project Justification The Court House Metro Station has only one elevator from the street level to the mezzanine. The elevator is small, slow and heavily used. When it breaks down or is not in service, WMATA must operate wheelchair accessible bus service connecting the Court House Station to the two adjacent Metrorail stations to provide Americans with Disabilities Act (ADA) accessible service. Numerous Metrorail stations throughout the system have only one elevator and experience similar problems of over use, frequent breakdowns, and no ADA access when out of service. To correct the problem caused by having a single elevator, the WMATA Board established an elevator redundancy plan stating that each Metrorail station should have a minimum of two elevators from the street level to the train platform for ADA access. This CIP project would help bring the Court House Metro Station into compliance with WMATA's elevator redundancy plan. All new operating and maintenance costs that result from the opening and use of the new elevator will be covered by the Metrorail regionally allocated operating subsidy. E-44

45 Changes from Prior CIP This project is a carryover project from the prior CIP and was shown in later years. The project is recommended for earlier implementation and is programmed for FY2017 through FY2020 in the new CIP instead of FY2021 through FY2024 in the last adopted CIP. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $18,387 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 0 1,796 3, ,734 Developer Contributions 0 0 1, ,377 New Bond Issue PAYG Transportation Capital Fund (TCF) ,873 C&I 57 3,549 4, TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 57 5,345 9,262 2, ,984 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 1, ,294 Subtotal Previously Approved Funding 1, ,403 Revenues 1,429 5,376 9,262 2, ,387 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule New proposed funding is state reimbursement at 34% of local funds (developer contributions plus TCF dollars). Developer contributions are from two approved site plans: $777,356 from SP #404 (2401 Wilson Blvd.) and $1,600,000 from SP #263 (2311 Wilson Blvd). All new local funds requested are estimated matches to state grants. Other Previously Approved Funds consists of state capital reimbursement grant for $517,000 and $777,356 from development contribution from SP #404. Notes on Operating Costs Upon completion and acceptance of construction, Arlington County will turn over ownership of the elevators to WMATA. All new operating and maintenance costs that result from the addition of a second elevator will be covered by the Metrorail regionally allocated operating subsidy. E-45

46 Court House Metro Station Second Elevator Associated Costs and Funding Sources Project Cost $18,449,000 Previous Funding State Funding $ 538,000 Developer Contribution $ 777,000 TCF HB2313 Local $ 150,000 Previous Funding $ 1,465,000 New Funding State Funding $ 5,734,000 Developer Contribution $ 2,377,000 TCF C&I $ 8,873,000 New Funding $16,984,000 Project Funding $18,449,000 E-46

47 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Crystal City Metro Station East Entrance Project Description The access improvement plan for the Crystal City Metro Station includes a new entrance at the east end of the station to provide easier access from Crystal Drive, the Virginia Railway Express (VRE) Station, and the new Transitway station soon to be constructed on the east side of Crystal Drive at 18th Street South. In addition, the access improvement plan includes elevator upgrades to improve compliance with the Americans with Disabilities Act (ADA) and provide more conveniently located elevator access to the station. The new east entrance will include elevators, escalators and/or stairs, a fare payment area with fare vending machines, kiosk, and an underground passageway to the existing train platform and/or mezzanine. The project is in the concept development and engineering analysis phase. The specific location for the new east entrance has not yet been determined but three alternative locations are under consideration in the vicinity of Crystal Drive and 18th Street South. Additional engineering analysis and public input are planned prior to deciding on the specific location. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Crystal City Sector Plan Neighborhood(s): Crystal City Critical Milestones: Refine site alternatives and cost FY 2016 estimates Preliminary engineering and final FY 2020 design Construction FY FY 2022 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification The Crystal City Sector Plan contemplates access improvements at the Crystal City Metro Station. The Crystal City Metro Station is one of the more highly utilized stations in Arlington County. The existing vertical circulation is reaching capacity during peak periods. The existing elevator access is slow, inconveniently located, and lacks redundancy. In addition, large volumes of passengers transfer between Metrorail and VRE, and yet the transfer route is long, circuitous, and has accessibility barriers. With redevelopment in Crystal City, overall tripmaking will increase and transit will need to capture a substantial majority of that increase, which will overburden the existing station entrance. It is anticipated that a new entrance will be located near Crystal Drive to provide better access to redevelopment sites along that street as well as to the existing Crystal City VRE Station and the Transitway station. Changes from Prior CIP Additional schedule was added for a design refinement phase and alternative selection project. Design and construction cost estimates will be refined when a preferred alternative is identified and design progresses. E-47

48 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $72,495 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,570 8,826 6, ,600 Developer Contributions New Bond Issue PAYG Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF) ,121 C&I TCF - HB2313 Local HB2313 Regional 0 0 1,477 16,362 16,852 11, ,581 TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 0 0 2,684 25,205 25,959 18, ,302 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues 0 0 2,877 25,205 25,959 18, ,495 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Funding plan consists of NVTA regional, $1 million of TCF C&I, and 34% state reimbursement. Other Previously Approved Fund consists of a state capital reimbursement grant. Notes on Operating Costs All new operating and maintenance costs that result from the opening and use of the second elevator will be covered by the Metrorail regionally allocated operating subsidy. New FTEs (#): 0 E-48

49 Crystal City Metro Station East Entrance Associated Costs and Funding Sources Project Cost $72,561,000 Previous Funding State Funding $ 67,000 TCF C&I $ 192,000 Previous Funding $ 259,000 New Funding State Funding $24,600,000 TCF C&I $ 1,121,000 HB2313 Regional $46,581,000 New Funding $72,302,000 Project Funding $72,561,000 E-49

50 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP East Falls Church Metro Station Second Entrance Project Description This project involves the planning, design and construction of a full second entrance to the East Falls Church Metro station. The new western station entrance will improve access to the East Falls Church station and better accommodate growing transit demand anticipated in the future from new development around the station and also from the Silver Line. Part of the plan is to connect the neighborhoods with a decked plaza over I-66. Associated Master Plan: East Falls Church Area Plan Critical Milestones: Engineering and design Construction FY22-FY23 FY24-FY26 Advisory Commission: Transit Advisory Committee, Transportation Commission Neighborhood(s): Arlington-East Falls Church Project Justification In July 2011, WMATA prepared a Station Vision Plan for East Falls Church Metro station. The plan forecasted an 80% growth in ridership at the station between 2009 and A new western entrance would greatly improve pedestrian access to the East Falls Church station for many transit customers by providing convenient, direct access to the station platform and reducing walking distances, especially for people walking from the City of Falls Church. The location of the new entrance would increase the catchment area for the walk mode by onethird of a mile and is expected to attract new customers to Metrorail over a period of time. The proposed new station entrance is also expected to serve as a catalyst for transit-oriented development. Changes from Prior CIP This is a new CIP project. E-50

51 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $96,062 Cost estimates are a preliminary order of magnitude based on the July 2011 Station Vision Plan. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,455 2,573 8,910 9,601 9,122 32,661 Developer Contributions New Bond Issue Other Funding , ,993 Transportation Capital Fund (TCF) C&I TCF - HB2313 Local , ,186 HB2313 Regional ,582 17,296 18,638 17,706 57,222 TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding ,221 7,568 26,206 28,239 26,828 96,062 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,221 7,568 26,206 28,239 26,828 96,062 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Funding plan assumes $57,222,000 million in NVTA regional funds, $1,186,000 in NVTA local funds, $4,993,000 from I-66 toll revenues plus 34% state capital reimbursement grant. The application for NVTA Regional will likely be a joint request with the City of Falls Church. Notes on Operating Costs All new operating and maintenance costs that result from the opening and use of the West Entrance will be covered by the Metrorail regionally allocated operating subsidy of which the County pays a pro rata share. E-51

52 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Pentagon City Metro Station Second Elevator Project Description This project will result in a second elevator entrance to the Pentagon City Metro Station from the street level to the mezzanine level of the station. The elevator will be located on the west side of S. Hayes near the west side Metro escalator. The new elevator will be recessed and include a substantial queueing area as well as its own machine room. In addition, the project seeks to improve the exterior of the existing elevator on the east side of S. Hayes Street to make it more visible and better match the appearance of the new elevator. The level of exterior refurbishment of the headhouse of the existing elevator will be subject to available funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Pentagon Centre Site Guiding Principles, Pentagon City Master Development Plan, Pentagon City Planning Task Force Report, Transit Development Plan Neighborhood(s): Pentagon City Critical Milestones: Preliminary Engineering FY 2017 Final Design FY 2017 Begin Construction FY 2018 Complete Construction and Open FY 2019 Advisory Commission: Disability Advisory Commission, Transit Advisory Committee, Transportation Commission Project Justification The Pentagon City Metro Station is among the most heavily used in Arlington County and the area is expected to experience significant growth in the next few years. Currently, there is one street-level elevator entrance located on the east side of South Hayes Street. A second elevator entrance on the west side of the street is necessary to improve general access and to provide wheelchair accessibility in compliance with the Americans with Disabilities Act (ADA). In addition, a second street level elevator will provide back-up ADA access when the other street level elevator is out of service for repairs or maintenance. Changes from Prior CIP Milestone dates and costs reflect the current project schedule, the latest cost estimate, and the actual secured funding. E-52

53 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $4,797 estimated project cost, including FY 2016 and prior spending, is $5,395,000. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Subtotal New Funding Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 712 2, ,287 Subtotal Previously Approved Funding 712 3, ,487 Revenues 712 3, ,797 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Other Previously Approved Funds include $3.590 million in Federal Funding and $697,000 in State Funding. Notes on Operating Costs All new operating and maintenance costs that result from the opening and use of the second elevator will be covered by the Metrorail regionally allocated operating subsidy. New FTEs (#): 0 E-53

54 TRANSPORTATION ARLINGTON TRANSIT PROGRAM PREMIUM TRANSIT NETWORK (PRTN) TRANSPORTATION CIP The Transit Development Plan (TDP) is a 10-year plan for new, modified and expanded bus service and supporting capital improvements. In FY16, the County began work on the TDP to perform a system-wide analysis of ART and Metrobus service in the County. Final results and recommendations will be presented in late May Though the TDP is not final, the proposed CIP incorporates many elements of the recommendations and introduces the concept of a Premium Transit Network. The Premium Transit Network (PrTN) will offer fast, reliable and easy to use bus service connecting Columbia Pike, Pentagon City, Crystal City, and Potomac Yard, which are major areas of growth and economic development in the County. The network will include a combination of local and limited-stop service and a new one-seat ride between Columbia Pike and Crystal City. Each segment will feature a variety of passenger amenities to improve travel times and attract new riders. Amenities may include: high quality transit stations, exclusive bus lanes, off-vehicle fare collection, transit signal priority, low-floor boarding, and branded vehicles and information. Several projects in the CIP will support the implementation of the Network. They are listed below and are discussed in more details in project pages that follow. o o o o o o ART Fleet Expansion: Anticipated growth of the ART fleet from 65 to nearly 90 vehicles by FY In FY18, a portion of this fleet expansion will be used to implement a new service concept on Columbia Pike. Transitway Extension to Pentagon City: Planning, design, and construction of an extension of the Crystal City Potomac Yard Transitway to Pentagon City. Transitway Extension (Potomac Avenue to Alexandria): This segment will connect the current Transitway when the Alexandria exclusive lanes are completed. Columbia Pike Transit Stations: 23 new high quality Transit Stations along Columbia Pike with a variety of passenger amenities: electronic and printed information, maps of bus routes and areas, ample seating, enhanced lighting, and improved landscaping and sidewalks. Off-Vehicle Fare Collection: Development of an implementation plan and procurement of equipment for the Crystal City-Potomac Yard Transitway and the Columbia Pike corridor. Transit ITS and Security Program: A portion of the ITS program funding will be dedicated to improving operations in the Premium Transit Network. For example, implementation of transit signal priority along Columbia Pike, allowing for faster transit travel times. E-54

55 PREMIUM TRANSIT NETWORK N CARLIN SPRINGS RD GREENBRIER!5!5 BAILEY'S CROSSROADS!5 SKYLINE µ DINWIDDIE COLUMBIA PIKE!5 N PERSHING DR ARLINGTON BLVD S GEORGE MASON DR!5 COLUMBUS S GE O RGE MASON DR GEORGE MASON S FOUR MILE RUN DR!5 BUCHANAN KING STREET!5 S GEORGE MASON DR TAYLOR/THOMAS S WA L T ER REED DR COLUMBIA PIKE S FOUR MILE RUN DR!5 ARLINGTON BLVD GLEBE S GLEBE RD 11TH ST S OAKLAND WALTER REED!5 S WALTER REED DR S GLEBE RD S ARLINGTON MILL DR S FILLMORE ST S WALTER REED DR!<. 12TH ST S S WALTER REED DR S FOUR MILE RUN DR COURTHOUSE 9TH ST S 11TH ST S!5 R OAD BARTON S GLEBE RD SHIR LINGTON!5 12TH ST S WASHINGTON BLVD ROUTE 27!5 SCOTT S SCOTT ST COLUMBIA PIKE S ADAMS ST 26TH ST S S ROLFE ST 13TH RD S INTERSTATE 395 S QUEEN ST S OAK ST ORME ORME!5 COLUMBIA PIKE ARMY NAVY DR 23RD ST S S ARLINGTON RIDGE RD S GLEBE RD ALEXANDRIA S ARLIN G T ON RIDGE RD S JOYCE ST PENTAGON CITY!5 WASHINGTON BLVD S HAYES ST RTE 27 ARMY NAVY ARMY NAVY DR ")M PENTAGON CITY PENTAGON!.!.!.!5 S HAY ES ST 23RD ST S 12TH ST S 12TH ST Existing Premium Infrastructure S GLEBE ")M RD S EADS ST 15TH ST S 18TH ST S 23RD & CLARK 33RD & CRYSTAL S EADS ST US ROUTE 1 JEFFERSON DAVIS HWY 18TH & CLARK 26TH & CLARK!H!H ")M US ROUTE 1!H 20TH ST S!H!H CRYSTAL DR!H CRYSTAL DR!H!H S GLEBE RTE INTERSTATE VRE CRYSTAL CITY 27TH & CRYSTAL 18TH & CRYSTAL 23RD & CRYSTAL GEORGE WASHINGTON MEMORIAL ")M REAGAN NAT'L AIRPORT PARKW INTERSTATE 395 Proposed Premium Infrastructure!H Existing Transit Stations to Braddock Road Metro KING STREET!. Proposed Transit Stations QUAKER LANE Streets ROUTE 7 E-55 County Line

56 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP PrTN: ART Fleet Expansion Project Description This project covers the purchase of additional buses to support the 10-year service plan for ART. A portion of the fleet expansion will be dedicated to improving local bus service in the Premium Transit Network. All buses will be low-floor vehicles powered by compressed natural gas (CNG). Fare boxes, radios, security cameras, bike racks, and other on-bus equipment are included in the fleet procurement. Associated Master Plan: Transit Development Plan Neighborhood(s): VARIOUS Critical Milestones: Procure 10 buses and related on-bus equipment Procure 9 buses and related on-bus equipment Procure 7 buses and related on-bus equipment FY 2018 FY 2020 FY 2024 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification ART carried 2.8 million passengers in FY 2015 and is expected to surpass 3 million in FY The County's FY FY 2026 Transit Development Plan recommends a 10-year operating and capital plan that will allow ART to keep pace with the increasing demand for transit. The ART fleet is expected to grow from 65 to 89 buses by FY A portion of the fleet will operate out of the ART fueling and bus wash facility which is under construction at S. Eads Street, but additional permanent space is needed to house the rest of the fleet. Changes from Prior CIP This project was included in ART Fleet & Equipment Replacement and Enhancement in the FY 2015 CIP. E-56

57 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $16,623 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 0 5, , , ,837 Developer Contributions New Bond Issue TCF - HB2313 Local HB2313 Regional , , ,730 TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 0 6, , , ,019 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues 0 6, , , ,623 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule The State approved a $4 million HB2 Smart Scale grant for bus purchases in FY 2018 which will be combined with a DRPT capital grant and a HB2313 regional grant if approved. Previously approved funding of $604,000 TCF-HB2313 Local is allocated to bus purchases in FY 2020 and FY Notes on Operating Costs New FTEs (#): 0 E-57

58 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP PrTN: Columbia Pike Transit Stations Project Description This project involves the design and construction of high quality Transit Stations along Columbia Pike. Transit Stations are larger, well designed transit shelters and platforms with the following planned passenger amenities: electronic and printed information, maps of bus routes and areas, ample seating, enhanced lighting, newspaper vendor corrals, and improved landscaping, sidewalks, curbs, and gutters. Twenty-three new Transit Stations at 12 locations along Columbia Pike are planned at the following intersections: Greenbrier, Dinwiddie, Buchanan, Taylor/Thomas, George Mason, Oakland, Glebe, Walter Reed, Barton, Courthouse, Scott, and Orme. The current project cost estimate is based on architectural design of the Transit Stations. In response to concerns about construction risks and lessons learned from other projects, the County commissioned a constructability review in the spring of 2016 to review risks associated with the design and construction of the shelters. Cost estimates will be updated as the design phase - including civil engineering - continues. It is important to note that cost estimates per station will vary depending on size and/or location and will reflect specific site conditions. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Transit Development Plan Neighborhood(s): Alcova Heights, Arlington Heights, Arlington View, Barcroft, Columbia Forest, Columbia Heights West, Douglas Park, Penrose Critical Milestones: Design FY 2017-FY 2018 Construction FY 2019-FY 2021 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification Columbia Pike is a major transit corridor serving an average of 16,000 bus riders each weekday -- the highest bus ridership of any corridor in Northern Virginia. Arlington's Transit Development Plan includes major service and facility enhancements in the corridor to better serve the growing number of transit riders. Street realignment, grade improvements, intersection improvements, wider sidewalks, streetscape improvements, new traffic signals, and pedestrian crossings are being completed to allow safer access to transit. The Transit Stations project will provide improved shelter and increased seating, real time bus arrival information, enhanced lighting, and other safety features. Twenty-three new Transit Stations will be constructed to support high quality, frequent transit service along Columbia Pike. One Transit Station was previously built as a prototype project on eastbound Columbia Pike at Walter Reed in E-58

59 Changes from Prior CIP Delivery of the stations will be in phases, and the project phasing plan has been adjusted to better coordinate with the Columbia Pike Multimodal street reconstruction project. At the July 14, 2016 TDP adoption, the Board authorized a funding increase for the Columbia Pike Transit Stations. As anticipated ridership growth is realized, it will warrant additional transit station capacity at several locations. Funding of $849,000 is added in FY 2019 to fund modular expansions at up to six locations. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $13,323 Funding Schedule (in $1,000s) New Funding State Funding ,145 Transportation Capital Fund (TCF) C&I Subtotal New Funding , ,705 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF)- 2,304 1, ,424 C&I Other Previously Approved Funds 2,610 4, ,786 Subtotal Previously Approved Funding 5,322 5, ,618 Revenues 5,322 6,162 1, ,323 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) ,561 Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,561 Notes on Funding Schedule Other Previously Approved Funds include $5.666M in Federal Funding and $1.12M in State Funding. Notes on Operating Costs Operations Costs include the cost for monthly electrical service from Virginia Dominion Power and costs for routine cleaning of Transit Stations. Maintenance Capital Impact includes costs for replacement of lighting fixtures at the end of its useful life. New FTEs (#): 0 E-59

60 PrTN: Columbia Pike Transit Stations Associated Costs and Funding Sources Project Cost $14,344,000 Previous Funding Issued but unspent bond $ 408,000 Federal Funding $ 6,366,000 State Funding $ 1,260,000 TCF C&I $ 4,605,000 Previous Funding $12,639,000 New Funding State Funding $ 1,145,000 TCF C&I $ 560,000 New Funding $ 1,705,000 Project Funding $14,344,000 E-60

61 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP PrTN: Off Vehicle Fare Collection Project Description This project involves development of an implementation plan and procurement of off-vehicle fare collection (OVFC) equipment for the Crystal City-Potomac Yard (CCPY) Transitway and the Columbia Pike corridor. The plan will identify the technology, installation requirements, site identification, and provide detailed cost estimates. Plan development will be conducted in coordination with WMATA and other regional partners, including the City of Alexandria. Several jurisdictions in the region have also identified funding for off-vehicle fare collection equipment to ensure a regional approach. Preliminary cost estimates are based on a previous WMATA procurement effort and will be adjusted as project development continues. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Crystal City Sector Plan, Transit Development Plan Neighborhood(s): VARIOUS Critical Milestones: Identify a preferred OVFC technology, design, and locations Develop implementation plan and costs; Procure contractor. Implement off-vehicle fare collection system for Columbia Pike corridor & Crystal City Potomac Yard FY 2017 FY 2018 FY2019-FY2021 Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification The goal of off-vehicle fare collection is to reduce the boarding times and improve transit travel times at transit stations in the Premium Transit Network. Off vehicle fare payment, farecard loading, and rear-door farecard readers are all options that will be explored. Changes from Prior CIP This is a new project for this CIP. Off-vehicle fare collection was included in the Crystal City Potomac Yard Transitway project in the prior FY15 CIP but it was eliminated from that project, pending a decision by WMATA on the Next Generation Fare Payment. WMATA has since cancelled the Next Generation Fare Payment program and the County will partner with WMATA and other jurisdictional partners to identify appropriate technology and an implementation plan. E-61

62 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $11,177 Costs based on estimated staff work, with a systems designer/engineer brought on board during FY17-FY18 to design a system for the two corridors and develop cost/benefit analysis. Preliminary estimate of construction costs for the implementation of hardware and software are shown as a placeholder and are subject to decision on technology and contractor. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,902 HB2313 Regional ,959 3,654 3, ,025 Tax Increment Financing (TIF) Subtotal New Funding ,360 4,403 3, ,177 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,360 4,403 3, ,177 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Funding plan assumes 17%state capital reimbursement grant. Notes on Operating Costs To be determined; dependent upon decision on type of technology and agreement with partners. New FTEs (#): 0 E-62

63 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP PrTN: Transit ITS and Security Program Project Description The Transit Intelligent Transportation System (ITS) and Security Program is dedicated to the use of technology to improve transit operations, enhance rider information systems, and identify and mitigate security and safety issues. A portion of the ITS program funding will be dedicated to improving operations in the Premium Transit Network. For example, implementation of transit signal priority along Columbia Pike will allow for faster transit travel times. In FY16, staff completed a countywide transit ITS needs study and master plan. The Transit ITS and Security program will fund the implementation of that plan. Examples of ITS projects include: installation of on-board bus video cameras to increase safety of riders and bus operators; consolidation of bus computers reaching end of life into a single system to improve efficiency; and procurement of a business intelligence solution to consolidate disparate data sources for operational and planning purposes. The ITS program will also conduct a pilot of neighborhood flexible bus service in areas with infrequent or limited fixed-route service, as recommended by the 10-year Transit Development Plan. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Transit Development Plan Neighborhood(s): VARIOUS Critical Milestones: Install demonstration portion of on FY 2017 board bus video Install on board bus video on full fleet Q1 FY 2017 Creation of bus ranking tool and FY 2018 technology deployment plan Consolidation of bus control system FY 2018 Deployment of TSP on Columbia FY 2018 Pike Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification Transit vehicles operate along congested primary and secondary roadways. The use of transit technology contributes to successful planning and operation of transit services. There are numerous benefits for the customer and the operator. Bus video recorded on the buses will allow for enhanced safety and security for transit customers as well as bus drivers and supervisors. Transit vehicle and signal technology improves reliability and performance, allowing buses to move through congested intersections with signal priority. Obtaining a Business Intelligence platform to consolidate numerous ART and STAR data sources into a single location will facilitate better reporting capabilities to meet requirements of the state and federal funding agencies (including the National Transit Database and quarterly reports), enable better analysis of operating parameters, and increase staff efficiency. The real-time information program provides transit riders with enhanced ability to obtain schedule and bus arrival information in a timely manner. Consolidating bus control systems into a single platform will alleviate concerns for end of support for current equipment and will also reduce staff costs. Implementing an asset inventory of transit technology will provide compliance with FTA MAP-21 provisions as well as provide County staff with comprehensive information for asset management. E-63

64 ITS Improvements Planned: FY 2017 * Installation of on board bus video cameras to increase safety of our riders * Procurement of a business intelligence solution to consolidate disparate data sources into a single dashboard for operational and planning purposes * Transit Signal Priority implementation for better running times of bus route 41 * Development of a communication implementation plan sending and receiving data for Realtime arrival signs and Off Vehicle Fare Collection and Card Replenishment * Market research on the use of technology by commuters and need for additional technologies leading to a deployment plan. FY2017-FY2018 FY 2018 * Consolidation of bus computers reaching end of life into a single system to improve efficiency * Transit Signal Priority implementation for better running times of bus route 55 FY 2019 * Transit Signal Priority implementation for better running times of bus routes County-wide implementation * Automation of bus pre- and post-trip inspections to eliminate paper transactions * Improvement of radio coverage in high density areas for supervisory staff FY 2020 * Text based system for real time bus arrival information * Develop and conduct a pilot deployment of neighborhood flexible bus service in areas with infrequent or limited fixed-route service Changes from Prior CIP CIP includes additional ITS projects identified in transit needs study. E-64

65 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $7,516 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,192 Developer Contributions New Bond Issue PAYG ,717 TCF - HB2313 Local , ,372 HB2313 Regional Subtotal New Funding ,178 1, ,950 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local ,043 Other Previously Approved Funds Subtotal Previously Approved Funding 1, ,566 Revenues 1,552 1,026 1,178 1, ,516 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,512 Notes on Funding Schedule Previously Approved Funds include $470,000 in federal monies and $45,000 in PAYG Notes on Operating Costs Additional cost increases beginning in FY21 are based upon the oversight and operational costs of a texted based arrival Realtime system and flexible bus system. New FTEs (#): 0 E-65

66 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP PrTN: Transitway Extension to Pentagon City Project Description This project is for the planning, design, and construction of an extension of the Crystal City Potomac Yard Transitway through Pentagon City. The project is just entering the planning stage, so the project description will be updated and confirmed through the project development process. The assumed project termini are Crystal City Metro Station in the east/south and Joyce St & Army-Navy Drive in the west/north, running along Crystal Drive, Clark Street, 12th Street, Hayes Street, and Army-Navy Drive. The project would provide exclusive and/or dedicated transit lanes, passenger stations, utility relocations, signing and pavement marking, and traffic signal upgrades. Stations are anticipated to be located at 12th & Clark Streets, 12th & Eads Streets, 12th & Hayes Streets, and Joyce Street & Army-Navy Drive. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Crystal City Sector Plan, Metropolitan Park Design Guidelines, Pentagon Centre Site Guiding Principles, Pentagon City Master Development Plan, Pentagon City Planning Task Force Report, Transit Development Plan Critical Milestones: Planning, Environmental, Prelim FY 2017 Engineering Final Design FY 2018 ROW Acquisition FY 2019 Construction FY Advisory Commission: Transit Advisory Committee, Transportation Commission Neighborhood(s): Arlington Ridge, Aurora Highlands, Crystal City, Pentagon City Project Justification Planning for improved surface transit in the Crystal City/Potomac Yard corridor began in earnest in the early 2000s. This early work examined bus and rail improvements connecting the Braddock Road Metro Station area through Potomac Yard to Crystal City, Pentagon City, and the Pentagon. After a series of planning, environmental, and operational studies, a transitway to serve buses was constructed in Arlington and Alexandria through Potomac Yard and Crystal City. Planning was also undertaken in the Crystal City corridor for a proposed streetcar project, as called for in the Crystal City Sector Plan (2010). The proposed streetcar project was canceled as the environmental clearance phase was coming to a close in late The extension of the Crystal City-Potomac Yard Transitway, as a bus facility, to Pentagon City would be a replacement project for the Crystal City Streetcar. The Transitway would serve local travel demand within the corridor, as well as enhance connections to Metrorail and improve connections to Columbia Pike. It would provide needed transportation capacity to support the anticipated infill residential and office development in Crystal City and Pentagon City, particularly PenPlace, Pentagon Centre, and Metropolitan Park. Changes from Prior CIP This is a new project. E-66

67 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $26,306 Capital costs are estimated at a planning level and will be adjusted as project development progresses. Costs are inclusive of planning, design, and construction. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding ,840 1, ,529 HB2313 Regional ,401 3, ,701 TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding ,791 5, ,889 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) ,279 C&I ,112 5,343 6,255 0 TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds ,138 Subtotal Previously Approved Funding ,112 5,343 6, ,417 Revenues 897 1,233 1,617 11,134 11, ,306 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Other Previously Approved Funds include $968K in Tax Increment Fund and $170K in a state capital reimbursement grant. Notes on Operating Costs Operations Costs include the cost for monthly electrical service from Virginia Dominion Power and costs for routine cleaning of stations. Maintenance Capital Impact includes costs for replacement of lighting fixtures after useful life. Other annual costs include Guideway maintenance, enforcement personnel and towing contract. New FTEs (#): 0 E-67

68 PrTN: Transitway Extension to Pentagon City Associated Costs and Funding Sources Project Cost $27,106,000 Previous Funding State Funding $ 170,000 Transportation Investment Fund (TIF) $ 968,000 Previous Funding $ 1,138,000 New Funding Federal Funding $13,279,000 State Funding $ 4,529,000 TCF HB2313 Regional $ 7,501,000 Transportation Investment Fund (TIF) $ 659,000 New Funding $25,968,000 Project Funding $27,106,000 E-68

69 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP PrTN: Transitway Extension (Potomac Ave-Alexandria) Project Description This project is to plan, design, and construct the portion of the Crystal City Potomac Yard Transitway "Segment C" between the Arlington County Line at Four Mile Run and South Glebe Road. The length of the project in Arlington is approximately 600 feet. The remainder of Segment C falls within the City of Alexandria. The project will consist of constructing two new southbound travel lanes on Potomac Avenue and repurposing the two existing southbound travel lanes as transit-only lanes. The project will include drainage, signing, pavement marking, and signal modification. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Crystal City Sector Plan, Potomac Yards Design Guidelines, Transit Development Plan Critical Milestones: Design FY 2023 Construction FY 2024 Advisory Commission: Transit Advisory Committee, Transportation Commission Neighborhood(s): Arlington Ridge, Crystal City, Potomac Yard Project Justification Planning for improved surface transit in the Crystal City/Potomac Yard corridor began in earnest in the early 2000s. This early work examined bus and rail improvements connecting the Braddock Road Metro Station area through Potomac Yard to Crystal City, Pentagon City, and the Pentagon. After a series of planning, environmental, and operational studies, a Transitway to serve buses was constructed in Arlington and Alexandria through Potomac Yard and Crystal City. The Transitway would serve local travel demand within the corridor, as well as enhance connections to Metrorail and improve connections to Columbia Pike. It would provide needed transportation capacity to support the anticipated infill residential and office development in Potomac Yard in Arlington and Alexandria. The Transitway was divided into operable segments. "Segment C" will be completed as part of redevelopment of the North Potomac Yard planning area in the City of Alexandria. At that time, Arlington County will complete the 600-foot section of Segment C that falls within the County. Changes from Prior CIP This project is a new addition to the County CIP. E-69

70 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $2,352 Capital costs are at a highly conceptual planning level, with no design having been completed. Costs are not escalated. Project schedule will be driven by completion of Transitway "Segment C" in Alexandria, whose schedule is unknown at this time. Therefore, timeframe is a placeholder. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue PAYG Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Tax Increment Financing (TIF) , ,567 Subtotal New Funding , ,352 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues , ,352 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Notes on Operating Costs It is assumed there are no additional operating costs for this project. There are no stations to maintain. The cost for enforcement, snow removal, street lights, and pavement repair would constitute a negligible increase over the costs for maintaining the rest of the transitway. E-70

71 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP STAR Call Center Office Space Project Description STAR transports Arlington residents, certified by the Washington Metropolitan Area Transit Authority (WMATA) MetroAccess program, who are unable to use public transit for some or all trips due to the effects of disability, as well as County human service agency clients (mostly seniors). The STAR Call Center receives service requests from residents, schedules rides, monitors the service, resolves customer concerns, and provides initial review of the billing from the STAR transportation vendors. The Specialized Transit for Arlington Residents (STAR) Call Center is currently located in leased space which is expiring. A new space is required but the location is yet to be determined. The new space should provide additional and more functional space, be Americans With Disabilities Act (ADA) compliant, as well as provide access to better telephone and data network system. The total cost of $1.3 M is funded mainly with state grants ($0.4M) and TCF-HB2313 Local funds ($0.9M). Transit Development Plan Updates Project Description This project involves the major update of Arlington County's Transit Development Plan (TDP) as required by the state every six years. Consultant services would be obtained to assess bus service and provide recommendations for increased productivity or expansion in Arlington County, including both ART and Metrobus. The Virginia Department of Rail and Public Transportation (VDRPT) requires that each grant recipient develop a six-year Transit Development Plan (TDP), provide annual updates, and submit a new TDP every six years. Arlington County has a TDP for FY FY 2016 which has been updated annually since adopted in fall of The next TDP will be adopted in Spring/Summer FY 2016 and is required for the County to be eligible for state transit funding. The cost of $1.1M assumes 34% state capital reimbursement grant and 66% PAYG funds. E-71

72 TRANSPORTATION ARLINGTON TRANSIT PROGRAM TRANSPORTATION CIP Shirlington Bus Station Expansion Project Description This project focuses on the redevelopment of the parking lot adjacent to Arlington County's Shirlington Station in order to explore alternative uses and possibly expand the number of bus bays at the station. The County purchased the land from a private owner in 2006 and agreed to provide parking spaces on the site until April of Since the use restriction expires in April of 2019, County staff will assess the site and explore alternative uses including redeveloping the parking lot into additional bus bays for the Shirlington Station. The demand for more bus service is growing at this location. Alexandria is planning to implement bus rapid transit service from West End Alexandria to Shirlington. In anticipation of the need for additional bus bays, the project consists of planning, design and construction of additional bus bays subject to the results of the redevelopment study, Alexandria's project, and agreement on plan to redevelop. Associated Master Plan: Transit Development Plan Neighborhood(s): Critical Milestones: Conduct planning and engineering study Complete design phase Complete construction FY rd Qtr FY nd Qtr FY2020 2nd Qtr Advisory Commission: Transit Advisory Committee, Transportation Commission Project Justification The demand for more bus service is growing at the Shirlington Bus Station. ART service is in high demand and Alexandria is planning to implement bus rapid transit from West End Alexandria to Shirlington. Expansion of the Shirlington Bus Station will ensure capacity for local bus service and connectivity with a regional bus rapid transit network. Changes from Prior CIP This is a new capital project. E-72

73 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $2,850 Preliminary cost estimate to cover planning, design, and construction. Cost estimate will be updated/refined during engineering study and design. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions Transportation Capital Fund (TCF) ,889 C&I TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding ,411 1, ,850 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,411 1, ,850 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Funding plan consists of TCF C&I and state capital reimbursement grants. Funding assumptions are TCF C&I and state funds in FY17 (83%/17% split) and FY18- FY20 (66%/34% split). Notes on Operating Costs Minor operating costs anticipated for utilities, snow removal, and cleaning. New FTEs (#): 0 E-73

74 Arlington County, Virginia TRANSPORTATION COMPLETE STREETS: PROGRAM FUNDING SUMMARY CIP Army Navy Country Club Emergency Access Drive Army Navy Drive Complete Street BIKEArlington Boundary Channel Drive Interchange Bridge Renovation Capital Bikeshare Columbia Pike Streets Commuter Stores Crystal City, Pentagon City, Potomac Yard Streets East Falls Church Streets Improvements Outside Major Corridors Intelligent Transportation Systems Lee Highway Multimodal Improvements Neighborhood Complete Streets Parking Meters 10 YEAR CATEGORY SUMMARY (in $1,000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY ,500 2, ,150 1, , ,009 3,467 1,712 1, ,820 6,057 1, ,888 2,150 2,395 2,440 8,630 3, ,331 4,025 2,812 2, ,497 2,435 1, ,534 2,610 21, ,238 1,792 1,187 1, ,215 10,303 28,715 40,787 23,412 5, , ,421 9,096 11,205 9,775 10,050 7,725 5,175 10,600 9,975 8,675 5,325 87, ,007 1, ,106 12,588 9,217 6,899 2,915 3,371 2,313 2,382 2,454 2,527 2,603 47,269 8,125 2,375 5,060 2,410 4,820 1,920 4,820 1,920 1,820 1,920 35, ,000 2, ,000 7,700 4,000 1,700 20, ,026 1,058 1,086 1,114 1,147 1,176 1,206 9, ,363 1, ,527 E-74

75 Parking Technology Regulatory Signage Rosslyn-Ballston Arterial Street Improvements Safe Routes To Schools Strategic Network Analysis and Planning Street Lighting Transportation Asset Management Transportation Systems & Traffic Signals WALKArlington , ,108 12,533 11,283 9,500 6,750 2,950 5,000 2,800 1,750 3,000 66,674 2,653 2,689 1,864 1,480 1, , ,100 1,190 3,041 2,953 1,697 1,745 1,800 1,855 1,905 1,960 2,025 20, ,330 6,948 7,209 4,974 3,250 4,950 3,250 3,250 4,950 3,250 3,250 45,281 1,026 1, ,560 Recommendation 95, ,327 89,637 56,330 45,516 29,174 42,301 44,308 33,792 28, ,910 CATEGORY FUNDING SOURCES (in $1,000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 New Funding Federal Funding 1,100 1,718 2,303 1, ,396 1, , ,249 State Funding 4,675 2,487 1,795 1,464 1,482 1, ,530 1, ,623 Developer Contributions ,213 1,750 2,000 4, ,000 14,023 New Bond Issue 1,485 3,207 1,899 4,426 4,697 3,119 3,291 2,987 3,383 3,479 31,973 PAYG 1,345 5,816 5,342 3,550 4,551 3,979 4,225 4,327 4,824 5,008 42,967 Other Funding 1,500 6,550 1,700 1,200 1, ,000 1, ,700 Transportation Capital Fund (TCF)-C&I 4,321 6,386 27,826 16,920 8,376 3,365 6,379 8,902 4,936 2,101 89,512 TCF - HB2313 Local 2,643 5,083 6,393 8,860 11,818 9,312 10,461 10,512 6,448 6,813 78,343 HB2313 Regional 14, ,411 3,000 5, ,000 7,700 4,000 1,700 48,661 Tax Increment Financing (TIF) 1,111 4,474 5,037 5,271 5,337 4,051 6,413 5,516 5,387 4,562 47,159 Subtotal New Funding 33,515 36,471 59,706 47,220 44,911 29,347 41,508 45,124 33,745 27, ,210 Previously Approved Funding Authorized but Unissued Bonds 1, ,396 Issued but Unspent Bonds 4,938 1, ,002 Transportation Capital Fund (TCF)-C&I 31,500 34,598 7,775 3, ,002 TCF - HB2313 Local 8,642 4,715 1, ,877 HB2313 Regional 8,350 11,950 6, ,535 Other Previously Approved Funds 22,463 7,975 6,652 1, ,888 Subtotal Previously Approved Funding 77,508 61,001 23,150 7, ,700 Funding Sources 111,023 97,472 82,856 54,261 44,911 29,347 41,508 45,124 33,745 27, ,910 E-75

76 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Army Navy Country Club Emergency Access Drive Project Description This project will consist of a new roadway connection for emergency, bicycle and pedestrian access through a 30 ft. wide easement along the edge of the Army Navy Country Club that will provide a connection between the Arlington View neighborhood and the Country Club driveway connection to Army Navy Drive. It will be designed to meet the needs of police and fire vehicles, not general motor traffic. Likewise, access will be restricted to public safety uses and bicycles and pedestrians only. The necessary easements were secured through a Use Permit filed by the Army Navy Country Club to expand their clubhouse along with other improvements. The Use Permit was approved in June of 2010 and the public use and access easement was recorded in March of This easement may terminate automatically if construction contracts are not awarded within 20 years of that date. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): Arlington View, Columbia Heights, Pentagon City Critical Milestones: Preliminary Design FY 2020 Engineering FY 2021 Construction FY FY 2023 Advisory Commission: Bicycle Advisory Committee, Emergency Preparedness Advisory Commission, Pedestrian Advisory Committee, Transportation Commission Project Justification Today, I-395 is a barrier that separates the neighborhoods along the redeveloping Columbia Pike corridor from those of Pentagon City, Crystal City and the important facilities and resources, such as Long Bridge Park, the Mt. Vernon Trail and Metro stations. Currently the only connection between Four Mile Run and The Potomac River is from S. Joyce Street. Should Joyce Street become blocked for some reason, these areas would become isolated from each other, exacerbating traffic and making emergency response extremely difficult. This connection would provide a much needed relief valve for emergency access. When not in use for emergency access, this drive would provide a much needed bicycle and pedestrian connection between these neighborhoods. Bridging the I-395 barrier will improve the mobility options of the thousands of people who live in these neighborhoods, reducing reliance on automobiles and expanding access to transit. E-76

77 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $5,150 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue PAYG Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF) C&I TCF - HB2313 Local ,500 2, ,150 HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding ,500 2, ,150 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,500 2, ,150 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Notes on Operating Costs E-77

78 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Army Navy Drive Complete Street Project Description This project will consist of a rebalancing of the right-of-way (ROW) to permit improved bicycle, pedestrian and transit accommodations on Army Navy Drive (includes narrowing of existing travel lanes). This project will provide for a 0.7 mile, two-way dedicated bicycling facility (cycle track) on the south side of the ROW, alongside the existing sidewalk. Americans with Disabilities Act (ADA) compliant curb ramps, rebuilt driveway aprons and traffic signalization modifications will be included in this project. The project is being coordinated with the Transitway project where they overlap between S Joyce St and S Hayes St. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): Arlington Ridge, Aurora Highlands, Pentagon City Design FY FY2018 Utility Relocation FY FY 2018 Bidding (Prep, AD, Review) FY 2019 Construction FY 2019 Advisory Commission: Bicycle Advisory Committee, Pedestrian Advisory Committee, Transportation Commission Project Justification Army Navy Drive is the key arterial street between the Pentagon, I-395, and the Pentagon City / Crystal City transit oriented activity center. It is currently designed primarily to funnel automobiles on and off I-395, and is extremely inhospitable to pedestrians, bicyclists, and transit users coming or going from the Pentagon. Conversion of Army Navy Drive to a complete multimodal street will improve the local connection between the Pentagon and the commercial, residential, and retail services of the Pentagon City and Crystal City areas, as well as to the many Department of Defense subcontractors with offices in those locations. This project will greatly improve Army Navy Drive's multimodal level of service. Higher quality biking facilities, such as cycle tracks, will improve the effectiveness of the County's investments in the regional bikeshare system. Changes from Prior CIP The estimated costs from the previous CIP were from a 2011 cost estimate that was done as part of the 14th Street Bridge study. The estimate was for construction only and did not include significant items including storm drainage, sidewalks, streetlights, traffic signals and other miscellaneous items. Additionally, staff determined that traffic analysis and concept development was necessary. Firm proposals received for traffic analysis and signal design added $148K to the current working estimate. The current estimate includes these items along with construction contingency and management, engineering, and project management. The schedule was adjusted based on the start of traffic analysis and recent experiences bidding federal and state funded projects. E-78

79 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $12,009 This working cost estimate is intended to cover completion of design and all construction. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions HB2313 Regional 0 0 4, ,411 TCF Bonds Tax Increment Financing (TIF) , ,647 TIF Bonds Subtotal New Funding , ,058 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 1, , ,951 Subtotal Previously Approved Funding 1, , ,951 Revenues 1, , ,009 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Other Previously Approved Funds includes $1,415,000 in federal funding, $2,156,000 from the Crystal City/Potomac Yard/Pentagon City TIF, and $1,380,000 in developer contributions (Arlington Apartments / to board in January 2015). Notes on Operating Costs New FTEs (#): 0 E-79

80 Army Navy Drive Complete Street Associated Costs and Funding Sources ($ in millions) Costs $12.6 Funding Sources TIF: $ 4.9 NVTA Regional: $ 4.4 Federal Funding: $ 1.9 Developer Funds: $ 1.4 Sources $12.6 E-80

81 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP BIKEArlington Project Description The BIKEArlington program makes physical enhancements to Arlington's bicycle infrastructure, including trails and streets. The program's goal is to ultimately increase the number of riders and their riding frequency to make bicycle usage a more significant travel mode. The intent of the program is to provide safe and convenient bike parking, to complete the bicycle network, make the network safer to use, and to provide intuitive and easy to understand wayfinding and traffic control. The program funds five types of projects: new construction of multi-use trails; trail renovations and safety improvements; expansion of bike lanes and other on-street facilities; installation of bike parking; and directional wayfinding. Projects range in scale from small intersection adjustments and spot fixes to 1/2 mile segments of new trails. The program coordinates with the Neighborhood Conservation (NC) Program, Department of Parks and Recreation, and Transportation Engineering & Operations (TE&O) to achieve multiple long term infrastructure and operational goals that span multiple departments and constituencies. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Bicycle Advisory Committee, Transportation Commission Neighborhood(s): VARIOUS Project Justification Arlington County adopted goals with the Master Transportation Plan that call for providing high-quality transportation services for all, moving more people without creating more automobile traffic, promoting safety, serving mobility and accessibility for all persons and enhancing environmental sustainability. In order to achieve these goals, the County's bicycle network will have to be substantially improved through capital projects to complete missing sections, address safety concerns and improve its usability. Incomplete segments, confusing or missing wayfinding information, or perceived danger from vehicular traffic discourages some residents and workers from using bicycles as regular transportation. As the County implements programs to increase its bicycle travel share, it can address traffic congestion, energy and environmental sustainability concerns, and improve public health. BIKEArlington projects have been able to link together and expand upon the improvements made by private development to create a more cohesive and functional bikeway system. E-81

82 Changes from Prior CIP In the prior CIP, half of the $5 million in funding for the Four Mile Run Pedestrian & Cyclist Bridge was in WALK Arlington, and the balance was in BIKE Arlington. In the FY17- FY26 CIP, all funding for this project is included in the BIKE Arlington program. Also, figures have been updated to reflect the latest cash flows for the eleven active projects and initiatives within this program. Placeholder funding is also included toward the latter part of the ten year plan for potential future projects. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $20,888 $3.55 million is included in this CIP for the Custis Trail Renovation and Expansion project, and $0.7 million for Protected Bike Lanes. Funding Schedule (in $1,000s) New Funding Federal Funding ,836 New Bond Issue ,045 PAYG Other Funding ,000 1, ,550 Transportation Capital Fund (TCF) , ,835 C&I TCF - HB2313 Local ,234 2, ,918 Tax Increment Financing (TIF) Subtotal New Funding ,757 6,057 1, ,049 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds ,159 Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 2,002 1, ,300 Subtotal Previously Approved Funding 3,288 1, ,839 Revenues 4,042 1,713 1, ,757 6,057 1, ,888 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): Notes on Funding Schedule Decal fee fund requests are as follows: $40,000 in FY17, $30,000 in FY18, and $5,000/year in FY19-FY26 for Wayfinding Signage. Other Funding includes anticipated I-66 toll revenues to be used for the Custis Trail Renovation and Expansion project. The $300,000 in Authorized but Unissued Bonds is from the 2014 Referenda. Other Previously Approved Funds include $1,808,000 in Federal Funding, $1,152,000 in State Funding, $10,000 in decal fee funding, $227,000 in Paygo, and $103,000 in TIF. Notes on Operating Costs Operating cost for one new automated counter. This includes: Modems subscription and data hosting + support $604/device/yr. = $1045/device/yr. E-82

83 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Boundary Channel Drive Interchange Project Description The existing Boundary Channel Drive interchange is inadequate for current demands and for planned growth in Crystal City. The addition of Long Bridge Park, the new Boeing office building and other planned high-density development in the Crystal City area accelerate the need for improvements at this location. Long Bridge Park Drive to and through the interchange with I-395 and Boundary Channel Drive will be reconstructed to provide a safe and attractive environment for all modes of transportation, including bicyclists, pedestrians, buses, and vehicles. Project elements include new curb and gutter, sidewalks, bicycle facilities, streets trees and street lighting. Critical bike and pedestrian connections will be made from Crystal City to the Mount Vernon Trail. Two roundabouts will be constructed, which will serve as a gateway to the new aquatic center and Long Bridge Park. The redesigned interchange will improve safety and will be effective in managing frequent closures of Boundary Channel Drive because of activities that take place on the Pentagon Reservation. Associated Master Plan: Natural Resources Management Plan (NRMP) Neighborhood(s): Critical Milestones: Design FY 2017 Notice to Proceed FY 2019 Construction Completion No later than FY 2021 Advisory Commission: Transportation Commission Project Justification The design of the existing Boundary Channel Drive/I-395 Interchange is not adequate to handle the trips expected with future development in the surrounding area. The Long Bridge Park, new Boeing office building and future densities expected in Crystal City will generate travel trips to/from the interchange that are beyond the existing design capacity. Multi-Modal improvements are also planned as part of the design, so that the area can be better connected to the trails and existing facilities in Crystal City and along the George Washington Parkway. This project is a part of the Federal Highway Administration's 14th Street Bridge Environmental Impact Study and is cited as an alternative that will help to mitigate congestion on I-395. E-83

84 Changes from Prior CIP The primary differences in the current, more refined concept plans and estimate include the following elements which were not previously included due to lack of a completed transportation analysis, in depth site analysis and stakeholder input: Reconstruction of the Pentagon entrance onto Boundary Channel Drive (BCD); The need to narrow BCD west of the Pentagon entrance; We are now connecting directly to the NB I-395 on-ramp from Long Bridge Drive; The need to widen Long Bridge Drive in order to accommodate a left turn lane on Long Bridge Drive; The need to rebuild the I-395 NB ramp further than what was included in the previous concept; The removal of the bus pull out lane that was on SB I-395; Inclusion of potential additional costs that may be discovered through the design development process (i.e. the need for retaining walls, discovery of currently unknown underground utilities, etc.) E-84

85 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $19,331 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 0 0 1, ,061 Developer Contributions New Bond Issue ,340 2, ,340 PAYG TCF - HB2313 Local ,814 1, ,530 HB2313 Regional TCF Bonds Tax Increment Financing (TIF) , ,754 TIF Bonds Subtotal New Funding ,061 5,613 3, ,685 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds ,326 Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional 1,250 1, ,335 Other Previously Approved Funds , ,985 Subtotal Previously Approved Funding 2,025 2,225 1,379 3, ,646 Revenues 2,150 2,395 2,440 8,630 3, ,331 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Other Previously Approved Funds includes $1.985 million in state revenue sharing, which requires a 50% match. $4,335,000 in HB 2313 Regional funding is from FY Notes on Operating Costs E-85

86 Boundary Channel Drive Interchange Associated Costs and Funding Sources ($ in millions) Costs $20.2 Funding Sources GO Bonds: $ 6.2 NVTA Regional: $ 4.3 TCF: $ 4.6 State Funding: $ 3.3 TIF: $ 1.8 Sources $20.2 E-86

87 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Bridge Renovation Project Description This program pays for rehabilitation, upgrade or replacement of bridges owned by Arlington County. Rehabilitation will address deterioration of the bridge structure and adjacent public roadway and landscaped area. Bridge reconstruction may include upgrades to: sidewalks, bicycle facilities, transit stops, lighting, facades and other features in accordance with the Arlington County policy of Complete Streets as defined in the 2007 Master Transportation Plan. Opportunities to include public art will be explored. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): VARIOUS Critical Milestones: North Carlin Springs Road Bridge Shirlington Road Bridge Design Complete FY16; Construction FY17-FY18 Design FY17-FY18; Construction FY19- FY20 Advisory Commission: Transportation Commission Project Justification All County bridges are inspected biennially and assessed as to their condition and need for repair or rehabilitation. Some bridges have also been identified through planning efforts as being in need of upgrades to accommodate non-automobile travel modes and for aesthetic improvement. The bridges currently in need of rehabilitation and upgrade are North Carlin Springs Road over George Mason Drive, Shirlington Road over Four Mile Run and North Meade Street over Arlington Boulevard. Place holders for out years (FY FY 2026) are included for potential projects based upon findings of upcoming physical inspections. Changes from Prior CIP Adjustment of project schedules due to delays with the Carlin Springs Road bridge project. E-87

88 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $21,300 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding , ,230 1, ,184 Developer Contributions New Bond Issue 450 1, , ,270 1,305 9,545 PAYG Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 700 3, ,387 1,932 2,031 1,019 1,720 2,537 1,379 16,482 Previously Approved Funding Authorized but Unissued Bonds ,300 Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 2, ,236 Subtotal Previously Approved Funding 3,325 1, ,818 Revenues 4,025 4,220 1,050 1,387 1,932 2,031 1,019 1,720 2,537 1,379 21,300 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): Notes on Funding Schedule State Funding in the New Funding section is shown in the year of application, not the year of use. The $1.3 million in Authorized but Unissued Bonds is from the 2014 Referenda. Other Previously Approved Funds includes federal funds totaling $852,000 and state funds totaling $2,384,000. Notes on Operating Costs E-88

89 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Capital Bikeshare Project Description Capital Bikeshare was launched in 2010 as the first public-private partnership bikeshare service in North America. Since then, the regional service in Arlington and D.C. has grown from 114 stations and 1,000 bicycles to 355 stations and 3,000 bicycles in 2015 and now includes the City of Alexandria, VA and Montgomery County, MD. As of October 2015, Arlington has 81 stations and 600 bicycles. Capital Bikeshare is bike transit which offers a fleet of bicycles available at automated stations 24 hours per day and 365 days per year. Fare types include 24- hour, 3-day, 30-day, annual, and annual with monthly installments. Arlington is also the first jurisdiction in the nation to offer cash payment for fare payment to assist unbanked Arlingtonians, rather than credit or debit cards which is the national standard for bikeshare payment. The first 30 minutes of every trip are included in the fare cost with each additional 30-minute period costing an increasing amount to encourage short transit trips. Eleven million trips have been taken to date regionally. The service is jointly managed by the four jurisdictions which has one operator for the entire system. Capital funding supports expansion into neighborhoods not yet served, in-fill stations within the service boundary, larger station sizes for the high demand stations, and on-going operations and maintenance. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Bicycle Advisory Committee, Transportation Commission Neighborhood(s): VARIOUS Project Justification Arlington's portion of the regional Capital Bikeshare service had a 63% operating cost recovery in FY15. During that fiscal year, trips starting in Arlington increased by 21% to 231,000. These trips accounted for 466,000 miles with customers burning 19.2 million calories for an increase of 18% over the prior fiscal year. The average trip distance was 1.8 miles. Changes from Prior CIP The current CIP reflects updated information from the "Arlington County Capital Bikeshare Transit Development Plan - Progress Report and FY2016-FY2021 TDP Update". This program has decreased by $3.1 million from the FY15-FY24 CIP. This is driven by the fact that the prior CIP included operating costs for the program. The current CIP excludes operating costs. E-89

90 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $10,303 cost includes expansion capital and maintenance capital for the program. Completion of the network is assumed to happen in FY20 with approximately 130 stations per the Arlington County Capital Bikeshare Transit Development Plan. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions Transportation Capital Fund (TCF) ,463 C&I TCF - HB2313 Local ,238 1,792 1,137 1, ,215 8,448 HB2313 Regional Subtotal New Funding ,238 1,792 1,187 1, ,215 9,961 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds TCF - HB2313 Local Subtotal Previously Approved Funding Revenues 1, ,238 1,792 1,187 1, ,215 10,303 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Developer contribution is for site plan # 429 (1401 Wilson in Rosslyn). Other Funding includes primarily revenue from user fees, and also some sponsorships. Notes on Operating Costs Estimated annual operating cost is $96.17 per dock per month. Annual increase in docks is per the Arlington County Capital Bikeshare Transit Development Plan published in April Operating costs for this program are funded by user revenues, sponsorships, and also transportation capital funds. E-90

91 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Columbia Pike Streets Project Description These improvements are necessary to accommodate current and future transit operations and to support existing and proposed land uses and development along Columbia Pike. The design and construction of a "complete street" including center/median left-turn lanes and improved pedestrian facilities and amenities will improve the efficiency and safety of all travel modes. Opportunities to incorporate public art will be explored. Parallel bike routes on 9th Street South and 12th Street South ("Bike Boulevards") are being installed as part of this initiative. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): Critical Milestones: Design Complete Spring 2017 Construction Start Fall 2016 Construction Complete Fall 2019 Closeout Fall 2019 Advisory Commission: Columbia Pike Civic Associations, Transportation Commission Project Justification This corridor is a focus of commercial and retail activity, and serves as South Arlington's Main Street, providing a direct connection to the Pentagon and Pentagon City. These street improvements directly benefit existing and proposed development and will benefit travel by all modes between Pentagon City and Jefferson Street. Columbia Pike currently carries between 20,000 and 30,000 vehicles and over 600 bus trips and 16,000 passengers on an average weekday. This reconstruction will improve traffic and transit operations and will support increasing the transit capacity. Changes from Prior CIP CIP now includes: Realignment of Columbia Pike from Oak to Joyce Street; sanitary sewer relocations from Southgate Road to Columbia Pike, routed down the new Joint Base Access Road (will be covered by federal funds); Bike Boulevards. E-91

92 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $99,040 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue PAYG Other Funding 0 5, ,050 Transportation Capital Fund (TCF) ,850 C&I ,724 5, TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 0 5,050 16,724 5, ,900 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) ,440 C&I 23,115 25, TCF - HB2313 Local HB2313 Regional 5,600 10,200 5, ,700 Other Previously Approved Funds Subtotal Previously Approved Funding 28,715 35,737 6, ,140 Revenues 28,715 40,787 23,412 5, ,040 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Other Funding includes an anticipated contribution from Arlington National Cemetery. Notes on Operating Costs In order to implement the adopted capital program, additional staffing may be required in the future. New FTEs (#): 0 E-92

93 S OAK ST COLUMBIA PIKE STREETS CAPITAL IMPROVEMENT PROJECTS µ S CARLIN SPRINGS RD COLUMBIA PIKE S GLEBE RD 9TH ST S S GEORGE MASON DR S FOUR MILE RUN DR 12TH ST S!> S WALTER REED DR 11TH ST S S ROLFE ST Capital Improvements Type Complete Streets Complete Streets With Undergrounding Bike/Pedestrian!> Intersection E-93

94 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Commuter Stores Project Description The Commuter Stores located in Rosslyn (1993), Crystal City (1992), Ballston (1989), Shirlington (2008) and the Mobile Commuter Store (2001), provide a one-stop retail place for residents, workers and visitors to get information and fares for all of the region's transit systems, as well as bike, walk, and shared ride information. Over 225,000 people visit The Commuter Stores annually. The stores are part of Arlington County Commuter Services multi-program approach to make it easy for residents, workers and visitors to take transit, bike, walk and share the ride rather than drive alone. The Commuter Stores are the retail face of Arlington's Car-Free Diet, Bike and Walk Arlington, Arlington Transportation Partners, Capital Bikeshare and Mobility Lab. Every day these services switch 42,000 single occupant vehicle trips to other modes - 75% of them to transit. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Transportation Commission Neighborhood(s): VARIOUS Project Justification The useful life of the Commuter Stores is about 10 years, and as such are each scheduled to be renovated/rebuilt approximately every 10 years. This plan includes the renovation of the Shirlington, Rosslyn, and Crystal City stores. This plan includes the build out of a new Commuter Store to be located in Pentagon City as part of site plan # 297. This plan also includes the build out of a new Commuter Store kiosk in 2021 to be located in Courthouse as part of the approved Courthouse Sector Plan Addendum 2015: Courthouse Square. The current Mobile Commuter Store was built in 2006 by Winnebago on an RV chassis. Plans are to procure a replacement unit in FY The goal is to acquire a low-floor vehicle to better meet Americans with Disabilities Act (ADA) requirements. Also, the delivery truck used by The Commuter Stores to pick-up and deliver transit schedules and transportation options brochures. Its useful life is estimated at five years. This plan includes replacement of this vehicle, which was purchased in 2011, in FY Changes from Prior CIP Addition of the Pentagon City Commuter Store build out per the Phased Development Site Plan Amendment of the Pentagon Centre PDSP (site plan # 297) approved by the County Board in September Addition of the Courthouse Commuter Store kiosk build out per the Courthouse Sector Plan Addendum: Courthouse Square, approved by the County Board in September E-94

95 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $2,421 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue PAYG ,921 Subtotal New Funding ,421 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,421 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) ,732 Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,732 New FTEs (#): 0 Notes on Funding Schedule Notes on Operating Costs Estimated annual operating cost per store, including contract staff and non-personnel expense, is $311,000. We anticipate opening the Pentagon City store in FY 2020, and the Courthouse kiosk in FY These additional costs will be funded by the Arlington County Commuter Services operating budget, which consists of a variety of federal, state, and local sources. Cost estimate assumes no rent (based on site plan conditions). E-95

96 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Crystal City, Pentagon City, Potomac Yard Streets Project Description This program is in support of the Crystal City Sector Plan and Crystal City Multi-Modal Study to construct street improvements that will support the transformation of Crystal City from a primary office environment to a balanced multi-modal transportation balanced office-residential built environment that has 24-hour use. The street network projects will begin to create a grid network for Crystal City, convert several one way streets into two way streets, and will prepare the road network for a bus transitway in the near-term and additional transit enhancements in the long-term. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, Crystal City Sector Plan Neighborhood(s): Aurora Highlands, Crystal City, Pentagon City, Potomac Yard Critical Milestones: Design is phased FY FY 2026 Construction is phased FY FY2026 Advisory Commission: Transportation Commission Project Justification This program will transform streets from auto-centric to multi-modal complete streets with bicycle lanes, improved pedestrian facilities, accommodations for transitway improvements, on-street parking, improved street lights, traffic signals and Americans with Disabilities Act compliant facilities. The planned roadway realignments will accommodate for redevelopment sites, create new park areas throughout Crystal City and a changing transportation environment for Crystal City. The program will achieve many of the goals outlined by the Crystal City Sector Plan, Crystal City Multi-Modal Study and the Transportation Master Plan. The transportation benefits include immediate improvements to existing conditions and laying the groundwork to accommodate a bus transitway. The improved street network will effectively accommodate the projected growth at the Crystal City Metro station area as the plan is built out. Projects include revised and new roadway alignments, improved intersection geometry, two-way traffic patterns, updated traffic signals, bike lanes, new signage and striping, utility undergrounding, accessible clear zone sidewalks and crosswalks, new street lights, street trees, and modern transit shelter facilities. Project locations include Crystal Drive, Clark Bell Street, 12th Street, 18th Street, 23rd Street, and 27th Street. E-96

97 Changes from Prior CIP This program was titled 'Crystal City Streets' in the prior CIP. The Eads Street cycle track pilot project and a storm sewer upgrade and the County's portion of street improvements on 12th Street between Fern and Eads Street were completed in FY Streetscape improvement along S. Eads Street and Route 1 around the ART House facility are currently under construction. Construction of the South Clark Street Bridge demolition project will begin this year. Additional projects have been added to the schedule for the out years and costs were refined given the need for technical analysis for major projects such as the 23rd Street South reconstruction and 15th Street South Extension. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $87,601 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Transportation Capital Fund (TCF)- 4,187 4,459 3, ,515 C&I ,038 2,188 1,124 HB2313 Regional 11, ,600 Tax Increment Financing (TIF) 986 4,282 2,379 3,812 5,337 4,051 6,413 5,516 5,387 4,562 42,725 Subtotal New Funding 12,716 4,679 3,320 5,850 7,525 5,175 10,600 9,975 8,675 5,325 73,840 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) ,304 1, ,167 C&I Other Previously Approved Funds 6,478 1, ,594 Subtotal Previously Approved Funding 6,952 2,179 2,880 1, ,761 Revenues 19,668 6,858 6,200 7,600 7,525 5,175 10,600 9,975 8,675 5,325 87,601 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Other Previously Approved Funds are from the Crystal City/Potomac Yard/Pentagon City Transportation Investment Fund (TIF). Notes on Operating Costs In order to implement the adopted capital program, additional project management, civil engineering, and real estate support may be required. New FTEs (#): 0 E-97

98 BIA PIKE CRYSTAL CITY, PENTAGON CITY, POTOMAC YARD STREETS CAPITAL IMPROVEMENT PROJECTS INTERST R T S S ARLINGTON RIDGE RD S JOYCE ST ARMY NAVY DR S HAYES ST S HAYES ST 23RD ST S 12TH ST S S EADS ST 15TH ST S 18TH ST S!>!>!>!> US ROUTE 1 JEFFERSON DAVIS HWY!>!>!>!> 20TH ST S CRYSTAL DR GEO US ROUTE 1!> RTE 233 µ Capital Improvements S ARLIN G T ON RIDGE RD CRYSTAL DR Type S GLEBE RD Complete Streets S GLEBE S EADS ST Bike/Pedestrian RD!> Intersection E-98

99 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP East Falls Church Streets Project Description The program will implement upgrades as identified in the adopted 2011 East Falls Church Area Plan, to include improvements to Sycamore Street, Washington Boulevard, Lee Highway, Westmoreland Street and Fairfax Drive. The goal of this program is to reconstruct portions of the primary streets within the East Falls Church area to improve pedestrian / bike safety and accessibility, an important piece within the transit-oriented development around the existing East Falls Church Metrorail station. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, East Falls Church Area Plan Neighborhood(s): Arlington-East Falls Church Critical Milestones: Sycamore Street FY17 - FY20 Lee Highway FY21 - FY24 Advisory Commission: Transportation Commission Project Justification The existing streets around the East Falls Church Metrorail station are designed almost exclusively for private automobile use and are difficult for pedestrians and bicyclists to use safely. The adopted East Falls Church Area Plan identified reconfigurations of a number of area streets including Lee Highway, Washington Boulevard, Fairfax Drive and North Sycamore Street that are to be implemented during the 20 plus year plan. While it is anticipated that redevelopment will construct some of the improvements, the County will need to initiate projects for sections of several of the streets. The primary intent of the projects is to create more complete streets with better facilities for pedestrians, bicyclists, and transit service. In some cases, such as along Lee Highway, improvements will need to be coordinated with the Virginia Department of Transportation (VDOT) and the City of Falls Church. This effort will also expand on the requested pedestrian / bike improvements associated with VDOT's Spot 2 Improvement Project, which adds additional ramp capacity to I-66 / Washington Boulevard. The County has raised pedestrian safety concerns within this project venue. Changes from Prior CIP Increased funding to include projects in years beyond FY E-99

100 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $6,106 No Right-of-Way will need to be purchased. Assume funds ($400,000) for upgrade of one traffic signal and intersection every third year, beginning in FY2017. There will be two large street retrofit projects: 1) Sycamore Street (FY17-20), and 2) Lee Highway (FY21-24) Funding Schedule (in $1,000s) New Funding Federal Funding ,297 State Funding ,770 Developer Contributions New Bond Issue ,810 PAYG Subtotal New Funding ,124 1, ,056 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding ,050 Revenues ,274 1, ,106 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Federal and State Funding in the New Funding section are shown in the year of application, not the year of use. Federal Funding is Transportation Alternatives (TAP), which requires a 20% match. TCF - HB 2313 Local funding will be used for the match. State Funding is revenue sharing, which requires a 50% match. GO Bond funds will be used for the match. Notes on Operating Costs E-100

101 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Improvements Outside Major Corridors Project Description This program is designed to provide improvements to major travel corridors outside principal business districts. The program includes multimodal enhancements such as pedestrian, bicycle and transit access improvements. This program will provide construction of left-turn lanes at the North Glebe Road/Lee Highway intersection, pedestrian improvements along Old Dominion Drive from the North Glebe Road to Fairfax County line, multimodal improvements to George Mason Drive, Walter Reed Drive, South Courthouse Road and Four Mile Run Drive. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Transportation Commission Neighborhood(s): VARIOUS Project Justification These projects improve travel for Arlington residents and commuters traveling to Arlington. The projects will improve access in the business districts where many small retail centers are located. It will also enhance the overall performance of these corridors through selective improvements such as new turn lanes and signals as well as enable more efficient bus service and improve accessibility for pedestrians and bicyclists. Arlington has about 30 miles of primary travel corridors, including Arlington Boulevard, George Mason Drive, Carlin Springs Road, Old Dominion Drive, Walter Reed Drive, and Washington Boulevard. These are used by most of the traveling public within the county. Although these corridors have some commercial frontages, they are largely outside of the County's primary business districts. Projects will provide accessible walking routes, adequate transit stops, curbside parking and loading areas, and safe accommodations for bicycling. Changes from Prior CIP Figures have been updated to reflect the latest cash flows for the nineteen active projects within this program. Placeholder funding is also included for potential future projects. E-101

102 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $47,269 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding 1,875 1, ,108 Developer Contributions New Bond Issue PAYG ,424 Master Lease Sanitary District Tax Other Funding Transportation Capital Fund (TCF) C&I TCF - HB2313 Local ,779 1,569 2,614 1,739 1,791 1,845 1,900 1,957 17,071 HB2313 Regional Tax Increment Financing (TIF) Subtotal New Funding 2,485 2,580 4,121 2,514 3,371 2,313 2,382 2,454 2,527 2,603 27,350 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) ,055 C&I 1,560 1, TCF - HB2313 Local 4,920 2, ,526 Other Previously Approved Funds 5,037 1, ,899 Subtotal Previously Approved Funding 11,956 5,597 1, ,919 Revenues 14,441 8,177 6,086 2,915 3,371 2,313 2,382 2,454 2,527 2,603 47,269 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Decal fee revenues (part of PAYG funds) help to pay for these projects. In this CIP, that includes $360,000 in FY17, $370,000 in FY18, and $395,000/year in FY19-FY26. The $226,000 in Authorized but Unissued Bonds is from the 2014 Referenda. Other Previously Approved Funds includes $933,000 in Federal Funding, $2,021,000 of State Funding, $2,667,000 in undergrounding funds, $832,000 in decal fee funds, and $446,000 in general PAYG funds. Notes on Operating Costs New FTEs (#): 0 E-102

103 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Intelligent Transportation Systems Project Description The Intelligent Transportation Systems (ITS) program focuses on leveraging new technologies to improve the traffic operations and monitoring capabilities for all modes throughout the County. These technologies include Closed Circuit Television (CCTV) cameras (controlled by the traffic operations monitoring team and emergency operations staff), real time traffic monitoring, real time traffic data collection, travel time forecasting (Columbia Pike, Arlington Blvd., Lee Hwy.), and the implementation of the new web-based traffic signal controller system. Upgrading the communication network to fiber optics will improve the reliability of signal communications. As this upgrade is almost complete, the program must now shift focus to expanding and upgrading the existing ITS components listed above. This project represents a subset of smart cities technologies to improve the quality of life for our residents and visitors. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Transportation Commission Neighborhood(s): VARIOUS Project Justification While the program has been recognized as a leader in local government ITS applications, the current system includes aging infrastructure (some 20+ years) and out-of-date hardware and software. The program requires continuous improvement and updating to maintain the County's approximately 294 traffic signals, 70 school flashers, 180 CCTV cameras, variable message signs, traffic sensors, and permanent count station system. E-103

104 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $35,190 Funding Schedule (in $1,000s) New Funding Federal Funding ,800 Transportation Capital Fund (TCF) ,510 C&I TCF - HB2313 Local 950 1,300 1,200 1, ,780 HB2313 Regional 3, , , , ,000 Subtotal New Funding 4,650 1,950 4,860 2,410 4,770 1,970 4,770 1,970 1,770 1,970 31,090 Previously Approved Funding Issued but Unspent Bonds 1, ,000 Transportation Capital Fund (TCF) ,025 C&I TCF - HB2313 Local HB2313 Regional 1, ,500 Subtotal Previously Approved Funding 3, ,100 Revenues 8,125 2,375 5,010 2,460 4,770 1,970 4,770 1,970 1,770 1,970 35,190 Projected Additional Operating Costs (in $1,000s) Personnel ($) ,800 Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost ,800 New FTEs (#): Notes on Funding Schedule Notes on Operating Costs The Traffic Management Center has grown to accommodate various computer servers for CCTV, Bluetooth, MaxView and count station programs. These servers are managed by traffic operations staff for data backups, troubleshooting, and data access. Staff may be needed in the future to manage all data access and servers installed by the ITS program as well as to process the data and make it available to the public under "open data initiatives". There is a potential to partially fund this position with I-66 HOT lane Transportation Management Plan funds. E-104

105 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Lee Highway Multimodal Improvements Project Description This project expands the multi-modal transportation capacity and safety in the Lee Highway corridor, providing viable options to move more people without increasing the volume of single-occupant vehicles. The project will add capacity via Arlington Transit (ART) service expansion and transit signal prioritization. It will improve accessibility to transit stops and will improve pedestrian and bicycle safety with various complete street design changes throughout the corridor. Complete street elements include sidewalk and crosswalk improvements, bus stop improvements, and roadway lane reconfiguration. Much of the focus in the early years of the project is expected to be on improvements to selected intersections to increase safety and capacity. In the later years, the focus will be on implementing the corridor-wide recommendations that are expected to be developed for Lee Highway in the corridor planning process that is underway. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington, East Falls Church Area Plan, Lee Highway Cherrydale Revitalization Plan, Transit Development Plan Critical Milestones: Advisory Commission: Bicycle Advisory Committee, Pedestrian Advisory Committee, Transit Advisory Committee, Transportation Commission Neighborhood(s): Arlington-East Falls Church, Cherrydale, Colonial Village, Donaldson Run, Glebewood, John M. Langston, Leeway Overlee, Lyon Village, Maywood, North Highlands, North Rosslyn, Old Dominion, Waverly Hills, Yorktown Project Justification Lee Highway is Arlington's longest unplanned commercial corridor. It links two Metrorail transfer stations, East Falls Church on the western end and Rosslyn on the eastern end. The local bus service was recently taken over from Metro by Arlington Transit. Lee Highway is a focus of commercial and retail activity, and it functions as a main street for many neighborhoods in North Arlington. The multimodal improvements in this project directly benefit Arlington residents' access to major regional activity centers, including downtown D.C and Tysons, as well as local access to retail, employment, civic, and residential destinations along the corridor. Lee Highway is one of the parallel routes identified by VDOT in the planning for high-occupancy toll lanes on I-66 inside the Beltway. The improvements in this project will maintain automobile mobility along the corridor, while enhancing the mobility and safety of bicycle riders, walkers and transit users. The project will also contribute to the redevelopment of some of the older commercial nodes along the corridor. E-105

106 Changes from Prior CIP The timing has changed from the prior CIP. The early years will cover selected intersection and pedestrian improvement projects, while the later years will cover corridor-wide multimodal improvements expected to be recommended in the upcoming Lee Highway corridor planning study. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $20,000 Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional ,000 2, ,000 7,700 4,000 1,700 19,900 Subtotal New Funding ,000 2, ,000 7,700 4,000 1,700 20,000 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Other Previously Approved Funds Subtotal Previously Approved Funding Revenues ,000 2, ,000 7,700 4,000 1,700 20,000 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Notes on Operating Costs E-106

107 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Neighborhood Complete Streets Project Description Arlington County is committed to the safety and livability of its residential neighborhoods. The Master Transportation Plan sets forth transportation policy directed at protecting the non-arterial function of streets designated as neighborhood streets. While the Neighborhood Conservation (NC) program addresses specific components of a neighborhood planning framework, gaps exist in delivering a comprehensive transportation neighborhood program. Currently, nearly all improvements to local streets are funded by the NC program. While the NC program undertakes many good projects, the program structure often prevents many other valuable projects from being initiated. The Neighborhood Complete Streets (NCS) program will enable County staff to initiate projects that would not normally be proposed through the NC program. The focus of the NCS program will be on improving walking connectivity, upgrading street crossings, particularly within school walking zones, and modifying incomplete streets with an aim at changing motorist behavior to manage vehicular speeds and minimize vehicle/pedestrian conflicts. This new program will enhance the delivery/construction of sidewalk, curb, gutter, on-street parking, bus stops, landscaping, bio-retention, street lights, drainage and curb ramps facilities on neighborhood streets within Arlington. The NCS program will enhance pedestrian and bicycle infrastructure in residential neighborhoods, improve safety and convenience, and provide for local access to residences and community resources. This new program will improve site locations within ¼ mile of schools, connections to residential streets, arterial streets and will address projects not being implemented by the NC program. The NCS program will include an annual call for projects. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Neighborhood(s): VARIOUS Critical Milestones: Kick Off New program FY 2017 First Project to Construction FY 2019 Advisory Commission: Neighborhood Complete Streets Committee Project Justification Neighborhood streets are a public infrastructure system, and need to be managed and improved in a strategic and methodical manner. Several County programs exist to address parts of our neighborhood streets including the Neighborhood Conservation program (NC) and annual street maintenance efforts. However, no single program evaluates all the needs of the neighborhood streets and addresses them in a complete manner. This County initiated program is to provide pedestrian and other transportation enhancements along non-arterial streets, not likely to be undertaken by NC or other County programs. The NC projects are identified and selected for funding by citizens and citizen-led groups. While the citizen-led nature of these programs take into consideration overall County needs, this new program will allow staff to prioritize projects based on ranking against predetermined criteria. Although significant County needs for sidewalk installation, storm water management, street lighting and speed management are currently being addressed by the NC program, the Complete Streets Program will complement those efforts and allow additional projects to be completed. E-107

108 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $9,145 Specific projects have not been identified at this time. It is assumed that two or three new projects will eventually be funded and undertaken each year. Initial project selection will take place in FY17, with prior funding paying for survey and design on the first projects. Construction of the first projects will start in FY2019. New projects will be selected each year and take about two years to design and construct. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue ,875 PAYG TCF - HB2313 Local ,338 HB2313 Regional Subtotal New Funding ,026 1,058 1,086 1,114 1,147 1,176 1,206 8,043 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding ,102 Revenues ,026 1,058 1,086 1,114 1,147 1,176 1,206 9,145 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 2.0 Notes on Funding Schedule The Issued but Unspent and Authorized but Unissued Bonds is from the 2014 Referenda. Other Previously Approved Funds includes $25,000 in PAYG. Notes on Operating Costs One new FTE, a Program Manager, was approved during the FY17 budget process. Two additional FTEs will be requested during the FY18 budget process: a Traffic Engineer that would be effective at the beginning of FY18, and a Design Engineer that would be effective mid-year FY18. Employees in these positions would charge their time to projects as appropriate, and their administrative time would be funded by TCF (the Transportation Capital Fund). There is no impact to the General Fund. E-108

109 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Parking Meters Project Description This program enables the County to convert all parking meter equipment to either multi-space meters or single-space meters that take credit cards and operate wirelessly, enabling real time detection of usage and problems. This program will allow the completion of the deployment of these meters, as well as allow for metering of new locations and replacement of meters past their useful life. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Transportation Commission Neighborhood(s): VARIOUS Project Justification County policy, as stated in the Master Transportation Plan's Parking and Curb Space Management Element, supports the use of multi-space meters and other high performing technologies. Multi-space meters have many benefits including improved convenience for the parker by being able to pay by coins or credit card. They also provide increased reliability of the equipment, providing customers with receipts to prove payment, a wireless real time reporting system for problems and usage reports, and reduce street clutter. Currently 64% of our customers are using credit cards, and as we convert more meters to multi-space we will see a further reduction in coin usage. Increased credit card usage lowers the cost to collect and count cash, and reduces wear and tear on collector vehicles and operating equipment. Credit card acceptance increases revenue by allowing customers to more easily comply with parking regulations to avoid receiving a ticket. The conversion of these meters will allow for increased revenue as well as better customer service. Changes from Prior CIP The aging mechanical meters, which make up almost 40% of the County's meter stock, are failing, and are no longer manufactured. Within three to five years these metering devices will no longer function. The current CIP reflects a spending plan to address this backlog, and meet the goals of the Master Transportation Plan. E-109

110 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $6,527 CIP funding for FY18 and FY19 will permit replacement of these failing mechanical meters with ADA compliant digital meter technology. Annual funds from FY20 through FY26 will permit replacement of existing digital meters which were initially installed in 2007 and which have an operating lifecycle of seven to ten years. Funding Schedule (in $1,000s) New Funding Federal Funding State Funding Developer Contributions New Bond Issue PAYG 100 1,363 1, ,527 Master Lease Other Funding Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 100 1,363 1, ,527 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF) C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds Subtotal Previously Approved Funding Revenues 100 1,363 1, ,527 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule Notes on Operating Costs Service agreement; charge is per meter. E-110

111 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Parking Technology Project Description This program enables the County to upgrade its parking management system to make the on-street and off-street facilities more efficient and easier to use for the driving public. This program will: (1) implement an electronic space identification and wayfinding system to show in real time the availability of parking spaces in the County-owned Ballston parking structure; (2) fund the development and implementation of a parking signage program in the public right-of-way to direct parking patrons to publicly available off-street facilities; (3) To advance a pilot that explores technology which permits a cost effective solution to monitoring the occupancy and turnover of on street parking spaces; (4) acquire hardware and software to convert the residential permit parking program to a paperless program; (5) create a parking information management center; and (6) convert County off-street parking facilities, where appropriate, to a controlled environment. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Critical Milestones: Advisory Commission: Transportation Commission Neighborhood(s): VARIOUS Project Justification On-street parking is very limited due to the finite amount of curb space in the County, and off-street parking is very expensive to build. Because of the limitation of both types of Parking, it is critical that the parking supply is managed effectively. New technology enables a much more efficient management of the overall parking system. This project will provide for the installation of a leading edge parking directional wayfinding and space availability system in the County's Ballston garage to meet Ballston Quarter redevelopment needs and expectations. It will provide hardware and software to monitor and display occupancy, turnover, and parked duration information from the curbside metered spaces and County owned and operated off-street facilities. It also will facilitate, where necessary, the conversion of County parking facilities from uncontrolled/unmanaged operations to access controlled operation. Additionally, this project will support the upgrade of the residential permit parking program (RPPP) by eliminating paper permits and passes and the current end-of-year renewal. Instead, the Department of Environmental Services, which is responsible for RPPP, and Arlington Police Department will enforce the program using a license place recognition (LPR) system and residents will have "electronic" permits and passes that can be renewed online at any time during the year. County policy, as stated in the Master Transportation Plan's Parking and Curb Space Management Element, supports the use of multi-space meters and other high performing technologies. E-111

112 Changes from Prior CIP This program has decreased by $2.9 million from the FY FY 2024 CIP. In the prior CIP, the parking program proposed district wide electronic parking wayfinding starting with Shirlington Village. Technology continues to evolve, and there is a much greater availability of privately provided parking applications to inform drivers of available parking. Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $3,397 Funding Schedule (in $1,000s) New Funding PAYG ,397 Subtotal New Funding ,397 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Subtotal Previously Approved Funding Revenues ,397 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost Notes on Funding Schedule Notes on Operating Costs In order to implement the program, additional staff may be required and will be discussed as part of the FY 2018 budget process. New FTEs (#): E-112

113 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Regulatory Signage Project Description This program funds the installation of new destination, parking, and regulatory signage along streets and major corridors. This program also upgrades traffic signal related signs. As Arlington becomes a more densely populated working and living environment, it becomes increasingly important to manage the curb space and provide clear signage to help motorists, bicyclists, and pedestrians find their way around the County. The current curb environment is a complex collection of uses, and it is important that we carefully re-examine what uses are best suited for specific blocks, notably in the Rosslyn-Ballston and Jefferson Davis corridors. This program installs new regulatory, warning, and guide signage for vehicles, cyclists, and pedestrian traffic, corresponding to the appropriate curb uses and to meet current standards identified in the Manual of Uniform Traffic Control Devices (MUTCD). Also, traffic signal signs will be changed to LED (light emitting diode) signs to upgrade the worn out, broken, and damaged signs. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington Advisory Commission: Transportation Commission Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $775 Funding Schedule (in $1,000s) New Funding PAYG Subtotal New Funding Previously Approved Funding Other Previously Approved Funds Subtotal Previously Approved Funding Revenues Projected Additional Operating Costs (in $1,000s) Non-Personnel ($) Net Operating Cost Notes on Funding Schedule Notes on Operating Costs E-113

114 TRANSPORTATION COMPLETE ARLINGTON STREETS TRANSPORTATION CIP Rosslyn-Ballston Arterial Street Improvements Project Description This program will study and implement projects to upgrade physical conditions along sections of the Rosslyn-Ballston Corridor in most critical need for improvement. Projects identified are in the current Sector Plans for Ballston, Virginia Square, Clarendon, Courthouse, Rosslyn, and the Rosslyn to Courthouse Urban Design Study. These projects meet the planning goals outlined in the Master Transportation Plan and implement the most current design and safety standards. This program will provide significant street and sidewalk safety and functionality improvements. Projects are located on Clarendon Boulevard, Wilson Boulevard, Clarendon Circle, Fairfax Drive, and nearby intersecting streets. Associated Master Plan: Ballston Sector Plan, Clarendon Sector Plan, Comprehensive Master Transportation Plan (MTP) for Arlington, Court House Sector Plan, R-B Corridor - Streetscape Standards Critical Milestones: Advisory Commission: Planning Commission, Transportation Commission Neighborhood(s): Ballston-Virginia Square, Clarendon-Courthouse, North Rosslyn Project Justification In 2015, the County adopted sector plan addendums or new long-range plans for the Rosslyn, Court House and West Rosslyn areas. Those plans specified a substantial number of transportation improvements that are needed to help transform the streets, walkways, public transit and bikeway facilities within those areas. The more robust and diversified transportation system that will result from the projects will allow for greater economic development and easier travel. A large number of the projects will include collaboration between Arlington County and private developers to fund and implement the public improvements. This program will provide significant street and sidewalk safety and functionality improvements. Projects include improved roadway lanes and crosswalks, updated traffic signals, left turn lanes, accessible walking routes, bike lanes and multi-use trails, new signage and striping, utility undergrounding, ADA compliant sidewalks and crosswalks, new streetlights, street trees, and modern bus facilities Changes from Prior CIP In response to the 2015 new long-range plans and addendums, the current CIP includes more than a dozen new projects identified in the recently adopted plans. E-114

115 Capital Costs during Ten Year Period (FY 2017 to FY 2026) (in $1,000s): $66,674 Funding Schedule (in $1,000s) New Funding Federal Funding , ,200 State Funding 2, ,000 Developer Contributions ,213 1,750 2,000 4, ,000 13,973 New Bond Issue PAYG Other Funding Transportation Capital Fund (TCF)- 3,320 5,060 7,300 6,787 5, , ,492 C&I TCF - HB2313 Local HB2313 Regional TCF Bonds Tax Increment Financing (TIF) TIF Bonds Subtotal New Funding 6,055 5,060 7,300 8,000 6,750 2,950 5,000 2,800 1,750 3,000 48,665 Previously Approved Funding Authorized but Unissued Bonds Issued but Unspent Bonds Transportation Capital Fund (TCF)- 3,893 4,686 2,645 1, ,724 C&I TCF - HB2313 Local HB2313 Regional Other Previously Approved Funds 3,160 1,125 1, ,285 Subtotal Previously Approved Funding 7,053 5,811 3,645 1, ,009 Revenues 13,108 10,871 10,945 9,500 6,750 2,950 5,000 2,800 1,750 3,000 66,674 Projected Additional Operating Costs (in $1,000s) Personnel ($) Non-Personnel ($) Master Lease Financing Costs Bond Financing Costs Net Operating Cost New FTEs (#): 0 Notes on Funding Schedule This program reflects private, public, partnership contributions for the Ballston Quarter redevelopment. New funding from Developer Contributions includes $735,000 from the Red Top site plan (#438, condition 59B), $7.5 million from the Rosslyn Gateway site plan (#419), and $5,738,000 from the 1401 Wilson Boulevard site plan ($429). Other Previously Approved Funding includes $2,250,000 in undergrounding funds, $2,600,000 in developer contributions from the Waterview site plan (#25), $153,000 in federal funding, and $282,000 in state funding. Notes on Operating Costs E-115

116 µ ROSSLYN - BALLSTON ARTERIAL STREET IMPROVEMENTS CAPITAL IMPROVEMENT PROJECTS GW PKWY LEE HWY N GLEBE RD N RANDOLPH ST FAIRFAX DR WILSON BLVD 13TH ST N!>!> WASHINGTON BLVD WILSON BLVD CLARENDON BLVD 10TH ST N RT 50 FT MYER DR!> N LYNN ST!> Lynn Street and Custis Trail Improvements E-116 Capital Improvements Type Complete Streets Complete Streets With Undergrounding Bike/Pedestrian!> Intersection

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital

More information

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital

More information

Adopted CIP Program Summary

Adopted CIP Program Summary Arlington County, Virginia Adopted CIP Program Summary The FY 215-224 CIP includes typical capital projects such as maintenance capital, parks, transportation, metro, community conservation, government

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM PRESENTED AND ADOPTED: SUBJECT: APPROVAL OF FISCAL 2007 2012 CAPITAL IMPROVEMENT PROGRAM RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSPORTATION AUTHORITY WHEREAS, The Board

More information

Amend FY07 System Access Program for Artwork

Amend FY07 System Access Program for Artwork Item: 10 Amend FY07 System Access Program for Artwork 55 of 75 Board Budget Committee July 6, 2006 EXECUTIVE SUMMARY Budget Committee Meeting July 6, 2006 Request for Board approval to amend the fiscal

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board This forum is sponsored by the Northern Virginia Transportation Commission. It is separate and distinct

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM XVI NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM FOR: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: December 8,

More information

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation 2016 Bond Referenda 1. Metro and Transportation bonds in the maximum principal amount of $58,785,000 to finance, together with other available funds, the cost of various capital projects for the Washington

More information

FY2020 Budget Outlook

FY2020 Budget Outlook Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

MANAGER S MESSAGE

MANAGER S MESSAGE Arlington County, Virginia MANAGER S MESSAGE CIP 2019 2028 To the County Board and Arlington Community: Every two years our community comes together to assess our physical infrastructure needs. We take

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report For the Fiscal Years Ended June 30, 2017 and 2016 Table of Contents Washington Metropolitan Area Transit Authority Financial Report For the

More information

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:

More information

GM/CEO s Proposed FY2020 Budget

GM/CEO s Proposed FY2020 Budget Finance and Capital Committee Information Item IV-A November 1, 2018 GM/CEO s Proposed FY2020 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Keeping Metro Safe, Reliable and Affordable

Keeping Metro Safe, Reliable and Affordable Finance Committee Information Item III-B September 14, 2017 Keeping Metro Safe, Reliable and Affordable Washington Metropolitan Area Transit Authority Keeping Metro Safe, Reliable and Affordable 1 Purpose

More information

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit

More information

FUND DESCRIPTIONS FY 2015 PROPOSED BUDGET SUMMARY

FUND DESCRIPTIONS FY 2015 PROPOSED BUDGET SUMMARY FY 2015 PROPOSED BUDGET SUMMARY FUND DESCRIPTIONS GENERAL FUND The General is the primary operating fund of the County and is used to account for the majority of services including fire and police protection,

More information

FY2017 Budget Discussion

FY2017 Budget Discussion Finance & Administration Committee Information Item IV-B November 5, 2015 FY2017 Budget Discussion Page 70 of 116 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Board Guidance and Notes to Accompany FY 2018 Adopted Budget

Board Guidance and Notes to Accompany FY 2018 Adopted Budget Board Guidance and Notes to Accompany FY 2018 Adopted Budget 1. Real Estate Tax Rate: The total real estate tax rate increased 1 ½ cents from $0.978 to $0.993 (base rate excluding the sanitary district

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about

More information

COUNTY BOARD COUNTY MANAGER S OFFICE

COUNTY BOARD COUNTY MANAGER S OFFICE COUNTY BOARD LIBBY GARVEY CHAIR JAY FISETTE VICE CHAIR KATIE CRISTOL CHRISTIAN DORSEY JOHN VIHSTADT COUNTY MANAGER S OFFICE MARK SCHWARTZ COUNTY MANAGER Vision for Arlington County Arlington will be a

More information

Draft TransAction Plan: Overview and Findings. Martin E. Nohe, Chairman July 13, 2017

Draft TransAction Plan: Overview and Findings. Martin E. Nohe, Chairman July 13, 2017 Draft TransAction Plan: Overview and Findings Martin E. Nohe, Chairman July 13, 2017 1 NVTA s Long Range Transportation Planning Responsibility NVTA is legislatively required to prepare a long range regional

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report issued in Accordance with Government Auditing Standards For the Years Ended June 30, 2016 and 2015 Single Audit Reports issued in Accordance

More information

FY2018 Third Quarter Financial Update

FY2018 Third Quarter Financial Update Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2018 Second Quarter Financial Update

FY2018 Second Quarter Financial Update Finance and Committee Information Item III-A February 8, 2018 Second Quarter Financial Update 4 of 52 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

RAC Capital Presentatition May 5, 2010

RAC Capital Presentatition May 5, 2010 RAC Capital Presentation ti May 5, 2010 Flexible Six-Year Agreement Flexible Six-Year Agreement minimum funding commitment to match Federal funds, and to annually assess availability of additional funds

More information

FY2017 Budget Work Session

FY2017 Budget Work Session Finance & Administration Committee Information Item IV-B January 14, 2016 FY2017 Budget Work Session Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

TESTIMONY OF RICHARD SARLES

TESTIMONY OF RICHARD SARLES TESTIMONY OF RICHARD SARLES Before the Council of the District of Columbia Committee on Economic Development on WMATA s FY2015 Budget Wednesday, April 30, 2014 Good Morning, Chairperson Bowser and other

More information

DES Director. Facilities & Engineering. Facilities Design & Construction. Engineering Bureau. Real Estate Bureau. Capital Assets Support

DES Director. Facilities & Engineering. Facilities Design & Construction. Engineering Bureau. Real Estate Bureau. Capital Assets Support Greg Emanuel, Director 2100 CLARENDON BLVD., SUITE 900, ARLINGTON, VA 22201 703-228-4488 des@arlingtonva.us Our Mission: To bring strategic focus to the critical policy areas of transportation, the environment,

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

2007 Legislative Program Northern Virginia Transportation Authority Approved: November 10, 2006

2007 Legislative Program Northern Virginia Transportation Authority Approved: November 10, 2006 State Legislative Items: Additional Transportation Funding 2007 Legislative Program Northern Virginia Transportation Authority Approved: November 10, 2006 Position: The Northern Virginia Transportation

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES Greg Emanuel, Director LINES OF BUSINESS

DEPARTMENT OF ENVIRONMENTAL SERVICES Greg Emanuel, Director LINES OF BUSINESS Greg Emanuel, Director 2100 CLARENDON BLVD., SUITE 900, ARLINGTON, VA 22201 703-228-4488 des@arlingtonva.us Our Mission: DES strives for excellence as we plan, build, operate, and maintain Arlington s

More information

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements To improve service delivery, the Proposed Budget continues a focus on improvements in: Core infrastructure Vital services

More information

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000)

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) TIP ID: 5853 Agency ID: Title: Rail Cars - Replacement, Rehabilitation, Expansion, & Enhancements Local 0/0/100 11,629 e 5,380 e 5,600 e 10,980 PRIIA 50/0/50 265,887 e 154,860 e 246,189 e 158,438 e 141,875

More information

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral FY2006 Proposed Operating Budget Final Summary for Board Referral 1 Operating Statements Subsidy nearly $10M lower than December proposal Dec Base Other Subtot Mar Prop$ Adj Adj Changes Prop$ Revenues

More information

FY2011 Budget Forum. District of Columbia. October 19, 2009

FY2011 Budget Forum. District of Columbia. October 19, 2009 FY2011 Budget Forum District of Columbia October 19, 2009 0 Meeting agenda What is Metro and what is the value of Metro service? What are the Fiscal Year 2011 budget challenges? What are the potential

More information

Transit Subsidy. Projected FY17 Transit Subsidy

Transit Subsidy. Projected FY17 Transit Subsidy Mission Statement Transit Subsidy The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the

More information

FUND DESCRIPTIONS FY 2016 PROPOSED BUDGET SUMMARY

FUND DESCRIPTIONS FY 2016 PROPOSED BUDGET SUMMARY FY 2016 PROPOSED BUDGET SUMMARY FUND DESCRIPTIONS GENERAL FUND The General is the primary operating fund of the County and is used to account for the majority of services including fire and police protection,

More information

PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET

PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET Before the Committee on Public Works and the Environment Council of the District of Columbia The Honorable Jim Graham,

More information

The Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania

The Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania Planning and Development Development Services, Department of Economic Development, Department of Housing and Community Development, Office of Planning Prince William County/ Manassas Convention and Visitors

More information

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority. PROPOSED FISCAL YEAR 2011 BUDGET Testimony of Richard Sarles, General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia Committee on Public Works and

More information

DES Director. Facilities & Engineering. Facilities Design & Construction. Engineering Bureau. Real Estate Bureau. Capital Assets Support

DES Director. Facilities & Engineering. Facilities Design & Construction. Engineering Bureau. Real Estate Bureau. Capital Assets Support Greg Emanuel, Director 2100 CLARENDON BLVD., SUITE 900, ARLINGTON, VA 22201 703-228-5022 des@arlingtonva.us Our Mission: DES strives for excellence as we plan, build, operate, and maintain Arlington s

More information

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun REVENUE AND RIDERSHIP 4th Quarter FY2014 REVENUE (in Millions) $90M $85M $80M $75M $70M $65M $60M $55M $50M 79 77 74 74 72 70 FY2013 Actual FY2014 Budget FY2014 Actual 79 85 78 78 77 67 66 70 59 67 65

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority

Notice of Public Hearing Washington Metropolitan Area Transit Authority Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B18-01: Proposed FY2019 Operating Budget and Docket B18-02: Proposed FY2019 Capital Improvement Program and Federal FY2018

More information

Toronto Transit Commission

Toronto Transit Commission CAPITAL BUDGET NOTES Toronto Transit Commission 2018 2027 CAPITAL BUDGET AND PLAN OVERVIEW The Toronto Transit Commission delivers transit services with an estimated 539.4 million riders in 2018, using

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

INVESTING STRATEGICALLY

INVESTING STRATEGICALLY 11 INVESTING STRATEGICALLY Federal transportation legislation (Fixing America s Surface Transportation Act FAST Act) requires that the 2040 RTP be based on a financial plan that demonstrates how the program

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY QUALITY TRANSPORTATION SUMMARY Quality Transportation Overview... 126 Department of Transportation... 127 Traffic Field Operations... 129 Winston-Salem Transit Authority... 131 Quality Transportation Non-Departmental...

More information

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA).

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). 8 FINANCIAL ANALYSIS This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). The alternative formerly known as

More information

FUND DESCRIPTIONS FY 2018 PROPOSED BUDGET SUMMARY

FUND DESCRIPTIONS FY 2018 PROPOSED BUDGET SUMMARY FY 2018 PROPOSED BUDGET SUMMARY FUND DESCRIPTIONS GENERAL FUND The General is the primary operating fund of the County and is used to account for the majority of services including fire and police protection,

More information

Approval of FY2011 Budget

Approval of FY2011 Budget Finance & Administration Committee Action Item III-A June 10, 2010 Approval of FY2011 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Chapter 3: Regional Transportation Finance

Chapter 3: Regional Transportation Finance Chapter 3: Regional Transportation Finance This chapter examines the sources of funding for transportation investments in the coming years. It describes recent legislative actions that have changed the

More information

QUALITY TRANSPORTATION SUMMARY

QUALITY TRANSPORTATION SUMMARY SUMMARY Transportation systems influence virtually every aspect of community life. They are the means for moving people, goods, and services throughout the community, and they play a significant role in

More information

FY2014 Capital and Operating Budget Discussion

FY2014 Capital and Operating Budget Discussion Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information

More information

To the County Board & the Arlington Community:

To the County Board & the Arlington Community: BARBARA M. DONNELLAN, COUNTY MANAGER 2100 CLARENDON BLVD., SUITE 302 ARLINGTON, VA 22201 703.228-3120 countymanager@arlingtonva.us Fiscal Year 2016 Proposed Budget Message To the County Board & the Arlington

More information

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item II-A April 22, 2010 Next Capital Funding Agreement The Next Capital Funding Agreement and the 2011-2016 Capital Program Finance and Administration Committee

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 15, Receive the County Manager s Budget Forecast for Fiscal Year 2018.

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 15, Receive the County Manager s Budget Forecast for Fiscal Year 2018. ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 15, 2016 DATE: October 14, 2016 SUBJECT: Presentation of the FY 2018 Financial C. M. RECOMMENDATION: Receive the County Manager s

More information

May 31, 2016 Financial Report

May 31, 2016 Financial Report 2016 May 31, 2016 Financial Report Capital Metropolitan Transportation Authority 7/13/2016 Table of Contents SUMMARY REPORTS Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses

More information

Review FY09 Subsidy Allocation

Review FY09 Subsidy Allocation Finance, Administration and Oversight Committee Information Item IV-D March 13, 2008 Review FY09 Subsidy Allocation Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

Technical Memorandum #1: Baseline Conditions. This section provides an overview of the main services operated and assets maintained by PRTC.

Technical Memorandum #1: Baseline Conditions. This section provides an overview of the main services operated and assets maintained by PRTC. Technical Memorandum #1: Baseline Conditions INTRODUCTION This Baseline Conditions Technical Memorandum provides a summary of the key services provided by the Potomac and Rappahannock Transportation Commission

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 16, 2015

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of May 16, 2015 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of May 16, 2015 DATE: April 14, 2015 SUBJECT: Sale of 2015 General Obligation Public Improvement & Refunding Bonds C. M. RECOMMENDATION: Adopt

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

DEBT POLICY AND CREDIT RATINGS

DEBT POLICY AND CREDIT RATINGS DEBT SERVICE The FY 2019 adopted budget includes outstanding and new money debt service on the County s General Obligation (G.O.) bonds, Industrial Development Authority (IDA) bonds issued for County projects,

More information

FY 2016 Proposed Budget Work Session

FY 2016 Proposed Budget Work Session Department of Environmental Services FY 2016 Proposed Budget Work Session Tuesday, March 24, 2:30 5:00 Agenda Tuesday, March 24, 2015 2:30 5:00 PM Related FAAC Report: DES Department / Topic Book pgs Web

More information

Operating Budget Report

Operating Budget Report Operating Budget Report Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) MTD May-FY2011 May - FY2012 Variance FY12 Actual Actual Budget $ Percent $140M Revenue $ 68,140 $ 70,480

More information

FY2017 Budget Guidance

FY2017 Budget Guidance Finance & Administration Committee Information Item IV-D September 10, 2015 FY2017 Budget Guidance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

FUND DESCRIPTIONS FY 2014 PROPOSED BUDGET SUMMARY

FUND DESCRIPTIONS FY 2014 PROPOSED BUDGET SUMMARY FY 2014 PROPOSED BUDGET SUMMARY FUND DESCRIPTIONS GENERAL FUND The General Fund is the primary operating fund of the County and is used to account for the majority of services including fire and police

More information

TSCC Budget Review TriMet

TSCC Budget Review TriMet TSCC Budget Review 2017-18 TriMet 1. Introduction to the District: The Tri-County Metropolitan Transportation District (TriMet) boundary covers about 575 square miles of the urban portions of Multnomah,

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201958 Resolution: Yes No TITLE: Second Quarter Capital Program Update PRESENTATION SUMMARY:

More information

Washington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808

Washington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808 Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action Information MEAD Number: 99808 Resolution: Yes No PURPOSE To obtain Board approval to modify the MetroAccess

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 20, 2014

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 20, 2014 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 20, 2014 DATE: September 11, 2014 SUBJECT: Fiscal Year 2014 Northern Virginia Transportation Authority ( NVTA ) Standard Project

More information

FISCAL YEAR 2016 COUNTY BUDGET RESOLUTION

FISCAL YEAR 2016 COUNTY BUDGET RESOLUTION BUDGET SUMMARY ATTACHMENT I FISCAL YEAR 2016 COUNTY BUDGET RESOLUTION Be it resolved by the County Board of Arlington County, Virginia, that the following Budget is hereby adopted for the Fiscal Year 2016

More information

Round 6.4 Cooperative Forecasts of Population, Households, Housing Units and Employment

Round 6.4 Cooperative Forecasts of Population, Households, Housing Units and Employment Round 6.4 Cooperative Forecasts of Population, Households, Housing Units and Employment This is the 58th in a series of Planning Information Reports produced by the Planning Research and Analysis Team

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE DATE: TO: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Nury Martinez, Chair, Energy and the Environment Committee

More information

FY17 Budget Discussion

FY17 Budget Discussion FY17 Budget Discussion Metro is Everywhere Metro is a lot more than buses and trains. Anyone who has boarded a bus or a train, driven on the freeway, used the toll roads, stopped at a traffic signal, or

More information

Metro 2025 Alternative Funding and Financing

Metro 2025 Alternative Funding and Financing Finance & Administration Committee Information Item IV-A June 12, 2014 Metro 2025 Alternative Funding and Financing 37 of 100 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

April 30, 2016 Financial Report

April 30, 2016 Financial Report 2016 April 30, 2016 Financial Report Capital Metropolitan Transportation Authority 6/15/2016 Table of Contents SUMMARY REPORT Budgetary Performance - Revenue 2 - Sales Tax Revenue 6 - Operating Expenses

More information

Amend FY 2006 Infrastructure Renewal Program

Amend FY 2006 Infrastructure Renewal Program Washington Metropolitan Area Transit Authority Amend FY 2006 Infrastructure Renewal Program Budget Committee December 8, 2005 Purpose That the Budget Committee approve and forward to the Board for approval

More information

Quarterly Capital Progress Update

Quarterly Capital Progress Update Finance & Administration Committee Information Item IV-A September 13, 2012 Quarterly Capital Progress Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FUND DESCRIPTIONS FY 2019 PROPOSED BUDGET SUMMARY

FUND DESCRIPTIONS FY 2019 PROPOSED BUDGET SUMMARY FY 2019 PROPOSED BUDGET SUMMARY FUND DESCRIPTIONS GENERAL FUND The General is the primary operating fund of the County and is used to account for the majority of services including fire and police protection,

More information

State of Good Repair Review

State of Good Repair Review Finance & Administration Committee Action Item IV-D October 9, 2014 State of Good Repair Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Metro Accessibility Programs and MetroAccess Free Ride Program Customer Service, Operations and Safety Committee

Metro Accessibility Programs and MetroAccess Free Ride Program Customer Service, Operations and Safety Committee Washington Metropolitan Area Transit Authority Metro Accessibility Programs and MetroAccess Free Ride Program Customer Service, Operations and Safety Committee October 20, 2005 Purpose Information portion

More information

FY19 Budget - Discussion. April 2018

FY19 Budget - Discussion. April 2018 FY19 Budget - Discussion April 2018 FY19 Proposed Budget: $6.6 Billion General Planning & Programs 3% Identify regional mobility needs and solutions Debt Service 6% Obligations from current and past projects

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 20, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of October 20, 2018 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of October 20, 2018 DATE: October 17, 2018 SUBJECT: Presentation of Financial Results & Closeout for the Fiscal Year (FY) ended June 30, 2018

More information

FY2012 Preliminary Subsidy Calculation

FY2012 Preliminary Subsidy Calculation Finance & Administration Committee Information Item III-A March 3, 20 FY202 Preliminary Subsidy Calculation Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Vision The Best Ride in the Nation

Vision The Best Ride in the Nation Washington Metropolitan Area Transit Authority FY 2008 Comprehensive Annual Financial Report Vision The Best Ride in the Nation Mission Provide the nation s best transit service to our customers and improve

More information

Transportation Finance Overview. Presentation Contents

Transportation Finance Overview. Presentation Contents Transportation Finance Overview Matt Burress House Research Department matt.burress@house.mn Andy Lee House Fiscal Analysis andrew.lee@house.mn January 5 th & 10 th, 2017 Presentation Contents 2 Part 1:

More information

FY2017 Year-End Financial Update

FY2017 Year-End Financial Update Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

INVEST IN TRANSIT. The Regional Transit Strategic Plan for Chicago and Northeastern Illinois ANNUAL PROGRESS REPORT FEBRUARY 2019

INVEST IN TRANSIT. The Regional Transit Strategic Plan for Chicago and Northeastern Illinois ANNUAL PROGRESS REPORT FEBRUARY 2019 ANNUAL PROGRESS REPORT FEBRUARY 2019 INVEST IN TRANSIT The 2018-2023 Regional Transit Strategic Plan for Chicago and Northeastern Illinois Read the full plan at StrategicPlan.RTAChicago.org Chicago and

More information

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM

BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM Date of Meeting: February 14, 2017 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM # 12 SUBJECT: Metrorail Financial Obligations ELECTION DISTRICT:

More information

Memorandum. Summary. Revenue

Memorandum. Summary. Revenue COUNTY MANAGER S OFFICE 2100 Clarendon Boulevard, Suite 314, Arlington, VA 22201 TEL 703.228.3120 FAX 703.228.3218 www.arlingtonva.us Memorandum To: County Board of Arlington, Virginia Date: March 13,

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 22, 2017 DATE: April 21, 2017 SUBJECT: Fiscal Year 2018 County Budget Resolution and Appropriations Resolution C. M. RECOMMENDATIONS:

More information

Columbia Pike Transit Initiative: Comparative Return on Investment Study

Columbia Pike Transit Initiative: Comparative Return on Investment Study Columbia Pike Transit Initiative: Comparative Return on Investment Study Presentation to the Arlington County Housing Commission May 1, 2014 Arlington County retained HR&A to update the 2012 Return on

More information