SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT

Size: px
Start display at page:

Download "SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT"

Transcription

1 ITEM 2 Agenda of January 19, 2017 TO: FROM: Board of Directors Sacramento Area Flood Control Agency Richard M. Johnson, Executive Director (916) SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR JANUARY 19, 2017 WATER INFRASTRUCTURE IMPROVEMENTS FOR THE NATION (WIIN) ACT On December 8, 2016, the U.S. House of Representatives passed the Water Infrastructure Improvements for the Nation (WIIN) Act, which includes the Water Resources Development Act of 2016 (WRDA 16). Though the overall bill is called the WINN Act, Title I (only 30 percent of the total text) will be known as WRDA On December 10, 2016, the U.S. Senate passed the bill. The President signed the bill into law on December 16, Section 1401 of the bill did include an authorization for the American River Watershed Common Features work identified in the Common Features General Reevaluation Report (GRR). The authorization was for $1,595,761,000, which is the largest authorization for a SAFCA project to date. Section 1166 of the bill included the SAFCA requested language on the transfer of excess credits from one project to another project. The intent of the language is to facilitate the use of excess credits from Natomas to the non-federal share for the Folsom Dam Raise or for the GRR construction in the future A SIGNIFICANT YEAR FOR SAFCA Calendar Year 2016 was one of the most significant for SAFCA ever. Two major U.S. Army Corps of Engineers (USACE) projects were completed and another one is operational if needed. The USACE received a new construction start and is proceeding with their first construction contract on another. Congress and the President authorized a significant amount of additional work. SAFCA entered into an agreement with the State of California to provide funding for the Levee Accreditation Project. SAFCA also entered into an agreement with United Auburn Indian Community laying out the principals for working together on these projects. SAFCA is proceeding with the first construction contract for the Levee Accreditation Project. Additionally, the property owners approved a new assessment to cover all the additional work required to provide this community with an acceptable level of flood risk reduction. Based on that new assessment, SAFCA successfully sold bonds to provide the funding to move forward with project implementation. More details on each of these follows.

2 Page 2 South Sacramento County Streams Group The project was originally authorized in 1999 to address the potential for flood risk from some of the streams passing through South Sacramento and to address the potential of flooding from the south should there be a levee breach in the Delta. The last phase of the project was essentially completed in Both the USACE and SAFCA constructed portions of the project. There is some closeout work still to be accomplished. This completed work will allow the remaining homes that are still mapped in the FEMA 100-year floodplain to be removed from the floodplain mapping. A ceremony will be held in SAFCA s Florin Creek Detention Basin

3 Page 3 American River Watershed Common Features - American River This project was originally authorized in 1996 and additional components were authorized in The project consists of bringing the levees on both sides of the American River up to the current design standards for seepage, underseepage and stability. The final phases of work were completed in early There is some closeout work still to be accomplished. On April 8, 2016, the USACE held a media event on the American River levees near Howe Avenue celebrating completion of the work on the American River levees authorized in 1996 and American River Cut-off Wall Construction

4 Page 4 American River Watershed - Folsom Dam Modifications This project was originally authorized in 1999 and is commonly known as the Joint Federal Project (JFP) as it is being constructed jointly by the USACE and the U.S Bureau of Reclamation. Folsom Dam is the backbone of the flood control system on the American River. The JFP consists of constructing a new dam and spillway with gates located much lower in elevation in the reservoir. This will allow releases from the dam to match the downstream levee capacity much earlier in a flood event, making the flood space available at Folsom Dam much more efficient. While project completion will occur in 2017, construction has progressed to the point where if we had an emergency situation, the new spillway could be utilized now. Folsom Dam Joint Federal Project

5 Page 5 American River Watershed Common Features - Natomas Basin The Natomas Basin is completely surrounded by levees. It has 42 miles of levees that protect it from flooding. The project consists of reconstructing all 42 miles of levees to bring them up to the current design standards for seepage, underseepage and stability. SAFCA, with funding from the State, reconstructed 18 miles of the levees starting in In 2014, there was a Federal authorization for the USACE to complete the remainder of the work required to have the levees around Natomas brought up to current standards for seepage, underseepage, and stability. The Federal Fiscal 2016 USACE Work Plan included $11.0 million in construction funding for Natomas to be combined with $21.15 million in the President s Proposed Budget for Fiscal Year 2017 to allow the USACE to initiate construction of their portion of the project. Congress included a caveat for the construction funding for Natomas - a cost share agreement had to be executed by August 31, 2016 or the funding would go to another project that is ready to start. The Project Participation Agreement (PPA) was executed at a signing ceremony on August 18, In order to advertise the first contract, the USACE needed to wait until Congress passed some type of funding bill for Federal Fiscal Year The Continuing Resolution bills passed provided sufficient funding to allow the USACE to award the first construction contract, with construction expected to begin in Natomas PPA Signing Ceremony

6 Page 6 American River Watershed Common Features - General Reevaluation Report In 2016, Congress and the President authorized American River Watershed Common Features work identified in the Common Features General Reevaluation Report (GRR). The USACE looked at the work being accomplished by all the flood risk reduction projects already authorized, and then looked at what else needs to be done to the system protecting Sacramento to bring it up to current design standards for urban areas and to provide at least a 200-year level of protection. The project will include reconstructing levees along the east side of Sacramento River south of the American River and levees in the North Sacramento Area to bring them up to the current design standards for seepage, underseepage and stability. Additionally, the project will include erosion protection in the river channels themselves to prevent the river banks from eroding into the levee sections during large flood events. The project will also include widening the Sacramento Weir and Bypass to allow more of the flood flows to be carried through the bypass system, reducing the stress and need to raise levees along the mainstream of the Sacramento River. Back in the 1990 s, the USACE looked at several comprehensive plans for addressing flood-risk reduction in the American River Watershed. For political reasons, a comprehensive plan was never authorized. Over the years, various components have been authorized as the circumstances allowed. One of the alternative comprehensive plans presented to Congress in the 1996 American River Watershed Investigation Supplemental Information Report was the Stepped Release Plan. Now that the GRR work has been authorized, all the components of the 1996 Stepped Release Plan are finally authorized, as shown in the table on a subsequent page. Also, the following graphic shows how all parts of the system are being addressed by one of the authorized projects.

7 Page 7

8 Page 8 Stepped Release Plan Component (American River Watershed Project Supplemental Information Report 1996) Folsom Dam Outlet Modifications Lower crest of main spillway Extend stilling basin Enlarge existing river outlets Folsom Dam Modified Surcharge Storage Replace main gates Replace emergency gates Modify surcharge storage operation Modify operation of Folsom Dam Replace SAFCA/USBR variable space operation with permanent Corps variable space operation Current Project Covering Component American River Watershed Folsom Dam Modifications Project (Authorized in 1999 Modified in 2007 to change to Joint Federal Project) New dam and gates lower in reservoir New spillway extending to river American River Watershed Folsom Dam Raise Project (Authorized in 2004)(Modified by Corps in 2007) Replace main gates Replace emergency gates Raise dam to increase surcharge storage Modify surcharge storage operation Permanent bridge at Folsom Dam American River Watershed Folsom Dam Modifications Project (Authorized in 1999) Replace SAFCA/USBR variable space operation with permanent Corps variable space operation Lower American River American River Watershed Common Features Project Lower American River (Authorized 1996, 1999, 2004) Levee stability, seepage, strengthening Levee stability, seepage, strengthening Raise existing levees Raise existing levees New levees and floodwalls New levees and floodwalls Incorporate non-federal levees Incorporate non-federal levees Modify utilities Modify utilities Bridge modifications Lower American River American River Watershed Common Features Project General Reevaluation Report (Authorized in 2016) Riprap existing bank and levees Riprap existing bank and levees Natomas American River Watershed Common Features Project Natomas (Authorized in 2014) Levee stability, seepage, strengthening Levee stability, seepage, strengthening Downstream from American River American River Watershed Common Features Project General Reevaluation Report (Authorized in 2016) Modify Sacramento Weir and Bypass Modify Sacramento Weir and Bypass Downstream from American River American River Watershed Common Features Project General Reevaluation Report (Authorized in 2016) Hydraulic mitigation Non-Federal Sponsor to handle hydraulic mitigation Increase Objective Release from Folsom Dam American River Watershed Common Features Project General Reevaluation Report (Authorized in 2016) and American River Watershed Folsom Dam Modifications Project (Authorized in 1999) Stepped release 115,000 cfs to 145,000 cfs to 180,000 cfs 115,000 cfs to 160,000 cfs

9 Page 9 SAFCA Levee Accreditation Program (LAP) As a result of the USACE withdrawing its levee accreditation in August 31, 2013, SAFCA has been pursuing its own efforts to accredit the levee system. This effort is focused on the levees outside of the Natomas Basin and consists of the levees along the east side of the Natomas East Main Drainage Canal/Steelhead Creek including Arcade Creek Levees, Robla Creek South Levee, Dry Creek North Levee; American River Levees; the Sacramento River East Levee from the Mouth of the American River to Freeport; and the Beach Lake Levee. SAFCA completed the Levee Accreditation Program evaluation and reached the following conclusions: up to 8 miles of the Sacramento River East Levee, including the Pocket and Little Pocket areas, do not meet embankment and foundation stability requirements; up to 4.0 miles of the levees along the north and south banks of Arcade Creek do not meet embankment and foundation stability requirements; up to 3,000 feet of erosion sites on the Sacramento River East Levee need to be repaired or monitored; and other issues including unacceptable encroachments, affecting all of the levee segments to varying degrees, need to be addressed to allow accreditation of these levee segments. As a result of the investigation, it is recognized that corrective action will need to be taken in order to bring the area levees up to Federal Emergency Management Agency (FEMA) and State standards. The work identified is also part of the work authorized in the American River Watershed Common Features Common Features General Reevaluation Report. SAFCA and its consultant teams have been actively advancing the LAP since June Even though the USACE just received authorization to implement the project, it could be several years until the project would be eligible for Federal construction funding. At the November 2016 SAFCA Board meeting, the Board approved proceeding with advertising the North Sacramento area project work. Pre-construction activity, which includes the removal of vegetation/trees located within the project footprint, is anticipated to be completed by the end of January 2017, prior to the start of bird nesting season. SAFCA expects to get levee construction underway in early spring The work along the Sacramento River is expected to follow in 2018 and State of California Urban Flood Risk Reduction Agreement In order to move forward with construction of the Levee Accreditation Program, SAFCA needed funding support from the State of California. The California Department of Water Resources (DWR) has been advancing the Urban Flood Risk Reduction (UFRR) Program. SAFCA identified a need for funding to implement its Levee Accreditation Program and executed an agreement with the State under the UFRR program. SAFCA estimates that the cost of the LAP improvements needed to meet Federal 100-year levee accreditation standards and State 200-year urban level of flood protection standards will be $166 million. Under the UFRR agreement, the State will provide up to $112 million. It is anticipated

10 Page 10 that a portion of the improvements required to complete the LAP would not be eligible for State Cost Share under the UFRR Program Funding Guidelines. United Auburn Indian Community Agreements In July, 2016, SAFCA and the United Auburn Indian Community (UAIC) entered into agreements identifying procedures, protocols and processes to identify, protect, avoid, monitor, and treat Tribal cultural resources in a culturally appropriate and respectful manner. The Agreements consist of a Memorandum of Agreement, a Tribal Monitoring Agreement, and a Burial Treatment Agreement. While the agreements were specific to the Levee Accreditation Program, it sets up how SAFCA expects to work with UAIC on all future projects. Consolidated Capital Assessment District No. 2 Since SAFCA formed the Consolidated Capital Assessment District (CCAD) in 2007 to fund its share of the capital improvement projects, there have been significant changes in Federal and State flood risk management standards and guidelines largely in response to Hurricane Katrina that have required significant adjustments to the capital improvement projects. These changes in the scope of the projects are expected to increase SAFCA s required contribution over what was anticipated in Additionally, the annual operations and maintenance costs have increased and the State and Federal required levee modernization work were not covered by the CCAD. In June 2016, the CCAD was replaced by the Consolidated Capital Assessment District No. 2 (CCAD 2). CCAD 2 will provide sufficient funds to pay for these additional costs as well as refinance outstanding CCAD bonds. Consolidated Capital Assessment District No. 2 Bond Sales As a result of the formation of the CCAD 2, the agency was in a position to take advantage of historically low interest rates and sell bonds. The purpose of the bond sales were to pay off the bonds previously sold based on the 2007 CCAD and to raise funding for projects anticipated to occur over the next three to five years. Even though the election threw some initial uncertainty in the bond market, we were able to sell bonds at a total cost of $312,663,174.55, which included all the costs to sell the bonds, to pay off the existing bonds, and all other required costs. This resulted in $109,417, of funds for project implementation. RJlr/Final ED Report Jan docx

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR AUGUST 20, 2015

SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR AUGUST 20, 2015 ITEM 1 TO: FROM: Board of Directors Sacramento Area Flood Control Agency Richard M. Johnson, Executive Director (916) 874-7606 SUBJECT: EXECUTIVE DIRECTOR'S REPORT FOR AUGUST 20, 2015 SAFCA Intent to Serve

More information

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET

RESOLUTION - APPROVING FINAL FISCAL YEAR BUDGET ITEM 12 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Richard M. Johnson, Executive Director (916) 874-7606 RESOLUTION - APPROVING FINAL FISCAL YEAR 2015-16 BUDGET OVERVIEW:

More information

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget.

RECOMMENDATION: Staff recommends the Board adopt Resolution No approving SAFCA s Fiscal Year Final Budget. ITEM 5 Agenda of August 18, 2016 TO: FROM: SUBJECT: Sacramento Area Flood Control Agency Board of Directors Jason D. Campbell, Deputy Executive Director (916) 874-7606 APPROVING FINAL FISCAL YEAR 2016-17

More information

APPENDIX E ECONOMICS

APPENDIX E ECONOMICS APPENDIX E ECONOMICS American River Watershed Common Features General Reevaluation Report Draft Economics Appendix E February 2015 Cover Photos courtesy of the Sacramento District: Sacramento Weir during

More information

Development Fee Program: Comparative risk analysis

Development Fee Program: Comparative risk analysis Development Fee Program: Comparative risk analysis January 2008 Sacramento Area Flood Control Agency David Ford Consulting Engineers, Inc. 2015 J Street, Suite 200 Sacramento, CA 95811 Ph. 916.447.8779

More information

Presented by: Connie Perkins, PE, CFM April 20, 2016

Presented by: Connie Perkins, PE, CFM April 20, 2016 Presented by: Connie Perkins, PE, CFM April 20, 2016 City of Sacramento s Flood History Need for a Comprehensive Flood Management Plan (CFMP) Overview of Sacramento s CFMP 2016 Next Steps Sacramento

More information

SACOG Board of Directors

SACOG Board of Directors SACOG Board of Directors Item #12-3-14 Action March 8, 2012 Federal Flood Policy Issues Issue: A lack of funding and several regulatory and legislative issues at the federal level related to flood protection.

More information

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps

Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain management plans and flood forecast inundation maps Presentation to USACE 2012 Flood Risk Management and Silver Jackets Joint Workshop, Harrisburg, Pennsylvania Action Items for Flood Risk Management on Wildcat Creek Interagency success with floodplain

More information

The Breadth of the Planning Portfolio

The Breadth of the Planning Portfolio The Breadth of the Planning Portfolio Travis Creel, Planner, Regional Planning and Environmental Division South, MVD Eric Halpin, Special Assistant for Dam and Levee Safety, HQUSACE Lisa Kiefel, PCoP,

More information

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety

A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety 4 th NACGEA GEOTECHNICAL WORKSHOP January 29, 2010 A Review of Our Legacy System, History of Neglect, Current Issues, and the Path Forward for Levee Safety Presented by: Leslie F. Harder, Jr., Phd, PE,

More information

U.S. Army Corp of Engineers

U.S. Army Corp of Engineers U.S. Army Corp of Engineers PL 84-99 Levee Inspections and Levee Certification Hank DeHaan Rock Island District March 9, 2011 US Army Corps of Engineers U.S. Army Corps of Engineers Flood Damage Reduction

More information

USACE Levee Screening Tool Understanding the Classification

USACE Levee Screening Tool Understanding the Classification USACE Levee Screening Tool Understanding the Classification Richard J. Varuso, Ph.D., P.E. Deputy Chief, Geotechnical Branch Levee Safety Program Manager USACE - New Orleans District 17 Nov 2011 US Army

More information

Abstract. An assessment of the benefits of DWR s levee inspection program in California s Central Valley

Abstract. An assessment of the benefits of DWR s levee inspection program in California s Central Valley An assessment of the benefits of DWR s levee inspection program in California s Central Valley At left: Crew members place sandbags during flood fighting effors (DWR). By David Ford, PhD, PE, D.WRE; Joanna

More information

GENERAL PLAN AMENDMENT # FLOOD HAZARDS

GENERAL PLAN AMENDMENT # FLOOD HAZARDS GENERAL PLAN AMENDMENT #2011-03 FLOOD HAZARDS The following text that appears on pages HS 3-4 of the Health and Safety Element in the Yolo 2030 Countywide General Plan has been amended. New language is

More information

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers, New York District New Jersey Department of Environmental Protection 11 &

More information

This survey is expected to take approximately 20 minutes and must be completed in one session.

This survey is expected to take approximately 20 minutes and must be completed in one session. State Flood Assessment Survey 1 Introduction Thank you for your willingness to participate in this online survey as part of the State Flood Assessment effort. This first step toward developing comprehensive

More information

This survey is expected to take approximately 20 minutes and must be completed in one session.

This survey is expected to take approximately 20 minutes and must be completed in one session. Introduction Thank you for your willingness to participate in this online survey as part of the State Flood Assessment effort. This first step toward developing comprehensive flood planning for Texas does

More information

Fighting the Flood: Current Political, Regulatory and Financial Challenges

Fighting the Flood: Current Political, Regulatory and Financial Challenges Fighting the Flood: Current Political, Regulatory and Financial Challenges for Levee Owners Kansas City, Missouri January 23, 2013 Emerging Policy, Programs and Tools for the Management of Levee Systems

More information

Urban Level of Protection 2017 Annual Adequate Progress Report Update

Urban Level of Protection 2017 Annual Adequate Progress Report Update SUTTER BUTTE FLOOD CONTROL AGENCY A Partnership for Flood Safety Urban Level of Protection 2017 Annual Adequate Progress Report Update August 9, 2017 Prepared By: 2450 Venture Oaks Way, Suite 240 Sacramento,

More information

Passaic River Flood Risk Management Projects

Passaic River Flood Risk Management Projects Passaic River Flood Risk Management Projects EPA Lower Passaic River Community Advisory Group Tom Shea, PMP Project Manager 12 March 2015 US Army Corps of Engineers Passaic River Main Stem Project Studies

More information

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development

DES MOINES CITY OF TWO RIVERS. Flooding Risk & Impact to Development DES MOINES CITY OF TWO RIVERS Flooding Risk & Impact to Development River System Des Moines Flood Protection Des Moines Flood Protection cont. Infrastructure Over 24 miles of levees 21stormwater pump stations

More information

UPDATE ON DALLAS FLOODWAY

UPDATE ON DALLAS FLOODWAY UPDATE ON DALLAS FLOODWAY ENVIRONMENTAL IMPACT STATEMENT [ EIS ] Transportation and Trinity River Project Committee Rob Newman Director, Trinity River Corridor Project, Fort Worth District 28 April 2014

More information

SPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT

SPILLWAY ADEQUACY ANALYSIS ROUGH RIVER LAKE LOUISVILLE DISTRICT SPILLWAY ADEQUACY ANALYSIS OF ROUGH RIVER LAKE LOUISVILLE DISTRICT RICHARD PRUITT (502) 315-6380 Louisville District COE richard.l.pruitt@lrl02.usace.army.mil Spillway ROUGH RIVER LAKE PERTINENT DATA Construction

More information

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality

FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality FREQUENTLY ASKED QUESTION ABOUT FLOODPLAINS Michigan Department of Environmental Quality WHAT IS A FLOOD? The National Flood Insurance Program defines a flood as a general and temporary condition of partial

More information

CONGRESSIONAL DISTRICT: IN 03

CONGRESSIONAL DISTRICT: IN 03 CONGRESSIONAL DISTRICT: IN 03 80 Steuben Lagrange Angola 69 Kendallville DeKalb Noble Garrett Auburn Kosciusko Warsaw Dam Safety Program (All COE Indiana Dams) Columbia City Allen Whitley Fort Wayne New

More information

Sutter Butte Flood Control Agency

Sutter Butte Flood Control Agency Sutter Butte Flood Control Agency Sutter and Butte Counties, California Basic Financial Statements and Independent Auditors Reports For the year ended June 30, 2017 Table of Contents Page FINANCIAL SECTION

More information

SUBJECT: LAND USE PLANNING POLICY WITHIN THE 100 YEAR FLOODPLAIN (REPORT #2)

SUBJECT: LAND USE PLANNING POLICY WITHIN THE 100 YEAR FLOODPLAIN (REPORT #2) DEPARTMENT OF PLANNING AND DEVELOPMENT City Council Sacramento, California Honorable Members in Session: CITY OF SACRAMENTO CALIFORNIA August 20, 1993 1231 1 STREET ROOM 200 SACRAMENTO, CA 95814-2998 ENVIRONMENTAL

More information

Army Corps of Engineers Indianapolis North Questions and Answers July QUESTION 1: What is the Indianapolis White River North project?

Army Corps of Engineers Indianapolis North Questions and Answers July QUESTION 1: What is the Indianapolis White River North project? Army Corps of Engineers Indianapolis North Questions and Answers July 2012 QUESTION 1: What is the Indianapolis White River North project? ANSWER 1: The project involves construction of floodwalls and

More information

Urban Level of Protection Adequate Progress Report

Urban Level of Protection Adequate Progress Report SUTTER BUTTE FLOOD CONTROL AGENCY A Partnership for Flood Safety Urban Level of Protection Adequate Progress Report July 5, 2016 Prepared By: 2450 Venture Oaks Way, Suite 240 Sacramento, CA 95833 Main:

More information

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California

DAEN SUBJECT: Lower San Joaquin River Feasibility Study Report, California 1.33 miles of new setback levee along the Delta Front to eliminate the eastern portions of the Fourteenmile Slough levee in North Stockton. 0.59 miles of height improvements between 1.8 and 2.7 feet on

More information

Levee Safety The Middle Age Of Levee Safety Development

Levee Safety The Middle Age Of Levee Safety Development Levee Safety The Middle Age Of Levee Safety Development HDR Showcase Panel Discussion June 22, 2016 Living the Current Changing Regulatory Climate by Roger Less, PE, CFM Overview of Section 408 Permit

More information

US Army Corps of Engineers Dam Safety

US Army Corps of Engineers Dam Safety US Army Corps of Engineers General Program Overview & Impacts of Issues on Project Regulation Charles Pearre, PE Program Manager,, Emeritus June 2011 US Army Corps of Engineers BUILDING STRONG Defined

More information

SWIF TO THE RESCUE. Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY

SWIF TO THE RESCUE. Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY SWIF TO THE RESCUE Patty Robinson Ike Pace, PE WATER NATURAL RESOURCES ENVIRONMENT INFRASTRUCTURE ENERGY AGENDA USACE Programs PL 84 99 (Rehabilitation & Inspection Program, RIP) Levee Safety Program (Routine,

More information

King County, WA DFIRM Update and Seclusion Process. Webinar June 14, 2016

King County, WA DFIRM Update and Seclusion Process. Webinar June 14, 2016 King County, WA DFIRM Update and Seclusion Process Webinar June 14, 2016 Agenda King County DFIRM Study History What is/has been done Process for moving forward Seclusion Seclusion mapping process Seclusion

More information

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts

Delaware River Basin Commission s Role in Flood Loss Reduction Efforts Delaware River Basin Commission s Role in Flood Loss Reduction Efforts There is a strong need to reduce flood vulnerability and damages in the Delaware River Basin. This paper presents the ongoing role

More information

CONGRESSIONAL DISTRICT: KY 03

CONGRESSIONAL DISTRICT: KY 03 CONGRESSIONAL DISTRICT: KY 03 3 Metro Louisville Flood Risk Management Reconstruction Study Louisville VAMC Location Map McAlpine 71 265 Portland Wharf Park (CAP Section 14) 264 264 64 Lower Salt River

More information

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS

CRISP COUNTY, GEORGIA AND INCORPORATED AREAS CRISP COUNTY, GEORGIA AND INCORPORATED AREAS Community Name Community Number ARABI, CITY OF 130514 CORDELE, CITY OF 130214 CRISP COUNTY (UNINCORPORATED AREAS) 130504 Crisp County EFFECTIVE: SEPTEMBER 25,

More information

Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program

Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Minimum Standards For USACE Evaluation of Levee Systems For the National Flood Insurance Program Christopher N. Dunn, P.E., Director Hydrologic Engineering Center ASCE Water Resource Group 20 October,

More information

Cedric Grant, CAO Gwen LeBlanc, CFO Bill Roux, Director, Drainage

Cedric Grant, CAO Gwen LeBlanc, CFO Bill Roux, Director, Drainage Tommy Martinez, Parish President Cedric Grant, CAO Gwen LeBlanc, CFO Bill Roux, Director, Drainage Presented and Approved May 4, 2009 East Ascension Consolidated Gravity Drainage District No. 1 Commission

More information

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update

Passaic River Basin Flood Advisory Commission Report/Status of Recommendations. October 2014 Update Passaic River Basin Flood Advisory Commission Report/Status of Recommendations October 2014 Update Passaic River Basin Flood Advisory Commission April 2010: By Executive Order, Governor Christie created

More information

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments

King County Flood Control District Flood Risk Reduction Work Program and Accomplishments King County Flood Control District Flood Risk Reduction Work Program and Accomplishments Brian Murray Water and Land Resources Division April 26, 2016 Department of Natural Resources and Parks Water and

More information

LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY

LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY September 2013 SEPTEMBER 2013 LETTER REPORT BAYOU SORREL LOCK REPLACEMENT, LOUISIANA POST AUTHORIZATION CHANGE STUDY

More information

Item No. 1 Public Comments on Non-Agenda Items: There were no comments on non-agenda items from members of the public.

Item No. 1 Public Comments on Non-Agenda Items: There were no comments on non-agenda items from members of the public. June 10, 2016 Sacramento, California The Board of Trustees of the American River Flood Control District met in regular session in its office at 185 Commerce Circle, Sacramento, CA at 11:00 a.m. on Friday,

More information

Lower San Joaquin River Feasibility Report

Lower San Joaquin River Feasibility Report Sacramento District Planning Division Lower San Joaquin River Feasibility Report San Joaquin County, California APPENDIX A: ECONOMICS This page intentionally left blank RISK ANALYSIS OVERVIEW Risk is defined

More information

Executive Summary Levee Engineering Assessments September 26, 2014

Executive Summary Levee Engineering Assessments September 26, 2014 Executive Summary s September 26, 2014 Purpose Multnomah County Drainage District (MCDD), the agency responsible for managing the Columbia Corridor levee system, received notification that in August of

More information

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES

JANUARY 13, ILL. ADM. CODE CH. I, SEC TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES TITLE 17: CONSERVATION CHAPTER I: DEPARTMENT OF NATURAL RESOURCES SUBCHAPTER h: WATER RESOURCES PART 3702 CONSTRUCTION AND MAINTENANCE OF DAMS Section Page No. 3702.10 Purpose 2 3702.20 Definitions 3 3702.30

More information

Community Development Department

Community Development Department Community Development Department Ryan DeVore, Interim Director of Community Development Scot Mende, Principal Planner Bill Busath, Interim Director of Utilities Connie Perkins, Senior Engineer, Floodplain

More information

Chapter 6 - Floodplains

Chapter 6 - Floodplains Chapter 6 - Floodplains 6.1 Overview The goal of floodplain management is to reduce the potential risks to both existing and future developments, and infrastructure, in the 100-year floodplain. Over the

More information

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau

Floodplain Management 101. Mississippi Emergency Management Agency Floodplain Management Bureau Floodplain Management 101 Mississippi Emergency Management Agency Floodplain Management Bureau Stafford Act The Stafford Disaster Relief and Emergency Assistance Act (Stafford Act) (Public Law 100-707)

More information

Northwest Flood Fight Workshops

Northwest Flood Fight Workshops Northwest Flood Fight Workshops September 24, 2014 IWR Webinar D. Leslie Miller, P.E. (Les) Flood Preparedness Program Manager US Army Corps of Engineers, Portland District US Army Corps of Engineers Welcome

More information

County of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT. PLANNING COMMISSION STAFF REPORT April 14, 2011

County of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT. PLANNING COMMISSION STAFF REPORT April 14, 2011 County of Yolo PLANNING AND PUBLIC WORKS DEPARTMENT John Bencomo DIRECTOR 292 West Beamer Street Woodland, CA 95695-2598 (530) 666-8775 FAX (530) 666-8728 www.yolocounty.org PLANNING COMMISSION STAFF REPORT

More information

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012

Testimony of the National Association of Flood And Stormwater Management Agencies. Water Resources Development Act of 2012 National Association of Flood & Stormwater Management Agencies 1333 H Street, NW, 10th Floor West Tower, Washington, DC 20005 Phone: 202-289-8625 www.nafsma.org Testimony of the National Association of

More information

ANNUAL REPORT. on the MITIGATION ACTIONS. in the SACRAMENTO COUNTY LOCAL HAZARD MITIGATION PLAN Dated December 2016 (AND FLOODPLAIN MANAGEMENT PLAN)

ANNUAL REPORT. on the MITIGATION ACTIONS. in the SACRAMENTO COUNTY LOCAL HAZARD MITIGATION PLAN Dated December 2016 (AND FLOODPLAIN MANAGEMENT PLAN) ATTACHMENT 4 ANNUAL REPORT on the MITIGATION ACTIONS in the SACRAMENTO COUNTY LOCAL HAZARD MITIGATION PLAN Dated December 2016 (AND FLOODPLAIN MANAGEMENT PLAN) Adopted County Board of Supervisors on July

More information

' New Orleans District. Lake Pontchartrain, Louisiana, and Vicinity (Hurricane Protection) Lower Mississippi Valley Division '---..

' New Orleans District. Lake Pontchartrain, Louisiana, and Vicinity (Hurricane Protection) Lower Mississippi Valley Division '---.. '---.. APPROPRIATION TITLE: PROJECT: ltzj'i "-.' "------- Construction General - Local Protection (Flood Control) (Continuing) LOCATION: The project is located in St. Charles, Jefferson, Orleans, St. Bernard,

More information

Comprehensive Flood Management Plan. City of Sacramento Department of Utilities

Comprehensive Flood Management Plan. City of Sacramento Department of Utilities Comprehensive Flood Management Plan City of Sacramento Department of Utilities City of Sacramento Department of Utilities Prepared by: Connie Perkins, City of Sacramento, Department of Utilities Kelly

More information

[Letter to be printed on official Levee Sponsor letterhead]

[Letter to be printed on official Levee Sponsor letterhead] [Letter to be printed on official Levee Sponsor letterhead] [Date] COL Joel R. Cross, Commander US Army Corps of Engineers, Omaha District 1616 Capitol Avenue Omaha, Nebraska 68102-4901 RE: [Levee Sponsor

More information

Flood Protection Structure Accreditation Task Force: Final Report

Flood Protection Structure Accreditation Task Force: Final Report Flood Protection Structure Accreditation Task Force: Final Report November 2013 Message from the Administrator and the Assistant Secretary of the Army (Civil Works) The United States Army Corps of Engineers

More information

2018 WASHOE COUNTY BALLOT QUESTION WC 1

2018 WASHOE COUNTY BALLOT QUESTION WC 1 2018 WASHOE COUNTY BALLOT QUESTION WC 1 Shall Washoe County be authorized to levy an additional property tax rate for the purpose of paying for the cost of designing, acquiring, constructing, improving

More information

Risk Assessment Framework. Levee Ready Columbia

Risk Assessment Framework. Levee Ready Columbia Risk Assessment Framework Levee Ready Columbia November 23, 2015 Today s Discussion Level of Protection Levees and Risk Tolerable Risk Guidelines Applying Tolerable Risk Guidelines Levees and Level of

More information

1. INTRODUCTION TECHNICAL MEMORANDUM

1. INTRODUCTION TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM TO: FROM: SUBJECT: JAMES GIOTTONINI, PE EXECUTIVE DIRECTOR, SJAFCA SETH WURZEL, MBA & MARK HENDRIE, CPA CAPITOL PFG SJAFCA SMITH CANAL CLOSURE STRUCTURE DESIGN PROJECT PRELIMINARY

More information

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

TESTIMONY. Association of State Floodplain Managers, Inc. Subcommittee on Transportation and Infrastructure

TESTIMONY. Association of State Floodplain Managers, Inc. Subcommittee on Transportation and Infrastructure ASSOCIATION OF STATE FLOODPLAIN MANAGERS, INC. 2809 Fish Hatchery Road, Suite 204, Madison, Wisconsin 53713 www.floods.org Phone: 608-274-0123 Fax: 608-274-0696 Email: asfpm@floods.org TESTIMONY Association

More information

FIVE YEAR CIP SUMMARY

FIVE YEAR CIP SUMMARY RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 7 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project Title

More information

Position Statement on a 2018 Water Resources Development Act (WRDA)

Position Statement on a 2018 Water Resources Development Act (WRDA) Position Statement on a 2018 Water Resources Development Act (WRDA) In order to maintain the safety and resilience of our nation s coastlines, Congress must continue a twoyear cycle for passing Water Resource

More information

A Little Less Conversation a Little More ACTION! Louie Greenwell, GISP, CFM T&M Associates Carey Johnson KY Division of Water

A Little Less Conversation a Little More ACTION! Louie Greenwell, GISP, CFM T&M Associates Carey Johnson KY Division of Water A Little Less Conversation a Little More ACTION! Louie Greenwell, GISP, CFM T&M Associates Carey Johnson KY Division of Water Topics Covered It s all about ACTION! Kentucky s plan for delivering actions

More information

King County Flood Control District 2015 Work Program

King County Flood Control District 2015 Work Program Attachment A 2015 Work Plan 10-24-14 King County Flood Control District 2015 Work Program The District work program is comprised of three categories: district oversight and policy development, operations,

More information

Subject: Upper Merrimack and Pemigewasset River Study Task 9 - Water Supply Evaluation

Subject: Upper Merrimack and Pemigewasset River Study Task 9 - Water Supply Evaluation Memorandum To: From: Barbara Blumeris, USACE Ginger Croom and Kirk Westphal, CDM Date: April 14, 2008 Subject: Upper Merrimack and Pemigewasset River Study Task 9 - Water Supply Evaluation Executive Summary

More information

Flood Plain Management Services (FPMS) Program

Flood Plain Management Services (FPMS) Program Flood Plain Management Services (FPMS) Program 2016 Winter Stakeholder Partnering Forum March 2016 Mario Beddingfield, P.E., CFM Hydraulic Engineer/FPMS Program Manager H&H/Water Control Branch U.S. Army

More information

Volusia County Floodplain Management Plan 2012

Volusia County Floodplain Management Plan 2012 Volusia County Floodplain Management Plan 2012 Introduction The National Flood Insurance Program (NFIP) provides federally supported flood insurance in communities that regulate development in floodplains.

More information

FLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE. Gerald E. Galloway, Jr. United States Military Academy

FLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE. Gerald E. Galloway, Jr. United States Military Academy FLOODPLAIN MANAGEMENT: A PRESENT AND A 21st CENTURY IMPERATIVE Gerald E. Galloway, Jr. United States Military Academy Introduction The principal rivers of the United States and their tributaries have played

More information

Discovery Report. Cache River Watershed, Alexander, Johnson, Pulaski, and Union Counties, Illinois

Discovery Report. Cache River Watershed, Alexander, Johnson, Pulaski, and Union Counties, Illinois Discovery Report Cache River Watershed, 07140108 Alexander, Johnson, Pulaski, and Union Counties, Illinois 12/21/2012 i Project Area Community List Community Name Alexander County Village of Tamms Johnson

More information

Requirements for Mapping Levees Complying with Section of the NFIP Regulations

Requirements for Mapping Levees Complying with Section of the NFIP Regulations FACT SHEET Requirements for Mapping Levees Complying with Section 65.10 of the NFIP Regulations As part of a mapping project, it is the levee owner s or community s responsibility to provide data and documentation

More information

Memorandum. November 11,2010. Trinity River Corridor Project Committee Members: David

Memorandum. November 11,2010. Trinity River Corridor Project Committee Members: David Memorandum DATE November 11,2010 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Steve Salazar (Vice-Chair) Delia Mayor Pro Tern Dwaine Caraway

More information

Analysis and Mapping Procedures for Non-Accredited Levees

Analysis and Mapping Procedures for Non-Accredited Levees Analysis and Mapping Procedures for Non-Accredited Levees Proposed Approach for Public Review December 9, 2011 www.fema.gov/plan/prevent/fhm/rm_main.shtm 1 877 FEMA MAP Executive Summary Background This

More information

SUTTER BUTTE FLOOD CONTROL AGENCY

SUTTER BUTTE FLOOD CONTROL AGENCY SUTTER BUTTE FLOOD CONTROL AGENCY ANNUAL FINANCIAL REPORT For the Fiscal Year Ended SUTTER BUTTE FLOOD CONTROL AGENCY FINANCIAL STATEMENTS JUNE 30, 2016 TABLE OF CONTENTS FINANCIAL SECTION Independent

More information

Flood Plain Management Annual Progress Report September 2014

Flood Plain Management Annual Progress Report September 2014 Flood Plain Management Annual Progress Report September 2014 Flood Plains in the City of Santa Cruz The City of Santa Cruz flood plains encompass the low-lying areas along the San Lorenzo River through

More information

Comprehensive Flood Mitigation for 12,000 Properties

Comprehensive Flood Mitigation for 12,000 Properties Comprehensive Flood Mitigation for 12,000 Properties Lori Rafferty, PE, CFM, Louisville MSD & Louie Greenwell, GISP, CFM, T&M Associates Association of State Floodplain Managers 2014 State Conference June

More information

Locally Operated Levees: Issues and Federal Programs

Locally Operated Levees: Issues and Federal Programs Locally Operated Levees: Issues and Federal Programs Natalie Keegan, Coordinator Analyst in American Federalism and Emergency Management Policy Rawle O. King Specialist in Financial Economics and Risk

More information

Situation: the need for non-structural flood risk reduction measures

Situation: the need for non-structural flood risk reduction measures Evaluating benefits of non-structural measures in flood risk management feasibility studies At left: Example of a house on an open foundation Source Asheville, NC (undated) By Steve Cowdin, CFM; Natalie

More information

Biggert-Waters Flood Insurance Reform and Modernization Act of 2012

Biggert-Waters Flood Insurance Reform and Modernization Act of 2012 Biggert-Waters Flood Insurance Reform and Modernization Act of 2012 On July 6, 2012, President Obama signed into law the Biggert-Waters Flood Insurance Reform Act of 2012, which reauthorizes and reforms

More information

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina

Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina Improving Flood Hazard Identification & Flood Risk Communication: Lessons Learned from Dam Failures in South Carolina Katy Goolsby-Brown June 23, 2016 1 Dam Failure Incidents in South Carolina SC Dam Failures

More information

Existing Manhattan Levee

Existing Manhattan Levee Tuttle Creek Dam and Lake Existing Conditions General location of existing project, Tuttle Creek Lake, and unprotected areas of the City of Manhattan examined in this study. Approximate Unprotected Northern

More information

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects

DRAFT. Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects DRAFT Prioritizing the Implementation of Harris County Flood Control District 2018 Bond Projects February 27, 2019 Purpose This document provides the draft documentation for the Harris County Flood Control

More information

ENGINEERING AND CONSTRUCTION BULLETIN

ENGINEERING AND CONSTRUCTION BULLETIN ENGINEERING AND CONSTRUCTION BULLETIN No. 2016-8 Issuing Office: CECW-CE Issued: 22 Feb 16 Expires: 22 Feb 18 SUBJECT: Interim Risk Reduction Measures (IRRMs) for Levee Safety CATEGORY: Directive and Policy

More information

University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1

University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1 University Drive Flood Risk Management Project Phase I 58 th Ave S to 500 S of 64 th Ave S City of Fargo Project FM-15-C1 Public Informational Meeting October 15, 2015 6:00 P.M. Overview Flood Risk FEMA

More information

Description: This work includes raising the earthen levee from the IHNC to Paris Rd. to the pre-katrina authorized height.

Description: This work includes raising the earthen levee from the IHNC to Paris Rd. to the pre-katrina authorized height. LPV 142 Levee Enlargement Description: This work includes raising the earthen levee from the IHNC to Paris Rd. to the pre-katrina authorized height. Status: The work in the original scope is 82% complete.

More information

MVD 2012 Flood Season Preparedness

MVD 2012 Flood Season Preparedness MVD 2012 Flood Season Preparedness Regional Workshop Identifying, Managing, and Communicating Risk 23 February US Army Corps of Engineers MVD 2012 Flood Season Preparation Scope: Move forward with priority

More information

USACE Rehabilitation and Inspection Program (RIP)

USACE Rehabilitation and Inspection Program (RIP) USACE Rehabilitation and Inspection Program (RIP) Lance Helwig, P.E. Chief, Engineering and Construction Division Jason McBain Levee Safety Program Manager Portland District November 14, 2014 US Army Corps

More information

Total Budget Year 1 - FY Estimated Project Specific Funding. External Deliver Project Contrib Cost Contrib Balance Cost

Total Budget Year 1 - FY Estimated Project Specific Funding. External Deliver Project Contrib Cost Contrib Balance Cost RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 4 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project Title

More information

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination

CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination Date: 8 May 2013 Division: Great Lakes and Ohio River Division District: Nashville District CONTINUING AUTHORITIES PROJECT (CAP) Federal Interest Determination 1. Project: Cumberland River, Metropolitan

More information

IMPLEMENTATION DOCUMENT REVIEW PLAN

IMPLEMENTATION DOCUMENT REVIEW PLAN IMPLEMENTATION DOCUMENT REVIEW PLAN Ohio River Shoreline, Paducah, KY (Paducah, KY LFPP) Reconstruction Project Louisville District MSC Approval Date: 15 January 2013 Last Revision Date: None IMPLEMENTATION

More information

U.S. Updates: Climate Change, Maintenance and Investigations

U.S. Updates: Climate Change, Maintenance and Investigations U.S. Updates: Climate Change, Monitoring, Assessment, Maintenance and Investigations Edward d J. Hecker Chief, Office of Homeland Security and Provost Marshal, Directorate of Civil Works June 15, 2010

More information

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C .t DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. 20314-1000 REPLY TO A TTENTION OF: CECW-PE (l0-1-7a) 1 3 OCT 199B SUBJECT: Tampa Harbor, Big Bend Channel, Florida THE SECRETARY

More information

City of Santa Clarita Engineering Services Division Valencia Boulevard Santa Clarita, CA (661) Levee Certification

City of Santa Clarita Engineering Services Division Valencia Boulevard Santa Clarita, CA (661) Levee Certification City of Santa Clarita Engineering Services Division 23920 Valencia Boulevard Santa Clarita, CA 91355 (661) 255-4942 Levee Certification FEMA is currently updating the nation s flood hazard maps under a

More information

Figure 4-1. ARB IRWMP Governance Structure

Figure 4-1. ARB IRWMP Governance Structure Sec t i on4 I RWMPGov er nanc e o nt e m a r c Sa n o i eg R B AR Contents Contents 4. IRWMP GOVERNANCE... 4-1 4.1. Background... 4-1 4.2. ARB Structure... 4-2 4.2.1. Planning Forum... 4-3 4.2.2. Advisory

More information

CONGRESSIONAL DISTRICT: IN 03

CONGRESSIONAL DISTRICT: IN 03 CONGRESSIONAL DISTRICT: IN 03 80 Steuben Lagrange Angola 69 Kendallville DeKalb Noble Garrett Auburn Kosciusko Warsaw Dam Safety Program (All COE Indiana Dams) Columbia City Allen Whitley Fort Wayne Olmsted

More information

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter

NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter Agenda Date: 6/7/2016 Agenda Placement: 8A Set Time: 1:30 PM PUBLIC HEARING Estimated Report Time: 20 Minutes NAPA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Board Agenda Letter TO: FROM: Board

More information

Modernization, FEMA is Recognizing the connection between damage reduction and

Modernization, FEMA is Recognizing the connection between damage reduction and EXECUTIVE SUMMARY Every year, devastating floods impact the Nation by taking lives and damaging homes, businesses, public infrastructure, and other property. This damage could be reduced significantly

More information

FEMA s Flood Map Modernization Preparing for FY09 and Beyond: Integrated Flood Data Update, Risk Assessment, and Mitigation Planning

FEMA s Flood Map Modernization Preparing for FY09 and Beyond: Integrated Flood Data Update, Risk Assessment, and Mitigation Planning FEMA s Flood Map Modernization Preparing for FY09 and Beyond: Integrated Flood Data Update, Risk Assessment, and Mitigation Planning DRAFT CONCEPT PAPER June 1, 2007 Integrated Flood Data Update, Risk

More information

Living with levees: using tolerable risk guidelines in California

Living with levees: using tolerable risk guidelines in California Living with levees: using tolerable risk guidelines in California Jessica Ludy, CFM. Arcadis-U.S. Inc. Larry Roth, G.E., P.E., Arcadis-US, Inc. Dustin Jones, P.E., Delta Stewardship Council 1 Hoogwater

More information