1 Public Disclsure Authrized The Wrld Bank Implementatin Status & Results Indnesia Third Water Supply and Sanitatin fr Lw Incme Cmmunities Prject (P85375) Reprt N: ISR3729 C Operatin Name: Third Water Supply and Sanitatin fr Lw Incme Prject Stage: Implementatin Seq.N: 7 Status: ARCHIVED Archive Date: 29-Mar-211 Cmmunities Prject (P85375) Cuntry: Indnesia Apprval FY: 26 Prduct Line: IBRD/IDA Regin: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Lan Implementing Agency(ies): Ministry f Health, DG Cipta Karya- Ministry f Public Wrks, Ministry f Hme Affairs Public Disclsure Authrized - Key Dates Bard Apprval Date 27-Jun-26 Original Clsing Date 3-Jun-213 Planned Mid Term Review Date 26-Nv-21 Last Archived ISR Date 29-Mar-21 1 Effectiveness Date 6-Jun-28 Revised Clsing Date 3-Jun-213 Actual Mid Term Review Date 27-Sep-21 Prject Develpment Objectives Prject Develpment Objective (frm Prject Appraisal Dcument) T increase the lw-incme rural and peri-urban ppulatins accessing imprved water and sanitatin facilities and practicing imprved hygiene behavirs, thrugh prgrammatic mainstreaming and scaling-up f a natin wide cmmunity-driven apprach t WSS-MDGs. Has the Prject Develpment Objective been changed since Bard Apprval f the Prject? O Yes N Cmpnent(s) Public Disclsure Authrized Cmpnent Name Cmpnent Cst Cmpnent 1: Cmmunity Empwerment and Lcal Institutinal Develpment 8.7 Cmpnent 2: Imprving Hygiene and Sanitatin Behavir and Services 25.2 Cmpnent 3: Water Supply and Public Sanitatin Infrastructure Cmpnent 4: District and Village Incentives Grants (VIG) 5.1 Cmpnent 5: Implementatin Supprt and Prject Management 52.1 Overall Ratings Previus Rating Current Rating -5- Prgress twards achievement f PDO Mderately Satisfactry Satisfactry " Overall Implementatin Prgress (IP) Mderately Satisfactry Satisfactry. Overall Risk Rating lsure Authrized Implementatin Status Overview The prject has nw met r exceeded mst f the perfrmance indicatrs. It has prvided 3.5 millin peple with imprved access t water supply and 2.1 millin with imprved Page 1 f 5

2 The Wrld Bank Reprt N: ISR3729 access t sanitatin. It has benefited 5,849 villages, and facilitated 4,61 cmmunity rganizatins (LKMs) and 3,496 peratin and maintenance bdies (BP SPAMS). Mre than 4.88% f target cmmunities are nw pen defecatin free, 5.9% have adpted hand washing prgrams, and 66.34% f targeted schls have a hygiene prgram and imprved sanitatin facilities. Abut 9 districts utside the target cmmunities have begun replicating the prject's apprach. Lcatins a) Cuntry First Administrative Divisin Lcatin Planned Actual ent Entered Prpinsi Sumatera Utara ) Indnesia Nt Entered Prpinsi Sumatera Selatan Indnesia Nt Entered Prpinsi Sumatera Barat Indnesia Nt Entered Prpinsi Sulawesi Tengah Indnesia Nt Entered Prpinsi Maluku Indnesia Nt Entered Prvinsi Papua Indnesia Nt Entered Prpinsi Bengkulu Results Prject Develpment Objective Indicatrs Indicatr Name Cre Unit f Measure Baseline Current End Target Additinal peple with sustainable access t Number Value imprved sanitatin facilities differentiated by Date 1-Sep Oct Jun-213 sciecnmic status Original target fr Year-4 Actual target in PAD is is millin. The millin, but restructured t be figures 3.1 millin. N specific targets set by sciecnmic status, but prject will capture differentiated data in results. # f additinal peple with sustainable access Text Value 3,59, t imprved water facilities differentiated by Date 1-Sep Oct Jun sciecnmic status. Original target fr Year-4 Task team will determine 211 is 3-5 millin. The whether a mre specific.u figures numerical target can be used. O Differentiated sciecnmic L). data n results will be gathered, but n differentiated target was set. Page 2 f 5

3 ) The Wrld Bank Reprt N: ISR3729 Intermediate Results Indicatrs Indicatr Name Cre Unit f Measure Baseline Current End Target percentage f target cmmunities adpting Percentage Value > hand washing prgrams Date 28-Oct-211 The figures represent 76% data cmpleteness & validatin. number f districts that are replicating the Number Value Pamsimas apprach utside targeted Date 1-Sep Oct Jun-213 cmmunities actual prject district WSS expenditure as a Percentage Value. 1. percentage f the budget needed t achieve Date 1-Sep Oct Jun-213 MDG gals Nt yet due, will be cnducted thrugh evaluatin study % f districts with Prject mnitring structure Text Value % districts engaged % districts engaged and tls (IMIS, M&E) that prvides regular Date 1-Sep Oct Jun-213 infrmatin n prject implementatin quality Target is 1% thrughut implementatin f prject. # f villages & districts exceeding prject Text Value villages & 2 districts perfrmance criteria and receiving Date 1-Sep Oct Jun-213 supplementary grants Target fr Year is 4-8 villages and 15 districts. ndcument It is lwer than the target, because Gl was nt ready with the budget and imprved Prcedures. It is already allcated in 212 budget fr 4 villages Iequal t 8.9 Millin US D % f villages with imprved water supply Value b 79.9 etext 9% :3 systems that are functining t the satisfactindae -p268-c-112-jn3 Ow f the majrity f targeted cmmunity, and ZP Target is 9% thrughut the Measures percentage f.a effectively managed/financed prject, fr whatever systems systems that meet satisfactin.2 are functining at a given and management criteria, nt time. The figures represent percentage f cnstructin 76% data cmpleteness & target met. validatin Page 3 f 5

4 The Wrld Bank Reprt N: ISR3729 % f targeted schls that have imprved Text Value % % sanitatin facilities and hygiene prgrams Date 1-Sep Oct Jun-213 Original target fr Year-4 C. 211 is 77%. The figures - % f target cmmunities free f pen Text Value % % free f pen defecatin U) defecatin d adate 1-Sep Oct Jun-213 Original target fr Year is 6%. The figures % f districts with Capacity building plan t Text Value % % supprt the adptin and mainstreaming f the Date 1-Sep Oct Jun-213 PAMSIMAS apprach, and prgress Intermediate target fr twardsachieving its bjectives 6/3/1 is 5%. 36 ut f 7 districts have draft capacity building plan, this indicatr will be updated sn the draft is issued under legal dcuments. # f villages develping cmmunity actin Text Value 5,352 5 plans Date 1-Sep Oct Jun-213 Substantially higher than prjected fr this stage f the prject. The riginal intermediate target fr Year is 3,85. The figures. 'I) Data n Financial Perfrmance (as f 7-Feb-212) Financial Agreement(s) Key Dates - Prject Lan N. Status Apprval Date Signing Date Effectiveness Date Clsing Date & P85375 IDA-424 Effective 27-Jun Dec-27 6-Jun-28 3-Jun-213 Disbursements (in Millins) Page 4 f 5

5 ) The Wrld Bank Reprt N: ISR3729 Prject Lan N. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P85375 IDA-424 Effective XDR Disbursement Graph 1- - Original ---- Frmally Revised -- Actual Bk75 t-supprt-that-effrt. E 25 /1q C Thr reae prjects. ar n S Thergernen reaeprjects.mtettcniun h aia cl-p h prmbyn h n h rjc,adisdsusn sbe efnnigf h Page 5 f 5

Implementation Status & Results India Biodiversity Conservation and Rural Livelihoods Improvement Project (P088520)

Implementation Status & Results India Biodiversity Conservation and Rural Livelihoods Improvement Project (P088520) lsure Authrized Public Disclsure Authrized Public Disclsure Authrized Public Disclsure Authrized @ The Wrld Bank Implementatin Status & Results India Bidiversity Cnservatin and Rural Livelihds Imprvement

More information

Implementation Status & Results Africa

Implementation Status & Results Africa Public Disclsure Authrized The Wrld Bank Implementatin Status & Results Africa Reprt N: ISR16989 Reginal and Dmestic Pwer Markets Develpment Prject (Suthern Africa Pwer Market Prject: APL-1b) (P9721) C

More information

o No b Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory The World Bank

o No b Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory The World Bank Public Disclsure Authrized Public Disclsure Authrized The Wrld Bank Implementatin Status & Results Cng, Demcratic Republic f DEMOCRATIC REPUBLIC OF CONGO - High Pririty Repening and Maintenance Prject

More information

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013

Community Planning Association of Southwest Idaho FY Strategic Plan Report No Approved by the COMPASS Board, December 16, 2013 Cmmunity Planning Assciatin f Suthwest Idah FY2015-2017 Strategic Plan Reprt N. 01-2014 Apprved by the COMPASS Bard, December 16, 2013 FINAL COMPASS FY2015 FY2017 Strategic Plan Page 1 Cmmunity Planning

More information

Overcoming obstacles to building public debt management capacity. The case of Moldova

Overcoming obstacles to building public debt management capacity. The case of Moldova Overcming bstacles t building public debt management capacity The case f Mldva Elena Matveeva, Head f Public Debt Department Ministry f Finance Republic f Mldva Key indicatrs Legal & Institutinal framewrk

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

TERMS OF REFERENCE FOR THE CONSULTANCY: STRATEGIC PLANING FOR 7 TARGET CSOs

TERMS OF REFERENCE FOR THE CONSULTANCY: STRATEGIC PLANING FOR 7 TARGET CSOs TERMS OF REFERENCE FOR THE CONSULTANCY: STRATEGIC PLANING FOR 7 TARGET CSOs Fr the prject: Better scial prtectin thrugh building capacity f CSOs in Bsnia and Herzegvina Deadline fr applicatin: Mnday 15th,

More information

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Mogadishu SO November 7 December 2018

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Mogadishu SO November 7 December 2018 EXECUTIVE SUMMARY INTERNAL AUDIT REPORT IOM Mgadishu SO201701 27 Nvember 7 December 2018 Issued by the Office f the Inspectr General Page 1 f 12 Reprt n the Audit f IOM Mgadishu Executive Summary Audit

More information

TERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE

TERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE W&RSETA Standard Bidding Dcuments Terms f Reference TERMS OF REFERENCE FOR THE PROVISION OF OUTSOURCED INTERNAL AUDIT SERVICE 1 W&RSETA Standard Bidding Dcuments Terms f Reference 1. BACKGROUND TO W&RSETA

More information

Commission d évaluation de l enseignement collégial. Analytical Framework. Evaluating the Effectiveness of Strategic Plans in the Cégeps

Commission d évaluation de l enseignement collégial. Analytical Framework. Evaluating the Effectiveness of Strategic Plans in the Cégeps Cmmissin d évaluatin de l enseignement cllégial Analytical Framewrk Evaluating the Effectiveness f Strategic Plans in the Cégeps April 2008 Dcument prepared and written by Katie Bérubé, Prject Crdinatr

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

National Planning Guide Summary A Practical Approach to Health Security Capacity Building Draft 21 July 2017

National Planning Guide Summary A Practical Approach to Health Security Capacity Building Draft 21 July 2017 Natinal Planning Guide Summary A Practical Apprach t Health Security Capacity Building Draft 21 July 2017 "Image designed by macrvectr / Freepik" P Purpse f this guide. The purpse f this guide is t prvide

More information

*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter

*** A DRAFT starting point *** South Central Fresno Community Steering Committee Charter *** A DRAFT starting pint *** Suth Central Fresn Cmmunity Steering Cmmittee Charter 1. Cmmittee Objectives The Suth Central Fresn Cmmunity Steering Cmmittee is a special cmmittee that will be respnsible

More information

COUNCIL COMMUNICATION

COUNCIL COMMUNICATION Meeting Date: May 10, 2016 COUNCIL COMMUNICATION Agenda Item: Agenda Lcatin: Public Hearing Wrk Plan # Legal Review: 1 st Reading 2 nd Reading Subject: A reslutin authrizing the submissin f the Cnslidated

More information

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017

EXECUTIVE SUMMARY INTERNAL AUDIT REPORT. IOM Kingston JM JULY 2017 EXECUTIVE SUMMARY INTERNAL AUDIT REPORT IOM Kingstn JM201701 17-21 JULY 2017 Issued by the Office f the Inspectr General Page 1 f 9 Reprt n the Audit f IOM Kingstn Executive Summary Audit File N. JM201701

More information

Consumer Protection 2015: What You Need to Know. New York Region Director s College

Consumer Protection 2015: What You Need to Know. New York Region Director s College Cnsumer Prtectin 2015: What Yu Need t Knw New Yrk Regin Directr s Cllege Agenda CRA - Understanding Cmmunity Develpment A Directr s Rle Fld - Fld Insurance Awareness and Updates 2 CRA Understanding Cmmunity

More information

Frequently Asked Questions: Broader Public Sector Procurement Directive

Frequently Asked Questions: Broader Public Sector Procurement Directive Frequently Asked Questins: Brader Public Sectr Prcurement Directive 1. What is the Brader Public Sectr (BPS) Prcurement Directive? The Brader Public Sectr Accuntability Act, 2010 prvides the authrity fr

More information

Trillium Community Health Plan Innovation Fund

Trillium Community Health Plan Innovation Fund UO Riverfrnt Research Park 1800 Millrace Drive Eugene, Oregn 97403 Trillium Cmmunity Health Plan Innvatin Fund 2018-2019 Request fr Prpsal What is the Trillium Cmmunity Health Plan Innvatin Fund? The Trillium

More information

Scope of Services and Timeline. PHASE 1: Project Organization & Best Practices Research Week Completed

Scope of Services and Timeline. PHASE 1: Project Organization & Best Practices Research Week Completed Organizatin Scpe f Services and Timeline Versin f December 9, 2011 PHASE 1: Prject Organizatin & Best Practices Research Cmpleted CONSULTANT Aug 8 12 Aug 15 19 Aug 22 26 Aug 29 Oct 28 CONSULTANT Nv 13

More information

Green Climate Fund (GCF) Readiness Programme in Ghana. Terms of Reference: Development of Climate Change Budget and Finance Tracking Tools

Green Climate Fund (GCF) Readiness Programme in Ghana. Terms of Reference: Development of Climate Change Budget and Finance Tracking Tools Green Climate Fund (GCF) Readiness Prgramme in Ghana Terms f Reference: Develpment f Climate Change Budget and Finance Tracking Tls I. Backgrund The Green Climate Fund (GCF) was established in 20 as an

More information

A Strategic Plan for Ohio s Aspire Adult Readiness Education (formerly ABLE) Program

A Strategic Plan for Ohio s Aspire Adult Readiness Education (formerly ABLE) Program A Strategic Plan fr Ohi s Aspire Adult Readiness Educatin (frmerly ABLE) Prgram O H I O S A S P I R E S T R A T E G I C P L A N U P D A T E D O C T O B E R 3 1, 2 0 1 7 1 Intrductin Our prgress has been

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810)

Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia FOURTH NATIONAL PROGRAM FOR COMMUNITY EMPOWERMENT IN RURAL AREA (PNPM IV) (P122810) Operation

More information

Sound Management of Electronic Wastes in North America Operating Year(s):

Sound Management of Electronic Wastes in North America Operating Year(s): 2011 2012 Operatinal Plan Prject Descriptin Sund Management f Electrnic Wastes in Nrth America Operating Year(s): 2011 2012 Planned Budget: C$400,000.00 2011: C$165,000.00 2012: C$235,000.00 Strategic

More information

Strategic Plan Request for Proposals. March 2018

Strategic Plan Request for Proposals. March 2018 Strategic Plan 2018-2022 Request fr Prpsals March 2018 Cntact: Denyse Newtn, Executive Directr Alzheimer Sciety Durham Regin 202 1600 Champlain Avenue Whitby, Ontari L1N 9B2 (905) 576-2567 ext 5223 dnewtn@alzheimerdurham.cm

More information

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405)

Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For (P125405) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia National Community Empowerment Program In Urban Areas For 2012-2015 (P125405) Operation

More information

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND

APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND APPLICATION FORM FOR ASSISTANCE FROM THE AFRICAN WORLD HERITAGE FUND This template is the riginal assistance request frm which when sent shuld cver all the questins asked. It can be adjusted t accmmdate

More information

Sempra Energy Environmental, Health, Safety and Technology Committee Charter

Sempra Energy Environmental, Health, Safety and Technology Committee Charter Sempra Energy Envirnmental, Health, Safety and Technlgy Cmmittee Charter As adpted by the Bard f Directrs f Sempra Energy n September 5, 2000 and amended thrugh Nvember 9, 2015. I. Purpse The purpse f

More information

PHAB Accreditation Impact Series

PHAB Accreditation Impact Series PHAB Accreditatin Impact Series Tpic #1: Accreditatin strengthens engagement in quality imprvement (QI) and perfrmance management in rder t imprve health departments ability t serve cmmunity. What has

More information

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924)

Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility Project (P099924) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Corporate and Public Sector Accountivility

More information

Collaboration Assessment Worksheets

Collaboration Assessment Worksheets Part 1 f 5: Knwledge Base Cllabratin Assessment Wrksheets 1. Have the cllabrating agencies agreed upn a cmmn definitin fr the target ppulatin? Cllabrating agencies have nt determined a cmmn definitin f

More information

Are you ready for the FUTURE of your Quality Management system?

Are you ready for the FUTURE of your Quality Management system? 1 Are yu ready fr the FUTURE f yur Quality Management system? BACKGROUND Quality Management System standard, ISO 9001 has made sme majr changes released in September 2015. Organizatins are studying and

More information

Quality Management_300_Quality Proccess Audit Procedure

Quality Management_300_Quality Proccess Audit Procedure Quality Management_300_Quality Prccess Audit Prcedure Last Updated: 05/17/2017 Audience: CWDS Service Teams, PMO Frequency: As needed After reading this prcedure, the audience will be able t understand

More information

DATE: December 14, Board of Commissioners. Patrick Quinton, Executive Director

DATE: December 14, Board of Commissioners. Patrick Quinton, Executive Director DATE: December 14, 2011 TO: FROM: Bard f Cmmissiners Patrick Quintn, Executive Directr SUBJECT: Reprt Number 11-71 Authrize the Third Amendment t Dispsitin and Develpment Agreement fr Statin Place Redevelpment

More information

TERMS OF REFERENCE (TOR) Mainstreaming gender inclusive features in a climate resilient energy policies and practices in ECOWAS countries

TERMS OF REFERENCE (TOR) Mainstreaming gender inclusive features in a climate resilient energy policies and practices in ECOWAS countries United Natins Industrial Develpment Organizatin TERMS OF REFERENCE (TOR) Mainstreaming gender inclusive features in a climate resilient energy plicies and practices in ECOWAS cuntries CTCN request reference

More information

PPCR MONITORING AND EVALUATION. Preliminary Guidance Note for PPCR Country Teams

PPCR MONITORING AND EVALUATION. Preliminary Guidance Note for PPCR Country Teams PPCR MONITORING AND EVALUATION Preliminary Guidance Nte fr PPCR Cuntry Teams I. INTRODUCTION PPCR MONITORING AND EVALUATION Preliminary Guidance Nte fr PPCR Cuntry Teams 1. A results framewrk fr the PPCR

More information

Alberta Indigenous Community Energy Program Guidelines

Alberta Indigenous Community Energy Program Guidelines Alberta Indigenus Cmmunity Energy Prgram Guidelines The Alberta Indigenus Cmmunity Energy Prgram (AICEP) is a prgram that prvides tls and funding t help Indigenus cmmunities and Indigenus rganizatins understand

More information

Information concerning the constitution, goals and functions of the agency, including 1 :

Information concerning the constitution, goals and functions of the agency, including 1 : Annual Reprt cmpliance checklist This checklist utlines the gvernance, perfrmance, reprting cmpliance and prcedural requirements f the Financial Administratin and Audit Act 1977 and the Financial Management

More information

ALAMEDA COUNTY BEHAVIORAL HEALTH CARE SERVICES (BHCS) INFORMAL REQUEST FOR QUOTATION (IRFQ) # SPECIFICATIONS, TERMS & CONDITIONS

ALAMEDA COUNTY BEHAVIORAL HEALTH CARE SERVICES (BHCS) INFORMAL REQUEST FOR QUOTATION (IRFQ) # SPECIFICATIONS, TERMS & CONDITIONS ALCOHOL, DRUG & MENTAL HEALTH SERVICES MANUEL J. JIMENEZ, JR., MA MFT, DIRECTOR Netwrk Office 1900 Embarcader Cve, Suite 205 Oakland, Califrnia 94606 510. 567.8296 ALAMEDA COUNTY BEHAVIORAL HEALTH CARE

More information

inemi Statement of Work (SOW) Name TIG Name Project

inemi Statement of Work (SOW) Name TIG Name Project inemi Statement f Wrk (SOW) Name TIG Name Prject Instructins fr use: 1. Save this file as Prject Name Statement f Wrk Draft 1.0 2. All bld headings shuld be left as they are. These will frm the structure

More information

MBA Essentials. Tips to Prepare a Better MBA Budget Submission

MBA Essentials. Tips to Prepare a Better MBA Budget Submission MBA Essentials Thank yu fr applying t the Meritrius Budget Award (MBA) prgram. Yur applicatin demnstrates the imprtance yu, yur finance team, and the schl district place n presenting a high-quality budget

More information

JOB OPPORTUNITY WITH CIBC FIRSTCARIBBEAN INTERNATIONAL BANK. This Role is being posted internally and externally simultaneously

JOB OPPORTUNITY WITH CIBC FIRSTCARIBBEAN INTERNATIONAL BANK. This Role is being posted internally and externally simultaneously Date f Ad: July 28, 2017 Expiry Date: August 14, 2017 JOB OPPORTUNITY WITH CIBC FIRSTCARIBBEAN INTERNATIONAL BANK Jb Title: Jb Level: Lcatin: Functin: Salary range: Assciate Directr, Risk Analytics FC9

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) IN CAMBODIA (PRINCIPAL RECIPIENT) INTERNAL AUDIT REPORT. 14 July 2017

UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) IN CAMBODIA (PRINCIPAL RECIPIENT) INTERNAL AUDIT REPORT. 14 July 2017 UNITED NATIONS OFFICE FOR PROJECT SERVICES (UNOPS) IN CAMBODIA (PRINCIPAL RECIPIENT) INTERNAL AUDIT REPORT 14 July 2017 PROJECT NAME: REGIONAL ARTEMISININ RESISTANCE INITIATIVE (RAI) PROJECT NUMBER: 00089688

More information

PET FORM Planning and Evaluation Tracking ( Assessment Period) Division of: Career and Technical Division

PET FORM Planning and Evaluation Tracking ( Assessment Period) Division of: Career and Technical Division PET FORM Planning and Evaluatin Tracking (2011 2012 Assessment Perid) Divisin f: Career and Technical Divisin Persn Respnsible fr this Divisin: Shawn Fust Department f: Instrumentatin Cntrl and Renewable

More information

UNITED REPUBLIC OF TANZANIA

UNITED REPUBLIC OF TANZANIA Public Disclsure Authrized UNITED REPUBLIC OF TANZANIA Prcurement Plan General Public Disclsure Authrized 1. Prject Infrmatin Cuntry: Tanzania Prject Name: Sustainable Rural Water Supply and Sanitatin

More information

AGENDA DOCKET FORM. Ronald D. Jacobsma Assistant General Manager

AGENDA DOCKET FORM. Ronald D. Jacobsma Assistant General Manager .. ~ CONTRA COST A WATER DISTRICT -- AGENDA DOCKET FORM Agenda Item N. 7 Meeting Date: September 19, 2018 Reslutin: N SUBJECT: 2019 RATE REVIEW ASSUMPTIONS SUMMARY: The District s Rate Setting Plicy (Attachment

More information

Central City Line Steering Committee

Central City Line Steering Committee Central City Line Steering Cmmittee Meeting #5 Mnday, 1:00 PM 2:30 PM Spkane Reginal Transprtatin Cuncil Paulsen Building 421 W. Riverside Ave., Spkane, WA 1 Agenda Welcme, Intrductins and Agenda Review

More information

OFFICE OF PUBLIC TRANSIT 2016 ANNUAL REPORT

OFFICE OF PUBLIC TRANSIT 2016 ANNUAL REPORT OFFICE OF PUBLIC TRANSIT 2016 ANNUAL REPORT SUBMITTED JANUARY 2017 SCDOT OFFICE OF PUBLIC TRANSIT 2016 ANNUAL REPORT EXECUTIVE SUMMARY Key transprtatin strategies identified in the Suth Carlina Department

More information

QUALITY IMPROVEMENT PLAN

QUALITY IMPROVEMENT PLAN QUALITY IMPROVEMENT PLAN 2018-2021 6.02 Effective Date: 07/18 Purpse: T prmte a culture f quality within Barren River District Health Department (BRDHD) that includes an rganizatin-wide management and

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directorate B - Natural Capital ENV.B.2 - Biodiversity ENV.B.3 - Nature CGBN.

EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directorate B - Natural Capital ENV.B.2 - Biodiversity ENV.B.3 - Nature CGBN. EUROPEAN COMMISSION DIRECTORATE-GENERAL ENVIRONMENT Directrate B - Natural Capital ENV.B.2 - Bidiversity ENV.B.3 - Nature CGBN C-rdinatin Grup fr Bidiversity and Nature 22 nd meeting 15/03/2017 Agenda

More information

Policy and Procedures Date: April 23, Subject: Policy and Procedures for Establishment of New Schools at Virginia Tech

Policy and Procedures Date: April 23, Subject: Policy and Procedures for Establishment of New Schools at Virginia Tech Virginia Plytechnic Institute and State University N. 6150 Rev.: 1 Plicy and Prcedures Date: April 23, 2002 Subject: Plicy and Prcedures fr Establishment f New Schls at Virginia Tech 1. Purpse...1 2. Plicy...1

More information

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015)

TASSAL GROUP LIMITED ABN Procedures for the Oversight and Management of Material Business Risks. (Approved by the Board 28 May 2015) Prcedures fr the Oversight and Management f Material Business Risks TASSAL GROUP LIMITED ABN 15 106 067 270 Prcedures fr the Oversight and Management f Material Business Risks (Apprved by the Bard 28 May

More information

SECTION 1 INTRODUCTION BACKGROUND CRS Origins Organizations Involved in the Mitigation Planning Effort...

SECTION 1 INTRODUCTION BACKGROUND CRS Origins Organizations Involved in the Mitigation Planning Effort... SECTION 1 INTRODUCTION... 1-1 1.1 BACKGROUND... 1-1 1.1.1 CRS Origins... 1-1 1.1.2 Organizatins Invlved in the Mitigatin Planning Effrt... 1-2 1.1.3 Multiple Agency Supprt fr Hazard Mitigatin... 1-2 1.2

More information

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740)

Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Project for Indonesian Tax Administration Reform (PINTAR) (P100740) Operation Name: Project

More information

New Hampshire s DSRIP Waiver Program, Alternative Payment Models and Safety Net Providers

New Hampshire s DSRIP Waiver Program, Alternative Payment Models and Safety Net Providers 1 New Hampshire s DSRIP Waiver Prgram, Alternative Payment Mdels and Safety Net Prviders Natinal Academy fr State Health Plicy s Value Based Payment Refrm Academy Meeting Washingtn D.C. July 25-26, 2017

More information

Implementation Status & Results India India: Bihar Integrated Social Protection Strengthening Project (P118826)

Implementation Status & Results India India: Bihar Integrated Social Protection Strengthening Project (P118826) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results India India: Bihar Integrated Social Protection Strengthening Project (P118826) Operation Name: India: Bihar Integrated

More information

Copiague Chamber of Commerce

Copiague Chamber of Commerce Cpiague Chamber f Cmmerce Est. 1955 BASIC REQUIREMENTS AND RESPONSIBILITIES FOR HOLDING OFFICE & POSITION DESCRIPTIONS 2016 Table f Cntents The basic requirements and respnsibilities fr hlding Office Psitin

More information

HOC Works Program Requirements

HOC Works Program Requirements HOC Wrks Prgram Requirements Last Revisin: March 2018 INTRODUCTION The Husing Opprtunities Cmmissin f Mntgmery Cunty (HOC) established the HOC Wrks prgram in 2015 in rder t guarantee that HOC emplyment

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

CITY OF MASSILLON, OHIO FY 2014 Community Development Block Grant Program Application for Project Funding

CITY OF MASSILLON, OHIO FY 2014 Community Development Block Grant Program Application for Project Funding 1. Prject Name CITY OF MASSILLON, OHIO FY 2014 Cmmunity Develpment Blck Grant Prgram Applicatin fr Prject Funding 2. Cmmunity Develpment Blck Grant Fund (CDBG) Request Ttal FY 2014 CDBG funds request:

More information

Local Code Of Corporate Governance

Local Code Of Corporate Governance Lcal Cde Of Crprate Gvernance Apprved by Jint Cmmittee 26 June 2017 Reprt N JC 09/2017 LOCAL CODE OF CORPORATE GOVERNANCE INTRODUCTION Crprate gvernance is the cmbinatin f prcesses and structures implemented

More information

2016/17 Annual Business Plan Update

2016/17 Annual Business Plan Update 2016/17 Annual Business Plan Update Central East LHIN Bard f Directrs December 21, 2016 Brian Laundry, Senir Directr System Design and Integratin, Central East LHIN Agenda Backgrund Annual Business Plan

More information

Overview of New Starts and Related Provisions in MAP-21

Overview of New Starts and Related Provisions in MAP-21 Overview f New Starts and Related Prvisins in MAP-21 Prgram Huse - HR 7, American Energy and Infrastructure Jbs Act - as reprted by Huse Transprtatin and Infrastructure Cmmittee Senate - S. 1813, Mving

More information

Emergency Solutions Grant (ESG) Program

Emergency Solutions Grant (ESG) Program Cunty f Santa Barbara Cmmunity Services Department Husing and Cmmunity Develpment Divisin State f Califrnia Emergency Slutins Grant (ESG) Prgram Bidder s Cnference June 22, 2018 Agenda I. Intrductins II.

More information

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207)

Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia Transport Rehabilitation Project (Serbia) (P075207) Operation Name: Transport Rehabilitation

More information

Implementation Status & Results Tajikistan Tax Administration (P127807)

Implementation Status & Results Tajikistan Tax Administration (P127807) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tajikistan Tax Administration (P127807) Operation Name: Tax Administration (P127807) Project Stage:

More information

Canvas Implementation STATUS REPORT FOR JULY 24, 2014 PROJECT MANAGEMENT TEAM

Canvas Implementation STATUS REPORT FOR JULY 24, 2014 PROJECT MANAGEMENT TEAM Canvas Implementatin STATUS REPORT FOR JULY 24, 2014 PROJECT MANAGEMENT TEAM 1 Prject Highlights June was a very prductive mnth, we imprved by 31% frm May (and 61% since April). Realistic faculty readiness

More information

Implementation Status & Results Burkina Faso Local Government Support Project (P120517)

Implementation Status & Results Burkina Faso Local Government Support Project (P120517) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Burkina Faso Local Government Support Project (P120517) Operation Name: Local Government Support

More information

o Continue to be a 'University of choice and opportunity' reaching out to students of all ages and backgrounds

o Continue to be a 'University of choice and opportunity' reaching out to students of all ages and backgrounds PROCUREMENT STRATEGY 1. The University Visin 1.1. The Strategic Prcurement Department will prvide a centre f prcurement expertise fr the University f West Lndn, minimising risks and delivering a psitive

More information

Resolution Adopting a Financial Management Policy

Resolution Adopting a Financial Management Policy Reslutin Adpting a Financial Management Plicy Reslutin N. 01-2011 A Reslutin Adpting a Financial Management Plicy WHEREAS: gd financial management is necessary fr the success f Rivercliff Estates Hmewner

More information

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415)

Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Senegal SENEGAL: TRANSPORT & URBAN MOBILITY PROJECT (P101415) Operation Name: SENEGAL: TRANSPORT

More information

Talking Points for CDFI Listening Tour

Talking Points for CDFI Listening Tour Talking Pints fr CDFI Listening Tur The CDFI Fund is hlding a natinal listening tur in July and August 2015 t slicit public pinin regarding a new strategic framewrk fr the CDFI Fund. CDBA encurages its

More information

Partnership for Market Readiness 17 th Meeting of the Partnership Assembly (PA17) DRAFT Agenda. Session 1 PA17 Opening and Introduction

Partnership for Market Readiness 17 th Meeting of the Partnership Assembly (PA17) DRAFT Agenda. Session 1 PA17 Opening and Introduction Partnership fr Market Readiness 17 th Meeting f the Partnership Assembly (PA17) DRAFT Agenda Octber 24-26, 2017 Hiltn Htel Tky, Tky, Japan Day 1 Sessin 1 PA17 Opening and Intrductin 15:00 Registratin:

More information

Active Sussex. Trustee Recruitment Pack

Active Sussex. Trustee Recruitment Pack Active Sussex Trustee Recruitment Pack Our main aim is t imprve lcal peple s health and wellbeing thrugh the prmtin f sprt and physical activity fr all members f the cmmunity, n matter their level f activity.

More information

ASETS APPLICATION. Are you receiving Income Support. Name Age Date of Birth Relationship Living with me. Emergency

ASETS APPLICATION. Are you receiving Income Support. Name Age Date of Birth Relationship Living with me. Emergency Inuvialuit Reginal Crpratin Human Resurces, Educatin & Training Department ASETS Prgram 867-777-7091 Tll Free: 1-855-777-7011 Fax: 867-777-4506 CRF EI PERSONAL IDENTIFICATION SIN Surname ASETS APPLICATION

More information

Position Description Fundraising Product Manager

Position Description Fundraising Product Manager Psitin Descriptin Fundraising Prduct Manager Psitin Details Psitin Title Business Unit Lcatin Appintment Status Cntract Hrs per F/N Nature f Appintment Incumbent/s Fundraising Prduct Manager Cmmunity Fundraising

More information

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines

ABORIGINAL ECONOMIC PARTNERSHIPS Program Application Guidelines ABORIGINAL ECONOMIC PARTNERSHIPS Prgram Applicatin Guidelines The Abriginal Ecnmic Partnerships Prgram (AEPP) supprts Abriginal cmmunities, businesses and rganizatins t increase participatin in ecnmic

More information

[AGENCY NAME] Mandate and Roles Document. (Pure Advisory Committees)

[AGENCY NAME] Mandate and Roles Document. (Pure Advisory Committees) [This sample dcument has been develped by the Agency Gvernance Secretariat. It is intended t be used fr infrmatinal purpses nly. Agencies are encuraged t adapt the dcument t meet their specific needs.

More information

Charter School Operational Performance Framework and Guidance

Charter School Operational Performance Framework and Guidance Charter Schl Operatinal Perfrmance Framewrk and Guidance Nrth Carlina Department f Public Instructin Office Charter Schls Prepared fr the Nrth Carlina Department f Public Instructin in cnjunctin with the

More information

Attachment C. Monitoring Procedures

Attachment C. Monitoring Procedures Attachment C. Mnitring Prcedures These prcedures set frth the prcess that the Federal Hme Lan Bank f Indianaplis ( FHLBI r the Bank ) fllws in mnitring its Affrdable Husing Prgram (AHP) cmpetitive applicatin

More information

December 2013 Ice Storm City of Toronto s Emergency Response Review

December 2013 Ice Storm City of Toronto s Emergency Response Review December 2013 Ice Strm City f Trnt s Emergency Respnse Review Executive Cmmittee July 2, 2014 2013 Ice Strm Emergency Respnse Review Overview Agenda 1. Review f the City s Emergency Respnse t the December

More information

Metrics to Quantify Performance Goals (DASNY) For 4/1/2015-3/31/2016

Metrics to Quantify Performance Goals (DASNY) For 4/1/2015-3/31/2016 DORMITORY AUTHORITY STATE OF NEW YORK Metrics t Quantify Perfrmance Gals (DASNY) Fr 4/1/2015-3/31/2016 Gal 1: Deliver prjects/services f high quality n-time and n-budget. Cnstructin Metrics: Actual cmpletin

More information

Vacant Home Program Application

Vacant Home Program Application Vacant Hme Prgram Applicatin Please read the attached Plicy Guidelines and prvide the requested infrmatin. 1. Address f Prperty: 2. Applicant s name & mailing address: 3. Requested Grant r Lan Amunt: $

More information

SAN JOAQUIN COUNTY OFFICE OF EDUCATION

SAN JOAQUIN COUNTY OFFICE OF EDUCATION SAN JOAQUIN COUNTY OFFICE OF EDUCATION MIGRANT EDUCATION REGION 23 REQUEST FOR PROPOSALS FOR: Migrant Educatin Lcal Needs Assessment March 25, 2015 Ntice NOTICE IS HEREBY GIVEN that the San Jaquin Cunty

More information

Office of Procurement. Cherri Branson Director

Office of Procurement. Cherri Branson Director Office f Prcurement Cherri Bransn Directr www.mntgmerycuntymd.gv/prcurement Office f Prcurement Prcurement Operatins The Office f Prcurement btains gds, services and cnstructin fr the Cunty Gvernment using

More information

Global Scan of Sustainable Purchasing Practices

Global Scan of Sustainable Purchasing Practices This summary f highlights frm Internatinal Scan f Sustainability Practices f Insurance and Nn Insurance Cmpanies is published nline curtesy f the BuySmart Netwrk. Thanks t Cr Strandberg and the Cperatrs

More information

Developing Performance Goals and Expectations

Developing Performance Goals and Expectations Subset: Emplyment Subset: Develping Perfrmance Gals Develping Perfrmance Gals and Expectatins Intrductin fr Managers and Supervisrs The fundatin f an effective perfrmance management prgram are the Perfrmance

More information

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)

More information

Transportation Management Plan: A Guide for Transportation Access to Washington Park Adopted - 10/13/16

Transportation Management Plan: A Guide for Transportation Access to Washington Park Adopted - 10/13/16 Transprtatin Management Plan: A Guide fr Transprtatin Access t Washingtn Park Adpted - 10/13/16 EWP Partner Missins At Hyt Arbretum, every tree has a stry t tell and is a prmise t future generatins. Our

More information

Chapter 1. Introduction and Overview of Audit & Assurance

Chapter 1. Introduction and Overview of Audit & Assurance Assurance & Auditing Textbk Ntes Chapter 1 Intrductin and Overview f Audit & Assurance Audit prcess in Fcus 1.1 Auditing & Assurance Defined - An assurance is an engagement where an auditr r cnsultant

More information

These Budget Preparation Guidelines are primarily directed towards preparation of the Operating Budget and Supplemental Items.

These Budget Preparation Guidelines are primarily directed towards preparation of the Operating Budget and Supplemental Items. Budget Areas There are three majr parts f the Midway ISD budget. The Operating Budget. This part cvers services, supplies, materials and ther expenditures, and persnnel csts fr extra duty, vertime and

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS A. Backgrund: Develping an Infrmatin System fr Develpment Plicy and Planning (KSTA) MON 51136-001 TERMS OF REFERENCE FOR CONSULTANTS The Asian Develpment Bank (ADB) will engage 82 persn-mnths f cnsulting

More information

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018)

Terms of Reference - Board of Directors (approved by the Board on 12 April 2018) Terms f Reference - Bard f Directrs (apprved by the Bard n 12 April 2018) 1. Respnsibility and Principal Duties The Bard f Directrs has the verall respnsibility fr the gvernance f the Cmpany and fr supervising

More information

Increasing financial capacity for UHC in Africa

Increasing financial capacity for UHC in Africa Increasing financial capacity fr UHC in Africa Dr. Feng Zha, PhD, MD, MPH Manager fr Health African Develpment Bank Ykhama, June 1, 2013 Africa Rising: Rapid Ecnmic Grwth Africa is grwing rapidly at 5-8%

More information

UPDATE ON INTERNAL CONTROL ENVIRONMENT REPORT OF DIRECTOR OF EDUCATION AND LIFELONG LEARNING AGENDA ITEM: 4.1.1

UPDATE ON INTERNAL CONTROL ENVIRONMENT REPORT OF DIRECTOR OF EDUCATION AND LIFELONG LEARNING AGENDA ITEM: 4.1.1 CARDIFF COUNCIL CYNGOR CAERDYDD AUDIT COMMITTEE: 18 th SEPTEMBER 2018 UPDATE ON INTERNAL CONTROL ENVIRONMENT REPORT OF DIRECTOR OF EDUCATION AND LIFELONG LEARNING AGENDA ITEM: 4.1.1 Reasn fr this Reprt

More information

Turkey s Project-Based Incentive Scheme

Turkey s Project-Based Incentive Scheme Turkey s Prject-Based Incentive Scheme December 4th, 2017 Executive Summary Turkey has intrduced a new system n September 26, 2016, which grants gvernment incentives fr eligible investments n prject basis.

More information

Siding Program Application

Siding Program Application Siding Prgram Applicatin Please read the attached Plicy Guidelines and prvide the requested infrmatin. 1. Address f Prperty: 2. Applicant s name & mailing address: Telephne: ( ) - E-mail 3. Applying fr:

More information

This is a living document that can be adjusted by a majority of the NDS Steering Committee, in consultation with the NDSC general membership.

This is a living document that can be adjusted by a majority of the NDS Steering Committee, in consultation with the NDSC general membership. NATIONAL DATA SERVICE (NDS) AND NATIONAL DATA SERVICES CONSORTIUM (NDSC) ELEMENTS OF AN INTERIM CHARTER Preamble This interim charter is designed t prvide guidance fr the peratins f the Natinal Data Service

More information

THE COMMUNITY NEEDS ASSESSMENT REQUIREMENT FOR THE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM

THE COMMUNITY NEEDS ASSESSMENT REQUIREMENT FOR THE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM THE COMMUNITY NEEDS ASSESSMENT REQUIREMENT FOR THE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM (Extracted, with permissin, frm The Cmmunity Needs Assessment Prcess, Mntana Department f Cmmerce, July

More information

THE WHITE HOUSE Office of the Press Secretary

THE WHITE HOUSE Office of the Press Secretary THE WHITE HOUSE Office f the Press Secretary FOR IMMEDIATE RELEASE March 16, 2009 President Obama and Secretary Geithner Annunce Plans t Unlck Credit fr Small Businesses Emphasizes Recvery Effrts Already

More information