1 HINDS Project: Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N of Berry Dr and Northside Dr from 650' East and West of intersection w/ Pinehaven Dr. Scope of Work: WIDEN TO FOUR/FIVE LANES; RECONSTRUCT, MILL, OVERLAY, DRAINAGE, SIDEWALKS, SIGNALS, LANDSCAPING / CON $3,000,000 $0 $3,000, / CON $3,068,000 $0 $3,068,000 SUB TOTAL FOR PROJECT $6,068,000 $0 $6,068,000

2 HINDS Project: Responsible Agency: CITY OF CLINTON Route: NORTHSIDE DR Fund Source: EARMARK/LOCAL Project Length: 1.75 NORTHSIDE DR FROM EAST OF PINEHAVEN DR TO CYNTHIA RD Total Project Cost: $6,670,000 Scope of Work: WIDEN TO FOUR/FIVE LANES FROM PINEHAVEN TO OLD VICKSBURG RD, WIDEN TO THREE LANES FROM OLD VICKSBURG RD TO CYNTHIA RD, RECONSTRUCT, MILL, OVERLAY, DRAINAGE, SIDEWALKS, SIGNALS, LANDSCAPING / DESIGN $0 $200,000 $200, / DESIGN $0 $200,000 $200, / ROW $0 $370,000 $370, / CON $1,570,356 $4,329,644 $5,900,000 SUB TOTAL FOR PROJECT $1,570,356 $5,099,644 $6,670,000 DELETED

3 HINDS Project: Responsible Agency: CITY OF CLINTON Route: NORTHSIDE DR Fund Source: EARMARK Project Length: 0.50 NORTHSIDE TANGLEWOOD DR Scope of Work: WIDEN, RECONSTRUCT, MILL, OVERLAY, MULTIUSE PATHS, DRAINAGE, SIGNAL Total Project Cost: $2,390, / DESIGN $150,000 $0 $150, / ROW $240,000 $0 $240, / CON $2,000,000 $0 $2,000,000 SUB TOTAL FOR PROJECT $2,390,000 $0 $2,390,000 DELETED

4 HINDS Project: Responsible Agency: CITY OF JACKSON Route: LYNCH ST Fund Source: EARMARK/LOCAL Project Length: 1.30 WIGGINS ST TO US 80 Scope of Work: STREET RECONSTRUCTION WITH NEW SIDEWALKS, TRAFFIC SIGNALS AND UTILITIES Total Project Cost: $7,230, / DESIGN $492,000 $123,000 $615, / ROW $732,000 $183,000 $915, / CON $3,783,375 $1,916,625 $5,700,000 SUB TOTAL FOR PROJECT $5,007,375 $2,222,625 $7,230,000 PROJECT INCLUDES THE COMPLETE RECONSTRUCTION OF J.R. LYNCH STREET BETWEEN US 80 AND WIGGINS STREET, WITH NEW SIDEWALKS, TRAFFIC SIGNALS, AND PEDESTRIAN BRIDGES AT LYNCH CREEK.

5 HINDS Project: Responsible Agency: CITY OF JACKSON Route: DR. JESSIE MOSLEY DR Fund Source: EARMARK/LOCAL Project Length: 0.13 FARISH STREET TO HIGH STREET Total Project Cost: $710,932 Scope of Work: RECONSTRUCT AND REALIGN EXISISTING ROADWAY FROM HIGH STREET TO BLOOM STREET. CONSTRUCT NEW ROADWAY FROM BLOOM STREET TO FARISH STREET. CONVERT OLD ALIGNMENT EAST OF BLOOM STREET TO ADDITIONAL PARKING FOR SMITH ROBERTSON MUSEUM / CON $500,000 $210,932 $710,932 SUB TOTAL FOR PROJECT $500,000 $210,932 $710,932

6 HINDS Project: Responsible Agency: CITY OF JACKSON Route: FORTIFICATION ST Fund Source: EARMARK/STP MPO/MDA/LOCAL Project Length: 1.75 BAILEY AVE TO I 55 Total Project Cost: $14,955,000 Scope of Work: RECONSTRUCTION, MILL, OVERLAY, DRAINAGE, WATER/SEWER UPGRADES, SIGNALS, ITS, SIDEWALKS, LANDSCAPING / CON $4,000,000 $3,014,000 $7,014, / CON $3,019,032 $2,500,000 $5,519,032 SUB TOTAL FOR PROJECT $7,019,032 $5,514,000 $12,533,032 DELETE

7 HINDS Project: Responsible Agency: CITY OF JACKSON Route: CAPITOL ST Fund Source: HUD/EARMARKS/LOCAL/MDA Project Length: 0.75 STATE ST TO ROBINSON ST Total Project Cost: $13,653,450 Scope of Work: WATER/SEWER REPLACEMENT, ROADWAY RECONSTRUCTION, CONVERT TRAFFIC TO TWO WAY, SIGNAL REPLACEMENT, SIDEWALK/ENHANCEMENT/LANDSCAPING/STREETSCAPING/LIGHTING / DESIGN $0 $650,000 $650, / CON $3,512,590 $2,150,410 $5,663, / DESIGN $0 $957,450 $957, / CON $0 $6,383,000 $6,383,000 SUB TOTAL FOR PROJECT $3,512,590 $10,140,860 $13,653,450

8 HINDS Project: Responsible Agency: CITY OF JACKSON Route: STATE ST, PARKSIDE PL Fund Source: EARMARK/LOCAL Project Length: 2.48 STATE ST (I 55/I 20 TO KCS RAILROAD); STATE SOUTH ST, WEST SOUTH ST; PARKSIDE PL (CAPITOL ST TO WOODROW WILSON AVE) Scope of Work: INSTALLATION OF AT GRADE RAILROAD CROSSING ADVANCE WARNING SYSTEMS Total Project Cost: $827, / CON $413,659 $413,659 $827,318 SUB TOTAL FOR PROJECT $413,659 $413,659 $827,318 DELETE

9 HINDS Project: Responsible Agency: CITY OF JACKSON Route: WEST COUNTY LINE RD Fund Source: STP MPO/EARMARK/LOCAL Project Length: 0.50 Total Project Cost: $15,255,000 Grant St to US 51/State St. Also includes Rand St./Guice Ln from Brown St to Tougaloo Village Dr, Grant St from West County Line Road/Tougaloo College signal to 450 feet south of intersection, CN Railroad from Brown St to Richmond Grove Rd. Scope of Work: (Detail 2) Phase 1B (Part 1): Reconstruct and connect Rand St and Guice Ln between Brown St and Tougaloo Village Dr. (Detail 3) Phase 1B (Part 2) Relocate CN Railroad to a new alignment between Brown St and Richmond Grove Rd crossings, close crossings at Brown St and Richmond Grove Rd, construct 4 lane West County Line Rd from Richmond Grove Rd to US 51/State St. (Detail 1) Phase 1C: Realign 450 ft of Grant St to intersect the existing traffic signal at West County Line Rd and Tougaloo College entrance / DESIGN $105,000 $0 $105, / ROW $100,000 $0 $100, / ROW $0 $150,000 $150, / CON $350,000 $0 $350, / CON $1,000,000 $0 $1,000, / ROW $0 $450,000 $450, / CON $0 $0 $0 SUB TOTAL FOR PROJECT $1,555,000 $600,000 $2,155,000

10 MADISON Project: Responsible Agency: CITY OF RIDGELAND Route: LAKR HARBOUR DRIVE EXTENSION Fund Source: EARMARK Project Length: 0.78 HIGHWAY 51 TO HIGHLAND COLONY PARKWAY Scope of Work: CONSTRUCTION OF 5 LANE ROADWAY WITH 10 FOOT MULTI USE PATH Total Project Cost: $21,406, / ENV $406,000 $0 $406, / DESIGN $1,000,000 $0 $1,000, / ROW $7,698,749 $1,901,251 $9,600, / CON $2,009,746 $8,390,254 $10,400,000 SUB TOTAL FOR PROJECT $11,114,495 $10,291,505 $21,406,000

11 RANKIN Project: Responsible Agency: CITY OF BRANDON Route: EAST BRANDON BYPASS Fund Source: EARMARK/LOCAL Project Length: 2.60 SR 18 N of Richland Creek to US 80 approx 2500' E of I 20 Scope of Work: NEW 4 LANE ROADWAY WITH MULTI PURPOSE TRAIL Total Project Cost: $26,150, / ENV $0 $200,000 $200, / DESIGN $735,000 $0 $735,000 SUB TOTAL FOR PROJECT $735,000 $200,000 $935,000

12 RANKIN Project: Responsible Agency: CITY OF PEARL Route: OLD WHITFIELD RD Fund Source: EARMARK/LOCAL Project Length: 4.00 FROM SR 468 TO SR 475 Scope of Work: WIDEN TO 3 LANES Total Project Cost: $15,000, / ENV $80,000 $20,000 $100, / DESIGN $560,000 $140,000 $700, / ROW $800,000 $200,000 $1,000, / CON $10,560,000 $2,640,000 $13,200,000 SUB TOTAL FOR PROJECT $12,000,000 $3,000,000 $15,000,000 DELETED

13 RANKIN Project: Responsible Agency: CITY OF PEARL Route: I 20 Fund Source: EARMARK/LOCAL Project Length: 3.13 I PIRATES COVE NEW INTERCHANGE Scope of Work: INTERCHANGE AND APPROACHES Total Project Cost: $23,150, / ENV $0 $0 $ / ROW $800,000 $200,000 $1,000, / CON $4,207,375 $1,051,843 $5,259,218 SUB TOTAL FOR PROJECT $5,007,375 $1,251,843 $6,259,218

14 RANKIN Project: Responsible Agency: CITY OF PEARL Route: OLD BRANDON RD Fund Source: EARMARK/LOCAL Project Length: 1.10 FROM BIERDEMAN RD TO PEMBERTON DR Scope of Work: GR DR PAVE 3 LANES Total Project Cost: $3,300, / ENV $80,000 $20,000 $100, / ROW $400,000 $100,000 $500, / DESIGN $160,000 $40,000 $200, / CON $2,000,000 $500,000 $2,500,000 SUB TOTAL FOR PROJECT $2,640,000 $660,000 $3,300,000 DELETED

15 RANKIN Project: Responsible Agency: CITY OF RICHLAND Route: HWY 149 Fund Source: EARMARK/LOCAL Project Length: 0.75 HWY 149 OVER KCS RAILROAD Scope of Work: 4 LANE BRIDGE OVER KCS RAILROAD, RELOCATION OF PORTION OF RIVERVIEW DRIVE Total Project Cost: $14,723, / ENV $149,323 $0 $149, / DESIGN $1,204,545 $0 $1,204, / ROW $919,489 $0 $919, / CON $0 $12,450,000 $12,450,000 SUB TOTAL FOR PROJECT $2,273,357 $12,450,000 $14,723,357

16 RANKIN Project: Responsible Agency: E. METRO CORRIDOR COMM Route: EAST METRO CORRIDOR Fund Source: EARMARK/LOCAL Project Length: 4.14 E Metro Corridor Fm I 20 to SR 25 Const East Metro Corridor linking I 20 at Brandon to Hwy 25 at Flowood Scope of Work: GR DR BR PAVE 4 LANE Total Project Cost: $47,000, / ROW $1,555,134 $0 $1,555,134 SUB TOTAL FOR PROJECT $1,555,134 $0 $1,555,134 MAP UPDATED

17 RANKIN Project: Responsible Agency: PEARL RICHLAND INTERMODAL CONNECTOR Route: PEARL/RICHLAND INTERMODAL CONNECTOR US 49 TO PEARSON RD Scope of Work: NEW ROADWAY Fund Source: EARMARK/LOCAL Total Project Cost: $26,404,296 Project Length: / ENV, DESIGN, ROW $2,301,506 $0 $2,301, / CON $10,014,751 $2,503,688 $12,518,439 SUB TOTAL FOR PROJECT $12,316,257 $2,503,688 $14,819,945

18 RANKIN Project: Responsible Agency: RANKIN COUNTY Route: OLD FANNIN RD Fund Source: EARMARK/STP MPO/LOCAL Project Length: 2.00 OLD FANNIN RD FROM FLOWOOD CORP LIMITS TO SPILLWAY RD Scope of Work: WIDEN TO 5 LANES Total Project Cost: $13,201, / CON $4,152,052 $1,038,013 $5,190, / CON $6,409,440 $1,602,360 $8,011,800 SUB TOTAL FOR PROJECT $10,561,492 $2,640,373 $13,201,865

How to Read the Project Modification Listings - Roadway Section

How to Read the Project Modification Listings - Roadway Section How to Read the Project Modification Listings - Roadway Section Sa m pl e The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation

More information

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS

LAKE~SUMTER MPO - COST FEASIBLE PROJECTS - COST FEASIBLE PROJECTS TABLE 1 - STATE PROJECTS (STRATEGIC INTERMODAL SYSTEM / FLORIDA'S TURNPIKE / CENTRAL FLORIDA EXPRESSWAY AUTHORITY) Facility From To Project Current Year Cost Estimates M-SIS M-SIS

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board

More information

Route Route Z Intersection Realignment

Route Route Z Intersection Realignment Route N @ Route Z Intersection Realignment Sponsor County Highway Project No. RB18-000016 Project Type Traffic Flow TOTAL FUNDING Total County Sponsor Federal $3,310,000 $1,776,000 $0 $1,534,000 Project

More information

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION

BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION BRISTOL TENNESSEE / VIRGINIA URBAN AREA METROPOLITAN PLANNING ORGANIZATION Amendment # 2 FY 2017-2020 Transportation Improvement Program Amendment Summary: The Transportation Improvement Program (TIP)

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

WAKULLA COUNTY PROJECTS

WAKULLA COUNTY PROJECTS DRAFT WAKULLA COUNTY PROJECTS PROGRAM ADOPTED: AMENDED: ADOPTED: AMENDED: FISCAL YEAR 2019 FISCAL YEAR 2023 TRANSPORTATION IMPROVEMENT PROGRAM Page 1 of 9 SR 30 (US 98) COASTAL HWY FROM CR 372 SURF RD

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 CHARLOTTE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 SARASOTA COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

Appendix D Total Project Cost and Year of Expenditure Breakdown

Appendix D Total Project Cost and Year of Expenditure Breakdown Total Project Cost and Year of Expenditure Breakdown p. D -1 Total Project Cost and Year of Expenditure Breakdown Financial Constraint Methodology using Total Project Cost and Year of Expenditure Dollars

More information

DRAFT. Summary of Projects List UNOFFICIAL. UNOFFICIAL Project Name Project No. Const. Yr Total UNOFFICIAL.

DRAFT. Summary of Projects List UNOFFICIAL. UNOFFICIAL Project Name Project No. Const. Yr Total UNOFFICIAL. Summary of Projects List Osage Nation Project Name Project No. Const. Yr 2019 2020 2021 2022 2023 Total Wildland Fire Management Building 2018 $0 $50,000 $0 $0 $0 $50,000 Dog Thresher Creek BR176 2018

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

How to Read the Project Modification Listings Roadway Section

How to Read the Project Modification Listings Roadway Section How to Read the Project Modification Listings Roadway Section The project listing includes all projects for which Regional Transportation Council action will be requested during this Transportation Improvement

More information

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019

Approved STIP Formal Amendments for the Period of 11/01/2018-3/15/2019 3116-151 Hwy 169 from Taconite to Pengilly, Safety Improvements 5409-32 Concrete resurface, raise grade at levee's, install lighting, improve drainage and pedestrian accessibility on Hwy 75 in Halstad

More information

Transportation Improvement Program FY 2018 FY 2022

Transportation Improvement Program FY 2018 FY 2022 DRAFT Transportation Improvement Program FY 2018 FY 2022 WAKULLA COUNTY PROJECTS ADOPTED: AMENDED: 5-Year Summary of ing Source Wakulla County ing Federal 38,844,480 6,323,416 34,273,829 0 0 79,441,725

More information

Overview of Funding Sources

Overview of Funding Sources Overview of Funding Sources 0 Transportation 0 Transportation Sales Tax 0 License Tax 0 G.O. Bonds 0 CIP Sales Tax 0 General Fund 0 Public Safety, Facilities, Buildings 0 G.O. Bonds 0 General Fund 0 Stormwater

More information

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300

Bike/Pedestrian Facilities Stellar Trail St Joseph TAP (INDOT) RW $ 346,640 $ 86,660 $ 433,300 Match 2018 2019 2020 M08-19 Goshen 1900739 Added Travel Lanes College Ave from US 33 to NS Railroad Line (East Entrance of parking lot) STBG PE $ 300,000 $ 75,000 $ 375,000 Add Des to TIP M07-19 MACOG

More information

Michigan City Urbanized Area & Non-Urban LaPorte County Changes

Michigan City Urbanized Area & Non-Urban LaPorte County Changes 2016-2019 Transportation Improvement Program for Lake, Porter, and Counties, Indiana Amendment #8 December 2015 Michigan City Urbanized Area & Non-Urban Changes 1297092 Supplemental Local Bridge Inspections

More information

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION

STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION STAUNTON-AUGUSTA-WAYNESBORO METROPOLITAN PLANNING ORGANIZATION City of Staunton County of Augusta City of Waynesboro 112 MTANLY PLE STAUNTON, VIRGINIA 24401 PHONE (540) 885-5174 FAX (540) 885-2687 July

More information

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario.

MEMORANDUM. Requested Action Provide comments and questions to staff regarding the proposed TIP projects funding scenario. MEMORANDUM To: MPO Technical and Citizens Advisory Committees From: Joshua Desmond, AICP BMCMPO Director Date: March 15, 2017 Re: FY 20182021 TIP s Proposal The MPO is developing the s 2018 through 2021

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District One DISTRICT ONE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make project investments in District One. In FY 2017 and FY 2018, current Turnpike projects total over $105 million within Okeechobee

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 HENDRY COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 MANATEE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

April 24, Subject: Amendments to the FY Transportation Improvement Program

April 24, Subject: Amendments to the FY Transportation Improvement Program CAMPO Capital Area Metropolitan Planning Organization April 24, 2006 Mr. Robert Daigh District Engineer Texas Department of Transportation - Austin District PO Drawer 15426 Austin, TX 78761 Subject: Amendments

More information

DRAFT. Hominy Indian Village ON $1,080,000 $0 $0 $0 $0 $1,080,000 $0 $60,000 $0 $600,000 $0 $660,000

DRAFT. Hominy Indian Village ON $1,080,000 $0 $0 $0 $0 $1,080,000 $0 $60,000 $0 $600,000 $0 $660,000 Summary of Projects List Osage Nation Project Name Project No. Const. Yr 2018 2019 2020 2021 2022 Total Hominy Indian Village ON-1062 2018 $1,080,000 $0 $0 $0 $0 $1,080,000 Tallgrass Prairie Chip Seal

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Chapter 4: Plan Implementation

Chapter 4: Plan Implementation This chapter discusses the financial and regulatory needs associated with the implementation of this Transportation System Plan. Projected Funding for Transportation Improvements Projecting the revenue

More information

July 25, Members of City Council City of League City, Texas

July 25, Members of City Council City of League City, Texas Mark Rohr City Manager 300 W Walker League City, TX 77573 Main: 281.554.1000 Direct: 281.554.1005 www.leaguecity.com July 25, 2016 Members of City Council City of League City, Texas Transmitted herewith

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2018/19 thru FY 2022/23 Summary of Projects FDOT District Six DISTRICT SIX PROJECT OVERVIE Florida s Turnpike Enterprise continues to make project investments in District Six. In FY 2017 and FY 2018, current Turnpike projects total over $109 million within Miami-Dade

More information

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT

Index of Projects CS 602/CS 650/GRANGE ROAD FROM SR 21 TO E OF SR 25 Z001 GDOT 0002923 Index of Projects PI # DESCRIPTION FUNDING SR 25 CONN/BAY STREET FROM I-516 TO THE BAY STREET VIADUCT CURRENT SPONSOR FY CST PAGE Z001, Z230 Chatham County 2016 3 0007885 CS 602/CS 650/GRANGE ROAD

More information

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids.

$+ 121 $+ 120 $+ 122 $+ 155 $+ 155 $+ 109 $+ 139 $+ 136 $+ 111 $+ 124 $ MINNEHAHA COUNTY TIP Projects !.!. !.!. Dell Rapids. ST AVE TH AVE TH AVE BIG SIOUX RD TH AVE TH AVE TH AVE TH AVE TH AVE 9 9 0 Miles TH AVE $+ 0 $+ 0 TH AVE TH AVE 9 Humboldt TH ST TH AVE $+ 0 0 0-0-00 0 Construction 09 Construction 00 Construction 0 Construction

More information

FY February Quarterly Revision. Bryan DISTRICT

FY February Quarterly Revision. Bryan DISTRICT FY 20132016 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM February Quarterly Revision Bryan DISTRICT TRANSIT Administrative Amendment February 2013 BCSMPO, Final FY 20132016 TIP, FY 2013 2016 Transportation

More information

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis

Attachment B. Project Cost Estimates. Ridge Road Extension Alternatives Analysis Attachment B Project Cost Estimates for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA

More information

Financial Capacity Analysis

Financial Capacity Analysis FINANCIAL CAPACITY ANALYSIS Introduction Federal transportation planning rules require that metropolitan area transportation plans include a financial capacity analysis to demonstrate that the plan is

More information

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST

FFY 2009 OBLIGATED AND GRANTED PROJECTS LIST Note: Yellow highlighted entries are bicycle and pedestrian facilities projects. CAPITOL 10 0400-0043 CON FTA SEC 5309RR RECOVERY & REINVESTMENT 10 0426-0049 ACQ FTA SEC 5307C CAPITAL 10 0426-0050 CON

More information

2017 Proposed Budget. and. Capital Plans

2017 Proposed Budget. and. Capital Plans 2017 Proposed Budget and Capital Plans GENERAL FUND 196,990,078 PERSONNEL TOTAL (143,396,905) ADMINISTRATION (1,435,812) CITY COUNCIL (329,558) CLERK TREASURER (1,411,310) FINANCE (2,724,778) GENERAL SERVICES

More information

2016 Boston Region MPO Transportation Improvement Program

2016 Boston Region MPO Transportation Improvement Program Adjustment Type Project ID Project Description Funding District Source Information Section 1A / Federal Aid Target Projects Indicates a change in project cost Indicates removed from TIP (cost not reflected

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

TECHNICAL PLANNING COMMITTEE AGENDA 3/18/2015; ITEM II.B. Amendment Number Four to the FY Transportation Improvement Program

TECHNICAL PLANNING COMMITTEE AGENDA 3/18/2015; ITEM II.B. Amendment Number Four to the FY Transportation Improvement Program TECHNICAL PLANNING COMMITTEE AGENDA 3/18/2015; ITEM II.B. Amendment Number Four to the FY 2015-2018 Transportation Improvement Program AGENDA DESCRIPTION: Ozarks Transportation Organization (Springfield,

More information

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary

FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary FY 2017 FY 2021 Capital Improvement Program (CIP) Executive Summary The adopted FY 2017 FY 2021 CIP is $235.8 million (including prior year expenditures) and is $28 million higher than the previous CIP

More information

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy

Administration and Projects Committee STAFF REPORT March 1, 2018 Page 2 of 9 Below is a summary of the FY adopted budget and the proposed midy Administration and Projects Committee STAFF REPORT Meeting Date: March 1, 2018 Subject Summary of Issues Recommendations Financial Implications Options Approval of FY 2017 18 Midyear Budget for the Contra

More information

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($):

Oakland Park Transportation Improvement Program (TIP) Projects. Mobility. Oakland Park Blvd. Total Funding Amounts ($): Oakland Park 2016-2020 Transportation Improvement Program (TIP) Projects 4358081 4346971 4359251 4360971 4366851 4331651 4368751 4316721 4316721 4260161 4387321 Legend Projects Interstates Roadway Mobility

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works

More information

Instructions for Completing the Annual Road and Street Finance Report

Instructions for Completing the Annual Road and Street Finance Report Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to

More information

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS

TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS TENTATIVE FIVE YEAR WORK PROGRAM FISCAL YEARS 2019-2023 OKEECHOBEE COUNTY FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE MISSION STATEMENT The Department will provide a safe, interconnected statewide

More information

EXHIBIT A DONATIONS April 26, 2018

EXHIBIT A DONATIONS April 26, 2018 EXHIBIT A DONATIONS April 26, 2018 1 830 Investors, Ltd. 2 AASA Holdings Humble The donor is donating the design and construction of a traffic signal from SH 99 at Imperial Promenade/Townsen Blvd into

More information

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number:

NASHVILLE AREA MPO. ADJUSTMENT to The Fiscal Years Transportation Improvement Program. Adjustment Number: TIP Number: NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2009019 TIP Number: 200852034 FROM: TIP# 200852034 Jurisdiction: Hendersonville Project:

More information

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P

TEXAS DEPARTMENT OF TRANSPORTATION BRYAN DISTRICT T I P TEXAS DEPARTMENT OF TRANSPORTATION S T A T E W I D E T R A N S P O R T A T I O N I M P R O V E M E N T P R O G R A M S T I P 2 015201 8 BRYAN DISTRICT 2 0 1 5 2 0 1 8 T I P H I G H W AY I n i t i a l 2015

More information

MnDOT Highway Construction Outlook

MnDOT Highway Construction Outlook MnDOT Highway Construction Outlook Mark Gieseke MnDOT Office of Capital Programs & Performance Measures Minnesota Transportation Alliance November 1, 2012 MnDOT Highway Construction Outlook Forecast Accuracy

More information

APPENDIX D: PROJECT FUNDING DISTRIBUTION

APPENDIX D: PROJECT FUNDING DISTRIBUTION APPENDIX D: PROJECT FUNDING DISTRIBUTION WSP Parsons Brinckerhoff February 2016 Table D.1 below provides a guide to the project funding distribution tables that follow. This appendix is organized into

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

Transportation Improvement Program Page 39

Transportation Improvement Program Page 39 Fiscal Year CSJ Project # Facility From To 1 - Preventive Maintenance 2019 2022 Transportation Improvement Program Page 39 2U - Urban Mobility 3LC - Local Contribution 4 - Congestion, Connectivity, Corridor

More information

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0

Programed Totals $39,761 $35,676 $75,437 $73,111 $2,326 $0 $17,109 $17,109 $17,109 $0 $0 $14,580 $14,580 $14,580 $0 WCOG Managed WHATCOM COUNCIL OF GOVERNMENTS 2014 Transportation Improvement Program Amendment #1 (1401) MPO Financial Feasibility Summary Anticipated Federal Funding* & Programmed Expenditures (in Thousands)

More information

City of Portsmouth Portsmouth, New Hampshire Department of Public Works

City of Portsmouth Portsmouth, New Hampshire Department of Public Works RFP# 10-07 City of Portsmouth Portsmouth, New Hampshire Department of Public Works MARKET STREET BICYCLE AND PEDESTRIAN PATH BETWEEN MICHAEL SUCCI DRIVE AND THE NH PORT AUTHORITY REQUEST FOR PROPOSAL Sealed

More information

Tech Memo #4: Capital Costs

Tech Memo #4: Capital Costs MILWAUKEE COUNTY EAST-WEST BUS RAPID TRANSIT Tech Memo #4: Capital Costs REVISION #1 DATE June 28, 2016 Prepared for: Milwaukee County 10320 W. Watertown Plank Rd. Wauwatosa, WI 53226 Prepared by: AECOM

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation 2016 Bond Referenda 1. Metro and Transportation bonds in the maximum principal amount of $58,785,000 to finance, together with other available funds, the cost of various capital projects for the Washington

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2013 Total Uncommitted Funds FY 2013 A + B = C C + D = E E - F = G A B C D E F G Balance Carryover from FY 12 FY (includes all adjustments) Total Available Total Obligations

More information

FY STIP. Paris District STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM. October Out-of-Cycle Revisions HIGHWAY

FY STIP. Paris District STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM. October Out-of-Cycle Revisions HIGHWAY FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Paris District October Out-of-Cycle Revisions October 2011 FY 2012 PAGE: 1 OF 4 1 - PARIS FANNIN 0045-20-017 US 82 LIMITS FROM GRAYSON

More information

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures

TABLE 1 BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and Expenditures Alameda CTC Programs Annual Compliance Report 00 Reporting Year TABLE BICYCLE AND PEDESTRIAN PROGRAM Measure B Revenues and DATE : Revised /0/ Column A Column B Column C Column D Column E Column F Column

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: December 21, 2017 TO: FROM ACTION TRANSMITTAL No. 2018-07 Technical Advisory Committee TAC Funding and Programming Committee

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019.

...;..;...;.;;..;.. Additional preservation and safety needs have been identified and recommend to be programmed with funding available in FY2019. DOT-1208 (6/09) (PROGRAM FISCAL YEAR IS OCTOBER 1 - SEPTEMBER 30) REVISION NUMBER: 19-001...;..;...;.;;..;.. J USTI FICA TION: Additional preservation and safety needs have been identified and recommend

More information

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0

DRAFT UTP November Update - Funding Adjustments Summary EXHIBIT A REVISION DATE 11/7/14. (Amounts in millions) Sum $0 UTP November Update - Funding Adjustments Summary (Amounts in millions) District/Division//TMA Fiscal Year Adjusted Amount Post Public Meeting Adjustments Austin 3 SH 130 Concession FY $6,500,000 3 SH

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF OKANE VALLEY Request for Council Action Meeting Date: May 23, 2017 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report

More information

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC: To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan

More information

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM

BHJTS TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL, STATE & LOCAL PROJECTS 2016 THROUGH 2019 FOUR-YEAR SHORT RANGE PROGRAM TOTAL PROJECT ESTIMATE ($) STATE ALLOCATION CODE (SAC) FUND TYPE ENCUMBERED FROM BEFORE FY 2011 PE/RW PRIOR TO FY 2016 LOCAL MATCH LOCAL LABOR STATE LABOR FED LABOR & TSKF LINE ITEM # ST. LINE ITEM

More information

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN

Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN Amendment 6 - OKI 2030 REGIONAL TRANSPORTATION PLAN February, 2011 Prepared by the Ohio-Kentucky-Indiana Regional Council of Governments Acknowledgments Title Amendment 6 - OKI 2030 Regional Transportation

More information

Revision Report A5.M Approved Dollars. Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement

Revision Report A5.M Approved Dollars. Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement BENNINGTON (29486) Route/Road/Entity: S BENNINGTON ROAD Scope: S. Bennington Rd over Russell Brook Bridge Rehab or Replacement $1,016,818 PE 2017 $165,000 $0 $0 $165,000 STP-Non Urban Areas Under 5K, Toll

More information

Boulder County Countywide Transportation Sales Tax Seven Year Update DRAFT FOR PUBLIC REVIEW

Boulder County Countywide Transportation Sales Tax Seven Year Update DRAFT FOR PUBLIC REVIEW Boulder County Countywide Transportation Sales Tax 2009-2024 Seven Year Update DRAFT FOR PUBLIC REVIEW April 2017 Boulder County Transportation 2007 Countywide Transportation Sales Tax 7-Year Update Summary

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

REQUEST FOR COUNCIL ACTION

REQUEST FOR COUNCIL ACTION REQUEST FOR COUNCIL ACTION Date: 6/23/14 Item No.: 7.f Department Approval City Manager Approval Item Description: Consider Resolution Requesting Jurisdictional Transfer of County Road B from its Western

More information

Project Programmed / budgeted in pool. Project's funds have been rolled forward. Project Sponsor TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM

Project Programmed / budgeted in pool. Project's funds have been rolled forward. Project Sponsor TOTAL FY HIGHWAYS BRIDGE - ON STATE SYSTEM Transportation Improvement FY 2016 - FY 2019 med / budgeted in pool 's funds have been rolled forward Description/Location HIGHWAYS BRIDGE - ON STATE SYSTEM SR46598 Region 4 Bridge - On System Pool CDOT

More information

Columbia Area Metropolitan Planning Organization

Columbia Area Metropolitan Planning Organization Columbia Area Metropolitan Planning Organization FY 2009 Annual Listing of Obligated Projects October 1, 2008 September 30, 2009 Approved by the CMCOG Board June 24, 2010 The preparation of this report

More information

Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs

Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs Grand Forks Transportation Overview 10 Year Outlook Anticipated Needs CITY OF GRAND FORKS February 27, 2017 Allen Grasser, City Engineer of the City of Grand Forks 1 National Highway System (NHS) 2 Funding/Needs

More information

** The due date has been extended to June 16, 2017 at 3:00 p.m. **

** The due date has been extended to June 16, 2017 at 3:00 p.m. ** June 8, 2017 To: All Potential Proposers Subject: RFP 17-Q Butterfly Lane Realignment Project Consisting of: RFIs and City Response, 3 PDFs Butterfly Ridge Elementary, Roadway Plan Sheet, Forest WRP This

More information

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary

FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary FY 2018 FY 2022 Capital Improvement Program (CIP) Executive Summary The adopted FY 2018 FY 2022 CIP is $138 million (including prior year expenditures) and is $100 million lower than the previous CIP due

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

Merced County Transportation Sales Tax Expenditure Plan

Merced County Transportation Sales Tax Expenditure Plan Merced County Transportation Sales Tax Expenditure Plan November 2005 Prepared by Merced County Association of Governments 369 West 18 th Street Merced, CA 95340 209-723-3153 http://mcag.cog.ca.us Summary

More information

final 2006 ½ Cent Transportation Sales Tax Measure EXPENDITURE Plan (Amended)

final 2006 ½ Cent Transportation Sales Tax Measure EXPENDITURE Plan (Amended) final 2006 ½ Cent Transportation Sales Tax Measure EXPENDITURE Plan (Amended) Prepared by: Tulare County Association of Governments 5961 S. Mooney Blvd. Visalia, CA 93277 ADOPTED BY: Tulare County TRANSPORTATION

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 2 DALLAS & FORT WORTH Districts Transportation Code, 228.012 requires the Texas Department of Transportation (department) to create

More information

CAPITAL IMPROVEMENTS PROGRAM (CIP)

CAPITAL IMPROVEMENTS PROGRAM (CIP) CAPITAL IMPROVEMENTS PROGRAM (CIP) A CIP is for the purchase, construction or replacement of the physical assets of the City. This section includes a listing of proposed projects for FY 2014 as well as

More information

Appendix B Example Project Designs and Engineers Opinion of Costs

Appendix B Example Project Designs and Engineers Opinion of Costs Appendix B Example Project Designs and Engineers Opinion of Costs 32 nd Street from E. 2 nd to Main Avenue CR 251 and CR 250 9 th Street Sidewalk Improvements 15 th Street Improvements Intermodal Facility

More information

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012

BEXAR COUNTY MPO CATEGORY 7 RECAP FY 2012 FY A + B = C D + E = F C + F = G G - H = I A B C D E F G H I Balance Carryover from FY 11 FY (includes all adjustments) CATEGORY 7 RECAP FY 2012 Total Available FTA Transfer of Funds Funds Obligated On

More information

75.00 Traffic Generation Assessment and Trust Funds

75.00 Traffic Generation Assessment and Trust Funds 75.00 Traffic Generation Assessment and Trust Funds Traffic generation assessments are imposed on certain new developments to finance the costs of roadway improvements that are necessary to relieve the

More information

TOWN OF JUPITER Community Redevelopment Agency

TOWN OF JUPITER Community Redevelopment Agency TOWN OF JUPITER Community Redevelopment Agency DATE: September 14, 2012 TO: THRU: FROM: Honorable Chair and Commissioners of the Community Redevelopment Agency Andrew D. Lukasik, Executive Director Brenda

More information

Capital improvements program (Cip)

Capital improvements program (Cip) Capital Improvements Program (CIP) CAPITAL IMPROVEMENTS PROGRAM Introduction In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the FY 219 to FY 223 Capital Improvements

More information

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates

Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates 2005-30 Amarillo Metropolitan Transportation Plan October 18, 2007 Revision Use Of Year-Of-Expenditure Cost Estimates The Federal Transportation bill, the Safe Accountable, Flexible, Efficient Transportation

More information

FY Work Funding Total Fed State Local

FY Work Funding Total Fed State Local NASHVILLE AREA MPO ADJUSTMENT to The Fiscal Years 20082011 Transportation Improvement Program Adjustment Number: 2010024 TIP Number: 2006201 FROM: TIP# 2006201 Jurisdiction: City of Murfreesboro Project:

More information

SOUND TRANSIT STAFF REPORT MOTION NO. M Agreement with the City of Newcastle for the Newcastle Transit Center Project

SOUND TRANSIT STAFF REPORT MOTION NO. M Agreement with the City of Newcastle for the Newcastle Transit Center Project SOUND TRANSIT STAFF REPORT MOTION NO. M2007-19 Agreement with the City of Newcastle for the Newcastle Transit Center Project Meeting: Date: Type of : Staff Contact: Phone: Finance Committee 2/1/07 Discussion/Possible

More information

FY Transportation Improvement Program (TIP)

FY Transportation Improvement Program (TIP) Corvallis Area Metropolitan Planning Organization (CAMPO) FY2018-2021 Transportation Improvement Program (TIP) Approved by the Corvallis Area Metropolitan Planning Organization Policy Board May 17, 2017

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information