Oakfield School District Community Survey Results. Fall 2018

Size: px
Start display at page:

Download "Oakfield School District Community Survey Results. Fall 2018"

Transcription

1 Oakfield School District Community Survey Results Fall 2018

2 Survey Summary The survey was conducted in late November/early December of Residents within the District were mailed a paper survey. Each survey included a unique survey access code for those who preferred to take the survey online. Total responses = 400 (219 paper) Participation rate = 32% Margin of error = +/- 5.0%

3 Respondent Information

4 What is your age? 30% 27% 25% 20% 24% 20% 16% 15% 11% 10% 5% 2% 0% and older

5 Do you live in the District? 13% Yes No 87%

6 In which municipality do you reside? Village of Oakfield 36% Town of Lamartine 22% Town of Oakfield 16% Town of Byron 13% Do not live in the District 9% Town of Fond du Lac 2% Town of Lomira 1% Town of Leroy 0.30% 0.00% 10.00% 20.00% 30.00% 40.00%

7 Are you an employee of the District? 15% 85% Yes (n=62) No (n=338)

8 Do you have children attending school in the District? 39% 61% Yes (n=154) No (n=244)

9 Please mark ALL other relationships you have with the District: Parent/guardian of an Oakfield graduate(s) 54% Graduate of Oakfield Schools 48% Grandparent/relative of an Oakfield student(s) 38% Parent/guardian of child not yet school age 14% Volunteer at Oakfield Schools 14% 0% 10% 20% 30% 40% 50% 60%

10 I rely on the following sources for School/District information: 21% 77% District mailings 61% 85% District website 17% 40% Facebook Text message Attend School Board meetings Attend meetings Twitter 10% 5% 3% 9% 4% 8% 0% 3% 34% 32% Non-Parents (Non-Staff) Parents (Non-Staff) Fond du Lac Reporter 3% 16% TV/Cable 3% 2% Other 2% 2% Booster Clubs 1% 0% 0% 20% 40% 60% 80% 100% 10

11 Financial Background

12 Over the past year, the District has worked hard to be better stewards of the taxpayers dollars. As a result, the School District of Oakfield s tax mill rate, which is used to calculate property taxes, declined by $1.21.

13 Funding to Support Operations

14 In 2014, our community generously supported the District with a six-year operating referendum. The referendum provided $1.2 million that allowed the District to maintain the quality services and programs our community has come to expect. In addition, these funds were utilized to complete the following projects: Renovated the instructional media center (library) Replaced flooring in the hallways and cafeterias Added carpeting in classrooms at both schools Replaced middle/high school lockers Replaced gym flooring and bleachers Repaired middle/high school windows and roof sections Converted two classrooms into a modern science lab Replaced the middle/high school fire alarm system Resurfaced parking lots Added handicap accessible entrance doors Increased access to technology for all students Next year, the funding from the 2014 referendum will end. In order to maintain current programs and services, voters will need to renew an operational referendum. However, due to careful planning, improved operating efficiencies and increased student enrollment, the funding needed will be lower than in previous years.

15 Would you support renewing the operational referendum for $1.1 million for each of the next five years? Representing a projected tax mill rate lower than the rate of $ All Residents Definitely yes 40% 63% Yes Probably yes 23% Undecided 17% Probably no Definitely no 7% 13% 20% No 0% 20% 40% 60% 80% 100%

16 Would you support renewing the operational referendum for $1.1 million for each of the next five years? Representing a projected tax mill rate lower than the rate of $ Staff Residents Definitely yes 90% 93% Yes Probably yes 3% Undecided 7% Probably no Definitely no 0% 0% 0% No 0% 20% 40% 60% 80% 100%

17 Would you support renewing the operational referendum for $1.1 million for each of the next five years? Representing a projected tax mill rate lower than the rate of $ Parent Residents (Non-Staff) Definitely yes 50% 74% Yes Probably yes 24% Undecided 14% Probably no Definitely no 5% 7% 12% No 0% 20% 40% 60% 80% 100%

18 Would you support renewing the operational referendum for $1.1 million for each of the next five years? Representing a projected tax mill rate lower than the rate of $ Non-Parent Residents (Non-Staff) Definitely yes Probably yes 27% 25% 52% Yes Undecided 21% Probably no Definitely no 9% 18% 27% No 0% 20% 40% 60% 80% 100%

19 Funding Cuts

20 Should the District consider the following to save money? Yes (10), No (1) Item All Residents Staff Residents Parent Residents (Non-Staff) Non-Parent Residents (Non-Staff) Should salaries be frozen to save money? Should the District postpone curriculum updates to save money? Should the District reduce the number of athletic/activity offerings? Should class sizes be increased to save money? Should the District delay implementing the technology plan to save money? Should elective course offerings be reduced or eliminated to save money?

21 Overall Satisfaction (All Respondents)

22 The School District of Oakfield s mission is to educate and inspire each student to think, to love learning, to pursue excellence and to succeed in work and life in the 21st century. It is our goal to have all our students prepared to think, learn, work, solve problems, communicate, collaborate and contribute effectively throughout their lives. How has the District done accomplishing this mission? 100% 80% 60% 40% 33% 46% 39% % 18% 19% 11% 4% 6% 13% 11% 0% Great Good Fair Poor Don't know

23 Overall, how satisfied are you with the communications that come from the District? 100% 80% 60% 57% 52% % 20% 26% 12% 8% 18% 2% 12% 6% 7% % Very satisfied Satisfied Not satisfied Very unsatisfied No opinion

24 Overall, how satisfied are you with the School District of Oakfield? 100% 80% 60% 40% 39% 50% 42% % 20% 13% 8% 2% 5% 9% 9% 0% Very satisfied Satisfied Not satisfied Very unsatisfied No opinion

25 Thank you!

Beaver Dam Unified School District Community Survey Results. Spring 2016

Beaver Dam Unified School District Community Survey Results. Spring 2016 Beaver Dam Unified School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in May of 2016. Residents within the District were mailed a paper survey. Each

More information

Lake Mills Area School District Community Survey Results. Spring 2018

Lake Mills Area School District Community Survey Results. Spring 2018 Lake Mills Area School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in late May through mid-june of 2018. Residents within the District were mailed a paper survey.

More information

Gillett School District Community Survey Results. Spring 2018

Gillett School District Community Survey Results. Spring 2018 Gillett School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in April of 2018. Residents within the District were mailed a paper survey. Each survey included a unique

More information

Marathon School District Community Survey Results. Spring 2018

Marathon School District Community Survey Results. Spring 2018 Marathon School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a unique

More information

Freedom Area School District Community Survey Results. Fall 2018

Freedom Area School District Community Survey Results. Fall 2018 Freedom Area School District Community Survey Results Fall 2018 Survey Summary The survey was conducted in late October/early November of 2018. Residents within the District were mailed a paper survey.

More information

West Bend School District Community Survey Results. Spring 2018

West Bend School District Community Survey Results. Spring 2018 West Bend School District Community Survey Results Spring 2018 Survey Summary The survey was conducted in June of 2018. Residents within the District were mailed a paper survey. Each survey included a

More information

Burlington Area School District Community Survey Results. Winter 2016

Burlington Area School District Community Survey Results. Winter 2016 Burlington Area School District Community Survey Results Winter 2016 Survey Summary The community survey was conducted in December of 2016. Residents within the District were mailed a paper survey. Each

More information

76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school:

76% The comprehensive solution put forward by the Community Steering Committee addresses a wide variety of needs at the high school: Mukwonago Area s c h o o l dis t ric t Your Feedback Counts! Thank you for your participation in the MASD Community Survey! The outstanding response rate of 2,766 completed surveys reflects a strong commitment

More information

School District of Somerset Community Survey Results. Fall 2015

School District of Somerset Community Survey Results. Fall 2015 School District of Somerset Community Survey Results Fall 2015 Survey Summary The community survey was conducted in November/December of 2015 Residents within the District were mailed a paper survey. Each

More information

Muskego Norway Schools Community Survey Results. Fall 2015

Muskego Norway Schools Community Survey Results. Fall 2015 Muskego Norway Schools Community Survey Results Fall 2015 Survey Summary The community survey was conducted in October of 2015 Residents within the District were mailed a paper survey. Each survey included

More information

School District of West De Pere Community Survey Results. Fall 2017

School District of West De Pere Community Survey Results. Fall 2017 School District of West De Pere Community Survey Results Fall 2017 Survey Summary The survey was conducted in October of 2017. Residents within the District were mailed a paper survey. Each survey included

More information

Sheboygan Area School District Community Survey Results. Spring 2016

Sheboygan Area School District Community Survey Results. Spring 2016 Sheboygan Area School District Community Survey Results Spring 2016 Survey Summary The community survey was conducted in April/early May of 2016 Residents within the District were mailed a paper survey.

More information

Barneveld School District Community Survey Results. Spring 2017

Barneveld School District Community Survey Results. Spring 2017 Barneveld School District Community Survey Results Spring 2017 Survey Summary The survey was conducted in late May/early June of 2017. Residents within the District were mailed a paper survey. Each survey

More information

School District of Horicon Community Survey Results. Fall 2017

School District of Horicon Community Survey Results. Fall 2017 School District of Horicon Community Survey Results Fall 2017 Survey Summary The survey was conducted in November December of 2017. Residents within the District were mailed a paper survey. Each survey

More information

Understanding the Costs: Frequently Asked Questions

Understanding the Costs: Frequently Asked Questions Understanding the Costs: Frequently Asked Questions As of 9/6/2016 What is the total proposed project cost? The total project cost is $54.9 M and cannot, by state law, exceed that amount if approved by

More information

Tomah Area School District Community Survey Results. Spring 2015

Tomah Area School District Community Survey Results. Spring 2015 Tomah Area School District Community Survey Results Spring 2015 Survey Summary The community survey was conducted in April and early May of 2015 All residents within the District were mailed a paper survey.

More information

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future

Hayfield Community Schools Bond Referendum. Vote Monday, September 11, Our Schools Our Communities Our Future Hayfield Community Schools 2017 Bond Referendum Vote Monday, September 11, 2017 Our Schools Our Communities Our Future 2017 Bond Referendum What s Already Been Done? Studies and Meetings and Meetings 2014-15

More information

Richland School District

Richland School District Richland School District April 5, 2016 Referendum Ballot and Cost Impact Presentation Presented by: Carol Wirth, President 1020 N. Broadway, Suite G-9 Milwaukee, WI 53202 Phone 414/434-9644 Question 1

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS The SMART FAQS are provided to answer questions regarding the SMART Initiative and will be updated on an ongoing basis. On November 4, 2014, Broward County voters approved a

More information

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure...

Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 7 Impartial Analysis... 8 Statement in Favor of Measure... 10 Ballot Measure EXHIBIT B MEASURE Y (ABBREVIATED FORM)

More information

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S

SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S SOMIS UNION SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE S SOMIS UNION SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE S Under this measure, the Somis Union School District ( District ) is submitting a bond measure, described below, to the voters

More information

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure...

Contents. Ballot Measure Full Text Ballot Proposition Tax Rate Statement Impartial Analysis Statement in Favor of Measure... Contents Ballot Measure... 2 Full Text Ballot Proposition... 3 Tax Rate Statement... 6 Impartial Analysis... 7 Statement in Favor of Measure... 8 Ballot Measure EXHIBIT A HANFORD ELEMENTARY SCHOOLS REPAIR

More information

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T

HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T HUENEME ELEMENTARY SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE T Under this measure, the Hueneme Elementary School District ( District ) is submitting a bond measure, described below,

More information

CH-UH Board of Education Meeting. June 27, 2017

CH-UH Board of Education Meeting. June 27, 2017 CH-UH Board of Education Meeting June 27, 2017 Tonight s Agenda Purpose of this work session Current status of the Master Facilities Plan Phase 1 Factors that led us to this point Current path for middle

More information

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List

Action Item. Sid Albaugh, Assistant Superintendent Business Services. Consideration of Approval of 2018 Measure A - Facilities Project List Action Item TO: PRESENTED BY: BOARD AGENDA ITEM: Board of Trustees and Superintendent of Schools Sid Albaugh, Assistant Superintendent Business Services Consideration of Approval of 2018 Measure A Facilities

More information

Progress Update Identified Needs & Capital Plan

Progress Update Identified Needs & Capital Plan Progress Update Identified Needs & Capital Plan May 29, 2012 Buena Park School District Facilities Assessment & Implementation Plan 0 Facilities Planning, Public Finance, Program Administration Summary

More information

Building and Site Sinking Fund Millage. Election Date: November 7th 2017

Building and Site Sinking Fund Millage. Election Date: November 7th 2017 Building and Site Sinking Fund Millage Election Date: November 7th 2017 How do Districts Fund Facilities and Technology Needs? General Fund - Use current operating dollars. These are limited to the amount

More information

Ballot Measures-T Section

Ballot Measures-T Section T, Westminster School District Classroom Improvement Measure To upgrade aging schools and improve the quality of education with funding that cannot be taken by the State; provide heating, ventilation and

More information

Galloway Township Public Schools

Galloway Township Public Schools Galloway Township Public Schools 2014-2015 PUBLIC BUDGET HEARING APRIL 28, 2014 Introduction Guiding Principles Core Values: respect, integrity, hard work, communication, diversity, excellence District

More information

BELLS INDEPENDENT SCHOOL DISTRICT

BELLS INDEPENDENT SCHOOL DISTRICT May 5, 2018 2018 BOND ELECTION Strong Schools BELLS INDEPENDENT SCHOOL DISTRICT Strong Community Committed to the Future \\\ Bond Election Information May 5, 2018 Bond to Improve Bells High School Committed

More information

Loveland City Schools FY Revenue

Loveland City Schools FY Revenue FREQUENTLY ASKED QUESTIONS 1. Where does the Loveland City School District revenue come from? In Ohio, the funding of schools is shared by the state and local school districts. The Ohio General Assembly

More information

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011

Fort Wayne Community Schools. Capital Projects Planning March 15, 2011 Fort Wayne Community Schools Capital Projects Planning March 15, 2011 District Balanced Scorecard Goal III Operate effectively with integrity and fiscal responsibility Condition scores unchanged Use of

More information

SPOTLIGHT FORSYTH COUNTY BOND REFERENDA. Three bonds totaling $430 million. Taxpayers should get the facts. CITY AND COUNTY GOVERNMENT #481

SPOTLIGHT FORSYTH COUNTY BOND REFERENDA. Three bonds totaling $430 million. Taxpayers should get the facts. CITY AND COUNTY GOVERNMENT #481 SPOTLIGHT CITY AND COUNTY GOVERNMENT #481 Julie Tisdale City and County Policy Analyst FORSYTH COUNTY BOND REFERENDA Three bonds totaling $430 million. Taxpayers should get the facts. ABOUT THE AUTHOR

More information

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS)

DISTRICT HISTORY Referendum ($585,000) Purchase of 10 Acres / Football Field Original junior high building (present old section of MS) 1917 Auburn Township HS ($50,000) 1948 Referendum ($240,000) Two-story section of present elementary Gym / Cafeteria / Kitchen Became K-12 district 1954 Referendum ($130,000) AG/IT shop area Band / Vocal

More information

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools

Ballot Measures-N 7. Centralia Elementary School District, Building Strong Neighborhood Schools Section Ballot Measures-N N Centralia Elementary School District, Building Strong Neighborhood Schools To repair/modernize aging classrooms, science labs/school facilities to keep pace with technology,

More information

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182

Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Page Item 174 Overview 175 Revenue 177 Expenditures 178 Elementary School Allocation 180 Middle School Allocation 181 High School Allocation 182 Operational Services/Central Services/Axtell Park School

More information

PERMANENT IMPROVEMENT LEVY

PERMANENT IMPROVEMENT LEVY SIDNEY CITY SCHOOLS PERMANENT IMPROVEMENT LEVY SUPPORT OUR SCHOOL FACILITIES VOTE YES AUGUST 2 Renewing Our Community s Commitment to School Facilities The mission of Sidney City Schools is to provide

More information

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515

$4,701,440 $2,727,355 $2,596,419 $447,703 $11,216,598 $21,689,515 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Cherry Creek School District Profile of Student-Based Budgeting for Schools FY

Cherry Creek School District Profile of Student-Based Budgeting for Schools FY Cherry Creek School District Profile of Student-Based Budgeting for Schools FY2014-15 Profile of Student-Based Budgeting for Schools TABLE OF CONTENTS Foreword... 1 Introduction... 2 The Annual Budget...

More information

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue

PROPOSITION FARMINGTON SCHOOLS. April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS April 8, 2014 Bond Issue PROPOSITION FARMINGTON SCHOOLS - BOND LANGUAGE Shall the Board of Education of the Farmington R-7 School District of St. Francois County, Missouri,

More information

2019 Capital Projects Plan

2019 Capital Projects Plan Rev. 03/18 School Name Crawford County Community School Corporation County Name Crawford School No. 1300 2019 Capital Projects Plan The following plan format should be used for your 2019 Capital Projects

More information

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT

Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT 2018-19 Proposed Final Budget Presentation (May 14, 2018) SELINSGROVE AREA SCHOOL DISTRICT GENERAL FUND FINANCIAL STATEMENT (Current financial position) 2017-18 Budget 2017-18 Projected 2017-18 Variance

More information

School District of Slinger Community Survey Report

School District of Slinger Community Survey Report School District of Slinger Community Survey Report Prepared by: School Perceptions October 2011 Overview The survey was conducted for the School District of Slinger during the fall of 2011 by School Perceptions.

More information

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget?

Frequently asked questions on the Ridgewood Public School Budget. 2. Why does the Board approve a preliminary budget? Over the last few weeks the Board of Education has received a number of questions regarding the proposed 2018-19 budget. We hope that the Frequently Asked Questions and our Answers below will help to shed

More information

Two Ballot Proposals. August 8, 2017

Two Ballot Proposals. August 8, 2017 Two Ballot Proposals August 8, 2017 Per-Pupil Foundation Allowance Ten-Year History for Schools* Per-Pupil Foundation Allowance Ten-Year History for Schools* FYs 2007-08 through 2016-17 FY2008 FY2009 FY2010

More information

SECTION 6: CAPITAL IMPROVEMENT DETAIL

SECTION 6: CAPITAL IMPROVEMENT DETAIL SECTION 6: CAPITAL IMPROVEMENT DETAIL Summary... 1 General Government... 2 Public Safety... 6 Public Works... 12 Recreation and Leisure... 18 Education... 24 SUMMARY TOTALS CAPITAL IMPROVEMENT PLAN AND

More information

SCHOOL BUDGET NEWS. Elmira City School District. May School District Annual Budget Vote and School Board Election May 17, 2016

SCHOOL BUDGET NEWS. Elmira City School District. May School District Annual Budget Vote and School Board Election May 17, 2016 SCHOOL BUDGET NEWS Elmira City School District May 2016 School District Annual Budget Vote and School Board Election May 17, 2016 VOTING INFO: WHEN: May 17 Dear Community Members, On behalf of the Board

More information

General Obligation Bond Frequently Asked Questions. What is a Bond Referendum and what will voter approval of the Bond Referendum mean technically?

General Obligation Bond Frequently Asked Questions. What is a Bond Referendum and what will voter approval of the Bond Referendum mean technically? What is a Bond Referendum and what will voter approval of the Bond Referendum mean technically? The Florida Constitution and state statutes limit the taxing powers of governmental agencies. However, the

More information

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5

CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 CIP FY2015 FY2019 Requests SCH-1, SCH-2 and SCH-5 Edwin Ataide Deputy Director Plant & Facilities SCH-1 School Projects All Schools Priority FY15 FY16 FY17 FY18 FY19 ADA Compliance (Handicap Accessibility)

More information

APPENDIX A FULL TEXT OF BOND MEASURE

APPENDIX A FULL TEXT OF BOND MEASURE APPENDIX A FULL TEXT OF BOND MEASURE INTRODUCTION To repair aging classrooms / leaky roofs / old facilities, and provide a safe, quality learning environment for current and future students, shall Grass

More information

Facility and Financial Overview. Brandywine Heights Area School District

Facility and Financial Overview. Brandywine Heights Area School District Facility and Financial Overview Brandywine Heights Area School District BHASD Mission: Our Mission is to enable students to strive for success in an ever-changing global society. Agenda 1. Overview of

More information

Cherry Creek School District Profile of Student-Based Budgeting for Schools FY

Cherry Creek School District Profile of Student-Based Budgeting for Schools FY Cherry Creek School District Profile of Student-Based Budgeting for Schools FY2011-12 TABLE OF CONTENTS Foreword... 1 Introduction... 2 The Annual Budget... 2 The Budget Process... 3 FY2011-12 General

More information

Public Presentation Capital Bond November 27, 2017

Public Presentation Capital Bond November 27, 2017 Public Presentation Capital Bond November 27, 2017 Capital Bond The Board of Education facilities committee working in concert with building administration, central administration, and the district architect

More information

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017

Attachment FC 16 SBCC 11/17/2017. STATE BOARD OF COMMUNITY COLLEGES Construction and Property November 17, 2017 A. Approval - New (Non-State and Other State Funds) Name (Other State) (Other State) Non-State Funds/ Undetermined 1 N/A B. Approval - Amended (Non-State and Other State Funds) 1 Coastal Carolina Main

More information

Capital Projects Fund. Board Work Session August 9, 2007

Capital Projects Fund. Board Work Session August 9, 2007 Capital Projects Fund Board Work Session August 9, 2007 Presentation Objectives Building inventory Revenue sources statutory adjustments and uses Demonstrate past use of funds 2008 proposed budget Setting

More information

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent

Tumwater University School District Budget Myths Bond Project Update. February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Tumwater University School District Budget Myths Bond Project Update February 2016 Mel Murray, Director of Capital Projects John Bash, Superintendent Construction Update $136,000,000 in bonds approved

More information

Budget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007

Budget Newsletter. Rush-Henrietta. In This Issue District Budget Proposal. Central School District May 2007 In This Issue... Budget Newsletter Rush-Henrietta Rush-Henrietta Central School District May 2007 2007-2008 District Budget Proposal Proposed Budget: $96,289,455 Budget-to-Budget Increase: 3.6% Tax Rate

More information

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL

FY 2014/ /24 CAPITAL IMPROVEMENTS PROGRAM MAINTENANCE/REPLACEMENT PROJECTS DETAIL Year 1 Project Revenue County Category FY 14/15 Total Offset Cost I 1 AGNOR HURT HVAC Design Chiller and Exhaust Fans replacement $30,000 $0 $30,000 I 2 AGNOR HURT HVAC Design replacement of 6 RTUs $35,000

More information

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R

OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R OXNARD SCHOOL DISTRICT TAX RATE STATEMENT BOND MEASURE R OXNARD SCHOOL DISTRICT IMPARTIAL ANALYSIS BY COUNTY COUNSEL* BOND MEASURE R Under this measure, the Oxnard School District ( District ) is submitting a bond measure, described below, to the voters for

More information

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

(TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I SCHOOL PROJECTS (TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I 1 Sum of Prior Years and Estimate to Complete Project Estimates: PlanningIDesign Land Construction Total 1 Sum of FY

More information

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA

MUROC JOINT UNIFIED SCHOOL DISTRICT KERN COUNTY NORTH EDWARDS, CALIFORNIA KERN COUNTY NORTH EDWARDS, CALIFORNIA FINANCIAL AND PERFORMANCE AUDIT JUNE 30, 2018 TABLE OF CONTENTS JUNE 30, 2018 PAGE INTRODUCTORY SECTION TABLE OF CONTENTS i FINANCIAL SECTION INDEPENDENT AUDITOR'S

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program August 1, 2018 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

Orange Unified School District (C) Copyright March 2018 All Rights Reserved

Orange Unified School District (C) Copyright March 2018 All Rights Reserved ORANGEUNIFIED UNIFIEDSCHOOL SCHOOLDISTRICT DISTRICT ORANGE Orange Unified School District (C) Copyright March 2018 All Rights Reserved 1 The Office of the Assistant Superintendent of Business Services

More information

GAVILAN JOINT COMMUNITY COLLEGE DISTRICT Gilroy, California. MEASURE E GENERAL OBLIGATION BOND PERFORMANCE AUDIT June 30, 2013

GAVILAN JOINT COMMUNITY COLLEGE DISTRICT Gilroy, California. MEASURE E GENERAL OBLIGATION BOND PERFORMANCE AUDIT June 30, 2013 Gilroy, California PERFORMANCE AUDIT June 30, 2013 PERFORMANCE AUDIT June 30, 2013 CONTENTS INDEPENDENT AUDITOR S REPORT... 1 BACKGROUND: LEGISLATIVE HISTORY... 2 GAVILAN JOINT COMMUNITY COLLEGE DISTRICT

More information

Capital Projects Completed since 1988

Capital Projects Completed since 1988 Projects Completed since 1988 Project Cost FY1988 ICCB Building Illinois Repair & Renovation - Replace Carpet in Classroom Buildings, Library and Lobby of Admin $ 51,901.00 $ 51,901.00 $ 51,901.00 FY1990

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2013 Measure V Bond Construction Fund Year Ended June 30, 2013 Table of Contents Page Independent Auditors'

More information

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015

Santa Barbara Community College District Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Financial Statements and Agreed-Upon Procedures Year Ended June 30, 2015 Measure V Bond Construction Fund Year Ended June 30, 2015 Table of Contents Page Independent Auditors'

More information

Elba Central School District Budget Hearing. May 7, :30 p.m.

Elba Central School District Budget Hearing. May 7, :30 p.m. Elba Central School District Budget Hearing May 7, 2018 6:30 p.m. Mission Statement The purpose and tradition of Elba Central School District and its community is to empower and inspire our students to

More information

Financial Plan

Financial Plan Financial Plan 2018-2019 Budget for Fiscal Year July 1, 2018 June 30, 2019 AT A GLANCE CHERRY CREEK SCHOOL DISTRICT NO. 5 4700 South Yosemite Street Greenwood Village, CO 80111 Arapahoe County, Colorado

More information

Annual Report on Parish Facilities. Patrick Jendraszak

Annual Report on Parish Facilities. Patrick Jendraszak Annual Report on Parish Facilities Patrick Jendraszak May 15, 2018 Buildings & Grounds Committee Andy Bauer (School Liaison) Sue MacGill (School Liaison) Progress on Last Year s Plans Renovate Grades 3/4

More information

Fiscal Year GUIDE TO UNDERSTANDING THE BUDGET CHERRY CREEK SCHOOL DISTRICT #5 ARAPAHOE COUNTY, COLORADO

Fiscal Year GUIDE TO UNDERSTANDING THE BUDGET CHERRY CREEK SCHOOL DISTRICT #5 ARAPAHOE COUNTY, COLORADO Fiscal Year 2015-16 GUIDE TO UNDERSTANDING THE BUDGET CHERRY CREEK SCHOOL DISTRICT #5 ARAPAHOE COUNTY, COLORADO ACKNOWLEDGMENTS Thank you to the members of the Budget Department for their dedicated efforts

More information

Budget and Proposition Information

Budget and Proposition Information Whitney Point Central School District 2014 2015 Budget and Proposition Information Budget Hearing: May 6, 2014 The Mission of the Whitney Point Central School District is.. to provide an excellent education

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

This workbook is designed as a supplement to the 2018 Department memo labeled "Capital Projects Plan Template and Notices for Budget Year 2019.

This workbook is designed as a supplement to the 2018 Department memo labeled Capital Projects Plan Template and Notices for Budget Year 2019. Capital Projects Plan Template and Notices for Budget Year 2019 Amended August 21, 2018 Pursuant to IC 20-40-18-6 and IC 20-40-18-7 and in conjunction with the implementation of HEA 1009-2017 and HEA 1167-2018,

More information

Local ballot measure: B. Redding School District Bond Measure

Local ballot measure: B. Redding School District Bond Measure B Redding School District Bond Measure Ballot question To improve the quality of education; repair/replace leaky roofs; modernize and construct classrooms, restrooms and school facilities; and make health,

More information

PORTA CUSD Bluejay Rd, Petersburg IL Tel Fax PORTA AT A GLANCE FY 2018

PORTA CUSD Bluejay Rd, Petersburg IL Tel Fax PORTA AT A GLANCE FY 2018 PORTA CUSD 202 17651 Bluejay Rd, Petersburg IL 62675 Tel 217-632-3803 Fax 217-632-3221 www.porta202.org PORTA AT A GLANCE FY 2018 Data within this document is a snapshot of the PORTA district s financial

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

April 2017 Operating & Capital Funds Referenda

April 2017 Operating & Capital Funds Referenda April 2017 Operating & Capital Funds Referenda February 12, 2017 Summary Update DRAFT WIP FOR DISCUSSION PURPOSES ONLY Rev. 11 February 2017 WHY ARE WE HERE TODAY? Our Core Mission: To provide a high quality

More information

The Municipal Budget Committee Meeting of Wednesday October 28, 2015 was called to order at 7:00 p.m. at the Knightly Meeting Room.

The Municipal Budget Committee Meeting of Wednesday October 28, 2015 was called to order at 7:00 p.m. at the Knightly Meeting Room. Budget Committee October, 0 0 MINUTES OF THE BUDGET COMMITTEE MEETING OF October, 0 0) OPEN MEETING The Municipal Budget Committee Meeting of Wednesday October, 0 was called to order at :00 p.m. at the

More information

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867

Total Revenues $27,158,867 $1,800,000 $2,400,000 $2,600,000 $3,600,000 $37,558,867 INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

Proposed Budget

Proposed Budget Westhampton Beach UFSD Proposed Budget 2016-2017 Budget Hearing - May 9, 2016 Budget Goals Maintaining world-class educational, extracurricular, and support programs for all students in challenging economic

More information

FY17 FMD Capital Budget

FY17 FMD Capital Budget FY17 FMD Capital Budget School Committee Presentation December 2, 2015 Wellesley Facilities Maintenance Department AGENDA Status Update on Capital Projects Role in Capital Planning Capital Planning & Budgeting

More information

Barnesville Public Schools Proposed Building Program

Barnesville Public Schools Proposed Building Program May 6, 2016 Proposal for Submitted to: Commissioner Dr. Brenda Cassellius Minnesota Department of Education Barnesville Public Schools Proposed Building Program Barnesville Public School District Independent

More information

LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES

LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES 1 LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES Lake Central Priority for Use of Facilities: Group I: Direct School-related Activities (100% Lake Central employees) e.g. classes, school clubs,

More information

COLUMBUS MUNICIPAL SCHOOL DISTRICT

COLUMBUS MUNICIPAL SCHOOL DISTRICT 1 COLUMBUS MUNICIPAL SCHOOL DISTRICT FY17 BUDGET PUBLIC HEARING JUNE 30, 2016 Dr. Philip Hickman, Superintendent Ms. Tammie Holmes, MBA, Chief Financial Officer Agenda 2 This presentation provides an overview

More information

Larkspur-Corte Madera School District: 2014 Bond Feasibility Survey

Larkspur-Corte Madera School District: 2014 Bond Feasibility Survey Larkspur-Corte Madera School District: 2014 Bond Feasibility Survey Overview and Research Objectives Larkspur-Corte Madera School District commissioned TBWB and Godbe Research to conduct a survey of local

More information

Garden City Public Schools Proposed Budget Revenues and Non-Instructional Components and District Reserves.

Garden City Public Schools Proposed Budget Revenues and Non-Instructional Components and District Reserves. Garden City Public Schools Proposed Budget 2015-16 Revenues and Non-Instructional Components and District Reserves February 24, 2015 Please remember: Tonight s presentation is the second step in a comprehensive

More information

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016

POJOAQUE VALLEY SCHOOL DISTRICT October 12, 2016 POJOAQUE VALLEY SCHOOL DISTRICT October 2, 206 Results from data gathered from community meeting held September 20, 206 regarding use of current bond funds and goals setting for possible 207 bond On Tuesday,

More information

EDUCATION SPOTLIGHT Voters turn to weigh in on school facility measures

EDUCATION SPOTLIGHT Voters turn to weigh in on school facility measures EDUCATION SPOTLIGHT Voters turn to weigh in on school facility measures By Chris Henry Yesterday 5:34 p.m. The last time South Kitsap School District passed a bond was in 1988. For Central Kitsap it was

More information

LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES

LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES 1 LAKE CENTRAL SCHOOL CORPORATION USE OF SCHOOL FACILITIES Lake Central Priority for Use of Facilities: Group I: Direct School-related Activities (100% Lake Central employees) e.g. classes, school clubs,

More information

Chancellor s Message - Achievements

Chancellor s Message - Achievements Chancellor s Message - Achievements We have achieved significant educational and operational advances. To name a few: $41 million in savings from operations through the elimination of redundancies and

More information

AGENDA ITEM 11e BOARD MEMORANDUM. T0: Board of Regents, State of Iowa. Jean Friedrich. DATE: June 1, FY 2006 Budgets Iowa School for the Deaf

AGENDA ITEM 11e BOARD MEMORANDUM. T0: Board of Regents, State of Iowa. Jean Friedrich. DATE: June 1, FY 2006 Budgets Iowa School for the Deaf BOARD MEMORANDUM T0: Board of Regents, State of Iowa FROM: Jean Friedrich DATE: June 1, 2005 SUBJ: FY 2006 s Iowa School for the Deaf Recommended Action: Approve the Iowa School for the Deaf s FY 2006

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA

SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA SONOMA COUNTY JUNIOR COLLEGE DISTRICT PROPOSITION 39 AND MEASURE A GENERAL OBLIGATION BONDS SANTA ROSA, CALIFORNIA YEAR ENDED TABLE OF CONTENTS PAGE Independent Auditors' Report 1 Objectives 2 Scope of

More information

Board of Education School Year Budget Update February 27, 2018

Board of Education School Year Budget Update February 27, 2018 Board of Education 2018-2019 School Year Budget Update February 27, 2018 Rollover Budget 2017-18 Expense Budget $43,335,851 2018-19 Expense Budget Rollover $44,989,666 2018-19 Expense Budget Draft $44,574,348

More information

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY)

JACKSON-MADISON COUNTY SCHOOL SYSTEM FUND #177 EDUCATION CAPITAL 5-YEAR PLAN (WORKING COPY) Elementary & K-8 Campuses Alexander 6 8 Guttering replacement 2 $ 20,000 HVAC replacement 1 $ 800,000 Remove and replace old glass block windows 3 Total for Alexander $ - $ 20,000 $ 800,000 $ - $ - $ -

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

School District of Manawa Community Survey Results. Winter

School District of Manawa Community Survey Results. Winter School District of Manawa Community Survey Results Winter 2018-2019 1 Survey Summary The survey was conducted in late December/early January of 2018-2019. Residents within the District were mailed a paper

More information

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION

INTRODUCTION. Summary of revenue/expenditures available for new construction and remodeling projects only. CERTIFICATION INTRODUCTION The 5-Year District Facilities Work Program is a very important document. The Department of Education, Legislature, Governor's Office, Division of Community Planning (growth management), local

More information

City School District of Albany Five Year Facilities Plan 3/14/2019

City School District of Albany Five Year Facilities Plan 3/14/2019 Bold indicates change from 3/7/19 BOE meeting Available Local Share $ 3,300,000 1 SPA Air condition gymnasium $ 267,000 1 $ 41,385 $ 41,385 $ 267,000 2 DCS Air condition gymnasium $ 221,000 1 $ 34,255

More information