1 Paper Nº ICMP123 8th International Conference on Managing Pavement Assets OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Goran Mladenovic 1*, Jelena Cirilovic 2 and Cesar Queiroz 3 1 University of Belgrade, Faculty of Civil Engineering, Assistant Professor, Serbia 2 Institute IMS, Serbia 3 University of Belgrade, Faculty of Civil Engineering, Visiting Professor, Serbia * Corresponding Author s emladen@imk.grf.bg.ac.rs ABSTRACT The paper presents the application of World Bank s model RONET to a strategic network level analysis of the Serbian toll road network. Tolls have been collected on these roads since the 1980s. Despite the toll revenues, the condition of this network deteriorated considerably during the 1990s. In recent years a more substantial part of the toll revenues has been applied to the toll roads, thus gradually improving the condition of such roads. The goals of the study are to obtain the optimum maintenance and rehabilitation (M&R) strategy and related budget, estimate the impact of different funding levels on the future quality, and estimate the economic consequences of budget constraints for maintenance and rehabilitation of the toll road network. The analysis shows that a substantial part of the toll revenues can be allocated to the non-tolled part of the Serbian road network without detrimental impact on the condition of the tolled network. Application of the RONET model to the prevailing conditions on the Serbian toll road network led to an optimal M&R strategy with a good balance between rehabilitation, periodic and recurrent maintenance. Implementation of the Optimal M&R strategy would keep up the relatively good current condition of the toll road network. In other words, the current level of maintenance is close to the optimal. Implementation of higher than optimal M&R standards would lead to substantially higher road agency costs and consequently lower net benefits, while the implementation of lower than optimal M&R standards would lead to considerably worse network condition and higher vehicle operating costs. KEY WORDS: toll road network, maintenance and rehabilitation (M&R) strategy, budget constraints. INTRODUCTION Serbia is located in South East Europe (Figure 1) and extends for 77,500 square km with a population of 7.5 million inhabitants. The total length of the road network in Serbia is about 38,600 km, including 634 km of motorways and half/motorways, 4481 km of main roads, km of regional roads and 23,084 km of local roads (1). Serbia s road network density is comparable to that of other Eastern European countries. Serbia's geographic position puts it at the crossroads of the two important Pan-European corridors (Figure 1). One is connecting Western Europe and the Near East, the other is linking Greece to Central Europe. This network is known as Corridor X. All existing toll motorways in Serbia are constructed along the Corridor X. However, despite their importance, nationally and

2 Mladenovic, Cirilovic and Queiroz internationally, currently not all sections of Corridor X in Serbia are of Motorway Standard and the remaining sections on north to the Hungarian border, on south toward Macedonia and on east toward Bulgaria are currently under construction and expected to be completed by the end of FIGURE 1 Location of Serbia and country s toll road network. The state road network, including motorways, was until beginning of 2009 managed by the Public Enterprise Roads of Serbia (former Road Directorate). In May 2009 the new company Corridors of Serbia was founded with the primary role to complete the construction of motorway network along the Corridor X. However, the PE Roads of Serbia remained responsible for the maintenance of the existing motorways. The construction of new sections is financed primarily by loans from International Financial Institutions (IFI), while the road network maintenance is financed from tolls, state budget, excise tax on fuel and other sources. Traffic levels on the state road network have varied substantially in the last 20 years due to economic and political changes in the region and in the country itself. Currently, AADT on the motorways range between 1000 and 130,000 vehicles per day (vpd) (2). The condition of the existing motorways deteriorated considerably during the 1990s due to under-financing of operations and maintenance. In recent years, as the financial situation in Serbia has improved, financing for the road sector has gradually increased, focusing on the most hazardous and highly trafficked parts of the road network. The result was that most of the motorway network has been rehabilitated since However, due to inadequately selected maintenance treatments and/or relatively poor quality control, some sections deteriorated faster than expected and will in next few years require additional corrective maintenance treatments. The objectives of the present study are to:

3 (i) Obtain the optimum maintenance and rehabilitation (M&R) strategy and the related budget for the motorway road network; (ii) Estimate the impact of different funding levels on the future quality of the country s motorway network; and (iii) Estimate the economic consequences of budget constraints for maintenance and rehabilitation of the motorway network. The analysis will also show how much of the toll revenues can be allocated to the non-tolled part of the Serbian road network without detrimental impact on the condition of the tolled network. The World Bank s model RONET (Road Network Evaluation Tools), designed to assess the current characteristics of road networks and their future performance depending on different levels of interventions (and budgets) to the networks, was selected for this study. CURRENT CONDITION OF THE MOTORWAY NETWORK A condition survey of the entire state road network in Serbia has been recently completed and has provided valuable data source for this study (3). The survey was quite comprehensive and included pavement and other road assets inventory and condition data, as well as traffic levels at a relatively high level of detail. The following road parameters were measured among others: Geometric parameters of roads Pavement roughness Skid resistance Pavement strength Surface distress The data are stored in a relational database in such a format that they can be conveniently used in models such as RONET and HDM-4. The overall traffic on motorway network is still relatively low, with 90 percent of the network having AADT lower than vpd (2). It was decided to implement a uniform rather than logarithmic split between traffic bins since it provided more equal (reasonable) split. 22 percent of network have AADT lower than 5000 vpd, 15 percent has AADT between 5000 vpd and 6000 vpd, 29 percent has AADT between 6000 vpd and 7000 vpd, while 24 % has AADT between 7000 vpd and vpd. Overall, the Serbian motorway network is currently in relatively good condition with an average IRI = 2.1 m/km. Of the total motorway length, 48 percent is in very good condition (IRI < 2.0 m/km); 27 percent in good condition (IRI between 2 m/km and 2.5 m/km); and 25 percent in fair, poor or very poor condition (IRI > 2.5 m/km). Figure 2 presents the overall toll road network condition split by traffic category. The part of the network with highest AADT is currently in the poorest condition. However, these sections of motorway that go through Belgrade are currently under reconstruction, expected to be finished by the end of Other sections that are in condition worse than average are typically sections with relatively low AADT.

4 Mladenovic, Cirilovic and Queiroz Half- motorways Lenght (km) Average IRI (m/km) Very Poor Poor Fair Good Very Good average IRI AADT (vehicles/ day) FIGURE 2 Overall motorway network split by AADT range and condition. OVERVIEW OF REVENUES AND EXPENDITURES IN THE PERIOD The overview of overall revenues of PE Roads of Serbia is presented in Table 1 (4). The revenues are grouped in three categories: state budget, excise taxes and other resources, toll revenues and loans from International Financial Institutions (IFI) that have been extensively used in recent period for financing construction of new sections and rehabilitation of the most trafficked roads, including toll motorways. TABLE 1 Revenues of PE Roads of Serbia in period (mil. ) Revenues Year Budget, excise tax and other resources Toll revenues Loans from IFI Total (mil. ) The toll revenues represented between 32.4 percent and 45.9 percent of total revenues of PE Roads of Serbia. The overview of main expenditures is presented in Table 2. TABLE 2 Expenditures of PE Roads of Serbia in period (mil. ) Year Expenditures

5 New construction / Reconstruction Maintenance Roads Routine/Prev./Rehabilitation Winter maintenance Structures Note: 1 The operation cost and annual loan repayments are not included in the table 2 Projection The road maintenance budget in last six years ranged between 140 million and 310 million. Such budget applies to the entire state road network of approximately km of main and regional roads, including 634 km of motorways and half-motorways. DESCRIPTION OF THE RONET MODEL The Road Network Evaluation Tools (RONET) is a model that can be used by decision makers to assess the current state of the road network, its relative importance to the economy (e.g. asset value as a percentage of GDP) and to compute a set of monitoring indicators to assess the performance of the road network. RONET simulates the future performance of the road network under different road maintenance standards and different levels of funding. It determines, for example, the minimum cost for sustaining the road network in its current condition and estimates the savings or the costs to the economy for maintaining the network at different levels of service. RONET determines the optimal maintenance standard for each road and determines the funding gap, defined as the difference between current maintenance spending and required maintenance spending. The Road User Revenue Module estimates the level of road user charges required (e.g., toll and fuel levy) to meet road maintenance expenditures under different budget scenarios. This could be used by road agencies to prepare a business case to negotiate and revise road tariffs on a sound basis. RONET is publicly available from the World Bank website at: CONFIGURATION OF RONET FOR LOCAL CONDITIONS To ensure that the RONET model simulates the conditions that realistically reflect the Serbian toll road network and provides reasonable outputs, it was considered important to: Adjust the model s decision matrix so it can accommodate more realistic assumptions for motorways Calibrate RONET pavement deterioration models and road works effects models (5) Develop a set of road user costs models for the local vehicle fleet Configure RONET analysis parameters with local conditions and maintenance practice The RONET model uses a simplified road deterioration model for paved roads, developed by Archondo-Callao (6): where: ( K ( ) ) gm m t 5 diri = K α e 1+ SNC α YE4 + α t + K m IRI gp o 1 2 gm a (1)

6 Mladenovic, Cirilovic and Queiroz diri = annual roughness increment (m/km), m = environmental coefficient, t = pavement age since last overlay, reconstruction or new construction (years), SNC = modified structural number, SNC = ai Hi + SNSG a i = layer coefficients (see Table C2.7 in 3), H i = layer thicknesses (mm), SNSG = 3.51 log CBR 0.85 ( log CBR ) CBR = subgrade California bearing ratio (%), YE4 = annual number of equivalent standard axles (million ESA/lane-year), IRI a = pavement longitudinal roughness at start of the year, expressed in terms of the International Roughness Index (m/km), α 0, α 1, α 2 = model coefficients, and K gp,k gm = calibration factors (7). The model coefficients and calibration factors, as well as the environmental coefficient, can be specified by the user. The default value of coefficient α 0 is 134, the same value as recommended in the HDM-4 (see Table 2.32 in 8) model. Coefficient α 1 reflects the reduction of strength of the pavement due to presence of cracking and its default value is Coefficient α 2 reflects the increase in roughness progression of the pavement due to presence of cracking, rutting, and potholes, and its default value is Calibration factor K gp based on comparison with already calibrated HDM-4 deterioration models (5) and the value of 1.2 was used in the analysis. The appropriate value of the environmental coefficient m, for a country such as Serbia, is between and ( Temperate-cool to Temperate-freeze temperature classification and Semi-arid to Sub-humid moisture classification) (see Table C2.31 in 8). Values of and 1.0 are used for the environmental coefficient m and the environmental calibration factor K gm respectively. A set of road user costs models for typical local vehicle categories was developed using the RUCKS model (9) that is based on HDM-4, version 1.3 road user effects equations. The models have the following shape: 2 3 o URUC($ / vehicle km) = a + a IRI + a IRI + a IRI (3) where: URUC = unit road users cost ( /vehicle-km), IRI = pavement longitudinal roughness (m/km), and a 0, a 1, a 2, a 3 = model coefficients that are input to RONET. RONET defines five default treatments that should be applied depending on the road condition, which means that one maintenance treatment is applicable only to the road in a certain condition. The intensity and cost of maintenance treatment can be adjusted in the program. Maintenance treatments used in the study of toll road network in Serbia are summarized in Table 3. TABLE 3 Maintenance Treatments with Associated Unit Costs

7 Road surface type Asphalt Road condition IRI range (m/km) Maintenance treatment Periodic maintenance treatment cost ( /km) Routine maintenance cost ( /km) Very Good < 2.0 Routine maintenance (RM) 5,954 Good RM+Preventive maintenance 25,000 6,750 Fair RM+Mill & Overlay 50 mm 108,946 5,329 Poor RM+Mill & Overlay 120 mm 225,773 13,528 Very Poor >3.5 RM+Reconstruction 325,911 17,700 The unit costs presented in Table 1 are applicable for half-motorway. ROAD MAINTENANCE STANDARDS RONET defines seven default maintenance standards. The standards are based on different trigger levels for each maintenance treatment. The Very High standard represents a withoutbudget-constraints scenario with a high level of periodic maintenance and rehabilitation works. The High, Medium, Low and Very Low standards represent scenarios of reduced levels of road works expenditures. The Do Minimum standard represents a scenario where only reconstruction is applied at a relatively high road roughness, while no capital road works are applied over the evaluation period. In addition, it is possible to define custom standards. The maintenance standards for toll roads applied in this study are presented in Table 4. TABLE 4 Evaluated Maintenance Standards for Paved Roads Maintenance Standard IRI 3.0 Preventive Roughness Range and Required Maintenance Treatment 2.5 < IRI < IRI 4.0 Mill & Overlay Mill & Overlay 50 mm 120 mm 3.5 < IRI 4.5 Reconstruction Code Name Roughness Threshold, IRI (m/km) A Very High Standard B High Standard C Medium Standard D Low Standard E Very Low Standard F Do Minimum G Do Nothing Note: IRI units are m/km The routine maintenance costs presented in Table 3 are adopted for the Very High Standard. These values were gradually reduced for lower maintenance standards, down to zero for the Do Nothing standard. NETWORK-LEVEL MAINTENANCE STRATEGIES For each road class, defined by road condition and traffic level, RONET was used to evaluate several maintenance standards, including the Optimal one, defined as the standard that leads to the lowest total society costs and highest Net Present Value (NPV). Total society costs are the sum of road agency and road users costs. The Optimal strategy at network level consists of optimal strategies for each road class. The program also evaluates two higher ( Optimal+1 and

8 Mladenovic, Cirilovic and Queiroz Optimal+2 ) and three lower ( Optimal-1, Optimal-2 and Optimal-3 ) strategies that consists of application of higher and lower maintenance standards compared to the optimal one for each road class. The base maintenance strategy, used for the calculation of benefits, is the Do minimum strategy that consists of the application of pavement reconstruction at relatively high roughness level. In addition, the program evaluates the Do nothing strategy that consists of no maintenance works. Table 5 presents the total agency and users costs and net benefits at a discount rate of 8 percent, using an analysis period of 20 years. For the Serbian toll road network, the total road agency costs range between 0 and 247 million; the corresponding discounted annual budgets for maintenance range between 0 and 21.8 million. The economic internal rate of return for the optimal strategy is 18.5 percent, as calculated by RONET. The Optimal strategy consists typically of the application of Very low or Do minimum maintenance standards as a result of relatively low traffic level on most of the toll road network and its relatively good current condition. The required annual maintenance and rehabilitation budget for the Optimal scenario is about 15.4 million per year, which represents annual requirements of about 25,000 per kilometer. TABLE 5 Total Discounted Costs and Benefits and other parameters for All Maintenance Strategies Total costs in years 1 to 20 Internal Average Network Net Road Road Total Rate of Roughness maintenance Benefits Agency Users Society Return IRI strategy mil. mil. mil. mil. % m/km Optimal Optimal Optimal Optimal The two strategies that include higher maintenance standards ( Optimal+1 and Optimal+2 ) would result in lower net benefits for much higher Agency costs. However, these strategy would also result in slightly improved network overall condition. Strategy Optimal -1 is essentially equal to Do minimum strategy and provides higher user and agency costs resulting in network deterioration over analysis period. Figure 3 presents the distribution of the total road works requirements during the analysis period between rehabilitation, periodic and recurrent maintenance for different M&R strategies.

9 Total Road Agency Costs (million euro) Optimal+2 Optimal+1 Optimal Optimal-1 Rehabilitation Periodic Maintenance Recurrent Maintenance FIGURE 3 Distribution of the total road works requirements. The periodic maintenance costs represent a major part of the total M&R costs, between 216 million and 281 million. The recurrent maintenance costs vary between 47 million and 127 million. The rehabilitation costs are relatively substantial only for the Optimal -1 strategy. Figure 4 presents toll network performance under different maintenance strategies over the 20- year evaluation period. IRI (m/km) Year Do nothing Optimal-1 Optimal Optimal+1 Optimal+2 FIGURE 4 Roughness over the analysis period for different maintenance standards. It was found that the Optimal strategy keeps up the relatively good current condition of the toll road network. The Optimal+1 and Optimal+2 strategies maintain the network continuously at a slightly higher quality level. The Optimal-1 strategy provides significantly lower IRI in the first 12 years, after which the condition significantly improves. Figure 5 illustrates the predicted network condition at the end of the 20-year analysis period.

10 Mladenovic, Cirilovic and Queiroz 100% Percentage of toll road network length 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Optimal+2 Optimal+1 Optimal Optimal-1 Very Poor Poor Fair Good Very Good M&R Strategy FIGURE 5 Impact of funding level on network condition at the end of the 20-year analysis period. The Optimal strategy would lead to a considerable improvement in the condition of the road network, throughout almost the entire evaluation period. The percentage of roads in very good and good condition slightly increases compared to the current condition. Current annual toll revenues are about 154 million Euros. The annual needs for pavement maintenance and rehabilitation are about 17 million Euros for the optimal alternative (equivalent to a discounted total of 169 million Euros, over the 20-year analysis period). The annual operating costs (e.g., toll collection and users support) and annual debt service (e.g., for loans used for rehabilitation and construction of new sections in recent years) can be estimated respectively at 17 million Euros and 50 million Euros. Consequently, it appears that an annual amount of about 70 million Euros of toll revenues can be used for maintenance and rehabilitation of other parts of the network, or for construction of new motorway sections, without detrimental impact on the condition of the tolled network. While the RONET model has been used in other countries, reportedly with satisfactory results, it would be convenient to validate its application and methodology for Serbian conditions. This is proposed as further research, and will be accomplished by applying the methodology described in this paper in future years, when more historical data will be available on the condition of the Serbian toll road network. CONCLUSIONS The paper presented the application of World Bank s model RONET to a strategic network level analysis of the Serbian toll road network. The current state of the network is good, with large variations in traffic range. Application of the RONET model to the prevailing conditions on the Serbian toll road network led to an optimal M&R strategy with a good balance between rehabilitation, periodic and recurrent maintenance. The corresponding ( optimal ) budget for the Serbian toll road network was found to be 169 million over the 20-year analysis period. The implementation of the Optimal M&R strategy would keep up the relatively good current condition of the toll road network. Implementation of higher M&R standards would lead to substantially higher road

11 agency costs and consequently lower net benefits, while the implementation of lower M&R standards would lead to considerably worse network condition for approximately the same or even higher agency costs. The analysis also shows that a substantial portion of toll revenues can be used for maintenance and rehabilitation of other parts of the road network, or for construction of new motorway sections, without detrimental impact on the condition of the tolled network. REFERENCES 1. Road network in the Republic of Serbia, PE Roads of Serbia, Accessed Feb. 22, Traffic counting on the Main Road Network in the Republic of Serbia, Annual Average Daily Traffic in 2009, PE Roads of Serbia, Transport Rehabilitation Project, Road Database, Final Report, PE Roads of Serbia, Strategic Study with Proposal of Medium-term Program of Development, Reconstruction, Maintenance and Protection of State Road Network in Period , PE Roads of Serbia, Transport Rehabilitation Project, Road Database, Final Report, Appendix G, HDM-4 Pavement Deterioration Model Calibration to Local Conditions in Serbia, PE Roads of Serbia, Archondo-Callao, R. Road Network Evaluation Tools (RONET), Version 2.00, User s Guide, The World Bank, Bennett, C.R. and W.D.O. Paterson. Highway Development and Management Series, Volume 5, A Guide to Calibration and Adaptation, PIARC/AIPCR and World Bank, Odoki, J.B. and H.G.R. Kerali. Highway Development and Management Series, Volume 4, Analytical Framework and Model Descriptions, PIARC/AIPCR and World Bank, Archondo-Callao, R. HDM-4 Road Use Cost Model Documentation, Version 1.20, User s Guide, The World Bank, 2007.

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM Frequently Asked Questions SMEC COMPANY DETAILS SMEC Australia Pty Ltd Sun Microsystems Building Suite 2, Level 1, 243 Northbourne Avenue, Lyneham ACT

More information

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned

More information

Long-Term Monitoring of Low-Volume Road Performance in Ontario

Long-Term Monitoring of Low-Volume Road Performance in Ontario Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario

More information

Hazim M Abdulwahid, MSC, MBA Hazim Consulting

Hazim M Abdulwahid, MSC, MBA Hazim Consulting Road Map for Establishing Pavement Maintenance Management System on the Strategic Level 13 th International O&M Conference in the Arab Countries,17-19 Nov 2015 Hazim M Abdulwahid, MSC, MBA Hazim Consulting

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

Highway Engineering-II

Highway Engineering-II Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning

More information

A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System

A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System Rafael Arturo Ramirez-Flores Ph. D. Candidate Carlos Chang-Albitres Ph.D., P.E. April 16,

More information

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University Effective Use of Pavement Management Programs Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Pavement Management Is A Decision Making Process Effective Pavement

More information

1.0 CITY OF HOLLYWOOD, FL

1.0 CITY OF HOLLYWOOD, FL 1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the

More information

The Cost of Pavement Ownership (Not Your Father s LCCA!)

The Cost of Pavement Ownership (Not Your Father s LCCA!) The Cost of Pavement Ownership (Not Your Father s LCCA!) Mark B. Snyder, Ph.D., P.E. President and Manager Pavement Engineering and Research Consultants, LLC 57 th Annual Concrete Paving Workshop Arrowwood

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for: Cement

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Montréal and Québec City Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis

More information

LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements)

LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements) 14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements) Prepared for Master Class / Workshops In Sydney, Melbourne and Brisbane September

More information

Application in LIBERIA ROAD ASSET MANAGEMENT PROJECT

Application in LIBERIA ROAD ASSET MANAGEMENT PROJECT Application in LIBERIA ROAD ASSET MANAGEMENT PROJECT Kulwinder S Rao ESMAP RBF Conference Task Team Leader, AFTTR May 7, 2012 Washington DC 1 Content Introduction to Output & Performance Based Contracting

More information

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive

ECONOMIC ANALYSIS. Table 1: Vehicle Fleet Characteristics Four- Medium Car. Light Bus. Wheel Drive Western Regional Road Corridor Investment Program (RRP MON 41193) A. Project Costs and Benefits ECONOMIC ANALYSIS 1. Project Costs. The project s capital costs include the costs of the road works, design,

More information

Optimising Road Maintenance

Optimising Road Maintenance Optimising Road Maintenance 12 Discussion Paper 2012 12 Mark O. Harvey Bureau of Infrastructure, Transport and Regional Economics (BITRE) Canberra, Australia Optimising Road Maintenance Discussion Paper

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Ontario Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for:

More information

NCHRP Consequences of Delayed Maintenance

NCHRP Consequences of Delayed Maintenance NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond

More information

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN 5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

City of Glendale, Arizona Pavement Management Program

City of Glendale, Arizona Pavement Management Program City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND

More information

Incorporating Variability into Life Cycle Cost Analysis and Pay Factors for Performance-Based Specifications

Incorporating Variability into Life Cycle Cost Analysis and Pay Factors for Performance-Based Specifications Incorporating Variability into Life Cycle Cost Analysis and Pay Factors for Performance-Based Specifications Leanne Whiteley, BASc. MASc Candidate Susan Tighe, Ph.D., P.Eng. Canada Research Chair in Pavement

More information

Implementing the MTO s Priority Economic Analysis Tool

Implementing the MTO s Priority Economic Analysis Tool Implementing the MTO s Priority Economic Analysis Tool presented at 6th National Conference on Transportation Asset Management presented by Alison Bradbury Ontario Ministry of Transportation November 2,

More information

IMPROVING THE SUSTAINABILITY OF ROAD MANAGEMENT

IMPROVING THE SUSTAINABILITY OF ROAD MANAGEMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No. 66532-AZ IMPROVING THE SUSTAINABILITY OF ROAD MANAGEMENT AND FINANCING IN

More information

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT Gordon Molnar, M.A.Sc., P.Eng. UMA Engineering Ltd., 17007 107 Avenue, Edmonton, AB, T5S 1G3 gordon.molnar@uma.aecom.com Paper

More information

Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads

Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads By: Noppadol Piyatrapoomi, Arun Kumar, Neil Robertson and Justin Weligamage

More information

Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management

Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management Multi-Objective Optimization Model using Constraint-Based Genetic Algorithms for Thailand Pavement Management Pannapa HERABAT Assistant Professor School of Civil Engineering Asian Institute of Technology

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Khyber Pakhtunkhwa Provincial Roads Improvement Project (RRP PAK 47360) A. Background ECONOMIC AND FINANCIAL ANALYSIS 1. The province of Khyber Pakhtunkhwa in northwest Pakistan covers almost six degrees

More information

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION DEVELOPMENT AND IMPLEMENTATION OF A NETWOR-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION Shuo Wang, Eddie. Chou, Andrew Williams () Department of Civil Engineering, University

More information

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University Asset Management Ruminations T. H. Maze Professor of Civil Engineering Iowa State University Why Transportation Asset Management Has Nothing to Do With Systems to Manage Individual Transportation Assets

More information

Technical Assistance Consultant s Report

Technical Assistance Consultant s Report Technical Assistance Consultant s Report Project Number: 46370-001 November 2015 Republic of the Union of Myanmar: Developing the Asset Management Program for Myanmar Roads (Financed by the Japan Fund

More information

A Financial Model to Estimate Annual Payments Required under Performance Based Contracts. Goran Mladenovic and Cesar Queiroz

A Financial Model to Estimate Annual Payments Required under Performance Based Contracts. Goran Mladenovic and Cesar Queiroz A Financial Model to Estimate Annual Payments Required under Performance Based Contracts Goran Mladenovic and Cesar Queiroz Outline Introduction Objective Graphical Financial Model for Performance Based

More information

Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update

Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update By Rick Olson, former State Representative Reporting analytical work performed by Gil Chesbro and Jim Ashman,

More information

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT

SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide

More information

Roads Economic Decision Model (RED)

Roads Economic Decision Model (RED) Roads Economic Decision Model (RED) March 2006 Rodrigo Archondo-Callao The World Bank RED Objectives Simplify the economic evaluation of unpaved roads Better capture the economic benefits of a project

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: PIDC19292 Project Name Road

More information

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 USE OF VDOT S PAVEMENT MANAGEMENT SYSTEM TO PROACTIVELY PLAN AND MONITOR PAVEMENT MAINTENANCE AND REHABILITATION ACTIVITIES TO MEET THE AGENCY S PERFORMANCE

More information

Economic Analysis Concepts

Economic Analysis Concepts Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds

More information

Pavement Distress Survey and Evaluation with Fully Automated System

Pavement Distress Survey and Evaluation with Fully Automated System Ministry of Transportation Pavement Distress Survey and Evaluation with Fully Automated System Li Ningyuan Ministry of Transportation of Ontario 2015 RPUG Conference Raleigh, North Carolina, November 2015

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN])

SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) CAREC Corridors 1 and 6 Connector Road (Aktobe Makat) Reconstruction Project (RRP KAZ 48424) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (ROAD TRANSPORT [NONURBAN]) 1. Sector Performance, Problems, and Opportunities

More information

Effective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW)

Effective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW) Effective Infrastructure Management Solutions Using the Analytic Hierarchy Process and Municipal DataWorks (MDW) James Smith, Ph.D., E.I.T Member Services/Infrastructure Coordinator Ontario Good Roads

More information

Residential Street Improvement Plan

Residential Street Improvement Plan Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the

More information

Effectiveness of Rural Road Improvement Using the Do-nou Method in Developing Countries: Economic Analysis with RED Model

Effectiveness of Rural Road Improvement Using the Do-nou Method in Developing Countries: Economic Analysis with RED Model Effectiveness of Rural Road Improvement Using the Do-nou Method in Developing Countries: Economic Analysis with RED Model Koichiro TAMURA 1, Yoshiya NAKAGAWA 2, Seiji KADOOKA 3 and Makoto KIMURA 4 1 Member

More information

Overview of Road Maintenance in Western Balkans 6

Overview of Road Maintenance in Western Balkans 6 SEETO Regional Participants Overview Albania, of Road Bosnia Maintenance and Herzegovina, Western Balkans 6 the former Yugoslav Republic of Macedonia, Montenegro, Serbia and Kosovo* Overview of Road Maintenance

More information

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY Travis Gilbertson, Opus International Consultants Ltd, Christchurch, NZ ABSTRACT Hybrid performance based road management and maintenance contracts

More information

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00

L/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Jul ,330,316.00 Public Disclosure Authorized 1. Project Data Report Number : ICRR0020321 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project ID P107840 Country Macedonia, former

More information

Framework and Methods for Infrastructure Management. Samer Madanat UC Berkeley NAS Infrastructure Management Conference, September 2005

Framework and Methods for Infrastructure Management. Samer Madanat UC Berkeley NAS Infrastructure Management Conference, September 2005 Framework and Methods for Infrastructure Management Samer Madanat UC Berkeley NAS Infrastructure Management Conference, September 2005 Outline 1. Background: Infrastructure Management 2. Flowchart for

More information

Planning Pavement Maintenance and Rehabilitation Projects in the New Pavement Management System in Texas 3. Feng Hong, PhD, PE

Planning Pavement Maintenance and Rehabilitation Projects in the New Pavement Management System in Texas 3. Feng Hong, PhD, PE Planning Pavement Maintenance and Rehabilitation Projects in the New Pavement Management System in Texas 0 Feng Hong, PhD, PE Texas Department of Transportation, Austin, TX Email: Feng.Hong@TxDOT.gov Eric

More information

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach Maintenance Management of Infrastructure Networks: Issues and Modeling Approach Network Optimization for Pavements Pontis System for Bridge Networks Integrated Infrastructure System for Beijing Common

More information

Group Exercise to Screen a PPP Project for Financial Feasibility

Group Exercise to Screen a PPP Project for Financial Feasibility World Bank & Brazilian Ministry of Transport Workshop on the Toolkit for PPP in Roads and Highways Group Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz, Ph.D. World Bank Brasilia,

More information

Development Practices for Municipal Pavement Management Systems Application

Development Practices for Municipal Pavement Management Systems Application Development Practices for Municipal Pavement Management Systems Application Mehran Kafi Farashah, MASc., EIT, University of Waterloo Dr. Susan L. Tighe, PhD, PEng, University of Waterloo Paper prepared

More information

Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States

Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States Dr Adnan Rahman Director General, IRF www.irfnet.ch THE INTERNATIONAL ROAD FEDERATION Promoting the development

More information

Chapter 12: Programming/Resource Allocation

Chapter 12: Programming/Resource Allocation Chapter 12: Programming/Resource Allocation What is works programming? Works programming refers to the preparation of annual and multi-annual works programs in which road assets requiring treatment are

More information

THE ECONOMICS OF PREVENTIVE MAINTENANCE

THE ECONOMICS OF PREVENTIVE MAINTENANCE THE ECONOMICS OF PREVENTIVE MAINTENANCE C lyde B urke Vice President Roy Jorgensen Associates, Inc. Gaithersburg, Maryland H O W M U C H P R E V E N T IV E M A IN T E N A N C E? How do we know when we

More information

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS City of Sonoma I. Introduction TABLE OF CONTENTS II. Methodology III. Pavement Condition Index (PCI) / Remaining Service Life (RSL) Report IV. Budget Analysis Reports A. Budget Needs Report Five Year B.

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Bihar New Ganga Bridge Project (RRP IND 48373) ECONOMIC AND FINANCIAL ANALYSIS A. Introduction 1. The proposed project is to build a new six-lane bridge across the Ganges River near Patna in the state

More information

InteMat4PMS. Integration of material-science based performance models into life-cycleanalysis processed in the frame of pavement management systems

InteMat4PMS. Integration of material-science based performance models into life-cycleanalysis processed in the frame of pavement management systems InteMat4PMS Integration of material-science based performance models into life-cycleanalysis processed in the frame of pavement management systems Technische Universität Braunschweig PMS-Consult GmbH Vienna

More information

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA

THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA THE MANAGEMENT OF ROAD PROJECTS IN PAPUA NEW GUINEA Roy Harry MUMU, John Belly Kelly KAIO PNG National Roads Authority Boroko, National Capital District, Papua New Guinea roymumu@daltron.com.pg, johnkaio@datec.net.pg

More information

LCCA Design and Maintenance

LCCA Design and Maintenance LCCA Design and Maintenance John Cunningham Iowa Concrete Paving Association ASCE Conference November 6, 2013 www.iowaconcretepaving.org Life Cycle Cost Analysis Life cycle cost analysis (LCCA) is an economic

More information

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT Performance Measures for Making Pavement Preservation Decisions David Luhr Pavement Management Engineer Washington State DOT 1 Performance Measures as Tools Project Decision Support - Where, When, and

More information

Maintaining roads Experience with output-based contracts in Argentina

Maintaining roads Experience with output-based contracts in Argentina Maintaining roads Experience with output-based contracts in Argentina Gerard Liautaud Gerard Liautaud (gliautaud@ worldbank.org) works in the Latin America and the Caribbean Region of the World Bank. He

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant

More information

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E.

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E. RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E. Texas Research and Development Inc. 2602 Dellana Lane,

More information

Development and implementation of a networklevel pavement optimization model

Development and implementation of a networklevel pavement optimization model The University of Toledo The University of Toledo Digital Repository Theses and Dissertations 2011 Development and implementation of a networklevel pavement optimization model Shuo Wang The University

More information

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program)

ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) ROAD SECTOR ROAD MAP (Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program) A. Road Sector Road Map 1. Strategic Objective 1. The strategic objective of the National Road Development

More information

Quantifying Multi-Criteria Approach for Identifying the Priority Level of Rural Road Projects

Quantifying Multi-Criteria Approach for Identifying the Priority Level of Rural Road Projects IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 13, Issue 5 Ver. VIII (Sep. - Oct. 2016), PP 96-106 www.iosrjournals.org Quantifying Multi-Criteria

More information

Estimating Future Renewal Costs for Road Infrastructure and Financial Burden in Japanese Prefectures

Estimating Future Renewal Costs for Road Infrastructure and Financial Burden in Japanese Prefectures Policy Research Institute, Ministry of Finance, Japan, Public Policy Review, Vol.12, No.1, March 2016 95 Estimating Future Renewal Costs for Road Infrastructure and Financial Burden in Japanese Prefectures

More information

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit

Public Disclosure Copy. East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Public Disclosure Authorized East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor EUROPE AND CENTRAL ASIA Kazakhstan Transport & ICT Global Practice

More information

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko Asset Management Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko 1 Introduction Topics that we will address today Review of Ontario Regulation 588/17 Defining

More information

CHALLENGES IN FINANCING ROAD MAINTENANCE IN SUB-SAHARA AFRICA.

CHALLENGES IN FINANCING ROAD MAINTENANCE IN SUB-SAHARA AFRICA. CHALLENGES IN FINANCING ROAD MAINTENANCE IN SUB-SAHARA AFRICA. By F Y Addo-Abedi,Ph D Chief Executive, TANROADS International seminar on sustainable road financing & 1 investment. Introduction (The role

More information

ECONOMIC AND FINANCIAL ANALYSIS

ECONOMIC AND FINANCIAL ANALYSIS Additional Financing of National Motorway M-4 Gojra Shorkot Khanewal Section Project (RRP PAK 48402) ECONOMIC AND FINANCIAL ANALYSIS A. General 1. Roads are the main mode of transport in Pakistan, accounting

More information

TECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT

TECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT 14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE SYDNEY 25-28 September, 201 1 TECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT Ralph Haas University of Waterloo Canada u Introduction

More information

Region Sector. Updated Project Information Document (PID) Report No: AB542

Region Sector. Updated Project Information Document (PID) Report No: AB542 Project Name Region Sector Theme Project Borrower(s) Implementing Agency(ies) Environment Category B (Partial Assessment) Date Prepared April 29, 2004 Auth Appr/Negs Date February 3, 2004 Bank Approval

More information

DEVELOPMENT OF PAVEMENT MAINTENANCE MANAGEMENT SYSTEM FOR RURAL ROADS

DEVELOPMENT OF PAVEMENT MAINTENANCE MANAGEMENT SYSTEM FOR RURAL ROADS CHAPTER 5 5.1 GENERAL DEVELOPMENT OF PAVEMENT MAINTENANCE MANAGEMENT SYSTEM FOR RURAL ROADS Development of Pavement Maintenance Management System for rural roads was attempted in three stages in this work.

More information

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Definition: Pavement Management is the process of overseeing the

More information

Enhanced NPV Analysis

Enhanced NPV Analysis Case Study Enhanced NPV Analysis Initiative Number 2013_05 Version No Date Item Affected Description of Change 1 24 Feb 14 Draft Document Created 2 25 Feb 14 Clarity edits after internal review by HNO

More information

C ITY OF S OUTH E UCLID

C ITY OF S OUTH E UCLID C ITY OF S OUTH E UCLID T A B L E O F C O N T E N T S 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance

More information

2016 PAVEMENT CONDITION ANNUAL REPORT

2016 PAVEMENT CONDITION ANNUAL REPORT 2016 PAVEMENT CONDITION ANNUAL REPORT January 2017 Office of Materials and Road Research Pavement Management Unit Table of Contents INTRODUCTION... 1 BACKGROUND... 1 DATA COLLECTION... 1 INDICES AND MEASURES...

More information

Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System

Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Susanne Chan Pavement Design Engineer, M.A.Sc, P.Eng. Ministry of Transportation

More information

Determining the Value of Information in Asset Management Decisions

Determining the Value of Information in Asset Management Decisions Determining the Value of Information in Asset Management Decisions David Luhr Jianhua Li Pavement Management Unit Washington State DOT Simple Decision Tree Solve by calculating Expected Monetary Value

More information

CORPORATE AND EMERGENCY SERVICES

CORPORATE AND EMERGENCY SERVICES CORPORATE AND EMERGENCY SERVICES Asset Management Plan April 19, 2018 EXECUTIVE SUMMARY CONTENTS Page (i) 1. INTRODUCTION 1.1 Overview 1-1 1.2 Plan Development 1-1 1.3 Maintaining the Asset Management

More information

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good.

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) Basic Components PMS Evaluation of Flexible Pavements Fundamental Theory of Typical Pavement Defects and Failures Physical Description

More information

Review of the Federal Transit Administration s Transit Economic Requirements Model. Contents

Review of the Federal Transit Administration s Transit Economic Requirements Model. Contents Review of the Federal Transit Administration s Transit Economic Requirements Model Contents Summary Introduction 1 TERM History: Legislative Requirement; Conditions and Performance Reports Committee Activities

More information

An Analysis of Sensitivity in Economic Forecasting for Pavement Management Systems

An Analysis of Sensitivity in Economic Forecasting for Pavement Management Systems Utah State University DigitalCommons@USU All Graduate Theses and Dissertations Graduate Studies 5-2015 An Analysis of Sensitivity in Economic Forecasting for Pavement Management Systems Antonio Fuentes

More information

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 RECOMMENDED ACTION: Approve the Final. RECOMMENDED ACTION from TAC: Accept the Final and include the NDDOT

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Examples of Decision Support Using Pavement Management Data

Examples of Decision Support Using Pavement Management Data Examples of Decision Support Using Pavement Management Data John Coplantz, PE Pavement Management Engineer Oregon Department of Transportation October 27, 2016 Strategic Network (Tactical) Project (Operational)

More information

Norfolk County Asset Management Plan Roads

Norfolk County Asset Management Plan Roads Norfolk County Asset Management Plan Roads An overview of the County s Asset Management Practices based on the Ontario Ministry of Infrastructure s Building Together Initiative Prepared for: Norfolk County

More information

LONG-TERM WARRANTY CONTRACTS RISK OR REWARD?

LONG-TERM WARRANTY CONTRACTS RISK OR REWARD? LONG-TERM WARRANTY CONTRACTS RISK OR REWARD? Anne Holt, P.Eng. Senior Engineer aholt@ara.com David K. Hein, P.Eng. Principal Engineer Vice-President, Transportation dhein@ara.com Applied Research Associates

More information

BANTAY LANSANGAN: ROAD SECTOR REPORT CARD (09 Nov 06)

BANTAY LANSANGAN: ROAD SECTOR REPORT CARD (09 Nov 06) BANTAY LANSANGAN: ROAD SECTOR REPORT CARD (09 Nov 06) CLUSTER / INDICATOR A. SYSTEM/NETWORK DESCRIPTION 1. Overall Philippine Road Network (For information): National Roads 28,805 km Provincial Roads 27,076

More information

Corporate and Financial restructuring of the road sector Context

Corporate and Financial restructuring of the road sector Context Corporate and Financial restructuring of the road sector The Croatian Government (the Government) is committed to optimizing the debt held by public companies in the road sector, and wants to achieve a

More information

Document of THE WORLD BANK HUNGARY ROADS PROJECT (LOAN 3549-HU) December 29, 1999

Document of THE WORLD BANK HUNGARY ROADS PROJECT (LOAN 3549-HU) December 29, 1999 Public Disclosure Authorized Document of THE WORLD BANK FOR OFFICIAL USE ONLY Report No.19982 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION REPORT HUNGARY ROADS PROJECT

More information

PAVEMENT PROGRAM PLANNING

PAVEMENT PROGRAM PLANNING CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 10-067 UILU-ENG-2010-2008 ISSN: 0197-9191 PAVEMENT PROGRAM PLANNING BASED ON MULTI-YEAR COST- EFFECTIVENESS ANALYSIS Prepared By

More information

Management and Financing of Roads

Management and Financing of Roads WORLD BANK TECHNICAL PAPER NUMBER 275 AFRICA TECHNICAL SERIES Management and Financing of Roads An Agenda for Reform Ian G. Heggie CONTENTS FOREWORD...IX ABSTRACT...XI ACKNOWLEDGMENT...XIII ABBREVIATIONS...

More information

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director City of La Habra Heights Benefit Assessment Districts June 6, 2016 Presented by Pablo Perez, Director 1 BENEFIT ASSESSMENT DISTRICTS Proposition 218 Defines Special Benefit as Particular and distinct benefit

More information

Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility

Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility World Bank and Ukravtodor Workshop on the Toolkit for PPP in Roads and Highways Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz World Bank Kyiv, Ukraine,

More information

Pavement Asset Management Decision Support Tools: Ohio Department of Transportation Case Study

Pavement Asset Management Decision Support Tools: Ohio Department of Transportation Case Study Pavement Asset Management Decision Suort Tools: Ohio Deartment of Transortation Case Study Eddie Chou Professor of Civil Engineering The University of Toledo Andrew Williams Administrator, Office of Technical

More information

Decision Supporting Model for Highway Maintenance

Decision Supporting Model for Highway Maintenance Decision Supporting Model for Highway Maintenance András I. Baó * Zoltán Horváth ** * Professor of Budapest Politechni ** Adviser, Hungarian Development Ban H-1034, Budapest, 6, Doberdo str. Abstract A

More information

Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility

Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility World Bank Workshop on the Toolkit for PPP in Roads and Highways Interactive Numerical Exercise to Screen a PPP Project for Financial Feasibility Cesar Queiroz Consultant and former Highways Adviser Moscow,

More information