DuPage County East Branch DuPage River Resiliency Project. Benefit Cost Analysis

Size: px
Start display at page:

Download "DuPage County East Branch DuPage River Resiliency Project. Benefit Cost Analysis"

Transcription

1 DuPage County East Branch DuPage River Resiliency Project Benefit Cost Analysis 1.0 Benefit Cost Analysis Preparation The BCA for this proposal was a collaborative effort between DuPage County, V3 engineering consultants, and the US Army Corps of Engineers (USACE). The vital inputs for determining the economic value were provided by the county and the county s consultants. These inputs were then provided to an economist from USACE (Chicago District). 2.0 Proposal Cost Please see Exhibit E for budget information. 3.0 Project Area Conditions About 204 structures of varying use are located within the proposed project area. Each of these structures was assigned a depth-damage function, based on the structure use, and a structure value, based on HAZUS data. Table Lisle Structure Summary Structure Category Structures Values in Lisle Structure Count 1 Average Structure Value 2 Total Structure Value Residential 167 $ 91,100 $ 15,214,200 Commercial 16 $ 430,700 $ 6,891,600 Other 21 $ 104,100 $ 2,185,300 Total 204 $ 119,100 $ 24,291,182 1 This represents the all of the structures within the project footprint 2 Derived from HAZUS data based on 2010 census The existing flood risk to the project area is fairly significant. Most of the project area is cut-off from the East Branch or St. Joseph s Creek by levees, which can overtop between a 0.04 and 0.25 frequency event (25-40 year recurrence interval). About 107 of the 204 structures in the proposed project area are expected to experience first floor flooding at the 0.01 frequency event (100 year recurrence interval).

2 Table Inundated Structures Summary (existing condition) Structure Category Structures Inundated by Water Surface Elevation 10 yr 25 yr 50 yr 75 yr 100 yr 200 yr 500 yr Residential Commercial Other Total This is an estimate of structures with first floor inundation by water surface elevation Damages to structures and contents were prepared by comparing the modeled water surface elevations to the developed structure inventory. Based on the existing condition, structure and content damages are estimated to be $5.11 million at the 0.01 frequency event (100 year recurrence interval). Table Existing Damages to Structures and Contents Structure and Content Damages Recurrence Interval Annual Chance Exceedance Without Project Damages $ $ $ $ 644, $ 3,579, $ 4,487, $ 5,111, $ 5,287, $ 5,761, $ 8,811,900 Notes: The damages are based on water surface elevations, assessor and HAZUS structure information, and USACE depth-damage functions 4.0 Project Description Key differences between plans 1- Levee (all) vs Levee (west) and elevation (east) 2- Development of land organic vs induced development 5.0 Community Risks Please see Exhibit D for a comprehensive analysis of risks.

3 6.0 Proposal Benefits and Costs The structure and content damages are different for each project condition. The first increment of work to be completed will be structure buyouts along portions of the East Branch. These buyouts will remove some of the most at risk properties. Buying out structures is not being proposed as a standalone scenario, but it has been displayed as an increment in the table and graph below. Buying out structures removes potential future damages and shifts the curve to a lower damage total. The levees and buyouts plan is displayed in a gray dashed line in the graph below. The proposed levees should reduce flooding risk up to a 0.01 frequency event (100 year recurrence interval), effectively removing all damages for all lower events. The residual risk for events exceeding a 0.01 frequency occurs when the levee is overtopped. During an overtopping event, the remaining structures would be expected to experience significant damages. The final alternative provides further damage reduction by elevating all remaining structures on the east side of the East Branch. By elevating these structures, they will be placed above the base flood elevation and only experience damages at less frequent events. Table Structure and Content Damages by Plan Recurrence Interval Annual Chance Exceedance Structure and Content Damages Without Project Damages Buyouts Only Levees and Buyouts Levees, Buyouts, and Fill $ - $ - $ - $ $ - $ - $ - $ $ - $ - $ - $ $ 644,600 $ 423,900 $ - $ $ 3,579,100 $ 3,044,700 $ - $ $ 4,487,900 $ 3,874,800 $ - $ $ 5,111,500 $ 4,441,100 $ - $ $ 5,287,800 $ 4,604,600 $ 4,604,600 $ 664, $ 5,761,600 $ 4,962,500 $ 4,962,500 $ 948, $ 8,811,900 $ 7,838,600 $ 7,838,600 $ 4,767,900 Notes: The damages are based on water surface elevations, assessor and HAZUS structure information, and USACE depth-damage functions

4 Structure and Content Damages Figure Structure and Content Damages by Plan Lisle Project Damages Recurrance Interval $9,000,000 $8,000,000 $7,000,000 $6,000,000 $5,000,000 $4,000,000 $3,000,000 $2,000,000 $1,000,000 $- Annual Chance Exceedance Without Project Damages Buyouts Only Levees and Buyouts Levees, Buyouts, and Fill

5 The transportation benefits account for the cost in using the vehicle and as well as the opportunity cost for the additional time required to follow the detour. The ADT estimates were provided by the City of Lisle and KSS Fuels (accessed through Google Earth Pro). The detour distance was estimated by USACE and the additional travel time is based on a driving speed of 20 miles per hour. The opportunity cost is based on the median household income for Lisle. Figure Transportation Benefits Street Average Daily Traffic 1 Transportation Costs Avoided Detour Distance 2 Detour Cost 3 (per mile) Additional Travel Time 2 (hrs) Opportunity Cost 4 (per hour) Total Closure Cost 5 Route 53 20,800 3 $ $ $ 152,835 E Ogden Ave 30,000 2 $ $ $ 146,957 Burlington Ave $ $ $ 24,493 1 AADT counts provided by the City of Lisle and KSS Fuels (accessed through Google Earth Pro) 2 Detour distance and time provided by the City of Lisle 3 Detour cost provided by AAA, based on the sedan average cost per mile 4 Opportunity Cost provided by American Fact Finder and estimated using the median household income Lisle, IL, divided by 2000 labor hours for the year 5 This total closure cost represents a closure for a single day The recreation benefits produced by this project were estimated using a USACE methodology where each activity can receive a dollar value per user day. The unit day value of $3.91 is the lowest possible value for general recreation activities and represents a conservative estimate of the value provided by the proposed bike trail. The 50,000 daily user estimate represents a likely number of visitors based on surrounding trail usage. Figure Recreation Benefits Bike Trail Recreation Benefits Project Condition Unit Day Value 1 User Days 2 Total Value Without Project $ - - $ - Levee and Buyouts $ ,000 $ 195,500 Levee, Buyouts, and Fill $ ,000 $ 195,500 1 Values are based on USACE EGM 15-03, Unit Day Values for Recreation for Fiscal Year 2015: general recreation 2 User Days are estimated using local recreation trail counts

6 The FEMA Environmental Benefits Calculator provides a method for evaluating the change from developed land, to natural areas. The calculator provides a dollar value for ecosystem services provided by natural floodplain areas, which was then annualized over a 50 year period and multiplied by the proposed green area square footage. It is assumed that the green areas will require some time to become fully functional ecosystems, so the full value was not applied until the tenth year following construction. This explains the difference in the maximum value provided by FEMA and the annualized value estimated for this project proposal. Figure Ecosystem Services Benefits Ecosystem Service Benefits provided by the East Branch Resiliency Project Project Area Acres Sq Ft Warrenville Storage West Pond Expansion Dumoulin/River Corridor ,376 Natural Land Use Green Open Space Maximum Value 1 (per sq ft) Annualized Value 2 (per sq ft) Total Average Annual Value $ 2.57 $ 1.91 $ 382, ,052 Aquatic $ - $ - $ ,040 Riparian Areas $ $ 9.13 $ 3,578,900 St. Joe Storage West ,648 Riparian Areas $ $ 9.13 $ 2,306,400 St. Joe Storage East ,512 Riparian Areas $ $ 9.13 $ 2,067,800 South St. Joe ,392 Riparian Areas $ $ 9.13 $ 1,272,500 Ogden to Burlington ,800 Riparian Areas $ $ 9.13 $ 1,988,300 Burlington to RR ,848 Riparian Areas $ $ 9.13 $ 318,100 RR to Short ,004 Riparian Areas $ $ 9.13 $ 2,346,200 South Short ,680 Riparian Areas $ $ 9.13 $ 1,193,000 Total Restoration Acres ,925,352 varies varies varies $15,453,700 1 Values are based on FEMA's Environmental Benefits Calculator (V2) and are annualized at the OMB rate of 7% 2 Annualized over a 50 year period at 7%, with the assumption that the natural areas will be fully functional 10 years after construction

7 In accordance with the HUD Resiliency Competition Criteria, all benefits and costs were annualized at an interest rate of 7%. The average annual benefits, costs, and benefit to cost ratios are displayed in the following tables. Figure Average Annual Benefits Benefit Category Average Annual Benefits Without Project East and West Levee West Levee and East Fill Structures and Contents $ - $ 113,000 $ 149,400 Real Estate Benefits $ - $ 4,023,500 $ 3,295,500 Transportation $ - $ 10,700 $ 10,700 Recreation $ - $ 195,500 $ 195,500 Ecosystem Services $ - $ 15,453,700 $ 15,453,700 All Categories $ - $ 19,796,400 $ 19,104,800 Notes: These benefits have been annualized at a rate of 7% over a period of 50 years Figure Average Annual Costs Benefit Category Average Annual Costs Without Project East and West Levee West Levee and East Fill Total First Cost $ - $ 80,061,800 $ 65,217,100 Total OMRR&R $ - $ 4,003,100 $ 3,260,900 Compounding During Construction 1 $ - $ 12,021,100 $ 9,792,200 Average Annual Cost 2 $ - $ 84,064,900 $ 68,478,000 1 This is an estimate of the time value of the construction expenditures, assuming a 5 year schedule, compounded at 7% 2 These benefits have been annualized at a rate of 7% over a period of 50 years

8 Figure Benefit Cost Ratios Category Benefit to Cost Ratios Without Project East and West Levee West Levee and East Fill Average Annual Benefits $ - $ 19,796,400 $ 19,104,800 Average Annual Costs $ - $ 4,003,100 $ 3,260,900 Average Annual Net Benefits $ - $ 15,793,300 $ 15,843,900 Benefit to Cost Ratio Notes: These benefits and costs have been annualized at a rate of 7% over a period of 50 years 7.0 Project Risks Please see Exhibit E for project risks. 8.0 Implementation Challenges Please see Exhibit E for project feasibility.

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &

More information

University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1

University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1 University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1 Public Informational Meeting October 15, 2015 6:00 P.M. Overview Flood Risk FEMA

More information

Westfield Boulevard Alternative

Westfield Boulevard Alternative Westfield Boulevard Alternative Supplemental Concept-Level Economic Analysis 1 - Introduction and Alternative Description This document presents results of a concept-level 1 incremental analysis of the

More information

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM

Green Stormwater. Flood Risk Reduction. Infrastructure for. June Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Green Stormwater Infrastructure for Flood Risk Reduction June 2016 Presented by: Kari Mackenbach, CFM ms consultants Lynn Mayo, PE, CFM AECOM Topics 1. Proposed ASFPM Policy Paper 2. Background Why is

More information

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction

Upper Joachim Creek Public Survey on Potential Flood Risk Reduction Upper Joachim Creek Public Survey on Potential Flood Risk Reduction This survey is intended to help the interagency planning committee to receive public feedback on specific flood risk reduction techniques,

More information

Vision to Action: Creating and Using a Flood Risk Assessment for Identifying Mitigation Options

Vision to Action: Creating and Using a Flood Risk Assessment for Identifying Mitigation Options Vision to Action: Creating and Using a Flood Risk Assessment for Identifying Mitigation Options Lisa Graff, CFM, GISP Clayton Ballerine, CFM Brad McVay, CFM, GISP University of Illinois Prairie Research

More information

Appendix G. Overview of Benefit Cost Analysis for Hamilton-Skagit Flood Mitigation & Town Relocation Program

Appendix G. Overview of Benefit Cost Analysis for Hamilton-Skagit Flood Mitigation & Town Relocation Program Appendix G Overview of Benefit Cost Analysis for Hamilton-Skagit Flood Mitigation & Town Relocation Program Benefit Cost Analysis for the Hamilton-Skagit Flood Mitigation & Town Relocation Project Preliminary

More information

BUTTS COUNTY, GEORGIA AND INCORPORATED AREAS

BUTTS COUNTY, GEORGIA AND INCORPORATED AREAS BUTTS COUNTY, GEORGIA AND INCORPORATED AREAS Butts County Community Name Community Number BUTTS COUNTY (UNICORPORATED AREAS) 130518 FLOVILLA, CITY OF 130283 JACKSON, CITY OF 130222 JENKINSBURG, TOWN OF

More information

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS CRISP COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number ARABI, CITY OF 130514 CORDELE, CITY OF 130214 CRISP COUNTY (UNINCORPORATED AREAS) 130504 Crisp County EFFECTIVE: SEPTEMBER 25,

More information

Overview of Capabilities and Current Limitations

Overview of Capabilities and Current Limitations Overview of Capabilities and Current Limitations Overview of the National Flood Risk Characterization Tool (NFRCT) Map based viewer of relative flood risk around the U.S., with supporting reports for more

More information

Appendix A Economic Analysis Appendix

Appendix A Economic Analysis Appendix Appendix A: Economic Analysis Appendix Appendix A Economic Analysis Appendix A-1 Appendix A: Economic Analysis Appendix A-2 Appendix A: Economic Analysis Appendix Table of Contents 1 INTRODUCTION...8 1.1

More information

USACE Levee Screening Tool Understanding the Classification

USACE Levee Screening Tool Understanding the Classification USACE Levee Screening Tool Understanding the Classification Richard J. Varuso, Ph.D., P.E. Deputy Chief, Geotechnical Branch Levee Safety Program Manager USACE - New Orleans District 17 Nov 2011 US Army

More information

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination Date: 8 May 2013 Division: Great Lakes and Ohio River Division District: Nashville District CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination 1. Project: Cumberland River, Metropolitan

More information

LELAND CONSULTING GROUP

LELAND CONSULTING GROUP Memorandum Date 25 April 2013 To From CC Thomas Puttman, Puttman Infrastructure April Chastain, Leland Consulting Group Chris Zahas, Leland Consulting Group Matt Arnold, SERA Architects Kevin Cronin, Portland

More information

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development DES MOINES CITY OF TWO RIVERS Flooding Risk & Impact to Development River System Des Moines Flood Protection Des Moines Flood Protection cont. Infrastructure Over 24 miles of levees 21stormwater pump stations

More information

Bucks County, PA Flood Risk Review Meeting. November 2014

Bucks County, PA Flood Risk Review Meeting. November 2014 Bucks County, PA Flood Risk Review Meeting November 2014 Agenda for Today Risk MAP Program overview Overview of non-regulatory Flood Risk Products and datasets Discuss mitigation action Technical overview

More information

Flood Risk Products. New Techniques for Identifying and Communicating Flood Risk

Flood Risk Products. New Techniques for Identifying and Communicating Flood Risk Flood Risk Products New Techniques for Identifying and Communicating Flood Risk Mark Zito, GISP, CFM GIS Specialist Amol Daxikar, GISP, CFM Project Manager March 28, 2012 1% Flood with 3 Feet Sea Level

More information

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option

Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option Frequently Asked Questions Oxbow / Hickson / Bakke Ring Levee Option October 16, 2012 Q1. Why has the position on a ring-levee changed? The feasibility study recommended buy-outs for areas with staging

More information

Development Fee Program: Comparative risk analysis

Development Fee Program: Comparative risk analysis Development Fee Program: Comparative risk analysis January 2008 Sacramento Area Flood Control Agency David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779

More information

Integrating Hazus into the Flood Risk Assessment

Integrating Hazus into the Flood Risk Assessment Integrating Hazus into the Flood Risk Assessment GAFM Conference, March 22, 2016 Mapping Assessment Planning Agenda What is Hazus & Risk Assessment? Census Block vs. Site Specific Analysis User Defined

More information

Flood Risk in the Schuylkill Watershed. Planning for Resilient Communities

Flood Risk in the Schuylkill Watershed. Planning for Resilient Communities Flood Risk in the Schuylkill Watershed Planning for Resilient Communities Welcome to Our Poster Session! We are here to talk about: Flood Risk in the Schuylkill River Watershed Taking Action to Reduce

More information

Non Regulatory Risk MAP Products Flood Depth and Probability Grids

Non Regulatory Risk MAP Products Flood Depth and Probability Grids Non Regulatory Risk MAP Products Flood Depth and Probability Grids Virginia Floodplain Management Association 2015 Floodplain Management Workshop October 29th, 2015 Nabil Ghalayini, P.E., PMP, D.WRE, CFM

More information

LIFE SAFETY HAZARD INDICATOR

LIFE SAFETY HAZARD INDICATOR LIFE SAFETY HAZARD INDICATOR Background The Life Safety Hazard Indicator (LSHI) is a value that represents the relative potential loss of life for a specific flood scenario. The LSHI is a screening level

More information

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

10526 Bermuda Isle Dr. Tampa, FL 33647

10526 Bermuda Isle Dr. Tampa, FL 33647 Flood Analysis Memo Property Address 10526 Bermuda Isle Dr. In Partnership with: ** This property is NOT within a high-risk flood zone ** 10526 Bermuda Isle Dr. BFE = 35 ft This property is located in

More information

Appendix B ECONOMIC CONSIDERATIONS: B-01 Areas of Consideration: B-02 General Computational Procedures:

Appendix B ECONOMIC CONSIDERATIONS: B-01 Areas of Consideration: B-02 General Computational Procedures: Appendix B ECONOMIC CONSIDERATIONS: B-01 Areas of Consideration: The study area comprises a stretch of the west bank of the Rio Grande extending from Bridge Blvd. south to the I-25 crossing over the Rio

More information

Flood Risk Assessment in the

Flood Risk Assessment in the Georgia Flood M.A.P. Program Flood Risk Assessment in the Upper Chattahoochee h h River Basin GAFM Annual Conference March 28, 2012 Agenda Map Mod to Risk MAP (Georgia Flood M.A.P.) transition Flood Risk

More information

Flood Analysis Memo. 629 Orangewood Dr. Dunedin, FL BFE = 21 ft

Flood Analysis Memo. 629 Orangewood Dr. Dunedin, FL BFE = 21 ft Flood Analysis Memo Property Address 629 Orangewood Dr. In Partnership with: ** This property is NOT within a high-risk flood zone ** 629 Orangewood Dr. BFE = 21 ft This property is located in the FEMA

More information

Levees: PL84-99 and the NFIP

Levees: PL84-99 and the NFIP Levees: PL84-99 and the NFIP Tony D. Krause, P.E., CFM Flood Risk and Floodplain Management Omaha District US Army Corps of Engineers Objectives and Overview Objectives: Identify overlaps between Federal

More information

Situation: the need for non-structural flood risk reduction measures

Situation: the need for non-structural flood risk reduction measures Evaluating benefits of non-structural measures in flood risk management feasibility studies At left: Example of a house on an open foundation Source Asheville, NC (undated) By Steve Cowdin, CFM; Natalie

More information

New Tools for Mitigation & Outreach. Louie Greenwell Stantec

New Tools for Mitigation & Outreach. Louie Greenwell Stantec New Tools for Mitigation & Outreach Louie Greenwell Stantec Our Discussion Today Background What is Risk MAP? FEMA Products Overview of RiskMAP Data Sets Changes Since Last FIRM Depth and Analysis Grids

More information

10526 Bermuda Isle Dr. Tampa, FL 33647

10526 Bermuda Isle Dr. Tampa, FL 33647 Flood Analysis Memo Property Address In Partnership with: ** This property is NOT within a high-risk flood zone ** This property is located in a FEMA low-risk zone designated as Zone X - an area of minimal

More information

SOUTH SAN FRANCISCO BAY SHORELINE PHASE I STUDY ALVISO PONDS AND SANTA CLARA COUNTY, CA. Economics Appendix. (Appendix C to Feasibility Report/EIS)

SOUTH SAN FRANCISCO BAY SHORELINE PHASE I STUDY ALVISO PONDS AND SANTA CLARA COUNTY, CA. Economics Appendix. (Appendix C to Feasibility Report/EIS) SOUTH SAN FRANCISCO BAY SHORELINE PHASE I STUDY ALVISO PONDS AND SANTA CLARA COUNTY, CA Economics Appendix (Appendix C to Feasibility Report/EIS) U.S. Army USACE of Engineers San Francisco District i Table

More information

Georgia Flood M.A.P. Program

Georgia Flood M.A.P. Program Georgia Flood M.A.P. Program Georgia Flood M.A.P. Program The Upper Chattahoochee River Basin Risk MAP Project Transitioning State Program to align with FEMA s Risk MAP Program Increase focus on risk assessment

More information

Planning for SLR Resiliency in Virginia Beach

Planning for SLR Resiliency in Virginia Beach Old Dominion University ODU Digital Commons May 18, 2016: The Economic Impacts of Sea-Level Rise in Hampton Roads Hampton Roads Intergovernmental Pilot Project: Meetings 5-18-2016 Planning for SLR Resiliency

More information

Georgia Silver Jackets Team

Georgia Silver Jackets Team Georgia Silver Jackets Team 9 th Annual GAFM Technical Conference Jeff Morris GA SJ Collaborator Savannah District, USACE US Army Corps of Engineers SMART GOVERNMENT Integrate and synchronize flood risk

More information

APPENDIX E - ECONOMICS For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY

APPENDIX E - ECONOMICS For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY APPENDIX E - ECONOMICS For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY October 2018 Page intentionally left blank Contents 1.0 Purpose and Overview... 1 1.1 Problems and Opportunities...

More information

Federal Emergency Management Agency

Federal Emergency Management Agency Page 1 of 3 COMMUNITY AND MAP PANEL INFORMATION COMMUNITY CITY OF MARGATE CITY, ATLANTIC COUNTY, NEW JERSEY LEGAL PROPERTY DESCRIPTION A parcel of land, as described in Deed recorded in Book 4826, page

More information

UPDATE ON DALLAS FLOODWAY

UPDATE ON DALLAS FLOODWAY UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014

More information

Lower San Joaquin River Feasibility Report

Lower San Joaquin River Feasibility Report Sacramento District Planning Division Lower San Joaquin River Feasibility Report San Joaquin County, California APPENDIX A: ECONOMICS This page intentionally left blank RISK ANALYSIS OVERVIEW Risk is defined

More information

NFIP Program Basics. KAMM Regional Training

NFIP Program Basics. KAMM Regional Training NFIP Program Basics KAMM Regional Training Floodplain 101 Homeowners insurance does not cover flood damage Approximately 25,000 flood insurance policies in KY According to BW12 analysis, approximately

More information

Appendix C: Economics

Appendix C: Economics Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Draft Integrated Feasibility Report & Environmental Assessment Appendix C: Economics Shrewsbury River Basin,

More information

IN THE LITTLE APPLE A PRESENTATION FOR THE 2017 ASFPM ANNUAL CONFERENCE IN KANSAS CITY, MO, MANAGING FLOOD RISK IN THE HEARTLAND

IN THE LITTLE APPLE A PRESENTATION FOR THE 2017 ASFPM ANNUAL CONFERENCE IN KANSAS CITY, MO, MANAGING FLOOD RISK IN THE HEARTLAND A PRESENTATION FOR THE 2017 ASFPM ANNUAL CONFERENCE IN KANSAS CITY, MO, MANAGING FLOOD RISK IN THE HEARTLAND NONSTRUCTURAL 237 217 200 ASSESSMENT 80 252 237 217 200 119 174 237 217 200 27.59 IN THE LITTLE

More information

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor

REQUEST FOR PROPOSALS. Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor REQUEST FOR PROPOSALS Planning in Water s Way: Flood Resilient Economic Development Strategy for the I-86 Innovation Corridor Southern Tier Central Regional Planning and Development Board (STC) is seeking

More information

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

Requirements for Mapping Levees Complying with Section of the NFIP Regulations FACT SHEET Requirements for Mapping Levees Complying with Section 65.10 of the NFIP Regulations As part of a mapping project, it is the levee owner s or community s responsibility to provide data and documentation

More information

Leveraging HAZUS for Risk Assessment Analysis within Risk MAP

Leveraging HAZUS for Risk Assessment Analysis within Risk MAP Leveraging HAZUS for Risk Assessment Analysis within Risk MAP Jen Meyer - FEMA Region X Shane Parson - RAMPP PTS Team (URS Corp.) 2010 HAZUS Conference - August 2010 The Paradigm Shift: Map Mod to Risk

More information

210 W Canal Dr Palm Harbor, FL 34684

210 W Canal Dr Palm Harbor, FL 34684 Flood Analysis Memo Property Address In Partnership with: ** This property is within a high risk flood zone ** BFE = 6 ft This property is located in the FEMA designated high-risk zone, Zone AE - an area

More information

Date: May 15, Council, Mayor, & City Manager. James Walton PE, CRS Coordinator, Stormwater Utility

Date: May 15, Council, Mayor, & City Manager. James Walton PE, CRS Coordinator, Stormwater Utility Date: May 15, 2018 TO: FROM: SUBJECT: Council, Mayor, & City Manager James Walton PE, CRS Coordinator, Stormwater Utility Annual Floodplain Management Plan Progress Report The City s Flood Management Plan

More information

APPENDIX E ECONOMICS

APPENDIX E ECONOMICS APPENDIX E ECONOMICS American River Watershed Common Features General Reevaluation Report Draft Economics Appendix E February 2015 Cover Photos courtesy of the Sacramento District: Sacramento Weir during

More information

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California

DAEN SUBJECT: South San Francisco Bay Shoreline, Santa Clara County, California opportunities would be significant with the restoration of the tidal marsh areas. Recreational features in the recommended plan include two pedestrian bridges, viewing platforms, and benches. The new levees

More information

Using GISWeb to Determine Your Property s Flood Zone

Using GISWeb to Determine Your Property s Flood Zone Using GISWeb to Determine Your Property s Flood Zone 1. In a new browser window, go to http://www.co.santacruz.ca.us/departments/geographicinformationsystemsgis.aspx 2. Click on GISWeb - GIS Mapping Application

More information

Not Your Average Risk Assessment: Multi-Stage Risk Assessments for Sites in the Passaic River Basin Stuart Geiger, CFM Joseph Ruggeri, PE, CFM

Not Your Average Risk Assessment: Multi-Stage Risk Assessments for Sites in the Passaic River Basin Stuart Geiger, CFM Joseph Ruggeri, PE, CFM Not Your Average Risk Assessment: Multi-Stage Risk Assessments for Sites in the Passaic River Basin Stuart Geiger, CFM Joseph Ruggeri, PE, CFM Agenda Project Background Risk Assessment Development Refined

More information

Overview of HAZUS. December 6, 2011

Overview of HAZUS. December 6, 2011 Overview of HAZUS December 6, 2011 What is HAZUS? Risk assessment tool for analyzing potential losses from hurricane, flood, and earthquake Uses current scientific and engineering concepts in a GIS to

More information

ASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016

ASFPM Partnerships for Statewide Mitigation Actions. Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016 ASFPM Partnerships for Statewide Mitigation Actions Alicia Williams GIS and HMP Section Manager, Amec Foster Wheeler June 2016 Summary The Concept Leveraging Existing Data and Partnerships to reduce risk

More information

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety 4 th NACGEA GEOTECHNICAL WORKSHOP January 29, 2010 A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety Presented by: Leslie F. Harder, Jr., Phd, PE,

More information

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget. ITEM 5 Agenda of August 18, 2016 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Jason D. Campbell, Deputy Executive Director (916) 874-7606 APPROVING FINAL FISCAL YEAR 2016-17

More information

King County Flood Control District 2015 Work Program

King County Flood Control District 2015 Work Program Attachment A 2015 Work Plan 10-24-14 King County Flood Control District 2015 Work Program The District work program is comprised of three categories: district oversight and policy development, operations,

More information

SECTION 4: HAZARD IDENTIFICATION AND RISK ASSESSMENT 156

SECTION 4: HAZARD IDENTIFICATION AND RISK ASSESSMENT 156 Figure 79: SECTION 4: HAZARD IDENTIFICATION AND RISK ASSESSMENT 156 Figure 80: SECTION 4: HAZARD IDENTIFICATION AND RISK ASSESSMENT 157 Figure 81: SECTION 4: HAZARD IDENTIFICATION AND RISK ASSESSMENT 158

More information

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0

G318 Local Mitigation Planning Workshop. Module 2: Risk Assessment. Visual 2.0 G318 Local Mitigation Planning Workshop Module 2: Risk Assessment Visual 2.0 Unit 1 Risk Assessment Visual 2.1 Risk Assessment Process that collects information and assigns values to risks to: Identify

More information

BGC Project Memorandum

BGC Project Memorandum Suite 500-1045 Howe Street, Vancouver, British Columbia, Canada. V6Z 2A9 Telephone (604) 684-5900 Fax (604) 684-5909 BGC Project Memorandum To: Attention: CANHUG Meeting Participants From: Kris Holm, BGC

More information

Living with levees: using tolerable risk guidelines in California

Living with levees: using tolerable risk guidelines in California Living with levees: using tolerable risk guidelines in California Jessica Ludy, CFM. Arcadis-U.S. Inc. Larry Roth, G.E., P.E., Arcadis-US, Inc. Dustin Jones, P.E., Delta Stewardship Council 1 Hoogwater

More information

Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management

Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management Moving Policy and Practice from Flood and Coastal Storm Damage Reduction to Risk Management and other words of encouragement for my friends in the Planning CoP Eric Halpin, PE Special Assistant for Dam

More information

The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively.

The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively. 2.1.1.2 HYDRAULIC IMPACTS VALLEY The maximum allowable valley storage decrease for the 100-year flood and Standard Project Flood are 0.0% and 5.0%, respectively. General. The computation of valley storage

More information

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps Presentation to USACE 2012 Flood Risk Management and Silver Jackets Joint Workshop, Harrisburg, Pennsylvania Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain

More information

Department of the Army U.S. Army Corps of Engineers Washington, DC

Department of the Army U.S. Army Corps of Engineers Washington, DC CECW-CP CECW-CE Engineer Regulation 1105-2-101 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Planning RISK ASSESSMENT FOR FLOOD RISK MANAGEMENT STUDIES Distribution Restriction

More information

Flood Risk Management and Columbia River Treaty Review

Flood Risk Management and Columbia River Treaty Review Flood Risk Management and Columbia River Treaty 2014 2024 Review Lower Columbia River Estuary Partnership 2013 Science to Policy Summit: The Columbia River Treaty May 10, 2013 Matt Rea Treaty Review Program

More information

RISK, RISK BASED DECISION MAKING, AND RISK ANALYSIS

RISK, RISK BASED DECISION MAKING, AND RISK ANALYSIS RISK, RISK BASED DECISION MAKING, AND RISK ANALYSIS Katie Jagt, PE Civil And Environmental Engineer Fulbright Fellow Walsh Environmental January 28, 2014 CSRN Risk and BOK Risk What is Risk? Societal Risk

More information

Comparing HAZUS Flood Loss Estimates Across Hazard Identification Methods and Building Stock Inventory Data. Albion Township Dane County, Wisconsin

Comparing HAZUS Flood Loss Estimates Across Hazard Identification Methods and Building Stock Inventory Data. Albion Township Dane County, Wisconsin Across Hazard Identification Methods and Building Stock Inventory Data Albion Township Dane County, Wisconsin Prepared for the Association of State Floodplain Managers September 1, 2010 Across Various

More information

Pierce County, Wisconsin. Bridge at Trenton Island. Photo by Rebecca Kihslinger.

Pierce County, Wisconsin. Bridge at Trenton Island. Photo by Rebecca Kihslinger. Pierce County, Wisconsin Bridge at Trenton Island. Photo by Rebecca Kihslinger. Background Pierce County (pop. 41,019) is located in northwestern Wisconsin and shares a border with Minnesota along the

More information

Overview of HAZUS for Earthquake Loss Estimation. September 6, 2012

Overview of HAZUS for Earthquake Loss Estimation. September 6, 2012 Overview of HAZUS for Earthquake Loss Estimation September 6, 2012 What is HAZUS? Risk assessment tool for analyzing potential losses from hurricane, flood, and earthquake Uses current scientific and engineering

More information

Justification for Floodplain Regulatory Standards in Illinois

Justification for Floodplain Regulatory Standards in Illinois Justification for Floodplain Regulatory Standards in Illinois Office of Water Resources Issue Paper April, 2015 Proactive Illinois floodplain and floodway regulatory standards have prevented billions of

More information

Skagit County Flood Insurance Study Update. Ryan Ike, CFM FEMA Region 10

Skagit County Flood Insurance Study Update. Ryan Ike, CFM FEMA Region 10 Skagit County Flood Insurance Study Update Ryan Ike, CFM FEMA Region 10 Skagit County Flood Insurance Study Process Overview Process, Schedule, & Deliverables Base Flood Elevations, Modeling, & Levees

More information

NONSTRUCTURAL FLOOD RISK MANAGEMENT ECONOMIC ASSESSMENT FOR LYCOMING COUNTY LYCOMING COUNTY, PENNSYLVANIA

NONSTRUCTURAL FLOOD RISK MANAGEMENT ECONOMIC ASSESSMENT FOR LYCOMING COUNTY LYCOMING COUNTY, PENNSYLVANIA NONSTRUCTURAL FLOOD RISK MANAGEMENT ECONOMIC ASSESSMENT FOR LYCOMING COUNTY LYCOMING COUNTY, PENNSYLVANIA Study requested by: Study supported by: Study led by: Lycoming County 330 Pine Street Williamsport,

More information

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina Katy Goolsby-Brown June 23, 2016 1 Dam Failure Incidents in South Carolina SC Dam Failures

More information

SILVER JACKETS: TEAMING TO MITIGATE AND MANAGE STATE FLOOD HAZARD PRIORITIES

SILVER JACKETS: TEAMING TO MITIGATE AND MANAGE STATE FLOOD HAZARD PRIORITIES SILVER JACKETS: TEAMING TO MITIGATE AND MANAGE STATE FLOOD 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 HAZARD PRIORITIES 110 135 120 252 174.59 112

More information

Rahway River Basin, New Jersey. Coastal Storm Risk Management Feasibility Study

Rahway River Basin, New Jersey. Coastal Storm Risk Management Feasibility Study Draft Economic Appendix New Jersey Department of Environmental Protection U.S. Army Corps of Engineers New York District May 2017 Table of Contents 1 Introduction... 1 2 Description of Study Area... 1

More information

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba

Creetown (Potentially Vulnerable Area 14/17) Local Plan District Local authority Main catchment Dumfries and Galloway Solway Moneypool Burn Council Ba Creetown (Potentially Vulnerable Area 14/17) Local Plan District Solway Local authority Dumfries and Galloway Council Main catchment Moneypool Burn Summary of flooding impacts 90 residential properties

More information

a) Ensure public safety through reducing the threats to life and personal injury.

a) Ensure public safety through reducing the threats to life and personal injury. SECTION VII: FLOODPLAIN DISTRICT 7-1 Statement Of Purpose The purposes of the Floodplain District are to: a) Ensure public safety through reducing the threats to life and personal injury. b) Eliminate

More information

Kentucky Risk MAP It s not Map Mod II

Kentucky Risk MAP It s not Map Mod II Kentucky Risk MAP It s not Map Mod II Risk Mapping Assessment and Planning Carey Johnson Kentucky Division of Water carey.johnson@ky.gov What is Risk MAP? Risk Mapping, Assessment, and Planning (Risk MAP)

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

SR-210 MIXED FLOW LANE ADDITION PROJECT EA NO. 0C7000 FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE. Prepared for. December 2012.

SR-210 MIXED FLOW LANE ADDITION PROJECT EA NO. 0C7000 FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE. Prepared for. December 2012. S A N T A A N A R I V E R L O C A T I O N H Y D R A U L I C S T U D Y SR-210 MIXED FLOW LANE ADDITION PROJECT FROM HIGHLAND AVENUE TO SAN BERNARDINO AVENUE EA NO. 0C7000 Prepared for San Bernardino Associated

More information

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments King County Flood Control District Flood Risk Reduction Work Program and Accomplishments Brian Murray Water and Land Resources Division April 26, 2016 Department of Natural Resources and Parks Water and

More information

Pre-Development Floodplain Application

Pre-Development Floodplain Application Pre-Development Floodplain Application The Department of Planning, at the recommendation of FEMA, is now requiring completion of a Pre- Development Floodplain Application for all properties in the regulated

More information

Durham County Preliminary Flood Hazard Data Public Meeting. July 28, 2016

Durham County Preliminary Flood Hazard Data Public Meeting. July 28, 2016 Durham County Preliminary Flood Hazard Data Public Meeting July 28, 2016 Why Are We Here New flood hazard data has been released as Preliminary for Durham County Statutory Due Process for review/comments

More information

Update of Project Benefits

Update of Project Benefits Update of Project Benefits February 2014 Contents 1. Introduction 1 2. Purpose of the Revaluation Study 2 3. Original Project Benefits 2 4. Update of Residential Structure Benefits 3 5. Update of Non Residential

More information

Delaware Bay / River Coastal Flood Risk Study. FEMA REGION II and III September 19, 2012

Delaware Bay / River Coastal Flood Risk Study. FEMA REGION II and III September 19, 2012 Delaware Bay / River Coastal Flood Risk Study FEMA REGION II and III September 19, 2012 Agenda Risk MAP Program Overview Risk MAP Non-Regulatory Products & Datasets Region II New Jersey Coastal Flood Study

More information

Risk Assessment Framework. Levee Ready Columbia

Risk Assessment Framework. Levee Ready Columbia Risk Assessment Framework Levee Ready Columbia November 23, 2015 Today s Discussion Level of Protection Levees and Risk Tolerable Risk Guidelines Applying Tolerable Risk Guidelines Levees and Level of

More information

Article 23-6 FLOODPLAIN DISTRICT

Article 23-6 FLOODPLAIN DISTRICT AMENDING THE CODE OF THE CITY OF PITTSFIELD CHAPTER 23, ZONING ORDINANCE SECTION I That the Code of the City of Pittsfield, Chapter 23, Article 23-6 Floodplain District, shall be replaced with the following:

More information

DAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project

DAEN SUBJECT: Little Colorado River at Winslow, Arizona, Flood Risk Management Project per year. In addition to the above, the Navajo County Flood Control District would be fully responsible for performing the investigation, cleanup, and response of hazardous materials on the project sites.

More information

Model Development to Support Assessment of Flood Risk for the Columbia River Treaty Review

Model Development to Support Assessment of Flood Risk for the Columbia River Treaty Review Model Development to Support Assessment of Flood Risk for the Columbia River Treaty Review 2012 AWRA Washington State Conference Sara Marxen, P.E. U.S. Army Corps of Engineers Seattle District September,

More information

SPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT

SPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT SPILLWAY ADEQUACY ANALYSIS OF ROUGH RIVER LAKE LOUISVILLE DISTRICT RICHARD PRUITT (502) 315-6380 Louisville District COE richard.l.pruitt@lrl02.usace.army.mil Spillway ROUGH RIVER LAKE PERTINENT DATA Construction

More information

Skagit Floodway Mitigation and Hamilton Relocation Program FACT SHEET

Skagit Floodway Mitigation and Hamilton Relocation Program FACT SHEET Skagit Floodway Mitigation and Hamilton Relocation Program FACT SHEET Successful mitigation means that various intentional measures have been taken to reduce the hazard vulnerability of communities, or

More information

Financing Floods in Chicago. Sephra Thomas. GIS for Water Resources C E 394K. Dr. David Maidment

Financing Floods in Chicago. Sephra Thomas. GIS for Water Resources C E 394K. Dr. David Maidment Financing Floods in Chicago Sephra Thomas GIS for Water Resources C E 394K Dr. David Maidment Fall 2018 Abstract The objective of this term paper is to study the hydrology and social vulnerability of Chicago,

More information

Vocabulary of Flood Risk Management Terms

Vocabulary of Flood Risk Management Terms USACE INSTITUTE FOR WATER RESOURCES Vocabulary of Flood Risk Management Terms Appendix A Leonard Shabman, Paul Scodari, Douglas Woolley, and Carolyn Kousky May 2014 2014-R-02 This is an appendix to: L.

More information

Receive and file capital works report CW providing an update on the Burloak grade separation.

Receive and file capital works report CW providing an update on the Burloak grade separation. Page 1 of Report CW-13-17 SUBJECT: Burloak Grade Separation Project Update TO: FROM: Committee of the Whole Capital Works Report Number: CW-13-17 Wards Affected: 5 File Numbers: 570.02-818 Date to Committee:

More information

Floodplain Management 101: UNIT II. Maps & Flood Insurance Studies

Floodplain Management 101: UNIT II. Maps & Flood Insurance Studies Floodplain Management 101: UNIT II Maps & Flood Insurance Studies Who is ASFPM? ASFPM stands for the Association of State Floodplain Managers A national organization of floodplain management professionals

More information

U.S. Army Corp of Engineers

U.S. Army Corp of Engineers U.S. Army Corp of Engineers PL 84-99 Levee Inspections and Levee Certification Hank DeHaan Rock Island District March 9, 2011 US Army Corps of Engineers U.S. Army Corps of Engineers Flood Damage Reduction

More information

Sutter Basin Pilot Feasibility Report - Environmental Impact Report / Supplemental Environmental Impacts Statement

Sutter Basin Pilot Feasibility Report - Environmental Impact Report / Supplemental Environmental Impacts Statement Sacramento District Planning Division Sutter Basin Pilot Feasibility Report - Environmental Impact Report / Supplemental Environmental Impacts Statement Butte and Sutter Counties, California APPENDIX A

More information

U.S. Updates: Climate Change, Maintenance and Investigations

U.S. Updates: Climate Change, Maintenance and Investigations U.S. Updates: Climate Change, Monitoring, Assessment, Maintenance and Investigations Edward d J. Hecker Chief, Office of Homeland Security and Provost Marshal, Directorate of Civil Works June 15, 2010

More information

MVD 2012 Flood Season Preparedness

MVD 2012 Flood Season Preparedness MVD 2012 Flood Season Preparedness Regional Workshop Identifying, Managing, and Communicating Risk 23 February US Army Corps of Engineers MVD 2012 Flood Season Preparation Scope: Move forward with priority

More information