RAC Capital Presentatition May 5, 2010

Size: px
Start display at page:

Download "RAC Capital Presentatition May 5, 2010"

Transcription

1 RAC Capital Presentation ti May 5, 2010

2 Flexible Six-Year Agreement Flexible Six-Year Agreement minimum funding commitment to match Federal funds, and to annually assess availability of additional funds Line of credit (LOC) to support annual program ($250M) Advantages Demonstrates commitment to Metro capital funding needs Preserves funder flexibility Reduces contracting and financing costs All projects under one roof supports oversight and spending efficiency Allows for increases in Metro capital funding Disadvantages Establishes only a minimum funding commitment Minimum commitment could be confused for "full" commitment Allows for decreases in Metro capital funding Implementation Issues/ Concerns Cost of purchasing LOC estimated at $5M over FY CIP timeframe Would require annual discussions with jurisdictions above minimum funding commitment

3 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Term of Six years with debt service and some No expiration agreement out-year spending ( tail ) Option to cancel every six years Debt service continues even if agreement cancellation is requested Capital Covers: IRP, bus, rail, and safety and Covers nine categories of Improvement Program security Funding amounts established Jurisdictional approval for changes in projects Projects described in detail and matched with funding sources major elements without excess funds in transferring category (expect for revenue shortfalls and recovery plans) Amounts subject to appropriation CIP approved annually with a five-year planning addition (no sixyear locked in program)

4 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Jurisdictional i Specific allocated Commitment is to match all federal grants Contributions contributions for agreement and tail periods annually and provide amounts for system performance funds for the upcoming year No static schedule of funds Metro to provide estimate of required matching funds for succeeding fiscal year If federal grants increase by more than 20%, parties will discuss within 30 days Jurisdictions must contribute all system performance funds allocated by subsidy formulas for placement in Annual Work Plan

5 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Funding for Silent on funding sources All unallocated and expended funds will be Annual Work Plan Projects All funds must be considered eligible for matching federal grants dropped from the Annual Work Plan and require approval for future use Unexpended funds from completed projects will be rolled into following year New projects in Annual Work Plan will have sources of funding listed Multi-year projects have first call on current funding sources in out years. If funds are not sufficient, then other funding will be used Debt service and state of good repair projects have first claim on all funds for which they are eligible

6 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Subsidy Formulas IRP by weighted average of rail capital and bus capital formulas Rail by rail capital Bus by bus capital No process to update amounts due to Metro Weighted average formula for rail, bus and financing expenditures Paratransit has unique formula Dedicated funding resources will use the dedicated funding provision Amounts adjusted on annual basis Weighted average can be changed as needed

7 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Annual Projects with fund obligated or Broken out by CIP element like Metro Matters Work Plan Contents expended in next fiscal year Budget, including cost estimates Also includes expected sources of funds for the budgeted work Must also include preliminary results of Jurisdictional contributions broken out by cash and debt service Summary current year work with costs incurred to date and remaining costs Summary of remaining Metro Matters projects with estimated costs to complete budget reconciliation process for the recently concluded fiscal year

8 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Appropriation Commitment Each year, jurisdictions must notify Metro before June 1 whether the required amount has been appropriated p or will be appropriated Written assurance that all reasonable efforts will be undertaken to obtain such appropriations Same but more detailed. No CIP or Annual Work Plan will be approved without all jurisdictions certifying that funding levels are reasonable and accurate reflections of available funds Reasonable efforts will require a jurisdiction to request its legislative body to appropriate p the entire amount of funds required under the terms of this agreement

9 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Annual Budget Actual expenditures for Same but with expected sources Reconciliation Process projects/activities to date as compared to planned expenditures of funds added to the estimated cost to complete section Actual contributions to date compared to scheduled contributions Projected contributions for remainder of program Actual grant amounts received as compared to projected amount for the same time Estimated cost to complete program

10 The Multi-Year Capital Program Metro Matters Next Capital Funding Agreement Reprogramming Board approval obtained To reprogram to a different element requires certification that the work in the first element can be completed with the remaining funds More formalized process Changes within category up to 50% of category amount can be approved by CFO Above that amount or between categories requires presentation to the JCC and then Board approval Addition or elimination of projects require presentation to the JCC 30 days before Board approval

11 CIP Assumptions Source of Funds Proposed Budget Revised Budget Federal Formula Grants 4-5% growth 1% growth in FY 2011, 4% FY , and 5% FY Systems Performance $108M annually $22M in FY 2011, $70M Funds (local additional) in FY 2012, and $108M FY Debt $442M $179M Use of Funds Program Management Stand alone project, Allocated to each project allocated to the entire program 10

12 Timeline for Jurisdictional and Board Actions May 13 (today) May FA Committee Committee review of draft agreement and referral to Board May 27 Board Approval of agreement and distribution to jurisdictions for signature Late May Jurisdictional staff initiate processes for required approvals Week of June 7 Public Roundtable by Council of the District of Columbia Committee on Public Works and Transportation June 7 or 21 City of Falls Church City Council Work Session June 8 (tentative) Washington Suburban Transit Commission Meeting June 12 Arlington County Board Meeting June 15 Council of the District of Columbia Meeting Committee of the Whole June 22 Meetings of the Fairfax County Board of Supervisors, Alexandria City Council and City of Fairfax Council June 28 City of Falls Church City Council Meeting June 30 General Manager execution of agreement

13 Appendix 12

14 Revisions to the Proposed FY CIP ($ Millions) FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Proposed FY11-16 CIP $718.3 $759.1 $764.4 $763.8 $1,039.9 $983.7 $5,029.2 A) Projected Less Growth in Federal Funds (8.9) (9.3) (12.9) (13.5) (14.2) (14.9) (73.8) B) Pro forma analysis for jurisdiction constraints (85.8) (37.6) (183.8) (127.3) (386.3) C) Revisions for 7000 Series Rail Cars (230.7) (145.2) D) Revisions for 4000 Series Rail Cars 0.0 (1.3) (1.4) 0.2 (51.7) E) Revisions for Credit Facility F) Revisions for NTSB Recommendations G) Revisions for Preventive Maintenance H) Priority projects added to the January Proposed CIP J) Add Rail Rehab. Tier 1: Dupont to Grosvenor K) Add Rail Mileage-based Asset Management L) Add Cheverly Abutment M) Projects reduced or removed Proposed CIP (C to L) (131.8) (34.6) (18.2) (81.8) (8.4) 64.4 (210.5) Total Revisions (94.7) (46.9) (12.9) 34.6 (198.0) (142.2) (460.1) Revised FY11-16 CIP $623.6 $712.3 $751.6 $798.4 $841.8 $841.5 $4,

15 January Budget Book vs. April FY CIP (dollars in millions) January FY CIP April FY CIP April vs Jan. Variance A Vehicles/ Vehicle Parts Replacement of Rail Cars (123.2) Replacement of Buses (59.2) Rehabilitation of Rail Cars Rehabilitation of Buses (10.4) Replacement of MetroAccess Vehicles (4.7) Replacement of Service Vehicles (5.1) Rail Car Fleet Expansion Bus Fleet Expansion (16.9) Bus Enhancements (2.9) MetroAccess Fleet Expansion Subtotal 2, ,059.2 (97.6) B Rail System Infrastructure Rehabilitation Rail Line Segment Rehabilitation Subtotal C Maintenance Facilities Rehabilitation and Replacement of Bus Garages Maintenance of Bus Garages Maintenance of Rail Yards Rail Maintenance Facilities (60.0) Environmental Compliance Projects Maintenance Bus and Rail Facilities (7.7) Expansion of Bus Garages (72.5) Expansion of MetroAccess Garages Subtotal (128.7) D Systems and Technology Power System Upgrades - Rail (1.3) Operations Support Software (76.5) Business Support Software & Equipment (44.3) Rail Fare Equipment (20.1) Subtotal (142.2) 14

16 January Budget Book vs. April FY CIP (dollars in millions) January FY CIP April FY CIP April vs Jan. Variance E Track and Structures Track Rehabilitation Station/Tunnel Rehabilitation Subtotal F Passenger Facilities Elevator/Escalator Facilities Maintenance of Rail Station Facilities Bicycle & Pedestrian Facilities (4.5) Rail Station: ti Capacity/Enhancements t (34.6) Bus Priority Corridor Improvements (4.5) Rail Station Equipment Subtotal G Maintenance Equipment Rail Maintenance Equipment Bus Repair Equipment Business Facilities Equipment Subtotal H Other Facilities Business Support Facilities (32.2) MTPD Support Facilities (33.3) MetroAccess Operations Facility Subtotal (65.5) I Program Management Program Management (142.9) Credit Facility Subtotal (133.9) Total 5, ,569.1 (460.1) 15

17 Proposed Budget Book Source of Funds with Jurisdictional Contribution Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Federal Funds: Budget Forecast Forecast Forecast Forecast Forecast FY Federal Formula Grant Funds: Section 5307 Grant $144.0 $149.8 $157.3 $165.2 $173.4 $182.1 $971.8 Section 5309 Grant Subtotal - Formula Grants $248.6 $258.5 $271.4 $285.0 $299.2 $314.2 $1,676.9 Federal Dedicated Funds Subtotal: Federal Funds $398.6 $408.5 $421.4 $435.0 $449.2 $464.2 $2,576.9 State and Local Funds: Match to Federal Formula Grants $62.1 $64.6 $67.9 $71.2 $74.8 $78.6 $419.2 Local Additional Funds Subtotal: Federal Match & Local ,064.6 District of Columbia $64.0 $64.9 $66.1 $67.4 $68.8 $70.2 $401.4 Montgomery County $29.4 $29.8 $30.3 $30.9 $31.6 $32.2 $184.2 Prince Georges County Maryland Subtotal Alexandria Arlington County City of Fairfax Fairfax County Falls Church Virginia i i Subtotal $44.0 $44.6 $ $46.3 $47.2 $48.2 $ Subtotal: Contributions $169.7 $172.2 $175.4 $178.8 $182.4 $186.1 $1,064.6 Match to Federal Dedicated Funds Subtotal: State and Local Funds $319.7 $322.2 $325.4 $328.8 $332.4 $336.1 $1,964.6 Misc. CIP Funding Sources Total without Debt $718.3 $759.1 $764.4 $763.8 $781.6 $800.3 $4,587.5 Debt Strategy Grand Total $718.3 $759.1 $764.4 $763.8 $1,039.9 $983.7 $5,

18 Revised Source of Funds with Jurisdictional Contribution Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Federal Funds: Budget Forecast Forecast Forecast Forecast Forecast FY Federal Formula Grant Funds: Section 5307 Grant $139.9 $145.5 $151.4 $158.9 $166.9 $175.2 $937.9 Section 5309 Grant Subtotal - Formula Grants $241.4 $251.1 $261.1 $274.2 $287.9 $302.3 $1,617.9 Federal Dedicated Funds Subtotal: Federal Funds $ $ $ $ $ $ $2, State and Local Funds: Match to Federal Formula Grants $60.4 $62.8 $65.3 $68.5 $72.0 $75.6 $404.5 Local Additional Funds Subtotal: Federal Match & Local District of Columbia Montgomery County Prince Georges County Maryland Subtotal Alexandria Arlington County City of Fairfax Fairfax County Falls Church Virginia Subtotal Subtotal: Contributions Match to Federal Dedicated Funds Subtotal: State and Local Funds $232.1 $282.8 $322.9 $326.1 $329.6 $333.2 $1,826.7 Misc. CIP Funding Sources Total without Debt $623.6 $712.3 $751.6 $750.3 $767.4 $785.4 $4,390.6 Debt Strategy Grand Total $623.6 $712.3 $751.6 $798.4 $841.8 $841.5 $4,

19 Proposed Budget Book - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY (dollars in millions) A Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Forecast Forecast Forecast Forecast Forecast Forecast FY Vehicles/ Vehicle Parts Replacement of Rail Cars CIP Series Rail Car Replacement Subtotal Replacement of Buses CIP006 Bus Replacement Subtotal Rehabilitation of Rail Cars CIP Series Rail Car HVAC Rehabilitation CIP /3000 Series Rail Car Mid-Life Rehabilitation CIP Series Rail Car Mid-Life Rehabilitation CIP067 Rail Car Safety & Reliability Enhancements CIP063 Rail Rehabilitation Program CIP125 Rail Preventive Maintenance Subtotal Rehabilitation of Buses CIP005 Bus Rehabilitation Program CIP008 Bus Repairables CIP137 Bus Preventive Maintenance Subtotal Replacement of MetroAccess Vehicles CIP015 MetroAccess Fleet Replacement Subtotal Replacement of Service Vehicles CIP009 Service Vehicle Replacement Subtotal Rail Car Fleet Expansion CIP Series Rail Car Procurement Subtotal Bus Fleet Expansion CIP003 Bus Capacity Enhancements: Fleet Expansion Subtotal Bus Enhancements CIP001 Antenna Reduction/ Security Enhancements CIP002 Automatic Vehicle Location Equipment Replacement CIP007 Bus Camera Installation Subtotal Subtotal ,

20 Proposed Budget Book - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY (dollars in millions) B Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Forecast Forecast Forecast Forecast Forecast Forecast FY Rail System Infrastructure Rehabilitation Rail Line Segment Rehabilitation CIP108 Rail Rehabilitation Tier 1: Dupont to Grosvenor CIP107 Rail Rehabilitation Tier 1: Dupont to Silver Spring CIP110 Rail Rehabilitation Tier 1: National Airport to Stadium Armory Subtotal Subtotal C Maintenance Facilities Rehabilitation and Replacement of Bus Garages CIP085 Replacement of Additional Bus Garages CIP086 Southeastern Bus Garage Replacement CIP084 Southern Avenue Bus Garage Replacement Subtotal Maintenance of Bus Garages CIP119 Bus Garage Facility Repairs Tier 1: Western, Northern and Landover Subtotal Maintenance of Rail Yards CIP116 Rail Yard Facility Repairs Tier 1: Alexandria, Brentwood and New Carrollton Subtotal Rail Maintenance Facilities CIP071 Test Track & Commissioning Facility Subtotal Environmental Compliance Projects CIP010 Environmental Compliance Projects CIP011 Underground Storage Tank Replacement Subtotal Maintenance Bus and Rail Facilities CIP127 Support Equipment - MTPD CIP126 Financial Planning, Project Administration, and System Wide Infrastructure Upgrades Subtotal Expansion of Bus Garages CIP078 Bladensburg Shop Reconfiguration CIP038 Bus Garage Capacity Enhancements Subtotal Subtotal

21 Proposed Budget Book - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY (dollars in millions) Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Forecast Forecast Forecast Forecast Forecast Forecast FY D Systems and Technology Power System Upgrades - Rail CIP % 8-Car Train -- Power Upgrades CIP076 8-Car Train Power Upgrades Subtotal Operations Support Software CIP042 Bus & Rail Asset Management Software CIP043 Bus Operations Support Software CIP044 Customer & Regional Integration CIP045 Data Centers and Infrastructures CIP047 Enterprise Geographic Information System CIP052 Network and Communications CIP053 Network Operations Center (NOC) CIP051 Police Dispatch and Records Management CIP056 Rail Operations Support Software Subtotal Business Support Software & Equipment CIP030 Currency Processing Machines CIP054 Customer Electronic Communications & Outreach CIP046 Document Management System CIP049 Management Support Software CIP050 Metro IT OneStop and Office Automation CIP103 Police Portable Radio Replacement CIP048 Sensitive Data Protection Technology Subtotal Rail Fare Equipment CIP091 Automatic Fare Collection Machines CIP031 Debit/Credit Processing Requirements CIP092 Ethernet Wiring for Rail Fare Machines CIP032 Fare Media Encoders CIP094 Improvements to Coin Collection Machines CIP093 Maintaining NEXTFARE System CIP097 Open Bankcard and Automatic Fare Collection Systems Subtotal Subtotal

22 Proposed Budget Book - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY (dollars in millions) Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Forecast Forecast Forecast Forecast Forecast Forecast FY E Track and Structures Track Rehabilitation CIP023 Third Rail Rehabilitation CIP089 Track Fasteners CIP019 Track Floating Slab Rehabilitation CIP021 Track Pad/Shock Absorber Rehabilitation CIP024 Track Rehabilitation CIP022 Track Structural Rehabilitation CIP018 Track Welding Program Subtotal Station/Tunnel Rehabilitation CIP026 Station/Tunnel Leak Mitigation Subtotal Subtotal F Passenger Facilities Elevator/Escalator Facilities CIP072 Elevator Rehabilitation CIP132 Elevator/Escalator Repairables CIP073 Escalator Rehabilitation Subtotal Maintenance of Rail Station Facilities CIP087 Station Enhancement Program Subtotal Bicycle & Pedestrian Facilities CIP035 Bicycle & Pedestrian Facilities: Capacity Improvements CIP036 Replacement of Bicycle Racks & Lockers Subtotal Rail Station: Capacity/Enhancements CIP039 Core & System Capacity Project Development CIP074 Installation of Parking Lot Credit Card Readers CIP088 Station Entrance Canopies Subtotal Bus Priority Corridor Improvements CIP037 Bus Priority Corridor Network Enhancements Subtotal Rail Station Equipment CIP099 Police Emergency Management Equipment Subtotal Subtotal

23 Proposed Budget Book - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY (dollars in millions) G Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Forecast Forecast Forecast Forecast Forecast Forecast FY Maintenance Equipment Rail Maintenance Equipment CIP136 FCC Radio Frequency Communication Changes CIP065 Geometry Vehicle CIP066 Rail Shop Repair Equipment CIP020 Replacement of Rail Track Signage CIP027 Switch Machine Rehabilitation Project CIP025 Track Maintenance Equipment CIP135 Train Control Signal CIP133 Wayside Work Equipment Subtotal Bus Repair Equipment CIP004 Bus Repair Equipment Subtotal Business Facilities Equipment CIP028 Materials Handling Equipment CIP029 Warehouse Vertical Storage Units/Shelving Subtotal Subtotal H Other Facilities Business Support Facilities CIP134 Carmen Turner Facility Parking Garage CIP080 Jackson Graham Building Renovation CIP033 Replacement of Revenue Facility Equipment CIP034 Revenue Collection Facility (RCF) Building Expansion Subtotal MTPD Support Facilities CIP101 Police Substation- New District CIP102 Police Substation-- New District CIP100 Police Training Facility CIP106 Special Operations Division Facility Subtotal Subtotal I Project Management and Support Program Management CIP130 Program Management Subtotal Credit Facility CIP131 Credit Facility Subtotal Subtotal Total , ,

24 Revised - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY Annual Work (dollars in millions) Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Budget Forecast Forecast Forecast Forecast Forecast FY A Vehicles/ Vehicle Parts Replacement of Rail Cars CIP Series Rail Car Replacement $67.1 $0.0 $2.1 $134.2 $377.1 $127.0 $707.5 Subtotal $67.1 $0.0 $2.1 $134.2 $377.1 $127.0 $707.5 Replacement of Buses CIP006 Bus Replacement $74.1 $72.0 $56.2 $59.3 $80.9 $ $ Subtotal $74.1 $72.0 $56.2 $59.3 $80.9 $80.8 $423.3 Rehabilitation of Rail Cars CIP Series Rail Car HVAC Rehabilitation $4.2 $1.1 $0.0 $0.0 $0.0 $0.0 $5.4 CIP /3000 Series Rail Car Mid-Life Rehabilitation CIP Series Rail Car Replacement CIP067 Rail Car Safety & Reliability Enhancements CIP063 Rail Rehabilitation Program CIP125 Rail Preventive Maintenance Subtotal $71.2 $37.2 $35.1 $58.5 $36.5 $224.2 $462.7 Rehabilitation of Buses CIP005 Bus Rehabilitation Program $19.2 $30.1 $30.8 $31.7 $32.5 $33.2 $177.5 CIP008 Bus Repairables CIP137 Bus Preventive Maintenance Subtotal $47.6 $48.8 $54.3 $54.1 $58.7 $60.5 $324.0 Replacement of MetroAccess Vehicles CIP015 MetroAccess Fleet Replacement $5.1 $11.9 $14.2 $10.3 $3.6 $13.8 $58.9 Subtotal $5.1 $11.9 $14.2 $10.3 $3.6 $13.8 $58.9 Replacement of Service Vehicles CIP009 Service Vehicle Replacement $0.0 $8.6 $8.0 $7.0 $0.0 $5.7 $29.3 Subtotal $0.0 $8.6 $8.0 $7.0 $0.0 $5.7 $29.3 Rail Car Fleet Expansion CIP Series Rail Car Procurement $8.0 $0.8 $1.7 $1.1 1 $0.0 0 $0.0 0 $11.6 Subtotal $8.0 $0.8 $1.7 $1.1 $0.0 $0.0 $11.6 Bus Fleet Expansion CIP003 Bus Capacity Enhancements: Fleet Expansion $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Subtotal $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Bus Enhancements CIP001 Antenna Reduction/ Security Enhancements $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 CIP002 Automatic Vehicle Location Equipment Replacement CIP007 Bus Camera Installation Subtotal $9.4 $19.1 $13.5 $0.0 $0.0 $0.0 $42.0 Subtotal $282.5 $198.5 $185.0 $324.5 $556.8 $511.9 $2,

25 Revised - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY Annual Work (dollars in millions) Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Budget Forecast Forecast Forecast Forecast Forecast FY B Rail System Infrastructure Rehabilitation Rail Line Segment Rehabilitation CIP108 Rail Rehabilitation Tier 1: Dupont to Grosvenor $0.0 $0.0 $0.0 $40.5 $50.0 $50.0 $140.5 CIP107 Rail Rehabilitation Tier 1: Dupont to Silver Spring CIP110 Rail Rehabilitation Tier 1: National Airport to Stadium Armory Subtotal $75.4 $126.4 $130.7 $183.5 $113.9 $118.8 $748.7 Subtotal $75.4 $126.4 $130.7 $183.5 $113.9 $118.8 $748.7 C Maintenance Facilities Rehabilitation and Replacement of Bus Garages CIP085 Royal Street Bus Garage Replacement (Cinder Bed Road) $16.4 $31.8 $48.0 $2.4 $0.0 $0.0 $98.7 CIP086 Southeastern Bus Garage Replacement (DC Village) CIP084 Southern Avenue Bus Garage Replacement Subtotal $27.0 $ $114.6 $ $0.0 0 $0.0 0 $ Maintenance of Bus Garages CIP119 Bus Garage Facility Repairs Tier 1: Western, Northern and Landover $8.3 $25.9 $51.7 $32.3 $9.6 $17.3 $145.1 Subtotal $8.3 $25.9 $51.7 $32.3 $9.6 $17.3 $145.1 Maintenance of Rail Yards CIP116 Rail Yard Facility Repairs Tier 1: Alexandria, Brentwood and New Carrollton $0.0 $33.8 $38.5 $41.9 $15.1 $26.8 $156.1 Subtotal $0.0 $33.8 $38.5 $41.9 $15.1 $26.8 $156.1 Rail Maintenance Facilities CIP071 Test Track & Commissioning Facility $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Subtotal $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Environmental Compliance Projects CIP010 Environmental Compliance Projects $0.6 $0.7 $0.7 $0.7 $0.8 $0.8 $4.3 CIP011 Underground Storage Tank Replacement Subtotal $2.8 $5.1 $3.2 $3.2 $1.8 $3.8 $19.8 Maintenance Bus and Rail Facilities CIP127 Support Equipment - MTPD $1.0 $1.0 $1.0 $1.0 $1.0 $1.0 $6.2 CIP126 Financial Planning, Project Administration, and System Wide Infrastructure Upgrades Subtotal $3.2 $3.2 $3.4 $4.1 $4.8 $4.3 $22.9 Expansion of Bus Garages CIP078 Bladensburg Shop Reconfiguration $3.1 $6.2 $7.2 $9.5 $0.0 $0.0 $25.9 CIP038 Bus Garage Capacity Enhancements Subtotal $3.1 $6.2 $7.2 $9.5 $0.0 $0.0 $25.9 Subtotal $44.3 $166.0 $218.6 $115.1 $31.3 $52.2 $

26 Revised - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY Annual Work (dollars in millions) Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Budget Forecast Forecast Forecast Forecast Forecast FY D Systems and Technology Power System Upgrades - Rail CIP % 8-Car Train -- Power Upgrades $4.1 $0.0 $0.0 $0.0 $0.0 $0.0 $4.1 CIP076 8-Car Train Power Upgrades Subtotal $4.1 $0.0 $10.1 $8.0 $3.7 $2.1 $28.0 Operations Support Software CIP042 Bus & Rail Asset Management Software $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 CIP043 Bus Operations Support Software CIP044 Customer & Regional Integration CIP045 Data Centers and Infrastructures CIP047 Enterprise Geographic Information System CIP052 Network and Communications CIP053 Network Operations Center (NOC) CIP051 Police Dispatch and Records Management CIP140 Rail Mileage Based Asset Management CIP056 Rail Operations Support Software Subtotal $21.9 $25.7 $25.1 $25.5 $18.3 $15.7 $132.1 Business Support Software & Equipment CIP030 Currency Processing Machines $0.0 $1.4 $1.4 $0.0 $0.0 $0.0 $2.9 CIP054 Customer Electronic Communications & Outreach CIP046 Document Management System CIP049 Management Support Software CIP050 Metro IT OneStop and Office Automation CIP103 Police Portable Radio Replacement CIP048 Sensitive Data Protection Technology Subtotal $9.3 $16.3 $19.8 $19.8 $12.8 $2.7 $80.7 Rail Fare Equipment CIP091 Automatic Fare Collection Machines $0.0 $1.1 $1.0 $1.0 $4.6 $6.7 $14.5 CIP031 Debit/Credit Processing Requirements CIP092 Ethernet Wiring for Rail Fare Machines CIP032 Fare Media Encoders CIP094 Improvements to Coin Collection Machines CIP093 Maintaining NEXTFARE System CIP097 Open Bankcard and Automatic Fare Collection Systems 0.0 $0.0 $ Subtotal $6.5 $1.9 $1.3 $1.3 $4.9 $7.0 $22.9 Subtotal $41.8 $44.0 $56.2 $54.6 $39.7 $27.5 $

27 Revised - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY (dollars in millions) Annual Work Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Budget Forecast Forecast Forecast Forecast Forecast FY E Track and Structures Track Rehabilitation CIP023 Third Rail Rehabilitation $0.0 $5.5 $4.2 $4.4 $4.6 $4.9 $23.6 CIP089 Track Fasteners CIP019 Track Floating Slab Rehabilitation CIP021 Track Pad/Shock Absorber Rehabilitation CIP024 Track Rehabilitation CIP022 Track Structural Rehabilitation CIP141 Cheverly Abutment CIP018 Track Welding Program Subtotal $58.6 $48.4 $48.6 $47.3 $49.5 $54.0 $306.3 Station/Tunnel Rehabilitation CIP026 Station/Tunnel Leak Mitigation $3.1 $3.3 $3.3 $3.5 $3.6 $3.8 $20.5 Subtotal $3.1 $3.3 $3.3 $3.5 $3.6 $3.8 $20.5 Subtotal $61.6 $51.7 $51.9 $50.7 $53.1 $57.8 $326.8 F Passenger Facilities Elevator/Escalator Facilities CIP072 Elevator Rehabilitation $2.4 $3.5 $2.3 $1.1 $1.7 $2.2 $13.1 CIP132 Elevator/Escalator Repairables CIP073 Escalator Rehabilitation Subtotal $11.6 $16.6 $18.8 $20.0 $21.0 $16.9 $104.9 Maintenance of Rail Station Facilities CIP132 Parking Lot Rehabilitation $43.9 $30.2 $9.3 $0.0 $0.0 $0.0 $83.4 CIP087 Station Enhancement Program Subtotal $51.6 $38.1 $17.2 $8.1 $8.2 $8.4 $131.6 Bicycle & Pedestrian Facilities CIP035 Bicycle & Pedestrian Facilities: Capacity Improvements $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 CIP036 Replacement of Bicycle Racks & Lockers Subtotal $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Rail Station: Capacity/Enhancements CIP039 Core & System Capacity Project Development $0.5 $1.0 $1.0 $1.0 $1.6 $1.0 $6.2 CIP074 Installation of Parking Lot Credit Card Readers CIP088 Station Entrance Canopies Subtotal $0.5 $1.0 $1.0 $1.0 $1.6 $4.4 $9.6 Bus Priority Corridor Improvements CIP037 Bus Priority Corridor Network Enhancements $2.1 $2.1 $2.1 $2.1 $2.1 $2.1 $12.4 Subtotal $2.1 $2.1 $2.1 $2.1 $2.1 $2.1 $12.4 Rail Station Equipment CIP099 Police Emergency Management Equipment $0.9 $0.0 $0.0 $0.0 $0.0 $0.1 $1.0 Subtotal $0.9 $0.0 $0.0 $0.0 $0.0 $0.1 $1.0 Subtotal $66.7 $57.8 $39.1 $31.2 $32.8 $31.8 $

28 Revised - Use of Funds Project Details Capital Improvement Program (CIP) Costs: FY Annual Work (dollars in millions) Plan Year: FY2011 FY2012 FY2013 FY2014 FY2015 FY2016 Total Budget Forecast Forecast Forecast Forecast Forecast FY G Maintenance Equipment Rail Maintenance Equipment CIP136 FCC Radio Frequency Communication Changes $0.2 $1.0 $10.3 $9.3 $0.0 $0.0 $20.8 CIP065 Geometry Vehicle CIP139 NTSB Recommendations CIP066 Rail Shop Repair Equipment CIP020 Replacement of Rail Track Signage CIP027 Switch Machine Rehabilitation Project CIP025 Track Maintenance Equipment CIP135 Train Control Signal CIP133 Wayside Work Equipment Subtotal $37.5 $55.6 $50.9 $28.6 $4.2 $31.4 $208.3 Bus Repair Equipment CIP004 Bus Repair Equipment $2.7 $2.9 $3.0 $3.1 $3.2 $3.4 $18.4 Subtotal $2.7 $2.9 $3.0 $3.1 $3.2 $3.4 $18.4 Business Facilities Equipment CIP028 Materials Handling Equipment $0.2 $0.1 $0.1 $0.1 $0.2 $0.2 $0.9 CIP029 Warehouse Vertical Storage Units/Shelving Subtotal $0.8 $0.8 $0.7 $0.8 $0.9 $0.8 $4.9 Subtotal $41.1 $59.3 $54.7 $32.5 $8.4 $35.6 $231.6 H Other Facilities Business Support Facilities CIP134 Carmen Turner Facility Parking Garage $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 CIP080 Jackson Graham Building Renovation CIP033 Replacement of Revenue Facility Equipment CIP034 Revenue Collection Facility (RCF) Building Expansion Subtotal $4.3 $1.5 $1.5 $0.5 $0.4 $0.3 $8.5 MTPD Support Facilities CIP101 Police Substation- New District 2 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 CIP102 Police Substation-- New District CIP100 Police Training Facility CIP106 Special Operations Division Facility Subtotal t $0.8 $1.6 $8.3 $0.3 $0.0 0 $0.0 0 $11.11 Subtotal $5.1 $3.2 $9.8 $0.8 $0.4 $0.3 $19.6 I Project Management and Support Program Management CIP130 Program Management $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Subtotal $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Credit Facility CIP131 Credit Facility $5.0 $5.5 $5.5 $5.5 $5.5 $5.5 $32.5 Subtotal $5.0 $5.5 $5.5 $5.5 $5.5 $5.5 $32.5 Subtotal $5.0 $5.5 $5.5 $5.5 $5.5 $5.5 $32.5 Total $623.6 $712.3 $751.6 $798.4 $841.8 $841.5 $4,

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item II-A April 22, 2010 Next Capital Funding Agreement The Next Capital Funding Agreement and the 2011-2016 Capital Program Finance and Administration Committee

More information

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item III-C May 13, 2010 Next Capital Funding Agreement Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Next Capital Funding Agreement

Next Capital Funding Agreement Finance & Administration Committee Action Item III-C May 13, 2010 Next Capital Funding Agreement Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Review of Capital Needs Inventory and Preliminary Capital Improvement Program

Review of Capital Needs Inventory and Preliminary Capital Improvement Program Finance & Administration Committee Information Item IV-A November 3, 2011 Review of Capital Needs Inventory and Preliminary Capital Improvement Program Page 1 of 116 Washington Metropolitan Area Transit

More information

Approval of FY2011 Budget

Approval of FY2011 Budget Finance & Administration Committee Action Item III-A June 10, 2010 Approval of FY2011 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

FY2011 Monthly Financial Report (October 2010)

FY2011 Monthly Financial Report (October 2010) REVISED Finance & Administration Committee Information Item IV-A December 2, 2010 FY2011 Monthly Financial Report (October 2010) Fiscal 2011 Financials Monthly Financial Report October 2010 WASHINGTON

More information

FY2011 Monthly Financial Report (July 2010)

FY2011 Monthly Financial Report (July 2010) Finance & Administration Committee Information Item IV-C September 16, 2010 FY2011 Monthly Financial Report (July 2010) Fiscal 2011 Financials Monthly Financial Report July 2010 WASHINGTON METROPOLITAN

More information

Approval of FY2013 Budget

Approval of FY2013 Budget Finance & Administration Committee Action Item III-A May 10, 2012 Approval of FY2013 Budget Page 3 of 126 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000)

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY TRANSPORTATION IMPROVEMENT PROGRAM CAPITAL COSTS (in $1,000) TIP ID: 5853 Agency ID: Title: Rail Cars - Replacement, Rehabilitation, Expansion, & Enhancements Local 0/0/100 11,629 e 5,380 e 5,600 e 10,980 PRIIA 50/0/50 265,887 e 154,860 e 246,189 e 158,438 e 141,875

More information

GM/CEO s Proposed FY2020 Budget

GM/CEO s Proposed FY2020 Budget Finance and Capital Committee Information Item IV-A November 1, 2018 GM/CEO s Proposed FY2020 Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

FY2012 Budget Update: Proposed Capital Budget and Financial Plan

FY2012 Budget Update: Proposed Capital Budget and Financial Plan Finance & Administration Committee Information Item IV-B March 10, 2011 FY2012 Budget Update: Proposed Capital Budget and Financial Plan Washington Metropolitan Area Transit Authority Board Action/Information

More information

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM

SUBJECT: APPROVAL OF FISCAL CAPITAL IMPROVEMENT PROGRAM PRESENTED AND ADOPTED: SUBJECT: APPROVAL OF FISCAL 2007 2012 CAPITAL IMPROVEMENT PROGRAM RESOLUTION OF THE BOARD OF DIRECTORS OF THE WASHINGTON METROPOLITAN AREA TRANSPORTATION AUTHORITY WHEREAS, The Board

More information

Quarterly Capital Progress Update

Quarterly Capital Progress Update Finance & Administration Committee Information Item IV-A September 13, 2012 Quarterly Capital Progress Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Operating Budget Report

Operating Budget Report Operating Report Operating ($ in Millions) Operating Expenditures ($ in Millions) Jun-11 Jun-12 $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $ 2,973 1% Expense $ 359,102 $ 361,882 $ 366,332 $ 4,450

More information

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance and Administration Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance and Administration Committee (B) 01-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201701 Resolution: Yes No TITLE:

More information

Operating Budget Report

Operating Budget Report Operating Budget Report Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) MTD May-FY2011 May - FY2012 Variance FY12 Actual Actual Budget $ Percent $140M Revenue $ 68,140 $ 70,480

More information

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session

Capital & Strategic Planning Committee. Item III - A. January 25, FY2019 Capital Budget Work Session Capital & Strategic Planning Committee Item III - A January 25, 2018 FY2019 Capital Budget Work Session Page 4 of 29 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board @NovaTransit This forum is sponsored by the Northern Virginia Transportation Commission. Learn more about

More information

FY2018 Third Quarter Financial Update

FY2018 Third Quarter Financial Update Finance and Committee Information Item IV-A May 10, 2018 Third Quarter Financial Update Page 30 of 53 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2017 Year-End Financial Update

FY2017 Year-End Financial Update Finance Committee Information Item III-A September 14, 2017 FY2017 Year-End Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Quarterly Financial Report FY2015 Q4 April June 2015

Quarterly Financial Report FY2015 Q4 April June 2015 Washington Metropolitan Area Transit Authority Fiscal Year 2015 Financials Quarterly Financial Report FY2015 Q4 April June 2015 1 of 61 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY QUARTERLY FINANCIAL

More information

Keeping Metro Safe, Reliable and Affordable

Keeping Metro Safe, Reliable and Affordable Finance Committee Information Item III-B September 14, 2017 Keeping Metro Safe, Reliable and Affordable Washington Metropolitan Area Transit Authority Keeping Metro Safe, Reliable and Affordable 1 Purpose

More information

FY2020 Budget Outlook

FY2020 Budget Outlook Finance and Capital Committee Information Item IV-A October 11, 2018 FY2020 Budget Outlook 35 of 60 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Approval of FY2017 Capital Budget and FY Capital Improvement Program

Approval of FY2017 Capital Budget and FY Capital Improvement Program Finance Committee Action Item III-B April 14, 2016 Approval of FY2017 Capital Budget and FY2017-2022 Capital Improvement Program Page 23 of 68 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Getting Metro Back on Track

Getting Metro Back on Track NVTC Presents: Getting Metro Back on Track A discussion with Virginia members of the WMATA Board This forum is sponsored by the Northern Virginia Transportation Commission. It is separate and distinct

More information

Quarterly Financial Report FY2015 Q3 January March 2015

Quarterly Financial Report FY2015 Q3 January March 2015 Washington Metropolitan Area Transit Authority Fiscal Year 2015 Financials Quarterly Financial Report FY2015 Q3 January March 2015 Page 1 of 54 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY QUARTERLY

More information

FY2018 Second Quarter Financial Update

FY2018 Second Quarter Financial Update Finance and Committee Information Item III-A February 8, 2018 Second Quarter Financial Update 4 of 52 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Amend FY 2006 Infrastructure Renewal Program

Amend FY 2006 Infrastructure Renewal Program Washington Metropolitan Area Transit Authority Amend FY 2006 Infrastructure Renewal Program Budget Committee December 8, 2005 Purpose That the Budget Committee approve and forward to the Board for approval

More information

FY2013 Preliminary Operating Budget

FY2013 Preliminary Operating Budget Finance & Administration Committee Information Item IV-D December 1, 2011 FY2013 Preliminary Operating Budget Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun

Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun REVENUE AND RIDERSHIP 4th Quarter FY2014 REVENUE (in Millions) $90M $85M $80M $75M $70M $65M $60M $55M $50M 79 77 74 74 72 70 FY2013 Actual FY2014 Budget FY2014 Actual 79 85 78 78 77 67 66 70 59 67 65

More information

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral

FY06 Operating Budget. FY2006 Proposed Operating Budget. Final Summary for Board Referral FY2006 Proposed Operating Budget Final Summary for Board Referral 1 Operating Statements Subsidy nearly $10M lower than December proposal Dec Base Other Subtot Mar Prop$ Adj Adj Changes Prop$ Revenues

More information

Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY First Quarter July -- September 2016

Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY First Quarter July -- September 2016 Washington Metropolitan Area Transit Authority Fiscal Year 2017 Financials Quarterly Financial Report FY2017 -- First Quarter July -- September 2016 Page 1 of 62 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

Policy on Reserve Balance for Claims

Policy on Reserve Balance for Claims Finance, Administration and Oversight Committee FY08 Budget Review Item V-B April 12, 2007 Policy on Reserve Balance for Claims Washington Metropolitan Area Transportation Authority Board Action/Information

More information

Operating Budget Report

Operating Budget Report Operating Budget Report 4th Quarter FY2012 Operating Budget ($ in Millions) Operating Expenditures ($ in Millions) Q4 2011 Q4 2012 Actual Actual Budget $ Percent Revenue $ 212,640 $ 217,643 $ 214,671 $

More information

FY2017 Third Quarter Financial Update and CIP Amendment

FY2017 Third Quarter Financial Update and CIP Amendment Finance Committee Action Item III-A May 11, 2017 FY2017 Third Quarter Financial Update and CIP Amendment Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Washington Metropolitan Area Transit Authority. TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs)

Washington Metropolitan Area Transit Authority. TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs) Washington Metropolitan Area Transit Authority TRIENNIAL DBE GOAL SETTING AND METHODOLOGY FEDERAL FISCAL YEARS (FFYs) 2017-2019 I. GOAL RECOMMENDATION WMATA has adopted a 22% DBE goal f or Federal Fiscal

More information

Amend FY07 System Access Program for Artwork

Amend FY07 System Access Program for Artwork Item: 10 Amend FY07 System Access Program for Artwork 55 of 75 Board Budget Committee July 6, 2006 EXECUTIVE SUMMARY Budget Committee Meeting July 6, 2006 Request for Board approval to amend the fiscal

More information

Washington Metropolitan Area Transit Authority Metro Budget Overview

Washington Metropolitan Area Transit Authority Metro Budget Overview Washington Metropolitan Area Transit Authority Metro Budget Overview February 2011 Metro 10,877 Employees (10,974 budgeted) 1,491 Buses 588 Escalators and 237 Elevators 106 Miles of Track 92 Traction Power

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report issued in Accordance with Government Auditing Standards For the Years Ended June 30, 2016 and 2015 Single Audit Reports issued in Accordance

More information

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011

SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 MEMORANDUM SUBJECT: October Monthly Financial Reports ^ DATE: December 22, 2011 FROM: DGMA/CFO - Carol Dillon Kissa TO: GM/CEO - Richard Sarles A I am enclosing for your review the October financial report.

More information

CHAPTER 7: Financial Plan

CHAPTER 7: Financial Plan CHAPTER 7: Financial Plan Report Prepared by: Contents 7 FINANCIAL PLAN... 7-1 7.1 Introduction... 7-1 7.2 Assumptions... 7-1 7.2.1 Operating Revenue Assumptions... 7-2 7.2.2 Operating Cost Assumptions...

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Sept-FY2012 Sept-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 68 $ 71 $ (3)

More information

Consent Item (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Consent Item (A) Washington Metropolitan Area Transit Authority Board Action/Information Summary Consent Item (A) 07-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201766 Resolution: Yes No TITLE: Renewal of Virginia PRIIA Funding

More information

FY2011 Budget Forum. District of Columbia. October 19, 2009

FY2011 Budget Forum. District of Columbia. October 19, 2009 FY2011 Budget Forum District of Columbia October 19, 2009 0 Meeting agenda What is Metro and what is the value of Metro service? What are the Fiscal Year 2011 budget challenges? What are the potential

More information

State of Good Repair Review

State of Good Repair Review Finance & Administration Committee Action Item IV-D October 9, 2014 State of Good Repair Review Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Operating Budget Report

Operating Budget Report Operating Budget Report MTD Operating Budget ($ in Millions) Oct-FY2012 Oct-FY2013 Variance FY13 Actual Actual Budget $ Percent $140M Operating Expenditures ($ in Millions) Revenue $ 67 $ 70 $ 79 $ (8)

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

FY2012 Preliminary Subsidy Calculation

FY2012 Preliminary Subsidy Calculation Finance & Administration Committee Information Item III-A March 3, 20 FY202 Preliminary Subsidy Calculation Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

FY2014 Capital and Operating Budget Discussion

FY2014 Capital and Operating Budget Discussion Finance & Administration Committee Information Item III-B December 6, 2012 FY2014 Capital and Operating Budget Discussion Page 18 of 44 Washington Metropolitan Area Transit Authority Board Action/Information

More information

OPERATING BUDGET REPORT

OPERATING BUDGET REPORT OPERATING BUDGET REPORT OPERATING BUDGET ($ in Millions) MTD Nov-FY2012 Nov-FY2013 Actual Actual Budget $ Percent Revenue $ 63.0 $ 65.7 $ 68.3 $ (2.7) -3.9% Expense $ 107.6 $ 124.8 $ 129.8 $ 5.0 3.8% Subsidy

More information

FY2010 Monthly Financial Report (April 2010)

FY2010 Monthly Financial Report (April 2010) Finance & Administration Committee Information Item IV-C June 10, 2010 FY2010 Monthly Financial Report (April 2010) Fiscal 2010 Financials Monthly Financial Report April 2010 WASHINGTON METROPOLITAN AREA

More information

FY2017 Budget Discussion

FY2017 Budget Discussion Finance & Administration Committee Information Item IV-B November 5, 2015 FY2017 Budget Discussion Page 70 of 116 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

FY2017 Budget Work Session

FY2017 Budget Work Session Finance & Administration Committee Information Item IV-B January 14, 2016 FY2017 Budget Work Session Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

Review FY09 Subsidy Allocation

Review FY09 Subsidy Allocation Finance, Administration and Oversight Committee Information Item IV-D March 13, 2008 Review FY09 Subsidy Allocation Washington Metropolitan Area Transportation Authority Board Action/Information Summary

More information

Notice of Public Hearing Washington Metropolitan Area Transit Authority

Notice of Public Hearing Washington Metropolitan Area Transit Authority Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B18-01: Proposed FY2019 Operating Budget and Docket B18-02: Proposed FY2019 Capital Improvement Program and Federal FY2018

More information

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1

- II OPERATING BUDGET REPORT ^ H FY2013 ^^ H. ««-ms. I ~?j i... \6.3 j^^^^^^ YTD OVERTIME BUDGET VS ACTUAL ($ in Millions) 1 OPERATING BUDGET REPORT ^ H FY2013 ^^ H OPERATING BUDGET($ in Millions) MTD Revenue Expense Subsidy Cost Recovery YTD Revenue Expense Subsidy Cost Recovery Jan-FY2012 Jan-FY2013 Variance FY13 Actual Actual

More information

FY2017 Budget Guidance

FY2017 Budget Guidance Finance & Administration Committee Information Item IV-D September 10, 2015 FY2017 Budget Guidance Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD

More information

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA).

This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). 8 FINANCIAL ANALYSIS This chapter describes the initial financial analysis and planning for the construction and operations of the Locally Preferred Alternative (LPA). The alternative formerly known as

More information

2 nd Quarter Capital and Operating Reports

2 nd Quarter Capital and Operating Reports Finance & Administration Committee Information Item IVB March 14, 2013 2 nd Quarter Capital and Operating Reports Washington Metropolitan Area Transit Authority Board Action/Information Summary Action

More information

BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM

BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM Date of Meeting: February 14, 2017 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE INFORMATION ITEM # 12 SUBJECT: Metrorail Financial Obligations ELECTION DISTRICT:

More information

TESTIMONY OF RICHARD SARLES

TESTIMONY OF RICHARD SARLES TESTIMONY OF RICHARD SARLES Before the Council of the District of Columbia Committee on Economic Development on WMATA s FY2015 Budget Wednesday, April 30, 2014 Good Morning, Chairperson Bowser and other

More information

Washington Metropolitan Area Transit Authority

Washington Metropolitan Area Transit Authority Washington Metropolitan Area Transit Authority Financial Report For the Fiscal Years Ended June 30, 2017 and 2016 Table of Contents Washington Metropolitan Area Transit Authority Financial Report For the

More information

Operating Budget. Second Quarter Financial Report

Operating Budget. Second Quarter Financial Report Second Quarter Financial Report INDEX A. Executive Summary... A-1 B. Revenue and Expense Analysis... B-1 C. Budget Variance Reports... C-1 D. Ridership and Performance Measures... D-1 Board Budget Committee

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 21, 2013 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of September 21, 2013 DATE: September 4, 2013 SUBJECT: Fiscal Year 2014 HB 2313 (House Bill 2313) Local Share Funding Allocations and Priorities

More information

Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007

Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007 Financial Analysis Working Paper 1 Existing Funding Sources Draft: April 2007 Prepared for: By: TABLE OF CONTENTS INTRODUCTION... 1 REVIEW OF FRED AND VRE EXISTING FUNDING SOURCES... 1 Federal Funding...

More information

FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING

FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING FISCAL YEAR 2009 ACTUAL AND MID-YEAR 2010 SPENDING Testimony of John B. Catoe, Jr. General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia s Committee

More information

Vision The Best Ride in the Nation

Vision The Best Ride in the Nation Washington Metropolitan Area Transit Authority FY 2008 Comprehensive Annual Financial Report Vision The Best Ride in the Nation Mission Provide the nation s best transit service to our customers and improve

More information

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority.

PROPOSED FISCAL YEAR 2011 BUDGET. Testimony of. Richard Sarles, General Manager. Washington Metropolitan Area Transit Authority. PROPOSED FISCAL YEAR 2011 BUDGET Testimony of Richard Sarles, General Manager Washington Metropolitan Area Transit Authority Before the Council of the District of Columbia Committee on Public Works and

More information

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update

Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Finance & Administration Committee Information Item IV-A October 9, 2014 Momentum Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:

More information

Metro. Board Report. Fare revenue projections, based on preliminary assumptions for ridership

Metro. Board Report. Fare revenue projections, based on preliminary assumptions for ridership Metro Board Report Los Angeles County Metropolitan Transportation Authority One Gateway Plaza 3rd Floor Board Room Los Angeles, CA SUBJECT: FY18 BUDGET DEVELOPMENT UPDATE ACTION: RECEIVE AND FILE RECOMMENDATION

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Providers of Public Transportation Individual Targets

Providers of Public Transportation Individual Targets APPENDIX Providers of Public Transportation Individual Targets The following letters, presentation slides, and other data were provided by the individual reporting entities, and are posted on the MWCOG

More information

Transit Subsidy. Mission Statement. Mandates

Transit Subsidy. Mission Statement. Mandates Mission Statement The Potomac and Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency representing Prince William, Stafford, and Spotsylvania Counties and the Cities of Manassas,

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201433 Resolution: Yes No TITLE: Improving Safety Through Fare Enforcement PRESENTATION SUMMARY:

More information

The following items were handed out at the November 2, 2017 NVTC Meeting.

The following items were handed out at the November 2, 2017 NVTC Meeting. The following items were handed out at the November 2, 2017 NVTC Meeting. Blue Item #6 Washington Metropolitan Area Transit Authority FY2019 Proposed Budget FY2017 Budget: Ridership and Revenue Finance

More information

SFMTA 2013 Revenue Bond Board of Directors

SFMTA 2013 Revenue Bond Board of Directors SFMTA Municipal Transportation Agency Image: Market and Geary Streets, circa 1920s, Muni Centennial logo SFMTA 2013 Revenue Bond Board of Directors 09 03 2013 SAN FRANCISCO, CALIFORNIA Background In 2007,

More information

MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017

MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017 MPO Staff Report Technical Advisory Committee: April 12, 2017 MPO Executive Board: April 19, 2017 RECOMMENDED ACTION: Approve Candidate Projects for the ND FTA 5339 & 5310 Grant in the priority order given.

More information

Operating Budget. Third Quarter Financial Report (July 2005 March 2006)

Operating Budget. Third Quarter Financial Report (July 2005 March 2006) Third Quarter Financial Report (July 2005 March 2006) INDEX A. Executive Summary...page 2 B. Revenue and Expense Analysis...page 3 C. Budget Variance Reports...page 14 D. Ridership and Performance Measures...page

More information

Metro 2025 Alternative Funding and Financing

Metro 2025 Alternative Funding and Financing Finance & Administration Committee Information Item IV-A June 12, 2014 Metro 2025 Alternative Funding and Financing 37 of 100 Washington Metropolitan Area Transit Authority Board Action/Information Summary

More information

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Washington Metropolitan Area Transit Authority Board Action/Information Summary Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201958 Resolution: Yes No TITLE: Second Quarter Capital Program Update PRESENTATION SUMMARY:

More information

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis

Honolulu High-Capacity Transit Corridor Project Alternatives Analysis Alternatives Analysis Financial Feasibility Report November 30, 2006 Prepared for: City and County of Honolulu Prepared by: PB Consult Inc. Under Subcontract to: Parsons Brinckerhoff Quade & Douglas, Inc.

More information

For Action. TTC 15-Year Capital Investment Plan & Capital Budget & Plan. Summary

For Action. TTC 15-Year Capital Investment Plan & Capital Budget & Plan. Summary For Action TTC 15-Year Capital Investment Plan & 2019 2028 Capital Budget & Plan Date: January 24, 2019 To: TTC Board From: Chief Financial Officer Summary The purpose of this report is to 1. Submit for

More information

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements

SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements SERVICE DELIVERY & GOVERNMENTAL TRANSPARENCY Infrastructure & Operational Enhancements To improve service delivery, the Proposed Budget continues a focus on improvements in: Core infrastructure Vital services

More information

Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010

Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010 Proposed Budget Fiscal Year 2010 July 1, 2009 June 30, 2010 Presented to the Board of Directors: Finance, Administration, and Oversight Committee January 8, 2009 1 General Manager s Overview And Summary

More information

The Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania

The Potomac and Rappahannock Transportation Commission (PRTC) is a multijurisdictional agency representing Prince William, Stafford and Spotsylvania Planning and Development Development Services, Department of Economic Development, Department of Housing and Community Development, Office of Planning Prince William County/ Manassas Convention and Visitors

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date December 31, 2017 Presented on February 14, 2018 1 Major Highlights Revenue FY2018 sales tax revenue budgeted at 2.5% growth over FY2017 Sales tax remittances

More information

FY2017 PROPOSED BUDGET

FY2017 PROPOSED BUDGET S A F E T Y, S E R V I C E A N D F I N A N C I A L R E S P O N S I B I L I T Y PROPOSED BUDGET EFFECTIVE JULY 1, 2016 FOCUSING ON THE CUSTOMER W A S H I N G T O N M E T R O P O L I TA N A R E A T R A N

More information

Capital Metropolitan Transportation Authority Monthly Performance & Financial Report For Period Ending October 31, 2012 Soft Close

Capital Metropolitan Transportation Authority Monthly Performance & Financial Report For Period Ending October 31, 2012 Soft Close Capital Metropolitan Transportation Authority Monthly Performance & Financial Report For Period Ending October 31, 2012 Soft Close Table of Contents SUMMARY REPORT Financial Performance -Sales Tax 3 -Other

More information

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability.

Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Department of Environmental Services Our Mission: To provide critical transportation infrastructure to enhance the community s long-term economic and environmental sustainability. Transportation Capital

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM XVI NORTHERN VIRGINIA TRANSPORTATION AUTHORITY MEMORANDUM FOR: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: December 8,

More information

Toronto Transit Commission

Toronto Transit Commission CAPITAL BUDGET NOTES Toronto Transit Commission 2018 2027 CAPITAL BUDGET AND PLAN OVERVIEW The Toronto Transit Commission delivers transit services with an estimated 539.4 million riders in 2018, using

More information

Washington Metropolitan Area Transit Authority. Approved Fiscal 2010 Annual Budget

Washington Metropolitan Area Transit Authority. Approved Fiscal 2010 Annual Budget Table of Contents Table of Contents Table of Contents General Manager s Message... 3 Chapter 1. Introduction to Washington Metropolitan Area Transit Authority... 5 Metro Profile... 5 Metro Board of Directors

More information

Financial Report Fiscal Year 2018

Financial Report Fiscal Year 2018 Financial Report Fiscal Year 2018 Year to Date September 30, 2018 1 Major Highlights Revenue Sales tax remittances received in FY2018 are 6.5% higher than FY2017 Additional $20 million in operating grants

More information

Comprehensive Annual Financial Report

Comprehensive Annual Financial Report Comprehensive Annual Financial Report For The Fiscal Year Ended June 30, 2012 Rebuilding the Foundation Washington, D.C. Comprehensive Annual Financial Report For The Fiscal Year Ended June 30, 2012 Carol

More information

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda

Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia Transportation Commission: 2018 Legislative and Policy Agenda Northern Virginia s economic growth and global competitiveness are directly tied to the region s transit network. Transit

More information

Washington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808

Washington Metropolitan Area Transportation Authority Board Action/Information Summary. MEAD Number: 99808 Washington Metropolitan Area Transportation Authority Board Action/Information Summary Action Information MEAD Number: 99808 Resolution: Yes No PURPOSE To obtain Board approval to modify the MetroAccess

More information

FY2016 Year-End Financial Update

FY2016 Year-End Financial Update Finance Committee Information Item III-A September 8, 2016 FY2016 Year-End Financial Update Page 4 of 37 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Revised 2011 Draft Operating and Capital Budgets

Revised 2011 Draft Operating and Capital Budgets Revised 2011 Draft Operating and Capital Budgets Board Meeting & Public Hearing November 17, 2010 Spokane Transit: Revised 2011 Draft Operating and Capital Budgets 1 Mission We are dedicated to providing

More information