1 Finance & Administration Committee Action Item III-A May 10, 2012 Approval of FY2013 Budget Page 3 of 126

2 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: Resolution: Yes No TITLE: Approval of the FY2013 Budget PURPOSE: To request Board approval of the FY2013 Operating and Capital Budgets and the six-year Capital Budget. DESCRIPTION: Total FY2013 Budget for Operating, Capital and Reimbursable projects is $2.52 billion. The six-year Capital Budget for FY is $5.50 billion. The FY2013 Operating Budget is $1.576 billion for operating expenses. After including total debt service due of $37.4 million less preventive maintenance and other funding of $33.0 million, the total budget is $1.580 billion. The FY2013 Operating Reimbursable Budget is $35.2 million. The FY2013 Capital Budget is $905.2 million, including $801.7 million for the Capital Improvement Program, $8.5 million ARRA, $38.5 million Safety and Security grants and $56.5 million in Capital reimbursable projects. Unexpended FY2012 amounts are not included in the budget. FUNDING IMPACT: Approval of the FY2013 Operating and Capital budgets will provide expenditure authority for the fiscal year. RECOMMENDATION: Approval of the FY2013 Budget. Page 4 of 126

3 Washington Metropolitan Area Transit Authority Operating & Capital Budget Discussioni Finance and Administration Committee May 10, 2012 Page 5 of 126

4 Purpose Approve the FY2013 Budget, including: Capital Budget Operating Budget Reimbursable Budget Multi-year Operating Plan Assumptions Address investment impacts Page 6 of 126

5 FY2013 Budget Adoption Review of Proposed FY2013 Capital Budget Page 7 of 126

6 FY2013 CIP Capital Budget Request January 2012 Proposed Budget for FY2013 FY2013 Budget Request $904.1M April 2012 Proposed Capital Funding For FY2013 Net funding required for FY2013 $801.7M add unexpended funds from FY2012 $168.8M adjustments for misc funds $26.3M FY2013 Expenditure Forecast $996.8M * FY2013 Jurisdiction contribution is lower by y$ $60M than the Annual Work Plan presented in January Page 8 of 126

7 FY2013 Proposed Capital Program Sources Proposed FY2013 Capital Program Program Capital Improvement Program (CIP) FY2013 $801.7M FY2012 CIP Rollover Misc funds 26.3 Total $996.8M American Recovery & Reinvestment Act (ARRA) 8.5 Reimbursable Projects 56.5 Safety and Security Grant Program 38.5 Total $1,100.3M FY12 CIP Rollover 18% Other Funds 3% FY2013 CIP Budget 91% Safety, Reliability & State t of Good Repair 9% Enhancement State/ Local Funds 35% Federal Grants 44% Page 9 of 126

8 FY2013 Proposed Capital Program Uses Safety NTSB Recommendations Bus facility and Station cameras Radio Upgrade Safety Measurement System development and implementation Reliability Elevators and Escalators Bus Maintenance Facilities Rail Yard Rehabilitation Track Rehabilitation and replacements Network and telecommunications upgrades Customer Enhancements Silver Line Phase I preparation Rehab 12 Metro Stations SmarTrip purchases via website Capital Program Uses Category FY2013 Vehicles s/ Vehicle Parts $ M Rail System Infrastructure Rehabilitation Maintenance Facilities Systems and Technology Track and Structures 73.5 Passenger Facilities Maintenance Equipment Other Facilities 46.6 Safety and Security 38.5 Project Management and Support 2.8 Total $ 1,100.3M 100 Page 10 of 126

9 FY2013 Capital Project Deliverables Safety ADA bumpy tiles at Potomac Ave and Eastern Market Stations Platform work at Takoma, Silver Spring, Minnesota Ave, and Deanwood Stations Install event recorders on 1000 and 4000 Series Rail cars Replace track circuits on Red Line Mock-up of 7000 Series Rail Car Miscellaneous track equipment such as prime movers and tie cranes Rehab/replace 12 miles of running rail Radio communications upgrades at 11 stations Page 11 of 126

10 FY2013 Capital Project Deliverables Reliability Escalator rehabilitation at Dupont Circle Elevator replacement at Rosslyn Station Passenger information pilot program at 14 stations ti Replace 95 buses, rehab 100 buses Rehab 34 escalators; rehab 25 elevators Customer Enhancements 90 passenger Kiosk Information Monitors SmarTrip dispensers at station mezzanines Add stairway between mezzanine and platform at Bethesda Open Shepherd Parkway bus garage Page 12 of 126

11 FY2013 New Capital Projects Safety Concrete Stairs - $2 M Reliability Improve customer access at Bethesda Station Right Of Way (ROW) Improvements - $5.5 M Electrical and lighting improvements along the ROW Breakers and Relay - $2 M Replace relays and breaker equipment in 6 electrical substations btti Core Improvement Initiative for 8-car train deployment - $3 M Initiate comprehensive designs and integrated schedules for deployment of 100% 8-car trains Page 13 of 126

12 FY Proposed Six Year Capital Program Sources Proposed FY CIP Development Projects are evaluated relative to Metro goals Priorities: safety, reliability and state of good repair Program FY Capital Improvement Program (CIP) $ 5,048.2M American Recovery & Reinvestment Act (ARRA) 8.5 Reimbursable Projects Safety and Security Grant Program 38.5 Other Funds 2% Debt 8% FY12 Rollover 3% Total $ 5,500.2M FY2012 CIP Rollover Misc funds 26.3 Total $ 5,695.3M FY CIP Budget 94% Safety, Reliability & State of Good Repair 6% Enhancement State/ Local Funds 42% Federal Grants 45% Page 14 of 126

13 FY2013 FY2018 Proposed Six Year Capital Uses Safety NTSB Recommendations Bus and Station Cameras Radio Upgrade Safety Measurement System Dev and Implementation Reliability Elevators and Escalators Bus Maintenance Facilities Rail Yard Rehabilitation Track Rehabilitation and replacements Network & telecom upgrades Customer Enhancements Silver Line Phase I preparation Rehab 72 Metro Stations New Electronic Payments Program SmarTrip purchases via website Capital Program Uses Category FY Vehicles / Vehicle Parts $2,103.7 M Rail System Infrastructure Rehabilitation Maintenance Facilities Systems and Technology Track and Structures Passenger Facilities Maintenance Equipment Other Facilities 86.6 Safety and Security 38.5 Project Management and Support 17.7 Total $ 5,695.3M Page 15 of 126

14 FY FY2018 Capital Project Deliverables Safety NTSB Track circuit it replacement Achieve steady state on track maintenance 7000 Series Rail Cars Reliability Replace 88 escalators; improve escalator performance Replace MetroAccess vehicles Migrate to automatic train operation Complete Red Line Stages 1 and 2 Next Bus signs at Bus shelters Customer Enhancements New Electronic Payment Program pilot at 10 mezzanines Rail cars for service on Silver Line Replace three bus garages Page 16 of 126

15 FY2013 Operating Budget Review of Proposed FY2013 Operating Budget Page 17 of 126

16 FY2013 Operating Budget - Uses $1.6 billion annual operating budget Expense category Rail Mode $896 M Bus Mode $565 M MetroAccess Mode $115 M Rail 57% Metro Access 7% Bus 36% Labor $768 M Pension $124 M * Health Benefit $154 M Other Fringe Benefits $81 M Services $112 M Paratransit $98 M Materials & Supplies $70 M Fuel & Utilities $131 M Casualty & Liability $32 M Other $6 M * Total pension for operating and capital = $150 M Page 18 of 126

17 FY2013 Operating Budget - Sources $1.6 billion annual funding sources Rail passenger fare revenue $631 M Bus passenger fare revenue $141 M MetroAccess passenger revenue $7.7 M Parking revenue $49 M Advertising revenue $15.5 M Other non-transit revenue $30 M Preventive maintenance $30.7 M Jurisdiction investment $669 M Other $2 M Gross Subsidy 42.5% Preventive Maintenance 2% Other 0.1% Bus Mode 10% Metro Access 0.5% Rail Mode 45% Page 19 of 126

18 FY2013 Budget Reimbursable $35.2 million annual reimbursable budget DC Circulator expense $17.9 M: jurisdiction subsidy $14.5 M plus $3.4 M revenue Neutral Host agreement $9.4 M Safety & Security Grants $6 M Joint tdevelopment t&adj Adjacent tconstruction ti $2M Security Grants 17% Joint Develop Construction 5% Neutral Host 27% DC Circulator 51% Page 20 of 126

19 FY2013 Proposed Operating Budget $1.6 billion Operating budget will: Continue advancing an aggressive safety program to comply with NTSB requirements and address worker fatigue management Improve capacity to perform equipment maintenance Increase escalator preventive maintenance Maintain Metro Access service Prepare for Silver Line Phase I service Expand select rush-hourhour service Enhance safety and security Page 21 of 126

20 Operating Budget Investments Investments with direct impact on Key Performance Indicators (KPI) Initiative Strategic Goal Key Performance Measure Influenced Police officers for bus Safer Organization Crime Rate security Preventive Quality Service Escalator System maintenance on escalators and elevators Availability Elevator System Availability Bus priority corridor adjustments Quality Service Bus On-Time Performance (OTP) Page 22 of 126

21 Operating Investments that Influence the KPIs Initiative Strategic Goal and KPI KPI Performance Measure Influenced Hours of service, productivity, and fatigue prevention Rail grinding to address wheel and rail failures due to corrugation and wheel/rail conductivity Maintaining primary safety radio system and underground radio Safer Organization Employee Injury Rate Quality Service Rail On-Time Performance Rail Fleet Reliability Safer Organization Employee Injury Rate Customer Injury Rate Compliance rate for maintaining 14/24 hour shift limits for ATC, Power and ontrack equipment operators Number of speed restrictions due to corrugation Rate of wheel and rail failures due to corrugation Percent of area with safety radio system coverage Rate of radio incident trouble calls Page 23 of 126

22 Operating Investments that Influence the KPIs, continued Initiative Strategic Goal and KPI KPI Performance Measure Influenced Maintenance and testing related to new capital investments Safer Organization Employee Injury Rate Customer Injury Rate Quality Service Rail On-Time Performance Rail Fleet Reliability Rate of code compliance Frequency rate of maintenance inspections Quantity of cost avoidance Page 24 of 126

23 FY2013 Proposed Operating Budget Proposed Budget FY2012 FY2013 CHANGE ($ in M) Budget Budget $ Revenue (including Fare Change) MetroRail Passenger Fare $582 $626 $44 MetroBus Passenger Fare MetroAccess Passenger Fare * Parking Other Revenue Total Revenue $812 $874 $62 Expense Baseline Operating Expenses $1,465 $1,531 $66 System Improvements Dulles Transition Plan Expense Efficiencies i i and Funding (10) (10) Total Expense $1,465 $1,576 $111 Preventive Maintenance (31) (31) 0 Bus Funding from FY2011 Surplus (2) (2) * FY2012 MetroAccess revenue budget was underestimated. Total $1,434 $1,543 $109 SUBSIDY $622 $669 $47 Page 25 of 126

24 Multi-Year Operating Budget Three Year Forecast FY2014 FY2016 Page 26 of 126

25 Multi-year Financial Planning Pro Forma Assumptions Revenue Ridership is forecasted to increase annually: Rail 2%, Bus 1% and MetroAccess passengers 0.5% Does not include a fare increase or other revenue opportunities Updated d Census and Rail survey data are not included d Personnel No salary or wage increases beyond step increases Increases in pension based on actuarial estimates Healthcare increases due to inflation and a growing number of participants Non-Personnel Non-personnel cost growth based on Consumer Price Index Cost growth in FY2014 due to Silver Line assumptions Debt issuance in FY2014, payments begin in FY2015 Page 27 of 126

26 Multi-year Financial Plan Three Year Pro Forma FY2013 FY2014 FY2015 FY2016 $ in Millions Proposed Forecast Forecast Forecast Revenues Passenger & Parking Fares $ 828 $ 842 $ 857 $ 872 Silver Line Phase I - Fares Advertising Revenue Other Revenue Total Revenue Expenses Payroll Pension Health & Other Benefits Non-Personnel Costs Paratransit Contract Fuel, Propulsion, Utilities Silver Line Phase I - Operating Total Expenses Preventive Maintenance & Surplus (33) (31) (31) (31) Gross Subsidy Debt Service & Other Net Operating Subsidy $ 707 $ 782 $ 787 $ 812 Subsidy Change $76 $5 $25 Page 28 of 126

27 Manage and Reduce Expenses Opportunities to mitigate expense, range $5-10 M Review business processes to increase efficiency through lower costs and reduced cycle time Sustainability & efficient use of resources, range $1-3 3M Replacement of equipment with newer more efficient i technology Page 29 of 126

28 Revenue Opportunities & Other Innovative advertising & marketing revenue, range $3-5 M Utilize FY2011 and FY2012 operating budget surplus, projected total $23 M Fare increase based on biennial Consumer Price Index Capital Program Changes FY2013 capital jurisdiction investment is $60M lower than Proposed Annual Work Plan Page 30 of 126

29 Multi-year Financial Plan Potential Offsets to Subsidy Growth Subsidy before offsets in millions) Inv vestment ($ Metro Proposed Offsets Jurisdiction Investment 6% decrease Subsidy after offsets FY2013 FY2014 FY2015 FY2016 Page 31 of 126

30 Recommendation Approve the FY2013 Operating and Capital Budgets Page 32 of 126

31 Appendix Page 33 of 126

32 Operating Budget Jurisdiction Contribution $47 M $ UPDATED FY2012 FY2013 Subsidy ($ Millions) Subsidy Proposed Variance District of Columbia $233.3 $249.1 $15.8 Montgomery County $104.7 $112.7 $7.9 Prince George's County $141.7 $150.9 $9.2 Maryland Total $ $ $17.2 City of Alexandria $22.3 $24.5 $2.2 Arlington County $37.4 $41.2 $3.8 City of Fairfax $1.4 $1.4 ($0.0) Fairfax County $79.3 $87.5 $8.1 City of Falls Church $1.8 $1.9 $0.0 Virginia Total $142.3 $ $14.11 Total Subsidy $622.0 $669.1 $47.1 Page 34 of 126

33 Capital Improvement Program Jurisdictional Contribution $324 M Multi-Year Capital Budget (CIP) Source of Funds: FY (dollars in millions) FY2013 Total AWP FY Match to Federal Formula Grants $60.2 $391.3 System Performance Funds Subtotal: Federal Match & Local ,066.2 District of Columbia Montgomery County Prince Georges County Maryland Subtotal Alexandria Arlington County City of Fairfax Fairfax County Falls Church Virginia Subtotal Subtotal: Contributions ,066.2 Match to Federal Bus Grants Match to Federal PRIIA Grant State and Local Funds: $323.8 $1,970.6 Total jurisdiction CIP contribution for FY2013 is $60 million less than AWP Page 35 of 126

34 Pension Benefit Comparative $400 Pension Benefits at Retirement for Local 689 Employees $300 $ in Thousands $200 $100 $0 Employer contribution $100 Employee contribution $200 Alexandria Arlington D.C. DC Fairfax Montgomery Prince WMATA George WMATA Local 689 employee wage increase was 9% FY2010-FY2012 Page 36 of 126

35 PROPOSED Page 37 of 126

36 PROPOSED Page 38 of 126

37 ATTACHMENT A FY2013 BUDGET (dollars in millions) Fiscal 2013 Budget Operating Budget Metrorail Operations $896.4 Metrobus Operations $565.0 MetroAccess Operations $114.7 Subsidized Operating Budget $1,576.1 Capital Six-year Budget Preventive Maintenance ($30.7) Funding from FY2011 Surplus ($2.3) Debt Service $16.2 Metro Matters Debt Service $21.2 Total Operating Budget $1,580.4 Operating Reimbursable Programs $35.2 Capital Budget Capital Improvement Program $801.7 $5,048.2 ARRA $8.5 $8.5 Safety and Security $38.5 $38.5 Capital Reimbursable $56.5 $405.0 Total Capital Budget $905.2 $5,500.2 FY2013 BUDGET APPROVAL $2,520.8 $5,500.2 Page 39 of 126

38 ATTACHMENT B-1 FISCAL 2013 OPERATING BUDGET REVENUE, EXPENSE & FUNDING SOURCES FY2013 Budget Metrobus Metrorail MetroAccess REVENUES Passenger $ 772,288,176 $ 138,420,469 $ 626,148,189 $ 7,719,518 Other Passenger 7,600,000 2,553,800 5,046,200 - Parking 48,600,256-48,600,256 - Advertising 15,500,000 10,385,000 5,115,000 - Joint Development 8,000,000-8,000,000 - Fiber Optics 14,500,000-14,500,000 - Interest 7,137,000 2,324,652 4,812,349 - Other 330, ,000 30,000 - Total Revenues $ 873,955,433 $ 153,983,920 $ 712,251,994 $ 7,719,518 EXPENSES Personnel $ 1,128,166,320 $ 439,343,081 $ 681,166,022 $ 7,657,218 Services 210,193,072 36,884,461 69,335, ,973,554 Materials & Supplies 69,694,018 24,954,464 44,363, ,254 Fuel & Propulsion Power 91,005,246 38,392,890 52,612,356 - Utilities 39,979,311 8,947,049 30,927, ,048 Casualty & Liability 31,579,237 13,117,426 16,662,291 1,799,520 Leases & Rentals 4,855,992 1,306,672 2,793, ,991 Miscellaneous 5,083,232 2,120,917 2,903,093 59,222 Reimbursements (4,456,118) (74,300) (4,381,818) - Total Expenses $ 1,576,100,310 $ 564,992,659 $ 896,380,844 $ 114,726,806 GROSS SUBSIDY $ 702,144,877 $ 411,008,739 $ 184,128,850 $ 107,007,288 Less: Preventive Maintenance (30,700,000) (10,438,000) (20,262,000) - Less: FY2011 Surplus Funding (2,300,000) (2,300,000) - Net Operating Subsidy $ 669,144,877 $ 398,270,739 $ 163,866,850 $ 107,007,288 Page 40 of 126

39 ATTACHMENT B-2 FY2013 Operating Budget FISCAL YEAR 2013 BUDGET SUMMARY OF STATE/LOCAL OPERATING REQUIREMENTS Prince City of District of Montgomery George's City of Arlington City of Fairfax Falls Total Columbia County County Alexandria County Fairfax County Church Metrobus Operating Subsidy Regional Bus Subsidy $325,304,243 $137,037,904 $48,593,172 $56,646,812 $14,935,836 $24,680,410 $592,174 $41,501,733 $1,316,200 Non-Regional Bus Subsidy $72,966,496 $31,765,878 $9,164,973 $22,533,782 $1,437,276 $737,807 $0 $7,326,779 $0 Subtotal $398,270,739 $168,803,782 $57,758,146 $79,180,594 $16,373,113 $25,418,217 $592,174 $48,828,513 $1,316,200 Percent of Total 100% 42.4% 14.5% 19.9% 4.1% 6.4% 0.1% 12.3% 0.3% Metrorail Operating Subsidy Base Allocation $155,233,824 $52,203,971 $28,633,319 $27,516,699 $6,954,045 $14,512,464 $463,005 $24,561,803 $388,520 Max Fare Subsidy $8,633,026 $727,531 $3,949,643 $1,715,654 $290,459 $217,869 $47,882 $1,647,598 $36,388 Subtotal $163,866,850 $52,931,502 $32,582,962 $29,232,354 $7,244,504 $14,730,333 $510,887 $26,209,401 $424,908 Percent of Total 100% 32.3% 19.9% 17.8% 4.4% 9.0% 0.3% 16.0% 0.3% MetroAccess Subsidy $107,007,288 $27,385,272 $22,324,318 $42,477,868 $929,894 $1,057,173 $283,116 $12,424,377 $125,268 Percent of Total 100% 25.6% 20.9% 39.7% 0.9% 1.0% 0.3% 11.6% 0.1% Net Operating Subsidy $669,144,877 $249,120,556 $112,665,426 $150,890,815 $24,547,511 $41,205,724 $1,386,178 $87,462,291 $1,866, % 37.2% 16.8% 22.5% 3.7% 6.2% 0.2% 13.1% 0.3% Debt Service $16,197,900 $6,088,784 $2,868,676 $2,871,859 $835,821 $1,614,946 $27,523 $1,867,601 $22,690 Metro Matters Debt Service $21,175,756 $10,672,581 $4,944,539 $5,505,697 $0 $0 $0 $0 $52,939 Total Debt Service $37,373,656 $16,761,365 $7,813,215 $8,377,556 $835,821 $1,614,946 $27,523 $1,867,601 $75,629 FY2013 Jurisdictional $706,518,533 $265,881,921 $120,478,641 $159,268,371 $25,383,332 $42,820,670 $1,413,701 $89,329,892 $1,942,006 Operating Funding Page 41 of 126

40 FY2013 CAPITAL BUDGET Multi-Year Capital Budget (CIP) Costs: FY ATTACHMENT C-1 FY2013 CAPITAL BUDGET (dollars in millions) Actual Budget AWP Forecast Forecast Forecast FY Forecast Forecast FY FY FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total FY2017 FY2018 Total Total A Vehicles/ Vehicle Parts Replacement of Rail Cars CIP Series Rail Car Replacemt $ $8.636 $2.392 $ $ $ $ $ $ $ $ CIP /3000 Series Rail Car Replacement CIP Series Rail Car Replacemt CIP0069 Rail Cars (7000 Series) - 75% 8-Car Trains Subtotal $ $8.636 $2.392 $ $ $ $ $ $ $ $ Replacement of Buses CIP0006 Bus Replacement $ $ $ $ $ $ $ $ $ $ $ Subtotal $ $ $ $ $ $ $ $ $ $ $ Rehabilitation of Rail Cars CIP /3000 Series Rail Car Mid-Life Rehabilitatio $4.723 $3.363 $0.000 $0.000 $0.000 $0.000 $8.085 $0.000 $0.000 $8.085 $0.000 CIP Series Rail Car Mid-Life Rehabilitation CIP0063 Rail Rehabilitation Program CIP Series Rail Car HVAC Rhab CIP0067 Rail Car Safety & Reliability Enhancements CIP0125 Rail Preventive Maintenance CIP0142 Rail Lifecycle Overhaul CIP0148 Repair of Damaged Railcars Subtotal $ $ $ $ $ $ $ $ $ $ $ Rehabilitation of Buses CIP0005 Bus Rehabilitation Program $ $ $ $ $ $ $ $ $ $ $ CIP0008 Bus Repairables CIP0137 Bus Preventive Maintenance CIP0143 Bus Lifecycle Overhaul Subtotal $ $ $ $ $ $ $ $ $ $ $ Replacement of MetroAccess Vehicles CIP0015 MetroAccess Fleet Replacement $ $ $8.547 $8.222 $ $ $ $ $ $ $ Subtotal $ $ $8.547 $8.222 $ $ $ $ $ $ $ Replacement of Service Vehicles CIP0009 Service Vehicle Replacement $0.080 $7.570 $8.039 $7.905 $8.193 $7.099 $ $8.410 $8.686 $ $ Subtotal $0.080 $7.570 $8.039 $7.905 $8.193 $7.099 $ $8.410 $8.686 $ $ Rail Car Fleet Expansion CIP Series Rail Car Procuremt $3.995 $5.491 $0.917 $1.029 $0.222 $0.048 $ $0.000 $0.000 $ $2.217 Subtotal $3.995 $5.491 $0.917 $1.029 $0.222 $0.048 $ $0.000 $0.000 $ $2.217 Bus Fleet Expansion CIP0003 Bus Fleet Expansion $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 Subtotal $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 Bus Enhancements CIP0002 Automatic Vehicle Location Eqt $0.437 $8.124 $ $ $2.707 $0.588 $ $0.000 $0.000 $ $ CIP0007 Bus Camera Installation Subtotal $2.522 $8.614 $ $ $3.219 $0.699 $ $0.000 $0.000 $ $ Subtotal $ $ $ $ $ $ $1, $ $ $2, $2, B Rail System Infrastructure Rehabilitation Rail Line Segment Rehabilitation CIP0107 Red Line Rehabilitation - Stage 1 $ $ $ $ $ $5.765 $ $0.000 $0.000 $ $ CIP0108 Red Line Rehabilitation - Stage CIP0110 Orange/Blue Rahabilitation - Stage Subtotal $ $ $ $ $ $ $ $ $ $ $ Subtotal $ $ $ $ $ $ $ $ $ $ $ C Maintenance Facilities Rehabilitation and Replacement of Bus Garages CIP0084 Southern Avenue Bus Garage $1.939 $ $0.862 $4.338 $ $ $ $0.000 $0.000 $ $ CIP0085 Royal Bus Garage/Cinder Bed CIP0086 Shepherd Parkway Bus Facility Subtotal $ $ $2.119 $ $ $ $ $0.000 $0.000 $ $ Page 42 of 126

41 FY2013 CAPITAL BUDGET Multi-Year Capital Budget (CIP) Costs: FY ATTACHMENT C-1 FY2013 CAPITAL BUDGET (dollars in millions) Actual Budget AWP Forecast Forecast Forecast FY Forecast Forecast FY FY FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total FY2017 FY2018 Total Total Maintenance of Bus Garages CIP0119 Bus Garage Facility Repairs $ $ $ $ $ $2.438 $ $0.000 $0.000 $ $ Subtotal $ $ $ $ $ $2.438 $ $0.000 $0.000 $ $ Maintenance of Rail Yards CIP0116 Rail Yard Facility Repairs $0.297 $ $ $ $ $ $ $7.634 $0.000 $ $ Subtotal $0.297 $ $ $ $ $ $ $7.634 $0.000 $ $ Rail Maintenance Facilities CIP0071 Test Track & Commissioning Fac $1.277 $3.623 $ $ $7.383 $1.604 $ $0.000 $0.000 $ $ Subtotal $1.277 $3.623 $ $ $7.383 $1.604 $ $0.000 $0.000 $ $ Environmental Compliance Projects CIP0010 Environmental Compliance Proj $0.458 $0.823 $1.930 $2.366 $1.135 $0.996 $7.709 $0.813 $0.840 $9.362 $8.081 CIP0011 Underground Storage Tank Rplce Subtotal $2.155 $5.481 $4.820 $4.595 $2.431 $3.985 $ $5.063 $5.229 $ $ Maintenance Bus and Rail Facilities CIP0126 Financial Plan/Systmwide Upgrd $1.321 $2.079 $0.782 $1.403 $1.961 $2.265 $9.811 $1.014 $1.902 $ $9.326 CIP0127 Support Equipment - MTPD CIP0145 Rail Yard Hardening CIP0155 Rehab Backlick Road Facility Subtotal $5.502 $ $ $9.408 $6.817 $6.879 $ $4.395 $5.227 $ $ Expansion of Bus Garages CIP0038 Bus Garage Capacity Enhancemnt $0.193 $0.705 $0.000 $0.000 $0.000 $0.000 $0.899 $0.000 $0.000 $0.899 $0.000 CIP0078 Bladensburg Shop Reconfigure Subtotal $1.546 $5.839 $7.421 $5.836 $5.007 $1.088 $ $0.000 $0.000 $ $ Subtotal $ $ $ $ $ $ $ $ $ $ $ D Systems and Technology Power System Upgrades - Rail CIP % 8-Car Train - Power Upgrd $0.000 $0.000 $0.880 $5.581 $6.709 $8.155 $ $7.268 $6.872 $ $ CIP Car Train Power Upgrades Subtotal $4.058 $0.108 $0.880 $5.581 $6.709 $8.155 $ $7.268 $6.872 $ $ Operations Support Software CIP0042 Bus & Rail Asset Mgmt Software $1.228 $4.359 $4.120 $2.971 $5.010 $5.354 $ $3.894 $3.624 $ $ CIP0043 Bus Operations Support Softwre CIP0044 Customer & Regional Integrate CIP0045 Data Centers & Infrastructures CIP0047 Geographic Information System CIP0051 Police Dispatch & Records Mgmt CIP0052 Network and Communications CIP0053 Network Operations Center(NOC) CIP0056 Rail Operations Support Software CIP0128 Data Governance&Business Intel CIP0140 Rail Mileage Based Asset Mgmt CIP0144 Bus Operations Control Center CIP0149 Transit Asset Management Systm Subtotal $ $ $ $ $ $ $ $ $ $ $ Business Support Software & Equipment CIP0030 Currency Processing Machines $0.125 $1.978 $0.704 $0.076 $0.016 $0.004 $2.903 $0.000 $0.000 $2.903 $0.799 CIP0046 Document Management System CIP0048 Sensitive Data Protection Tech CIP0049 Management Support Software CIP0050 IT OneStop & Office Automation CIP0054 Customer Electronic Comm CIP0103 Police Portable Radio Replace CIP0147 Electronic Countermeasures CIP0195 Radio Project - Add'l Coverage CIP0196 Safety Measurement System Subtotal $ $ $ $ $ $ $ $ $ $ $ Rail Fare Equipment CIP0031 Debit/Credit Processing Requir $0.331 $1.122 $0.227 $0.229 $0.258 $0.293 $2.459 $0.257 $0.243 $2.960 $1.507 CIP0032 Fare Media Encoders Page 43 of 126

42 FY2013 CAPITAL BUDGET Multi-Year Capital Budget (CIP) Costs: FY ATTACHMENT C-1 FY2013 CAPITAL BUDGET (dollars in millions) Actual Budget AWP Forecast Forecast Forecast FY Forecast Forecast FY FY FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total FY2017 FY2018 Total Total CIP0091 Automatic Fare Collection Mach CIP0092 Ethernet Wiring for Rail Fare CIP0093 Regional NEXTFARE System CIP0094 Coin Collection Machines Imprv CIP0097 New Electronic Payment Program Subtotal $7.116 $ $ $ $ $ $ $ $ $ $ Subtotal $ $ $ $ $ $ $ $ $ $ $ E Track and Structures Track Rehabilitation CIP0018 Track Welding Program $0.369 $2.756 $2.519 $2.709 $3.262 $3.989 $ $3.730 $4.484 $ $ CIP0019 Track Floating Slab Rehab CIP0021 Track Pad/Shock Absorber Rehab CIP0022 Track Structural Rehabilitate CIP0023 Third Rail Rehabilitation CIP0024 Track Rehabilitation CIP0089 Track Fasteners CIP0141 Cheverly Abutment CIP0146 Mainline #8 Switch Replacement Subtotal $ $ $ $ $ $ $ $ $ $ $ Station/Tunnel Rehabilitation CIP0026 Station/Tunnel Leak Mitigation $3.420 $3.298 $2.883 $3.035 $3.574 $4.242 $ $4.952 $5.539 $ $ Subtotal $3.420 $3.298 $2.883 $3.035 $3.574 $4.242 $ $4.952 $5.539 $ $ Subtotal $ $ $ $ $ $ $ $ $ $ $ F Passenger Facilities Elevator/Escalator Facilities CIP0072 Elevator Rehabilitation $0.923 $5.425 $2.871 $1.995 $1.762 $0.383 $ $0.000 $0.000 $ $7.010 CIP0073 Escalator Rehabilitation CIP0132 Elevator/Escalator Repairables CIP0185 Escalator Replacement Subtotal $9.095 $ $ $ $ $ $ $ $ $ $ Maintenance of Rail Station Facilities CIP0087 Station Rehabilitation Program $8.633 $7.832 $ $8.900 $ $ $ $ $ $ $ CIP0138 System-wide Infrastructure Rhb CIP0150 Fire Systems CIP0151 Station Cooling Program CIP0152 Parking Garage Rehabilitation CIP0153 Accessible Station Signage Subtotal $ $ $ $ $ $ $ $ $ $ $ Bicycle & Pedestrian Facilities CIP0035 Bicycle & Pedestrian Facility $0.516 $2.315 $2.646 $1.674 $1.716 $1.927 $ $1.703 $1.622 $ $ Subtotal $0.516 $2.315 $2.646 $1.674 $1.716 $1.927 $ $1.703 $1.622 $ $ Rail Station: Capacity/Enhancements CIP0039 Core & System Capacity Develop $0.252 $3.283 $2.048 $1.036 $1.471 $1.267 $9.357 $1.748 $1.771 $ $9.341 Page 44 of 126

43 FY2013 CAPITAL BUDGET Multi-Year Capital Budget (CIP) Costs: FY ATTACHMENT C-1 FY2013 CAPITAL BUDGET (dollars in millions) Actual Budget AWP Forecast Forecast Forecast FY Forecast Forecast FY FY FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total FY2017 FY2018 Total Total CIP0074 Parking Lot Credit Card Reader CIP0088 Station Entrance Canopies CIP0179 Gallery Place Access Improvements Subtotal $4.952 $8.373 $3.068 $1.733 $6.377 $5.407 $ $ $ $ $ Bus Priority Corridor Improvements CIP0037 Bus Priority Corridor Network $1.139 $8.547 $2.500 $4.915 $3.640 $6.382 $ $4.073 $2.262 $ $ Subtotal $1.139 $8.547 $2.500 $4.915 $3.640 $6.382 $ $4.073 $2.262 $ $ Rail Station Equipment CIP0099 Police Emergency Mgmt Equipment $0.103 $0.982 $0.176 $0.179 $0.206 $0.298 $1.943 $0.210 $0.212 $2.366 $1.282 Subtotal $0.103 $0.982 $0.176 $0.179 $0.206 $0.298 $1.943 $0.210 $0.212 $2.366 $1.282 Subtotal $ $ $ $ $ $ $ $ $ $ $ G Maintenance Equipment Rail Maintenance Equipment CIP0020 Rail Track Signage Replacement $1.238 $1.061 $0.983 $1.035 $1.235 $1.406 $6.958 $1.341 $1.396 $9.694 $7.395 CIP0025 Track Maintenance Equipment CIP0027 Switch Machine Rehabilitation CIP0065 Geometry Vehicle CIP0066 Rail Shop Repair Equipment CIP0133 Wayside Work Equipment CIP0135 Train Control Signal CIP0136 FCC Radio Frequency Comm CIP0139 NTSB Recommendations Subtotal $ $ $ $ $ $ $ $ $ $ $ Bus Repair Equipment CIP0004 Bus Repair Equipment $2.331 $7.791 $2.016 $3.447 $3.345 $3.841 $ $3.549 $3.665 $ $ Subtotal $2.331 $7.791 $2.016 $3.447 $3.345 $3.841 $ $3.549 $3.665 $ $ Business Facilities Equipment CIP0028 Materials Handling Equipment $0.102 $0.195 $0.127 $0.131 $0.152 $0.179 $0.886 $0.171 $0.158 $1.215 $0.918 CIP0029 Warehouse Vertical Storage Unt Subtotal $0.292 $1.377 $5.016 $0.657 $0.266 $0.203 $7.811 $0.171 $0.158 $8.140 $6.471 Subtotal $ $ $ $ $ $ $ $ $ $ $ H Other Facilities Business Support Facilities CIP0033 Revenue Facility Equipment $0.030 $0.892 $0.194 $0.422 $0.423 $0.336 $2.296 $0.399 $0.377 $3.072 $2.150 CIP0034 Revenue Collection Facility CIP0080 Jackson Graham Building Renova Subtotal $1.125 $9.789 $6.837 $3.839 $2.461 $3.803 $ $2.529 $3.838 $ $ MTPD Support Facilities CIP0101 Police Substation District 2 $0.318 $3.502 $ $ $2.585 $0.562 $ $0.000 $0.000 $ $ CIP0106 Special Operations Division Facility Subtotal $0.445 $ $ $ $3.111 $0.676 $ $0.000 $0.000 $ $ Subtotal $1.570 $ $ $ $5.573 $4.478 $ $2.529 $3.838 $ $ I Project Management and Support Credit Facility CIP0131 Credit Facility $2.466 $3.534 $2.500 $3.000 $3.000 $3.000 $ $3.000 $2.951 $ $ Subtotal $2.466 $3.534 $2.500 $3.000 $3.000 $3.000 $ $3.000 $2.951 $ $ Subtotal $2.466 $3.534 $2.500 $3.000 $3.000 $3.000 $ $3.000 $2.951 $ $ New Projects CIP0197 Non-Revenue Facilities $0.000 $0.000 $0.704 $0.900 $0.622 $1.070 $3.295 $1.657 $0.813 $5.766 $5.766 CIP0198 Concrete Stairs (NEW) , $2.000 $0.000 $0.000 CIP0199 Station & ROW Improvements (NEW) , CIP0200 Breakers & Relay Electric Power (NEW) , CIP0201 Design for facility for 8 car trains (NEW) , Subtotal $0.000 $0.000 $ $0.900 $0.622 $1.070 $ $1.657 $0.813 $ $ Total $ $1, $ $ $ $ $5, $ $ $6, $5, Page 45 of 126

44 ATTACHMENT C-2 FY2013 CAPITAL BUDGET Multi-Year Capital Budget (CIP) Source of Funds: FY (dollars in millions) FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total FY2017 FY2018 Total Total Federal Funds: Actual Budget AWP Forecast Forecast Forecast FY Forecast Forecast FY FY Federal Formula Grant Funds: Section 5307 Grant $87.6 $191.1 $139.4 $142.8 $147.8 $152.5 $861.3 $158.9 $165.2 $1,185.4 $906.7 Section 5309 Grant Federal Advance (29.1) Subtotal - Formula Grants $160.9 $320.3 $269.8 $217.5 $255.3 $263.7 $1,487.5 $274.0 $284.9 $2,046.4 $1,565.1 FTA State of Good Repair Grant Federal PRIIA Grant , Federal TIGER Grant Federal New Freedom Grant Federal Urban Area Security Initiative (USA Federal Transit Security Grant Program (TS Federal Bus Grants Subtotal: Federal Funds $279.5 $529.9 $431.2 $373.4 $410.2 $421.8 $2,446.0 $427.8 $434.9 $3,308.7 $2,499.4 State and Local Funds: Match to Federal Formula Grants $40.2 $76.9 $60.2 $61.7 $63.8 $65.9 $368.7 $68.5 $71.2 $508.4 $391.3 System Performance Funds Subtotal: Federal Match & Local , , ,066.2 District of Columbia Montgomery County Prince Georges County Maryland Subtotal Alexandria Arlington County City of Fairfax Fairfax County Falls Church Virginia Subtotal Subtotal: Contributions , , ,066.2 Match to Federal Bus Grants Match to Federal PRIIA Grant , Subtotal: State and Local Funds $217.8 $355.0 $323.8 $326.4 $330.5 $334.1 $1,887.7 $327.0 $328.8 $2,543.5 $1,970.6 Other CIP Funding Sources: Metro Matters Rollover $113.7 $32.0 $1.4 $2.3 $0.0 $0.0 $149.5 $0.0 $0.0 $149.5 $3.7 Metro Matters Residual Funding FY2011 Projected Surplus Land Sales Red Line Insurance Proceeds Insurance Proceeds WFC Insurance Proceeds Arlington Bus Garage Proceeds Other CIP Funds Subtotal: Other Funds $113.9 $90.7 $39.4 $51.2 $8.2 $3.1 $306.4 $0.0 $0.0 $306.4 $101.8 Total without Debt $611.2 $975.6 $794.4 $751.1 $748.8 $759.0 $4,640.1 $754.9 $763.7 $6,158.6 $4,571.8 Unbilled Jurisdictional Contributions $0.0 $30.1 $7.3 $29.1 $0.0 $0.0 $66.5 $0.0 $0.0 $66.5 $36.4 Debt Strategy $0.0 $0.0 $0.0 $14.5 $79.1 $239.9 $333.4 $106.6 $0.0 $440.0 $440.0 Total CIP $611.2 $1,005.7 $801.7 $794.7 $827.9 $998.8 $5,040.0 $861.4 $763.7 $6,665.1 $5,048.2 Reimbursable Funds $64.9 $97.5 $56.5 $47.3 $48.3 $29.6 $344.2 $167.3 $56.1 $567.5 $405.0 Federal ARRA Grant Funds $62.7 $47.7 $8.5 $0.0 $0.0 $0.0 $118.9 $0.0 $0.0 $118.9 $8.5 Federal Safety & Security Grants Funds $3.2 $17.7 $38.5 $0.0 $0.0 $0.0 $59.4 $0.0 $0.0 $59.4 $38.5 Total Capital Program $742.0 $1,168.6 $905.2 $842.0 $876.2 $1,028.4 $5,562.4 $1,028.7 $819.8 $7,410.8 $5,500.2 Page 46 of 126

45 ATTACHMENT D-1 OTHER CAPITAL PROJECTS American Recovery and Investment Act Projects: FY2013 (dollars in millions) Annual Work Plan Year: Pre-FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 ARRA Actual Actual Forecast Forecast Forecast Forecast Forecast Forecast Forecast Total Vehicles & Vehicle Parts ARA0027 Replacement of Oldest Buses (ST02) $ $ $ ARA0030 MetroAccess Fleet Expansion and Replacement (ST10) ARA0028 Service Vehicle Replacement (ST14) ARA0021 Bus Replacement Components (ST26) ARA0022 Preventative Maintenance Subtotal $ $0.003 $0.393 $ $ Maintenance Facilities ARA0001 New Bus Budy and Paint Shop (ST04) $4.259 $ $3.336 $ $ ARA0002 Replacement of Southeastern Bus Garage (ST05) ARA0003 Bus Garage Facility Repairs (ST11) Subtotal $ $ $ $ $ Passenger Facilities ARA0004 Replacement of Crumbling Platforms (ST08) $4.360 $8.890 $1.000 $ $ ARA0005 Update Platform Real-Time Signs (ST28) ARA0006 Metro Center Sales Office Replacement (ST38) Subtotal $4.437 $9.080 $1.960 $ $ Safety & Security ARA0007 Bus Garage Security Update (ST23) $1.965 $0.169 $ $3.000 ARA0017 Communications Equipment for OCC (ST24) ARA0025 Emergency Tunnel Evacuation Carts (ST30) ARA0031 Underground Communications Radios (ST40) ARA0008 Additional Station Alarm/Chemical Sensors (ST48) Subtotal $8.620 $1.856 $1.221 $ $ Maintenance & Repair Equipment ARA0009 Heavy Duty Locomotives for Maintenance (ST12) - - $ $4.999 ARA0020 Power Tool Equipment Replacement (ST31) ARA Ton Crane for Track Work (ST17) ARA0011 Heavy Duty Track Equipment (ST07) ARA0012 Track Welding Program to Repair Defects (ST18) ARA0029 Track Pad/Shock Absorber Rehabilitation (ST37) Subtotal $3.517 $ $ $ $ Operations Systems ARA0013 Upgrade 3 (Three) Oldest Stations and Systems (ST09) $0.649 $2.840 $ $ $ ARA0026 Additional SmarTrip Fare Machines (ST19) ARA0014 Bus Real-Time, Route, and Scheduling Systems (ST21) ARA0019 Bus Engine Fluid Alert System (ST34) ARA0018 Kiosk and Train Control Computers (ST41) Subtotal $3.844 $5.089 $ $ $ Information Technology ARA0015 Sensitive Data Protection Technology (ST16) $1.591 $1.045 $0.818 $ $3.511 ARA0024 Document Management System (ST32) ARA0016 Financial System Integration (ST63) Subtotal $2.374 $6.011 $0.818 $ $9.261 Miscellaneous Other ARA0023 Program Management - $0.196 $0.096 $ $0.550 Total $ $ $ $ $ Page 47 of 126

46 ATTACHMENT D-2 OTHER CAPITAL PROJECTS Summary of Safety & Security Projects: FY2013 (dollars in millions) Annual Work Plan Year: Pre-FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total FY2017 FY2018 Grand Actual Actual Forecast Forecast Forecast Forecast Forecast FY Forecast Forecast Total SEC0001 Bus Garage Security $ $ $ $ - $ $ SEC0002 Cameras on Buses SEC0003 Cameras on Rail Cars SEC0004 CCV and Access Control SEC0005 Chemical Detection SEC0006 Metrorail Station Camera SEC0007 Montgomery Garage SEC0008 PG Radio Upgrade SEC0009 Platform Security SEC0010 PROTECT Systems SEC0011 Radio Redundancy AOCC SEC0012 Vent Intrusion Detection SEC0030 Mobile Emergency Response Vehicl Total $ $ $ $ $ - $ - $ - $ $ - $ - $ Page 48 of 126

47 ATTACHMENT D-3 OTHER CAPITAL PROJECTS Summary of Reimbursable Capital Projects: FY2013 (dollars in millions) Annual Work Plan Year: Pre-FY2011 FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 Reimbursable Actual Actual Forecast Forecast Forecast Forecast Forecast Forecast Forecast Total District of Columbia CRB0027 Brentwood Rail Yard Expansion $ $ - $ - $ - $ - $ - $ - $ - $ - $ CRB0002 DC Downtown Circulator Buses CRB0031 DC Convention Center CRB0073 Dupont Circle Artwork CRB0078 Minnesota Avenue Public Hearing CRB0036 Navy Yard Station Modification CRB0004 Southeast Bus Garage Replacement CRB0047 DC Student SmarTrip Pass CRB0049 Union Row: U Str/Cardozo Stn CRB0056 Yellow Line Extension CRB0001 Ana. Lt. Rail Dem. - Vehicles CRB0052 U St Stat 14 St Bus Access Imp CRB0057 DC Alternative Analysis CRB0058 DC Starter Line CRB0003 NY Avenue Metrorail Station CRB0096 DC Station Name Changes CRB0100 Georgetown Streetscape CRB0107 MCI Arena CRB0111 National Airport CRB0119 DC Station Trailblazer Signs Regional CRB0005 Project Development DC Subtotal $ $ $ $ $ $ $ $ $ $ Page 49 of 126

RAC Capital Presentatition May 5, 2010

RAC Capital Presentatition May 5, 2010 RAC Capital Presentation ti May 5, 2010 Flexible Six-Year Agreement Flexible Six-Year Agreement minimum funding commitment to match Federal funds, and to annually assess availability of additional funds

More information

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item II-A April 22, 2010 Next Capital Funding Agreement The Next Capital Funding Agreement and the 2011-2016 Capital Program Finance and Administration Committee

More information

Approval of FY2011 Budget

Approval of FY2011 Budget Finance & Administration Committee Action Item III-A June 10, 2010 Approval of FY2011 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Quarterly Capital Progress Update

Quarterly Capital Progress Update Finance & Administration Committee Information Item IV-A September 13, 2012 Quarterly Capital Progress Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Review of Capital Needs Inventory and Preliminary Capital Improvement Program

Review of Capital Needs Inventory and Preliminary Capital Improvement Program Finance & Administration Committee Information Item IV-A November 3, 2011 Review of Capital Needs Inventory and Preliminary Capital Improvement Program Page 1 of 116 Washington Metropolitan Area Transit

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:

More information

FY2013 Preliminary Operating Budget

FY2013 Preliminary Operating Budget Finance & Administration Committee Information Item IV-D December 1, 2011 FY2013 Preliminary Operating Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2011 Monthly Financial Report (July 2010)

FY2011 Monthly Financial Report (July 2010) Finance & Administration Committee Information Item IV-C September 16, 2010 FY2011 Monthly Financial Report (July 2010) Fiscal 2011 Financials Monthly Financial Report July 2010 WASHINGTON METROPOLITAN

More information

FY2011 Monthly Financial Report (October 2010)

FY2011 Monthly Financial Report (October 2010) REVISED Finance & Administration Committee Information Item IV-A December 2, 2010 FY2011 Monthly Financial Report (October 2010) Fiscal 2011 Financials Monthly Financial Report October 2010 WASHINGTON

More information

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun REVENUE AND RIDERSHIP 4th Quarter FY2014 REVENUE (in Millions) $90M $85M $80M $75M $70M $65M $60M $55M $50M 79 77 74 74 72 70 FY2013 Actual FY2014 Budget FY2014 Actual 79 85 78 78 77 67 66 70 59 67 65

More information

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000)

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) TIP ID: 5853 Agency ID: Title: Rail Cars - Replacement, Rehabilitation, Expansion, & Enhancements Local 0/0/100 11,629 e 5,380 e 5,600 e 10,980 PRIIA 50/0/50 265,887 e 154,860 e 246,189 e 158,438 e 141,875

More information

FY2018 Third Quarter Financial Update

FY2018 Third Quarter Financial Update Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2018 Second Quarter Financial Update

FY2018 Second Quarter Financial Update Finance and Committee Information Item III-A February 8, 2018 Second Quarter Financial Update 4 of 52 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2017 Year-End Financial Update

FY2017 Year-End Financial Update Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

GM/CEO s Proposed FY2020 Budget

GM/CEO s Proposed FY2020 Budget Finance and Capital Committee Information Item IV-A November 1, 2018 GM/CEO s Proposed FY2020 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board This forum is sponsored by the Northern Virginia Transportation Commission. It is separate and distinct

More information

FY2012 Budget Update: Proposed Capital Budget and Financial Plan

FY2012 Budget Update: Proposed Capital Budget and Financial Plan Finance & Administration Committee Information Item IV-B March 10, 2011 FY2012 Budget Update: Proposed Capital Budget and Financial Plan Washington Metropolitan Area Transit Authority Board Action/Information

More information

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM PRESENTED AND ADOPTED: SUBJECT: APPROVAL OF FISCAL 2007 2012 CAPITAL IMPROVEMENT PROGRAM RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSPORTATION AUTHORITY WHEREAS, The Board

More information

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Approval of FY2017 Capital Budget and FY Capital Improvement Program

Approval of FY2017 Capital Budget and FY Capital Improvement Program Finance Committee Action Item III-B April 14, 2016 Approval of FY2017 Capital Budget and FY2017-2022 Capital Improvement Program Page 23 of 68 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Operating Budget Report

Operating Budget Report Operating Budget Report Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) MTD May-FY2011 May - FY2012 Variance FY12 Actual Actual Budget $ Percent $140M Revenue $ 68,140 $ 70,480

More information

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral FY2006 Proposed Operating Budget Final Summary for Board Referral 1 Operating Statements Subsidy nearly $10M lower than December proposal Dec Base Other Subtot Mar Prop$ Adj Adj Changes Prop$ Revenues

More information

Quarterly Financial Report FY2015 Q4 April June 2015

Quarterly Financial Report FY2015 Q4 April June 2015 Washington Metropolitan Area Transit Authority Fiscal Year 2015 Financials Quarterly Financial Report FY2015 Q4 April June 2015 1 of 61 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY QUARTERLY FINANCIAL

More information

Operating Budget Report

Operating Budget Report Operating Report Operating ($ in Millions) Operating Expenditures ($ in Millions) Jun-11 Jun-12 $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $ 2,973 1% Expense $ 359,102 $ 361,882 $ 366,332 $ 4,450

More information

Quarterly Financial Report FY2015 Q3 January March 2015

Quarterly Financial Report FY2015 Q3 January March 2015 Washington Metropolitan Area Transit Authority Fiscal Year 2015 Financials Quarterly Financial Report FY2015 Q3 January March 2015 Page 1 of 54 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY QUARTERLY

More information

FY2010 Monthly Financial Report (April 2010)

FY2010 Monthly Financial Report (April 2010) Finance & Administration Committee Information Item IV-C June 10, 2010 FY2010 Monthly Financial Report (April 2010) Fiscal 2010 Financials Monthly Financial Report April 2010 WASHINGTON METROPOLITAN AREA

More information

Keeping Metro Safe, Reliable and Affordable

Keeping Metro Safe, Reliable and Affordable Finance Committee Information Item III-B September 14, 2017 Keeping Metro Safe, Reliable and Affordable Washington Metropolitan Area Transit Authority Keeping Metro Safe, Reliable and Affordable 1 Purpose

More information

Operating Budget Report

Operating Budget Report Operating Budget Report 4th Quarter FY2012 Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) Q4 2011 Q4 2012 Actual Actual Budget $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about

More information

TESTIMONY OF RICHARD SARLES

TESTIMONY OF RICHARD SARLES TESTIMONY OF RICHARD SARLES Before the Council of the District of Columbia Committee on Economic Development on WMATA s FY2015 Budget Wednesday, April 30, 2014 Good Morning, Chairperson Bowser and other

More information

FY2014 Capital and Operating Budget Discussion

FY2014 Capital and Operating Budget Discussion Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority

Notice of Public Hearing Washington Metropolitan Area Transit Authority Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B18-01: Proposed FY2019 Operating Budget and Docket B18-02: Proposed FY2019 Capital Improvement Program and Federal FY2018

More information

FY2011 Budget Forum. District of Columbia. October 19, 2009

FY2011 Budget Forum. District of Columbia. October 19, 2009 FY2011 Budget Forum District of Columbia October 19, 2009 0 Meeting agenda What is Metro and what is the value of Metro service? What are the Fiscal Year 2011 budget challenges? What are the potential

More information

FY2017 Budget Discussion

FY2017 Budget Discussion Finance & Administration Committee Information Item IV-B November 5, 2015 FY2017 Budget Discussion Page 70 of 116 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Review FY09 Subsidy Allocation

Review FY09 Subsidy Allocation Finance, Administration and Oversight Committee Information Item IV-D March 13, 2008 Review FY09 Subsidy Allocation Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report issued in Accordance with Government Auditing Standards For the Years Ended June 30, 2016 and 2015 Single Audit Reports issued in Accordance

More information

FY2020 Budget Outlook

FY2020 Budget Outlook Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Sept-FY2012 Sept-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 68 $ 71 $ (3)

More information

FY2017 Third Quarter Financial Update and CIP Amendment

FY2017 Third Quarter Financial Update and CIP Amendment Finance Committee Action Item III-A May 11, 2017 FY2017 Third Quarter Financial Update and CIP Amendment Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY First Quarter July -- September 2016

Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY First Quarter July -- September 2016 Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY2017 -- First Quarter July -- September 2016 Page 1 of 62 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

More information

2 nd Quarter Capital and Operating Reports

2 nd Quarter Capital and Operating Reports Finance & Administration Committee Information Item IVB March 14, 2013 2 nd Quarter Capital and Operating Reports Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

FY2017 Budget Work Session

FY2017 Budget Work Session Finance & Administration Committee Information Item IV-B January 14, 2016 FY2017 Budget Work Session Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

FY2012 Preliminary Subsidy Calculation

FY2012 Preliminary Subsidy Calculation Finance & Administration Committee Information Item III-A March 3, 20 FY202 Preliminary Subsidy Calculation Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report For the Fiscal Years Ended June 30, 2017 and 2016 Table of Contents Washington Metropolitan Area Transit Authority Financial Report For the

More information

FY2017 Budget Guidance

FY2017 Budget Guidance Finance & Administration Committee Information Item IV-D September 10, 2015 FY2017 Budget Guidance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Oct-FY2012 Oct-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 70 $ 79 $ (8)

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

Amend FY07 System Access Program for Artwork

Amend FY07 System Access Program for Artwork Item: 10 Amend FY07 System Access Program for Artwork 55 of 75 Board Budget Committee July 6, 2006 EXECUTIVE SUMMARY Budget Committee Meeting July 6, 2006 Request for Board approval to amend the fiscal

More information

FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING

FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING Testimony of John B. Catoe, Jr. General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia s Committee

More information

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority. PROPOSED FISCAL YEAR 2011 BUDGET Testimony of Richard Sarles, General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia Committee on Public Works and

More information

Amend FY 2006 Infrastructure Renewal Program

Amend FY 2006 Infrastructure Renewal Program Washington Metropolitan Area Transit Authority Amend FY 2006 Infrastructure Renewal Program Budget Committee December 8, 2005 Purpose That the Budget Committee approve and forward to the Board for approval

More information

OPERATING BUDGET REPORT

OPERATING BUDGET REPORT OPERATING BUDGET REPORT OPERATING BUDGET ($ in Millions) MTD Nov-FY2012 Nov-FY2013 Actual Actual Budget $ Percent Revenue $ 63.0 $ 65.7 $ 68.3 $ (2.7) -3.9% Expense $ 107.6 $ 124.8 $ 129.8 $ 5.0 3.8% Subsidy

More information

Policy on Reserve Balance for Claims

Policy on Reserve Balance for Claims Finance, Administration and Oversight Committee FY08 Budget Review Item V-B April 12, 2007 Policy on Reserve Balance for Claims Washington Metropolitan Area Transportation Authority Board Action/Information

More information

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 MEMORANDUM SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 FROM: DGMA/CFO - Carol Dillon Kissa TO: GM/CEO - Richard Sarles A I am enclosing for your review the October financial report.

More information

FY2014 Operating Budget Performance Report

FY2014 Operating Budget Performance Report Finance & Administration Committee Information Item IV-C September 11, 2014 FY2014 Operating Budget Performance Report Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

State of Good Repair Review

State of Good Repair Review Finance & Administration Committee Action Item IV-D October 9, 2014 State of Good Repair Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Operating Budget. Second Quarter Financial Report

Operating Budget. Second Quarter Financial Report Second Quarter Financial Report INDEX A. Executive Summary... A-1 B. Revenue and Expense Analysis... B-1 C. Budget Variance Reports... C-1 D. Ridership and Performance Measures... D-1 Board Budget Committee

More information

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1 OPERATING BUDGET REPORT ^ H FY2013 ^^ H OPERATING BUDGET($ in Millions) MTD Revenue Expense Subsidy Cost Recovery YTD Revenue Expense Subsidy Cost Recovery Jan-FY2012 Jan-FY2013 Variance FY13 Actual Actual

More information

Metro 2025 Alternative Funding and Financing

Metro 2025 Alternative Funding and Financing Finance & Administration Committee Information Item IV-A June 12, 2014 Metro 2025 Alternative Funding and Financing 37 of 100 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Safety and Operations Committee. Information Item III-B. January 24, 2019

Safety and Operations Committee. Information Item III-B. January 24, 2019 Safety and Operations Committee Information Item III-B January 24, 2019 Overnight Maintenance Window and Work Hours Page 54 of 75 Washington Metropolitan Area Transit Authority Board Action/Information

More information

The following items were handed out at the November 2, 2017 NVTC Meeting.

The following items were handed out at the November 2, 2017 NVTC Meeting. The following items were handed out at the November 2, 2017 NVTC Meeting. Blue Item #6 Washington Metropolitan Area Transit Authority FY2019 Proposed Budget FY2017 Budget: Ridership and Revenue Finance

More information

Washington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808

Washington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808 Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action Information MEAD Number: 99808 Resolution: Yes No PURPOSE To obtain Board approval to modify the MetroAccess

More information

FY2016 Year-End Financial Update

FY2016 Year-End Financial Update Finance Committee Information Item III-A September 8, 2016 FY2016 Year-End Financial Update Page 4 of 37 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201958 Resolution: Yes No TITLE: Second Quarter Capital Program Update PRESENTATION SUMMARY:

More information

Metro Accessibility Programs and MetroAccess Free Ride Program Customer Service, Operations and Safety Committee

Metro Accessibility Programs and MetroAccess Free Ride Program Customer Service, Operations and Safety Committee Washington Metropolitan Area Transit Authority Metro Accessibility Programs and MetroAccess Free Ride Program Customer Service, Operations and Safety Committee October 20, 2005 Purpose Information portion

More information

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA).

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). 8 FINANCIAL ANALYSIS This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). The alternative formerly known as

More information

Operating Budget. Third Quarter Financial Report (July 2005 March 2006)

Operating Budget. Third Quarter Financial Report (July 2005 March 2006) Third Quarter Financial Report (July 2005 March 2006) INDEX A. Executive Summary...page 2 B. Revenue and Expense Analysis...page 3 C. Budget Variance Reports...page 14 D. Ridership and Performance Measures...page

More information

Washington Metropolitan Area Transit Authority. TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs)

Washington Metropolitan Area Transit Authority. TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs) Washington Metropolitan Area Transit Authority TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs) 2017-2019 I. GOAL RECOMMENDATION WMATA has adopted a 22% DBE goal f or Federal Fiscal

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities

More information

BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM

BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM Date of Meeting: February 14, 2017 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM # 12 SUBJECT: Metrorail Financial Obligations ELECTION DISTRICT:

More information

TESTIMONY OF RICHARD SARLES. Before the Council of the District of Columbia s Committee on Economic Development. April 22, 2013

TESTIMONY OF RICHARD SARLES. Before the Council of the District of Columbia s Committee on Economic Development. April 22, 2013 TESTIMONY OF RICHARD SARLES Before the Council of the District of Columbia s Committee on Economic Development April 22, 2013 Good Morning, Chairperson Bowser and other members of the Committee on Economic

More information

METRO. Fiscal Year 2012 Monthly Board Report. December 2011 (First Quarter Fiscal Year-to-Date)

METRO. Fiscal Year 2012 Monthly Board Report. December 2011 (First Quarter Fiscal Year-to-Date) METRO Fiscal Year 2012 Monthly Board Report Revenue Expense Ridership Performance (First Quarter Fiscal Year-to-Date) 1/27/2012 Table of Contents Section A Section B Section C Section D Section E Section

More information

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit

More information

New York City Transit

New York City Transit New York City Transit MTA New York City Transit 2008 Preliminary Budget July Financial Plan 2008 2011 MISSION STATEMENT The mission of MTA New York City Transit is to provide customers with safe, reliable

More information

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 200690 Resolution: Yes No TITLE: Adoption of FY15 Operating Budget and Fare Changes PRESENTATION

More information

Providers of Public Transportation Individual Targets

Providers of Public Transportation Individual Targets APPENDIX Providers of Public Transportation Individual Targets The following letters, presentation slides, and other data were provided by the individual reporting entities, and are posted on the MWCOG

More information

METRO. Fiscal Year 2014 Monthly Board Report. May 2014

METRO. Fiscal Year 2014 Monthly Board Report. May 2014 METRO Fiscal Year 2014 Monthly Board Report Revenue Expense Ridership Performance 7/11/2014 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I Section

More information

Approval of FY Capital Improvement Program and CFA Extension

Approval of FY Capital Improvement Program and CFA Extension Finance Committee Action Item III-A March 23, 2017 Approval of FY2018-2023 Capital Improvement Program and CFA Extension Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010

Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010 Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010 Presented to the Board of Directors: Finance, Administration, and Oversight Committee January 8, 2009 1 General Manager s Overview And Summary

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201433 Resolution: Yes No TITLE: Improving Safety Through Fare Enforcement PRESENTATION SUMMARY:

More information

Customer Service, Operations and Security Committee. Information Item III-A. June 8, 2017

Customer Service, Operations and Security Committee. Information Item III-A. June 8, 2017 Customer Service, Operations and Security Committee Information Item III-A June 8, 2017 Fair Share Pilot Page 3 of 71 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Vision The Best Ride in the Nation

Vision The Best Ride in the Nation Washington Metropolitan Area Transit Authority FY 2008 Comprehensive Annual Financial Report Vision The Best Ride in the Nation Mission Provide the nation s best transit service to our customers and improve

More information

Customer Service and Operations Committee. Board Information V-D. September 10, 2015

Customer Service and Operations Committee. Board Information V-D. September 10, 2015 Customer Service and Operations Committee Board Information V-D September 10, 2015 MetroAccess Sustainability Study Page 90 of 104 Washington Metropolitan Area Transit Authority Board Action/Information

More information

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date)

METRO. Fiscal Year 2012 Monthly Board Report. September 2012 (Fourth Quarter Fiscal Year-to-Date) METRO Fiscal Year 2012 Monthly Board Report Revenue Expense Ridership Performance (Fourth Quarter Fiscal Year-to-Date) This report is based on a preliminary closing of the year-end financials for FY2012

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM XVI NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM FOR: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: December 8,

More information

METRO. Fiscal Year 2013 Monthly Board Report. December 2012 (First Quarter Fiscal Year-to-Date)

METRO. Fiscal Year 2013 Monthly Board Report. December 2012 (First Quarter Fiscal Year-to-Date) METRO Fiscal Year 2013 Monthly Board Report Revenue Expense Ridership Performance (First Quarter Fiscal Year-to-Date) 1/14/2013 Table of Contents Section A Section B Section C Section D Section E Section

More information

FY2017 PROPOSED BUDGET

FY2017 PROPOSED BUDGET S A F E T Y, S E R V I C E A N D F I N A N C I A L R E S P O N S I B I L I T Y PROPOSED BUDGET EFFECTIVE JULY 1, 2016 FOCUSING ON THE CUSTOMER W A S H I N G T O N M E T R O P O L I TA N A R E A T R A N

More information

METRO MONTHLY BOARD REPORT

METRO MONTHLY BOARD REPORT METRO Revenue Expenses Service Performance Fiscal Year FY2011 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Summary Sales Tax Revenue Fare Revenue Operating

More information

Quarterly Financial Performance Report

Quarterly Financial Performance Report Quarterly Financial Performance Report Q1 2018 Connecting Communities / Ride the Wave T (206) 398-5000 TTY Relay 711 401 S Jackson Street Seattle, WA 98104 soundtransit.org main@soundtransit.org Page 1

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

METRO. Fiscal Year 2013 Monthly Board Report. November 2012

METRO. Fiscal Year 2013 Monthly Board Report. November 2012 METRO Fiscal Year 2013 Monthly Board Report Revenue Expense Ridership Performance 12/13/2012 Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Report by Finance, Administration & Oversight Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance, Administration & Oversight Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance, Administration & Oversight Committee (B) 03-26-09 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 100331 Resolution: Yes

More information

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. February 2018 (First Quarter Fiscal Year-to Date)

METRO. Fiscal Year Monthly Performance Report. Revenue Expense Ridership Performance. February 2018 (First Quarter Fiscal Year-to Date) METRO Fiscal Year 2018 Monthly Performance Report Revenue Expense Ridership Performance (First Quarter Fiscal Year-to Date) 3/12/2018 Table of Contents Section A Section B Section C Section D Section E

More information

PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET

PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET PUBLIC HEARING ON WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY FISCAL YEAR 2008 BUDGET Before the Committee on Public Works and the Environment Council of the District of Columbia The Honorable Jim Graham,