1 City of Glendale, Arizona Pavement Management Program Current Year Plan (FY 2014) and Five-Year Plan (FY ) EXECUTIVE SUMMARY REPORT December 2013

2 TABLE OF CONTENTS TABLE OF CONTENTS I BACKGROUND 1 GENERAL PRINCIPLES OF PAVEMENT MANAGEMENT 1 Pavement Treatment Descriptions 2 Pavement Condition Ratings & Treatments 4 ROADWAY NETWORK CONDITION AND FINDINGS 5 ANNUAL FUNDING AND BUDGET ANALYSIS 6 Annual Funding Levels For Fiscal Years 2014 Through Budget Analyis Models 7 PROPOSED REHABILITATION PLANS 9 Current Year Plan (FY 2014) 9 Five-Year Plan (FY 2015 Through FY 2019) 10 SUMMARY AND RECOMMENDATIONS FOR COUNCIL GUIDANCE 11 APPENDIX A: Summary Map of Rehabilitation Plans for FY 2014, FY 2015, and FY FY 2019 I

3 EXECUTIVE SUMMARY REPORT BACKGROUND The City of Glendale has 103 miles of arterial roadways (urban and rural arterials) plus an additional 615 miles of residential roadways (residential, minor collectors, and major collectors) encompassing over 16.8 million square yards of asphalt surfacing (Figure 1). At a replacement cost fast approaching $1 million per mile, plus the cost of right of way improvements, the city has roughly $1 billion invested in the paved roadway network. Figure 1: Glendale Roadway Network A pavement management program identifies objectives to establish design and maintenance standards, prioritizes maintenance treatments, models long-term maintenance activities to obtain maximum pavement life, and ultimately protects the investment already made in the roadway system. Preservation of existing road and street systems has become a major activity for municipal, state and federal governments. A shortage of funds to maintain street systems exists at all the levels of government. Funds that have been designated for pavement preservation must therefore be used as effectively as possible. The key to a successful pavement management program is to develop a reasonably accurate performance model of the roadway, and then identify the optimal timing and strategies for cost effective rehabilitation of the street network. A comprehensive pavement management study was conducted by Infrastructure Management Services, LLC (IMS) with the goal to assess the condition of the roadway system and to determine pavement treatment activities for immediate and long-term needs. The study collected information on roadway surface conditions, roughness evaluations, distress assessments and traffic classification surveys to determine traffic impacts on all arterial and residential streets. In addition, structural analysis testing was conducted on arterial roads. GENERAL PRINCIPLES OF PAVEMENT MANAGEMENT Pavement management is the process of planning, budgeting, funding, designing, constructing, monitoring, evaluating, maintaining, and rehabilitating the pavement network to provide maximum benefits from the available funds. A pavement management system is a set of tools or methods that 1

4 assists decision makers in finding optimum strategies for providing and maintaining pavement in a serviceable condition over a given time period. The condition of a street is affected by a number of factors, including: Surface Condition (roughness, cracking, etc.) Moisture Intrusion and Drainage (street profile, cross section, storm sewer) Sub-grade strength and conditions Traffic characteristics and loading Pavement Age Prior Maintenance (overlays, micro resurfacing, crack filling, seal coating, patching) Each of the above listed factors contributes to the overall condition and lifecycle of the street system. As shown in Figure 2, streets that are repaired when they are in good condition will cost less over their lifetime than streets that are allowed to deteriorate to a poor condition and are then in need of reconstruction. A $1 investment after 40% lifespan is much more effective than deferring maintenance until heavier overlays or reconstruction is required just a few years later. Acceptable Figure 2: Pavement Deterioration and Life Cycle Costs Without an adequate routine pavement maintenance program, streets require more frequent reconstruction, thereby costing millions of extra dollars. Over time, pavement quality drops until the pavement condition becomes unacceptable. PAVEMENT TREATMENT DESCRIPTIONS A variety of pavement maintenance techniques are used to preserve city streets and the cost for each treatment can vary significantly. The following is a description of each maintenance treatment by the least expensive to most expensive, and the potential benefits of the treatment. 2

5 Surface Treatments Various surface treatments provide for the installation of a thin surface coating, typically an oil emulsion and small aggregate rock to reseal the pavement surface. This allows for an extension of the pavement surface life by minimizing the effects of the sun and weather on the existing asphalt material and re-establishing a wearing surface. Surface treatments are typically either a fog seal or a slurry seal on residential or collector streets, and a microsurface seal on arterial roadways. Microsurface seals are very similar to slurry seal with the exception of the size of the aggregate and resulting thickness of the treatment. Surface Treatment Example: Tonto Drive near 66 th Ave, PCI = 76 Overlay An overlay provides for the addition of another layer of asphalt type material or rubberized asphalt pavement on the existing roadway. This can be performed either through the removal and replacement of a 1 to 2-inch thick layer to maintain the current surface elevations or by placing an additional layer of pavement on top of the existing surface. An overlay of this thickness extends the life of the roadway by adding additional material to the surface, reestablishing the cross slope of the road to promote drainage and creating a smooth driving surface. Surface Reconstruction Surface reconstruction provides for full depth overlay, typically 3-5 inches, by removing the existing pavement in place and replacing it with new asphalt. The existing pavement is ground up and blended into the aggregate base, and the new pavement is installed to restore the proper cross slope and provide a stronger roadway section. This process is typically less expensive than full reconstruction and is usually only done on arterial roadways where the depth of the asphalt is much thicker than residential roadways. Full Reconstruction Full reconstruction provides for the removal of the existing roadway and the rebuilding of the road from the sub-grade through the pavement surface. Sub-grade correction consists of the removal of unsuitable materials, backfill with granular materials, aggregate base, and new asphalt pavement. This method is typically applied in areas where the pavement is showing significant areas of major distress and where it is unlikely that a surface reconstruction will properly repair the street. Full Reconstruction Example: Camelback Rd West of 55 th Ave, PCI = 16 3

6 PAVEMENT CONDITION RATINGS & TREATMENTS As part of the Pavement Management study, the arterial and residential pavement conditions were evaluated and assigned a value from 1 to 100 based on surface distress, roughness, and structural assessment. This value is known as the Pavement Condition Index (PCI). The following figure (Figure 3) illustrates the PCI range and corresponding maintenance treatment shown on the pavement condition versus time curve. Figure 3: PCI Range and Maintenance Treatments Figure 3 also identifies the remaining life related to each pavement condition category (i.e., very good, good, fair, acceptable, poor, and very poor). Streets in very good condition will last up to 40 years depending on the timeframe, quality of construction, and routine maintenance activities. Whereas, very poor streets only have up to 10 years of service life, which requires timely planned reconstruction before complete failure of the pavement occurs. Lastly, maintenance costs increase significantly depending on the current pavement condition and selected treatment technique. A maintenance cost comparison between pavement condition categories identifies costs ranging from $50,000 to $70,000 per mile for good condition streets, from $250,000 to $650,000 per mile for acceptable condition streets, and from $1 million to $2 million per mile for streets having very poor pavement condition. This shows that very poor streets have approximately a four-fold greater maintenance cost as compared to acceptable streets. 4

7 ROADWAY NETWORK CONDITION AND FINDINGS At the time of the last field survey in 2009, the network overall average PCI was 73 (i.e., the average of all arterials, collectors and residential streets). Furthermore, the arterial network had an average PCI of 72 and the residential network had an average PCI of 73. Nationwide the average PCI score for similar cities to Glendale, Arizona is 65 to 70. Glendale s current 2013 network overall average PCI is 72. The arterial network has an average PCI of 71 and the residential network has an average PCI of 73. Although the 2013 network average is higher than the national average for similar cities, this PCI rating places the overall street network into the fair category for describing the overall pavement condition. As shown in Figure 4 below, 13 percent (or 93 miles), of the total street network can be considered in very good condition with a PCI score greater than 85. These streets are in like new condition and only require routine maintenance. Nationwide, the amount of roadways falling into this category is about 15 percent, so this value is below the national average. Roughly 32 percent (or 230 miles) of the street network falls into the good category; these are roads that benefit the most from preventative maintenance techniques such as a microsurface treatment, slurry seals, and localized repairs. If left untreated these roadways will drop in quality to become heavy surface treatment or overlay candidates. Figure 4: Current 2013 Network Pavement Condition Figure 4 also shows that 40 percent (or 287 miles) of the streets are rated as fair and are candidates for heavy surface treatment rehabilitation and thin overlays. Nine percent (or 65 miles) of the street network can be considered as acceptable, representing candidates for progressively thicker overlay rehabilitation 5

8 or concrete panel replacements. If left untreated, they will decline rapidly into reconstruction candidates. The remaining 6 percent (or 43 miles) of the network is rated as poor or very poor condition, meaning these roadways have failed or are past the point for an overlay or surface based rehabilitation to be an effective treatment. Streets in poor or very poor condition will require progressively heavier or thicker forms of rehabilitation (i.e., surface reconstruction, deep patch and paving) or total reconstruction. Because of the declining and/or limited allocation of funds to Glendale s pavement management program over the past several years (since 2009), the applied maintenance treatments have not kept pace with the aging of the street network. As streets in Glendale continue to receive only routine preventative maintenance treatments, as well as experience deferred maintenance or rehabilitation due to lack of funding, the percentage of poor and very poor conditions streets will increase as these streets fast approach or reach the end of their service life. ANNUAL FUNDING AND BUDGET ANALYSIS ANNUAL FUNDING LEVELS FOR FISCAL YEARS 2014 THROUGH 2019 The pavement management analysis provided in this report for fiscal years (FY) 2014 through 2019 is based on the current funding levels as well as proposed additional bond funding. Available funding of $2 million dollars per year for pavement management improvements comes from the half-cent transportation sales tax of the Glendale Onboard (GO) Program and this funding is scheduled to run through FY The $2 million in GO funding is programmed annually into Glendale s Pavement Management capital improvement plan (CIP). For FY 2014, $5.25 million is budgeted for roadway maintenance in Glendale, which includes $2 million in Pavement Management CIP funding (GO Program), a Glendale City Council approved one-time supplemental of $3 million in Highway User Revenue Fund (HURF), and $250,000 in Community Development Block Grant (CDBG) funds. The funding in FY 2014 currently is programmed to pay for street network improvements on residential roadways (residential, minor collectors, and major collectors) only. Furthermore, the sale of HURF bonds is proposed, which would be made possible due to the retirement of current debt service in FY 2015 and would allow for approximately $28 million in HURF funding to be available for pavement management. For FY 2015 and FY 2016, the proposed plan is to use the $2 million in annual Pavement Management CIP funding (GO Program, plus the $28 million in HURF bond funding for arterial and residential/collector streets in Glendale. For FY 2017 through FY 2019, the $2 million annually of GO Program funding is programmed in the Pavement Management CIP for surface treatments to residential streets in the city. The current annual funding levels are outlined in the following table: 6

9 The Annual Budget column (in the table above) provides the construction costs related directly to the placement of pavement on the streets. Whereas, the Less Additional Work column represents the indirect administrative costs such as engineering design and construction administration services, construction inspection and testing services, and internal costs for finance and engineering contract administration services, as well as the Arts Fund contribution (1% of construction cost). These two columns combined (Less Additional Work plus Annual Budget) provide the total amount of funding available for each fiscal year from FY 2014 through FY BUDGET ANALYIS MODELS The following section of this report presents the analysis results on four budget models for the pavement management program. These models are illustrated in Figure 5 below. The X axis highlights the annual budget, while the Y axis plots the five-year network post-rehabilitation PCI value (i.e., the network average PCI assuming all rehabilitations have been completed according to plan). The diagonal blue line is the analysis results. The models can be described as the following: 1. Do Nothing Model this model identifies the effect of spending no capital for 5 years. It is depicted on Figure 5 where the diagonal blue line intersects the Y axis. After 5 years, the Do Nothing option results in a PCI drop from 72 to a Current Budget Model this model identifies the resultant network PCI at a $2.0M annual budget or funding level. After 5 years, the $2.0 million option results in a PCI drop from 72 to Five-Year Plan Model this model identifies the resultant network PCI with the $28M in bond funding distributed over 2 years starting in This model also assumes a base of $2 million per year from 2015 through 2019 that is currently received in CIP funding (GO Program) for annual street maintenance. After 5 years, the Proposed Bond option results in a PCI rating of 68. 7

10 4. Steady State Model this model identifies the required annual budget to maintain Glendale s current network average PCI at 72. The steady state option requires that: The annual budget needed to maintain the current 2013 PCI at 72 = $13 Million As part of the budget analysis, an upper limit of spending (or a Fix All budget) was calculated in order to calibrate the four budget models. The Fix All budget expends $208 million. Assuming this funding is initially spent in the first year the PCI would increase to 89 and would taper off to a PCI rating of 84 in five years. Figure 5: Budget Models and Network PCI Ratings Figure 5 may also be used to identify the impact to the street network of other budget levels; based on the chart you can also select any particular dollar amount ($6.0 M, $10.0M, or $12.0M, for example) to identify the resulting network PCI at each funding level. Alternatively, Figure 5 may also be used to identify the required budget to achieve a specific target PCI within five years. For example, selecting a network average target PCI of 70 would require an annual budget of $10 million. By 2019, even with the investment of the $28 million bond funds applied to roadway rehabilitation, the amount of streets rated below a PCI rating of 50 (or classified in poor or very poor condition) is expected to double to 13 percent (or 93 miles). The biggest increase will be seen in the major roadway network (103 total miles) where close to one quarter (or 26 miles) of the arterial roadways will be classified as poor or very poor. This causes a greater funding concern due to the much higher rehabilitation cost for arterials streets as compared to residential streets. For instance, the cost to rehabilitate a collector/residential street is approximately half the cost to rehabilitate an arterial street in all categories as a residential street is typically one half to one third the width of an arterial roadway. 8

11 PROPOSED REHABILITATION PLANS The general methodology for developing the proposed rehabilitation plans for Glendale s street network is based on current PCI ratings, functional classification and strength, and the funding available for roadway maintenance. A slightly different approach was used for the Current Year Plan (FY 2014) in comparison to the Five-year Plan (FY 2015 through 2019). The methodologies are described below in more detail. The selection of roadways and the proposed pavement maintenance work to be performed in each year is located in Appendix A of this executive summary report. CURRENT YEAR PLAN (FY 2014) The approach for developing the current year rehabilitation plan was to select residential roadways (residential, minor collectors, and major collectors) only for pavement improvements during FY This plan was developed with previous City Council feedback and input related to community priorities and needs. The methodology to identify streets involved selecting the lowest rated streets that could be rehabilitated, ranking in order based on the PCI from lowest to highest, selecting the type of pavement treatment required, and determining how much could be completed based on available funding within the current fiscal year. Figure 6 displays the costs, percentages, and miles associated with each type of rehabilitation activity proposed for the current year plan. Figure 6 further identifies a significant trend in costs versus miles for the rehabilitation activities. For instance, reconstruction work consumes a similar percentage of the available funding for only 0.5 miles rehabilitated as compared to 8.4 miles of streets that will receive surface treatments. Figure 6: Current Year (FY 2014) Plan Rehabilitation Summary Based on this approach, a grand total investment of $5.25 million, which includes both construction ($3.9 million) and administrative overhead costs ($1.35 million), will allow for roughly 13 miles of surface and overlay treatments and one-half mile of residential/collector reconstruction work. Additionally, in FY 2014 the city will reconstruct a little over a half-mile of roadway at the Bethany Home Frontage Road, from 61 st Avenue to 66th Avenue, and the 67 th Avenue Frontage Road, from Keim Drive to Rose Lane using the 9

12 $250,000 in CDBG funds and $200,000 from the GO Program. The GO Program funded portion of this project is included in the total annual budget funding for FY FIVE-YEAR PLAN (FY 2015 THROUGH FY 2019) The approach for developing the five-year rehabilitation plan involved prioritizing and selecting both arterial and residential streets for pavement improvements. The methodology used included assigning the appropriate rehabilitation activity (or pavement treatment) to all street segments in the roadway network first, and then the critical streets having the highest cost of deferral were selected followed by less critical streets having a lower incremental cost of deferral. For example, the cost of an arterial thick overlay is $18.50/yd2 increasing to $40.00/yd2 if deferred resulting in an incremental cost of $21.50/yd2, while the cost to defer a thin overlay to a moderate overlay is only $3.00/yd2. Thus a critical thick overlay is assigned a higher priority (lower sequence) than a thin overlay. Under this approach, the streets were ranked from lowest to highest PCI after selecting the type of required pavement treatment or rehabilitation activity. The effect of utilizing this methodology for the five-year plan is to develop the most cost effective rehabilitation strategy that maximizes pavement life. Figures 7 and 8 displays the costs, percentages, and miles associated with each type of pavement treatment proposed for the five-year (FY 2015 through FY 2019) plan. Figure 7: FY 2015 Plan Rehabilitation Summary Based on this approach, part of the recommended plan is to spread the HURF bond funding equally over years 2015 and 2016 ($14 million each). The other funding available for street rehabilitation during each of the five years, 2015 through 2019, includes the $2 million in annual Pavement Management CIP funding. The $32 million investment in 2015 and 2016 (funded mostly through the $28 million HURF bond), will allow for roughly 94 miles of surface and overlay treatments and 2.4 miles of reconstruction work. For the remaining $6 million to be spent from 2017 through 2019, slightly less than 14 miles of residential streets could be maintained for this investment. Therefore, the grand total investment for the five-year plan includes approximately $29 million in construction costs and $9 million in administrative 10

13 overhead costs for a total amount of $38 million to be expended on roughly 110 miles (50.2 miles in 2015 and 59.7 miles in 2016 through 2019) of Glendale s street network. Figure 8: FY Plan Rehabilitation Summary Figures 7 and 8 further identify the trend already shown in Figure 6 (above) and related to the greater costs versus smaller number of miles for the more intensive rehabilitation activities (thick overlays and reconstruction) as compared to the less intensive pavement treatments (surface or thin to moderate overlays). Overall, this shows the importance of developing detailed rehabilitation plans in order to effectively prioritize pavement treatment activities and to avoid millions of extra or unnecessary street rehabilitation costs. SUMMARY AND RECOMMENDATIONS FOR COUNCIL GUIDANCE As outlined in this pavement management analysis, it is planned to spend $5.25 million to complete the Current Year Plan (FY 2014), which focuses on residential street rehabilitation and improvement activities. This current year plan was developed with previous City Council feedback and input related to community priorities and needs. The Five-Year Plan (FY 2015 through 2019) provides a proposed program to complete street network improvements across all roadway types (residential, arterials, collectors, etc.); funding sources for these improvements includes HURF bond funding in the amount of $28 million spread equally ($14 million each) during years 2015 and 2016 as well as an additional $2 million in HURF funding during each of the five years. Although a larger amount of spending is proposed during FY 2015 and 2016 than what traditionally has been spent during previous fiscal years, additional funding will eventually be needed to have an effective program for on-going maintenance to properly repair the city s roadways and to extend the useful life of this city asset. 11

14 Lastly, the Pavement Management Report provided by IMS to the City of Glendale identifies a number of recommendations to be considered by the City Council. The recommendations for which policy guidance is sought are the following: 1. Move forward with the $28.0 million bond option; it is also recommended to spend this funding over a two-year period in FY 2015 and FY Adopt a policy statement identifying the desired overall pavement condition rating and establishing a maximum percentage for streets allowed to have a PCI rating lower than 50 (or classified in poor or very poor condition); recommended targets include maintaining the current network profile at or above a PCI rating of 72 for 5 years and establishing a maximum percentage of 12 percent (12%) for streets with PCI rating lower than 50. An annual budget of at least $13 Million is required to achieve this goal. 3. Review annually the comprehensive plan of proposed rehabilitation strategies and unit rates, which can have considerable effects on the finalized construction program placed out for bid; all costs are in constant 2013 dollars, so no allowances have been made for annual inflation or fluctuations in rehabilitation costs. 4. Complete an updated field survey assessment and analysis of pavement conditions for Glendale s entire street network in FY 2014, which will provide current field data to assist with future short and/or long-range planning efforts related to the pavement management program. 5. Incorporate budget allowances for network growth into annual pavement management program. As the city expands or increases the amount of paved roads, increased budgets will be required. No allowance has been made for routine maintenance activities such as crack sealing, sweeping, striping or patching. These costs are assumed to be outside the pavement management costs and will affect the network performance if not completed. 6. Increase annual funding for compliance with the Americans with Disabilities Act (ADA), which is required on all roadway rehabilitation projects. An increased level of funding will be necessary should the city elect to become fully ADA compliant. 12

15 Appendix A Summary Map of Rehabilitation Plans for FY 2014, FY 2015, and FY FY 2019

1.0 CITY OF HOLLYWOOD, FL

1.0 CITY OF HOLLYWOOD, FL 1.0 CITY OF HOLLYWOOD, FL PAVEMENT MANAGEMENT SYSTEM REPORT 1.1 PROJECT INTRODUCTION The nation's highways represent an investment of billions of dollars by local, state and federal governments. For the

More information

Residential Street Improvement Plan

Residential Street Improvement Plan Residential Street Improvement Plan Introduction Aging infrastructure, including streets, is a nationwide problem and it is one of the biggest challenges facing many cities and counties throughout the

More information

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS

City of Sonoma 2015 Pavement Management Program Update (P-TAP 16) Final Report February 25, 2016 TABLE OF CONTENTS City of Sonoma I. Introduction TABLE OF CONTENTS II. Methodology III. Pavement Condition Index (PCI) / Remaining Service Life (RSL) Report IV. Budget Analysis Reports A. Budget Needs Report Five Year B.

More information

C ITY OF S OUTH E UCLID

C ITY OF S OUTH E UCLID C ITY OF S OUTH E UCLID T A B L E O F C O N T E N T S 1. Executive Summary... 2 2. Background... 3 3. PART I: 2016 Pavement Condition... 8 4. PART II: 2018 Current Backlog... 12 5. PART III: Maintenance

More information

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016 CITY OF ORINDA Road and Drainage Repairs Plan (As Updated in 2016) March 15, 2016 (ORIGINALLY ADOPTED BY THE CITY COUNCIL JULY 17, 2012 AND UPDATED APRIL 22, 2014) CITY OF ORINDA 22 Orinda Way Orinda,

More information

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016

CITY OF ORINDA. Road and Drainage Repairs Plan. (As Updated in 2016) March 15, 2016 CITY OF ORINDA Road and Drainage Repairs Plan (As Updated in 2016) March 15, 2016 (ORIGINALLY ADOPTED BY THE CITY COUNCIL JULY 17, 2012 AND UPDATED APRIL 22, 2014) CITY OF ORINDA 22 Orinda Way Orinda,

More information

Pavement Management Technical Report

Pavement Management Technical Report Pavement Management Technical Report October 2008 Prepared by the Genesee County Metropolitan Planning Commission Pavement Management Technical Report Pavement Management System Technical Report 1 What

More information

AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS

AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS AGENDA ITEM CITY COUNCIL MEETING DATE OCTOBER 18, 2016 BUSINESS ITEMS DATE : October 7, 2016 TO : City Manager FROM : Public Works Director SUBJECT : CITYWIDE STREET RESURFACING PROGRAM AND REQUEST FOR

More information

Instructions for Completing the Annual Road and Street Finance Report

Instructions for Completing the Annual Road and Street Finance Report Instructions for Completing the Annual Road and Street Finance Report Additional information you wish to submit may be attached to the report on 8.5" by 11" paper. Please round all amounts up or down to

More information

Pavement Preservation

Pavement Preservation Road Foreman Meeting West Windsor, Vermont March 24, 2015 Dan Patenaude, P.E. Hometown: Chester, VT Pavement Preservation Your Key to Pavement Management Success Since 1957 Corporate Headquarters Braintree,

More information

Highway Engineering-II

Highway Engineering-II Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning

More information

Hazim M Abdulwahid, MSC, MBA Hazim Consulting

Hazim M Abdulwahid, MSC, MBA Hazim Consulting Road Map for Establishing Pavement Maintenance Management System on the Strategic Level 13 th International O&M Conference in the Arab Countries,17-19 Nov 2015 Hazim M Abdulwahid, MSC, MBA Hazim Consulting

More information

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO

REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO OF THE CITY OF SAN JACINTO REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 OF THE CITY OF SAN JACINTO December 11, 2003 REVISED ENGINEER'S REPORT ASSESSMENT DISTRICT NO. 2003-1 CITY OF SAN JACINTO Prepared for CITY OF SAN

More information

Long-Term Monitoring of Low-Volume Road Performance in Ontario

Long-Term Monitoring of Low-Volume Road Performance in Ontario Long-Term Monitoring of Low-Volume Road Performance in Ontario Li Ningyuan, P. Eng. Tom Kazmierowski, P.Eng. Becca Lane, P. Eng. Ministry of Transportation of Ontario 121 Wilson Avenue Downsview, Ontario

More information

Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update

Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update Michigan s Roads Crisis: How Much Will It Cost to Maintain Our Roads and Bridges? 2014 Update By Rick Olson, former State Representative Reporting analytical work performed by Gil Chesbro and Jim Ashman,

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Honorable Mayor and Members of the City Council. Failing Streets: Time to Change Direction to Achieve Sustainability

Honorable Mayor and Members of the City Council. Failing Streets: Time to Change Direction to Achieve Sustainability Office of the City Auditor Ann Marie Hogan, City Auditor CONSENT CALENDAR November 15, 2011 To: From: Subject: Honorable Mayor and Members of the City Council Ann-Marie Hogan, City Auditor RECOMMENDATION

More information

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University

Effective Use of Pavement Management Programs. Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University Effective Use of Pavement Management Programs Roger E. Smith, P.E., Ph.D. Zachry Department of Civil Engineering Texas A&M University 1 Pavement Management Is A Decision Making Process Effective Pavement

More information

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015

MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 MPO Staff Report Technical Advisory Committee: April 8, 2015 MPO Executive Board: April 15, 2015 RECOMMENDED ACTION: Approve the Final. RECOMMENDED ACTION from TAC: Accept the Final and include the NDDOT

More information

UNIFIED TRANSPORTATION PROGRAM

UNIFIED TRANSPORTATION PROGRAM 2002 UNIFIED TRANSPORTATION PROGRAM Blank Page SUMMARY OF CATEGORIES CATEGORIES NUMBER, NAME AND YEAR ESTABLISHED PROGRAMMING AUTHORITY FUNDING BANK BALANCE (Yes/) RESPONSIBLE ENTITY RANKING INDEX OR ALLOCATION

More information

City of Grand Forks Staff Report

City of Grand Forks Staff Report City of Grand Forks Staff Report Committee of the Whole November 28, 2016 City Council December 5, 2016 Agenda Item: Federal Transportation Funding Request Urban Roads Program Submitted by: Engineering

More information

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management

Pavement Preservation in Hillsborough County, Florida. Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Pavement Preservation in Hillsborough County, Florida Roger Cox, P.E. Department of Public Works Transportation Infrastructure Management Definition: Pavement Management is the process of overseeing the

More information

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN

A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN 5-9035-01-P8 A PROCEDURAL DOCUMENT DESCRIBING THE PROCESS OF DEVELOPING THE 4-YEAR PLAN Authors: Zhanmin Zhang Michael R. Murphy TxDOT Project 5-9035-01: Pilot Implementation of a Web-based GIS System

More information

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT

MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT MONETARY PERFORMANCE APPLIED TO PAVEMENT OPTIMIZATION DECISION MANAGEMENT Gordon Molnar, M.A.Sc., P.Eng. UMA Engineering Ltd., 17007 107 Avenue, Edmonton, AB, T5S 1G3 gordon.molnar@uma.aecom.com Paper

More information

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS

EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS EXECUTIVE SUMMARY EVALUATION OF EXPENDITURES ON RURAL INTERSTATE PAVEMENTS IN KANSAS by Stephen A. Cross, P.E. Associate Professor University of Kansas Lawrence, Kansas and Robert L. Parsons, P.E. Assistant

More information

Chapter 8: Lifecycle Planning

Chapter 8: Lifecycle Planning Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance

More information

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6

DRAFT C APITAL I MPROVEMENT P LAN C ITY OF G EORGETOWN, TEXAS S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 C ITY OF G EORGETOWN, TEXAS C APITAL I MPROVEMENT P LAN S TREETS/ DRAINAGE/AIRPORT F ISCAL Y EAR 201 6 Georgetown Transportation Advisory Board April 10, 2015 Table of Contents Introduction... 1 Transportation

More information

City of Piedmont COUNCIL AGENDA REPORT

City of Piedmont COUNCIL AGENDA REPORT City of Piedmont COUNCIL AGENDA REPORT DATE: April 20, 2015 TO: FROM: Mayor and Council Paul Benoit, City Administrator SUBJECT: Street Selection Criteria and Discussion of Budget for the Proposed 2015

More information

Asset Management Plan

Asset Management Plan 2016 Asset Management Plan United Counties of Prescott and Russell 6/1/2016 Preface This Asset Management Plan is intended to describe the infrastructure owned, operated, and maintained by the United Counties

More information

Preliminary Asset Management Plan for Streets and Fleet.

Preliminary Asset Management Plan for Streets and Fleet. DATE: August 28, 2017 TO: FROM: SUBJECT: Honorable Mayor Jerry Smith City Council Anne Marie Gaura, City Manager Tim Holdeman, Public Works Director Jeff Wilkens, Acting Finance Director Robert Miller,

More information

A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System

A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System A Stochastic Approach for Pavement Condition Projections and Budget Needs for the MTC Pavement Management System Rafael Arturo Ramirez-Flores Ph. D. Candidate Carlos Chang-Albitres Ph.D., P.E. April 16,

More information

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION

Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Maintenance Funding & Investment Decisions STACEY GLASS, P.E. STATE MAINTENANCE ENGINEER ALABAMA DEPARTMENT OF TRANSPORTATION Funding Allocations Routine State $ 166 Million Resurfacing Federal $ 260 Million

More information

Revenue Sharing Program Guidelines

Revenue Sharing Program Guidelines Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219

More information

Minnesota Department of Transportation Report to Legislature on Life-Cycle Cost Analyses. January 2013

Minnesota Department of Transportation Report to Legislature on Life-Cycle Cost Analyses. January 2013 This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Minnesota Department

More information

Capital Investment Program (CIP) About CIP

Capital Investment Program (CIP) About CIP Capital Investment Program (CIP) About CIP The Capital Investment Program (CIP) is a multi-year program aimed at upgrading and expanding City facilities, buildings, grounds, streets, parks and roads. The

More information

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director

City of La Habra Heights. Benefit Assessment Districts. June 6, Presented by Pablo Perez, Director City of La Habra Heights Benefit Assessment Districts June 6, 2016 Presented by Pablo Perez, Director 1 BENEFIT ASSESSMENT DISTRICTS Proposition 218 Defines Special Benefit as Particular and distinct benefit

More information

Norfolk County Asset Management Plan Roads

Norfolk County Asset Management Plan Roads Norfolk County Asset Management Plan Roads An overview of the County s Asset Management Practices based on the Ontario Ministry of Infrastructure s Building Together Initiative Prepared for: Norfolk County

More information

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007

Infrastructure Asset Management. Southwest Chula Vista Civic Association April 26, 2007 Infrastructure Asset Management Southwest Chula Vista Civic Association April 26, 2007 Chula Vista s Municipal Infrastructure Pavement* Traffic Signals Alleys Streetlights Parking Lots Street Signs Sidewalks*

More information

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1

Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 Hosten, Chowdhury, Shekharan, Ayotte, Coggins 1 USE OF VDOT S PAVEMENT MANAGEMENT SYSTEM TO PROACTIVELY PLAN AND MONITOR PAVEMENT MAINTENANCE AND REHABILITATION ACTIVITIES TO MEET THE AGENCY S PERFORMANCE

More information

Asset Management Plan 2016 Township of King

Asset Management Plan 2016 Township of King Asset Management Plan 206 Township of King GHD Allstate Parkway Suite 30 Markham Ontario L3R 9T8 T 905 752 4300 F 905 752 430 5432 Table of Contents. 2. 3. 4. 5. 6. Executive Summary. Introduction.2 State

More information

Department of Public Works

Department of Public Works Department of Public Works Bureau of Street Services Pothole Politics: The Road To Pavement Preservation Rev. Oct. 2008 William A. Robertson Director Potholes Are Like Diamonds They re Forever! HOW BIG

More information

Revenue Sharing Program Guidelines

Revenue Sharing Program Guidelines Revenue Sharing Program Guidelines For further information, contact Local VDOT Manager or Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219

More information

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko

Asset Management. Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko Asset Management Linking Levels of Service and Lifecycle Management Strategies Andrew Grunda Peter Simcisko 1 Introduction Topics that we will address today Review of Ontario Regulation 588/17 Defining

More information

TRANSPORTATION CAPITAL PROGRAM

TRANSPORTATION CAPITAL PROGRAM TRANSPORTATION CAPITAL PROGRAM The transportation capital program for fiscal year 2016 through fiscal year 2020 consists of a variety of transportation construction and maintenance capital projects primarily

More information

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions

SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM. Frequently Asked Questions SMEC PAVEMENT MANAGEMENT AND ROAD INVENTORY SYSTEM Frequently Asked Questions SMEC COMPANY DETAILS SMEC Australia Pty Ltd Sun Microsystems Building Suite 2, Level 1, 243 Northbourne Avenue, Lyneham ACT

More information

NCHRP Consequences of Delayed Maintenance

NCHRP Consequences of Delayed Maintenance NCHRP 14-20 Consequences of Delayed Maintenance Recommended Process for Bridges and Pavements prepared for NCHRP prepared by Cambridge Systematics, Inc. with Applied Research Associates, Inc. Spy Pond

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for: Cement

More information

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade.

GLOSSARY. At-Grade Crossing: Intersection of two roadways or a highway and a railroad at the same grade. Glossary GLOSSARY Advanced Construction (AC): Authorization of Advanced Construction (AC) is a procedure that allows the State to designate a project as eligible for future federal funds while proceeding

More information

City of Dallas Infrastructure Management Plan

City of Dallas Infrastructure Management Plan City of Dallas Infrastructure Management Plan S.A.M.E Infrastructure Forum February 2, 2018 Rick Galceran, P.E. Director Public Works Dept. Infrastructure Management Plan City of Dallas transportation

More information

Memorandum. CITY OF DALLAS (Report No. A15-008) June 19, 2015

Memorandum. CITY OF DALLAS (Report No. A15-008) June 19, 2015 Memorandum CITY OF DALLAS (Report No. A15-008) DATE: June 19, 2015 TO: SUBJECT: Honorable Mayor and Members of the City Council Audit of the Paving and Maintenance Program / Capital Program 1 The Department

More information

The Cost of Pavement Ownership (Not Your Father s LCCA!)

The Cost of Pavement Ownership (Not Your Father s LCCA!) The Cost of Pavement Ownership (Not Your Father s LCCA!) Mark B. Snyder, Ph.D., P.E. President and Manager Pavement Engineering and Research Consultants, LLC 57 th Annual Concrete Paving Workshop Arrowwood

More information

2016 PAVEMENT CONDITION ANNUAL REPORT

2016 PAVEMENT CONDITION ANNUAL REPORT 2016 PAVEMENT CONDITION ANNUAL REPORT January 2017 Office of Materials and Road Research Pavement Management Unit Table of Contents INTRODUCTION... 1 BACKGROUND... 1 DATA COLLECTION... 1 INDICES AND MEASURES...

More information

Memorandum CITY OF DALLAS

Memorandum CITY OF DALLAS Memorandum DATE December 21, 2018 CITY OF DALLAS TO Honorable Mayor and Members of the City Council SUBJECT Infrastructure Management Program On Wednesday, January 2, 2019, Robert Perez, Interim Director

More information

Using Asset Management Planning to Make Roadway Improvements

Using Asset Management Planning to Make Roadway Improvements Using Asset Management Planning to Make Roadway Improvements 1 Presentation Overview Status of Municipal Infrastructure Asset Management 101 15+ Year Pavement Life cycle Data, M,R&R, Prediction Models,

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Montréal and Québec City Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis

More information

Demonstrating the Use of Pavement Management Tools to Address GASB Statement 34 Requirements

Demonstrating the Use of Pavement Management Tools to Address GASB Statement 34 Requirements Demonstrating the Use of Pavement Management Tools to Address GASB Statement 34 Requirements Angela S. Wolters and Kathryn A. Zimmerman Applied Pavement Technology, Inc. 3001 Research Road, Suite C Champaign,

More information

Stephanie Smith, Project EngineerW

Stephanie Smith, Project EngineerW MEMORANDUM v TO: Paul Oehme, Director of Public Works/ City Engineer o FROM: Stephanie Smith, Project EngineerW 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 9522271100 Fax

More information

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project

Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission. Street Repair Policy Update and Permeable Paver Trial Project Public Works Commission ACTION CALENDAR July 14, 2009 To: From: Honorable Mayor and Members of the City Council Public Works Commission Submitted by: Jeffrey Egeberg, Secretary, Public Works Commission

More information

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University

Asset Management Ruminations. T. H. Maze Professor of Civil Engineering Iowa State University Asset Management Ruminations T. H. Maze Professor of Civil Engineering Iowa State University Why Transportation Asset Management Has Nothing to Do With Systems to Manage Individual Transportation Assets

More information

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES

MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES MUNICIPALITY OF CHATHAM-KENT CORPORATE SERVICES TO: FROM: Mayor and Members of Council Gerry Wolting, B. Math, CPA, CA General Manager, Corporate Services DATE: January 13, 2014 SUBJECT: 2013 Asset Management

More information

County Administrator s Office Department of Transportation & Public Works

County Administrator s Office Department of Transportation & Public Works County Administrator s Office Department of Transportation & Public Works Long-Term Road Ad Hoc Committee Update Current Roads Funding 2014 Proposed Pavement Preservation Program Pavement Management Program

More information

FOR HISTORICAL REFERENCE ONLY

FOR HISTORICAL REFERENCE ONLY To: Distribution 57, 612, 618, 650 From: Subject: MINNESOTA DEPARTMENT OF TRANSPORTATION Policy, Safety, and Strategic Initiatives Division Technical Memorandum No. 10-04-MAT-01 Khani Sahebjam Deputy Commissioner

More information

Pavement and Roadway Asset Management Project Construction Management & Engineering

Pavement and Roadway Asset Management Project Construction Management & Engineering Pavement and Roadway Asset Management Project Construction Management & Engineering Project Purpose The purpose of this project is to develop a pavement and roadway asset management program allowing the

More information

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System

Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System Developing Optimized Maintenance Work Programs for an Urban Roadway Network using Pavement Management System M. Arif Beg, PhD Principal Consultant, AgileAssets Inc. Ambarish Banerjee, PhD Consultant, AgileAssets

More information

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.

Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide. Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University

More information

Development and implementation of a networklevel pavement optimization model

Development and implementation of a networklevel pavement optimization model The University of Toledo The University of Toledo Digital Repository Theses and Dissertations 2011 Development and implementation of a networklevel pavement optimization model Shuo Wang The University

More information

COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT

COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT COUNTY OF SONOMA AGENDA ITEM SUMMARY REPORT Clerk of the Board Use Only Meeting Date Held Until / / / / Agenda Item No: Agenda Item No: Department: Permit and Resource Management Department/Transportation

More information

2018 Annual Report. Highway Department Accomplishments

2018 Annual Report. Highway Department Accomplishments 2018 Annual Report Highway Department The vision of the Eau Claire County Highway Department is to provide services to the taxpayer that, to the best of our ability, provides safe and efficient travel

More information

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT

Performance Measures for Making Pavement Preservation Decisions. David Luhr Pavement Management Engineer Washington State DOT Performance Measures for Making Pavement Preservation Decisions David Luhr Pavement Management Engineer Washington State DOT 1 Performance Measures as Tools Project Decision Support - Where, When, and

More information

City of Clovis Date completed or revised: September 26, 2014

City of Clovis Date completed or revised: September 26, 2014 Date completed or revised: September 26, 2014 Completed by: (print) Renee Mathis The anticipated Fiscal Year 2014-15 revenue allocation for Street Maintenance sub-program: $912,013 X Street Maintenance

More information

Including Maintenance & Rehabilitation Schedules

Including Maintenance & Rehabilitation Schedules Final Report Methodology for the Development of Equivalent Structural Design Matrix for Municipal Roadways- Ontario Including Maintenance & Rehabilitation Schedules and Life Cycle Analysis Prepared for:

More information

TOWN OF LONDONDERRY Road Department 100 Old School Street South Londonderry, 05155

TOWN OF LONDONDERRY Road Department 100 Old School Street South Londonderry, 05155 REQUEST FOR PROPOSALS (RFP) RFP NO. 2018-2R PROJECT TITLE: Road Paving PROPOSAL DUE DATES: Proposals are due by June 1, 2018, no later than 4:00 PM. Sealed bids will be opened on June 4, 2018. ESTIMATED

More information

Pavement Investment Guide. CPAM March 15, 2018

Pavement Investment Guide. CPAM March 15, 2018 Pavement Investment Guide CPAM March 15, 2018 MnDOT s Pavement System 14,302 total roadway miles. Current value of about $4 Billion. MnDOT spends around $ 300M a year to keep it in a serviceable condition.

More information

TM TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT

TM TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT TECHNICAL MANUAL PAVEMENT MAINTENANCE MANAGEMENT HEADQUARTERS, DEPARTMENT 0F THE ARMY NOVEMBER 1982 TECHNICAL MANUAL HEADQUARTERS DEPARTMENT OF THE ARMY No. 5-623 WASHINGTON, DC, November 1982 } PAVEMENT

More information

Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan

Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Analysis of TAMC Investment Reporting Data for Network Level Modeling on the Locally Owned Road System in Michigan Photo Credit: Alcona County Road Commission Andy Manty, PE, Research Engineer Center for

More information

COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013

COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013 COUNTY OF LAMBTON ASSET MANAGEMENT PLAN 2013 Pictures Key Front Cover Top Row 1) Administration Building Second Row, left to right 2) Brigden EMS Station 3) Judith & Norman Alix Art Gallery Third row,

More information

Chapter 6: Financial Resources

Chapter 6: Financial Resources Chapter 6: Financial Resources Introduction This chapter presents the project cost estimates, revenue assumptions and projected revenues for the Lake~Sumter MPO. The analysis reflects a multi-modal transportation

More information

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits

2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits 2040 Long Range Transportation Plan - Needs Assessment: System Preservation Pavement, Bridges, and Transit Costs and Benefits Prepared For: 601 East Kennedy Boulevard Tampa, FL 33602 Prepared by: Jacobs

More information

NCDOT Legislative Report on Outsourcing Pavement Preservation. December 1, 2016

NCDOT Legislative Report on Outsourcing Pavement Preservation. December 1, 2016 NCDOT Legislative Report on Outsourcing Pavement Preservation December 1, 2016 This report is presented to the Joint Legislative Transportation Oversight Committee (JLTOC) and Fiscal Research Division

More information

PUBLIC WORKS CIP SUPPORT

PUBLIC WORKS CIP SUPPORT PUBLIC WORKS Public Works is comprised of several Departments/Divisions that develop, improve, and maintain the County s basic infrastructure needs related to transportation, storm water management, and

More information

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements

Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Railroad-DOT Mitigation Strategies (R16) Resurfacing Agreements Resurfacing projects are among the most common and routine types of projects regularly conducted by highway agencies. When resurfacing projects

More information

Public Services Department 2015 Presentation to El Paso County Board of County Commissioners Jim Reid, Executive Director

Public Services Department 2015 Presentation to El Paso County Board of County Commissioners Jim Reid, Executive Director Public Services Department 2015 Presentation to El Paso County Board of County Commissioners Jim Reid, Executive Director PSD 1 Agenda General Fund Fleet Capital Replacement Security Camera Upgrade General

More information

City of Newnan, Georgia

City of Newnan, Georgia City of Newnan, Georgia Invitation to Bid Mill & Resurfacing of Various Streets- 2017 Issue Date: May 25, 2017 Issued By: Inquiries: Proposals Due: Bid Opening: City of Newnan Public Works Department 25

More information

Street Maintenance. City Needs to Improve Planning, Coordination, and Oversight to Effectively Manage Transportation Assets.

Street Maintenance. City Needs to Improve Planning, Coordination, and Oversight to Effectively Manage Transportation Assets. Office of the City Auditor, City of San Diego Audit Report November 2010 Street Maintenance City Needs to Improve Planning, Coordination, and Oversight to Effectively Manage Transportation Assets OCA-11-009

More information

Leveraging Infrastructure Management Systems. Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services

Leveraging Infrastructure Management Systems. Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services Leveraging Infrastructure Management Systems Andrea Becker, MASc, P.Eng. Doug Manarin, P.Eng. Engineering 1 Services PRESENTATION AGENDA Engineering s Asset Management Strategy and Framework Integrated

More information

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.

Master Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates. , Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...

More information

Legislative Report on Life-Cycle Cost Analyses

Legislative Report on Life-Cycle Cost Analyses This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Legislative Report

More information

THE ECONOMICS OF PREVENTIVE MAINTENANCE

THE ECONOMICS OF PREVENTIVE MAINTENANCE THE ECONOMICS OF PREVENTIVE MAINTENANCE C lyde B urke Vice President Roy Jorgensen Associates, Inc. Gaithersburg, Maryland H O W M U C H P R E V E N T IV E M A IN T E N A N C E? How do we know when we

More information

Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads

Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads Strategy for the Development of Investment Decision-Making Framework for Road Asset Management for Queensland Department of Main Roads By: Noppadol Piyatrapoomi, Arun Kumar, Neil Robertson and Justin Weligamage

More information

Enhanced NPV Analysis

Enhanced NPV Analysis Case Study Enhanced NPV Analysis Initiative Number 2013_05 Version No Date Item Affected Description of Change 1 24 Feb 14 Draft Document Created 2 25 Feb 14 Clarity edits after internal review by HNO

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT) MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS & WORKMANSHIP PAVEMENT WARRANTY (NEW/RECONSTRUCTED HOT MIX ASPHALT PAVEMENT) C&T:SCB 1 of 10 C&T:APPR:JTL:JDC:09-29-03 FHWA:APPR:10-15-03

More information

Allen County Highway Engineering Department Problems and Progress

Allen County Highway Engineering Department Problems and Progress Allen County Highway Engineering Department Problems and Progress K a r l J o h n s o n Allen County Highway Engineer Fort Wayne, Indiana IN T R O D U C T IO N The present and future traffic demands and

More information

100 YEARS OF TRANSPORTATION EXCELLENCE. Addressing Michigan s Road-Funding Crisis: THE TIME IS NOW! REPORT OF THE 2013 STRATEGIC PLANNING PROCESS

100 YEARS OF TRANSPORTATION EXCELLENCE. Addressing Michigan s Road-Funding Crisis: THE TIME IS NOW! REPORT OF THE 2013 STRATEGIC PLANNING PROCESS 100 YEARS OF TRANSPORTATION EXCELLENCE Addressing Michigan s Road-Funding Crisis: THE TIME IS NOW! REPORT OF THE 2013 STRATEGIC PLANNING PROCESS Overview During the recent 2013 Road Commission for Oakland

More information

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION

DEVELOPMENT AND IMPLEMENTATION OF A NETWORK-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION DEVELOPMENT AND IMPLEMENTATION OF A NETWOR-LEVEL PAVEMENT OPTIMIZATION MODEL FOR OHIO DEPARTMENT OF TRANSPORTATION Shuo Wang, Eddie. Chou, Andrew Williams () Department of Civil Engineering, University

More information

CITY OF REGINA GENERAL CAPITAL PROGRAM PROPOSED

CITY OF REGINA GENERAL CAPITAL PROGRAM PROPOSED 2013-2017 CITY OF REGINA GENERAL CAPITAL PROGRAM PROPOSED Table of Contents Letter of Transmittal Introduction Corporate Strategic Planning and Performance Management Process... 1 The Need for Infrastructure

More information

Reserve Study. Willow Lake Homeowner's Association, Inc.

Reserve Study. Willow Lake Homeowner's Association, Inc. Reserve Study For Willow Lake Homeowner's Association, Inc. August 03, 2015 Reserve Study Prepared By The Whayland Group,LLC 30613 Sussex Highway Laurel, Delaware 19956 TABLE OF CONTENTS Willow Lake Homeowner's

More information

Examples of Decision Support Using Pavement Management Data

Examples of Decision Support Using Pavement Management Data Examples of Decision Support Using Pavement Management Data John Coplantz, PE Pavement Management Engineer Oregon Department of Transportation October 27, 2016 Strategic Network (Tactical) Project (Operational)

More information

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good.

PCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) Basic Components PMS Evaluation of Flexible Pavements Fundamental Theory of Typical Pavement Defects and Failures Physical Description

More information

NOTICE OF VARIOUS BID RENEWALS

NOTICE OF VARIOUS BID RENEWALS NOTICE OF VARIOUS BID RENEWALS April 22, 2015 TO WHOM IT MAY CONCERN: This letter shall serve notice that the Board of Acquisition and Contract (BAC) approved the following bid renewal option on April

More information

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP)

CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) CITY OF ALHAMBRA UTILITIES DEPARTMENT SEWER SYSTEM MAINTENANCE PROGRAM (SSMP) APRIL 2009 Table of Contents INTRODUCTION... 3 SECTION I: GOALS... 3 SECTION II: ORGANIZATION... 4 SECTION III: LEGAL AUTHORITY...

More information