1 Finance & Administration Committee Information Item IV-A September 13, 2012 Quarterly Capital Progress Update

2 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: Capital Quarterly Report FY2012 Fourth Quarter (Year End) PRESENTATION SUMMARY: This presentation provides an overview of Metro s performance in executing the FY2012 Capital Program from both a project delivery and financial perspective. The presentation highlights several key projects that were delivered or progressed significantly during FY2012 and includes a preview of the FY2013 capital program activities and deliverables. PURPOSE: The Finance and Administration Committee will be informed on the status, delivery rates and success of the FY2012 Capital Program. DESCRIPTION: Key Highlights: The FY2012 Capital Improvement Program delivery exceeded FY2011 program delivery by 26 percent Metro is prepared to deliver projects in FY2013 and beyond to address safety priorities and rebuild the system Sustained capital investment in the Metro system is critical Background and History: Metro is investing in the largest and most aggressive capital program since its construction. Metro is literally being rebuilt over the next six years to provide safer and more reliable service. Through the FY Capital Improvement Program, Metro will deliver capital projects that will improve safety, enhance reliability, and continue to rebuild Metro s infrastructure and equipment to achieve a state of good repair. Additional system improvements, including the purchase of state of the art rail cars and increased fare

3 payment options will enhance the customer experience. However, reduced federal funding of WMATA s capital program would have a significant negative impact on WMATA s rebuilding effort and on the future performance of the system. Discussion: FY2012 Capital Investment Financial Results In fiscal year 2012, capital program delivery continued to improve, exceeding FY2011 program delivery by 26 percent or nearly $160 million. Total capital program investments totaled $770 million. This represents a delivery rate of 84 percent of the $917 million available in FY2012. FY2012 Capital Investment Project Results Several significant capital projects were delivered during FY2012 including, but not limited to: Safety Completion of the mainline guarded number eight rail switches project 178 guarded switches installed NTSB Recommended GRS Track Circuit Replacement 229 track circuits replaced Reliability Delivery of 166 new buses Completed rehabilitation of 100 buses Delivery of 221 replacement MetroAccess vehicles Completed rehabilitation of 36 escalators and replacement of 3 escalators Significant progress was made to reduce the backlog and bring the rail infrastructure to a steady state: o Replaced 12 miles of running rail o Tamped 44 miles of track o Replaced over 21,000 cross-ties o Replaced over 36,000 fastners o Welded 1,200 joints o Fixed leaks, replaced signs, repaired floating slabs and other activities Overall, Track and Structures exceeded its planned deliverables by 25 percent

4 FY2013 Capital Program - Outlook The FY2013 Capital Budget continues the ramp up of investment shown over the last two years. The FY2013 Capital Improvement Program Budget includes $975 Million in projects. Significant FY2013 project deliverables include: Replacement of 95 buses and rehabilitation of 100 buses Rehabilitation of 42 escalators and 21 elevators Replacement of 3 escalators at Dupont Circle Completion and opening of Shepherd Parkway bus garage Aggressive Red and Orange/Blue line segment rehabilitation and track and structures maintenance Initiation of the 8-car train implementation study Installation of event recorders on 1000 and 4000 series railcars ALTERNATIVES: Not applicable. FUNDING IMPACT: This is an information item to present a progress report on the Capital Program and Capital Budget. No specific action with a budget impact is requested at this time. TIMELINE: Previous actions June 2012 FY2012 third quarter capital progress report delivered to the Committee. May 2012 Board adopted FY CIP February 2012 FY2012 second quarter capital progress report delivered to the Committee. Anticipated actions after presentation RECOMMENDATION: Not applicable. October 2012 Metro will provide the FY2012 reconciliation of capital project expenditures and the updated FY2013- FY2019 CIP. November 2012 Metro will update six quarter Jurisdictional Billing Forecast based on FY2012 performance and FY2013 first quarter forecast. November 2012 FY2013 first quarter capital progress report and updated six year CIP delivered to the Committee.

5 Washington Metropolitan Area Transit Authority Capital Program Update Finance and Administration Committee Finance and Administration Committee September 13, 2012

6 Capital Program Monthly Investment Performance vs. FY2011 y $900 $800 $700 $600 $500 $400 $300 $200 $100 $ Invested $159 M more than FY2011 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun FY12 Investment Profile FY11 Investment Profile FY2012 invested $770M or 84% of Forecast

7 Capital Program Investments to Date (as of June 30, 2012) FY2012 Performance: CIP Projects FY2012 PM FY2012 Invest. FY2012 Remaining Capital Program Group Forecast % of % of Dollars Dollars (12/15/2011) Bud. Bud. A. Vehicles/Vehicle Parts $ $ % $ % B. Rail System Infrastructure Rehab $ 99.6 $ % $ (18.9) -19% C. Maintenance Facilities $ $ % $ % D. Systems and Technology $ 91.0 $ % $ % E. Track and Structures $ 80.9 $ % $ 1.2 1% F. Passenger Facilities $ $ % $ % G. Maintenance Equipment $ $ % $ % H. Other Facilities $ 25.3 $ % $ % I. Program Mgmt. / Credit Facility $ 4.8 CIP Total: $ $ % $ % $ % $ % Actual Expenditures RemainingForecast 0% 20% 40% 60% 80% 100% Pre-FY12 FY12 Pre-FY2012 Exp. FY2012 Exp. Remaining FY2012 Invest. FY2012 Remaining Total Exp. Budget Safety & Security Projects* Budget % of % of Dollars Dollars Dollars Dollars 0% 20% 40% 60% 80% 100% Bud. Bud. Safety & Security Total: $ 61.0 $ $ 33.1 $ % $ % *Expenditure data is recorded from the inception of Safety & Security program Pre-FY12 FY12 Pre-FY2012 Exp. FY2012 Exp. Remaining FY2012 Invest. FY2012 Remaining Total Exp. Budget ARRA Projects* Budget % of % of Dollars Dollars Dollars Dollars 0% 20% 40% 60% 80% 100% Bud. Bud. ARRA Total: $ $ $ 55.7 $ % $ % *Expenditure data is recorded from the inception of ARRA program in FY2009

8 Fasteners Achieving Steady State Maintenance Fasteners in Thousands FY12 FY13 FY14 FY15 FY16 FY17 FY18 Good Condition Work Plan Backlog

9 Track and Structures Track and Structures Budget Deliverables 10.0% 0% 10.0% 0% 30.0% 0% 50.0% 0% 70.0% 0% 90.0% 0% 110.0% 0% 130.0% 0% FY2012 Major Deliverables FY2012 FY2012 Program Planned Actual Status Welding Program CIP0018 # joints welded 1,000 1,229 Floating Slab Rehab CIP0019 linear ft. 2,700 1,445 Rail Signage Replacement CIP0020 # signs replaced 1,500 2,679 Pad/Shock Absorber Rehab CIP0021 linear ft. 7,500 9,204 Track Rehab CIP0024 # miles of track tamped miles of running rail # direct fixation fasteners 15,000 25,401 # cross ties 13,000 21,336 # turnouts Leak Mitigation CIP0026 #leaks fixed 2,150 2,759 Fasteners CIP0089 # direct fixation fasteners 6,260 10,887

10 Passenger Facilities Elevators and Escalators Budget Deliverables 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% FY2012 Major Deliverables FY2012 FY2012 Program Planned Actual Status Elevator Rehabilitation CIP0072 # Elevator rehabilitated 5 4 Escalator Rehabilitation CIP0073 # Escalator rehabilitated Escalator Replacement # Escalator Replaced 3 3

11 Vehicles and Vehicles Parts Bus and MetroAccess Budget Deliverables 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% FY2012 Major Deliverables FY2012 FY2012 Program Planned Actual Status Bus Rehabilitation CIP0005 # Buses rehabilitated Bus Replacement CIP0006 # Buses delivered MetroAccess Fleet CIP0015 # Vehicles delivered

12 Maintenance Facilities Bus Garages Budget Deliverables 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% FY2012 Major Deliverables Program Royal Street Bus Garage Southeastern Bus Garage Replacement (Shepherds Parkway) Southern Avenue Bus Percentage Complete Status CIP % CIP0086/ARA0002/CRB % CIP %

13 Major Challenges Track Time Competition Accelerate reduction in backlog Increase productivity

14 Major Accomplishments

15 Guarded #8 s

16 NTSB Track Circuit Replacement

17 Buses

18 Bus Garage

19 Access Vehicles

20 Station Platforms

21 Track Geometry Vehicle

22 7K Final Design

23 ROCC

24 Station Cooling

25 Moving Forward FY2013 Plans Replacement of 95 buses and rehabilitation of 100 buses Rehabilitation of 42 escalators and 21 elevators Replacement of 3 escalators at Dupont Circle Completion and opening of Shepherd Parkway bus garage Aggressive track and structures maintenance Initiation of the 8-car train implementation study Installation of event recorders on 1000 and 4000 series railcars

26 Moving Forward FY2013 Plans Red line segment rehabilitation Platform rehabilitation at Fort Totten and Brookland CUA Emergency Trip Station between Union Station and Silver Spring Replace CCTV at Metro Center, Farragut North, and Brookland - CUA Orange/Blue line segment rehabilitation Platform rehabilitation at Deanwood and Minnesota Ave. Tractions power substation rehabilitation between Stadium-Armory and Metro Center A/C switchgear room equipment replacement at Stadium-Armory, Potomac Ave., Eastern Market, and Rosslyn. Continue rehabilitation of ceilings, tunnels, and domes

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun REVENUE AND RIDERSHIP 4th Quarter FY2014 REVENUE (in Millions) $90M $85M $80M $75M $70M $65M $60M $55M $50M 79 77 74 74 72 70 FY2013 Actual FY2014 Budget FY2014 Actual 79 85 78 78 77 67 66 70 59 67 65

More information

State of Good Repair Review

State of Good Repair Review Finance & Administration Committee Action Item IV-D October 9, 2014 State of Good Repair Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

2 nd Quarter Capital and Operating Reports

2 nd Quarter Capital and Operating Reports Finance & Administration Committee Information Item IVB March 14, 2013 2 nd Quarter Capital and Operating Reports Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Operating Budget Report

Operating Budget Report Operating Report Operating ($ in Millions) Operating Expenditures ($ in Millions) Jun-11 Jun-12 $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $ 2,973 1% Expense $ 359,102 $ 361,882 $ 366,332 $ 4,450

More information

Operating Budget Report

Operating Budget Report Operating Budget Report 4th Quarter FY2012 Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) Q4 2011 Q4 2012 Actual Actual Budget $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $

More information

Capital Improvement Program Update

Capital Improvement Program Update Finance & Administration Committee Information Item III-A May 12, 2011 Capital Improvement Program Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2018 Second Quarter Financial Update

FY2018 Second Quarter Financial Update Finance and Committee Information Item III-A February 8, 2018 Second Quarter Financial Update 4 of 52 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2018 Third Quarter Financial Update

FY2018 Third Quarter Financial Update Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2017 Year-End Financial Update

FY2017 Year-End Financial Update Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

RAC Capital Presentatition May 5, 2010

RAC Capital Presentatition May 5, 2010 RAC Capital Presentation ti May 5, 2010 Flexible Six-Year Agreement Flexible Six-Year Agreement minimum funding commitment to match Federal funds, and to annually assess availability of additional funds

More information

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 MEMORANDUM SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 FROM: DGMA/CFO - Carol Dillon Kissa TO: GM/CEO - Richard Sarles A I am enclosing for your review the October financial report.

More information

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1 OPERATING BUDGET REPORT ^ H FY2013 ^^ H OPERATING BUDGET($ in Millions) MTD Revenue Expense Subsidy Cost Recovery YTD Revenue Expense Subsidy Cost Recovery Jan-FY2012 Jan-FY2013 Variance FY13 Actual Actual

More information

OPERATING BUDGET REPORT

OPERATING BUDGET REPORT OPERATING BUDGET REPORT OPERATING BUDGET ($ in Millions) MTD Nov-FY2012 Nov-FY2013 Actual Actual Budget $ Percent Revenue $ 63.0 $ 65.7 $ 68.3 $ (2.7) -3.9% Expense $ 107.6 $ 124.8 $ 129.8 $ 5.0 3.8% Subsidy

More information

Quarterly Financial Report FY2015 Q3 January March 2015

Quarterly Financial Report FY2015 Q3 January March 2015 Washington Metropolitan Area Transit Authority Fiscal Year 2015 Financials Quarterly Financial Report FY2015 Q3 January March 2015 Page 1 of 54 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY QUARTERLY

More information

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Oct-FY2012 Oct-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 70 $ 79 $ (8)

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Sept-FY2012 Sept-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 68 $ 71 $ (3)

More information

Quarterly Financial Report FY2015 Q4 April June 2015

Quarterly Financial Report FY2015 Q4 April June 2015 Washington Metropolitan Area Transit Authority Fiscal Year 2015 Financials Quarterly Financial Report FY2015 Q4 April June 2015 1 of 61 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY QUARTERLY FINANCIAL

More information

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000)

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) TIP ID: 5853 Agency ID: Title: Rail Cars - Replacement, Rehabilitation, Expansion, & Enhancements Local 0/0/100 11,629 e 5,380 e 5,600 e 10,980 PRIIA 50/0/50 265,887 e 154,860 e 246,189 e 158,438 e 141,875

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201958 Resolution: Yes No TITLE: Second Quarter Capital Program Update PRESENTATION SUMMARY:

More information

TESTIMONY OF RICHARD SARLES

TESTIMONY OF RICHARD SARLES TESTIMONY OF RICHARD SARLES Before the Council of the District of Columbia Committee on Economic Development on WMATA s FY2015 Budget Wednesday, April 30, 2014 Good Morning, Chairperson Bowser and other

More information

FY2014 Capital and Operating Budget Discussion

FY2014 Capital and Operating Budget Discussion Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information

More information

FY2017 Budget Guidance

FY2017 Budget Guidance Finance & Administration Committee Information Item IV-D September 10, 2015 FY2017 Budget Guidance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Approval of FY2013 Budget

Approval of FY2013 Budget Finance & Administration Committee Action Item III-A May 10, 2012 Approval of FY2013 Budget Page 3 of 126 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2017 Budget Discussion

FY2017 Budget Discussion Finance & Administration Committee Information Item IV-B November 5, 2015 FY2017 Budget Discussion Page 70 of 116 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

FY2014 Operating Budget Performance Report

FY2014 Operating Budget Performance Report Finance & Administration Committee Information Item IV-C September 11, 2014 FY2014 Operating Budget Performance Report Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

FY2017 Third Quarter Financial Update and CIP Amendment

FY2017 Third Quarter Financial Update and CIP Amendment Finance Committee Action Item III-A May 11, 2017 FY2017 Third Quarter Financial Update and CIP Amendment Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Operating Budget Report

Operating Budget Report Operating Budget Report Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) MTD May-FY2011 May - FY2012 Variance FY12 Actual Actual Budget $ Percent $140M Revenue $ 68,140 $ 70,480

More information

Keeping Metro Safe, Reliable and Affordable

Keeping Metro Safe, Reliable and Affordable Finance Committee Information Item III-B September 14, 2017 Keeping Metro Safe, Reliable and Affordable Washington Metropolitan Area Transit Authority Keeping Metro Safe, Reliable and Affordable 1 Purpose

More information

FY2011 Monthly Financial Report (October 2010)

FY2011 Monthly Financial Report (October 2010) REVISED Finance & Administration Committee Information Item IV-A December 2, 2010 FY2011 Monthly Financial Report (October 2010) Fiscal 2011 Financials Monthly Financial Report October 2010 WASHINGTON

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about

More information

FY2020 Budget Outlook

FY2020 Budget Outlook Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Review of Capital Needs Inventory and Preliminary Capital Improvement Program

Review of Capital Needs Inventory and Preliminary Capital Improvement Program Finance & Administration Committee Information Item IV-A November 3, 2011 Review of Capital Needs Inventory and Preliminary Capital Improvement Program Page 1 of 116 Washington Metropolitan Area Transit

More information

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:

More information

FY2010 Monthly Financial Report (April 2010)

FY2010 Monthly Financial Report (April 2010) Finance & Administration Committee Information Item IV-C June 10, 2010 FY2010 Monthly Financial Report (April 2010) Fiscal 2010 Financials Monthly Financial Report April 2010 WASHINGTON METROPOLITAN AREA

More information

GM/CEO s Proposed FY2020 Budget

GM/CEO s Proposed FY2020 Budget Finance and Capital Committee Information Item IV-A November 1, 2018 GM/CEO s Proposed FY2020 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: Safety Report PURPOSE: To present to the Board of Directors a report

More information

FY2011 Budget Forum. District of Columbia. October 19, 2009

FY2011 Budget Forum. District of Columbia. October 19, 2009 FY2011 Budget Forum District of Columbia October 19, 2009 0 Meeting agenda What is Metro and what is the value of Metro service? What are the Fiscal Year 2011 budget challenges? What are the potential

More information

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item II-A April 22, 2010 Next Capital Funding Agreement The Next Capital Funding Agreement and the 2011-2016 Capital Program Finance and Administration Committee

More information

Safety and Operations Committee. Information Item III-B. January 24, 2019

Safety and Operations Committee. Information Item III-B. January 24, 2019 Safety and Operations Committee Information Item III-B January 24, 2019 Overnight Maintenance Window and Work Hours Page 54 of 75 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Operating Budget. Third Quarter Financial Report (July 2005 March 2006)

Operating Budget. Third Quarter Financial Report (July 2005 March 2006) Third Quarter Financial Report (July 2005 March 2006) INDEX A. Executive Summary...page 2 B. Revenue and Expense Analysis...page 3 C. Budget Variance Reports...page 14 D. Ridership and Performance Measures...page

More information

M Aug sept OCt Nov Dec ~ FtIb ~ ~ ~

M Aug sept OCt Nov Dec ~ FtIb ~ ~ ~ Ill. $14OM FY2012 Actual _ FY2013 Budget _ FY2013 Actual $13OM $11OM $l00m $9OM $10M Jul Aug sept OCt Nov Dec Jan FtIb Mar May Jun As of December YID, Metro Is favorable to budget by $S.OM, or 1.4%. Year-to-date

More information

Financial Report - FY 2017 Year to Date May 31, 2017

Financial Report - FY 2017 Year to Date May 31, 2017 Financial Report - FY 2017 Year to Date July 19, 2017 1 Major Highlights Revenue Sales tax remittances received through YTD April 2017 are 4.2% higher than YTD April 2016 Plaza Saltillo lease income budgeted

More information

FY2011 Monthly Financial Report (July 2010)

FY2011 Monthly Financial Report (July 2010) Finance & Administration Committee Information Item IV-C September 16, 2010 FY2011 Monthly Financial Report (July 2010) Fiscal 2011 Financials Monthly Financial Report July 2010 WASHINGTON METROPOLITAN

More information

Approval of FY2017 Capital Budget and FY Capital Improvement Program

Approval of FY2017 Capital Budget and FY Capital Improvement Program Finance Committee Action Item III-B April 14, 2016 Approval of FY2017 Capital Budget and FY2017-2022 Capital Improvement Program Page 23 of 68 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY First Quarter July -- September 2016

Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY First Quarter July -- September 2016 Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY2017 -- First Quarter July -- September 2016 Page 1 of 62 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

More information

Approval to Submit TIFIA Loan Application

Approval to Submit TIFIA Loan Application Finance & Administration Committee Action Item III-G September 16, 2010 Approval to Submit TIFIA Loan Application Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority

Notice of Public Hearing Washington Metropolitan Area Transit Authority Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B18-01: Proposed FY2019 Operating Budget and Docket B18-02: Proposed FY2019 Capital Improvement Program and Federal FY2018

More information

FY2012 Budget Update: Proposed Capital Budget and Financial Plan

FY2012 Budget Update: Proposed Capital Budget and Financial Plan Finance & Administration Committee Information Item IV-B March 10, 2011 FY2012 Budget Update: Proposed Capital Budget and Financial Plan Washington Metropolitan Area Transit Authority Board Action/Information

More information

FY2012 Preliminary Subsidy Calculation

FY2012 Preliminary Subsidy Calculation Finance & Administration Committee Information Item III-A March 3, 20 FY202 Preliminary Subsidy Calculation Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Operating Budget. Second Quarter Financial Report

Operating Budget. Second Quarter Financial Report Second Quarter Financial Report INDEX A. Executive Summary... A-1 B. Revenue and Expense Analysis... B-1 C. Budget Variance Reports... C-1 D. Ridership and Performance Measures... D-1 Board Budget Committee

More information

Report by Finance and Administration Committee (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance and Administration Committee (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance and Administration Committee (A) 07-23-2015 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201642 Resolution: Yes No TITLE:

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM PRESENTED AND ADOPTED: SUBJECT: APPROVAL OF FISCAL 2007 2012 CAPITAL IMPROVEMENT PROGRAM RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSPORTATION AUTHORITY WHEREAS, The Board

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

FY2016 Year-End Financial Update

FY2016 Year-End Financial Update Finance Committee Information Item III-A September 8, 2016 FY2016 Year-End Financial Update Page 4 of 37 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING

FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING Testimony of John B. Catoe, Jr. General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia s Committee

More information

FY2013 Preliminary Operating Budget

FY2013 Preliminary Operating Budget Finance & Administration Committee Information Item IV-D December 1, 2011 FY2013 Preliminary Operating Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2017 Budget Work Session

FY2017 Budget Work Session Finance & Administration Committee Information Item IV-B January 14, 2016 FY2017 Budget Work Session Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

TESTIMONY OF RICHARD SARLES. Before the Council of the District of Columbia s Committee on Economic Development. April 22, 2013

TESTIMONY OF RICHARD SARLES. Before the Council of the District of Columbia s Committee on Economic Development. April 22, 2013 TESTIMONY OF RICHARD SARLES Before the Council of the District of Columbia s Committee on Economic Development April 22, 2013 Good Morning, Chairperson Bowser and other members of the Committee on Economic

More information

Providers of Public Transportation Individual Targets

Providers of Public Transportation Individual Targets APPENDIX Providers of Public Transportation Individual Targets The following letters, presentation slides, and other data were provided by the individual reporting entities, and are posted on the MWCOG

More information

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority. PROPOSED FISCAL YEAR 2011 BUDGET Testimony of Richard Sarles, General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia Committee on Public Works and

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board This forum is sponsored by the Northern Virginia Transportation Commission. It is separate and distinct

More information

Approval of FY2011 Budget

Approval of FY2011 Budget Finance & Administration Committee Action Item III-A June 10, 2010 Approval of FY2011 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

PASSENGER REJECTION REDUCTION INITIATIVE KIRK PEREIRA. 24 th April 2018

PASSENGER REJECTION REDUCTION INITIATIVE KIRK PEREIRA. 24 th April 2018 PASSENGER REJECTION REDUCTION INITIATIVE KIRK PEREIRA 24 th April 2018 WHAT IS THIS PROJECT ABOUT? Well we are not going into that again this year! Nearly everyone in this room knows about the project

More information

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date)

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date) METRO Fiscal Year 2012 Monthly Board Report Revenue Expense Ridership Performance (Fourth Quarter Fiscal Year-to-Date) This report is based on a preliminary closing of the year-end financials for FY2012

More information

Fiscal Year 2018 Project 1 Annual Budget

Fiscal Year 2018 Project 1 Annual Budget Fiscal Year 2018 Project 1 Annual Budget Table of Contents Table Page Summary 3 Summary of Costs Table 1 4 Treasury Related Expenses Table 2 5 Summary of Full Time Equivalent Table 3 6 Positions Cost-to-Cash

More information

METRO. Monthly Board Report. June 2006

METRO. Monthly Board Report. June 2006 METRO Monthly Board Report Operating Capital Service Performance June 26 7/17/26 June 26 MONTHLY BOARD REPORT INDEX Section A Section B Section C Section D Section E Section F Section G Operating Budget

More information

Cash & Liquidity The chart below highlights CTA s cash position at March 2018 compared to March 2017.

Cash & Liquidity The chart below highlights CTA s cash position at March 2018 compared to March 2017. To: Chicago Transit Authority Board From: Jeremy Fine, Chief Financial Officer Re: Financial Results for March 2018 Date: May 9, 2018 I. Summary CTA s financial results are $0.9 million favorable to budget

More information

Metropolitan Council. Big Picture 2016 Unified Budget

Metropolitan Council. Big Picture 2016 Unified Budget Metropolitan Council Big Picture 2016 Unified Budget Council Meeting June 24, 2014 Timeline for Budget Development Jun 24 Jul-Aug Aug 12 Aug 12 Aug 26 Oct Dec 9 Council - Big-Picture Operating & Capital

More information

Capital Metropolitan Transportation Authority

Capital Metropolitan Transportation Authority Capital Metropolitan Transportation Authority Monthly Performance Report (Covering Performance Data Through March and April 2010) Capital Metropolitan Transportation Authority 1 Performance Report Contents

More information

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting December 15, 2014 Discussion Outline Finance Plan for the Metrorail Project Allocation of Estimated Capital Costs

More information

WORKING IN THE DARK: IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY S CAPITAL PLAN

WORKING IN THE DARK: IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY S CAPITAL PLAN WORKING IN THE DARK: IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY S CAPITAL PLAN Citizens Budget Commission October 20, 2009 Overview Importance of the capital plan Scope of CBC analysis

More information

Cash & Liquidity The chart below highlights CTA s cash position at August 2018 compared to August 2017.

Cash & Liquidity The chart below highlights CTA s cash position at August 2018 compared to August 2017. To: Chicago Transit Authority Board From: Jeremy Fine, Chief Financial Officer Re: Financial Results for August 2018 Date: October 10, 2018 I. Summary CTA s financial results are favorable to budget for

More information

Amend FY07 System Access Program for Artwork

Amend FY07 System Access Program for Artwork Item: 10 Amend FY07 System Access Program for Artwork 55 of 75 Board Budget Committee July 6, 2006 EXECUTIVE SUMMARY Budget Committee Meeting July 6, 2006 Request for Board approval to amend the fiscal

More information

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Cash & Liquidity The chart below highlights CTA s cash position at June 2018 compared to June 2017.

Cash & Liquidity The chart below highlights CTA s cash position at June 2018 compared to June 2017. To: Chicago Transit Authority Board From: Jeremy Fine, Chief Financial Officer Re: Financial Results for June 2018 Date: August 15, 2018 I. Summary CTA s financial results are unfavorable to budget for

More information

Operating Budget Stability

Operating Budget Stability Operating Budget Stability March Financial Update Report to Agenda Executive Summary March Performance Against FY16 Budget March Performance Against Same Period Last Year Appendix Financial Detail: March

More information

Review of Membership Developments

Review of Membership Developments RIPE Network Coordination Centre Review of Membership Developments 7 October 2009/ GM / Lisbon http://www.ripe.net 1 Applications development RIPE Network Coordination Centre 140 120 100 80 60 2007 2008

More information

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting

Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting May 30, 2014 Discussion Outline Finance Plan for the Metrorail Project Allocation of Estimated Capital Costs and TIFIA

More information

Financial Management Report... 3

Financial Management Report... 3 November 13, 2013 Table of Contents Financial Management Report... 3 OPERATING FUNDS STATEMENT OF REVENUES & EXPENSES... 3 METROPOLITAN COUNCIL INVESTMENT PERFORMANCE SHORT-TERM PORTFOLIO... 4 METROPOLITAN

More information

Capital Metropolitan Transportation Authority Monthly Performance & Financial Report For Period Ending October 31, 2012 Soft Close

Capital Metropolitan Transportation Authority Monthly Performance & Financial Report For Period Ending October 31, 2012 Soft Close Capital Metropolitan Transportation Authority Monthly Performance & Financial Report For Period Ending October 31, 2012 Soft Close Table of Contents SUMMARY REPORT Financial Performance -Sales Tax 3 -Other

More information

Approval of FY Capital Improvement Program and CFA Extension

Approval of FY Capital Improvement Program and CFA Extension Finance Committee Action Item III-A March 23, 2017 Approval of FY2018-2023 Capital Improvement Program and CFA Extension Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Spheria Australian Smaller Companies Fund

Spheria Australian Smaller Companies Fund 29-Jun-18 $ 2.7686 $ 2.7603 $ 2.7520 28-Jun-18 $ 2.7764 $ 2.7681 $ 2.7598 27-Jun-18 $ 2.7804 $ 2.7721 $ 2.7638 26-Jun-18 $ 2.7857 $ 2.7774 $ 2.7690 25-Jun-18 $ 2.7931 $ 2.7848 $ 2.7764 22-Jun-18 $ 2.7771

More information

Revenue Estimating Conference Tobacco Tax and Surcharge Executive Summary

Revenue Estimating Conference Tobacco Tax and Surcharge Executive Summary Revenue Estimating Conference Tobacco Tax and Surcharge Executive Summary February 12, 2014 The Revenue Estimating Conference reviewed Tobacco Tax and Surcharge revenues on February 12, 2014. The forecasts

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

METRO. Fiscal Year 2013 Monthly Board Report. December 2012 (First Quarter Fiscal Year-to-Date)

METRO. Fiscal Year 2013 Monthly Board Report. December 2012 (First Quarter Fiscal Year-to-Date) METRO Fiscal Year 2013 Monthly Board Report Revenue Expense Ridership Performance (First Quarter Fiscal Year-to-Date) 1/14/2013 Table of Contents Section A Section B Section C Section D Section E Section

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report For the Fiscal Years Ended June 30, 2017 and 2016 Table of Contents Washington Metropolitan Area Transit Authority Financial Report For the

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report issued in Accordance with Government Auditing Standards For the Years Ended June 30, 2016 and 2015 Single Audit Reports issued in Accordance

More information

Capital Metropolitan Transportation Authority

Capital Metropolitan Transportation Authority Capital Metropolitan Transportation Authority # Monthly Performance Report Capital Metropolitan Transportation Authority 1 Performance Report Contents Page Financial Performance 3 -- Sales Tax 3 -- Cost

More information

METRO. Fiscal Year 2014 Monthly Board Report. May 2014

METRO. Fiscal Year 2014 Monthly Board Report. May 2014 METRO Fiscal Year 2014 Monthly Board Report Revenue Expense Ridership Performance 7/11/2014 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I Section

More information

Metro 2025 Alternative Funding and Financing

Metro 2025 Alternative Funding and Financing Finance & Administration Committee Information Item IV-A June 12, 2014 Metro 2025 Alternative Funding and Financing 37 of 100 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

VIIl. Agency Financial Plans and 12-Month Allocations

VIIl. Agency Financial Plans and 12-Month Allocations VIIl. Agency Financial Plans and 12-Month Allocations New York City Transit MTA NEW YORK CITY TRANSIT FEBRUARY FINANCIAL PLAN FOR 2006-2009 2005 FINAL ESTIMATE AND ADOPTED BUDGET FOR 2006 In accordance

More information

REVENUE & RIDERSHIP REPORT OCTOBER 2017

REVENUE & RIDERSHIP REPORT OCTOBER 2017 REVENUE & RIDERSHIP REPORT OCTOBER 2017 Monthly passenger revenue 3.5% above last year and 1.4% below budget Monthly ridership 3.4% below budget and 6.3% below last year Year-to-date revenue 3.5% and ridership

More information

Customer Service, Operations and Security Committee. Information Item III-A. June 8, 2017

Customer Service, Operations and Security Committee. Information Item III-A. June 8, 2017 Customer Service, Operations and Security Committee Information Item III-A June 8, 2017 Fair Share Pilot Page 3 of 71 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Customer Service and Operations Committee. Board Action Item III-A. July 10, 2014

Customer Service and Operations Committee. Board Action Item III-A. July 10, 2014 Customer Service and Operations Committee Board Action Item III-A July 10, 2014 FY2015 Bus Service Adjustments Request For Public Hearings Page 3 of 52 Washington Metropolitan Area Transit Authority Board

More information

RMTA FY2016 Annual Traffic and Toll Revenue Report

RMTA FY2016 Annual Traffic and Toll Revenue Report RMTA Richmond Metropolitan Transportation Authority RMTA RMTA FY216 Annual Traffic and Report Richmond Metropolitan Transportation Authority August 216 Final Report RMTA FY216 Annual Traffic and Report

More information

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral FY2006 Proposed Operating Budget Final Summary for Board Referral 1 Operating Statements Subsidy nearly $10M lower than December proposal Dec Base Other Subtot Mar Prop$ Adj Adj Changes Prop$ Revenues

More information

Policy on Reserve Balance for Claims

Policy on Reserve Balance for Claims Finance, Administration and Oversight Committee FY08 Budget Review Item V-B April 12, 2007 Policy on Reserve Balance for Claims Washington Metropolitan Area Transportation Authority Board Action/Information

More information