1 Pavement Asset Management Decision Suort Tools: Ohio Deartment of Transortation Case Study Eddie Chou Professor of Civil Engineering The University of Toledo Andrew Williams Administrator, Office of Technical Services The Ohio Deartment of Transortation TRB 9th National Conference on Transortation Asset Management Aril 16-18, 2012, San Diego, California

2 Introduction Aging avement network and tight budget at most highway agencies Demonstrated otimal use of M&R dollars has become necessary amid calls for transarency and accountability Ohio DOT has develoed decision suort tools for avement asset management through research rojects Exanding from avement to bridges and other assets Pilot for web access of information and tools 2

3 Dashboard Condition Reorting

4 Condition of Different Systems

5 Average Treatment Performance

6 Pavement Condition History

7 Network Level Otimization Suorts high level asset management decisions Estimate the minimum budget required to achieve a desired condition level Maximize the benefits for a given amount of budget Determine treatment olicy and budget allocation

8 Network Level Otimization Condition Classification Historical Pavement Condition Project History Treatment Classification Markov Prediction Model Current Pavement Condition Allowable Treatments Condition Target Linear Programming Otimization Model 1. Minimize Total Cost 2. Maximize Network Condition Treatment Unit Cost Available Budget Required Minimum Budget Otimal Treatment Policy & Budget Allocation Network Condition Prediction 8

9 Markov Prediction Model P = 0.7 P = 0. 2 P = P14 = P = Excellent 2. Good 3. Fair 4. Poor 5. Very Poor Markov Transition Probability Matrix: P =

10 Markov Prediction Model System riority: General and Priority Pavement tye: Concrete, Flexible and Comosite Reair treatment: Preventive Maintenance, Thin Overlay, Minor Rehab and Major Rehab = 24 avement grous are formed Treatment Matrix Excellent Good Fair Poor Very Poor Excellent Good Fair Poor Very Poor Do Nothing Matrix Excellent Good Fair Poor Very Poor Excellent Good Fair Poor Very Poor

11 Performance vs. Treatment Cost PCR Pavement Condition Deterioration Trend $ Pavement Age $ Minor Rehabilitation Major Rehabilitation Deficiency Threshold 11

12 Determination of Treatment Policy Current Network Condition Predicted Performance Condition Target Treatment Otions & Cost Otimization Condition Otimal Treatment Policy Do Nothing Recommended Treatment PM Thin Overlay Minor Major Excellent 100% 0% 0% 0% 0% Good 100% 0% 0% 0% 0% Fair 31% 69% 0% 0% 0% Poor 0% 0% 0% 100% 0% Very Poor 0% 0% 0% 0% 100% $ Required Network Budget

13 Minimum Budget Required to Achieve a Condition Level 3.0% Condition Target Deficiency Level 2.0% 1.0% $ Budget? 0.0% Year

14 Recommended Treatment Budget and Allocation Budget ($ Million) Year PM Thin Overlay Minor Rehab Major Rehab

15 Corresonding Pavement Condition Distribution 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Year Very Poor Poor Fair Good Excellent

16 Budget Allocation among Treatments to Achieve the Best Condition Level Budget $140 Million Allocation? Condition?

17 Use of Network Otimization Network otimization can be used as a decision making tool to answer what-if questions regarding: Imact of different condition targets Imact of different funding levels Imact of different budget allocation Imact of different reair treatment olicy

18 Deficiency Level Versus Average Annualized Exenditure $20 Average Annualized Exenditure Per Lane Mile ($1,000) $18 $16 $14 $12 $10 $8 Priority System General System $6 0% 1% 2% 3% 4% 5% 6% 7% 8% 9% 10% Deficiency Level

19 Future Directions: Transortation Assets Management opavement opedestrian Facilities oriver Ports oparks obike Facilities otransit Lines obridges orail Lines

20 Pavement Management Develoment Markov Forecast Road Inventory Decision Trees Pavement Condition District Work lans Caital Projects Maintenance Projects

21 PMS Data Process DoIT Suort 1. DoIT will transfer Pavement Databases needed for analysis into Sybase. DoIT Suort 2. DoIT will rovide GQL access to those basic databases on the PMS model. 3. Pavement Engineering will rovide DoIT with the avement management logic needed for rogramming analysis tools. 4. Pavement Engineering and DoIT will develo an udate lan for all avement databases. PMS PCR Roughness Skid Coring Analysis (PMS Software) BTRS (RI,.01, Log file, etc.) Analyze Data List Projects/ Treatments Budget Allocation (PMS Software) District Analysis Scoing Muliti Year Program (PMS Software) Feedback Ellis Project Tracking TMS DoIT Extraction Pavement History Database DoIT Extraction CMS 21

22 Systems Conditions State Average PCR for each System Over Time Average PCR Year State Avg Priority Avg Urban Avg General Avg

23 Integrated Decision Suort Average Conditions at Rehabilitation General System Flexible Pavements Activity 50 and Activity 60 from 1985 to 2010 District PCR Prior CRD Prior STRD Prior Raveling Bleeding Patching Debonding Crack Sealing Defic Rutting Settlements Corrugations Wheel Track Cracking Block and Transverse Cracking Longitudinal Cracking Edge Cracking Random Cracking Thermal cracking Thickness Added Thickness Removed Age at Reair Age at Next Reair

24

25

26

27

28 Footer (use Insert>Headers & Footers to change)

29 Pavement Summary 3 ODOT - Priority System ODOT - General ODOT - Urban % of Accetable Pavement 100% 98% 96% 94% 92% 90% 88% 97.9% Goal: 95% % of Accetable Pavement 100% 98% 96% 94% 92% 90% 88% Goal: 90% 97.3% % of Accetable Pavement 100% 98% 96% 94% 92% 90% 88% Goal: 90% 97.5% 86% 86% 86% 84% 84% 84% 82% 82% 82% 80% SFY % SFY % SFY

30 Where are we going? Currently Imlementing a Commercial Pavement Management System (Deighton System) Currently develoing an integrated asset management system rototye through the University of Toledo Currently Imlementing Web-GIS alication for dislaying, distributing, and analyzing avement and other assets Currently develoing the framework for asset management database (consolidated database, COD) Performance Based Management Return on Investment Management Integrated System Suort Tools World Class Transortation System

31 Thank You!

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION DEVELOPMENT AND IMPLEMENTATION OF A NETWOR-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION Shuo Wang, Eddie. Chou, Andrew Williams () Department of Civil Engineering, University

More information

Development and implementation of a networklevel pavement optimization model

Development and implementation of a networklevel pavement optimization model The University of Toledo The University of Toledo Digital Repository Theses and Dissertations 2011 Development and implementation of a networklevel pavement optimization model Shuo Wang The University

More information

Determining the Value of Information in Asset Management Decisions

Determining the Value of Information in Asset Management Decisions Determining the Value of Information in Asset Management Decisions David Luhr Jianhua Li Pavement Management Unit Washington State DOT Simple Decision Tree Solve by calculating Expected Monetary Value

More information

C ITY OF S OUTH E UCLID

C ITY OF S OUTH E UCLID C ITY OF S OUTH E UCLID T A B L E O F C O N T E N T S 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance

More information

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS City of Sonoma I. Introduction TABLE OF CONTENTS II. Methodology III. Pavement Condition Index (PCI) / Remaining Service Life (RSL) Report IV. Budget Analysis Reports A. Budget Needs Report Five Year B.

More information

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 RECOMMENDED ACTION: Approve the Final. RECOMMENDED ACTION from TAC: Accept the Final and include the NDDOT

More information

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN 5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University Asset Management Ruminations T. H. Maze Professor of Civil Engineering Iowa State University Why Transportation Asset Management Has Nothing to Do With Systems to Manage Individual Transportation Assets

More information

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University Effective Use of Pavement Management Programs Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Pavement Management Is A Decision Making Process Effective Pavement

More information

Highway Engineering-II

Highway Engineering-II Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning

More information

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System M. Arif Beg, PhD Principal Consultant, AgileAssets Inc. Ambarish Banerjee, PhD Consultant, AgileAssets

More information

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT Performance Measures for Making Pavement Preservation Decisions David Luhr Pavement Management Engineer Washington State DOT 1 Performance Measures as Tools Project Decision Support - Where, When, and

More information

NCHRP Consequences of Delayed Maintenance

NCHRP Consequences of Delayed Maintenance NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond

More information

Examples of Decision Support Using Pavement Management Data

Examples of Decision Support Using Pavement Management Data Examples of Decision Support Using Pavement Management Data John Coplantz, PE Pavement Management Engineer Oregon Department of Transportation October 27, 2016 Strategic Network (Tactical) Project (Operational)

More information

Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update

Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update By Rick Olson, former State Representative Reporting analytical work performed by Gil Chesbro and Jim Ashman,

More information

TM TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT

TM TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT HEADQUARTERS, DEPARTMENT 0F THE ARMY NOVEMBER 1982 TECHNICAL MANUAL HEADQUARTERS DEPARTMENT OF THE ARMY No. 5-623 WASHINGTON, DC, November 1982 } PAVEMENT

More information

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million

More information

Hazim M Abdulwahid, MSC, MBA Hazim Consulting

Hazim M Abdulwahid, MSC, MBA Hazim Consulting Road Map for Establishing Pavement Maintenance Management System on the Strategic Level 13 th International O&M Conference in the Arab Countries,17-19 Nov 2015 Hazim M Abdulwahid, MSC, MBA Hazim Consulting

More information

A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System

A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System Rafael Arturo Ramirez-Flores Ph. D. Candidate Carlos Chang-Albitres Ph.D., P.E. April 16,

More information

Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System

Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Transition from Manual to Automated Pavement Distress Data Collection and Performance Modelling in the Pavement Management System Susanne Chan Pavement Design Engineer, M.A.Sc, P.Eng. Ministry of Transportation

More information

A Local Perspective on Pavement Condition Data Collection & Use

A Local Perspective on Pavement Condition Data Collection & Use A Local Perspective on Pavement Condition Data Collection & Use Tim Colling PhD., P.E. Director Center For Technology & Training tkcollin@mtu.edu (906)-487-2102 Why Do We Rate Roads? Planning: What work

More information

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach

Maintenance Management of Infrastructure Networks: Issues and Modeling Approach Maintenance Management of Infrastructure Networks: Issues and Modeling Approach Network Optimization for Pavements Pontis System for Bridge Networks Integrated Infrastructure System for Beijing Common

More information

City of Glendale, Arizona Pavement Management Program

City of Glendale, Arizona Pavement Management Program City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY 2015-2019) EXECUTIVE SUMMARY REPORT December 2013 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND

More information

PMS: PUTTING THE DATA TO WORK. Judith Corley-Lay May 16, 2016

PMS: PUTTING THE DATA TO WORK. Judith Corley-Lay May 16, 2016 PMS: PUTTING THE DATA TO WORK Judith Corley-Lay May 16, 2016 Outline of Presentation Use of Open graded friction course in NC Data available in PMS Individual performance curves Overall performance of

More information

1.0 CITY OF HOLLYWOOD, FL

1.0 CITY OF HOLLYWOOD, FL 1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the

More information

Development Practices for Municipal Pavement Management Systems Application

Development Practices for Municipal Pavement Management Systems Application Development Practices for Municipal Pavement Management Systems Application Mehran Kafi Farashah, MASc., EIT, University of Waterloo Dr. Susan L. Tighe, PhD, PEng, University of Waterloo Paper prepared

More information

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good.

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) Basic Components PMS Evaluation of Flexible Pavements Fundamental Theory of Typical Pavement Defects and Failures Physical Description

More information

Management Accounting of Production Overheads by Groups of Equipment

Management Accounting of Production Overheads by Groups of Equipment Asian Social Science; Vol. 11, No. 11; 2015 ISSN 1911-2017 E-ISSN 1911-2025 Published by Canadian Center of Science and Education Management Accounting of Production verheads by Grous of Equiment Sokolov

More information

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT Gordon Molnar, M.A.Sc., P.Eng. UMA Engineering Ltd., 17007 107 Avenue, Edmonton, AB, T5S 1G3 gordon.molnar@uma.aecom.com Paper

More information

The Cost of Pavement Ownership (Not Your Father s LCCA!)

The Cost of Pavement Ownership (Not Your Father s LCCA!) The Cost of Pavement Ownership (Not Your Father s LCCA!) Mark B. Snyder, Ph.D., P.E. President and Manager Pavement Engineering and Research Consultants, LLC 57 th Annual Concrete Paving Workshop Arrowwood

More information

Pavement Preservation

Pavement Preservation Road Foreman Meeting West Windsor, Vermont March 24, 2015 Dan Patenaude, P.E. Hometown: Chester, VT Pavement Preservation Your Key to Pavement Management Success Since 1957 Corporate Headquarters Braintree,

More information

OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS

OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Paper Nº ICMP123 8th International Conference on Managing Pavement Assets OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Goran Mladenovic 1*, Jelena Cirilovic 2 and Cesar Queiroz

More information

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 USE OF VDOT S PAVEMENT MANAGEMENT SYSTEM TO PROACTIVELY PLAN AND MONITOR PAVEMENT MAINTENANCE AND REHABILITATION ACTIVITIES TO MEET THE AGENCY S PERFORMANCE

More information

Pavement Condition Forecasting System (PCFS) A Network Level Funding & Strategy Analysis Tool

Pavement Condition Forecasting System (PCFS) A Network Level Funding & Strategy Analysis Tool Pavement Condition Forecasting System (PCFS) A Network Level Funding & Strategy Analysis Tool Ron Vibbert, Manager Asset Management Section, Michigan DOT San Diego, CA April 17, 2012 What is the PCFS?

More information

Pavement Distress Survey and Evaluation with Fully Automated System

Pavement Distress Survey and Evaluation with Fully Automated System Ministry of Transportation Pavement Distress Survey and Evaluation with Fully Automated System Li Ningyuan Ministry of Transportation of Ontario 2015 RPUG Conference Raleigh, North Carolina, November 2015

More information

Leveraging Infrastructure Management Systems. Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services

Leveraging Infrastructure Management Systems. Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services Leveraging Infrastructure Management Systems Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services PRESENTATION AGENDA Engineering s Asset Management Strategy and Framework Integrated

More information

Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax

Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax Columbia County Town Hall Meeting District 2 Charter County and Regional Transportation System Sales Surtax Kevin Kirby, Assistant County Manager Operations Ben Scott, County Manager Tuesday, July 31,

More information

Feasibilitystudyofconstruction investmentprojectsassessment withregardtoriskandprobability

Feasibilitystudyofconstruction investmentprojectsassessment withregardtoriskandprobability Feasibilitystudyofconstruction investmentrojectsassessment withregardtoriskandrobability ofnpvreaching Andrzej Minasowicz Warsaw University of Technology, Civil Engineering Faculty, Warsaw, PL a.minasowicz@il.w.edu.l

More information

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM Frequently Asked Questions SMEC COMPANY DETAILS SMEC Australia Pty Ltd Sun Microsystems Building Suite 2, Level 1, 243 Northbourne Avenue, Lyneham ACT

More information

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E.

RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT. Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E. RISK BASED LIFE CYCLE COST ANALYSIS FOR PROJECT LEVEL PAVEMENT MANAGEMENT Eric Perrone, Dick Clark, Quinn Ness, Xin Chen, Ph.D, Stuart Hudson, P.E. Texas Research and Development Inc. 2602 Dellana Lane,

More information

Department of Public Works

Department of Public Works Department of Public Works Bureau of Street Services Pothole Politics: The Road To Pavement Preservation Rev. Oct. 2008 William A. Robertson Director Potholes Are Like Diamonds They re Forever! HOW BIG

More information

Framework and Methods for Infrastructure Management. Samer Madanat UC Berkeley NAS Infrastructure Management Conference, September 2005

Framework and Methods for Infrastructure Management. Samer Madanat UC Berkeley NAS Infrastructure Management Conference, September 2005 Framework and Methods for Infrastructure Management Samer Madanat UC Berkeley NAS Infrastructure Management Conference, September 2005 Outline 1. Background: Infrastructure Management 2. Flowchart for

More information

District 6 10-Year Capital Highway Investment Plan ( )

District 6 10-Year Capital Highway Investment Plan ( ) District 6 10-Year Caital Highway Plan (2017-2026 Cover Picture OCTOBER 2016 Preared by Office of Transortation System Management DISTRICT 6 10-YER CHIP District 6 shares the southeast ortion of Minnesota

More information

Parmalat FY 2009 Results

Parmalat FY 2009 Results February 25 th, 2010 Parmalat FY 2009 Results Listed on the Italian Stock Exchange since October 6 th, 2005 Imortant information This resentation has been reared by Parmalat (the Comany ) for illustrative

More information

Long-Term Monitoring of Low-Volume Road Performance in Ontario

Long-Term Monitoring of Low-Volume Road Performance in Ontario Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario

More information

Residential Street Improvement Plan

Residential Street Improvement Plan Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the

More information

2016 PAVEMENT CONDITION ANNUAL REPORT

2016 PAVEMENT CONDITION ANNUAL REPORT 2016 PAVEMENT CONDITION ANNUAL REPORT January 2017 Office of Materials and Road Research Pavement Management Unit Table of Contents INTRODUCTION... 1 BACKGROUND... 1 DATA COLLECTION... 1 INDICES AND MEASURES...

More information

Pavement Management Technical Report

Pavement Management Technical Report Pavement Management Technical Report October 2008 Prepared by the Genesee County Metropolitan Planning Commission Pavement Management Technical Report Pavement Management System Technical Report 1 What

More information

Columbia County Town Hall Meeting District 4 Charter County and Regional Transportation System Sales Surtax

Columbia County Town Hall Meeting District 4 Charter County and Regional Transportation System Sales Surtax Columbia County Town Hall Meeting District 4 Charter County and Regional Transportation System Sales Surtax Kevin Kirby, Assistant County Manager Operations Ben Scott, County Manager Tuesday, July 17,

More information

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant

More information

Sampling Procedure for Performance-Based Road Maintenance Evaluations

Sampling Procedure for Performance-Based Road Maintenance Evaluations Samling Procedure for Performance-Based Road Maintenance Evaluations Jesus M. de la Garza, Juan C. Piñero, and Mehmet E. Ozbek Maintaining the road infrastructure at a high level of condition with generally

More information

Prediction of Rural Residents Consumption Expenditure Based on Lasso and Adaptive Lasso Methods

Prediction of Rural Residents Consumption Expenditure Based on Lasso and Adaptive Lasso Methods Oen Journal of Statistics, 2016, 6, 1166-1173 htt://www.scir.org/journal/ojs ISSN Online: 2161-7198 ISSN Print: 2161-718X Prediction of Rural Residents Consumtion Exenditure Based on Lasso and Adative

More information

Modeling of Life Cycle Alternatives in the National Bridge Investment Analysis System (NBIAS) Prepared by: Bill Robert, SPP Steve Sissel, FHWA

Modeling of Life Cycle Alternatives in the National Bridge Investment Analysis System (NBIAS) Prepared by: Bill Robert, SPP Steve Sissel, FHWA Modeling of Life Cycle Alternatives in the National Bridge Investment Analysis System (NBIAS) Prepared by: Bill Robert, SPP Steve Sissel, FHWA TRB International Bridge & Structure Management Conference

More information

Analysis of Past NBI Ratings for Predicting Future Bridge System Preservation Needs

Analysis of Past NBI Ratings for Predicting Future Bridge System Preservation Needs Analysis of Past NBI Ratings for Predicting Future Bridge System Preservation Needs Xiaoduan Sun, Ph.D., P.E. Civil Engineering Department University of Louisiana at Lafayette P.O. Box 4229, Lafayette,

More information

Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN

Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN Florida Department of Transportation INITIAL TRANSPORTATION ASSET MANAGEMENT PLAN April 30, 2018 (This page intentionally left blank) Table of Contents Chapter 1 Introduction... 1-1 Chapter 2 Asset Management

More information

Tools & Methods for Monitoring Performance Results

Tools & Methods for Monitoring Performance Results Tools & Methods for Monitoring Performance Results Craig B. Newell Bureau of Transportation Planning Manager Michigan Department of Transportation Overview of MDOT s Tools & Methods for Monitoring Performance

More information

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Definition: Pavement Management is the process of overseeing the

More information

COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013

COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013 COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013 Pictures Key Front Cover Top Row 1) Administration Building Second Row, left to right 2) Brigden EMS Station 3) Judith & Norman Alix Art Gallery Third row,

More information

MoDOT Dashboard. Measurements of Performance

MoDOT Dashboard. Measurements of Performance MoDOT Dashboard Measurements of Performance 1997 1998 1999 2000 2001 2002 MoDOT Dashboard Executive Summary Performance measurement is not new to MoDOT. In July 2001, MoDOT staff began completing quarterly

More information

SEGREGATION RATING MANUAL

SEGREGATION RATING MANUAL SEGREGATION RATING MANUAL 2017 This page is intentionally left blank SEGREGATION RATING MANUAL Introduction This Segregation Rating Manual is a revision of earlier editions prepared by the Department.

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering

More information

Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan

Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Photo Credit: Alcona County Road Commission Andy Manty, PE, Research Engineer Center for

More information

Governor s Working Group on Highway Funding Tuesday, July 28, 2015

Governor s Working Group on Highway Funding Tuesday, July 28, 2015 Governor s Working Group on Highway Funding Tuesday, July 28, 2015 Sources and Distribution of Highway Revenue Highway User Revenues Receipts & Distribution Fiscal Year 2014 Highway User Revenues Receipts

More information

Disclosure of Further Corporate Information

Disclosure of Further Corporate Information Cororate Information Set out below is information disclosed ursuant to the Rules Governing the Listing of Securities (the "Listing Rules") on The Stock Exchange of Hong Kong Limited (the "Hong Kong Stock

More information

Limitations of Value-at-Risk (VaR) for Budget Analysis

Limitations of Value-at-Risk (VaR) for Budget Analysis Agribusiness & Alied Economics March 2004 Miscellaneous Reort No. 194 Limitations of Value-at-Risk (VaR) for Budget Analysis Cole R. Gustafson Deartment of Agribusiness and Alied Economics Agricultural

More information

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director City of La Habra Heights Benefit Assessment Districts June 6, 2016 Presented by Pablo Perez, Director 1 BENEFIT ASSESSMENT DISTRICTS Proposition 218 Defines Special Benefit as Particular and distinct benefit

More information

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko Asset Management Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko 1 Introduction Topics that we will address today Review of Ontario Regulation 588/17 Defining

More information

FINAL REPORT FHWA/IN/JTRP-2004/34 AN EVALUATION OF THE COST-EFFECTIVENESS OF WARRANTY CONTRACTS IN INDIANA. Priyanka Singh Graduate Research Assistant

FINAL REPORT FHWA/IN/JTRP-2004/34 AN EVALUATION OF THE COST-EFFECTIVENESS OF WARRANTY CONTRACTS IN INDIANA. Priyanka Singh Graduate Research Assistant FINAL REPORT FHWA/IN/JTRP-2004/34 AN EVALUATION OF THE COST-EFFECTIVENESS OF WARRANTY CONTRACTS IN INDIANA By Priyanka Singh Graduate Research Assistant Samuel Labi Visiting Assistant Professor Bob G.

More information

Project 06-06, Phase 2 June 2011

Project 06-06, Phase 2 June 2011 ASSESSING AND INTERPRETING THE BENEFITS DERIVED FROM IMPLEMENTING AND USING ASSET MANAGEMENT SYSTEMS Project 06-06, Phase 2 June 2011 Midwest Regional University Transportation Center College of Engineering

More information

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD

COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD COST BENEFIT ANALYSIS OF CHENNAI PERIPHERAL ROAD 1 Introduction The objective of the cost benefit economic analysis is to identify and quantify the benefits and costs associated with the project. This

More information

Webinar 11 August 12, 2014

Webinar 11 August 12, 2014 Transporta)on*Asset*Management* Webinar*Series* Webinar(11:(Managing(NHS(Assets(( Not(Owned(by(the(State( ( Sponsored(by(FHWA(and(AASHTO( ( Submit*ques)ons*and*comments*using*the*webinar s*q&a*feature(

More information

Multi-Year, Multi-Constraint Strategy to

Multi-Year, Multi-Constraint Strategy to Multi-Year, Multi-Constraint Strategy to Optimize Linear Assets Based on Life Cycle Costs Keivan Neshvadian, PhD Transportation Consultant July 2016 2016 AgileAssets Inc All Rights Reserved Pavement Asset

More information

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007 Infrastructure Asset Management Southwest Chula Vista Civic Association April 26, 2007 Chula Vista s Municipal Infrastructure Pavement* Traffic Signals Alleys Streetlights Parking Lots Street Signs Sidewalks*

More information

Planning Pavement Maintenance and Rehabilitation Projects in the New Pavement Management System in Texas 3. Feng Hong, PhD, PE

Planning Pavement Maintenance and Rehabilitation Projects in the New Pavement Management System in Texas 3. Feng Hong, PhD, PE Planning Pavement Maintenance and Rehabilitation Projects in the New Pavement Management System in Texas 0 Feng Hong, PhD, PE Texas Department of Transportation, Austin, TX Email: Feng.Hong@TxDOT.gov Eric

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY. CFS:EMC 1 of 7 APPR:KPK:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY. CFS:EMC 1 of 7 APPR:KPK:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT PERFORMANCE WARRANTY CFS:EMC 1 of 7 APPR:KPK:DBP:12-07-12 FHWA:APPR:12-18-12 a. Description. The pavement performance warranty consists

More information

Analytical support in the setting of EU employment rate targets for Working Paper 1/2012 João Medeiros & Paul Minty

Analytical support in the setting of EU employment rate targets for Working Paper 1/2012 João Medeiros & Paul Minty Analytical suort in the setting of EU emloyment rate targets for 2020 Working Paer 1/2012 João Medeiros & Paul Minty DISCLAIMER Working Paers are written by the Staff of the Directorate-General for Emloyment,

More information

2018 Local Roads Workshop Local Agency Warranties

2018 Local Roads Workshop Local Agency Warranties 2018 Local Roads Workshop Local Agency Warranties March 2018 MICHIGAN RIDES ON US Presentation Outline Legislation and Program Development Special Provisions and Warranty Process Details Types of Warranties

More information

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY

THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY THE HYBRID PERFORMANCE BASED PAVEMENT MANAGEMENT STRATEGY Travis Gilbertson, Opus International Consultants Ltd, Christchurch, NZ ABSTRACT Hybrid performance based road management and maintenance contracts

More information

PAVEMENT PROGRAM PLANNING

PAVEMENT PROGRAM PLANNING CIVIL ENGINEERING STUDIES Illinois Center for Transportation Series No. 10-067 UILU-ENG-2010-2008 ISSN: 0197-9191 PAVEMENT PROGRAM PLANNING BASED ON MULTI-YEAR COST- EFFECTIVENESS ANALYSIS Prepared By

More information

Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015

Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015 Performance-Based Planning and Programming Why Is It Important? Northwest TTAP and BIA Symposium Portland, OR March 17, 2015 Transportation has two purposes & Mobility Access Quileute Reservation La Push,

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS

THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS THE ASSET MANAGEMENT PLAN FOR THE CITY OF NIAGARA FALLS 2013 THE CITY OF NIAGARA FALLS 4310 QUEEN STREET NIAGARA FALLS, ONTARIO, L2E 6X5 SUBMITTED DECEMBER 2013 BY PUBLIC SECTOR DIGEST 148 FULLARTON STREET,

More information

State of Ohio. Department of Transportation ~ Innovative Contracting Manual

State of Ohio. Department of Transportation ~ Innovative Contracting Manual State of Ohio Department of Transportation ~ Innovative Contracting Manual 5/1/2010 Copies of this manual and reference materials may be obtained at: Ohio Department of Transportation Division of Construction

More information

Forecasting Asset Conditions with Decay Curves April 16, 2012 Keith Gates, PE Senior Analyst, Strategic Planning & Analysis

Forecasting Asset Conditions with Decay Curves April 16, 2012 Keith Gates, PE Senior Analyst, Strategic Planning & Analysis Forecasting Asset Conditions with Decay Curves April 16, 2012 Keith Gates, PE Senior Analyst, Strategic Planning & Analysis 9 th National Conference on Transportation Asset Management San Diego, California

More information

Bridge Asset Management or IT S THE MONEY DUMMY

Bridge Asset Management or IT S THE MONEY DUMMY Bridge Asset Management or IT S THE MONEY DUMMY Chris Keegan, P. E. Bridge Maintenance Engineer Region Operations Engineer. Secretary of Transportation Roger Millar WBPP, Denver CO May, 2017 Asset Management

More information

TOWN HALL MEETING. Neighborhood Connector Street Projects. February 7, 2016

TOWN HALL MEETING. Neighborhood Connector Street Projects. February 7, 2016 TOWN HALL MEETING Neighborhood Connector Street Projects February 7, 2016 Neighborhood Connector Street Projects Overview April 17 2014 May 17 2014 November 20 2014 January 29 2015 March 5 2015 March 19

More information

VDOT s Pavement Management Program Virginia Asphalt Association Annual Meeting, 2013

VDOT s Pavement Management Program Virginia Asphalt Association Annual Meeting, 2013 VDOT s Pavement Management Program Virginia Asphalt Association Annual Meeting, 2013 Commissioner Gregory Whirley Virginia Department of Transportation Outline of the Presentation Where we are now current

More information

The Impact of Flexibility And Capacity Allocation On The Performance of Primary Care Practices

The Impact of Flexibility And Capacity Allocation On The Performance of Primary Care Practices University of Massachusetts Amherst ScholarWorks@UMass Amherst Masters Theses 1911 - February 2014 2010 The Imact of Flexibility And Caacity Allocation On The Performance of Primary Care Practices Liang

More information

Revenue Sharing Program Guidelines

Revenue Sharing Program Guidelines Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219

More information

TECHNICAL ADVISORY COMMITTEE (TAC) AGENDA. DATE: Wednesday, October 3, 2018

TECHNICAL ADVISORY COMMITTEE (TAC) AGENDA. DATE: Wednesday, October 3, 2018 TECHNICAL ADVISORY COMMITTEE (TAC) AGENDA DATE: Wednesday, October 3, 2018 TIME: 9:00 A.M. PLACE: Vista Center 4 th Floor Conference Room 4E-12 2300 North Jog Road West Palm Beach, FL 33411 1. REGULAR

More information

THE ECONOMICS OF PREVENTIVE MAINTENANCE

THE ECONOMICS OF PREVENTIVE MAINTENANCE THE ECONOMICS OF PREVENTIVE MAINTENANCE C lyde B urke Vice President Roy Jorgensen Associates, Inc. Gaithersburg, Maryland H O W M U C H P R E V E N T IV E M A IN T E N A N C E? How do we know when we

More information

South Huron Asset Management Program. Spending the right amount of money, on the right assets, at the right time

South Huron Asset Management Program. Spending the right amount of money, on the right assets, at the right time South Huron Asset Management Program Spending the right amount of money, on the right assets, at the right time Current Asset Management Plan Identifies all asset classes with condition data mainly for

More information

Alabama Transportation Conference. February 9 th, 2015

Alabama Transportation Conference. February 9 th, 2015 Alabama Transportation Conference February 9 th, 2015 2 3 4 5 Transportation in Georgia 10 th Largest Road System in Nation 17,967 Centerline Miles of State Routes/Interstates 85,738 Centerline Miles of

More information

Effects of Size and Allocation Method on Stock Portfolio Performance: A Simulation Study

Effects of Size and Allocation Method on Stock Portfolio Performance: A Simulation Study 2011 3rd International Conference on Information and Financial Engineering IPEDR vol.12 (2011) (2011) IACSIT Press, Singaore Effects of Size and Allocation Method on Stock Portfolio Performance: A Simulation

More information

Tony Mento, P.E. January 2017

Tony Mento, P.E. January 2017 Tony Mento, P.E. January 2017 Evolution of the Federal Program Manage ITS & Operations Manage Build preserve maintain Outcome Performance 2 National Highway Performance Program ($21.8B) Funds an enhanced

More information

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis

HDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned

More information

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA National Goals Focus the Federal-aid program on the following national goals: 1) SAFETY 2) INFRASTRUCTURE

More information

in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E.

in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E. Life Cycle Cost Analysis in Pavement Design In Search of Better Investment Decisions Northwest Pavement Management Association 2016 Conference Jim Powell, P.E. What is it? Economic procedure That uses

More information

Preliminary Asset Management Plan for Streets and Fleet.

Preliminary Asset Management Plan for Streets and Fleet. DATE: August 28, 2017 TO: FROM: SUBJECT: Honorable Mayor Jerry Smith City Council Anne Marie Gaura, City Manager Tim Holdeman, Public Works Director Jeff Wilkens, Acting Finance Director Robert Miller,

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Montréal and Québec City Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis

More information