Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:

Size: px
Start display at page:

Download "Memo. To: Mayor Lee Gray Members of Council City Manager Bill Vance. From: Scott Tourville. Project: 2015 CIP Budget Update CC:"

Transcription

1 To: Mayor Lee Gray Members of Council City Manager Bill Vance Memo From: Scott Tourville Project: 2015 CIP Budget Update CC: C. Schornack S. Spencer File Date: November 21, 2014 RE: Updated 2015 CIP Plan Attached is the updated CIP for The updates include adjusting the total cost and funding sources for the 256 safety project to reflect prior discussions. The comprehensive parks path project has also been updated to reflect recent discussions related to the grant and path costs. In addition, the operations budget has had $150,000 removed from the stormwater fund item to help reduce the cash flow stress on the storm water fund in Engineering Department City of Pickerington 51 E. Columbus St. Pickerington, Ohio (614) Fax (614)

2 The Capital Improvement Plan has been reformatted to contain additional information aimed at providing a better picture of each individual project and that project s impact on the overall budget. Highlights of the new format include project location maps, a description and detailed funding for various phases of the proposed project. At the front of the document you will find overall summaries for the entire document, as well as a by year breakdown of the projects and their various funding sources. After that, there is a section for each fundstreet, Water, Sanitary, Storm and Parks. These sections all have an overall summary, a summary of each project and then individual project sheets. In total, this year s CIP is nearly 50 pages and represents a total of over $26 million in design and construction of proposed capital improvement projects. Included projects come from prior approved CIP s, master studies (2010 Water study by Burgess & Niple) as well as staff and community input. Engineering Department City of Pickerington 51 E. Columbus St. Pickerington, Ohio (614) Fax (614)

3 City of Pickerington, Ohio Five Year Capital Improvement Budget As prepared by staff and amended by Council October 20, 2014

4 Total Summary Fund Summary Fund Summary Fund Summary Fund Summary Fund Summary 7 Streets Projects 8 Streets ProjectsOverall Summary 9 Streets ProjectsIndividual Summaries 10 Street Resurfacing 12 Center/Milnor/Meadows Intersection Improvements 13 State Route 256 Safety Improvements 14 State Route 256 Landscaping 15 State Route 256 Resurfacing 16 Refugee RoadOhio Health TIF Turn Lanes 17 Refugee RoadWidening 18 Spring Creek Traffic Signal 19 Water Projects 20 Water ProjectsOverall Summary 21 Water ProjectsIndividual Summaries 22 Mingo Estates Water Mains Phase 2 24 West Columbus Water Main 25 Refugee RoadInverness Glen Fire Flow Connection 26 Meter Replacement 27 Gravity Filter Rehabilitation 28 Clear Well Painting 29 Meadowbrook Estates Water Main Replacement 30 Hill Road South Water Main 31 Diley Road Pressure Relief Valves 32 Subdivision Replacement 33 Sanitary Projects 34 Sanitary ProjectsOverall Summary 35 Sanitary ProjectsIndividual Summaries 36 Sewer Plant Backup Generator 37 DLine Interceptor Phase 2A 38 Stormwater Projects 39 Stormwater ProjectsOverall Summary 40 Stormwater ProjectsIndividual Summaries 41 Willow Run Storm Sewer 42 State Route 256 Culvert Cleaning 43 Parks Projects 44 Parks ProjectsOverall Summary 45 Parks ProjectsIndividual Summaries 46 Comprehensive Path Project 47 Pool ADA Improvements 48 Page 1

5 Five Year Capital improvements Program Overall Project Summary Total Street $ 2,640,776 $ 500,200 $ 1,380,000 $ $ 40,000 $ 4,560,976 Water $ 965,000 $ 660,000 $ 955,000 $ 385,000 $ 295,000 $ 3,260,000 Sanitary $ 410,000 $ 140,000 $ 200,000 $ $ 15,000 $ 765,000 Storm $ 684,632 $ 45,000 $ 100,000 $ $ 15,000 $ 844,632 Parks $ 506,473 $ 178,000 $ 50,000 $ $ $ 734,473 Other/Grants $ 6,351,224 $ 2,330,706 $ 7,620,000 $ $ $ 16,301,930 Totals $ 11,558,105 $ 3,853,906 $ 10,305,000 $ 385,000 $ 365,000 $ 26,467,011 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 2

6 Five Year Capital improvements Program Fund Summary for Street Water Sanitary Storm Parks Other/Grants Total Roadway Street Resurfacing $ 310,000 $ $ $ $ $ $ 310,000 CMM $125,000 $ $20,000 $5,000 $ $ 180,000 $ 330, Saftey $397,576 $ $ $402,832 $ $ 4,499,592 $ 5,300, Landscaping $150,000 $ $ $ $ $ 150,000 $ 300, Resurfacing $ 50,000 $ $ $ $ $ 1,244,105 $ 1,294,105 RefugeeOH Turn $762,200 $ $ $52,800 $ $ $ 815,000 RefugeeWidening $846,000 $ $ $94,000 $ $ $ 940,000 Spring Creek Signal $ $ $ $ $ $ $ Water $ $ $ $ $ $ $ Mingo Water Mains $ $ 310,000 $ $ $ $ 234,000 $ 544,000 W Columbus Main $ $ 40,000 $ $ $ $ $ 40,000 Inverness Loop $ $ 10,000 $ $ $ $ $ 10,000 Meter Replacement $ $ 285,000 $ 90,000 $ $ $ $ 375,000 Gravity Filter Rehab $ $ 320,000 $ $ $ $ $ 320,000 Paint Clear Wells $ $ $ $ $ $ $ Meadowbrook Estates $ $ $ $ $ $ $ Hill Road S Main $ $ $ $ $ $ $ Diley Road PRV $ $ $ $ $ $ $ Subdivision Replacement $ $ $ $ $ $ $ Sanitary $ $ $ $ $ $ $ Plant Generator $ $ $ 300,000 $ $ $ $ 300,000 DLine Interceptor 2A $ $ $ $ $ $ $ Storm $ $ $ $ $ $ $ Willow Run Storm Sewer $ $ $ $ 60,000 $ $ $ 60, Culvert Cleaning $ $ $ $ 70,000 $ $ $ 70,000 Parks $ $ $ $ $ $ $ Comprehensive Path $ $ $ $ $ 250,000 $ $ 250,000 Pool ADA Improvements $ $ $ $ $ 256,473 $ 43,527 $ 300,000 Totals by Fund $ 2,640,776 $ 965,000 $ 410,000 $ 684,632 $ 506,473 $ 6,351,224 $ 11,558,105 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 3

7 Five Year Capital improvements Program Fund Summary for Street Water Sanitary Storm Parks Other/Grants Total Roadway Street Resurfacing $ $ $ $ $ $ $ CMM $ 270,200 $ $ 140,000 $ 45,000 $ $ 1,260,706 $ 1,715, Saftey $ $ $ $ $ $ $ 256 Landscaping $ $ $ $ $ $ $ 256 Resurfacing $ $ $ $ $ $ $ RefugeeOH Turn $ $ $ $ $ $ $ RefugeeWidening $ 230,000 $ $ $ $ $ 920,000 $ 1,150,000 Spring Creek Signal $ $ $ $ $ $ $ Water $ $ $ $ $ $ $ Mingo Water Mains $ $ $ $ $ $ $ W Columbus Main $ $ 210,000 $ $ $ $ $ 210,000 Inverness Loop $ $ $ $ $ $ $ Meter Replacement $ $ 350,000 $ $ $ $ $ 350,000 Gravity Filter Rehab $ $ $ $ $ $ $ Paint Clear Wells $ TBD $ $ $ $ $ Meadowbrook Estates $ $ 100,000 $ $ $ $ $ 100,000 Hill Road S Main $ $ $ $ $ $ $ Diley Road PRV $ $ $ $ $ $ $ Subdivision Replacement $ $ $ $ $ $ $ Sanitary $ $ $ $ $ $ $ Plant Generator $ $ $ $ $ $ $ DLine Interceptor 2A $ $ $ $ $ $ $ Storm $ $ $ $ $ $ $ Willow Run Storm Sewer $ $ $ $ $ $ $ 256 Culvert Cleaning $ $ $ $ $ $ $ Parks $ $ $ $ $ $ $ Comprehensive Path $ $ $ $ $ 178,000 $ 150,000 $ 328,000 Pool ADA Improvements $ $ $ $ $ $ $ Totals by Fund $ 500,200 $ 660,000 $ 140,000 $ 45,000 $ 178,000 $ 2,330,706 $ 3,853,906 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 4

8 Five Year Capital improvements Program Fund Summary for Street Water Sanitary Storm Parks Other/Grants Total Roadway Street Resurfacing $ $ $ $ $ $ $ CMM $ $ $ $ $ $ $ 256 Saftey $ $ $ $ $ $ $ 256 Landscaping $ $ $ $ $ $ $ 256 Resurfacing $ $ $ $ $ $ $ RefugeeOH Turn $ $ $ $ $ $ $ RefugeeWidening $ 1,380,000 $ 50,000 $ $ 100,000 $ 50,000 $ 7,620,000 $ 9,200,000 Spring Creek Signal $ $ $ $ $ $ $ Water $ $ $ $ $ $ $ Mingo Water Mains $ $ $ $ $ $ $ W Columbus Main $ $ $ $ $ $ $ Inverness Loop $ $ 55,000 $ $ $ $ $ 55,000 Meter Replacement $ $ 350,000 $ $ $ $ $ 350,000 Gravity Filter Rehab $ $ $ $ $ $ $ Paint Clear Wells $ $ $ $ $ $ $ Meadowbrook Estates $ $ 500,000 $ $ $ $ $ 500,000 Hill Road S Main $ $ $ $ $ $ $ Diley Road PRV $ $ $ $ $ $ $ Subdivision Replacement $ $ $ $ $ $ $ Sanitary $ $ $ $ $ $ $ Plant Generator $ $ $ $ $ $ $ DLine Interceptor 2A $ $ $ 200,000 $ $ $ $ 200,000 Storm $ $ $ $ $ $ $ Willow Run Storm Sewer $ $ $ $ $ $ $ 256 Culvert Cleaning $ $ $ $ $ $ $ Parks $ $ $ $ $ $ $ Comprehensive Path $ $ $ $ $ $ $ Pool ADA Improvements $ $ $ $ $ $ $ Totals by Fund $ 1,380,000 $ 955,000 $ 200,000 $ 100,000 $ 50,000 $ 7,620,000 $ 10,305,000 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 5

9 Five Year Capital improvements Program Fund Summary for Street Water Sanitary Storm Parks Other/Grants Total Roadway Street Resurfacing $ $ $ $ $ $ $ CMM $ $ $ $ $ $ $ 256 Saftey $ $ $ $ $ $ $ 256 Landscaping $ $ $ $ $ $ $ 256 Resurfacing $ $ $ $ $ $ $ RefugeeOH Turn $ $ $ $ $ $ $ RefugeeWidening $ $ $ $ $ $ $ Spring Creek Signal $ $ $ $ $ $ $ Water $ $ $ $ $ $ $ Mingo Water Mains $ $ $ $ $ $ $ W Columbus Main $ $ $ $ $ $ $ Inverness Loop $ $ $ $ $ $ $ Meter Replacement $ $ 350,000 $ $ $ $ $ 350,000 Gravity Filter Rehab $ $ $ $ $ $ $ Paint Clear Wells $ $ $ $ $ $ $ Meadowbrook Estates $ $ $ $ $ $ $ Hill Road S Main $ $ 35,000 $ $ $ $ $ 35,000 Diley Road PRV $ $ $ $ $ $ $ Subdivision Replacement $ $ $ $ $ $ $ Sanitary $ $ $ $ $ $ $ Plant Generator $ $ $ $ $ $ $ DLine Interceptor 2A $ $ $ $ $ $ $ Storm $ $ $ $ $ $ $ Willow Run Storm Sewer $ $ $ $ $ $ $ 256 Culvert Cleaning $ $ $ $ $ $ $ Parks $ $ $ $ $ $ $ Comprehensive Path $ $ $ $ $ $ $ Pool ADA Improvements $ $ $ $ $ $ $ Totals by Fund $ $ 385,000 $ $ $ $ $ 385,000 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 6

10 Five Year Capital improvements Program Fund Summary for Street Water Sanitary Storm Parks Other/Grants Total Roadway Street Resurfacing $ $ $ $ $ $ $ CMM $ $ $ $ $ $ $ 256 Saftey $ $ $ $ $ $ $ 256 Landscaping $ $ $ $ $ $ $ 256 Resurfacing $ $ $ $ $ $ $ RefugeeOH Turn $ $ $ $ $ $ $ RefugeeWidening $ $ $ $ $ $ $ Spring Creek Signal $ 25,000 $ $ $ $ $ $ 25,000 Water $ $ $ $ $ $ $ Mingo Water Mains $ $ $ $ $ $ $ W Columbus Main $ $ $ $ $ $ $ Inverness Loop $ $ $ $ $ $ $ Meter Replacement $ $ $ $ $ $ $ Gravity Filter Rehab $ $ $ $ $ $ $ Paint Clear Wells $ $ $ $ $ $ $ Meadowbrook Estates $ $ $ $ $ $ $ Hill Road S Main $ $ 230,000 $ $ $ $ $ 230,000 Diley Road PRV $ $ 50,000 $ $ $ $ $ 50,000 Subdivision Replacement $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ $ $ 60,000 Sanitary $ $ $ $ $ $ $ Plant Generator $ $ $ $ $ $ $ DLine Interceptor 2A $ $ $ $ $ $ $ Storm $ $ $ $ $ $ $ Willow Run Storm Sewer $ $ $ $ $ $ $ 256 Culvert Cleaning $ $ $ $ $ $ $ Parks $ $ $ $ $ $ $ Comprehensive Path $ $ $ $ $ $ $ Pool ADA Improvements $ $ $ $ $ $ $ Totals by Fund $ 40,000 $ 295,000 $ 15,000 $ 15,000 $ $ $ 365,000 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 7

11 City of Pickerington, Ohio Five Year Capital Improvement Budget Streets Page 8

12 Five Year Capital improvements Program Streets Project Summary Total City Expenditures by Category Category Totals Design $ 1,085,000 $ $ $ $ 25,000 $ 1,110,000 RightofWay $ 45,000 $ 170,000 $ $ $ $ 215,000 Utilities $ $ 60,000 $ $ $ $ 60,000 Construction $ 1,975,408 $ 455,200 $ 1,430,000 $ $ $ 3,860,608 CA/Inspection $ 260,000 $ $ 150,000 $ $ $ 410,000 Outside Sources $ 5,923,697 $ 2,180,706 $ 7,620,000 $ $ $ 15,724,403 Yearly Totals $ 9,289,105 $ 2,865,906 $ 9,200,000 $ $ 25,000 $ 21,380,011 Total Outside Funding Expenditures by Category Category Totals Design $ $ $ $ $ $ RightofWay $ 180,000 $ 920,000 $ 4,120,000 $ $ $ 5,220,000 Utilities $ $ $ $ $ $ Construction $ 5,743,697 $ 1,260,706 $ 3,500,000 $ $ $ 10,504,403 CA/Inspection $ $ $ $ $ $ Yearly Totals $ 5,923,697 $ 2,180,706 $ 7,620,000 $ $ $ 15,724,403 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 9

13 Five Year Capital improvements Program Streets Project Summary Street Resurfacing Total Cost Design $ 40,000 $ 40,000 $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 270,000 $ 270,000 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 310,000 $ 310,000 $ $ $ $ Fund(s) Information: General Fund CMM Total Cost Design $ 105,000 $ 105,000 $ $ $ $ RightofWay $ 45,000 $ 45,000 $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 455,200 $ $ 455,200 $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ 1,440,706 $ 180,000 $ 1,260,706 $ $ $ Yearly Totals $ 2,045,906 $ 330,000 $ 1,715,906 $ $ $ Fund(s) Information: General Fund, MORPC Grant, Stormwater, Sanitary 256 Safety Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 624,408 $ 624,408 $ $ $ $ CA/Inspection $ 176,000 $ 176,000 $ $ $ $ Grants $ 4,499,592 $ 4,499,592 $ $ $ $ Yearly Totals $ 5,300,000 $ 5,300,000 $ $ $ $ Fund(s) Information: General Fund, ODOT Grant, Stormwater Page 10

14 Five Year Capital improvements Program Streets Project Summary 256 Landscaping Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 250,000 $ 250,000 $ $ $ $ CA/Inspection $ 50,000 $ 50,000 $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 300,000 $ 300,000 $ $ $ $ Fund(s) Information: General Fund, State Route 256 Fund 256 Resurfacing Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 50,000 $ 50,000 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ 1,244,105 $ 1,244,105 $ $ $ $ Yearly Totals $ 1,294,105 $ 1,294,105 $ $ $ $ Fund(s) Information: State Route 256 Fund, OPWC Grant, ODOT Funds RefugeeOH Turn TIF Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 781,000 $ 781,000 $ $ $ $ CA/Inspection $ 34,000 $ 34,000 $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 815,000 $ 815,000 $ $ $ $ Fund(s) Information: Debt Proceeds (TIF Financing), Stormwater RefugeeWidening Total Cost Design $ 940,000 $ 940,000 $ $ $ $ RightofWay $ 170,000 $ $ 170,000 $ $ $ Utilities $ 60,000 $ $ 60,000 $ $ $ Construction $ 1,430,000 $ $ $ 1,430,000 $ $ CA/Inspection $ 150,000 $ $ $ 150,000 $ $ Grants $ 8,540,000 $ $ 920,000 $ 7,620,000 $ $ Yearly Totals $ 11,290,000 $ 940,000 $ 1,150,000 $ 9,200,000 $ $ Fund(s) Information: Debt Proceeds (TIF Financing), ODOT Grant, Stormwater Spring Creek Signal Total Cost Design $ 25,000 $ $ $ $ $ 25,000 RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ $ $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 25,000 $ $ $ $ $ 25,000 Fund(s) Information: Street Trust Fund Page 11

15 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST01 Annual Street Maintenance The proposed 2015 project would apply rejuvinator to all residential streets resurfaced in 2012 and Location Map Figures below are for five year program uses current year $ city wide project Design/Engineering $40,000 RightofWay $0 Utilities $0 Construction $270,000 CA/Inspection $0 Grants $0 none Companion CIP's 2015 City Funding Source(s) Authorizing Legislation General Fund Expenditures to date: Annual Program Project Origin Priority Level Calendar Year Design $ 40,000 $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 270,000 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 310,000 $ $ $ $ Page 12

16 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST14 Center/Milnor/Meadows Intersection Improvements The proposed work includes the realignment and reconstruction of the intersection to a fully functional modern roundabout. The project would be partially funded by a Congestion Mitigation and Air Quality (CMAQ) grant administered by MORPC. The project would be bid and administered by ODOT per previous legislation. Staff anticipates to finish design and authorize ROW in 2015 and construct the project in The project would also extend sanitary sewer from intersection to corporation limit on Milnor Road. Figures below are for five year program uses current year $ Design/Engineering $ 105,000 RightofWay $ 45,000 Utilities $ Construction $ 455,200 CA/Inspection $ Grants $ 1,440,706 none Companion CIP's 2015 Funding Source(s) Authorizing Legislation City General Fund $125,000 March 2014 Service Committee approval City Stormwater Fund $5,000 City Sanitary Fund $20,000 MORPC Grant $180,000 Project Origin Expenditures to date: $90, as of 9/8/14 Priority Level Calendar Year Design $ 105,000 $ $ $ $ RightofWay $ 45,000 $ $ $ $ Utilities $ $ $ $ $ Construction $ $ 455,200 $ $ $ CA/Inspection $ $ $ $ $ Grants $ 180,000 $ 1,260,706 $ $ $ Yearly Totals $ 330,000 $ 1,715,906 $ $ $ Page 13

17 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST18 State Route 256 Safety Improvement The project is to add additional SB lane, turn lane and new signals along SR 256 from SR 204 to the Kroger/Giant Eagle signal. The project includes ODOT grant money at a 90/10 split, up to the remaining balance on the original $5,000,000 grant. Estimated grant available after design and ROW is $4.5 million, yet construction costs are not anticipated to use entire grant balance which is reflected in budget numbers below. ODOT will bid and administer the project, and our share of the costs include CA/Inspection. Additional CA/Inspection funds budgeted to assist the City with resident and business communications, as staff will be actively engaged in all aspects of the project. Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 624,408 CA/Inspection $ 176,000 ODOT Grant $ 4,499,592 ST101 Companion CIP's UF101 Authorizing Legislation Project Origin Priority Level 2015 Funding Source(s) City General Fund $ 397,576 City Stormwater Fund $402,832 ODOT Grant $4,499,592 City Expenditures to date: $42,035 as of 9/4/14 Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 624,408 $ $ $ $ CA/Inspection $ 176,000 $ $ $ $ Grants $ 4,499,592 $ $ $ $ Yearly Totals $ 5,300,000 $ $ $ $ Page 14

18 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets UF101 State Route 256 Landscaping The proposed project is the landscaping component of the SR 256 Safety Improvements. The anticipated landscaping improvements include landscaped medians, new street trees and a new entry feature. CA/Inspection funds include both actual construction inspection as well as landscape plant selection consultation. Location Map Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 250,000 CA/Inspection $ 50,000 Grants $ ST18 Companion CIP's ST101 Authorizing Legislation Project Origin Priority Level 2015 City Funding Source(s) General Fund $150,000 State Route 256 Fund $150,000 Expenditures to date: $28,500 as of 9/8/14 Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 250,000 $ $ $ $ CA/Inspection $ 50,000 $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 300,000 $ $ $ $ Page 15

19 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST101 State Route 256 Resurfacing The project resurfaces State Route 256 outside of the limits of the SR 256 Safety Project. The project will be done concurrently with the Safety Project, which is ODOT bid and administered. Project is done under ODOT's Urban Paving Program, which includes 80% of the cost funded by ODOT. The City has also received an OPWC grant/loan which is expected to cover the City's 20% share. Location Map Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ 2015 Funding Source(s) Utilities $ City State Route 256 Fu $50,000 Construction $ 50,000 ODOT $960,438 CA/Inspection $ OPWC Grant $212,750 Grants $ 1,244,105 OPWC Loan $70,917 Authorizing Legislation Expenditures to date: $4,500 (used to apply for grant) UF101 Companion CIP's ST18 Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 50,000 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ 1,244,105 $ $ $ $ Yearly Totals $ 1,294,105 $ $ $ $ Page 16

20 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST27A Refugee RoadOhio Health TIF Turn Lane Phase The project adds the TIF required turn lanes and signal at the new intersection of Refugee Road and Stonecreek Drive South, and is anticipated to be complete in spring The project will complete almost all of the construction that physically impacts the Ohio Health property, including a multiuse path on the north side of Refugee Road. It is expected that all funds will come from the $4.4 million TIF guaranteed revenue. Location Map Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 781,000 CA/Inspection $ 34,000 Grants $ Companion CIP's ST27 (Refugee Road Widening) Authorizing Legislation City Funding Source(s) Project Origin Debt Proceeds (TIF Revenue) $762,200 Stormwater Fund $52,800 Priority Level Expenditures to date: None as of 9/8/14; anticipated to be $145,100 in 2014 for design and ROW Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 781,000 $ $ $ $ CA/Inspection $ 34,000 $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 815,000 $ $ $ $ Page 17

21 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST27B Refugee RoadWidening The project widens Refugee Road/SR 256 Intersection with additional thru and turn lanes. The project will connect to the widening in front of Ohio Health and potentially continue west depending on additional grant funding. The City has received $3.5 million from ODOT for improvements at the Refugee/256 intersection. Additional funds will come from the Ohio Health TIF. The funds reflected in the amounts below assume a successful MORPC application in excess of $5 million. The City anticipates notification of the application status in the winter of 2014/2015. Location Map Figures below are for five year program Companion CIP's uses current year $ ST27 (Ohio Health Turn Lanes) Design/Engineering $ 940,000 RightofWay $ 170,000 Utilities $ 60, City Funding Source(s) Construction $ 1,430,000 Debt Proceeds (TIF Revenues) $846,000 CA/Inspection $ 150,000 Stormwater $94,000 Grants $ 8,540,000 Expenditures to date: $122,663 as of 9/10/14. Anticipated to be approximately $150k by end of year Project Origin Priority Level Calendar Year Design $ 940,000 $ $ $ $ RightofWay $ $ 170,000 $ $ $ Utilities $ $ 60,000 $ $ $ Construction $ $ $ 1,430,000 $ $ CA/Inspection $ $ $ 150,000 $ $ Grants $ $ 920,000 $ 7,620,000 $ $ Yearly Totals $ 940,000 $ 1,150,000 $ 9,200,000 $ $ Page 18

22 Location Map FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Streets ST17 Spring Creek Traffic Signal The eventual project is to install a traffic signal at the intersection of Spring Creek Drive and Refugee Road. The project has been partially funded by a developer with $25,000 on deposit with the city. Signal is to be installed when actual traffic warrants a signal installation. Project is shown in 5 year CIP to reflect the potential work related to new signal installation. Figures below are for five year program uses current year $ Design/Engineering $ 25,000 RightofWay $ Utilities $ Construction $ CA/Inspection $ Grants $ none Companion CIP's Funding Source(s) City Street Trust Fund Authorizing Legislation Expenditures to date: $0 Project Origin Priority Level Calendar Year Design $ $ $ $ $ 25,000 RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ $ $ $ $ 25,000 Page 19

23 City of Pickerington, Ohio Five Year Capital Improvement Budget Water Page 20

24 Five Year Capital improvements Program Water Project Summary Total City Expenditures by Category Category Totals Design $ 50,000 $ 100,000 $ $ 35,000 $ 110,000 $ 295,000 RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 956,000 $ 560,000 $ 905,000 $ 350,000 $ 200,000 $ 2,971,000 CA/Inspection $ 49,000 $ $ $ $ 30,000 $ 79,000 Outside Sources $ 234,000 $ $ $ $ $ 234,000 Yearly Totals $ 1,289,000 $ 660,000 $ 905,000 $ 385,000 $ 340,000 $ 3,579,000 Total Outside Funding Expenditures by Category Category Totals Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 234,000 $ $ $ $ $ 234,000 CA/Inspection $ $ $ $ $ $ Yearly Totals $ 234,000 $ $ $ $ $ 234,000 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 21

25 Five Year Capital improvements Program Water Project Summary Mingo Phase 2 Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 261,000 $ 261,000 $ $ $ $ CA/Inspection $ 49,000 $ 49,000 $ $ $ $ Grants $ 234,000 $ 234,000 $ $ $ $ Yearly Totals $ 544,000 $ 544,000 $ $ $ $ Fund(s) Information: Water Fund, OPWC Grant W Columbus Main Total Cost Design $ 40,000 $ 40,000 $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 210,000 $ $ 210,000 $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 250,000 $ 40,000 $ 210,000 $ $ $ Fund(s) Information: Water Fund Inverness Glen Total Cost Design $ 10,000 $ 10,000 $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 55,000 $ $ $ 55,000 $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 65,000 $ 10,000 $ $ 55,000 $ $ Fund(s) Information: Water Fund Meter Replacement Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 1,425,000 $ 375,000 $ 350,000 $ 350,000 $ 350,000 $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 1,425,000 $ 375,000 $ 350,000 $ 350,000 $ 350,000 $ Fund(s) Information: Water Fund, Sewer Fund Gravity Filter Rehab Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 320,000 $ 320,000 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 320,000 $ 320,000 $ $ $ $ Fund(s) Information: Water Fund Page 22

26 Five Year Capital improvements Program Water Project Summary Paint Clear Wells Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 0 $ $ 0 $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 0 $ $ 0 $ $ $ Fund(s) Information: Water Fund Meadowbrook Estates Total Cost Design $ 100,000 $ $ 100,000 $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 500,000 $ $ $ 500,000 $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 600,000 $ $ 100,000 $ 500,000 $ $ Fund(s) Information: Water Fund Hill Road South Total Cost Design $ 35,000 $ $ $ $ 35,000 $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 200,000 $ $ $ $ $ 200,000 CA/Inspection $ 30,000 $ $ $ $ $ 30,000 Grants $ $ $ $ $ $ Yearly Totals $ 265,000 $ $ $ $ 35,000 $ 230,000 Fund(s) Information: Water Fund Diley Road PRV Total Cost Design $ 50,000 $ $ $ $ $ 50,000 RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ $ $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 50,000 $ $ $ $ $ 50,000 Fund(s) Information: Water Fund Subdivision Replacement Total Cost Design $ 60,000 $ $ $ $ $ 60,000 RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ $ $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 60,000 $ $ $ $ $ 60,000 Fund(s) Information: MultipleWater, Sewer, Storm, Street Page 23

27 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects Mingo Estates Water Main ReplacementPhase 2 The project includes replacement of approximately 3,700 LF of 8" water main within the Mingo subdivision. The project includes 11 new fire hydrants and over 50 new residential water services. The work is being coordinated with Violet Township (replacement of streets, storm sewer and curb & gutter sections), and Fairfield County Utilities (repair/replacement of sanitary sewers). The project is partially funded by an OPWC grant/loan. The City share of the grant is $234,000 and requires a 26% match. Location Map Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 261,000 CA/Inspection $ 49,000 Grants $ 234,000 none Companion CIP's 2015 Funding Source(s) Authorizing Legislation City Water Fund $ 310,000 August 2014 Service Committee Mtg OPWC Grant $ 234, Expenditures to date: Approximately $8,600 in 2014 Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 261,000 $ $ $ $ CA/Inspection $ 49,000 $ $ $ $ Grants $ 234,000 $ $ $ $ Yearly Totals $ 544,000 $ $ $ $ Page 24

28 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects W42 West Columbus 12" Main The staff recommended project includes the installation of a 12" water main along West Columbus Street from Hill Road to Fair Oaks Avenue. The proposed project is needed to help reduce headloss within the existing main along the corridor. The project is being programmed in 2015 as staff will be requesting authorization to apply for a Safe Routes to School Grant (SRTS) in 2015 that would install bike path/sidewalks within the same limits. This is the same grant that was unsuccessfully applied for in 2014, and staff would like to combine the two potential projects to maximize efficiency. If the SRTS grant application is unsuccessful, staff would not be moving forward with this project. Location Map Figures below are for five year program uses current year $ Design/Engineering $ 40,000 RightofWay $ Utilities $ Construction $ 210,000 CA/Inspection $ Grants $ none Companion CIP's Authorizing Legislation Project Origin Priority Level 2015 City Funding Source(s) Water Fund Expenditures to date: None Calendar Year Design $ 40,000 $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ 210,000 $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 40,000 $ 210,000 $ $ $ Page 25

29 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects W21 Refugee RoadInverness Glen Fire Flow Connection The proposed project adds approximatly 700 LF of 8" water main along Refugee Road to connect Mingo Estates with Inverness Glen. Inverness Glen is a large area of an isolated main with substandard fire flows. The project would improve fire flows in the area. It is anticipated to be done in conjunction with the Refugee Road Project. Location Map Figures below are for five year program uses current year $ Design/Engineering $ 10,000 RightofWay $ Utilities $ Construction $ 55,000 CA/Inspection $ Grants $ none Companion CIP's Authorizing Legislation Project Origin Priority Level 2015 City Funding Source(s) Water Fund Expenditures to date: None Calendar Year Design $ 10,000 $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ 55,000 $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 10,000 $ $ 55,000 $ $ Page 26

30 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects Project Number Meter Replacement Multiyear project to replace meters within all properties that the City serves. The project will be phased over 4 years, and is anticipated to generate additional revenue by providing more accurate readings. The initial phase will also utilize sanitary funding. Location Map Citywide project Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 1,425,000 CA/Inspection $ Grants $ none Companion CIP's 2015 City Funding Source(s) Authorizing Legislation Water Fund $ 285,000 Sewer Fund $ 90,000 Expenditures to date: none Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 375,000 $ 350,000 $ 350,000 $ 350,000 $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 375,000 $ 350,000 $ 350,000 $ 350,000 $ Page 27

31 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects Project Number Gravity Filter Rehabilitation The project will rehab the existing gravity filters to ensure they are working properly. Project will result in more efficient filters and will extend current filter life by completing preventative maintenance. Project Location Water Treatment Plant Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 320,000 CA/Inspection $ Grants $ none Companion CIP's 2015 City Funding Source(s) Authorizing Legislation Water Fund Expenditures to date: None Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 320,000 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 320,000 $ $ $ $ Page 28

32 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects Project Number Clear Well Painting The project will paint the existing clear wells at the water treatment plant. The cost of the work is yet to be determined, but the project is currently scheduled for Location Map Figures below are for five year program uses current year $ Water treatment plant Design/Engineering $ RightofWay $ Utilities $ Construction $ 0 Project Origin CA/Inspection $ ODOT Grant $ Priority Level Funding Source(s) Companion CIP's City Water Fund City Expenditures to date: None Authorizing Legislation Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ 0 $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ $ 0 $ $ $ Page 29

33 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects W12 & W13 Meadowbrook Estates Water Main Replacement The proposed project would replace the old 4" AC watermain within the Meadowbrook Estates Subdivision. Project will install 8" mains, new services replace the existing hydrants and add new hydrants for the area. The project is a part of the City's master plan. Location Map Figures below are for five year program uses current year $ Design/Engineering $ 100,000 RightofWay $ Utilities $ Construction $ 500,000 CA/Inspection $ Grants $ Companion CIP's Authorizing Legislation Project Origin Priority Level Funding Source(s) City Water Fund Expenditures to date: None Calendar Year Design $ $ 100,000 $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ 500,000 $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ $ 100,000 $ 500,000 $ $ Page 30

34 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects W46 Hill Road South Water Main The proposed project replaces existing 6" water main on Hill Road South from Columbus Street to Stonebridge Drive with a 12" main. The project will improve fire flows in the area, including to Ridgeview Middle School and Pickerington Central High School. Location Map Figures below are for five year program uses current year $ Design/Engineering $ 35,000 RightofWay $ Utilities $ Construction $ 200,000 CA/Inspection $ 30,000 Grants $ Companion CIP's Authorizing Legislation Project Origin Priority Level Funding Source(s) City Water Fund Expenditures to date: None Calendar Year Design $ $ $ $ 35,000 $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ $ $ 200,000 CA/Inspection $ $ $ $ $ 30,000 Grants $ $ $ $ $ Yearly Totals $ $ $ $ 35,000 $ 230,000 Page 31

35 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects Project Number Diley Road Pressure Relief Valves The proposed project installs pressure relief valves at several locations along Diley Road. Valves will help control water pressures in the area to ensure a more regulated, consistent pressure. Current pressures in some parts exceed 100 PSI during normal operation, which can cause problems for both the system and its users. The project is recommended in the water master plan. Location Map A total of 5 valves are proposed within the Diley Road corridor near the water treatment plant. One valve along Diley just south of the water treatment plant, one at Zeller Drive near Sycamore Creek Street, two for Fox Glen subdivision west of Diley Road and one for Fox Glen East Figures below are for five year program uses current year $ Design/Engineering $ 50,000 RightofWay $ Utilities $ Construction $ CA/Inspection $ Grants $ Companion CIP's Funding Source(s) City Water Fund Authorizing Legislation Expenditures to date: None Project Origin Priority Level Calendar Year Design $ $ $ $ $ 50,000 RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ $ $ $ $ 50,000 Page 32

36 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Water Projects Subdivision Replacement A complete project which includes replacement of watermain, street and curb repair, storm sewer and sanitary sewer repairs/replacement. Several older neighborhoods have failing streets/curb, older sewer infrastructure and undersized asbestos cement water mains. This project would upgrade a section of a subdivision to be determined. Project funding would come from applicable sources once the project is approved in the current year CIP. Location Map Figures below are for five year program TBD uses current year $ Design/Engineering $ 60,000 RightofWay $ Utilities $ Construction $ CA/Inspection $ Grants $ Companion CIP's Project Origin Priority Level Authorizing Legislation Funding Source(s) General Fund Water Fund Stormwater Fund Sanitary Fund Expenditures to date: None Calendar Year Design $ $ $ $ $ 60,000 RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ $ $ $ $ 60,000 Page 33

37 City of Pickerington, Ohio Five Year Capital Improvement Budget Sanitary Page 34

38 Five Year Capital improvements Program Sanitary Project Summary Total City Expenditures by Category Category Totals Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 300,000 $ $ 180,000 $ $ $ 480,000 CA/Inspection $ $ $ 20,000 $ $ $ 20,000 Outside Sources $ $ $ $ $ $ Yearly Totals $ 300,000 $ $ 200,000 $ $ $ 500,000 Total Outside Funding Expenditures by Category Category Totals Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ $ $ $ $ $ CA/Inspection $ $ $ $ $ $ Yearly Totals $ $ $ $ $ $ *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 35

39 Five Year Capital improvements Program Sanitary Project Summary Plant Generator Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 300,000 $ 300,000 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 300,000 $ 300,000 $ $ $ $ Fund(s) Information: Sanitary Fund DLine Interceptor 2A Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 180,000 $ $ $ 180,000 $ $ CA/Inspection $ 20,000 $ $ $ 20,000 $ $ Grants $ $ $ $ $ $ Yearly Totals $ 200,000 $ $ $ 200,000 $ $ Fund(s) Information: Sanitary Fund Page 36

40 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Sanitary Projects Sewer Plant Backup Generator Replacement of emergency generator at treatment plant Location Map Within sewer treatment plant Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Utilities $ Construction $ 300,000 CA/Inspection $ Grants $ none Companion CIP's 2015 City Funding Source(s) Authorizing Legislation Sanitary $300,000 Expenditures to date: $0 Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 300,000 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 300,000 $ $ $ $ Page 37

41 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Sanitary Projects WW04 DLine Interceptor Phase 2A The proposed project would install approximately 750 LF of sanitary sewer immediately south of Refugee Road. The installation of the sewer will allow for the abandonment of a pump station in the area by bypassing the station. This will result in lower maintenance and electricity costs as well as reduced overflow/sewer backup risks. Figures below are for five year program uses current year $ Design/Engineering $0 RightofWay $0 Utilities $0 Construction $180,000 CA/Inspection $20,000 Grants $0 none Companion CIP's City Funding Source(s) Sanitary Authorizing Legislation Expenditures to date: last expenditures in early 2013 Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ $ $ 180,000 $ $ CA/Inspection $ $ $ 20,000 $ $ Grants $ $ $ $ $ Yearly Totals $ $ $ 200,000 $ $ Page 38

42 City of Pickerington, Ohio Five Year Capital Improvement Budget Stormwater Page 39

43 Five Year Capital improvements Program Stormwater Project Summary Total City Expenditures by Category Category Totals Design $ 20,000 $ $ $ $ $ 20,000 RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 110,000 $ $ $ $ $ 110,000 CA/Inspection $ $ $ $ $ $ Outside Sources $ $ $ $ $ $ Yearly Totals $ 130,000 $ $ $ $ $ 130,000 Total Outside Funding Expenditures by Category Category Totals Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ $ $ $ $ $ CA/Inspection $ $ $ $ $ $ Yearly Totals $ $ $ $ $ $ *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 40

44 Five Year Capital improvements Program Stormwater Project Summary Willow Run Total Cost Design $ 15,000 $ 15,000 $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 45,000 $ 45,000 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 60,000 $ 60,000 $ $ $ $ Fund(s) Information: Stormwater Fund SR 256 Culvert Clean Total Cost Design $ 5,000 $ 5,000 $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 65,000 $ 65,000 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ $ $ $ $ $ Yearly Totals $ 70,000 $ 70,000 $ $ $ $ Fund(s) Information: Stormwater Fund Page 41

45 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Stormwater Projects Location Map Willow Run Storm Sewer The proposed project includes replacement of failed storm sewer in Willow Run area. During heavy rains the failure results in localized, short periods of flooded streets and water flowing towards homes. The project would ensure the sewer is sized correctly and replace it, along with some minor grading to improve flow in the area. Figures below are for five year program uses current year $ Design/Engineering $15,000 RightofWay $0 Utilities $0 Construction $45,000 CA/Inspection $0 Grants $0 none Companion CIP's City Funding Source(s) Stormwater Fund Authorizing Legislation Expenditures to date: $0 Project Origin Priority Level Calendar Year Design $ 15,000 $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 45,000 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 60,000 $ $ $ $ Page 42

46 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Stormwater Projects 256 Culvert Cleaning The proposed project is to remove debris and sediment from within a culvert under SR 256. The culvert carries water to the Windmiller Pond/Dam just south of Refugee Road. Location Map Figures below are for five year program uses current year $ Design/Engineering $ 5,000 RightofWay $ Utilities $ Construction $ 65,000 CA/Inspection $ Grants $ none Companion CIP's 2015 City Funding Source(s) Authorizing Legislation Storm water $70,000 Expenditures to date: None Project Origin Priority Level Calendar Year Design $ 5,000 $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 65,000 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ $ $ $ $ Yearly Totals $ 70,000 $ $ $ $ Page 43

47 City of Pickerington, Ohio Five Year Capital Improvement Budget Parks Page 44

48 Five Year Capital improvements Program Parks Project Summary Total City Expenditures by Category Category Totals Design $ 30,000 $ $ $ $ $ 30,000 RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 476,473 $ 178,000 $ $ $ $ 654,473 CA/Inspection $ $ $ $ $ $ Outside Sources $ 43,527 $ 150,000 $ $ $ $ 193,527 Yearly Totals $ 550,000 $ 328,000 $ $ $ $ 878,000 Total Outside Funding Expenditures by Category Category Totals Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 43,527 $ 150,000 $ $ $ $ 193,527 CA/Inspection $ $ $ $ $ $ Yearly Totals $ 43,527 $ 150,000 $ $ $ $ 193,527 *Proposed Capital Improvement Plan as prepared by city engineer, service director, finance department, parks and rec director and city manager and amended by Council. October 16, Page 45

49 Five Year Capital improvements Program Parks Project Summary Comprehensive Paths Total Cost Design $ 30,000 $ 30,000 $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 398,000 $ 220,000 $ 178,000 $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ 150,000 $ $ 150,000 $ $ $ Yearly Totals $ 578,000 $ 250,000 $ 328,000 $ $ $ Fund(s) Information: Park Impact Fee Fund, ODNR Grant PoolADA Improvements Total Cost Design $ $ $ $ $ $ RightofWay $ $ $ $ $ $ Utilities $ $ $ $ $ $ Construction $ 256,473 $ 256,473 $ $ $ $ CA/Inspection $ $ $ $ $ $ Grants $ 43,527 $ 43,527 $ $ $ $ Yearly Totals $ 300,000 $ 300,000 $ $ $ $ Fund(s) Information: Park Impact Fee Fund, ODNR Grant Page 46

50 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Parks P&R100 Comprehensive Parks Path Project The proposed project designs and constructs a comprehensive internal path system in Sycamore Creek Park. The project will also add a pedestrian bridge to cross Sycamore Creek just west of Lockville Road, connecting Victory Park allowing pedestrians to get between parks without having to cross Lockville Road. The City has applied for a grant and will be notified of application status in early October The project will also expand the parking lot in the lower section of Sycamore Creek Park. Figures below are for five year program uses current year $ Design/Engineering $ 30,000 RightofWay $ Companion CIP's Utilities $ P&R14 Construction $ 398,000 CA/Inspection $ Grants $ 150,000 Authorizing Legislation 2015 City Funding Source(s) Parks Impact Fees $250,000 Expenditures to date: Project Origin $45k as of 9/1/14. Additional expenditures possible if design contract awarded in council Priority Level Calendar Year Design $ 30,000 $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 220,000 $ 178,000 $ $ $ CA/Inspection $ $ $ $ $ Grants $ 150,000 $ $ $ Yearly Totals $ 250,000 $ 328,000 $ $ $ Page 47

51 FIVE YEAR CAPITAL IMPROVEMENTS PROGRAM Parks Pool ADA Improvements The project removes the baby pool and replaces it with an ADA compliant splash pad. The new pad is more appropriate to serve more users as the popularity of the pool increases. Location Map Figures below are for five year program uses current year $ Design/Engineering $ RightofWay $ Companion CIP's Utilities $ Construction $ 256,473 CA/Inspection $ Grants $ 43,527 Authorizing Legislation 2015 City Funding Source(s) Parks Impact Fees $256,473 ODNR Grant $43,527 Expenditures to date: $0 Project Origin Priority Level Calendar Year Design $ $ $ $ $ RightofWay $ $ $ $ $ Utilities $ $ $ $ $ Construction $ 256,473 $ $ $ $ CA/Inspection $ $ $ $ $ Grants $ 43,527 $ $ $ $ Yearly Totals $ 300,000 $ $ $ $ Page 48

2016 City of Pickerington, Ohio Comprehensive Annual Financial Report

2016 City of Pickerington, Ohio Comprehensive Annual Financial Report Sycamore Creek Senior Living Shoppes at Turnberry 2016 City of Pickerington, Ohio Comprehensive Annual Financial Report Zettler Hardware Lake Forest Subdivision Violet Township Fire Station 591 For the

More information

This page intentionally left blank

This page intentionally left blank 197 This page intentionally left blank 198 Capital Improvement Program PROCEDURE Each year the Capital Improvement Program (CIP) is prepared from project requests submitted by the various departments.

More information

Where the Money Goes (Uses) FY 2011

Where the Money Goes (Uses) FY 2011 Capital Expenditure Analysis The total FY2011 capital budget for the Village of Orland Park is $23,650,283, a 33% decrease from the fiscal year 2010 adopted capital budget of $31,446,027. The decrease

More information

PROJECT EVALUATION FORM

PROJECT EVALUATION FORM PROJECT EVALUATION FORM Program Year 33 (2018-2019) (Revised 2/6/18) This form is to be used for both SCIP and LTIP projects. Remember that only transportation projects (roads, bridges, and culverts) are

More information

Capital Improvement Projects

Capital Improvement Projects Capital Improvement Projects This section highlights the Capital Improvement Program (CIP) projects proposed for FY 2017-2018. Capital projects are designed to enhance the City s infrastructure, extend

More information

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC

RECEIVE A REPORT AND APPROVE PROPOSED PUBLIC ENGAGEMENT POLICIES AND PRACTICES FOR THE PUBLIC J-17 STAFF REPORT MEETING DATE: October 24, 2017 TO: City Council FROM: Russ Thompson, Public Works Director PRESENTER: Russ Thompson, Public Works Director SUBJECT: RECEIVE A REPORT AND APPROVE PROPOSED

More information

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer

Christopher Blunk, Deputy Director Public Works/City Engineer. PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer STAFF REPORT MEETING DATE: April 10, 2018 TO: FROM: City Council Christopher Blunk, Deputy Director Public Works/City Engineer PRESENTER: Christopher Blunk, Deputy Director Public Works/City Engineer 922

More information

Region 5 Upcoming Projects for Summer/Fall 2018

Region 5 Upcoming Projects for Summer/Fall 2018 Region 5 Upcoming Projects for Summer/Fall 2018 The budget amount provided does not reflect the construction costs for projects. The amounts may include ROW, engineering, design, and utility costs. The

More information

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016

City of Des Moines. Citizen Engagement Capital Improvement Program. November 29, 2016 City of Des Moines Citizen Engagement Capital Improvement Program November 29, 2016 Goals of Citizen Engagement Goal Focus on service levels Department definitions of adequate service and opportunities

More information

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY

NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY NASHVILLE AREA MPO TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 Amendment Conformity Report for August 20, 2008 Amendments (Amendment # 2008-028 thru 2008-030) On August 20, 2008 the Executive Board

More information

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000

CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION. Local Option Sales Tax Funds $ 500,000 CAPITAL IMPROVEMENT PROJECTS CAPITAL PROJECTS FUND FISCAL YEAR 2013/2014 PROJECTS SCHEDULED FOR CONSTRUCTION On-Going Pavement Management Program: In 2009/2010 the city completed the initial 3-year plan

More information

PUBLIC WORKS - ENGINEERING

PUBLIC WORKS - ENGINEERING PUBLIC WORKS - ENGINEERING 4 DIVISIONS: CAPITAL IMPROVEMENT PROGRAM (CIP) TRAFFIC ENGINEERING DEVELOPMENT ENGINEERING SEWER & STORM DRAIN ENGINEERING 18 FTE s, 2 Hourly s In FY 14/15 Expended approximately

More information

Total Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60%

Total Current Revenue: $450 million Current need: $1.12 Billion Funding Deficiency: 60% Chris E. Bauserman, P.E., P.S., Delaware County Engineer, President CEAO Testimony House Bill 26 Ohio House of Representatives Finance Committee February 14, 2017 Chairman Smith, Ranking Member Cera, Sub.

More information

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation

City of Vacaville FY 2017/2018 CIP Budget, General Plan Consistency and CEQA Review Parks and Recreation Parks and Recreation Park & Recreation Housing 14160 Grant Total Fund Balance $3,916,598 $3,916,598 Prior Budget Commitments ($2,770,788) ($2,770,788) Other Budget Commitments ($126,482) ($126,482) Other

More information

Capital Improvement Plan. Fiscal Year through Fiscal Year

Capital Improvement Plan. Fiscal Year through Fiscal Year Fiscal Year 2015-16 through Fiscal Year 2020-21 Adopted: May 20, 2015 Overview City of Jonesville 2015-16 through 2020-21 The (CIP) is a six year schedule of all proposed major capital improvement projects

More information

Stephanie Smith, Project EngineerW

Stephanie Smith, Project EngineerW MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax

More information

City of North Liberty FY 15 Budget Goal Setting. November 19, 2013 North Liberty City Council Chambers 6:30 P.M.

City of North Liberty FY 15 Budget Goal Setting. November 19, 2013 North Liberty City Council Chambers 6:30 P.M. City of North Liberty FY 15 Budget Goal Setting November 19, 2013 North Liberty City Council Chambers 6:30 P.M. Budget Timeline Sep 2 Sep 30 Department Heads create budgets Oct 1 Proposals submitted to

More information

MAINTENANCE DEPARTMENT

MAINTENANCE DEPARTMENT MAINTENANCE DEPARTMENT E-78 City of Mercer Island 2007-2008 Budget Department: Maintenance The Maintenance Department consists of the following functions: 1) administration, 2) capital projects engineering,

More information

Rock Chalk Park - Infrastructure Report. July 2013

Rock Chalk Park - Infrastructure Report. July 2013 Rock Chalk Park Infrastructure Report July 2013 The following report is the first monthly report for the construction of infrastructure at Rock Chalk Park. The format follows the sections outlined in the

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Implementation Project Development and Review 255

Implementation Project Development and Review 255 Introduction 248 Implementation Principles 249 Public Agency Fiduciary Responsibilities 250 Project Development and Review Process 252 Project Development and Review 255 Maintenance 23 Implementation Implementation

More information

City of Hartford Capital Improvement Program Share Total Project Cost. General Obligation Debt

City of Hartford Capital Improvement Program Share Total Project Cost. General Obligation Debt 2019 Summary of Costs ~ Governmental Funds Law Enforcement Number Priority 2019 Share Total Cost General Obligation Term Borrowings Grants & Aids Trusts & Donations Retained Earnings Police Patrol Vehicle

More information

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500

Funding Source: Highway Safety Improvement Program (HSIP) Grant - $315,100; Measure I - $60,500 FY 2017-18 Capital Improvement Program Detail STREETS Raised Median on Pipeline Avenue S14009 Program Year Initiated: FY 2013-14 Construction Year: FY 2016-17 Project Description: Install raised median

More information

2018 Asset Report Cards

2018 Asset Report Cards 2018 s Bridges & Culverts ASSET TOTAL VALUE ($) TREND Annual Deficit Infrastructure Gap $58M -($500K) $6 M Sanitary Sewers $141M $80K $10 M Fleet $16M - - Pumping Stations $13M $140K $625K Roads $280M

More information

Public Works and Development Services

Public Works and Development Services City of Commerce Capital Improvement Program Prioritization Policy Public Works and Development Services SOP 101 Version No. 1.0 Effective 05/19/15 Purpose The City of Commerce s (City) Capital Improvement

More information

Arlington County, Virginia

Arlington County, Virginia Arlington County, Virginia METRO METRO 2015 2024 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed

More information

Capital improvements program (Cip)

Capital improvements program (Cip) Capital Improvements Program (CIP) CAPITAL IMPROVEMENTS PROGRAM Introduction In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the FY 219 to FY 223 Capital Improvements

More information

CITY OF BELTON, MISSOURI CAPITAL IMPROVEMENT PROGRAM. Planned Prepared Measured Transparent FY

CITY OF BELTON, MISSOURI CAPITAL IMPROVEMENT PROGRAM. Planned Prepared Measured Transparent FY CITY OF BELTON, MISSOURI CAPITAL IMPROVEMENT PROGRAM Planned Prepared Measured Transparent Contents EXECUTIVE SUMMARY... 1 Purpose... 1 NEXT FIVE YEARS... 1 Projects Under Construction... 2 Underground

More information

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT

CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT CHAPTER 11. CAPITAL FACILITIES PLAN ELEMENT 11.1 INTRODUCTION A is one of eight elements required by the Growth Management Act (GMA) to be included in Yakima County s comprehensive plan. The reason for

More information

Mayor Riggle and Members of City Council R. Thomas Homan, City Manager. SUBJECT: Capital Improvement Program DATE: August 14, 2017

Mayor Riggle and Members of City Council R. Thomas Homan, City Manager. SUBJECT: Capital Improvement Program DATE: August 14, 2017 TO: FROM: Mayor Riggle and Members of City Council R. Thomas Homan, City Manager SUBJECT: 2017-2021 Capital Improvement Program DATE: August 14, 2017 Pursuant to section 79 of the City Charter, submitted

More information

CAPITAL IMPROVEMENTS PROGRAM (CIP)

CAPITAL IMPROVEMENTS PROGRAM (CIP) CAPITAL IMPROVEMENTS PROGRAM (CIP) A CIP is for the purchase, construction or replacement of the physical assets of the City. This section includes a listing of proposed projects for FY 2014 as well as

More information

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000

NOTICE OF ELECTION 2021 $10,000, $10,000, $10,000, $10,000,000 NOTICE OF ELECTION TO THE QUALIFIED VOTERS OF DEKALB COUNTY, GEORGIA NOTICE IS HEREBY GIVEN that on the 7 th day of November, 2017, an election will be held at the regular polling places in all of the

More information

COUNTY ADMINISTRATOR PUBLIC WORKS

COUNTY ADMINISTRATOR PUBLIC WORKS COUNTY ADMINISTRATOR PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm

More information

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project

Removed Projects TR th Way SE (Snake Hill) Improvements o Will be completed in TR th Ave SE Gap Project Agenda Bill City Council Regular Meeting June 19, 2018 SUBJECT: 2019-2024 Six-Year Transportation Improvement Plan (TIP) DATE SUBMITTED: June 12, 2018 DEPARTMENT: Public Works NEEDED FROM COUNCIL: Action

More information

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s):

METRO. Metro Funding. Associated Master Plan: Comprehensive Master Transportation Plan (MTP) for Arlington. Neighborhood(s): METRO METRO METRO 2017 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit

More information

Memorandum City of Lawrence City Manager s Office

Memorandum City of Lawrence City Manager s Office Memorandum City Manager s Office TO: FROM: Date: CC: Lawrence Cultural Arts Commission Diane Stoddard, Assistant City Manager September 4, 2014 David L. Corliss, City Manager Casey Toomay, Assistant City

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3

Potential Changes to the 2015 to 2018 TIP Highway List. Proposed Administrative Adjustment #3 Potential Changes to the 2015 to 2018 TIP Highway List Proposed Administrative Adjustment # PROJECT #60644, WORCESTER CENTRAL BUSINESS DISTRICT STREETSCAPE IMPROVEMENTS Move the FY 2015 Statewide Transportation

More information

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation

2016 Bond Referenda. QUESTION: Shall Arlington County contract a debt and issue its general obligation 2016 Bond Referenda 1. Metro and Transportation bonds in the maximum principal amount of $58,785,000 to finance, together with other available funds, the cost of various capital projects for the Washington

More information

Capital Improvement Program. Fiscal Years

Capital Improvement Program. Fiscal Years Capital Improvement Program Fiscal Years 2014-2021 1 Capital Improvement Program Fiscal Years 2014-2021 Agenda Background Significant Accomplishments (2012-2014) Proposed Work Plan (2014-2016) and 7- Year

More information

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN

TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN TOWN OF COLLINGWOOD ASSET MANAGEMENT PLAN JUNE 24, 2014 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management Plan 1-2 1.4

More information

Bond and Interest Fund

Bond and Interest Fund Bond and Interest Fund J-1 Fund 301 - BOND AND INTEREST Budget Resources by Classification: Total $10,305,374 Fund Bal. Fwd., 44.28% Ad Valorem Taxes, 43.30% Spec. Assessment 5.92% Misc., 0.05% Other Taxes,

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017

DRAFT PROPOSED BUDGET THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 THE GOOD, THE BAD AND THE UGLY (Part 2) City of Chico May 2, 2017 DRAFT PROPOSED BUDGET 2017 18 SCHEDULE May 2 nd Round #2 Community Development Public Works May 16 th Questions

More information

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A

LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A LEGEND Bridges Parks Fire Stations Project Locations Libraries Schools A Aid to Construction Fund The Aid to Construction Fund (Water) are funds received from customers for requested water service and

More information

CHAPTER 9 CAPITAL FACILITIES ELEMENT

CHAPTER 9 CAPITAL FACILITIES ELEMENT Town of La Conner Comprehensive Plan Capital Facilities Element CHAPTER 9 CAPITAL FACILITIES ELEMENT Introduction The Capital Facilities Element sets policy direction for determining capital improvement

More information

Budget. One. Time Cost. Total

Budget. One. Time Cost. Total Service Enhancements General Fund Town of Los Altos Hills 2018 20 Budget Attachment 2 - Budget Service Enhancements/New Requests CIP and Capital Funds Town wide 15,072,124 (1,364,236) 13,707,888 932,967

More information

Infrastructure and Capital Projects Planning and Funding

Infrastructure and Capital Projects Planning and Funding Infrastructure and Capital Projects Planning and Funding September 6, 2018 Preview of FY 2020 2024 CIP process Why are we here? Overview Current Assets Overview and Highlights of Adopted FY 2019 2023 CIP

More information

Your Consultant Team

Your Consultant Team Your Consultant Team Kimley Horn Keith Greminger, Jared Schneider, Dawn Dodge Fred Hearns Tours, LLC Fred Hearns Ferrell Redevelopment Stephanie Ferrell Urbanomics Ken Creveling, Tony Mondae Community

More information

ADOPTED CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENT FY 2009/10 to FY 2014/15. Year /11. Year /10. Ranking Score

ADOPTED CAPITAL IMPROVEMENTS PROGRAM BY DEPARTMENT FY 2009/10 to FY 2014/15. Year /11. Year /10. Ranking Score FY to FY Department: PARKS & RECREATION 305-65000-70008 Magnolia Park CF-305 & Outdoor amphitheatre furthers the network of public green spaces that form the framework for the Town and promotes & expands

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY

OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY OHIO MPO AND LARGE CITY CAPITAL PROGRAM SFY 2015 SUMMARY TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW.. 3 MPO AND LARGE CITY SFY 2015 STP BUDGET SUMMARY......... 4 MPO AND LARGE CITY SFY 2015

More information

Public Works Maintenance STORMWATER AND

Public Works Maintenance STORMWATER AND Public Works Maintenance STORMWATER AND TRANSPORTATION Mission Statement T H E P U B L I C W O R K S M A I N T E N A N C E D I V I S I O N I S T H E M A I N C U S T O D I A N A N D P R I N C I P A L C

More information

10-Year Capital Highway Investment Plan DRAFT

10-Year Capital Highway Investment Plan DRAFT This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 10-Year Capital Highway

More information

5-Year Capital Improvement Program 2018/ /2023

5-Year Capital Improvement Program 2018/ /2023 5-Year Capital Improvement Program 2018/2019-2022/2023 City Council Steve Miller, Mayor Jeannie Bruins, Vice Mayor Bret Daniels, Council Member Albert J. Fox, Council Member Jeff Slowey, Council Member

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

Transportation Funding

Transportation Funding Transportation Funding TABLE OF CONTENTS Introduction... 3 Background... 3 Current Transportation Funding... 4 Funding Sources... 4 Expenditures... 5 Case Studies... 6 Washington, D.C... 6 Chicago... 8

More information

Morgan County Engineer 2017 Annual Report Stevan Hook PE, PS - January 17, 2018

Morgan County Engineer 2017 Annual Report Stevan Hook PE, PS - January 17, 2018 Morgan County Engineer 2017 Annual Report Stevan Hook PE, PS - January 17, 2018 In accordance with the provisions of the Ohio Revised Code an annual report must be submitted to the Board of County Commissioners

More information

EVANSTON. FY 2017 Proposed Budget Presentation. Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer.

EVANSTON. FY 2017 Proposed Budget Presentation. Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer. EVANSTON FY 2017 Proposed Budget Presentation Martin Lyons, Assistant City Manger / CFO Lara Biggs, City Engineer October 24, 2016 Administrative Services 1 FY 2017 BUDGET PRESENTATION-- October 17, 2016

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

Report Accompanying the Diamond Lake Urban Renewal Plan

Report Accompanying the Diamond Lake Urban Renewal Plan Report Accompanying the Diamond Lake Urban Renewal Plan Adopted by the City of Roseburg July 9, 2018 Ordinance No. 3502 Diamond Lake Urban Renewal Area Consultant Team Elaine Howard Consulting, LLC Elaine

More information

Nith Peninsula, Brant County Fiscal Impact Study

Nith Peninsula, Brant County Fiscal Impact Study Fiscal Impact Study October 25, 2017 Fiscal Impact Study Prepared for: Losani Homes Prepared by: 33 Yonge Street Toronto Ontario M5E 1G4 Phone: (416) 641 9500 Fax: (416) 641 9501 economics@altusgroup.com

More information

Capital Improvements Program (CIP)

Capital Improvements Program (CIP) Capital Improvements Program (CIP) 373 CAPITAL IMPROVEMENTS PROGRAM Introduction In accordance with the Texas Local Government Code and the Charter of the City of Southlake, the proposed FY 2017 to FY

More information

City of San Juan Capistrano Age eport

City of San Juan Capistrano Age eport 6/19/2014 C1 City of San Juan Capistrano Age eport TO: FROM: DATE: SUBJECT: Karen P. Brust, City a Cindy Russell, Chief Financial Officer/City Treasure~~ Prepared by: Michelle Bannigan, Assistant Finance

More information

2018 Budget Public Budget Consultation Meeting November 16 th, 2017

2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2018 Budget Public Budget Consultation Meeting November 16 th, 2017 2 1. 2018 Budget Process and Communications Plan 2. 2018 Proposed Capital Budget a. Funding Sources b. Expenditures c. Life Cycle Reserve

More information

City of Pittsburg Five Year Capital Improvements Plan

City of Pittsburg Five Year Capital Improvements Plan General Fund Roadways Roadways account for forty three percent of the plan total and are the largest category at over $26.8 million. Planned improvements include annual street resurfacing, Silverback Way,

More information

Capital Overview. Capital projects also include purchase of infrastructure, plant, and equipment that meet the following thresholds:

Capital Overview. Capital projects also include purchase of infrastructure, plant, and equipment that meet the following thresholds: Capital Overview The capital budget consists of capital projects, which are a set of activities that maintain or improve a city asset, often referred to as infrastructure-from buildings, to park trails,

More information

CITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager

CITY OF WILLIAMSBURG MEMORANDUM. Mayor and City Council Planning Commission. From: Andrew O Trivette, Assistant City Manager CITY OF WILLIAMSBURG MEMORANDUM To: Mayor and City Council Planning Commission From: Andrew O Trivette, Assistant City Manager Date: Thursday, January 11, 2018 RE: Capital Improvements for FY18 Status

More information

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment

Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Okaloosa-Walton 2035 Long Range Transportation Plan Amendment Adopted August 22, 2013 This report was financed in part by the U.S. Department of Transportation, Federal Highway Administration, the Florida

More information

2017 Budget & Capital Improvement Plan AUGUST 29, 2017

2017 Budget & Capital Improvement Plan AUGUST 29, 2017 2017 Budget & Capital Improvement Plan AUGUST 29, 2017 FY 2017 Budget Calendar May June July August September October November December Financial Forecast & Public Safety Staffing Priorities, Programs,

More information

Ten-Year Capital Improvement Program (CIP)

Ten-Year Capital Improvement Program (CIP) Ten-Year Capital Improvement Program (CIP) 1 Introduction to CIP Buildings, infrastructure, technology, and major equipment are the physical foundation for providing services to constituents. Capital planning

More information

July 25, Members of City Council City of League City, Texas

July 25, Members of City Council City of League City, Texas Mark Rohr City Manager 300 W Walker League City, TX 77573 Main: 281.554.1000 Direct: 281.554.1005 www.leaguecity.com July 25, 2016 Members of City Council City of League City, Texas Transmitted herewith

More information

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS

CITY OF ROSEBURG, OREGON TABLE OF CONTENTS ENTERPRISE FUNDS TABLE OF CONTENTS ENTERPRISE FUNDS Storm Drainage Fund... 121-124 Off Street Parking Fund... 125-126 Airport Fund... 127-131 Water Service Fund... 132-145 STORM DRAINAGE FUND CURRENT OPERATIONS This fund

More information

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016

Guelph/Eramosa 2016 Budget Presentation. Thursday, February 18, 2016 Guelph/Eramosa 2016 Budget Presentation Thursday, February 18, 2016 1 Our Township We cover 292 km 2 and provide services to 12,380 residents The Township is responsible for maintaining: 225 km of roads

More information

City of Ocoee Quarterly Report First Quarter Fiscal Year

City of Ocoee Quarterly Report First Quarter Fiscal Year City of Ocoee Quarterly Report First Quarter Fiscal Year 2008-2009 Prepared by the Finance Department February 2009 TABLE OF CONTENTS Quarterly Overview...i-iii General Fund... 1 Revenue Comparison Graph...

More information

Report to Committee of the Whole

Report to Committee of the Whole Report to Committee of the Whole To: Mayor Linton and Members of Council Prepared By: Dan Wilson, Managing Director of Corporate Services / Treasurer Report: COR2018-10 Date: 19 Mar 2018 RE: Asset Management

More information

An Evaluation of the Performance Measurement Process of The City of Austin

An Evaluation of the Performance Measurement Process of The City of Austin To: Mayor Steve Adler From: Mike Hebert and Linda Bailey Cc: City Council Members April 22, 2016 Summary An Evaluation of the Performance Measurement Process of The City of Austin Recently, the City Council

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

TAUSSIG. & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO (PLATINUM TRIANGLE) DAVID

TAUSSIG. & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO (PLATINUM TRIANGLE) DAVID DAVID TAUSSIG & Associates, Inc. CITY OF ANAHEIM COMMUNITY FACILITIES DISTRICT NO. 08-1 (PLATINUM TRIANGLE) February 22, 2008 Public Finance Facilities Planning Urban Economics Newport Beach Riverside

More information

2017 Capital Budget. Budget Committee of the Whole. Tuesday, November 1, 2016

2017 Capital Budget. Budget Committee of the Whole. Tuesday, November 1, 2016 2017 Capital Budget Budget Committee of the Whole Tuesday, November 1, 2016 Objectives Capital Planning & Process 2017 Draft Capital Budget 2018-2027 Capital Forecast Funding Implications Operating Impacts

More information

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

JACKSON METROPOLITAN PLANNING ORGANIZATION (MPO) TRANSPORTATION IMPROVEMENT PROGRAM (TIP) HINDS Project: 480001 Responsible Agency: CITY OF CLINTON Total Project Cost: $6,068,000 Route: PINEHAVEN/NORTHSIDE DR Fund Source: EARMARK Project Length: 1.25 Pinehaven Dr from Northside Dr to 400' N

More information

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD

2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD AGENDA ITEM NO. 2. fl Concord REPORT TO MAYOR AND COUNCIL/AGENCY BOARD TO THE HONORABLE MAYOR AND COUNCIL: DATE: June 22, 2009 Subiect: ADOPTING RESOLUTION NO. 09-53, APPROVING THE CITY'S REVISED PROPOSITION

More information

Development of the Cost Feasible Plan

Development of the Cost Feasible Plan March 15, 2012 TPO Board and Advisory Committee Meetings Development of the Cost Feasible Plan Transportation Outlook 2035 LRTP Update Atkins Development of the Cost Feasible Plan P a g e 1 Development

More information

COUNTY OF OTTAWA, MICHIGAN FINANCIAL STATEMENTS YEAR ENDED DECEMBER 31, 2017

COUNTY OF OTTAWA, MICHIGAN FINANCIAL STATEMENTS YEAR ENDED DECEMBER 31, 2017 COUNTY OF OTTAWA, MICHIGAN FINANCIAL STATEMENTS YEAR ENDED DECEMBER 31, 2017 Vredeveld Haefner LLC CPAs and Consultants Grand Haven Charter Township TABLE OF CONTENTS FINANCIAL SECTION PAGE Independent

More information

CAPITAL IMPROVEMENT PROGRAM SUMMARY

CAPITAL IMPROVEMENT PROGRAM SUMMARY CAPITAL IMPROVEMENT PROGRAM SUMMARY The purpose of the CIP Budget is to serve as a planning tool, which coordinates the financing and scheduling of major projects undertaken by the City. The CIP Budget

More information

City of Clovis Date completed or revised: September 26, 2014

City of Clovis Date completed or revised: September 26, 2014 Date completed or revised: September 26, 2014 Completed by: (print) Renee Mathis The anticipated Fiscal Year 2014-15 revenue allocation for Street Maintenance sub-program: $912,013 X Street Maintenance

More information

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY

OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY OHIO MPO & LARGE CITY CAPITAL PROGRAM SFY 2017 SUMMARY Revised 9/19/2017 TABLE OF CONTENTS MPO AND LARGE CITY PROGRAM OVERVIEW... 3 MPO AND LARGE CITY SFY 2017 STBG BUDGET SUMMARY... 4 MPO AND LARGE CITY

More information

Project Description & Fund Overview Account Number Fund Name *C* September 2015 Additional Appropriation Mid-Year Adjustment Adjustments Approved by Council as separate actions Proposed & Approved Adjustments

More information

City of Des Moines. Budget Workshop. December 7, 2015

City of Des Moines. Budget Workshop. December 7, 2015 City of Des Moines Budget Workshop December 7, 2015 Today s Agenda SSMID Review Sanitary and Storm Sewer 2 Self-Supported Municipal Improvement Districts 3 Operation and Terms Each SSMID has a separate

More information

ADOPTED BUDGET FOR THE FISCAL YEAR 2015/2016 CITY OF BARSTOW CALIFORNIA

ADOPTED BUDGET FOR THE FISCAL YEAR 2015/2016 CITY OF BARSTOW CALIFORNIA ADOPTED BUDGET FOR THE FISCAL YEAR 2015/2016 CITY OF BARSTOW CALIFORNIA Julie Hackbarth-McIntyre, Mayor Tim Silva, Mayor Pro Tem Merrill Gracey, Councilmember Rich Harpole, Councilmember Carmen Hernandez,

More information

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount

~ FINANCIAL ACTION SUMMARY / Expenditure Required Amount Budgeted/Approved (Over)/Under Approved Amount CITYOFWOODINVILLE, WA REPORT TO THE CITY COUNCIL 17301 133rct Avenue NE, Woodinville, WA 98072 WWW.Cl.WOODINVILLE.WA.US To: Honorable City Council Date: April 5, 2016 By Thomas E Hansen P E., Public Works

More information

Capital Improvement Program

Capital Improvement Program June 1, 2015 EXECUTIVE SUMMARY AND ANALYSIS The proposed 2015-2017 Capital Improvement Program includes an appropriation of $101,522,000 in expenditures over a two year period for Fiscal Years 2015-2016

More information

City of Markham Asset Management Plan

City of Markham Asset Management Plan 2016 City of Markham Asset Management Plan Table of Content 1. Executive Summary...4 2. Introduction...7 2.1 Provincial Guidelines on Asset Management Plans...7 2.2 City of Markham Goals / Strategic Plan...7

More information

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan

FUNDING SOURCES Restricted vs. Un-Restricted Funding Sources Fund Balances and Projected Funding Availability IBank Loan FUNDING SOURCES The following section discusses the major funding sources available to fund projects. ing amounts included in the s column are those that are available for use as of preparation of this

More information

City of Saratoga Springs

City of Saratoga Springs City of Saratoga Springs Proposed Capital Program 2019 2024 Submitted by Mayor Meg Kelly and the 2019 Capital Program Committee Office of the Mayor City Hall 474 Broadway, Saratoga Springs, NY 12866 518.587.3550

More information

Chapter 5: Cost and Revenues Assumptions

Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions Chapter 5: Cost and Revenues Assumptions INTRODUCTION This chapter documents the assumptions that were used to develop unit costs and revenue estimates for the

More information

CAPITAL IMPROVEMENTS PLAN Fiscal Years Ending ADOPTED 03/08/16 37

CAPITAL IMPROVEMENTS PLAN Fiscal Years Ending ADOPTED 03/08/16 37 CAPITAL IMPROVEMENTS PLAN Fiscal Years Ending 2017-2021 03/08/16 37 Introduction A Capital Improvements Plan (CIP) is a planning tool to assess the long-term capital needs of the village. The CIP is drafted

More information

AGENDA. 2. APPROVE BUDGET MINUTES May 2, 2018 Pages 2-5

AGENDA. 2. APPROVE BUDGET MINUTES May 2, 2018 Pages 2-5 1. CALL TO ORDER AGENDA City of Hood River Budget Committee Meeting #3 Fiscal Year 2018-19 Budget Wednesday, May 9, 2018 City Council Chambers, 211 Second St. The meeting will begin no earlier than 7:00pm

More information

CITY OF PORT MOODY 2011 CAPITAL BUDGET SUMMARY

CITY OF PORT MOODY 2011 CAPITAL BUDGET SUMMARY SUMMARY ACCOUNT 4710 4711 4790 4727 4728 4724 4771 4700 4712 4774 4772 4701 4736 TOTAL TAXATION TAXATION LIFE CYCLE MRN CAPITAL REPLACE LAND STAT. PRIVATE DEV. ASSET DEPARTMENT EXP. (Strategic) (Operating)

More information

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $

CITY OF CHINO ENGINEERING COST ESTIMATE. Quantity Unit Item Unit Total Cost Price Per Item. LS Traffic Control (5% of construction cost) 5% $ RESOLUTION NO 2015078 STREETS LS Traffic Control (5% of construction cost) 5% $ LS Clear & Grub Site (5% of construction cost) 5% $ EA Tree Removal $ 800.00 $ CY Concrete Removal $ 300.00 $ CY AC Pavement

More information