Sampling Procedure for Performance-Based Road Maintenance Evaluations

Size: px
Start display at page:

Download "Sampling Procedure for Performance-Based Road Maintenance Evaluations"

Transcription

1 Samling Procedure for Performance-Based Road Maintenance Evaluations Jesus M. de la Garza, Juan C. Piñero, and Mehmet E. Ozbek Maintaining the road infrastructure at a high level of condition with generally limited amounts of available funding is a challenge for many transortation agencies. To address this challenge, many road administrators worldwide have imlemented erformance-based maintenance contracts. In erformance-based maintenance contracts, road administrators define erformance measures (e.g., erformance-based secifications) that secify the minimum condition at which the asset items are to be maintained. To ensure that contractors maintain the asset items according to these measures, road administrators must design and imlement a comrehensive and reliable erformance monitoring rocess. One of the most imortant areas within the erformance monitoring rocess is insection conducted in the field. Defining a rocedure that guarantees the success of field insections is a challenge. When defining such a rocedure, road administrators must consider budget and time limitations, among others. Since erformance-based road maintenance contracts are relatively new, the availability of guidelines for such issues (with focus on erformance-based contracts) is limited. That need is addressed by resentation of a three-stage and seven-ste statistical samling rocedure develoed to ensure that findings from field insections will be reliable and reresentative with high confidence of the actual condition of asset items in the entire oulation. Also resented are three alternative aroaches for samling for the cases in which samling needs to be erformed not just once but multile times over the duration of a erformance-based road maintenance contract. The challenge of maintaining the road infrastructure at the best ossible condition by investing the minimum amount of money kees transortation agencies continually searching for innovative aroaches to eventually rovide otimum benefits to taxayers. According to road administrators worldwide, in the last two decades, one initiative that has roduced significant benefits is the imlementation of erformance-based contracts in maintenance of road infrastructure. In the United States, transortation agencies in Virginia, Florida, Texas, and District of Columbia have been active in imlementation of erformance-based road maintenance contracts. In the international arena, countries such as Argentina, Uruguay, Australia, New Zealand, Brazil, Chile, and Colombia are considered ioneers in imlementation of this initiative as art of their strategies to reserve the road J. M. de la Garza and M. E. Ozbek, Charles E. Via, Jr. Deartment of Civil and Environmental Engineering, 200 Patton Hall, 0105, Virginia Polytechnic Institute and State University, Blacksburg, VA J. C. Piñero, NEX Cororation, 400 Calaf Street, Suite 225, San Juan, Puerto Rico Corresonding author: M. E. Ozbek, meozbek@vt.edu. Transortation Research Record: Journal of the Transortation Research Board, No. 2044, Transortation Research Board of the National Academies, Washington, D.C., 2008, DOI: / system (1, 2). This initiative calls for erformance-based work, in which a desired outcome is secified rather than materials or techniques to be used by the contractors to maintain the asset items. In erformance-based contracts, road administrators define erformance measures that secify the minimum accetable condition at which the asset items should be maintained. To ensure that contractors maintain the asset items according to these measures, road administrators must design and imlement a comrehensive and reliable erformance monitoring rocess. One of the most imortant areas in the erformance monitoring rocess is insections conducted in the field. Field insections require a significant amount of lanning and careful monitoring. Defining a rocedure that guarantees the success of field insections is a challenge. When defining such rocedure, road administrators must consider budget and time limitations, among others. These constraints influence the final techniques adoted that address issues such as the ortion of the oulation to be insected, frequency at which insections should be conducted, and methodology to be used to collect information. Since erformancebased road maintenance contracts are relatively new, the availability of guidelines that address such issues (with focus on erformancebased contracts) is limited (2). This aer resents a three-stage and seven-ste statistical samling rocedure develoed to ensure that findings from field insections will be reliable and reresentative with high confidence of the actual condition of asset items in the entire oulation. Also, this aer resents three alternative aroaches of samling for the cases when samling needs to be erformed not just once, but multile times over the duration of a erformance-based road maintenance contract (e.g., once in every year to monitor a contractor working under the terms of a 5-year-long erformancebased road maintenance contract). Of note is that this aer does not discuss the oerational issues related to the condition assessment rocess, such as frequency of insections and insection techniques. Discussion of oints resented is limited to the samling asect of the condition assessment rocess. RANDOM INSPECTIONS In road maintenance evaluations, conducting a 100% insection may not be feasible because of time and cost constraints. The condition data for a number of asset items such as avement and shoulders can be collected by using road scanning vehicles at traveling seeds without necessarily deloying crews to erform manual assessments in the field. However, data collection with resect to many other asset items, such as ies, ditches, underdrains, and fences, requires a considerable amount of time to be sent by the crews in the field. It is not feasible to collect the condition information for such asset items for the whole oulation when such information cannot be collected at traveling seeds. When collecting information for the 11

2 12 Transortation Research Record 2044 whole oulation is not feasible, erforming random insections is considered a useful way to maximize the benefits of the data collection effort (3). The objective of random insections is to measure or survey only a ortion of the whole oulation of interest. Results obtained from the samled ortion are then generalized to the whole oulation at a certain confidence level. If the intent is to use samling in the data collection rocess, as is mostly the case for road administrations (because of budget and time constraints), then the rocess should secify a samling method. The selection of method and the comlexity of the samling rocess deend on characteristics of the oulation considered in the evaluation and the confidence at which the findings from the samled oulation need to be rojected to the entire oulation. When considering the use of samling in the evaluation rocess, it is imortant to understand any bias that may be inherent in the samled data. Samle bias refers to the likelihood that a measurement by a samle of the oulation does not accurately reflect the measurement of the whole oulation. Random insections and the collection of large samles are efficient ways to decrease samle bias. Moreover, this aroach can make significant contributions such as reducing the cost of data collection and data analysis, and decreasing the time needed to comlete an evaluation. However, one must consider that there are also some disadvantages associated with samling or random insection. One of the most significant disadvantages is that samling does not collect all cases and, although statistically unlikely, may result in misidentification of the general condition. Moreover, the situation of missing observations may lead to loss of unique ersectives, affecting the quality of data. Thus, attention must be aid when defining and imlementing samling techniques (2). With resect to the secific scenario, defining a methodology that addresses all the samling needs associated to erformance-based road maintenance evaluation is a challenge. The objective of this aer is to rovide a detailed descrition of the aroach used to define such rocedure. DEVELOPMENT OF SAMPLING PROCEDURE The samling rocedure resented in this aer was develoed in three stages, to do the following: 1. Perform a detailed analysis of the characteristics of erformancebased road maintenance evaluations, 2. Study otential samling techniques that can be used to imrove the effectiveness and efficiency of the samle selection rocess, and 3. Define a comrehensive methodology for the selection of samle units that will ensure with a high confidence level that the findings from the samled ortion of the oulation are reresentative of the entire oulation. A detailed descrition of each of these stages follows. Characteristics of Performance-Based Road Maintenance Evaluations The first ste when defining any samling alication is to comrehensively study the articular roerties of the oulation to be evaluated. This is Stage 1. With resect to erformance-based road maintenance evaluations, understanding the characteristics of factors such as overall oulation, samle units, asset items within each samle unit, and accetable quality levels for each asset item is crucial to guarantee the success of the samling rocedure to be defined. An evaluation of each one of these factors is resented as follows. Poulation The oulation normally considered for the road maintenance evaluations is defined by small road segments of a secific length. These segments are better known in samling theory as the samle units. Samle units can be considered indeendently on each direction (north and south, east and west). For examle, for a ortion of a road that is 10 mi long running north and south direction and that is divided in samle units of 0.1 mi long, then the total oulation size will be 200 samle units (10 mi 2 directions 10 segments). Another imortant characteristic of the oulation is that ortions of the road (oulation) can be exosed to very different conditions. In most cases, as in this one, it is of interest to evaluate areas with different characteristics searately. To address this need, it is recommended to divide the oulation in grous exosed to similar conditions, such as same geograhical location, weather variation, urban and rural settings, traffic volumes, and tye of asset items. For examle, suose that the first 5 mi of the 10 mi of road in the revious examle are located in urban areas and the other 5 mi are located in rural areas, then the 200 samle units will be divided in two oulations with 100 samle units each. This concet of dividing the oulation in grous with similar characteristics is better known in samling theory as stratification of the oulation. Samle Units One imortant characteristic of each tyical samle unit considered is that each contains more than one element to be evaluated. Such elements are named asset items. Each samle unit may have different number of asset items. Considering once again the examle of the 10 mi of road ortion, let us say that there is a total of five asset items that can be resent on a given samle unit (0.1-mi long road segment). Obviously, not all samle units contain similar asset items. For examle, 3 of 5 asset items can be resent in one samle unit and 2 of 5 asset items can be resent in another samle unit. This articular characteristic of each samle unit makes the develoment of an aroriate samle selection rocess comlex. The challenge is to sufficiently insect each asset item to guarantee the findings from the samled oulation are reresentative, with high confidence, of the condition of the asset items in the entire oulation. Performance Targets Since the methodologies resented in this aer focus on erformancebased evaluations, accetable quality levels, better known as erformance targets, must be considered in the develoment of the samling rocedure. Performance targets are generally different for each asset item. For examle, a erformance target can state that it will be considered accetable when 90% of the ies in a oulation are in good condition, where good condition is defined according to secific erformance criteria (e.g., greater than 80% of the ie s diameter should be oen), whereas the erformance target for traffic signs can be 95%. The variability in erformance targets among asset items is an imortant characteristic that can make a significant difference when determining the minimum number of samles required for each asset item.

3 de la Garza, Piñero, and Ozbek 13 Samling Concets and Techniques Now that the characteristics and roerties of the oulation under consideration are known, a review of samling concets is resented. This is Stage 2. The objective is identifying otential techniques that can serve as a latform to define the methodology that will better address samling needs. The review of samling theory focuses on the following three areas: (a) samling mechanism for drawing samles from the oulation, (b) basic samling concets, and (c) formulas for samle size determination. Samling Mechanism The roosed rocedure entails three different samling mechanisms to be used as discussed herein (2). As reviously mentioned, one need is to erform an indeendent evaluation of ortions of the roadway system that are exosed to different conditions. For this reason, stratified samling is used to be able to divide the oulation into suboulations or strata. Once stratification is erformed, then samle size for each asset item is calculated using the simle random samling equations, as will be resented later in this aer. For the actual rocess of random samling, a samling mechanism known as samling roortional to size is alied. In this samling mechanism, instead of assigning equal robability (equal chance of being selected) to each samle unit, unequal robabilities are assigned to each samle unit based on the number of existing asset items in such samle unit. The objective of assigning unequal robabilities is to give more chance to the samle units that contain more asset items of being selected comared with the samle units containing less number of asset items. This aroach is more cost-effective because field insections can be accomlished by visiting a minimal number of samle units with many asset items, as oosed to a large number of units with a few asset items. Basic Samling Concets This section reviews the basic samling concets that will be used in the samling rocedure roosed by this aer (4, 5): 1. Poulation. Poulation is defined as the collection of N samle units denoted by Y 1,..., Y N. Each samle unit is associated with a unit size a i. In the scenario, the unit size is determined according to the number of asset items. Each samle unit is associated with a quantitative resonse measurement, denoted as x i, that can be observed only if it is drawn and included in the samle. When the resonse measurement can only take two values (for convenience, x i = 0 or 1) the oulation is classified as a binary oulation. For instance, the scenario has a binary oulation because an asset item within a samle unit either meets the erformance criteria (x i = 1) or it does not (x i = 0). The samling concets resented in this aer focus on a binary oulation, because one is dealing with such a oulation tye. 2. Poulation roortion for each asset item. The objective of most samling rocedures is to make inferences about the oulation roortion, denoted by and defined by the following: = # assing in the oulation total count in the oulation Because the entire oulation is never observed, the oulation roortion cannot be known exactly. Instead, inferences about are to be derived from the observed samle. () 1 3. Samle roortion for each asset item. Inferences about the oulation are made through the use of samle roortion, denoted by ˆ and defined by the following: ˆ = 4. Confidence interval. A detailed assessment of uncertainty is available in the form of an interval estimate, which is meant to reresent a region of high confidence, where the oulation roortion is thought to lie. Such interval, known as confidence interval, is stated with a numerical level of confidence, usually a high ercentage such as 90%, 95%, and even 99% in some cases. In the case used here, the confidence interval for the oulation roortion is where e is the desired (secified) recision rate, which will be discussed in detail later. Formulas for Samle Size Determination To determine the samle size for erformance-based road maintenance evaluations, the following equations are used (6, 7): zα 2S n = 2 2 e + z S 2 # assing in the samle total count in thesamle [ ] 3 ˆ e, ˆ + e () 2 2 α 2 S N ( 4) 2 N = 1 5 N 1 ( ) () where e = desired recision rate that should be secified by road administrators, z α /2 = confidence level coefficient, N = oulation size, and = oulation roortion. For simlicity, the factor N / N 1 can be set to 1, which is a fair assumtion for large oulations the case investigated in this aer (2). In the roosed methodology, it is recommended to assign the value of as the minimum of the following two: the historical erformance rate or the erformance target. This definition results in taking any value such that 0 1. However, can not be chosen to be equal to 0 or 1. In such cases, the equations defined to determine the samle size are considered invalid as they yield to a samle size that is equal to 0. In addition to this restriction, must be at least 0.5, which is the value to obtain the maximum samle size (2). Proosed Samling Procedure This section, Stage 3, rovides a detailed descrition of the stes required to imlement the roosed samling rocedure for conducting erformance-based road maintenance evaluations. The methodology is summarized in seven stes in which the samling theories and concets introduced in revious sections are combined. They rovide comrehensive guidance on how to determine the aroriate ( 2)

4 14 Transortation Research Record 2044 samle size and then select samle units for evaluation. A descrition of each ste follows. Stratifying the Poulation The oulation is stratified into different areas of interest, with the number of strata deending on the information needed and the different arameters to be incororated in the analysis. Some of the criteria that can be considered to stratify the oulation were reviously discussed (e.g., rural versus urban areas). Defining the Samle Units Once the strata are identified, the next ste is to divide each stratum into samle units. It is suggested that one secifies the same samle length to all units. For instance, in the scenario, one can secify a samle unit length of 0.1-mi long, which divides each mile into 10 equal samle units in one direction and 10 in the other direction (if two directions are considered searately). Identifying Asset Items on Each Samle Unit via Asset Density Database Once the samle units have been defined, a density of all the asset items located within each samle unit needs to be created. What must be recorded in this asset density is not the exact quantity of a articular asset item on a given samle unit, whereby to establish if the asset item exists or not. For instance, a given samle unit may have 10 ies. Information that needs to be recorded in the asset density database is only that ies exist on that articular samle unit as oosed to secifying the exact quantity (in this case 10). Thus, the asset density can easily (and by sending a minimal amount of resources) be obtained by erforming windshield insections along with making use of the construction lans. The only required information is whether an asset item is resent in a given samle unit and not the count, condition, or hysical characteristics of such asset item. Table 1 resents an examle of the kind of information needed in the asset density to roerly imlement the roosed rocedure. As deicted, the oulation in Table 1 contains N = 95 samle units (Column 1) for which the existing asset items have been identified (Columns 2 through 5). The total of existing asset items in each sam- le unit is added in Column 6. Note that in addition to the column with the total number of asset items on each samle unit, an additional column (Column 7) with the cumulative number of asset items is included. The urose of having the cumulative number of asset items is to use them to define the intervals (Column 8) that will be used to determine the sites selected for insection. This rocedure is detailed in Ste 7. Creating the Database with the Samle Units Containing Each Asset Item Before erforming the calculations to determine the samle size for each asset item, comlementary databases identifying the samle units containing each asset item within each stratum should be created. These databases are essential to guarantee the success of the random selection rocess discussed in Ste 7. The information needed to create these databases can be derived from the asset density study conducted in Ste 3. Table 2 rovides an examle of what these databases look like, based on the information rovided in Table 1. For instance, note in column 3 that database number 1 (for sloes) only contains samle units 1, 3,..., and 95. Samle unit number 2 is not included in database 1 because according to the information in Table 1, that segment does not have sloes that is, they do not exist. Defining the Values of Parameters to Be Used in Samle Size Formulas The next ste is to define the values for arameters to be used in the formulas to determine the samle size. According to Equations 4 and 5, the arameters that need to be defined for each asset item are oulation size (N), standard normal deviate (Z α/2 ), oulation roortion ( ), and desired (secified) recision rate (e). As shown in Ste 3, the value of N for each asset item is already calculated. The standard normal deviate Z α/2 value deends on the desired confidence level (CL). This value can be obtained from statistics tables. Among the most commonly used values for Z α/2 are 1.96 for a 95% CL (α =0.05) and 1.65 for a 90% CL (α =0.10). It is recalled that the value of must be assigned as the minimum of the historical erformance rate or the erformance target (but not lower than 0.5). Finally, the desired recision rate e, as the name imlies, must be defined by the road administrators according to the accetable range within the confidence interval. TABLE 1 Examle of Density of Asset Items in Each Samle Unit Asset Items That Exist at Each Site (E = exists, NE = does not exist) Samle Unit (1) Sloes (2) Signals (3) Guardrail (4) Sidewalk (5) Total (N) (6) Cum. (ΣN) (7) Interval (8) 1 E E E E NE E NE E E NE E NE E NE E E 3 Σ E 95 Σ E ΣE 95 Total Σ E s Σ E s Σ E s Σ E s Σ E s

5 de la Garza, Piñero, and Ozbek 15 TABLE 2 Databases for Each Asset Item Performing Random Selection of Samle Units Database (1) Main Asset Included (2) Sites Included in Database (3) 1 Sloes 1, 3,..., 95 2 Signals 1, 2,..., 95 3 Guardrail 1, 3,..., 95 4 Sidewalks 1, 2,..., 95 Comuting the Required Samle Size for Each Asset Item The samle sizes determined for each asset item need to guarantee with high confidence that findings from the samled ortion of the oulation are reresentative of the general condition of the different asset items in the entire oulation. To identify the samle size for each asset item, Equations 4 and 5, which corresond to simle random samling on a binary oulation, should be used. For examle, let us assume that, as identified through the asset density database, a total of 91 samle units contain sloes. This value reresents the total oulation for the sloes asset item (N = 91). Assuming that the values of Z α/2,, and e have been defined, one can comute the required samle size n for sloes by using Equations 4 and 5. This rocedure must be reeated for each asset item within each stratum. Once that is done, the actual random selection of samle units can be erformed. The first ste in selecting sites for insection is to generate random numbers. This random number must be generated from an interval of 1 through the total number of asset items on each stratum. The urose of using this interval is to introduce the concet of samling roortional to the samle size to the random selection rocess. Deending on the interval (Column 8 of Table 1) in which the random number is located, the samle unit associated with that articular interval will be selected. For examle, according to Table 1, if a value of 5 is randomly generated, then the samle unit that will be selected for insection is unit 2. The remaining stes of the rocedure to be followed, once a samle unit is selected, are illustrated in Table 3. As shown in Table 3, samle units will be randomly selected from all the databases created in Ste 4 until a articular asset item is sufficiently insected. Then the list of databases used for the selection of samles is narrowed to only those databases containing the asset items that have not reached sufficiency (i.e., samle size determined in Ste 6). A closer look at Table 3 illustrates this rocess. For the first 35 samle units selected for insection (order of selection 35), all databases were considered. However, after 35 samle units have been selected, the signals asset item met sufficiency (according to Column 6, which indicates that 22 sites were needed and 22 sites were selected). Nonetheless, since the cumulative number of selected samle units (n A ) containing sloes, guardrails, and sidewalks is lower than the number of samle units required (n R ) for such asset items, more samle units need to be selected for insection. After the selection TABLE 3 Selection of Sites Statistics of Asset Insected Sloes Signals Guardrail Sidewalks Order of Unit Database (5) (6) (7) (8) Route Selection a Selected Used (1) (2) (3) (4) b n R c n A b n R c n A b n R c n A b n R c n A A 1 3 1,2,3, ,2,3, ,3, , NOTE: reresents the asset items that met sufficiency. a Reresents the cumulative number of sites selected for insection. b Reresents the minimum number of sites required for insection in order to meet sufficiency. c Reresents the actual number of asset items selected for insection.

6 16 Transortation Research Record 2044 of the 35th samle unit at which sufficiency is met for the signals asset item, only databases 1, 3, and 4 are used for the selection of the next samle units. Note that after 50 sites were selected, the sidewalks asset item met sufficiency, which required another reduction in the databases considered for selection of the next samle units (only databases 1 and 3 are used after that oint). This rocess is reeated until the sufficiency is met for all of the different asset items as shown in the last row in Table 3 (74 sites were required to sufficiently insect all asset items). Note in Table 3 that every time sufficiency is met for a given asset item, the cumulative number of such asset item selected for insection, n A, remains the same as the number of such asset item required to be insected, n R, even though the samling continues to take lace. This means that only the asset items that have not met sufficiency yet will be considered for insection in the subsequent samle units selected. For examle, let us consider in Table 3 the order of selection number 50, which corresonds to the selection of unit number 5. At this stage, two of the four asset items have met sufficiency (signals and sidewalks). However, one of these asset items, signals, had already met sufficiency in selection order number 35. If any samle unit selected for insection after the signals asset item had met sufficiency (which occurs at selection order number 35) contains such asset item, then such asset item would not be selected to be insected in those samle units, even though it exists. This aroach makes the rocess more cost-effective since only the asset items within each samle unit that make a contribution to the sufficiency of asset items are selected to be insected. SAMPLING MULTIPLE TIMES OVER THE COURSE OF A PERIOD Performance-based road maintenance contracts tend to last for long terms. Field insections should be erformed a number of times over the course of the contract to ensure continuous monitoring of the contractor s erformance. Deending on the resources allocated by the transortation agency, the frequency of such insections may range from four times a year to cature the seasonal effects on the asset items to once a year. Presented in this section are three alternative aroaches of alying the samling rocedure discussed in the revious section for cases in which samling needs to be erformed not just once, but multile times over the course of the erformance-based contract duration. Keeing Desired Precision Rate e Constant As discussed earlier, the value of in Equation 5 must be assigned as the minimum of the historical erformance rate or the erformance target. In the absence of historical erformance data, the erformance targets as secified by the contract should be used in the samling equations to determine the samle size. This is usually the case for the first samling rocess (i.e., to evaluate the contractor s erformance for the first time) for which no historical data are available. In Aroach 1, starting with the second evaluation, is chosen according to the aforementioned criterion. This means that, as a result of the first insections, if the erformance of the contractor is found to be less than the erformance target for a given asset item, then the used in the samling rocedure erformed for the second insections will be based on such erformance. Consequently, in the second insections, the determined samle size will be different from the one determined for the first insections. This is mainly because, keeing every other arameter in Equations 4 and 5 (i.e., Z α/2, e, and N) constant, samle size n changes when changes. Therefore, if desired recision rate e is ket constant in multile samlings, then the samle sizes resulting from such samlings will be different. Figure 1 deicts the relationshi of and n for an asset item with N = 785, Z α/2 = 1.96, and e = Using Aroach 1 for multile samlings may result in considerable changes in the samle size from one evaluation to another. Using the case deicted by Figure 1 as an examle, if a of 0.95 is used to determine the samle size (for a given asset item) for the first evaluation of the contractor, resulting samle size is 100. Let us assume that as a result of the first insections, the erformance of the contractor (i.e., historical erformance) is found to be at Then, such should be used as the value of for the samling erformed for second evaluations. That would result in a samle size of 258, which is a substantial increase from the first evaluations. Stating Desired Precision Rate e Relative to Poulation Coefficient of Variation One aroach to deal with the issue of substantial changes in the samle size from one evaluation to another (as shown in Aroach 1) is to state the desired recision rate e in the second and subsequent n =0.80 n=258 N=785 CL=95% (z /2=1.96) e=0.04 (constant) =0.95 n= FIGURE 1 Relationshi between and n when e is constant.

7 de la Garza, Piñero, and Ozbek 17 evaluations relative to the oulation s coefficient of variation (COV) as follows (4): e = e initial COV = where e initial is the value of e used in the first evaluations, and initial is the value of used in the first evaluations. To better illustrate how this aroach works, let us consider the following examle: Suose in lanning a binary samling exeriment it is determined that a suitable e initial = 0.04 when initial = However, the interest is in estimating the value of e when = By substituting the known values into Equations 6 and 7, e can be calculated as follows: e = COV initial initial = () 6 ( 7) Therefore, if this aroach is used for the multile samling scenario, then the desired recision rates in different evaluations will be adjusted according to the. This ensures that the samle size from one evaluation to another remains in the same order of magnitude. Figure 2 deicts the relationshi of and n when this aroach is used for an asset item with N = 785, Z α/2 = 1.96, e initial = 0.04, and initial = As can be seen, with this aroach, when changes from 0.95 to 0.80, the samle size goes from 100 to 73. This is an insignificant change when comared with the change from 100 to 258, which was the case for Aroach 1. However, concurrently (when changes from 0.95 to 0.80) the desired recision rate e goes from 0.04 to 0.09, which may be too large for an accetable recision rate. Keeing the Samle Size Constant Using Aroach 2 for multile samlings, while keeing the samle sizes close to each other, may result in considerable changes in the desired recision rate, as mentioned. It is ossible to kee e in an accetable range while not changing the samle size from one evaluation to another. In this aroach, samle size is calculated for the first evaluations. In subsequent evaluations, the same samle size is used. Deending on the value of that is used in such evaluations, e changes from one evaluation to another. Nonetheless, such change is less than what is encountered when Aroach 2 is used. Figure 3 deicts the relationshi of and e when this aroach is used for an asset item with N = 785, Z α/2 = 1.96, and n = 100. As can be seen, with this aroach, when changes from 0.95 to 0.80, e goes from 0.04 to This is much less of a change when comared with the case for Aroach 2 in which the change was from 0.04 to CONCLUDING REMARKS This aer resented a samling rocedure that is develoed to address the need of monitoring, effectively and efficiently, the contractors working under the terms of erformance-based road maintenance contracts. The develoed rocedure is effective, for it ensures that the findings from the field insections will be reliable and reresentative with high confidence of the actual condition of asset items in the entire oulation. Also, the develoed rocedure is efficient because field insections can be accomlished by visiting a minimal number of samle units with many asset items rather than a large number of samle units with a few asset items. The result is substantial savings in cost and time in erforming such insections. 120 N=785 CL=95% (z /2=1.96) e initial =0.04 initial = n =0.80 n=73 =0.95 n=100 e= e= FIGURE 2 Relationshi between and n when e changes relative to COV.

8 18 Transortation Research Record 2044 e =0.80 e=0.07 N=785 CL: 95% (z /2=1.96) n=100 (constant) =0.95 e= FIGURE 3 Relationshi between and e when n is constant. Presentation of the develoed rocedure and aroaches is in a stage-by-stage and ste-by-ste manner to hel interested transortation agencies easily comrehend the concets and imlement the develoed rocedure. The develoed rocedure has been imlemented since 2002 to assist the Virginia Deartment of Transortation (DOT) in monitoring the erformance of two searate contractors working under terms of erformance-based road maintenance contracts. Both contracts are long term, necessitating develoment of the three alternative aroaches of samling for cases in which samling needs to be erformed not just once, but multile times over the course of the contract duration, as resented in this aer. Of note is that such imlementations used sohisticated comuter rogramming aroaches during samling. Also, tablet comuters with built-in intelligent forms were used in data collection to ensure that monitoring of the contractors from incetion to finalization ran smoothly and was error free. Within all imlementations that included a number of different scenarios (i.e., number of asset items in a given samle unit), the samling rocedure was found successful in obtaining the required confidence levels. As stated, this aer does not discuss oerational issues related to the condition assessment rocess, such as frequency of insections and insection techniques. Nevertheless, it is suggested that insections be erformed multile times in a year to cature seasonal effects (resulting in climate and traffic changes) on the deterioration of asset items. Furthermore, in addition to erforming condition assessment of the samles generated by the methodology described, it is suggested that continuous and comrehensive monitoring be erformed of the whole oulation with resect to certain asset items, to cature conditions (such as large otholes and nonfunctioning signals) requiring emergency maintenance actions due to safety reasons. ACKNOWLEDGMENT The research work described in this aer has been funded by Virginia DOT. REFERENCES 1. Zietlow, G. Cutting Costs and Imroving Quality Through Performance- Based Road Management and Maintenance Contracts. University of Birmingham/Transit New Zealand Senior Road Executive Courses: Innovations in Road Management. Birmingham, United Kingdom, Piñero, J. C. A Framework for Monitoring Performance-Based Road Maintenance. PhD dissertation. Virginia Polytechnic Institute and State University, Blacksburg, Thomson, S. K., and G. A. F. Seber. Adative Samling. John Wiley and Sons, New York, Scheaffer, R. L., W. Mendenhall, and R. L. Ott. Elementary Survey Samling, 5th ed. Duxbury Press (Wadsworth/ITP), Belmont, Calif., Ott, R. L., and M. Longnecker. An Introduction to Statistical Methods and Data Analysis, 5th ed. Duxbury, Pacific Grove, Calif., Schmitt, R. L., S. Owusu-Ababio, R. M. Weed, and E. V. Nordheim. Understanding Statistics in Maintenance Quality Assurance Programs. In Transortation Research Record: Journal of the Transortation Research Board, No. 1948, Transortation Research Board of the National Academies, Washington, D.C., 2006, Kardian, R. D., and W. W. Woodward, Jr. Virginia Deartment of Transortation s Maintenance Quality Evaluation Program. In Transortation Research Record 1276, TRB, National Research Council, Washington, D.C., 1990, The oinions and findings are those of the authors and do not necessarily reresent the views of Virginia DOT. The Maintenance and Oerations Management Committee sonsored ublication of this aer.

Confidence Intervals for a Proportion Using Inverse Sampling when the Data is Subject to False-positive Misclassification

Confidence Intervals for a Proportion Using Inverse Sampling when the Data is Subject to False-positive Misclassification Journal of Data Science 13(015), 63-636 Confidence Intervals for a Proortion Using Inverse Samling when the Data is Subject to False-ositive Misclassification Kent Riggs 1 1 Deartment of Mathematics and

More information

Objectives. 3.3 Toward statistical inference

Objectives. 3.3 Toward statistical inference Objectives 3.3 Toward statistical inference Poulation versus samle (CIS, Chater 6) Toward statistical inference Samling variability Further reading: htt://onlinestatbook.com/2/estimation/characteristics.html

More information

Capital Budgeting: The Valuation of Unusual, Irregular, or Extraordinary Cash Flows

Capital Budgeting: The Valuation of Unusual, Irregular, or Extraordinary Cash Flows Caital Budgeting: The Valuation of Unusual, Irregular, or Extraordinary Cash Flows ichael C. Ehrhardt Philli R. Daves Finance Deartment, SC 424 University of Tennessee Knoxville, TN 37996-0540 423-974-1717

More information

Non-Inferiority Tests for the Ratio of Two Correlated Proportions

Non-Inferiority Tests for the Ratio of Two Correlated Proportions Chater 161 Non-Inferiority Tests for the Ratio of Two Correlated Proortions Introduction This module comutes ower and samle size for non-inferiority tests of the ratio in which two dichotomous resonses

More information

SINGLE SAMPLING PLAN FOR VARIABLES UNDER MEASUREMENT ERROR FOR NON-NORMAL DISTRIBUTION

SINGLE SAMPLING PLAN FOR VARIABLES UNDER MEASUREMENT ERROR FOR NON-NORMAL DISTRIBUTION ISSN -58 (Paer) ISSN 5-5 (Online) Vol., No.9, SINGLE SAMPLING PLAN FOR VARIABLES UNDER MEASUREMENT ERROR FOR NON-NORMAL DISTRIBUTION Dr. ketki kulkarni Jayee University of Engineering and Technology Guna

More information

A Comparative Study of Various Loss Functions in the Economic Tolerance Design

A Comparative Study of Various Loss Functions in the Economic Tolerance Design A Comarative Study of Various Loss Functions in the Economic Tolerance Design Jeh-Nan Pan Deartment of Statistics National Chen-Kung University, Tainan, Taiwan 700, ROC Jianbiao Pan Deartment of Industrial

More information

INDEX NUMBERS. Introduction

INDEX NUMBERS. Introduction INDEX NUMBERS Introduction Index numbers are the indicators which reflect changes over a secified eriod of time in rices of different commodities industrial roduction (iii) sales (iv) imorts and exorts

More information

Asian Economic and Financial Review A MODEL FOR ESTIMATING THE DISTRIBUTION OF FUTURE POPULATION. Ben David Nissim.

Asian Economic and Financial Review A MODEL FOR ESTIMATING THE DISTRIBUTION OF FUTURE POPULATION. Ben David Nissim. Asian Economic and Financial Review journal homeage: htt://www.aessweb.com/journals/5 A MODEL FOR ESTIMATING THE DISTRIBUTION OF FUTURE POPULATION Ben David Nissim Deartment of Economics and Management,

More information

The Impact of Flexibility And Capacity Allocation On The Performance of Primary Care Practices

The Impact of Flexibility And Capacity Allocation On The Performance of Primary Care Practices University of Massachusetts Amherst ScholarWorks@UMass Amherst Masters Theses 1911 - February 2014 2010 The Imact of Flexibility And Caacity Allocation On The Performance of Primary Care Practices Liang

More information

Statistics and Probability Letters. Variance stabilizing transformations of Poisson, binomial and negative binomial distributions

Statistics and Probability Letters. Variance stabilizing transformations of Poisson, binomial and negative binomial distributions Statistics and Probability Letters 79 (9) 6 69 Contents lists available at ScienceDirect Statistics and Probability Letters journal homeage: www.elsevier.com/locate/staro Variance stabilizing transformations

More information

Management Accounting of Production Overheads by Groups of Equipment

Management Accounting of Production Overheads by Groups of Equipment Asian Social Science; Vol. 11, No. 11; 2015 ISSN 1911-2017 E-ISSN 1911-2025 Published by Canadian Center of Science and Education Management Accounting of Production verheads by Grous of Equiment Sokolov

More information

Matching Markets and Social Networks

Matching Markets and Social Networks Matching Markets and Social Networks Tilman Klum Emory University Mary Schroeder University of Iowa Setember 0 Abstract We consider a satial two-sided matching market with a network friction, where exchange

More information

Objectives. 5.2, 8.1 Inference for a single proportion. Categorical data from a simple random sample. Binomial distribution

Objectives. 5.2, 8.1 Inference for a single proportion. Categorical data from a simple random sample. Binomial distribution Objectives 5.2, 8.1 Inference for a single roortion Categorical data from a simle random samle Binomial distribution Samling distribution of the samle roortion Significance test for a single roortion Large-samle

More information

Annex 4 - Poverty Predictors: Estimation and Algorithm for Computing Predicted Welfare Function

Annex 4 - Poverty Predictors: Estimation and Algorithm for Computing Predicted Welfare Function Annex 4 - Poverty Predictors: Estimation and Algorithm for Comuting Predicted Welfare Function The Core Welfare Indicator Questionnaire (CWIQ) is an off-the-shelf survey ackage develoed by the World Bank

More information

TESTING THE CAPITAL ASSET PRICING MODEL AFTER CURRENCY REFORM: THE CASE OF ZIMBABWE STOCK EXCHANGE

TESTING THE CAPITAL ASSET PRICING MODEL AFTER CURRENCY REFORM: THE CASE OF ZIMBABWE STOCK EXCHANGE TESTING THE CAPITAL ASSET PRICING MODEL AFTER CURRENCY REFORM: THE CASE OF ZIMBABWE STOCK EXCHANGE Batsirai Winmore Mazviona 1 ABSTRACT The Caital Asset Pricing Model (CAPM) endeavors to exlain the relationshi

More information

LECTURE NOTES ON MICROECONOMICS

LECTURE NOTES ON MICROECONOMICS LECTURE NOTES ON MCROECONOMCS ANALYZNG MARKETS WTH BASC CALCULUS William M. Boal Part : Consumers and demand Chater 5: Demand Section 5.: ndividual demand functions Determinants of choice. As noted in

More information

A Multi-Objective Approach to Portfolio Optimization

A Multi-Objective Approach to Portfolio Optimization RoseHulman Undergraduate Mathematics Journal Volume 8 Issue Article 2 A MultiObjective Aroach to Portfolio Otimization Yaoyao Clare Duan Boston College, sweetclare@gmail.com Follow this and additional

More information

Publication Efficiency at DSI FEM CULS An Application of the Data Envelopment Analysis

Publication Efficiency at DSI FEM CULS An Application of the Data Envelopment Analysis Publication Efficiency at DSI FEM CULS An Alication of the Data Enveloment Analysis Martin Flégl, Helena Brožová 1 Abstract. The education and research efficiency at universities has always been very imortant

More information

A Variance Estimator for Cohen s Kappa under a Clustered Sampling Design THESIS

A Variance Estimator for Cohen s Kappa under a Clustered Sampling Design THESIS A Variance Estimator for Cohen s Kaa under a Clustered Samling Design THESIS Presented in Partial Fulfillment of the Requirements for the Degree Master of Science in the Graduate School of The Ohio State

More information

A GENERALISED PRICE-SCORING MODEL FOR TENDER EVALUATION

A GENERALISED PRICE-SCORING MODEL FOR TENDER EVALUATION 019-026 rice scoring 9/20/05 12:12 PM Page 19 A GENERALISED PRICE-SCORING MODEL FOR TENDER EVALUATION Thum Peng Chew BE (Hons), M Eng Sc, FIEM, P. Eng, MIEEE ABSTRACT This aer rooses a generalised rice-scoring

More information

5.1 Regional investment attractiveness in an unstable and risky environment

5.1 Regional investment attractiveness in an unstable and risky environment 5.1 Regional investment attractiveness in an unstable and risky environment Nikolova Liudmila Ekaterina Plotnikova Sub faculty Finances and monetary circulation Saint Petersburg state olytechnical university,

More information

FORECASTING EARNINGS PER SHARE FOR COMPANIES IN IT SECTOR USING MARKOV PROCESS MODEL

FORECASTING EARNINGS PER SHARE FOR COMPANIES IN IT SECTOR USING MARKOV PROCESS MODEL FORECASTING EARNINGS PER SHARE FOR COMPANIES IN IT SECTOR USING MARKOV PROCESS MODEL 1 M.P. RAJAKUMAR, 2 V. SHANTHI 1 Research Scholar, Sathyabama University, Chennai-119, Tamil Nadu, India 2 Professor,

More information

CLAS. CATASTROPHE LOSS ANALYSIS SERVICE for Corporate Risk Management. Identify the Hazard. Quantify Your Exposure. Manage Your Risk.

CLAS. CATASTROPHE LOSS ANALYSIS SERVICE for Corporate Risk Management. Identify the Hazard. Quantify Your Exposure. Manage Your Risk. CLAS CATASTROPHE LOSS ANALYSIS SERVICE for Cororate Risk Management Identify the Hazard. Quantify Your Exosure. Manage Your Risk. Identify the Hazard What erils kee you u at night? Earthquakes. Hurricanes.

More information

Lecture 2. Main Topics: (Part II) Chapter 2 (2-7), Chapter 3. Bayes Theorem: Let A, B be two events, then. The probabilities P ( B), probability of B.

Lecture 2. Main Topics: (Part II) Chapter 2 (2-7), Chapter 3. Bayes Theorem: Let A, B be two events, then. The probabilities P ( B), probability of B. STT315, Section 701, Summer 006 Lecture (Part II) Main Toics: Chater (-7), Chater 3. Bayes Theorem: Let A, B be two events, then B A) = A B) B) A B) B) + A B) B) The robabilities P ( B), B) are called

More information

Analysing indicators of performance, satisfaction, or safety using empirical logit transformation

Analysing indicators of performance, satisfaction, or safety using empirical logit transformation Analysing indicators of erformance, satisfaction, or safety using emirical logit transformation Sarah Stevens,, Jose M Valderas, Tim Doran, Rafael Perera,, Evangelos Kontoantelis,5 Nuffield Deartment of

More information

EVIDENCE OF ADVERSE SELECTION IN CROP INSURANCE MARKETS

EVIDENCE OF ADVERSE SELECTION IN CROP INSURANCE MARKETS The Journal of Risk and Insurance, 2001, Vol. 68, No. 4, 685-708 EVIDENCE OF ADVERSE SELECTION IN CROP INSURANCE MARKETS Shiva S. Makki Agai Somwaru INTRODUCTION ABSTRACT This article analyzes farmers

More information

DP2003/10. Speculative behaviour, debt default and contagion: A stylised framework of the Latin American Crisis

DP2003/10. Speculative behaviour, debt default and contagion: A stylised framework of the Latin American Crisis DP2003/10 Seculative behaviour, debt default and contagion: A stylised framework of the Latin American Crisis 2001-2002 Louise Allso December 2003 JEL classification: E44, F34, F41 Discussion Paer Series

More information

Professor Huihua NIE, PhD School of Economics, Renmin University of China HOLD-UP, PROPERTY RIGHTS AND REPUTATION

Professor Huihua NIE, PhD School of Economics, Renmin University of China   HOLD-UP, PROPERTY RIGHTS AND REPUTATION Professor uihua NIE, PhD School of Economics, Renmin University of China E-mail: niehuihua@gmail.com OD-UP, PROPERTY RIGTS AND REPUTATION Abstract: By introducing asymmetric information of investors abilities

More information

Quantitative Aggregate Effects of Asymmetric Information

Quantitative Aggregate Effects of Asymmetric Information Quantitative Aggregate Effects of Asymmetric Information Pablo Kurlat February 2012 In this note I roose a calibration of the model in Kurlat (forthcoming) to try to assess the otential magnitude of the

More information

2/20/2013. of Manchester. The University COMP Building a yes / no classifier

2/20/2013. of Manchester. The University COMP Building a yes / no classifier COMP4 Lecture 6 Building a yes / no classifier Buildinga feature-basedclassifier Whatis a classifier? What is an information feature? Building a classifier from one feature Probability densities and the

More information

Effects of Size and Allocation Method on Stock Portfolio Performance: A Simulation Study

Effects of Size and Allocation Method on Stock Portfolio Performance: A Simulation Study 2011 3rd International Conference on Information and Financial Engineering IPEDR vol.12 (2011) (2011) IACSIT Press, Singaore Effects of Size and Allocation Method on Stock Portfolio Performance: A Simulation

More information

Prediction of Rural Residents Consumption Expenditure Based on Lasso and Adaptive Lasso Methods

Prediction of Rural Residents Consumption Expenditure Based on Lasso and Adaptive Lasso Methods Oen Journal of Statistics, 2016, 6, 1166-1173 htt://www.scir.org/journal/ojs ISSN Online: 2161-7198 ISSN Print: 2161-718X Prediction of Rural Residents Consumtion Exenditure Based on Lasso and Adative

More information

Economic Performance, Wealth Distribution and Credit Restrictions under variable investment: The open economy

Economic Performance, Wealth Distribution and Credit Restrictions under variable investment: The open economy Economic Performance, Wealth Distribution and Credit Restrictions under variable investment: The oen economy Ronald Fischer U. de Chile Diego Huerta Banco Central de Chile August 21, 2015 Abstract Potential

More information

and their probabilities p

and their probabilities p AP Statistics Ch. 6 Notes Random Variables A variable is any characteristic of an individual (remember that individuals are the objects described by a data set and may be eole, animals, or things). Variables

More information

Causal Links between Foreign Direct Investment and Economic Growth in Egypt

Causal Links between Foreign Direct Investment and Economic Growth in Egypt J I B F Research Science Press Causal Links between Foreign Direct Investment and Economic Growth in Egyt TAREK GHALWASH* Abstract: The main objective of this aer is to study the causal relationshi between

More information

ECON 1100 Global Economics (Fall 2013) Government Failure

ECON 1100 Global Economics (Fall 2013) Government Failure ECON 11 Global Economics (Fall 213) Government Failure Relevant Readings from the Required extbooks: Economics Chater 11, Government Failure Definitions and Concets: government failure a situation in which

More information

***SECTION 7.1*** Discrete and Continuous Random Variables

***SECTION 7.1*** Discrete and Continuous Random Variables ***SECTION 7.*** Discrete and Continuous Random Variables Samle saces need not consist of numbers; tossing coins yields H s and T s. However, in statistics we are most often interested in numerical outcomes

More information

Investment in Production Resource Flexibility:

Investment in Production Resource Flexibility: Investment in Production Resource Flexibility: An emirical investigation of methods for lanning under uncertainty Elena Katok MS&IS Deartment Penn State University University Park, PA 16802 ekatok@su.edu

More information

By choosing to view this document, you agree to all provisions of the copyright laws protecting it.

By choosing to view this document, you agree to all provisions of the copyright laws protecting it. Coyright 2015 IEEE. Rerinted, with ermission, from Huairui Guo, Ferenc Szidarovszky, Athanasios Gerokostooulos and Pengying Niu, On Determining Otimal Insection Interval for Minimizing Maintenance Cost,

More information

Feasibilitystudyofconstruction investmentprojectsassessment withregardtoriskandprobability

Feasibilitystudyofconstruction investmentprojectsassessment withregardtoriskandprobability Feasibilitystudyofconstruction investmentrojectsassessment withregardtoriskandrobability ofnpvreaching Andrzej Minasowicz Warsaw University of Technology, Civil Engineering Faculty, Warsaw, PL a.minasowicz@il.w.edu.l

More information

Management of Pricing Policies and Financial Risk as a Key Element for Short Term Scheduling Optimization

Management of Pricing Policies and Financial Risk as a Key Element for Short Term Scheduling Optimization Ind. Eng. Chem. Res. 2005, 44, 557-575 557 Management of Pricing Policies and Financial Risk as a Key Element for Short Term Scheduling Otimization Gonzalo Guillén, Miguel Bagajewicz, Sebastián Eloy Sequeira,

More information

PLUTOCRATIC AND DEMOCRATIC CONSUMER PRICE INDEXES: Francesco Chelli and Elvio Mattioli

PLUTOCRATIC AND DEMOCRATIC CONSUMER PRICE INDEXES: Francesco Chelli and Elvio Mattioli LUTORATI AND DEMORATI ONSUMER RIE INDEXES: AN ESTIMATION OF A DEMORATI INDEX FOR ITALY 995-2005 Francesco helli and Elvio Mattioli We thank. Ercolani for helful discussion and comments. All errors are

More information

Supplemental Material: Buyer-Optimal Learning and Monopoly Pricing

Supplemental Material: Buyer-Optimal Learning and Monopoly Pricing Sulemental Material: Buyer-Otimal Learning and Monooly Pricing Anne-Katrin Roesler and Balázs Szentes February 3, 207 The goal of this note is to characterize buyer-otimal outcomes with minimal learning

More information

Setting the regulatory WACC using Simulation and Loss Functions The case for standardising procedures

Setting the regulatory WACC using Simulation and Loss Functions The case for standardising procedures Setting the regulatory WACC using Simulation and Loss Functions The case for standardising rocedures by Ian M Dobbs Newcastle University Business School Draft: 7 Setember 2007 1 ABSTRACT The level set

More information

Lecture 5: Performance Analysis (part 1)

Lecture 5: Performance Analysis (part 1) Lecture 5: Performance Analysis (art 1) 1 Tyical Time Measurements Dark grey: time sent on comutation, decreasing with # of rocessors White: time sent on communication, increasing with # of rocessors Oerations

More information

Asymmetric Information

Asymmetric Information Asymmetric Information Econ 235, Sring 2013 1 Wilson [1980] What haens when you have adverse selection? What is an equilibrium? What are we assuming when we define equilibrium in one of the ossible ways?

More information

BA 351 CORPORATE FINANCE LECTURE 7 UNCERTAINTY, THE CAPM AND CAPITAL BUDGETING. John R. Graham Adapted from S. Viswanathan

BA 351 CORPORATE FINANCE LECTURE 7 UNCERTAINTY, THE CAPM AND CAPITAL BUDGETING. John R. Graham Adapted from S. Viswanathan BA 351 CORPORATE FINANCE LECTURE 7 UNCERTAINTY, THE CAPM AND CAPITAL BUDGETING John R. Graham Adated from S. Viswanathan FUQUA SCHOOL OF BUSINESS DUKE UNIVERSITY 1 In this lecture, we examine roject valuation

More information

Summary of the Chief Features of Alternative Asset Pricing Theories

Summary of the Chief Features of Alternative Asset Pricing Theories Summary o the Chie Features o Alternative Asset Pricing Theories CAP and its extensions The undamental equation o CAP ertains to the exected rate o return time eriod into the uture o any security r r β

More information

THE DELIVERY OPTION IN MORTGAGE BACKED SECURITY VALUATION SIMULATIONS. Scott Gregory Chastain Jian Chen

THE DELIVERY OPTION IN MORTGAGE BACKED SECURITY VALUATION SIMULATIONS. Scott Gregory Chastain Jian Chen Proceedings of the 25 Winter Simulation Conference. E. Kuhl,.. Steiger, F. B. Armstrong, and J. A. Joines, eds. THE DELIVERY OPTIO I ORTGAGE BACKED SECURITY VALUATIO SIULATIOS Scott Gregory Chastain Jian

More information

Index Methodology Guidelines relating to the. EQM Global Cannabis Index

Index Methodology Guidelines relating to the. EQM Global Cannabis Index Index Methodology Guidelines relating to the EQM Global Cannabis Index Version 1.2 dated March 20, 2019 1 Contents Introduction 1 Index secifications 1.1 Short name 1.2 Initial value 1.3 Distribution 1.4

More information

Volumetric Hedging in Electricity Procurement

Volumetric Hedging in Electricity Procurement Volumetric Hedging in Electricity Procurement Yumi Oum Deartment of Industrial Engineering and Oerations Research, University of California, Berkeley, CA, 9472-777 Email: yumioum@berkeley.edu Shmuel Oren

More information

Appendix Large Homogeneous Portfolio Approximation

Appendix Large Homogeneous Portfolio Approximation Aendix Large Homogeneous Portfolio Aroximation A.1 The Gaussian One-Factor Model and the LHP Aroximation In the Gaussian one-factor model, an obligor is assumed to default if the value of its creditworthiness

More information

Swings in the Economic Support Ratio and Income Inequality by Sang-Hyop Lee and Andrew Mason 1

Swings in the Economic Support Ratio and Income Inequality by Sang-Hyop Lee and Andrew Mason 1 Swings in the Economic Suort Ratio and Income Inequality by Sang-Hyo Lee and Andrew Mason 1 Draft May 3, 2002 When oulations are young, income inequality deends on the distribution of earnings and wealth

More information

Maximize the Sharpe Ratio and Minimize a VaR 1

Maximize the Sharpe Ratio and Minimize a VaR 1 Maximize the Share Ratio and Minimize a VaR 1 Robert B. Durand 2 Hedieh Jafarour 3,4 Claudia Klüelberg 5 Ross Maller 6 Aril 28, 2008 Abstract In addition to its role as the otimal ex ante combination of

More information

Online Robustness Appendix to Are Household Surveys Like Tax Forms: Evidence from the Self Employed

Online Robustness Appendix to Are Household Surveys Like Tax Forms: Evidence from the Self Employed Online Robustness Aendix to Are Household Surveys Like Tax Forms: Evidence from the Self Emloyed October 01 Erik Hurst University of Chicago Geng Li Board of Governors of the Federal Reserve System Benjamin

More information

Information and uncertainty in a queueing system

Information and uncertainty in a queueing system Information and uncertainty in a queueing system Refael Hassin December 7, 7 Abstract This aer deals with the effect of information and uncertainty on rofits in an unobservable single server queueing system.

More information

Towards an advanced estimation of Measurement Uncertainty using Monte-Carlo Methods- case study kinematic TLS Observation Process

Towards an advanced estimation of Measurement Uncertainty using Monte-Carlo Methods- case study kinematic TLS Observation Process Towards an advanced estimation of Measurement Uncertainty using Monte-Carlo Methods- case study Hamza ALKHATIB and Hansjörg KUTTERER, Germany Key words: terrestrial laser scanning, GUM, uncertainty, Monte

More information

The Effect of Prior Gains and Losses on Current Risk-Taking Using Quantile Regression

The Effect of Prior Gains and Losses on Current Risk-Taking Using Quantile Regression The Effect of rior Gains and Losses on Current Risk-Taking Using Quantile Regression by Fabio Mattos and hili Garcia Suggested citation format: Mattos, F., and. Garcia. 2009. The Effect of rior Gains and

More information

Inventory Systems with Stochastic Demand and Supply: Properties and Approximations

Inventory Systems with Stochastic Demand and Supply: Properties and Approximations Working Paer, Forthcoming in the Euroean Journal of Oerational Research Inventory Systems with Stochastic Demand and Suly: Proerties and Aroximations Amanda J. Schmitt Center for Transortation and Logistics

More information

Do Poorer Countries Have Less Capacity for Redistribution?

Do Poorer Countries Have Less Capacity for Redistribution? Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Policy Research Working Paer 5046 Do Poorer Countries Have Less Caacity for Redistribution?

More information

LIS Working Paper Series

LIS Working Paper Series LIS Working Paer Series No. 648 Relative income change and ro-oor growth Marek Kośny, and Gastón Yalonetzky Setember 2015 Luxembourg Income Study (LIS), asbl Relative income change and ro-oor growth Marek

More information

Equity Incentive Model of Crowdfunding in Different Types of Projects

Equity Incentive Model of Crowdfunding in Different Types of Projects Equity Incentive Model of in Different Tyes of Proects Lingling Huang, Li Xin School of Economics and Management, orth China University of Technology, Beiing,China Abstract As a new financing tool for

More information

On the Power of Structural Violations in Priority Queues

On the Power of Structural Violations in Priority Queues On the Power of Structural Violations in Priority Queues Amr Elmasry 1, Claus Jensen 2, Jyrki Katajainen 2, 1 Comuter Science Deartment, Alexandria University Alexandria, Egyt 2 Deartment of Comuting,

More information

Loan portfolio loss distribution: Basel II unifactorial approach vs. Non parametric estimations

Loan portfolio loss distribution: Basel II unifactorial approach vs. Non parametric estimations MPRA Munich Personal RePEc Archive Loan ortfolio loss distribution: Basel II unifactorial aroach vs. on arametric estimations Analía Rodríguez Duuy Banco Central del Uruguay October 007 Online at htt://mra.ub.uni-muenchen.de/0697/

More information

Application of Monte-Carlo Tree Search to Traveling-Salesman Problem

Application of Monte-Carlo Tree Search to Traveling-Salesman Problem R4-14 SASIMI 2016 Proceedings Alication of Monte-Carlo Tree Search to Traveling-Salesman Problem Masato Shimomura Yasuhiro Takashima Faculty of Environmental Engineering University of Kitakyushu Kitakyushu,

More information

Risk and Return. Calculating Return - Single period. Calculating Return - Multi periods. Uncertainty of Investment.

Risk and Return. Calculating Return - Single period. Calculating Return - Multi periods. Uncertainty of Investment. Chater 10, 11 Risk and Return Chater 13 Cost of Caital Konan Chan, 018 Risk and Return Return measures Exected return and risk? Portfolio risk and diversification CPM (Caital sset Pricing Model) eta Calculating

More information

Does Anti-dumping Enforcement Generate Threat?

Does Anti-dumping Enforcement Generate Threat? Does Anti-duming Enforcement Generate Threat? Sagnik Bagchi Research Scholar Deartment of Humanities and Social Sciences Indian Institute of Technology Bombay. India E-mail: bagchi.sagnik@gmail.com Surajit

More information

Policyholder Outcome Death Disability Neither Payout, x 10,000 5, ,000

Policyholder Outcome Death Disability Neither Payout, x 10,000 5, ,000 Two tyes of Random Variables: ) Discrete random variable has a finite number of distinct outcomes Examle: Number of books this term. ) Continuous random variable can take on any numerical value within

More information

Are capital expenditures, R&D, advertisements and acquisitions positive NPV?

Are capital expenditures, R&D, advertisements and acquisitions positive NPV? Are caital exenditures, R&D, advertisements and acquisitions ositive NPV? Peter Easton The University of Notre Dame and Peter Vassallo The University of Melbourne February, 2009 Abstract The focus of this

More information

Third-Market Effects of Exchange Rates: A Study of the Renminbi

Third-Market Effects of Exchange Rates: A Study of the Renminbi PRELIMINARY DRAFT. NOT FOR QUOTATION Third-Market Effects of Exchange Rates: A Study of the Renminbi Aaditya Mattoo (Develoment Research Grou, World Bank), Prachi Mishra (Research Deartment, International

More information

Analysis on Mergers and Acquisitions (M&A) Game Theory of Petroleum Group Corporation

Analysis on Mergers and Acquisitions (M&A) Game Theory of Petroleum Group Corporation DOI: 10.14355/ijams.2014.0301.03 Analysis on Mergers and Acquisitions (M&A) Game Theory of Petroleum Grou Cororation Minchang Xin 1, Yanbin Sun 2 1,2 Economic and Management Institute, Northeast Petroleum

More information

THE ROLE OF CORRELATION IN THE CURRENT CREDIT RATINGS SQUEEZE. Eva Porras

THE ROLE OF CORRELATION IN THE CURRENT CREDIT RATINGS SQUEEZE. Eva Porras THE ROLE OF CORRELATION IN THE CURRENT CREDIT RATINGS SQUEEZE Eva Porras IE Business School Profesora de Finanzas C/Castellón de la Plana 8 8006 Madrid Esaña Abstract A current matter of reoccuation is

More information

Informal Lending and Entrepreneurship

Informal Lending and Entrepreneurship Informal Lending and Entrereneurshi Pinar Yildirim Geyu Yang Abstract How does the informal economy affect financial inclusion and entrereneurial activity of consumers? We investigate the imact of informal

More information

CS522 - Exotic and Path-Dependent Options

CS522 - Exotic and Path-Dependent Options CS522 - Exotic and Path-Deendent Otions Tibor Jánosi May 5, 2005 0. Other Otion Tyes We have studied extensively Euroean and American uts and calls. The class of otions is much larger, however. A digital

More information

Partially Ordered Preferences in Decision Trees: Computing Strategies with Imprecision in Probabilities

Partially Ordered Preferences in Decision Trees: Computing Strategies with Imprecision in Probabilities Partially Ordered Preferences in Decision Trees: Comuting trategies with Imrecision in Probabilities Daniel Kikuti scola Politécnica University of ão Paulo daniel.kikuti@oli.us.br Fabio G. Cozman scola

More information

MACAY HOLDINGS INCORPORATED 2013 ANNUAL REPORT. A Year Full of Opportunities

MACAY HOLDINGS INCORPORATED 2013 ANNUAL REPORT. A Year Full of Opportunities MACAY HOLDINGS INCORPORATED 2013 ANNUAL REPORT A Year Full of Oortunities TABLE OF CONTENTS ABOUT THE COMPANY 1 About the Comany 2 Chairman s Message Macay Holdings, Inc. ( Macay or the Comany ) is an

More information

Cash-in-the-market pricing or cash hoarding: how banks choose liquidity

Cash-in-the-market pricing or cash hoarding: how banks choose liquidity Cash-in-the-market ricing or cash hoarding: how banks choose liquidity Jung-Hyun Ahn Vincent Bignon Régis Breton Antoine Martin February 207 Abstract We develo a model in which financial intermediaries

More information

Twin Deficits and Inflation Dynamics in a Mundell-Fleming-Tobin Framework

Twin Deficits and Inflation Dynamics in a Mundell-Fleming-Tobin Framework Twin Deficits and Inflation Dynamics in a Mundell-Fleming-Tobin Framework Peter Flaschel, Bielefeld University, Bielefeld, Germany Gang Gong, Tsinghua University, Beijing, China Christian R. Proaño, IMK

More information

CONSUMER GUIDE TO ARMA-Q. Big changes are coming to the way your managing agent is regulated

CONSUMER GUIDE TO ARMA-Q. Big changes are coming to the way your managing agent is regulated CONSUMER GUIDE TO ARMA-Q Big changes are coming to the way your managing agent is regulated 2 3 ARMA-Q: QUALITY STANDARDS FOR LEASEHOLD PROPERTY MANAGEMENT Who are we? ARMA is the leading trade association

More information

The Inter-Firm Value Effect in the Qatar Stock Market:

The Inter-Firm Value Effect in the Qatar Stock Market: International Journal of Business and Management; Vol. 11, No. 1; 2016 ISSN 1833-3850 E-ISSN 1833-8119 Published by Canadian Center of Science and Education The Inter-Firm Value Effect in the Qatar Stock

More information

External Debt and External Rate of Interest: An Empirical Analysis of Pakistan

External Debt and External Rate of Interest: An Empirical Analysis of Pakistan External Debt and External Rate of Interest: An Emirical Analysis of Pakistan Muhammad Zahid Naeem Deartment of Economics, University of the Punjab, Lahore, Pakistan. Shaista Akhlaque Deartment of Economics,

More information

Analytical support in the setting of EU employment rate targets for Working Paper 1/2012 João Medeiros & Paul Minty

Analytical support in the setting of EU employment rate targets for Working Paper 1/2012 João Medeiros & Paul Minty Analytical suort in the setting of EU emloyment rate targets for 2020 Working Paer 1/2012 João Medeiros & Paul Minty DISCLAIMER Working Paers are written by the Staff of the Directorate-General for Emloyment,

More information

Limitations of Value-at-Risk (VaR) for Budget Analysis

Limitations of Value-at-Risk (VaR) for Budget Analysis Agribusiness & Alied Economics March 2004 Miscellaneous Reort No. 194 Limitations of Value-at-Risk (VaR) for Budget Analysis Cole R. Gustafson Deartment of Agribusiness and Alied Economics Agricultural

More information

Games with more than 1 round

Games with more than 1 round Games with more than round Reeated risoner s dilemma Suose this game is to be layed 0 times. What should you do? Player High Price Low Price Player High Price 00, 00-0, 00 Low Price 00, -0 0,0 What if

More information

Growth, Distribution, and Poverty in Cameroon: A Poverty Analysis Macroeconomic Simulator s Approach

Growth, Distribution, and Poverty in Cameroon: A Poverty Analysis Macroeconomic Simulator s Approach Poverty and Economic Policy Research Network Research Proosal Growth, istribution, and Poverty in Cameroon: A Poverty Analysis Macroeconomic Simulator s Aroach By Arsene Honore Gideon NKAMA University

More information

How Large Are the Welfare Costs of Tax Competition?

How Large Are the Welfare Costs of Tax Competition? How Large Are the Welfare Costs of Tax Cometition? June 2001 Discussion Paer 01 28 Resources for the Future 1616 P Street, NW Washington, D.C. 20036 Telehone: 202 328 5000 Fax: 202 939 3460 Internet: htt://www.rff.org

More information

Quality Regulation without Regulating Quality

Quality Regulation without Regulating Quality 1 Quality Regulation without Regulating Quality Claudia Kriehn, ifo Institute for Economic Research, Germany March 2004 Abstract Against the background that a combination of rice-ca and minimum uality

More information

Modeling and Estimating a Higher Systematic Co-Moment Asset Pricing Model in the Brazilian Stock Market. Autoria: Andre Luiz Carvalhal da Silva

Modeling and Estimating a Higher Systematic Co-Moment Asset Pricing Model in the Brazilian Stock Market. Autoria: Andre Luiz Carvalhal da Silva Modeling and Estimating a Higher Systematic Co-Moment Asset Pricing Model in the Brazilian Stock Market Autoria: Andre Luiz Carvalhal da Silva Abstract Many asset ricing models assume that only the second-order

More information

On the Power of Structural Violations in Priority Queues

On the Power of Structural Violations in Priority Queues On the Power of Structural Violations in Priority Queues Amr Elmasry 1 Claus Jensen 2 Jyrki Katajainen 2 1 Deartment of Comuter Engineering and Systems, Alexandria University Alexandria, Egyt 2 Deartment

More information

We connect the mix-flexibility and dual-sourcing literatures by studying unreliable supply chains that produce

We connect the mix-flexibility and dual-sourcing literatures by studying unreliable supply chains that produce MANUFACTURING & SERVICE OPERATIONS MANAGEMENT Vol. 7, No. 1, Winter 25,. 37 57 issn 1523-4614 eissn 1526-5498 5 71 37 informs doi 1.1287/msom.14.63 25 INFORMS On the Value of Mix Flexibility and Dual Sourcing

More information

No. 81 PETER TUCHYŇA AND MARTIN GREGOR. Centralization Trade-off with Non-Uniform Taxes

No. 81 PETER TUCHYŇA AND MARTIN GREGOR. Centralization Trade-off with Non-Uniform Taxes No. 81 PETER TUCHYŇA AND MARTIN GREGOR Centralization Trade-off with Non-Uniform Taxes 005 Disclaimer: The IES Working Paers is an online, eer-reviewed journal for work by the faculty and students of the

More information

Does Anti-dumping Enforcement Generate Threat?

Does Anti-dumping Enforcement Generate Threat? MPRA Munich Personal RePEc Archive Does Anti-duming Enforcement Generate Threat? Sagnik Bagchi and Surajit Bhattacharyya and Krishnan Narayanan Indian Institute of Technology Bombay. February 04 Online

More information

Gottfried Haberler s Principle of Comparative Advantage

Gottfried Haberler s Principle of Comparative Advantage Gottfried Haberler s rincile of Comarative dvantage Murray C. Kem a* and Masayuki Okawa b a Macquarie University b Ritsumeiken University bstract Like the Torrens-Ricardo rincile of Comarative dvantage,

More information

A random variable X is a function that assigns (real) numbers to the elements of the sample space S of a random experiment.

A random variable X is a function that assigns (real) numbers to the elements of the sample space S of a random experiment. RANDOM VARIABLES and PROBABILITY DISTRIBUTIONS A random variable X is a function that assigns (real) numbers to the elements of the samle sace S of a random exeriment. The value sace V of a random variable

More information

Informed Principals in the Credit Market when Borrowers and Lenders Are Heterogeneous

Informed Principals in the Credit Market when Borrowers and Lenders Are Heterogeneous ISSN 2282-6483 Informed rincials in the Credit Market when Borrowers and Lenders re Heterogeneous Francesca Barigozzi iero Tedeschi Quaderni - Working aer DSE N 1051 Informed rincials in the Credit Market

More information

A Graphical Depiction of Hicksian Partial-Equilibrium Welfare Analysis

A Graphical Depiction of Hicksian Partial-Equilibrium Welfare Analysis A rahical eiction of Hicksian Partial-quilibrium Welfare Analysis Keir. Armstrong eartment of conomics Carleton University Ottawa, ON KS 5B6 karmstro@ccs.carleton.ca May 22, 23 Abstract An inescaable conclusion

More information

ADB Working Paper Series on Regional Economic Integration. Methods for Ex Post Economic Evaluation of Free Trade Agreements

ADB Working Paper Series on Regional Economic Integration. Methods for Ex Post Economic Evaluation of Free Trade Agreements ADB Working Paer Series on Regional Economic Integration Methods for Ex Post Economic Evaluation of Free Trade Agreements David Cheong No. 59 October 2010 ADB Working Paer Series on Regional Economic

More information

Monetary policy is a controversial

Monetary policy is a controversial Inflation Persistence: How Much Can We Exlain? PAU RABANAL AND JUAN F. RUBIO-RAMÍREZ Rabanal is an economist in the monetary and financial systems deartment at the International Monetary Fund in Washington,

More information

Worst-case evaluation complexity for unconstrained nonlinear optimization using high-order regularized models

Worst-case evaluation complexity for unconstrained nonlinear optimization using high-order regularized models Worst-case evaluation comlexity for unconstrained nonlinear otimization using high-order regularized models E. G. Birgin, J. L. Gardenghi, J. M. Martínez, S. A. Santos and Ph. L. Toint 2 Aril 26 Abstract

More information

EMPIRICAL TAX POLICY ANALYSIS AND EVALUATION. Katinka Hort * and Henry Ohlsson **

EMPIRICAL TAX POLICY ANALYSIS AND EVALUATION. Katinka Hort * and Henry Ohlsson ** EMPIRICAL TAX POLICY ANALYSIS AND EVALUATION Katinka Hort * and Henry Ohlsson ** Introduction The main objective of our aer is to formulate an agenda for emirical tax olicy analysis and evaluation. We

More information