1 BANTAY LANSANGAN: ROAD SECTOR REPORT CARD (09 Nov 06) CLUSTER / INDICATOR A. SYSTEM/NETWORK DESCRIPTION 1. Overall Philippine Road Network (For information): National Roads 28,805 km Provincial Roads 27,076 km City Roads 7,052 km Municipal Roads 15,804 km Barangay Roads 121,989 km Total 200,726 km DATA SOURCE 1. DPWH (Planning Service or PS) and LGUs Toll Expressways 165 km 2. Existing National Roads (a) Roads by Surface Type: Paved Roads 70.1%: 20,179 km Concrete 44.5%: 12,795 km Asphalt 25.6%: 7,384 km Unpaved Roads 29.9%: 8,626 km Gravel 29.5%: 8,516 km Earth 0.4%: 110 km Total 100.0%: 28,805 km (b) Roads by Condition (using Visual Road Condition or or ROCOND Rating): Paved Roads 100.0%: 20,179 km Good 27.4% Fair 25.0% Poor 25.7% Bad 21.9% Unpaved Roads 100.0%: 8,626 km Good 32.8% Fair 50.6% Poor 14.4% Bad 2.2% Total 100.0%: 28,805 km Good 29.1% Fair 32.9% Poor 22.2% Bad 15.8% (c) Bridges by Structure Type: Permanent 93%: 246,160 lm Temporary 7%: 17,280 lm 2 (a). DPWH (PS using Road and Bridge Application or RBIA database) 2 (b). DPWH (PS w/ RBIA and ROCOND), with BL validation of sample. 2 (c). DPWH (PS w/ RBIA). 1
2 Total 100%: 263,440 lm 3. (a) Increase in length, in km and percentage, of paved National Roads (this report vs. last report) (b) Reduction in road user costs: vehicle (fixed and running) operating costs, and time costs due to 3 (a). 4. (a) Increase in length (km) and percent of paved national roads which achieve a ROCOND Rating of Good. OR with an International Roughness Index (IRI) of at least 3 for asphalt roads and 4 for concrete roads. (b) Reduction in road user costs: vehicle (fixed and running) operating costs and time costs due to 4 (a). 5. Increase in length (lm) and percent of national bridges built of permanent (concrete/steel) and strong structures (per American Association of State and Highway Officials or AASHTO standards). 6. Reduction in incidence of vehicle overloading on national roads. 3 (a). DPWH (PS w/ RBIA). 3 (b). DPWH (PS w/ PMS/ HDM 4), independently validated by BL with road users. 4 (a). DPWH (PS w/ RBIA, ROCOND, IRI), verified by BL on sample roads. 4 (b). DPWH (PS w/ PMS/ HDM 4), validated by BL with road users. 5. DPWH (PS w/ RBIA) 6. BL, with info from DPWH (PS with data from 22 weighbridge stations & 84 axle load survey stns). B. GOVERNANCE 1. Jurisdiction / responsibility for the planning, design, construction, maintenance, funding of roads, by road classification (For information): 1. DPWH (PS), Road Board, LGUs, TRB National Roads DPWH, except for the following: Road Board for management of MVUC maintenance fund LGUs for operation and maintenance of lights. Provincial Roads Provincial Governments City Roads City Governments Municipal Roads Municipal Governments Barangay Roads Barangay Governments Toll Expressways DPWH for planning, procurement, design & construction supervision 2
3 Toll Regulatory Board (TRB) for toll rate approval, supv n of operation Concessionaire for funding, construction, operation, maintenance 2. Number and length of Local (Provincial/City/Municipal) Roads converted to National Roads but not complying with DPWH criteria. 3. Cost and percent (in terms of value) of Local Road construction projects funded in DPWH budget 4. National road sections with gaps or overlaps in jurisdiction (e.g., non operation by LGUs of lights) 2. BL consultant with DPWH (PS). 3. BL consultant with DPWH (PS, Comptrollership & Financial Mgt. Service or CFMS). 4. BL consultant with DPWH (PS). C. RESOURCE ALLOCATION 1. Projection of needs and sector trends for national roads 2. Current investment needs vs. allocations for national roads: construction and maintenance 3. National budget norms 4. Private sector participation in roads (tollway concessions) 1. BL consultant with info from DPWH (PS), NEDA 2. DPWH (PS & Bureau of Maintenance or BOM, w/ MYPS, PMS/HDM 4) 3. BL consultant with info from DPWH (PS, CFMS) and DBM 4. BL consultant with info from DPWH (PS), TRB, NEDA D. ASSET MANAGEMENT 1. Planning and Budgeting (a) Planning of Construction Projects: (1) Compliance with Prerequisites: Number, value and percent of national road construction projects funded by DPWH which meet the following prerequisites: 1 (a). DPWH (PS & Bureau of Design or BOD w/ MYPS), with BL (i) Included in the approved DPWH medium term infrastructure program based on the priorities 3
4 generated by the Multi Year Planning and Scheduling (MYPS) system using objective criteria within the budget ceiling. (ii) Undergone (i) detailed engineering with an accuracy of +/ 10%, (ii) quality assurance check for design and estimates, and (iii) value engineering if project cost is Php100 M or more, all according to DPWH standards. (iii) Approved by the NEDA Investment Coordination Committee, if the cost exceeds Php 500M. (iv) Endorsed by the Regional Development Council. (2) Efficiency in Construction Fund Allocation: Amount and percentage of variance between (i) actual allocation of construction funds under the General Appropriations Act (GAA) (by district and project), and (ii) planned allocation and priorities generated by MYPS within the budget ceiling. (b) Planning of Maintenance Projects (1) Compliance with Prerequisites: Number and percent of funded national road maintenance projects which meet the following: 1 (b). DPWH (PS & BOM w/ PMS/HDM 4 and RMMS) and Road Board, with BL (i) (ii) Included in the DPWH annual work program approved by the Road Board, program based on the priorities generated by the Pavement Management System / Highway Development and Management Version 4 (PMS/HDM 4) and Routine Maintenance Management System (RMMS) using objective planning criteria within the budget ceiling. Exclude works or activities not related to road maintenance (2) Efficiency in Maintenance Fund Allocation: Amount and percent of variance between (i) actual allocation of maintenance funds under MVUC and GAA (by district and project), and (ii) needs and planned allocation and priorities based on the program generated by the PMS/HDM 4 and 4
5 RMMS using objective planning criteria within the budget ceiling. (c) Transparency in Funding: Extent (in number, value and percentage) of posting in the websites of DPWH and the Philippine Government Electronic Procurement System (Philgeps) of the actual vs. planned allocations under 1 (a)(2) and 1 (b)(2) above, plus actual releases, disbursements, and physical accomplishments. 2. Procurement (a) Compliance with Procurement Plan: Number, value and percent of construction/maintenance contracts procured which are included in the approved DPWH Annual Procurement Plan (Satisfactory threshold 100% of the total no. of contracts). (b) Complete Bidding Documents: Number, value and percent of procured contracts supported by complete Bidding Documents in accordance with the approved DPWH Procurement Manual (Satisfactory threshold 100% of the total no. of contracts). (c) Public Bidding as General Mode: Number, value and percent of contracts procured through modes other than public bidding, e.g., negotiated contract (Satisfactory threshold not more than 10% of the total no. of contracts procured through all modes). (d) Advertisement and Posting for Transparency : Number, value and percent of contracts bid out which were advertised in the newspapers and posted in the websites of Philgeps and DPWH, per R.A and its Implementing Rules and Regulations Part A (IRR A) (Satisfactory threshold 100% of the total no. of contracts procured). (e) Eligibility/Prequalification: Average number of contractors declared eligible/ prequalified vs. applicants for eligibility/prequalification for the contract. (f) Participation of Bidders: Average number of submitted bids per contract vs. (i) average number declared eligible/prequalified and (ii) benchmark of at least 5 bids. (g) Level of Competition: Number, value and percent of 1 (c). DPWH (Mgt Info System or MIS, w/ PS and CFMS), DBM (Philgeps), with BL 2 (a). DPWH (Bids and Awards Committee or BAC Secretariat, 2 (b). DPWH (BAC Sec), 2 (c). DPWH (BAC Sec), 2 (d). DPWH (MIS w/ BAC Sec) and DBM (Philgeps), with BL 2 (e). DPWH (BAC Sec), 2 (f). DPWH (BAC Sec), 2 (g). DPWH (BAC Sec), 5
6 publicly bid contracts with at least five submitted bids (Satisfactory threshold at least 75% of the total no. of such contracts). (h) Reasonableness of ABC: Number, value and percent of contracts where the Approved Budget for the Contract (ABC) or components thereof do not exceed the accepted benchmark range of costs (e.g., cost per km of road, cubic meter of earthwork, square meter of rightof way, etc.). (Satisfactory threshold 100%). (i) Effectiveness of CES: Number, value and percent of foreign assisted contracts where the winning bid does not exceed the Approved Budget for the Contract (ABC) prepared using the DPWH Cost Estimation System (CES) (Satisfactory threshold at least 90% of the total no. of such contracts). (j) Posting of Contract Awards for Transparency: Number and percent of contract awards posted in Philgeps and DPWH websites (Satisfactory threshold 100% of all awards made). (k) Time for Bidding (Efficiency): Number and percent of publicly bid contracts where the period between bid invitation and bid opening is not more than 3 months (Satisfactory threshold at least 75% of the total no. of such contracts). (l) Time for Bid Evaluation (Efficiency): Number and percent of publicly bid contracts where the period between bid opening and contract award is not more than 15 days (Satisfactory threshold at least 75% of the total no. of such contracts). (m) Protests and Adverse Reports on Procurement: Number and percent of biddings where (i) protests were filed and/or (ii) NGO Observers in the BACs submitted Observation Reports on irregularities noted in the procurement (Satisfactory threshold not more than 10% of the total no. of biddings weighted by value). 3. Construction (a) Quality: Number, value and percent of construction projects with major defects costing more than 10% of the contract cost vs. approved plans and specifications (Satisfactory threshold 0). 2 (h). DPWH (BAC Sec, BOD, Bureau of Construction or BOC), 2 (i). DPWH (BAC Sec, BOD, BOC, w/ CES), 2 (j). DPWH (MIS w/ BAC Sec), DBM (Philgeps), 2 (k). DPWH (BAC Sec), 2 (l). DPWH (BAC Sec), 2 (m)(i). DPWH (BAC Sec), 2 (m)(ii). BL thru NGO Observers in BACs. 3 (a). DPWH (MIS) w/ Bureau of Research & Standards Quality Assurance Units (BRS QAU) & BOC), 6
7 with BL verification (b) Quantity/Scope: Number, value and percent of construction projects with variation orders whose cumulative value exceeds 10% of the original contract cost vs. approved plans, specifications, and bill of quantities (Satisfactory threshold not more than 10% of the total no. of projects). (c) Cost: Number, value and percent of construction projects with cost overruns exceeding the ABC and benchmark unit costs (Satisfactory threshold 0). (d) Timeliness: Number, value and percent of construction projects with slippage or delay exceeding 15% of the approved construction schedule for the project/contract (Satisfactory threshold not more than 10% of the total no. of contracts). (e) Disbursements: Number, value and percent of construction projects where actual disbursements disproportionately exceed, by more than 20%, the value of the physical works done, based on verified Statements of Works Accomplished (SWA) (Satisfactory threshold 0). (f) Payments: Number, value and percent of construction contracts with payments to contractors made more than 45 days from date of billing (Satisfactory threshold not more than 10% of the total no. of projects). (g) Completion: Number, value and percent of construction projects reported to be completed and accepted by DPWH but found to be incomplete or with uncorrected defects per BL checklist (Satisfactory threshold 100% of the total no. of projects). 3 (b). DPWH (MIS w/ BOC), with BL verification 3 (c). DPWH (MIS w/ BOC and CES), with BL verification 3 (d). DPWH (MIS w/ BOC), with BL verification 3 (e). DPWH (MIS w/ CFMS, BOC), with BL 3 (b). DPWH (MIS w/ CFMS, BOC), with BL verification 3 (g). BL shall determine this, with info from DPWH. 4. Maintenance (a) Quality: (1) Number, value and percent of maintenance projects with major defects costing more than 10% of the project/contract cost vs. approved plans and specifications (Satisfactory threshold 0). (2) Length (km) and percentage of national roads 4 (a)(1). DPWH (MIS w/ BOM, BRS QAU), 4 (a)(2). DPWH (PS w/ RBIA, ROCOND), 7
8 maintained to Visual Road Condition (ROCOND) Rating of Good. (b) Quantity/Scope: Number, value and percent of maintenance projects with variation orders whose cumulative value exceeds 10% of the original contract cost vs. approved plans, specifications, and bill of quantities (Satisfactory threshold not more than 10% of the total no. of projects). (c) Cost: Number, value and percent of maintenance projects with cost overruns exceeding the ABC and benchmark unit costs (Satisfactory threshold 0). (d) Timeliness: (1) Number, value and percent of maintenance projects with slippage or delay exceeding 15% of the approved construction schedule for the project/contract (Satisfactory threshold not more than 10% of the total no. of contracts). (2) Number and percentage of cases where the actual DPWH response time to repair/correct reported defects exceeds the allowable time per prescribed standards, e.g., 24 hours for potholes, 3 days for pavement damage, etc. (Satisfactory threshold not more than 10% of the total no. of cases). (e) Disbursements: Number, value and percent of maintenance projects where actual disbursements disproportionately exceed, by more than 20%, the value of the performed work, net of contract penalties (e.g., for failure to repair defects within the prescribed time) based on verified Statements of Works Accomplished (SWA) (Satisfactory threshold 0). (f) Payments: Number, value and percent of maintenance contracts with payments to contractors made more than 45 days from date of billing (Satisfactory threshold not more than 10% of the total no. of projects). (g) Completion: Number, value and percent of maintenance projects reported to be completed and accepted by DPWH but found to be incomplete or with uncorrected with BL sample 4 (b). DPWH (MIS w/ BOM), with BL 4 (c). DPWH (MIS w/ BOM), with BL 4 (d)(1). DPWH (MIS w/ BOM), with BL 4 (d)(2). BL, with road users assessing compliance by making own reports & monitoring response times. DPWH (MIS w/ BOM) reports are for reference. 4 (e). DPWH (MIS w/ CFMS & BOM), with BL verification 4 (f). DPWH (MIS w/ BOM), with BL verification 4 (g). BL shall determine this, with info from DPWH. 8
9 defects per checklist (Satisfactory threshold 100% of the total no. of projects). E. AGENCY PERFORMANCE 1. DPWH Staff Efficiency: Reduction in number of staff per km of national roads. 2. Complaints: Number of complaints acted upon vs. number of complaints received on national road services and transactions. 3. Investigations and Sanctions: Number of prosecutions/ sanctions vs. number of investigations made on national road services and transactions. 4. Blacklisted Contractors : Number of contractors suspended/blacklisted vs. number of irregularities reported. 5. DPWH Personnel Sanctioned/Recognized : Number of DPWH Project Managers/Engineers/personnel given (a) sanctions/penalties for poor performance or irregularities and (b) incentives for outstanding/good performance. 1. DPWH (Admn & Manpo Mgt Service or AMMS) 2. DPWH (Internal Affairs Office or IAO), with BL 3. DPWH (IAO and Legal Service or LS), with BL 4. DPWH (BAC Sec), with BL 5. DPWH (AMMS and LS,) 6. Internal Audit Findings : Reduction (or increase) in the number, percentage and value of non compliance with internal controls and systems found by the DPWH Internal Audit Service. 7. COA Findings: Reduction (or increase) in the number, percentage and value of disallowances and irregularities shown in Commission on Audit (COA) reports. 8. Perception Surveys on Corruption: Improved (or worse) perception of corruption in the DPWH: 6. DPWH (Internal Audit Service or IAS), with BL 7. COA and DPWH (CFMS, IAS), 8. BL (a) Social Weather Stations (SWS) annual survey. (b) Separate TAN/BL survey 9. Road Users /Community Satisfaction Feedback Surveys: (a) Quality and effectiveness of national road services. 9. BL thru survey of sample of road users/communities (b) Extent and effectiveness of DPWH communications 9
10 with the public, including website, annual reports, billboards, advisories, etc. 10. Transparency (a) Number and percent of requests for information on national road services and transactions granted/ denied by DPWH/ Road Board. 10. BL, with info from DPWH. (b) Existence of DPWH public disclosure policy and its implementation F. ENVIRONMENT AND SOCIAL ASPECTS 1. Air Quality and Noise (a) Extent of vehicle emissions and noise arising from road congestion and other road defects. (b) Reduction in length and percentage of congested national road sections with traffic volume to capacity (V/C) ratio of more than 1. (c) Increase in vehicle speeds (kph) due to 1 (b). 1 (a). BL, with info from DPWH (Environmental and Social Services Office or ESSO), MMDA, DENR 1 (b). DPWH (PS w/ RBIA), 1 (c). DPWH (PS), with BL 2. Road Safety (a) Number, location, and priority of accident black spots. (b) Reduction in number of accident black spots due to DPWH road safety measures. 2 (a). DPWH (PS using Traffic Accident Recording and Analysis System or TARAS, with accident data from PNP). 2 (b). DPWH (PS TARAS), (c) Decrease in number and severity of accidents related to road defects due to DPWH road safety measures. 2 (c). DPWH (PS TARAS), 3. Encroachment 10
11 (a) Location and length/area of encroachment/occupancy of road right of way by informal settlers, billboards, structures, debris, etc. (b) Reduction in the length/area of national road sections with encroachments (squatters, billboards, structures, etc.) on the right of way. 3 (a). DPWH (PS w/ RBIA), with LGUs, verified by BL. 3 (b). DPWH (PS w/ RBIA), 11
SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT
A. Sector Road Map Road Improvement and Institutional Development Project (RRP PHI 41076) SECTOR ASSESSMENT (SUMMARY): ROAD TRANSPORT 1. Sector Performance, Problems and Opportunities 1. Roads provide
More information'!'? /~tji'wi; O}. /Y- ~I/
Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OFFICE OF THE SECRETARY Manila MAR 1lt 2011 '!'? /~tji'wi; O}. /Y- ~I/ DEPARTMENT 12 ORDER NO. Series of 201 (D~.If/'11 SUBJECT: PREPARATION
More informationDennis S. Santiago Executive Director Department of Budget
Dennis S. Santiago Executive Director Department of Budget 2015 PASIAWorld Annual Conference 2020 Vision: Competitive Procurement, Logistics and Supply Chain Understanding Government Contracting: The Philippine
More informationLack of implementing rules and regulations governing procurement of foreignfunded
ANNEX B PROPOSED ACTION PLAN FOR THE IMPROVEMENT OF THE PHILIPPINE PUBLIC PROCUREMENT SYSTEM Key Result Area Recommended Action/Measure BLI Improvements in 1(b) (c) Processes and Procedures v Review and
More informationPresentation at Asian Highways Investment Forum. Performance based Maintenance Contracts for Highways
Presentation at Asian Highways Investment Forum Bangkok, 8-9, October 2013 United Nations Economic & Social Commission For Asia & The Pacific Performance based Maintenance Contracts for Highways By Atul
More informationMAINTENANCE CONTRACT ADMINISTRATION, INSPECTION, AND REPORTING
Approved: Effective: December 22, 2017 Review: October 10, 2017 Office: Maintenance Topic No.: 375-020-002-l Department of Transportation PURPOSE: MAINTENANCE CONTRACT ADMINISTRATION, INSPECTION, AND REPORTING
More informationChapter 8: Lifecycle Planning
Chapter 8: Lifecycle Planning Objectives of lifecycle planning Identify long-term investment for highway infrastructure assets and develop an appropriate maintenance strategy Predict future performance
More informationMind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States
Mind the Maintenance Gap: Framework, Global Trends, and Maintenance in OIC Member States Dr Adnan Rahman Director General, IRF www.irfnet.ch THE INTERNATIONAL ROAD FEDERATION Promoting the development
More informationDesigning an Assurance Process
Construction Sector Transparency Initiative October 2013 / V1 Guidance Note: 7 Designing an Assurance Process Introduction The aim of CoST is to increase the transparency and accountability of publicly
More informationWelcome PBB Focal Persons!
Orientation on the Guidelines for the Grant of FY 2018 Performance-Based Bonus for National Government Agencies and State Universities and Colleges 14 June 2018 01:00 PM to 05:00 PM AFPCOC Tejeros Hall
More informationLocal Road Management Performance Assessment Manual
Local Road Management Performance Assessment Manual Revised Manual March 2015 Department of the Interior and Local Government Office of Project Development Services March 2015 Page1 Contents 1. Background...
More informationPublic Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND. Public Disclosure Authorized LOAN AGREEMENT. (Fourth Highway Project)
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 1236 IND Public Disclosure Authorized Public Disclosure Authorized LOAN AGREEMENT (Fourth Highway Project) between REPUBLIC OF INDONESIA and INTERNATIONAL
More informationBudget Reform Bill (BRB)
The proposed Budget Reform Bill (BRB) The People s Agenda for Budget Reform 4 May 2018 Status of the BRB The BRB is expected to be enacted into law in time for the SONA House Bill No. 7302 - The House
More informationLIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements)
14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE LIFE CYCLE MANAGEMENT OF ROAD ASSETS (Emphasis on Long Life Pavements) Prepared for Master Class / Workshops In Sydney, Melbourne and Brisbane September
More informationChapter 12: Programming/Resource Allocation
Chapter 12: Programming/Resource Allocation What is works programming? Works programming refers to the preparation of annual and multi-annual works programs in which road assets requiring treatment are
More informationHDM-4 Applications. Project Appraisal. Project Formulation. Maintenance Policy Optimization. Road Works Programming. Network Strategic Analysis
HDM-4 Applications HDM-4 Applications Project Appraisal Project Formulation Maintenance Policy Optimization Road Works Programming Network Strategic Analysis Standards & Policies 2 Project Appraisal Concerned
More informationARTICLE 8: BASIC SERVICES
THE SCOPE OF SERVICES ADDED BY THIS AMENDMENT IS FOR A CM AT RISK PROJECT ONLY. THE SCOPE OF SERVICES SPECIFIED BELOW INCLUDES ARTICLES 8.1, 8.3, 8.4, 8.5, 8.6, 8.7 AND 8.8. THE SERVICES SPECIFIED IN ARTICLE
More informationPCI Definition. Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) PCI Scale. Excellent Very Good Good.
Module 1 Part 4: Methodology for Determining Pavement Condition Index (PCI) Basic Components PMS Evaluation of Flexible Pavements Fundamental Theory of Typical Pavement Defects and Failures Physical Description
More informationDr. Pramod Kumar Anand JS (RC) & DG, NRRDA : : : D.O. # P-10021/1/2010/P-III August 4, 2010
Dr. Pramod Kumar Anand JS (RC) & DG, NRRDA : 23383553 : 23388207 : anandpk@nic.in D.O. # P-10021/1/2010/P-III August 4, 2010 Dear Shri As you are aware, Government of India launched the Pradhan Mantri
More informationOverview of the framework
Overview of the framework Need for a framework The highways sector in India is witnessing a significant interest from both domestic as well as foreign investors following the policy initiatives taken by
More informationModel Concession Agreement for Highways: An Overview
Model Concession Agreement for Highways: An Overview - Gajendra Haldea The highways sector in India is witnessing significant interest from both domestic as well as foreign investors following the policy
More informationTransfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities. Municipal Funding Agreement Guide.
Transfer of Federal Gas Tax Revenues Under the New Deal for Cities and Communities Municipal Funding Agreement Guide January 2010 Administered by: Association of Municipalities of Ontario 200 University
More informationTown of South Bruce Peninsula. Tender PW Asphalt Paving
Town of South Bruce Peninsula Tender PW 18-09 Asphalt Paving Town of South Bruce Peninsula Tender PW 18-09 Asphalt Paving The Town of South Bruce Peninsula is requesting tenders for the supply and placement
More informationMaintaining roads Experience with output-based contracts in Argentina
Maintaining roads Experience with output-based contracts in Argentina Gerard Liautaud Gerard Liautaud (gliautaud@ worldbank.org) works in the Latin America and the Caribbean Region of the World Bank. He
More informationOPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS
Paper Nº ICMP123 8th International Conference on Managing Pavement Assets OPTIMIZATION OF ROAD MAINTENANCE AND REHABILITATION ON SERBIAN TOLL ROADS Goran Mladenovic 1*, Jelena Cirilovic 2 and Cesar Queiroz
More information2017 TRAIL PAVING TENDER DOCUMENT FOR. THE MUNICIPALITY DISTRICT OF BONNYVILLE No. 87
2017 TRAIL PAVING TENDER DOCUMENT FOR THE MUNICIPALITY DISTRICT OF BONNYVILLE No. 87-1 - Municipal District of Bonnyville No. 87 2017 Trail Paving INVITATION TO TENDER The Municipal District of Bonnyville
More informationPublic Sector Reform Initiatives in the Philippines IMELDA C. CALUEN Development Academy of the Philippines
Public Sector Reform Initiatives in the Philippines IMELDA C. CALUEN Development Academy of the Philippines The New Era for the Public Sector Reform in ASEAN Community 17 18 January 2013 Bangkok, Thailand
More informationUpdates on the Assessment and Validation Process for the Grant of 2014 BBB
Updates on the Assessment and Validation Process for the Grant of 2014 BBB Objectives Discuss the eligibility requirements for the grant of Performance-Based Bonus for FY 2014 Share other concerns and
More informationBid Data Sheet. Southern Leyte State University Sogod Campus. The identification number of the Contract is: PB-2017-IP-01
ITB Clause 1.1 The Procuring Entity is: Bid Data Sheet Southern Leyte State University Sogod Campus. The name of the Contract is: Construction of Graduate School Building Roof Deck Shed The identification
More informationNew Development Bank Procurement Policy
New Development Bank Procurement Policy Owner: Operations Division Version: 2015 V4 Revision Date: [10] March 2016 Procurement Policy All rights reserved. Any unauthorized use, duplication or disclosure
More informationPublic Private Partnership in Highway Sector in Punjab, India
Public Private Partnership in Highway Sector in Punjab, India Infrastructure Governance Roundtable March 24 th, 2006 Kulwinder Singh Rao Deputy Project Director Punjab Roads & Bridges Development Board
More informationTHE ROAD TO ECONOMIC GROWTH
THE ROAD TO ECONOMIC GROWTH Introduction 1. As in many countries, the road sector accounts for the major share of domestic freight and inter-urban passenger land travel in Indonesia, playing a crucial
More informationEconomic Analysis Concepts
Economic Analysis Concepts Questions & Decisions (1) Is the project justified?- Are benefits greater than costs? Which is the best investment if we have a set of mutually exclusive alternatives? If funds
More informationSession 4 Status of Climate Finance in the Philippines
Session 4 Status of Climate Finance in the Philippines Workshop on Corruption Risks and Anti- Corruption Strategies in Climate Finance Manila, Philippines 25 to 27 May 2015 Summary of Day 1 2 Session objective
More informationDocument of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-70060) ON A LOAN IN THE AMOUNT OF US$150.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank Report No.: ICR0000445 IMPLEMENTATION COMPLETION AND RESULTS
More informationThe City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
More informationLoan Agreement. (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA. and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
CONFORMED COPY LOAN NUMBER 4643 IND Loan Agreement (Eastern Indonesia Region Transport Project) between REPUBLIC OF INDONESIA and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Dated January 22,
More informationANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY
ANNUAL PERFORMANCE AGREEMENTS BETWEEN THE ROAD AGENCY AND ROAD FUND OR PARENT MINISTRY Source: General suggestions by Ian G. Heggie, UK Highways Agency example from Mel Quinn and Tanzania example from
More informationREQUEST FOR QUOTATION
Standard Form Number: SF GOOD 60 RFQ No. RFQ 2018 117 Revised on: May 24, 2004 Date: August 31, 2018 Standard Form Title: Request for Quotation Quotation No. REQUEST FOR QUOTATION Sir/Madam: The National
More informationALL DSWD FIELD OFFICE DIRECTORS DSWD FO 1-CARAGA STANDARDS UNIT HEADS SOCIAL MARKETING UNIT HEADS
a Republic of the Philippines Department of Social Welfare and Development IBP Road, Batasan Pambansa Complex, Constitution Hills, Quezon City 1126 Telephone Nos. (632) 931-8101 to 07; Telefax (632) 931-8191
More informationASIAN DEVELOPMENT BANK PPA: INO PPA: INO 22265
ASIAN DEVELOPMENT BANK PPA: INO 21169 PPA: INO 22265 PROJECT PERFORMANCE AUDIT REPORT ON THE TENTH AND ELEVENTH ROAD (SECTOR) PROJECTS (Loans 966/1115-INO) IN INDONESIA April 2002 CURRENCY EQUIVALENTS
More informationPROCUREMENT POLICIES AND PROCEDURES
PROCUREMENT POLICIES AND PROCEDURES Table of Contents INTRODUCTION... 2 I. GENERAL CONSIDERATIONS... 2 Borrower/Grantee Responsibility... 2 Planning... 2 Applicability... 3 Eligibility... 3 Advance Contracting
More informationImplementing the MTO s Priority Economic Analysis Tool
Implementing the MTO s Priority Economic Analysis Tool presented at 6th National Conference on Transportation Asset Management presented by Alison Bradbury Ontario Ministry of Transportation November 2,
More informationCorporate and Financial restructuring of the road sector Context
Corporate and Financial restructuring of the road sector The Croatian Government (the Government) is committed to optimizing the debt held by public companies in the road sector, and wants to achieve a
More informationCOMMUNITY DEVELOPMENT PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SECTION OVERVIEW This Operational Manual (the Manual) provides operational guidelines
More informationPHILIPPINES New Commitments for Open Governance
PHILIPPINES New Commitments for Open Governance http://www.opengovpartnership.org/countries/philippines Every gain, including the gains mentioned above, paves the way for increasing transparency, accountability
More informationNOTICE TO BIDDERS H.M.A. PAVING
ROAD COMMISSION for MONTCALM COUNTY 619 W. MAIN STREET STANTON, MICHIGAN 48888 PHONE: 989-831-5285 NOTICE TO BIDDERS Sealed bids will be received by the Board of County Road Commissioners of Montcalm County
More informationMaster Development Plan for the TxDOT North Tarrant Express Project, Segments 2-4. Chapter 6: Preliminary Cost Estimates.
, Segments 2-4 Chapter 6: Preliminary Cost Estimates Table of Contents 6.1 Details of Facilities... 17 6.2 Pre-Development and Facility Feasibility... 1 6.2.1 Planning... 1 6.2.2 Environmental Mitigation...
More informationEx-Post Evaluation of Japanese ODA Loan Cordillera Road Improvement Project
The Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Cordillera Road Improvement Project External Evaluator: Ryujiro Sasao, IC Net Limited 0. Summary The objective of this project is
More informationTENDER FOR THE TOWNSHIP OF SEVERN
TENDER FOR THE TOWNSHIP OF SEVERN Contract No. PW2017-1O 1 Page S Contract No. PW2017-1O The Corporation of the Township of Severn Tender Closing Date is February 17, 2017 at 10:00 a.m. Local Time Lowest
More informationREQUEST FOR PROPOSAL (RFP 06-16) WATER SYSTEM ASSESSMENT CITY OF FOLLY BEACH
REQUEST FOR PROPOSAL (RFP 06-16) WATER SYSTEM ASSESSMENT CITY OF FOLLY BEACH 1. GENERAL The City of Folly Beach, South Carolina (City) requests proposals from qualified engineering firms for a Water System
More informationLife-Cycle Project Delivery
Life-Cycle Project Delivery A Note for Discussion IndII Round Table 11 th December 2012 Concerns with Conventional Project Delivery Government pays for inputs, not outputs Incentive for time/cost over-runs
More informationP R I M E. Platform of Rail Infrastructure Managers in Europe. General Presentation KPIs and benchmarking. 5 th of February 2015 Mr Jan Pettersson 1
P R I M E Platform of Rail Infrastructure Managers in Europe General Presentation KPIs and benchmarking 5 th of February 2015 Mr Jan Pettersson 1 Agenda Objective and recap from PRIME 4 Our chosen subjects
More informationOPTION A: 2 BITUMINOUS PAVING WITH SHOULDERS OPTION B: SCRATCH COURSE BITUMINOUS PAVING WITHOUT SHOULDERS
SHIAWASSEE COUNTY ROAD COMMISSION PROPOSAL FOR 2018 BITUMINOUS PAVING PROGRAM JUDDVILLE ROAD FROM CLINTON COUNTY LINE (MERIDIAN ROAD) TO GENESSEE COUNTY LINE (M-13) IN SHIAWASSEE COUNTY + / - 22.34 MILES
More informationHALIFAX REGIONAL WATER COMMISSION PROCUREMENT POLICY. Edited May 22, 2012
HALIFAX REGIONAL WATER COMMISSION PROCUREMENT POLICY Edited May 22, 2012 May 1, 1997 Table of Contents 1. POLICY STATEMENT... 3 2. GUIDING PRINCIPLES... 3 3. DEFINITIONS... 4 4. GENERAL... 4 5. AUTHORITY
More informationPREPARATORY SURVEY FOR EXPRESSWAY PROJECTS IN MEGA MANILA REGION. NAIA EXPRESSWAY PROJECT (Phase II) FINAL REPORT APPENDIX-I DRAFT BID DOCUMNTS
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS (DPWH) PREPARATORY SURVEY FOR EXPRESSWAY PROJECTS IN MEGA MANILA REGION NAIA EXPRESSWAY PROJECT (Phase II) FINAL REPORT APPENDIX-I DRAFT
More informationPUBLIC-PRIVATE PARTNERSHIPS. ACEC Risk Management Committee
PUBLIC-PRIVATE PARTNERSHIPS A LOOK FROM THE INSIDE AT THE RISK MANAGEMENT ISSUES ACEC Risk Management Committee The Risk Management Committee of the American Council of Engineering Companies (ACEC) believes
More informationIndia: Public Private Partnerships in Highways Sector
India: Public Private Partnerships in Highways Sector Prepared by World Bank as input for IDA paper, 2008 (provided by Tarun Sankar, PPIAF office, South Asia) India s transport program is one of the most
More informationTechnical Assistance Consultant s Report
Technical Assistance Consultant s Report Project Number: 46370-001 November 2015 Republic of the Union of Myanmar: Developing the Asset Management Program for Myanmar Roads (Financed by the Japan Fund
More informationREPORT ON THE TECHNICAL AND FINANCIAL REVIEW OF ROAD MAINTENANCE PROJECTS IN KABALE MUNICIPAL COUNCIL FOR THE FINANCIAL YEAR
REPORT ON THE TECHNICAL AND FINANCIAL REVIEW OF ROAD MAINTENANCE PROJECTS IN KABALE MUNICIPAL COUNCIL FOR THE FINANCIAL YEAR 2015-16 1 P a g e TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 3 1.1 Introduction...
More informationSHIAWASSEE COUNTY ROAD COMMISSION PROPOSAL FOR 2017 LIQUID DUST CONTROL PROGRAM
SHIAWASSEE COUNTY ROAD COMMISSION PROPOSAL FOR 2017 LIQUID DUST CONTROL PROGRAM Sealed bids will be received at the office of the Shiawassee County Road Commission at 701 W. Corunna Avenue, Corunna, Michigan
More informationCHECKLIST 3: EA INTERNATIONAL COMPETITIVE BIDDING PROCUREMENT CHECKLIST
ADB Loan/Grant & Project Name Contract & Description Supplier/Contractor Name Contract Amount Prepared By Date Reviewed/Noted By Date Guidance: The responsibility for the implementation of the project,
More informationLANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK. Michele Cyna
October I992 Transport No. RD-12 TRANSPORTATION, WATER AND URBAN DEVELOPMENT DEPARTMENT THE WORLD BANK LANE RENTAL: CREATING INCENTIVES FOR EARLY COMPLETION OF ROAD WORK Michele Cyna Delays in the completion
More informationGuidelines on the Grant of Performance-Based Bonus for FY 2015 under Executive Order No. 80
Inter-Agency Task Force on the Harmonization of National Government Performance, Monitoring, Information and Reporting Systems Guidelines on the Grant of Performance-Based Bonus for FY 2015 under Executive
More informationITB-PW-U Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2
Page 1 of 16 ITB-PW-U-15-02 Matanzas Woods Parkway Reclaimed Water Main Construction Phase 2 ISSUE DATE: January 7, 2015 DUE DATE: January 15, 2015 at 2:00 p.m. SUBJECT: Miscellaneous Changes INTENT: This
More informationE: DECLARATION OF INTEREST MBD No bid will be accepted from persons in the service of the state¹.
E: DECLARATION OF INTEREST MBD 4 1. No bid will be accepted from persons in the service of the state¹. 2. Any person, having a kinship with persons in the service of the state, including a blood relationship,
More information77th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. House Bill 2800 CHAPTER... AN ACT
77th OREGON LEGISLATIVE ASSEMBLY--2013 Regular Session Enrolled House Bill 2800 Sponsored by Representatives READ, BENTZ, Senators BEYER, STARR CHAPTER... AN ACT Relating to the Interstate 5 bridge replacement
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1113 VALUE ENGINEERING IN CONSTRUCTION. October 19, 2012
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1113 VALUE ENGINEERING IN CONSTRUCTION October 19, 2012 1113.01 Description 1113.02 References 1113.03 Definitions 1113.04 Value Engineering Change
More informationBudget Modernization Program (BMP)
Budget Modernization Program (BMP) Shifting to Annual Cash-Based Appropriations Outline 1. The 2019 Proposed National Budget 2. Objective of the Budget Modernization Program 3. Shifting to an Annual Cash-based
More informationIn addition to embarking on a new dialogue on Ohio s transportation priorities,
Strategic Initiatives for 2008-2009 ODOT Action to Answer the Challenges of Today In addition to embarking on a new dialogue on Ohio s transportation priorities, the Strategic Initiatives set forth by
More informationControl activities that are part of the process are detailed in the riskcontrol
Policy Title Previous title (if any) Cash Transfers to Implementing Partners N/A Policy objective Target audience Risk control matrix Checklist The policy and procedures outline the process for management
More informationHighway Engineering-II
Highway Engineering-II Chapter 7 Pavement Management System (PMS) Contents What is Pavement Management System (PMS)? Use of PMS Components of a PMS Economic Analysis of Pavement Project Alternative 2 Learning
More informationEXECUTIVE SUMMARY. a) Comparative Financial Position and Results of Operations Increase/ Particulars
EXECUTIVE SUMMARY A. Introduction 1. Dinagat Islands was once a part of the 1st District of the Province of Surigao del Norte until it became a separate province on October 2, 2006 through Republic Act
More information53rd Annual Transportation Research Forum Tampa, March 14-17, 2012
53rd Annual Transportation Research Forum Tampa, March 14-17, 2012 Financing the Future Transportation System Developing Country Finance Dr. Andreas Kopp World Bank Financing the Future Transportation
More informationGladwin County Road Commission 2016 Hot Mix Asphalt (HMA) Paving. Page 1 of 5
Page 1 of 5 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 9:30 A.M., EST, WEDNESDAY, March 9, 2016 Board of County Road Commissioners of the County of Gladwin, 301 South State Street, Gladwin, Michigan
More informationSAN RAFAEL CITY COUNCIL AGENDA REPORT
Agenda Item No: 4.g Meeting Date: March 6, 2017 Department: Public Works SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared by: Bill Guerin, Director of Public Works TOPIC: ADA-DOJ CURB RAMPS 2016-2017 City
More informationORIENTATION ON THE GUIDELINES ON THE GRANT OF PERFORMANCE-BASED INCENTIVES FOR FY 2013
ORIENTATION ON THE GUIDELINES ON THE GRANT OF PERFORMANCE-BASED INCENTIVES FOR FY 2013 Outline of Presentation Highlights of 2012 PBB Implementation Observations and Lessons Learned Guidelines on the Grant
More informationSUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1
KALAHI CIDSS National Community-Driven Development Project (RRP PHI 46420) SUPPLEMENTARY DOCUMENT 3: THE PROPOSED NATIONAL COMMUNITY-DRIVEN DEVELOPMENT PROGRAM 1 A. Program Objective and Outcomes 1. The
More informationOwner Phone. Contractor. Address. Type Existing Type Proposed. Type Existing Type Proposed. Length Width Area S.F.
TOWN OF MORRISTOWN DEPARTMENT OF PUBLIC WORKS Sidewalk and curb Permit Application Town Code Section 18-2 (No permit or fee required for minor repairs as determined by the Director of Public Works) Location
More informationExperience of Implementing Transportation PPPs in India. Abhijit Bhaumik August 6, 2015
Experience of Implementing Transportation PPPs in India Abhijit Bhaumik August 6, 2015 Experience of Implementing PPPs in India India has witnessed successful PPPs across several infrastructure sectors
More informationGeneral Discussion A&E Services Consultants
WSDOT Local Agency Guidelines M 36-63.01 Chapter 31 Chapter 31 General Discussion To be eligible for reimbursement of Federal Highway Administration (FHWA) funds for payments to a consultant, the procedures
More informationState Highway Annual Plan Instructions Manual. 1. Purpose. 2. Document Information. 3. Amendment and Review Strategy. 4.
System Design and Delivery Date of Issue: July 2018 State Highway Annual Plan Instructions Manual Manual Owner: Sponsor Endorsement: Principal Asset Management Advisor Liane Powell (Operational Policy,
More informationICC GUIDELINES AND PROCEDURES 1
ICC GUIDELINES AND PROCEDURES 1 The following have been formulated to guide the ICC and it clients in the context of investment planning and financing and balance of payments (BOP) monitoring. It will
More informationReforms and the OGP. The Open Government Initiative in the Philippines. Usec. Richard Moya August 04, 2015 Richmonde Hotel
Reforms and the OGP The Open Government Initiative in the Philippines Usec. Richard Moya August 04, 2015 Richmonde Hotel 1 The Social Contract Good Governance Cluster Chair: The President Members: Department
More informationProject Agreement CONFORMED COPY LOAN NUMBER CHA. (Hubei Shiman Highway Project) between INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT
Public Disclosure Authorized CONFORMED COPY LOAN NUMBER 4745 - CHA Public Disclosure Authorized Project Agreement Public Disclosure Authorized (Hubei Shiman Highway Project) between INTERNATIONAL BANK
More informationTECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT
14 th INTERNATIONAL FLEXIBLE PAVEMENTS CONFERENCE SYDNEY 25-28 September, 201 1 TECHNICAL AND ECONOMIC BASE REQUIREMENTS FOR EFFECTIVE ASSET MANAGEMENT Ralph Haas University of Waterloo Canada u Introduction
More informationP3: OPPORTUNITIES FOR AMERICA S INFRASTRUCTURE. Greg Hummel
P3: OPPORTUNITIES FOR AMERICA S INFRASTRUCTURE Greg Hummel Public Private Partnerships ( P3 ) Broadly refers to a variety of transactions in which a public or quasi-public entity shifts some degree of
More informationHCG PURCHASING CO-OP INVITATION TO BID
HCG PURCHASING CO-OP INVITATION TO BID #1186 HOT MIX ASPHALT #1187 HOT MIX ASPHALT EXCAVATION BY COLD PLANER (MILLING) #1188 LINE PAINTING Sealed bids for Hot Mix Asphalt, Hot Mix Asphalt Excavation by
More informationBASE BID and ALTERNATES WORK ITEM PROPOSAL 2017 Parking Structure #2 Renovations WSU #
VENDOR NAME GENERAL CONTRACT - PROPOSAL FORM (revised 4-2017) Please Note Vendors must Pre-qualify themselves when responding to this bid opportunity. Our Prequalification questions can be found on page
More informationUpdates on Compensation. By Assistant Secretary Myrna S. Chua Department of Budget and Management July 2015
Updates on Compensation By Assistant Secretary Myrna S. Chua Department of Budget and Management July 2015 Presentation Outline 1. Performance-Based Incentive System 1.1 Productivity Enhancement Incentive
More informationPROJECT AGREEMENT. (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK. and
LOAN NUMBER 2835-PRC PROJECT AGREEMENT (Hebei Energy Efficiency Improvement and Emission Reduction Project) between ASIAN DEVELOPMENT BANK and HEBEI PROVINCIAL GOVERNMENT DATED 6 MARCH 2012 PRC 44012 PROJECT
More informationSession 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department
Session 8 Case Study: PHI: Development Policy Support Program Kelly Bird Southeast Asia Regional Department Introductory Course on Economic Analysis of Policy-Based Lending Operations 7 June 2007 ADB-Philippines
More informationLOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ).
LOAN AGREEMENT (Special Operations) LOAN AGREEMENT dated 17 January 2013 between KINGDOM OF CAMBODIA ( Borrower ) and ASIAN DEVELOPMENT BANK ( ADB ). WHEREAS (A) by a loan agreement of even date herewith
More informationPROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT
PROGRAM FOR ALTERNATIVE FINANCING MECHANISM FOR ROAD INFRASTRUCTURE DEVELOPMENT ENG. M.O. KIDENDA, MBS DIRECTOR GENERAL KENYA NATIONAL HIGHWAYS AUTHORITY Wednesday 30 th July, 2014 1 PRESENTATION OUTLINE
More informationUPDATES ON THE STRENGTHENING OF INTERNAL CONTROL SYSTEMS AND INTERNAL AUDIT IN THE PHILIPPINE GOVERNMENT
UPDATES ON THE STRENGTHENING OF INTERNAL CONTROL SYSTEMS AND INTERNAL AUDIT IN THE PHILIPPINE GOVERNMENT Department of Budget and Management October 12, 2016 DBM as an Oversight Agency on ICS/IA Activities
More informationManaging Project Risk and Design Claims Avoidance:
Managing Project Risk and Design Claims Avoidance: A Roadmap for Success or Failure Michael S. Ellegood, PE Consultant, Managing Risk Risk Recognition, Analysis and Management of Public Projects What You
More informationTown of South Bruce Peninsula. Quotation PW Tree Removal Services
Town of South Bruce Peninsula Quotation PW 18-06 Tree Removal Services Town of South Bruce Peninsula Quotation PW 18-06 Tree Removal Services The Town of South Bruce Peninsula is requesting quotations
More informationTHE 2016 REVISED IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 9184, OTHERWISE KNOWN AS THE GOVERNMENT PROCUREMENT REFORM ACT
THE 2016 REVISED IMPLEMENTING RULES AND REGULATIONS OF REPUBLIC ACT NO. 9184, OTHERWISE KNOWN AS THE GOVERNMENT PROCUREMENT REFORM ACT RULE I GENERAL PROVISIONS Section 1. Short Title and Purpose This
More informationPanorama Mundial de la Conservacion de Carreteras
Chile Provial 2002 Panorama Mundial de la Conservacion de Carreteras Cesar Queiroz, Ph.D. Lead Highway Engineer World Bank November 5, 2002 Topics Developing and advanced countries Road infrastructure
More informationSUMMARY FINANCIAL MANAGEMENT ASSESSMENT
A. Introduction Emergency Assistance for Relief and Recovery from Typhoon Yolanda (RRP PHI 47337) UMMARY FINANCIAL MANAGEMENT AEMENT 1. This financial management assessment was prepared in accordance with
More information