Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update

Size: px
Start display at page:

Download "Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update"

Transcription

1 Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update By Rick Olson, former State Representative Reporting analytical work performed by Gil Chesbro and Jim Ashman, with the Michigan Department of Transportation, at my request March 19, 2014 In the September, 2011 original report, we said: The model projected that almost $1.4 billion dollars more revenue per year would be needed in and rising to almost $2.6 billion per year by 2023 to achieve the goals set... The conclusion reached was that if the investments projected by these models are not done, either the deferred costs of maintaining our roads will be much higher OR we choose to accept lower quality roads. From a business perspective, the set of investments recommended is the lowest long-term costs of maintaining our roads. In 2012, the model was updated to reflect the road condition data collected in 2011 and 2012, and the additional revenue needed climbed to $1.542 billion and rising through the years. In 2013, the model was again updated and the number climbed to $1.754 billion and rising through the years. It is important to have a 2014 update with the current discussions about road funding in the Michigan legislature. In the 2012 and 2013 updates, we did not update the construction cost numbers. However, construction costs have increased in the past three years, despite a very competitive bidding environment with contractors hungry for work. In this update, we have run the model with a combination of the change in road condition AND with the construction cost numbers updated to reflect current conditions. The bad news is that the total in the first year has risen again - to $2.183 billion additional funding needed. Changes in Road Conditions and Implications Therefrom The road condition data used in this study is a combination of that data collected in 2012 and 2013, which is more comprehensive than any one year, due to road agencies rating different roads each year. In contrast to past years, we do not see an increase in the percentage of roads rated poor and relatively steady percentages of good and fair roads. It is believed that this has been caused by a very high percentage of road maintenance and/or construction had occurred on the poor roads. This worst first approach is contrary to the pavement preservation methods that have been proven to be the best approach financially in the long run. Nonetheless, this is not a criticism of the road agencies, as they have had to respond to safety issues and public demand with very limited dollars. Despite the apparent steady percentage of road rated good or fair, if those roads have not received preventive maintenance treatments, they have deteriorated somewhat, developing cracks and making them more susceptible to developing potholes. A casual observer this spring will see severe potholes in some roads that just last summer looked in good condition. These 1

2 roads will now be more costly to save than if they had received pavement preservation treatments Pavement Condition of Federal Aid Eligible Roads Source: Chesbro, Transportation Asset Management Council Paved Non Federal Aid Roads 2013 Chesbro, TAMC, 25 Feb 2014 As in previous years, the data regarding the non-federal aid roads show them to be in much worse condition than the more heavily traveled roads eligible for federal aid. Key Study Assumptions. We used the same goals that were used in the 2011 study of 95% of the state s trunkline freeways having a PASER rating of good or fair, and 85% of the remaining paved roads good or fair. 2

3 The construction cost assumptions were updated as follows: 2011 Lane-Mile Costs Reconstruction Rehabilitation CPM Freeway 1,456, ,000 66,600 Non-Freeway Trunkline 1,250, ,000 54,800 Federal Aid Non-Trunkline 562, ,000 26,000 Non-Ffederal Aid 365, ,000 20, Lane-Mile Costs Reconstruction Rehabilitation CPM Freeway 1,785, ,059 68,988 Non-Freeway Trunkline 1,378, ,106 58,559 Federal Aid Non-Trunkline 619, ,318 27,783 Non-Ffederal Aid 402, ,203 21,372 The model was run for the roads, but updated projections for bridges has not been received since the 2011 report. To make the totals for both roads and bridges, the 2011 bridge data is used to calculate a road and bridge total. Study Results. The table below shows the year by year results of how much additional money is needed to maintain our roads and bridges over the course of 12 years to reach the goals of 95% and 85% good or fair Road Study Results Bridge Results Road & Bridge Total Year Needed Current Budget Shortfall Shortfall Shortfall 2014 $3,230,002,014 $1,097,002,014 $2,133,000,000 $50,000,000 $2,183,000, $3,230,002,015 $1,097,002,015 $2,133,000,000 $50,000,000 $2,183,000, $3,230,002,016 $1,097,002,016 $2,133,000,000 $50,000,000 $2,183,000, $3,230,002,017 $1,097,002,017 $2,133,000,000 $50,000,000 $2,183,000, $3,230,002,018 $1,097,002,018 $2,133,000,000 $63,060,000 $2,196,060, $3,230,002,019 $1,097,002,019 $2,133,000,000 $78,600,000 $2,211,600, $3,531,502,020 $1,097,002,020 $2,434,500,000 $94,000,000 $2,528,500, $3,638,077,021 $1,097,002,021 $2,541,075,000 $110,030,000 $2,651,105, $3,749,980,772 $1,097,002,022 $2,652,978,750 $127,080,000 $2,780,058, $3,867,479,711 $1,097,002,023 $2,770,477,688 $144,890,000 $2,915,367, $3,990,853,596 $1,097,002,024 $2,893,851,572 $163,110,000 $3,056,961, $4,120,396,175 $1,097,002,025 $3,023,394,150 $183,220,000 $3,206,614,150 Note the amount needed rises over the years. Note that the first five years totals exceed $2 billion and goes up to over $3 billion by the end of the 12 year period. The amount for the roads stays flat over the first six years because the model has a built in assumption that construction costs are constant to 2019, then rises at a rate of 5% per year thereafter. Therefore, any revenue source added should have the capability of growing, otherwise the state will be in a similar position within just a few years as inflation eats up the increased revenue.

4 The results were also looked at as averages over the 12 year period to calculate the proportions of the additional money would be needed for the various categories of roads, as shown here. Paved Lane Miles Goal Funds Needed Current Budget Shortfall Freeway 10,024 95% $706 $148 $558 NonFreeway Trunkline 19,432 85% $794 $317 $477 NonTrunkline Federal Aid 54,396 85% $1,300 $378 $922 Year Funds Needed to Achieve Condition Goals for (Percentage in Good/Fair Condition).. Annual Average in Millions... Non-Federal Aid 79,482 85% $723 $254 $469 Road Subtotal 163,334 86% $3,523 $1,097 $2,426 Bridges Freeway 3,260 95% $208 $148 $60 Non-Freeway Trunkline 1,209 85% $43 $37 $6 Non-Trunkline Bridges 6,446 84% $75 $44 $31 Bridge Subtotal 10,915 87% $326 $229 $97 Grand Total $3,849 $1,326 $2,523 All Roads & Bridges ($ in millions) Year Total Additional Funding Above Current Investment Needed to Meet and Sustain Goals Year Total Additional Funding Above Current Investment Needed to Meet and Sustain Goals Increase in Shortfall Year Total Additional Funding Above Current Investment Needed to Meet and Sustain Goals Increase in Shortfall Year Total Additional Funding Above Current Investment Needed to Meet and Sustain Goals Increase in Shortfall 2011 Study Results 2012 Study Results 2013 Study Results 2014 Study Results $1, $1,542 $ $1,754 $ $2,183 $ $1, $1,546 $ $1,745 $ $2,183 $ $1, $1,542 $ $1,822 $ $2,183 $ $1, $1,623 $ $1,906 $ $2,183 $ $1, $1,854 $ $2,087 $ $2,196 $ $1, $2,004 $ $2,221 $ $2,212 ($10) $1, $2,152 $ $2,399 $ $2,528 $ $2, $2,318 $ $2,585 $ $2,651 $ $2, $2,379 $ $2,780 $ $2,780 ($0) $2, $2,536 $ $2,986 $ $2,915 ($70) $2, $2,731 $ $3,201 $ $3,057 ($144) $2, $2,924 $ $3,428 $ $3,207 ($221) 2025 $3, Year Total $21, Total $25,151 $3,186 $28,912 $3,761 $30,279 $1,367 Less 2012 Increase Avoided by Delay $1,377 Increase in Cost Due to Delay in Legislative Action $1,809 Less 2013 Increase Avoided by Delay $1, Year Increase in Cost Due to Delay in Legislative Action $2,219 Less 2014 Increase Avoided by Delay $1, Year Increase in Cost Due to Delay in Legislative Action ($387) 4

5 The total 12 year cost rose from $ billion in the 2011 study, to $25,151 billion in the 2012 study, to $28,912 in the 2013 study, to this year s study 12 year total of $30,279. Whereas we calculated the cost of delay, year by year to be $1.809 billion from 2011 to 2012 due to legislative inaction, and $2.219 billion from , curiously the net cost of legislative inaction from 2013 to 2014 is a negative $387 million. I suspect, however, this savings is illusory, with the deterioration of the roads that the PASER rating system does not pick up, with it being a visual rating, while in fact the aging roadway may be becoming more susceptible to damage such as we are seeing this winter and spring. Projected Road Quality with Proposed Additional Funding. This graph shows the percentages of the freeway miles that are good or fair, and what would be poor, assuming the additional funding shown above was available. Even with the additional funding, initially we would not see an instantaneous average improvement, as even the additional money will only go so far, and there is a limit on the percentage of the highways that may be worked on in one year without severely adversely causing traffic congestion. Nonetheless, by the 9 th year the goal of 95% good or fair is achieved. 5

6 For the non-freeway federal aid road that are still in the trunkline category, we would actually see a reduction in the percentage of the roads rated good or fair for a couple of years before construction could catch up with the deterioration rate. Nonetheless, by the 12 year, the goal of 85% good or fair is achieved. 6

7 For the non-trunkline federal aid roads, we would see significant improvement pretty quickly from their current low 60% good or fair ratings, and the 85% good or fair goal would be reached in the 12 year. For the non-federal aid roads, here too we would see rather dramatic improvement from the low below 60% good or fair ratings, and the goal of 85% good or fair would be reached in the 12 th year. Is $2.183 Billion All We Would Need to Increase Transportation Revenue to Solve the Transportation Funding Problem? The $2.183 billion calculated with the model is just the additional amount needed to maintain our existing pavements and bridges, and does not consider additional funding for relieving congestion, addressing safety issues, increased attention to our gravel roads, meeting deferred state and local road agency equipment needs, or providing increased funding for transit, rail, air or water transportation. If we consider just the current 10% of the Michigan Transportation Fund going to transit, the $2.183 billion would need to be increased by 10/9 = 1.11, or $2.426 billion. (The 10% is after carveouts for the recreation fund, administration and collection, rail grade crossings, critical bridge debt service, and about $200 million of other allocations of funds.) Does the Current Brutal Winter Affect This Analysis? This winter with the extended periods of below freezing temperatures has the potential to significantly affect this analysis. The deep frost has and is causing heaving, and when the frost comes out and the surface sags, the pothole problems will likely multiply from the already severe breakup on many of our roads. The lack of the desired preventive maintenance in many of the 7

8 roads has left them vulnerable to water penetration, which is the roads greatest enemy. When the road rating data is collected this summer, we expect the resulting road condition data reported next winter by the Transportation Asset Management Council will look far worse. When this data is plugged into the model next year, this year s study results will likely look very optimistic. Is There a Less Expensive Way to Reach Our Goals of Good or Fair Roads? Incorporated in the original study and each subsequent update is the concept of asset management, i.e., a pavement preservation program employing a network level, long-term strategy that enhances pavement performance by using an integrated, cost-effective set of practices that extend pavement life, improve safety and meet motorist expectations. The program adopts the idea of the right fix (from the mix of fixes ) at the right place at the right time to optimize pavement life. The asset management concept emphasizes that it is less expensive to maintain good pavements over the long-term than allow the pavements to deteriorate to the point of requiring more expensive fixes, including reconstruction. In practice this would not be able to be done perfectly, so this study s projections are the best case scenario. As concluded in the 2011 study, Bottom line: if the investments projected by these models are not done, either the deferred costs of maintaining our roads will be much higher OR we choose to accept lower quality roads. From a business perspective, the set of investments recommended is the lowest long-term costs of maintaining our roads. Do We Really Need to Have 95% or 85% In Such Good Condition? It is important to note that even when we approach, hit and maintain the 95% good or fair condition, all the roads will not look in like-new condition. Percentage of "Good" and "Fair" When 95% or 85% Goals Are Reached Good Fair Total Goal Freeway Non freeway Trunkline Non Trunkline Federal Aid Non federal Aid The table above shows that for the freeways, only 50% will be in the 8-10 good rating, 45% in the 5-7 fair rating and the remaining 5% in the 1-4 poor condition. For the remaining paved roads, the good roads range from 38% to 61%. (The non-trunkline percentage of good reflects the large amount of reconstruction needed due to their being so deteriorated that reconstruction is needed, while some of the other categories qualify for less costly fixes to keep them out of the poor ratings. Failure to apply the lower cost 3, 5 or 7 year right fix in past years is coming back to haunt us.) Some of the capital preventive maintenance, such as crack filling, will not be as aesthetically pleasing as fresh, smooth asphalt, but will be much more cost effective. As the photos taken from pages of the PASER (Pavement Surface Evaluation and Rating Manual Asphalt Roads) attached show, fair is not good. 8

9 What If We Just Maintain Our Current Poor Quality? What Would That Cost? The House Transportation Committee Work Group in 2011 set the 95%/85% goals and then sought to see what the lowest cost combination of fixes and timing of fixes was to derive the additional funding needed. A follow up question was asked by a legislator, What would it take to just maintain the road conditions with no average road system improvement? The funding model was again used and the following table was the result (i.e., we would still need over $1 billion more per year, and rising) Year Total Funds Needed to Maintain Roads in 2011 Condition Total Additional Funding Above Current Investment Needed to Maintain 2011 Condition (millions) (millions) 2013 $2, $1, $2, $1, $2, $1, $2, $ $2, $ $2, $1, $2, $1, $3, $1, $3, $1, $3, $1, $3, $1, $3, $1, $3, $1, Total $37, $15, Avg $2, $1, The takeaway from this finding could well be that if political capital is to be expended, it would be advisable to actually fix the problem, rather than angering some taxpayers by raising taxes and still having them mad because the roads were not getting better, but merely maintained in a poor condition. 9

10 18 Rating pavement surface condition RATING 7 GOOD Routine sealing recommended Roads show first signs of aging, and they may have very slight raveling. Any longitudinal cracks are along paving joint. Transverse cracks may be approximately 10 or more apart. All cracks are 1 4 or less, with little or no crack erosion. Few if any patches, all in very good condition. Maintain a crack sealing program. Tight and sealed transverse and longitudinal cracks. Maintain crack sealing program. Tight and sealed transverse and longitudinal cracks. Transverse cracks about 10 or more apart. Maintain crack sealing program.

11 Rating pavement surface condition 19 RATING 6 GOOD Consider preservative treatment Roads are in sound structural condition but show definite signs of aging. Sealcoating could extend their useful life. There may be slight surface raveling. Transverse cracks can be frequent, less than 10 apart. Cracks may be and sealed or open. Pavement is generally sound adjacent to cracks. First signs of block cracking may be evident. May have slight or moderate bleeding or polishing. Patches are in good condition. Slight surface raveling with tight cracks, less than 10 apart. Transverse cracking less than 10 apart; cracks well-sealed. Open crack, 1 2 Large blocks, early signs of raveling and block cracking. wide; adjoining pavement sound. Moderate flushing.

12 20 Rating pavement surface condition RATING 5 Block cracking with open cracks. FAIR Preservative maintenance treatment required Roads are still in good structural condition but clearly need sealcoating or overlay. They may have moderate to severe surface raveling with significant loss of aggregate. First signs of longitudinal cracks near the edge. First signs of raveling along cracks. Block cracking up to 50% of surface. Extensive to severe flushing or polishing. Any patches or edge wedges are in good condition. Moderate to severe raveling in wheel paths. Severe flushing. Wedges and patches extensive but in good condition.

13 Rating pavement surface condition 21 Severe raveling with extreme loss of aggregate. Load cracking and slight rutting in wheel path. RATING 4 FAIR Structural improvement required Roads show first signs of needing strengthening by overlay. They have very severe surface raveling which should no longer be sealed. First longitudinal cracking in wheel path. Many transverse cracks and some may be raveling slightly. Over 50% of the surface may have block cracking. Patches are in fair condition. They may have rutting less than 1 2 deep or slight distortion. Longitudinal cracking; early load-related distress in wheel path. Strengthening needed. Slight rutting; patch in good condition. Extensive block cracking. Blocks tight and sound. Slight rutting in wheel path.

Michigan s Roads Crisis: What Will It Cost to Maintain Our Roads and Bridges? 2012 Update

Michigan s Roads Crisis: What Will It Cost to Maintain Our Roads and Bridges? 2012 Update Michigan s Roads Crisis: What Will It Cost to Maintain Our Roads and Bridges? 2012 Update (A Report of the Work Group on Transportation Funding, of the House of Representatives Transportation Committee)

More information

Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax

Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax Kevin Kirby, Assistant County Manager Operations Ben Scott, County Manager Tuesday, July 31,

More information

A Local Perspective on Pavement Condition Data Collection & Use

A Local Perspective on Pavement Condition Data Collection & Use A Local Perspective on Pavement Condition Data Collection & Use Tim Colling PhD., P.E. Director Center For Technology & Training tkcollin@mtu.edu (906)-487-2102 Why Do We Rate Roads? Planning: What work

More information

1.0 CITY OF HOLLYWOOD, FL

1.0 CITY OF HOLLYWOOD, FL 1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the

More information

Pavement Management Technical Report

Pavement Management Technical Report Pavement Management Technical Report October 2008 Prepared by the Genesee County Metropolitan Planning Commission Pavement Management Technical Report Pavement Management System Technical Report 1 What

More information

City of Glendale, Arizona Pavement Management Program

City of Glendale, Arizona Pavement Management Program City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT) C&T:SCB 1 of 10 C&T:APPR:JTL:JDC:09-29-03 FHWA:APPR:10-15-03

More information

Columbia County Town Hall Meeting District 4 Charter County and Regional Transportation System Sales Surtax

Columbia County Town Hall Meeting District 4 Charter County and Regional Transportation System Sales Surtax Columbia County Town Hall Meeting District 4 Charter County and Regional Transportation System Sales Surtax Kevin Kirby, Assistant County Manager Operations Ben Scott, County Manager Tuesday, July 17,

More information

Economic Impact and Policy Analysis of Four Michigan Transportation Investment Proposals

Economic Impact and Policy Analysis of Four Michigan Transportation Investment Proposals Issued: June 2012 Revised-September 2012 Economic Impact and Policy Analysis of Four Michigan Transportation Investment Proposals Prepared by: Anderson Economic Group, LLC Alex Rosaen, Consultant Colby

More information

Best First. A Strategy for Extending the Service Life of Roadways. (or are you a chicken?)

Best First. A Strategy for Extending the Service Life of Roadways. (or are you a chicken?) Best First A Strategy for Extending the Service Life of Roadways (or are you a chicken?) Premise for this presentation You don t have enough scratch to do it all (or do you more on this later) This Photo

More information

Tools & Methods for Monitoring Performance Results

Tools & Methods for Monitoring Performance Results Tools & Methods for Monitoring Performance Results Craig B. Newell Bureau of Transportation Planning Manager Michigan Department of Transportation Overview of MDOT s Tools & Methods for Monitoring Performance

More information

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good.

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) Basic Components PMS Evaluation of Flexible Pavements Fundamental Theory of Typical Pavement Defects and Failures Physical Description

More information

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 RECOMMENDED ACTION: Approve the Final. RECOMMENDED ACTION from TAC: Accept the Final and include the NDDOT

More information

Asset Management Guide for Local Agencies in Michigan

Asset Management Guide for Local Agencies in Michigan Asset Management Guide for Local Agencies in Michigan sponsored by Michigan Transportation Asset Management Council prepared by Cambridge Systematics, Inc. revised by Michigan s Local Technical Assistance

More information

Residential Street Improvement Plan

Residential Street Improvement Plan Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the

More information

100 YEARS OF TRANSPORTATION EXCELLENCE. Addressing Michigan s Road-Funding Crisis: THE TIME IS NOW! REPORT OF THE 2013 STRATEGIC PLANNING PROCESS

100 YEARS OF TRANSPORTATION EXCELLENCE. Addressing Michigan s Road-Funding Crisis: THE TIME IS NOW! REPORT OF THE 2013 STRATEGIC PLANNING PROCESS 100 YEARS OF TRANSPORTATION EXCELLENCE Addressing Michigan s Road-Funding Crisis: THE TIME IS NOW! REPORT OF THE 2013 STRATEGIC PLANNING PROCESS Overview During the recent 2013 Road Commission for Oakland

More information

Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System

Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Susanne Chan Pavement Design Engineer, M.A.Sc, P.Eng. Ministry of Transportation

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY. CFS:EMC 1 of 7 APPR:KPK:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY. CFS:EMC 1 of 7 APPR:KPK:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY CFS:EMC 1 of 7 APPR:KPK:DBP:12-07-12 FHWA:APPR:12-18-12 a. Description. The pavement performance warranty consists

More information

Grand Rapids has a tax and a plan to fix its bad roads

Grand Rapids has a tax and a plan to fix its bad roads Grand Rapids has a tax and a plan to fix its bad roads By Rod Kackley Crain s Detroit Business November 16, 2014 ISTOCK PHOTO A report released by the Grand Rapids 21st Century Infrastructure Task Force

More information

C ITY OF S OUTH E UCLID

C ITY OF S OUTH E UCLID C ITY OF S OUTH E UCLID T A B L E O F C O N T E N T S 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

All Institutions. The Center examines the important role of voluntary associations, communities, businesses and families, as well as government.

All Institutions. The Center examines the important role of voluntary associations, communities, businesses and families, as well as government. The is a nonpartisan research and educational institute dedicated to improving the quality of life for all Michigan residents by promoting sound solutions to state and local policy questions. The Mackinac

More information

Antrim County Road Commission Annual Report to the Antrim County Board of Commissioners. June 8, 2017

Antrim County Road Commission Annual Report to the Antrim County Board of Commissioners. June 8, 2017 Antrim County Road Commission 2016 Annual Report to the Antrim County Board of Commissioners June 8, 2017 TABLE OF CONTENTS Introduction 3 Revenues 4 Expenses 6 Road Projects 7 County Road Pavement Conditions

More information

Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan

Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Photo Credit: Alcona County Road Commission Andy Manty, PE, Research Engineer Center for

More information

Pavement Preservation

Pavement Preservation Road Foreman Meeting West Windsor, Vermont March 24, 2015 Dan Patenaude, P.E. Hometown: Chester, VT Pavement Preservation Your Key to Pavement Management Success Since 1957 Corporate Headquarters Braintree,

More information

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits 2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits Prepared For: 601 East Kennedy Boulevard Tampa, FL 33602 Prepared by: Jacobs

More information

Interested Parties William E. Hamilton Transportation Needs and Revenue Distribution

Interested Parties William E. Hamilton Transportation Needs and Revenue Distribution MEMORANDUM DATE: December 3, 2010 TO: FROM: RE: Interested Parties William E. Hamilton Transportation Needs and Revenue Distribution Introduction Michigan residents rely on a safe efficient transportation

More information

2018 Annual Report. Highway Department Accomplishments

2018 Annual Report. Highway Department Accomplishments 2018 Annual Report Highway Department The vision of the Eau Claire County Highway Department is to provide services to the taxpayer that, to the best of our ability, provides safe and efficient travel

More information

Initial Transportation Asset Management Plan

Initial Transportation Asset Management Plan Initial Transportation Asset Management Plan Table of Contents Acronym Table Introduction.................. 1 Act 51 Michigan Public Act 51 of 1951 Program Development Call For Projects Process...........5

More information

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016 CITY OF ORINDA Road and Drainage Repairs Plan (As Updated in 2016) March 15, 2016 (ORIGINALLY ADOPTED BY THE CITY COUNCIL JULY 17, 2012 AND UPDATED APRIL 22, 2014) CITY OF ORINDA 22 Orinda Way Orinda,

More information

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016 CITY OF ORINDA Road and Drainage Repairs Plan (As Updated in 2016) March 15, 2016 (ORIGINALLY ADOPTED BY THE CITY COUNCIL JULY 17, 2012 AND UPDATED APRIL 22, 2014) CITY OF ORINDA 22 Orinda Way Orinda,

More information

Gladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5

Gladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5 Page 1 of 5 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 9:30 A.M., EST, WEDNESDAY, March 9, 2016 Board of County Road Commissioners of the County of Gladwin, 301 South State Street, Gladwin, Michigan

More information

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million

More information

Proposed Franchise Fee Pavement Management Program (PMP)

Proposed Franchise Fee Pavement Management Program (PMP) 1 Agenda Explain the Purpose and the Need for Additional Funding for Pavement Management Discuss what a Franchise Fees is Input from Audience on Franchise Fee 2 Proposed Franchise Fee Pavement Management

More information

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I

FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I FULL RESERVE STUDY FUNDING ANALYSIS PLAN Level I QUALCHAN HILLS HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 6 AUGUST 2012 CONTENTS 1.0 INTRODUCTION...

More information

NCHRP Consequences of Delayed Maintenance

NCHRP Consequences of Delayed Maintenance NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond

More information

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 USE OF VDOT S PAVEMENT MANAGEMENT SYSTEM TO PROACTIVELY PLAN AND MONITOR PAVEMENT MAINTENANCE AND REHABILITATION ACTIVITIES TO MEET THE AGENCY S PERFORMANCE

More information

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM Frequently Asked Questions SMEC COMPANY DETAILS SMEC Australia Pty Ltd Sun Microsystems Building Suite 2, Level 1, 243 Northbourne Avenue, Lyneham ACT

More information

SUBJECT: SEE BELOW DATE: April 13, 2017 ANNUAL PAVEMENT MAINTENANCE STATUS REPORT & FUNDING STRATEGY UPDATE.

SUBJECT: SEE BELOW DATE: April 13, 2017 ANNUAL PAVEMENT MAINTENANCE STATUS REPORT & FUNDING STRATEGY UPDATE. COUNCIL AGENDA: 4/25/17 ITEM: 6.2 TO: HONORABLE MAYOR AND CITY COUNCIL FROM: Toni J. Taber, CMC City Clerk SUBJECT: SEE BELOW DATE: April 13, 2017 SUBJECT: ANNUAL PAVEMENT MAINTENANCE STATUS REPORT & FUNDING

More information

Background. Request for Decision. Asset Management Plan. Resolution. Presented: Tuesday, Dec 13, Report Date Tuesday, Nov 29, 2016

Background. Request for Decision. Asset Management Plan. Resolution. Presented: Tuesday, Dec 13, Report Date Tuesday, Nov 29, 2016 Presented To: City Council Request for Decision Asset Management Plan Presented: Tuesday, Dec 13, 2016 Report Date Tuesday, Nov 29, 2016 Type: Presentations Resolution THAT the City of Greater Sudbury

More information

Long-Term Monitoring of Low-Volume Road Performance in Ontario

Long-Term Monitoring of Low-Volume Road Performance in Ontario Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario

More information

Department of Public Works

Department of Public Works Department of Public Works Bureau of Street Services Pothole Politics: The Road To Pavement Preservation Rev. Oct. 2008 William A. Robertson Director Potholes Are Like Diamonds They re Forever! HOW BIG

More information

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS City of Sonoma I. Introduction TABLE OF CONTENTS II. Methodology III. Pavement Condition Index (PCI) / Remaining Service Life (RSL) Report IV. Budget Analysis Reports A. Budget Needs Report Five Year B.

More information

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Definition: Pavement Management is the process of overseeing the

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Pavement Distress Survey and Evaluation with Fully Automated System

Pavement Distress Survey and Evaluation with Fully Automated System Ministry of Transportation Pavement Distress Survey and Evaluation with Fully Automated System Li Ningyuan Ministry of Transportation of Ontario 2015 RPUG Conference Raleigh, North Carolina, November 2015

More information

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University Effective Use of Pavement Management Programs Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Pavement Management Is A Decision Making Process Effective Pavement

More information

COMPASS 2009 DATA ANALYSIS AND REPORTING. Project February 2011

COMPASS 2009 DATA ANALYSIS AND REPORTING. Project February 2011 COMPASS 2009 DATA ANALYSIS AND REPORTING Project 04-01 February 2011 National Center for Freight & Infrastructure Research & Education College of Engineering Department of Civil and Environmental Engineering

More information

Frequently Asked Questions County Road Maintenance Sales Tax Proposition 403: Your Roads. Your Decision.

Frequently Asked Questions County Road Maintenance Sales Tax Proposition 403: Your Roads. Your Decision. Frequently Asked Questions County Road Maintenance Sales Tax Proposition 403: Your Roads. Your Decision. For more detailed information, please go to www.coconino.az.gov/countyroads 1. Why is the County

More information

Examples of Decision Support Using Pavement Management Data

Examples of Decision Support Using Pavement Management Data Examples of Decision Support Using Pavement Management Data John Coplantz, PE Pavement Management Engineer Oregon Department of Transportation October 27, 2016 Strategic Network (Tactical) Project (Operational)

More information

in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E.

in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E. Life Cycle Cost Analysis in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E. What is it? Economic procedure That uses

More information

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN 5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

Highway Engineering-II

Highway Engineering-II Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning

More information

Department of Transportation

Department of Transportation Department of Transportation Programs Primary Roads Local Roads County Roads Managing Director Office Management Permits, Traffic Services, and Safety Operations Project Management & Design Parma Crew

More information

Pavement Condition Forecasting System (PCFS) A Network Level Funding & Strategy Analysis Tool

Pavement Condition Forecasting System (PCFS) A Network Level Funding & Strategy Analysis Tool Pavement Condition Forecasting System (PCFS) A Network Level Funding & Strategy Analysis Tool Ron Vibbert, Manager Asset Management Section, Michigan DOT San Diego, CA April 17, 2012 What is the PCFS?

More information

2016 PAVEMENT CONDITION ANNUAL REPORT

2016 PAVEMENT CONDITION ANNUAL REPORT 2016 PAVEMENT CONDITION ANNUAL REPORT January 2017 Office of Materials and Road Research Pavement Management Unit Table of Contents INTRODUCTION... 1 BACKGROUND... 1 DATA COLLECTION... 1 INDICES AND MEASURES...

More information

LONG RANGE ROAD MAINTENANCE AND RECONSTRUCTION BUDGET FORECASTING St Croix County Unit of the WI Towns Association

LONG RANGE ROAD MAINTENANCE AND RECONSTRUCTION BUDGET FORECASTING St Croix County Unit of the WI Towns Association LONG RANGE ROAD MAINTENANCE AND RECONSTRUCTION BUDGET FORECASTING St Croix County Unit of the WI Towns Association Scott Counter Chair, St Croix County Unit of the WI Towns Association The following Long

More information

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT Performance Measures for Making Pavement Preservation Decisions David Luhr Pavement Management Engineer Washington State DOT 1 Performance Measures as Tools Project Decision Support - Where, When, and

More information

Keep Wisconsin Moving Smart Investments Measurable Results

Keep Wisconsin Moving Smart Investments Measurable Results Keep Wisconsin Moving Smart Investments Measurable Results Wisconsin Transportation Finance and Policy Commission January 2013 Investment in transportation Investment in our economy Investment in our quality

More information

Driving Ahead for Funding: What Will We Do About Our Crumbling Transportation System

Driving Ahead for Funding: What Will We Do About Our Crumbling Transportation System Driving Ahead for Funding: What Will We Do About Our Crumbling Transportation System Thursday, October 1, 2015 8:00 a.m. 9:30 a.m. California Statewide Local Streets & Roads Needs Assessment 2014 Update

More information

Review and Update of Year 2035 Regional Transportation Plan

Review and Update of Year 2035 Regional Transportation Plan Review and Update of Year 2035 Regional Transportation Plan #217752 1 Background Every four years, the Year 2035 Plan is reviewed Elements of review Validity of Plan Year 2035 forecasts Transportation

More information

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System M. Arif Beg, PhD Principal Consultant, AgileAssets Inc. Ambarish Banerjee, PhD Consultant, AgileAssets

More information

Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN

Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN April 30, 2018 (This page intentionally left blank) Table of Contents Chapter 1 Introduction... 1-1 Chapter 2 Asset Management

More information

Revenue Sharing Program Guidelines

Revenue Sharing Program Guidelines Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219

More information

TM TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT

TM TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT HEADQUARTERS, DEPARTMENT 0F THE ARMY NOVEMBER 1982 TECHNICAL MANUAL HEADQUARTERS DEPARTMENT OF THE ARMY No. 5-623 WASHINGTON, DC, November 1982 } PAVEMENT

More information

OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS

OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Paper Nº ICMP123 8th International Conference on Managing Pavement Assets OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Goran Mladenovic 1*, Jelena Cirilovic 2 and Cesar Queiroz

More information

Revenue Sharing Program Guidelines

Revenue Sharing Program Guidelines Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219

More information

Development Practices for Municipal Pavement Management Systems Application

Development Practices for Municipal Pavement Management Systems Application Development Practices for Municipal Pavement Management Systems Application Mehran Kafi Farashah, MASc., EIT, University of Waterloo Dr. Susan L. Tighe, PhD, PEng, University of Waterloo Paper prepared

More information

Department of Transportation

Department of Transportation Department of Transportation Managing Director Office Management Permits, Traffic Services, and Safety Operations Project Management & Design Parma Crew Clark Lake Crew Henrietta Crew Jackson Crew Mission

More information

Instructions for Completing the Annual Road and Street Finance Report

Instructions for Completing the Annual Road and Street Finance Report Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to

More information

THE ECONOMICS OF PREVENTIVE MAINTENANCE

THE ECONOMICS OF PREVENTIVE MAINTENANCE THE ECONOMICS OF PREVENTIVE MAINTENANCE C lyde B urke Vice President Roy Jorgensen Associates, Inc. Gaithersburg, Maryland H O W M U C H P R E V E N T IV E M A IN T E N A N C E? How do we know when we

More information

A Guide to. Provided by: The Road Commission for Oakland County. Visit RCOC online at Updated January 2015

A Guide to. Provided by: The Road Commission for Oakland County. Visit RCOC online at  Updated January 2015 A Guide to Provided by: The Road Commission for Oakland County 2015 Visit RCOC online at www.rcocweb.org Updated January 2015 1 Table of Contents Subject Page About the Road Commission for Oakland County...

More information

THE ROAD TO ECONOMIC GROWTH

THE ROAD TO ECONOMIC GROWTH THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction

FY Statewide Capital Investment Strategy... asset management, performance-based strategic direction FY 2009-2018 Statewide Capital Investment Strategy.. asset management, performance-based strategic direction March 31, 2008 Governor Jon S. Corzine Commissioner Kris Kolluri Table of Contents I. EXECUTIVE

More information

Investment Handout. Complete All 94 Miles of Roads As Proposed In The 15 Year Plan. (The Engineered Solution)

Investment Handout. Complete All 94 Miles of Roads As Proposed In The 15 Year Plan. (The Engineered Solution) Town Road Improvement Investment Handout DRAFT ONLY 08_08_17 SCENARIO 1 Complete All 94 Miles of Roads As Proposed In The 15 Year Plan. (The Engineered Solution) $9.5 Million Bond $629,180 Value $130 The

More information

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS 2013 THE CITY OF NIAGARA FALLS 4310 QUEEN STREET NIAGARA FALLS, ONTARIO, L2E 6X5 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET,

More information

Transportation Improvement Program and Incentives for Local Planning

Transportation Improvement Program and Incentives for Local Planning Capital District November 9, 2004 Transportation Committee Transportation Improvement Program and Incentives for Local Planning CDTC has been successful in funding 36 Linkage Program planning studies since

More information

NON-MOTORIZED FACILITIES

NON-MOTORIZED FACILITIES NON-MOTORIZED FACILITIES POLICY The Board of Road Commissioners of the County of Kalamazoo non-motorized policy provides a guideline for the development of non-motorized facilities in the public right-of-way.

More information

Bridge Asset Management or IT S THE MONEY DUMMY

Bridge Asset Management or IT S THE MONEY DUMMY Bridge Asset Management or IT S THE MONEY DUMMY Chris Keegan, P. E. Bridge Maintenance Engineer Region Operations Engineer. Secretary of Transportation Roger Millar WBPP, Denver CO May, 2017 Asset Management

More information

Governor s Advisory Committee on Transportation and Infrastructure

Governor s Advisory Committee on Transportation and Infrastructure Governor s Advisory Committee on Transportation and Infrastructure Director Jack Marchbanks, Ph.D. Ohio Department of Transportation February 5, 2019 Members of the Transportation Advisory Committee: I

More information

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT Gordon Molnar, M.A.Sc., P.Eng. UMA Engineering Ltd., 17007 107 Avenue, Edmonton, AB, T5S 1G3 gordon.molnar@uma.aecom.com Paper

More information

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for:

RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION. Prepared for: RESERVE STUDY LEVEL II UPDATE WITH VISUAL SITE INSPECTION Prepared for: MEADOWWOOD GLEN HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM PFAFF ENGINEERS 12128 N. DIVISION ST. #200 (509)467-8554 Site Inspection:

More information

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned

More information

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017

Corridors of Commerce DRAFT Scoring and Prioritization Process. Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Corridors of Commerce DRAFT Scoring and Prioritization Process Patrick Weidemann Director of Capital Planning and Programming November 1, 2017 Project Purpose To develop and implement a scoring and project

More information

Pavement Asset Management Decision Support Tools: Ohio Department of Transportation Case Study

Pavement Asset Management Decision Support Tools: Ohio Department of Transportation Case Study Pavement Asset Management Decision Suort Tools: Ohio Deartment of Transortation Case Study Eddie Chou Professor of Civil Engineering The University of Toledo Andrew Williams Administrator, Office of Technical

More information

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing

TESTIMONY. The Texas Transportation Challenge. Testimony Before the Study Commission on Transportation Financing TESTIMONY The Texas Transportation Challenge Testimony Before the Study Commission on Transportation Financing Ric Williamson Chairman Texas Transportation Commission April 19, 2006 Texas Department of

More information

Chapter 2 Performance and Funding Gap Analysis

Chapter 2 Performance and Funding Gap Analysis Chapter 2 Performance and Funding Gap Analysis The first steps in addressing a county s system preservation issues is to assemble pertinent data, evaluate it, ascertain if preservation needs exist, and

More information

AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS

AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS DATE : October 7, 2016 TO : City Manager FROM : Public Works Director SUBJECT : CITYWIDE STREET RESURFACING PROGRAM AND REQUEST FOR

More information

Honorable Mayor and Members of the City Council. Failing Streets: Time to Change Direction to Achieve Sustainability

Honorable Mayor and Members of the City Council. Failing Streets: Time to Change Direction to Achieve Sustainability Office of the City Auditor Ann Marie Hogan, City Auditor CONSENT CALENDAR November 15, 2011 To: From: Subject: Honorable Mayor and Members of the City Council Ann-Marie Hogan, City Auditor RECOMMENDATION

More information

Pavement Investment Guide. CPAM March 15, 2018

Pavement Investment Guide. CPAM March 15, 2018 Pavement Investment Guide CPAM March 15, 2018 MnDOT s Pavement System 14,302 total roadway miles. Current value of about $4 Billion. MnDOT spends around $ 300M a year to keep it in a serviceable condition.

More information

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University Asset Management Ruminations T. H. Maze Professor of Civil Engineering Iowa State University Why Transportation Asset Management Has Nothing to Do With Systems to Manage Individual Transportation Assets

More information

SEGREGATION RATING MANUAL

SEGREGATION RATING MANUAL SEGREGATION RATING MANUAL 2017 This page is intentionally left blank SEGREGATION RATING MANUAL Introduction This Segregation Rating Manual is a revision of earlier editions prepared by the Department.

More information

NAO Report Maintaining Strategic Infrastructure: Roads

NAO Report Maintaining Strategic Infrastructure: Roads Briefing 14/28 August 2014 NAO Report Maintaining Strategic Infrastructure: Roads To: All English contacts For information: All contacts in Scotland, Northern Ireland and Wales Key issues NAO report highlights

More information

State Highway Paving Report Oman Data

State Highway Paving Report Oman Data Introduction State Highway Paving Report Oman Data Concrete s market share in paving activity, as reflected in Oman data, has increased only modestly during the past two years. Oman data refers to state

More information

Town of Chino Valley Roads Maintenance Program Property Tax Rate Study 2018

Town of Chino Valley Roads Maintenance Program Property Tax Rate Study 2018 Roads Maintenance Program Property Tax Rate Study 2018 This report is prepared to meet the requirements of ARS 9-499.15 October 24, 2018 Page 1 Table of Contents Introduction...3 HURF Fund Cash Flow Projections...3

More information

MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting

MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting MONTE SERENO BETTER STREETS COMMISSION AGENDA 7:00 P.M. Thursday March 8, 2018 Regular Meeting Monte Sereno City Council Chambers 18041 Saratoga-Los Gatos Road, Monte Sereno, CA 95030 MEETING CALLED TO

More information

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project Public Works Commission ACTION CALENDAR July 14, 2009 To: From: Honorable Mayor and Members of the City Council Public Works Commission Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission

More information

SUBJECT: Issues Related to State Highway Rehabilitation Program Budget

SUBJECT: Issues Related to State Highway Rehabilitation Program Budget Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 Email: fiscal.bureau@legis.wisconsin.gov Website: http://legis.wisconsin.gov/lfb February 27, 2018

More information